Safety monitoring method and equipment for tunnel construction, medium and product
By acquiring tunnel design documents and construction specifications, analyzing monitoring targets and deploying sensors, and combining real-time data and image recognition technology, the problem of low efficiency in tunnel construction safety monitoring has been solved, enabling efficient and accurate identification of safety hazards and emergency response.
Patent Information
- Application Number
- CN202411169491.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-24
- Publication Date
- 2024-11-12
AI Technical Summary
Existing tunnel construction safety monitoring methods rely on manual inspections and traditional monitoring techniques, which are inefficient and cannot fully reflect the internal structural condition of the tunnel, thus failing to effectively identify potential safety hazards.
By acquiring tunnel design documents and construction safety specifications, analyzing monitoring targets, determining sensor deployment information, and acquiring sensor data in real time for construction safety analysis, combined with on-site image recognition of operational behavior, the safety monitoring results are comprehensively evaluated.
It improves the efficiency and accuracy of tunnel construction safety monitoring, enables rapid response to safety hazards, ensures project quality and progress, reduces delays caused by human intervention, optimizes sensor layout, and reduces risks to construction personnel.
Smart Images

Figure CN118934060A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of safety monitoring, and in particular to a safety monitoring method, equipment, medium and product for tunnel construction. Background Art
[0002] With the acceleration of urbanization and the rapid development of infrastructure construction, tunnels, as an important part of modern transportation infrastructure, play a key role in overcoming complex terrain, especially geographical barriers in mountainous and urban areas. Tunnels can not only significantly shorten the travel distance of roads and railways, but also effectively improve the connectivity of subway systems and the efficiency of overall traffic flow. However, the safety hazards in the tunnel construction process cannot be ignored, especially the construction safety issues are directly related to the life safety of construction workers and the progress of the project.
[0003] At present, tunnel construction safety inspection mainly relies on manual inspection and traditional monitoring methods, such as regular measurement of the tunnel surface through measuring instruments, or real-time monitoring of the tunnel interior through video surveillance systems. However, the traditional tunnel construction safety monitoring method requires manual inspection, resulting in low efficiency of safety inspection. At the same time, only obtaining information on the tunnel surface makes it difficult to fully reflect the structural status and potential safety hazards inside the tunnel.
[0004] Therefore, how to improve the efficiency and accuracy of tunnel construction safety monitoring is an urgent problem to be solved by technical personnel in this field. Summary of the invention
[0005] The purpose of this application is to provide a tunnel construction safety monitoring method, equipment, medium and product to solve at least one of the above technical problems.
[0006] The above invention objectives of the present application are achieved through the following technical solutions: In a first aspect, the present application provides a tunnel construction safety monitoring method, which adopts the following technical solution: A safety monitoring method for tunnel construction, comprising: Obtaining tunnel design documents and construction safety specifications, performing monitoring target analysis based on the tunnel design documents and the construction safety specifications, and determining safety monitoring targets; Performing sensor deployment analysis based on the safety monitoring target and the tunnel design file to determine sensor deployment information, wherein the sensor deployment information includes: sensor type, sensor specification, and sensor installation information; Sending the sensor deployment information to the installer's mobile terminal so that the installer can complete the deployment operation of all sensors according to the sensor deployment information; When the sensor deployment completion instruction is detected, the sensor data emitted by each sensor is acquired in real time, and a construction safety analysis is performed based on each of the sensor data to determine the environmental safety monitoring results.
[0007] By adopting the above technical solution, the tunnel design documents and construction safety specifications are obtained, and the monitoring target analysis is performed based on the tunnel design documents and construction safety specifications to determine the safety monitoring target. Then, the sensor deployment analysis is performed based on the safety monitoring target and tunnel design documents to determine the sensor deployment information, and the sensor deployment information is sent to the installer's mobile terminal so that the installer can complete the deployment operation of all sensors according to the sensor deployment information. Sensors are scientifically deployed according to the tunnel design documents and safety monitoring targets to ensure that the monitoring points are fully and reasonably covered, which can accurately reflect the various safety indicators in the tunnel construction process and improve the accuracy and reliability of the monitoring data. When the sensor deployment completion instruction is detected, the sensor data sent by each sensor is obtained in real time, and the construction safety analysis is performed based on each sensor data to determine the environmental safety monitoring results. Real-time acquisition of sensor data and construction safety analysis can quickly respond to safety hazards in the construction process and improve the efficiency and accuracy of tunnel construction safety monitoring.
[0008] In a preferred example, the present application may be further configured as follows: after the real-time acquisition of sensor data sent by each sensor, the method further includes: Acquire a tunnel construction site image, perform construction operation recognition based on the tunnel construction site image, and obtain construction operations corresponding to construction personnel; An operation safety assessment is performed based on the construction operation and the construction safety specification to determine an operation safety monitoring result.
[0009] In a preferred example, the present application may be further configured as follows: after performing construction safety analysis based on each of the sensor data and determining the environmental safety monitoring result, the application may further include: Based on the environmental safety monitoring results and the operational safety monitoring results, the monitoring results are integrated to determine the target safety monitoring results; When the target safety monitoring result is abnormal, risk assessment is performed based on abnormal data to determine tunnel risk information, wherein the abnormal data is data determined to be abnormal in the operation safety assessment and / or construction safety analysis; Perform emergency measures analysis based on the tunnel risk information and determine target emergency measures; When the target safety monitoring result is normal, the sensor data and tunnel construction site images acquired in real time are classified and stored, so as to improve the data retrieval speed when there is a subsequent query request.
[0010] In a preferred example, the present application may be further configured as follows: after performing emergency measures analysis based on the tunnel risk information and determining target emergency measures, the application may further include: Screening intelligent robots based on the tunnel risk information and determining target intelligent robots; Based on the target emergency measures, intelligent operation analysis is performed to determine the work information corresponding to the target intelligent robot, and the target intelligent robot is controlled to perform intelligent operations according to the work information to reduce the operational risks of construction personnel.
[0011] In a preferred example, the present application may be further configured as follows: after performing sensor deployment analysis based on the safety monitoring target and the tunnel design file and determining the sensor deployment information, the configuration further includes: Building a model based on the tunnel design file to obtain a three-dimensional model of the tunnel, and integrating sensors on the three-dimensional model of the tunnel based on the sensor deployment information to obtain a three-dimensional monitoring model; Based on the sensor specifications and the sensor type in the sensor deployment information, a field of view simulation is performed in the monitoring three-dimensional model, and a deployment analysis is performed based on the coverage area corresponding to the field of view simulation to obtain a sensor deployment report.
[0012] In a preferred example, the present application may be further configured as follows: performing construction safety analysis based on each of the sensor data to determine the environmental safety monitoring results includes: Performing a fusion operation based on each of the sensor data to obtain fused sensor data, wherein the fusion operation is used to accurately and comprehensively characterize the current safety status of the tunnel construction; Perform feature extraction based on the fused sensor data to obtain safety analysis and evaluation features; A construction safety analysis model is obtained, the safety analysis assessment feature is input into the construction safety analysis model, and an output result of the construction safety analysis model is determined as an environmental safety monitoring result.
[0013] In a second aspect, the present application provides an electronic device, which adopts the following technical solution: at least one processor; Memory; At least one application, wherein the at least one application is stored in a memory and configured to be executed by at least one processor, and the at least one application is configured to: execute the above-mentioned tunnel construction safety monitoring method.
[0014] In a third aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution: A computer-readable storage medium stores a computer program, which, when executed in a computer, causes the computer to execute the above-mentioned tunnel construction safety monitoring method.
[0015] In a fourth aspect, the present application provides a computer program product, which adopts the following technical solution: A computer program product comprises a computer program, wherein when the computer program is executed by a processor, the safety monitoring method for tunnel construction is implemented.
[0016] In summary, the present application includes at least one of the following beneficial technical effects: Obtain tunnel design documents and construction safety specifications, analyze monitoring targets based on tunnel design documents and construction safety specifications, and determine safety monitoring targets. Then, perform sensor deployment analysis based on safety monitoring targets and tunnel design documents, determine sensor deployment information, and send the sensor deployment information to the installer's mobile terminal so that the installer can complete the deployment of all sensors according to the sensor deployment information. Scientifically deploy sensors according to tunnel design documents and safety monitoring targets to ensure that monitoring points are fully and reasonably covered, accurately reflect various safety indicators during tunnel construction, and improve the accuracy and reliability of monitoring data. When the sensor deployment completion instruction is detected, obtain the sensor data sent by each sensor in real time, perform construction safety analysis based on each sensor data, and determine the environmental safety monitoring results. Real-time acquisition of sensor data and construction safety analysis can quickly respond to safety hazards during construction and improve the efficiency and accuracy of tunnel construction safety monitoring.
[0017] Acquire tunnel construction site images, identify construction operations based on tunnel construction site images, obtain the corresponding construction operations of construction personnel, and conduct operation safety assessment based on construction operations and construction safety specifications to determine the operation safety monitoring results. Identifying the operation behavior of construction personnel helps to promptly discover and correct unsafe behaviors, prevent construction accidents, promptly discover and solve problems in construction, and ensure project quality and progress. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a flow chart of a safety monitoring method for tunnel construction according to one embodiment of the present application; Figure 2 It is a structural schematic diagram of a safety monitoring device for tunnel construction according to one embodiment of the present application; Figure 3 It is a structural schematic diagram of an electronic device according to one embodiment of the present application. DETAILED DESCRIPTION
[0019] The following combination Figures 1 to 3This application is described in further detail.
[0020] This specific embodiment is merely an explanation of the present application and is not a limitation of the present application. After reading this specification, a person skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by the patent law as long as they are within the scope of the present application.
[0021] In order to make the purpose, technical scheme and advantages of the embodiment of the present application clearer, the technical scheme in the embodiment of the present application will be clearly and completely described in conjunction with the drawings in the embodiment of the present application. Obviously, the described embodiment is a part of the embodiment of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application. It should be noted that in the optional embodiments of the present application, the object information and other related data involved, when the embodiments in the present application are applied to specific products or technologies, need to obtain the permission or consent of the object, and the collection, use and processing of the relevant data need to comply with the relevant laws, regulations and standards of the relevant countries and regions. In other words, if the data related to the object is involved in the embodiment of the present application, it needs to be obtained through the authorization and consent of the object, the authorization and consent of the relevant departments, and in accordance with the relevant laws, regulations and standards of the country and region. If personal information is involved in the embodiment, the acquisition of all personal information needs to obtain the consent of the individual. If sensitive information is involved, the separate consent of the information subject needs to be obtained, and the embodiment also needs to be implemented with the authorization and consent of the object.
[0022] In addition, the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.
[0023] The embodiments of the present application are further described in detail below in conjunction with the drawings in the specification.
[0024] The embodiment of the present application provides a method for monitoring the safety of tunnel construction, which is performed by an electronic device, which can be a server or a terminal device, wherein the server can be an independent physical server, or a server cluster or distributed system composed of multiple physical servers, or a cloud server that provides cloud computing services. The terminal device can be a smart phone, a tablet computer, a laptop computer, a desktop computer, etc., but is not limited thereto. The terminal device and the server can be directly or indirectly connected via wired or wireless communication, which is not limited in the embodiment of the present application. Figure 1As shown, the method includes step S101, step S102, step S103 and step S104, wherein: Step S101: Obtain tunnel design documents and construction safety specifications, perform monitoring target analysis based on the tunnel design documents and construction safety specifications, and determine safety monitoring targets.
[0025] For the embodiment of the present application, the tunnel design documents and construction safety specifications are obtained. The tunnel design documents are usually provided by the design unit or the owner unit, including but not limited to: tunnel design drawings, geological survey reports, structural design instructions, etc. The tunnel design documents describe in detail the key information such as the geometric dimensions, structural design, material selection, construction technology and geological conditions of the tunnel. The construction safety specifications are usually issued by the industry supervisor or standardization organization, and the specifications contain the safety requirements, operating procedures, protective measures and emergency treatment in the tunnel construction process. Then, based on the tunnel design documents and construction safety specifications, the monitoring target analysis is carried out to determine the safety monitoring target, that is, by deeply analyzing the tunnel design documents and construction safety specifications to foresee various safety risks that may be encountered during the construction process, so as to set the safety monitoring targets and parameter indicators in a targeted manner. For example, the safety monitoring targets include but are not limited to: the stability of the tunnel surrounding rock, the stress condition of the support structure, the change of groundwater pressure, the safety of construction machinery operation, etc., and the parameter indicators include but are not limited to: the deformation of the surrounding rock, the stress value of the support structure, the groundwater pressure, etc. By analyzing tunnel design documents and construction safety specifications, we can identify the safety risks that may be faced during tunnel construction, so that we can set safety monitoring goals and parameter indicators in a targeted manner, so that the monitoring work can be focused on key areas, improving the effectiveness and pertinence of safety monitoring.
[0026] Step S102: performing sensor deployment analysis based on the safety monitoring target and the tunnel design document to determine sensor deployment information, wherein the sensor deployment information includes: sensor type, sensor specification, and sensor installation information; Step S103: Send the sensor deployment information to the installer's mobile terminal so that the installer can complete the deployment operation of all sensors according to the sensor deployment information.
[0027] For the embodiments of the present application, the sensor deployment analysis is performed based on the safety monitoring target and the tunnel design file to determine the sensor deployment information. Specifically, the sensor type that meets the requirements is selected according to the safety monitoring target. Since different sensor types have different monitoring dimensions and monitoring focuses, the corresponding relationship between the monitoring target and the sensor type is pre-stored in the electronic device so that the sensor type can be quickly and accurately determined based on the safety monitoring target. For example, the displacement sensor is used to monitor the displacement change of the tunnel structure; the stress strain sensor is used to monitor the stress strain state of the support structure; the environmental monitoring sensor is used to monitor the air quality, noise, vibration, etc. in the construction environment; the construction machinery monitoring sensor is used to monitor the operating status of the construction machinery. After the sensor type is determined, the sensor specifications are determined based on the monitoring requirements in the tunnel design file and the specification table corresponding to the sensor, where the sensor specifications include but are not limited to: sensor measurement range, accuracy, stability and durability and other operations. Then, the installation location analysis is performed based on the tunnel design documents and safety monitoring objectives to determine the installation location of the sensor, so that the sensor can accurately reflect the status of the tunnel construction after installation, which is convenient for tunnel construction and maintenance. For example, stress strain sensors are installed at key parts of the tunnel lining to monitor its stress conditions; environmental monitoring sensors are installed at the tunnel entrance to monitor the safety of the construction environment. At the same time, the appropriate installation method can be determined according to the sensor type and sensor specifications. The installation method should ensure that the sensor can work stably and reliably and reduce external interference. For example, for displacement sensors, fixed brackets or embedded installations can be used. On this basis, the wiring and communication methods of the sensors can also be planned, including but not limited to: the cable direction of the sensor, the location of the connector, the communication protocol, etc. Finally, the installation location, installation method, wiring and communication method of the sensor are comprehensively considered to determine the sensor installation information.
[0028] After that, the sensor deployment information is sent to the installer's mobile terminal so that the installer can complete the deployment of all sensors according to the sensor deployment information. Sensors are scientifically deployed according to tunnel design documents and safety monitoring objectives to ensure that the monitoring points are fully and reasonably covered, accurately reflect various safety indicators during tunnel construction, and improve the accuracy and reliability of monitoring data.
[0029] Step S104: When the sensor deployment completion instruction is detected, the sensor data emitted by each sensor is acquired in real time, and a construction safety analysis is performed based on each sensor data to determine the environmental safety monitoring result.
[0030] For the embodiment of the present application, when the sensor deployment completion instruction is detected, the characterization sensor has been deployed at the tunnel construction site, and the corresponding data communication interface is configured for each sensor type, and a stable data communication is established between the electronic device and the sensor to achieve the operation purpose of obtaining the sensor data sent by each sensor in real time. Of course, the collected sensor data can also be stored in the database for subsequent analysis and query. In order to improve the data query performance, a distributed database or an inter-sequence database is used to optimize the storage of large amounts of data. Furthermore, a construction safety analysis is performed based on each sensor data to determine the environmental safety monitoring result. There are many ways to analyze the construction safety, and the embodiment of the present application is no longer limited. In an achievable manner, a standard range is set for each sensor data in the electronic device, and matching is performed based on the sensor data and the corresponding standard range. If there is sensor data that is not within the standard range, the environmental safety monitoring result is determined to be environmental safety abnormality, otherwise, the environmental safety monitoring result is determined to be environmental safety normal. In another feasible way, a fusion operation is performed based on each sensor data to obtain fused sensor data, wherein the fusion operation is used to accurately and comprehensively characterize the current safety status of the tunnel construction; feature extraction is performed based on the fused sensor data to obtain safety analysis and evaluation features; a construction safety analysis model is obtained, the safety analysis and evaluation features are input into the construction safety analysis model, and the output result of the construction safety analysis model is determined as the environmental safety monitoring result. Deploying different types of sensors in the tunnel construction environment in advance, acquiring sensor data in real time and performing construction safety analysis can quickly respond to safety hazards in the construction process, and improve the efficiency and accuracy of tunnel construction safety monitoring.
[0031] It can be seen that in the embodiment of the present application, the tunnel design documents and construction safety specifications are obtained, and the monitoring target analysis is performed based on the tunnel design documents and construction safety specifications to determine the safety monitoring target. Then, the sensor deployment analysis is performed based on the safety monitoring target and the tunnel design documents, the sensor deployment information is determined, and the sensor deployment information is sent to the installer's mobile terminal so that the installer can complete the deployment operation of all sensors according to the sensor deployment information. Sensors are scientifically deployed according to the tunnel design documents and safety monitoring targets to ensure that the monitoring points are fully and reasonably covered, and can accurately reflect various safety indicators during the tunnel construction process, thereby improving the accuracy and reliability of the monitoring data. When the sensor deployment completion instruction is detected, the sensor data emitted by each sensor is obtained in real time, and a construction safety analysis is performed based on each sensor data to determine the environmental safety monitoring results. Real-time acquisition of sensor data and construction safety analysis can quickly respond to safety hazards during the construction process, thereby improving the efficiency and accuracy of tunnel construction safety monitoring.
[0032] Furthermore, in order to timely discover and correct unsafe behaviors and prevent construction accidents, in the embodiment of the present application, after obtaining the sensor data sent by each sensor in real time, the following steps are also included: Acquire tunnel construction site images, identify construction operations based on the tunnel construction site images, and obtain corresponding construction operations of construction personnel; Conduct operational safety assessments based on construction operations and construction safety specifications to determine operational safety monitoring results.
[0033] For the embodiments of the present application, the operating behavior of the construction personnel has a direct impact on the construction safety. In the process of performing safety monitoring of tunnel construction, identifying the operating behavior of the construction personnel helps to timely discover and correct unsafe behaviors and prevent construction accidents. By comprehensively monitoring the construction environment and construction operations, it helps to timely discover and solve problems in the construction and ensure the quality and progress of the project.
[0034] Specifically, image acquisition equipment is installed at the tunnel construction site to ensure that the monitoring area can cover the construction personnel's operation area and key construction links. Then, the image acquisition equipment sends the real-time image to the electronic device by wireless means to realize the operation of obtaining the tunnel construction site image. Then, the tunnel construction site image is preprocessed to improve the image quality and the accuracy of subsequent construction operation recognition. The preprocessing includes but is not limited to: denoising, enhancement, scaling and other operations. Then, the image recognition algorithm (for example, deep learning algorithm, computer vision algorithm, etc.) is used to extract features from the preprocessed tunnel construction site image, extract key features related to the construction operation, and compare the extracted key features with the preset construction operation template, and identify the specific construction operation of the construction personnel through pattern recognition or classification algorithm. A database containing various types of construction safety specifications is pre-stored in the electronic device. The specification database includes both feature data corresponding to standard operations and feature data corresponding to illegal operations, so that the identified construction operations can be compared with the specifications in the construction safety specification database to evaluate whether the construction operations comply with the safety specifications. Based on the evaluation results, the operation safety monitoring results are determined. The operation safety monitoring results can be divided into different levels such as safety, warning, and danger.
[0035] It can be seen that in the embodiment of the present application, the tunnel construction site image is obtained, the construction operation is identified based on the tunnel construction site image, the construction operation corresponding to the construction personnel is obtained, and the operation safety assessment is performed based on the construction operation and construction safety specifications to determine the operation safety monitoring results. Identifying the operation behavior of construction personnel helps to promptly discover and correct unsafe behaviors, prevent the occurrence of construction accidents, promptly discover and solve problems in construction, and ensure the quality and progress of the project.
[0036] Furthermore, in order to improve the accuracy and reliability of tunnel construction safety monitoring and increase the data retrieval speed, in the embodiment of the present application, after performing construction safety analysis based on each sensor data and determining the environmental safety monitoring result, it also includes: Based on the environmental safety monitoring results and operational safety monitoring results, the monitoring results are integrated to determine the target safety monitoring results; When the target safety monitoring result is abnormal, a risk assessment is performed based on the abnormal data to determine the tunnel risk information, wherein the abnormal data is data determined to be abnormal in the operation safety assessment and / or construction safety analysis; Conduct emergency measures analysis based on tunnel risk information and determine target emergency measures; When the target safety monitoring result is normal, the real-time sensor data and tunnel construction site images are classified and stored to improve the data retrieval speed when there is a subsequent query request.
[0037] For the embodiment of the present application, the environmental safety monitoring results include: environmental safety abnormality and environmental safety normal, and the operational safety monitoring results include: safe, warning, and dangerous. Therefore, the monitoring results are integrated based on the environmental safety monitoring results and the operational safety monitoring results to determine the target safety monitoring results. Only when the environmental safety monitoring result is environmental safety normal and the operational safety monitoring result is safe, the target safety monitoring result is determined to be normal; otherwise, the target safety monitoring result is determined to be abnormal. By integrating the environmental safety monitoring results and the operational safety monitoring results, the safety status during the tunnel construction process can be more comprehensively and accurately reflected. This comprehensive monitoring method avoids the limitations of a single monitoring method and improves the accuracy and reliability of tunnel construction safety monitoring.
[0038] When the target safety monitoring result is abnormal, the abnormal data is identified from the results of the operation safety assessment and / or construction safety analysis. The abnormal data may involve data such as the operation behavior of the construction personnel not meeting the specifications and the environmental parameters monitored by the sensor exceeding the safety threshold. Then, the identified abnormal data is classified to distinguish whether it is an abnormality related to operation safety or an abnormality related to construction safety, or both. At the same time, the relevant abnormal data is integrated to form a complete abnormal data set. The pre-established risk assessment model is obtained, and the abnormal data set is processed using the risk assessment model to assess the risk type, risk level and consequences of the risk faced by the tunnel construction, and determine it as tunnel risk information. Among them, the risk assessment model is obtained by training the machine learning algorithm model using the subordinate data. An emergency measures library is constructed in advance, which includes emergency response plans for different types and levels of risks, and lists in detail the emergency measures, execution steps, responsible departments or personnel corresponding to each risk. Then, the determined tunnel risk information is matched with the emergency treatment plan in the emergency measures library, and the most appropriate emergency measures are determined according to the risk type and risk level; if there are multiple emergency measures that need to be considered at the same time, the emergency measures should be prioritized according to the urgency and impact range of the risk to ensure that the most important and urgent emergency measures are implemented first. Finally, the appropriate emergency measures, or the set of emergency measures after priority sorting, will be determined as the target emergency measures. The intelligent emergency response mechanism can quickly launch the corresponding emergency plan, reduce delays and errors in human intervention, and improve the efficiency and accuracy of emergency response.
[0039] At the same time, when the target safety monitoring result is normal, the real-time sensor data and tunnel construction site images are classified and stored, that is, sensor data is classified and stored according to the monitoring target, sensor type, time and other dimensions; tunnel construction site images are classified and stored according to the monitoring area, monitoring time and other dimensions, and indexes are set to improve the retrieval speed. The database stored in the classification has efficient data retrieval and query functions, which is convenient for subsequent query requests to improve the data retrieval speed, providing strong support for construction safety management and decision support.
[0040] It can be seen that in the embodiment of the present application, the monitoring results are integrated based on the environmental safety monitoring results and the operational safety monitoring results to determine the target safety monitoring results. By integrating the environmental safety monitoring results and the operational safety monitoring results, the safety status during the tunnel construction process can be more comprehensively and accurately reflected. This comprehensive monitoring method avoids the limitations of a single monitoring method and improves the accuracy and reliability of tunnel construction safety monitoring. When the target safety monitoring result is abnormal, a risk assessment is performed based on the abnormal data to determine the tunnel risk information, and an emergency measures analysis is performed based on the tunnel risk information to determine the target emergency measures. The intelligent emergency response mechanism can quickly initiate the corresponding emergency plan, reduce delays and errors in human intervention, and improve the efficiency and accuracy of emergency response. At the same time, when the target safety monitoring result is normal, the sensor data and tunnel construction site images acquired in real time are classified and stored to facilitate subsequent query requests and improve data retrieval speed.
[0041] Furthermore, in order to reduce the operation risk of construction personnel, in the embodiment of the present application, after performing emergency measures analysis based on tunnel risk information and determining target emergency measures, the following steps are also included: Screen intelligent robots based on tunnel risk information and determine target intelligent robots; Intelligent operation analysis is performed based on the target emergency measures to determine the corresponding work information of the target intelligent robot, and the target intelligent robot is controlled to perform intelligent operations according to the work information to reduce the operational risks of construction personnel.
[0042] For the embodiments of the present application, the capabilities of the available intelligent robots are analyzed in advance to clarify the functional characteristics, scope of application, performance indicators, etc. of each robot. According to the tunnel risk information, the current tunnel risk type and the required response capabilities are determined, such as inspection, maintenance, cleaning, rescue, etc. Then, according to the tunnel risk type and the required response capabilities, a screening strategy for intelligent robots is formulated. The screening strategy includes but is not limited to: the correspondence between the tunnel risk type and the type, quantity, and configuration requirements of the robot. Furthermore, based on the screening strategy and tunnel risk information, the target intelligent robot is determined from the available intelligent robots, wherein the target robot should be able to provide effective response measures for the current tunnel risk. Then, according to the actual situation in the tunnel, the deployment location and path of the target intelligent robot are planned to ensure that it can smoothly reach the operating area.
[0043] After that, intelligent operation analysis is performed based on the target emergency measures to determine the work information corresponding to the target intelligent robot, where the work information includes but is not limited to: task objectives, work areas, work paths, work time, work requirements, etc. For example, when the target emergency measures are tunnel inspections, the work information corresponding to the target intelligent robot may include: the tunnel section to be inspected, the frequency of inspections, the content of the inspections (such as cracks, water seepage, etc.), and the recording method of the inspection results, etc. Then, the target intelligent robot is controlled to perform intelligent operations according to the planned work paths and task objectives, and the working status and work effects of the target intelligent robot are monitored in real time. Using intelligent robots to perform tasks in high-risk areas reduces the necessity for construction personnel to enter high-risk areas, thereby reducing the operational risks of construction personnel.
[0044] It can be seen that in the embodiment of the present application, intelligent robots are screened based on tunnel risk information to determine the target intelligent robot. Then, intelligent operation analysis is performed based on the target emergency measures to determine the work information corresponding to the target intelligent robot, and the target intelligent robot is controlled to perform intelligent operations according to the work information to reduce the operational risks of construction personnel.
[0045] Furthermore, in order to optimize the layout of sensors, ensure that there are no blind spots in monitoring, and improve monitoring efficiency and accuracy, in the embodiment of the present application, after performing sensor deployment analysis based on the safety monitoring target and the tunnel design file and determining the sensor deployment information, it also includes: The model is built based on the tunnel design file to obtain a three-dimensional model of the tunnel, and the sensor is integrated on the three-dimensional model of the tunnel based on the sensor deployment information to obtain a three-dimensional monitoring model; Based on the sensor specifications and sensor types in the sensor deployment information, a field of view simulation is performed in the monitoring three-dimensional model, and a deployment analysis is performed based on the coverage area corresponding to the field of view simulation to obtain a sensor deployment report.
[0046] For the embodiment of the present application, in the process of executing the model building, a professional three-dimensional modeling software is used to build a three-dimensional model of the tunnel according to the tunnel design file, and the geometric shape, structural features and surrounding environment (for example, terrain, landform, buildings, etc.) of the tunnel are summarized and accurately displayed in the three-dimensional model of the tunnel. The three-dimensional model of the tunnel built by the tunnel design file can accurately present the key information such as the structure, size, layout, etc. of the tunnel, so that the designer can intuitively understand the tunnel morphology and improve the design accuracy. Then, according to the sensor deployment information, the three-dimensional model corresponding to the sensor is placed at the corresponding position in the three-dimensional model of the tunnel to obtain a monitoring three-dimensional model, wherein the size, direction, angle and other parameters of the sensor model in the monitoring three-dimensional model are consistent with the actual deployment situation. After that, based on the sensor specifications and sensor types in the sensor deployment information, the field of view simulation is performed in the monitoring three-dimensional model, that is, the monitoring area corresponding to each sensor is drawn using a visualization tool. Through the field of view simulation technology, the monitoring range and coverage area of each sensor can be intuitively displayed, so as to carry out scientific deployment analysis, which helps to optimize the layout of the sensor, ensure that there is no blind spot in the monitoring, and improve the monitoring efficiency and accuracy.
[0047] Then, deployment analysis is performed based on the coverage area corresponding to the field of view simulation. During the deployment analysis process, it is necessary to determine whether there are blind spots in the monitoring three-dimensional model that are not covered by the sensor monitoring area. Special attention should be paid to complex areas such as tunnel entrances and exits, intersections, and turns to ensure that there are no blind spots in the monitoring of these areas. Of course, it is also possible to check whether there is overlap in the sensor monitoring area and determine whether the area of the overlapping area is greater than the overlapping area threshold. The overlapping area threshold is determined by the relevant technical personnel who deploy the sensor based on a large number of experimental operations. When the area of the overlapping area is greater than the overlapping area threshold, it indicates that the distribution position of the sensor is unreasonable. It is possible to consider adjusting the position or parameters of the sensor to reduce redundant monitoring and ensure the effective use of monitoring resources. Finally, a sensor deployment report is written, which records the deployment of the sensor, the monitoring range evaluation results, and optimization suggestions in detail.
[0048] It can be seen that in the embodiment of the present application, a model is built based on the tunnel design file to obtain a three-dimensional model of the tunnel, and sensors are integrated on the three-dimensional model of the tunnel based on the sensor deployment information to obtain a monitoring three-dimensional model. Then, based on the sensor specifications and sensor types in the sensor deployment information, a field of view simulation is performed in the monitoring three-dimensional model. Through the field of view simulation technology, the monitoring range and coverage area of each sensor can be intuitively displayed, so as to perform scientific deployment analysis, which helps to optimize the layout of sensors, ensure that there are no blind spots in monitoring, and improve monitoring efficiency and accuracy. Furthermore, a deployment analysis is performed based on the coverage area corresponding to the field of view simulation to obtain a sensor deployment report.
[0049] Furthermore, in order to improve the accuracy and completeness of the sensor data, in the embodiment of the present application, a construction safety analysis is performed based on each sensor data to determine the environmental safety monitoring results, including: Performing a fusion operation based on each sensor data to obtain fused sensor data, wherein the fusion operation is used to accurately and comprehensively characterize the current safety status of the tunnel construction; Extract features based on fused sensor data to obtain safety analysis and evaluation features; A construction safety analysis model is obtained, the safety analysis assessment characteristics are input into the construction safety analysis model, and the output result of the construction safety analysis model is determined as the environmental safety monitoring result.
[0050] For the embodiments of the present application, different types of sensors have different sensing capabilities and precisions. The sensor data corresponding to different types of sensors are fused, and the sensor data complement each other, thereby improving the accuracy and integrity of the sensor data. For sensors of the same type, a single sensor may be affected by environmental noise or the accuracy limitations of the device itself, resulting in errors in the data. Through data fusion, the data redundancy of multiple sensors can be utilized to effectively suppress noise and improve data reliability.
[0051] Therefore, time synchronization and coordinate conversion operations are performed for each sensor data so that the timestamps of all sensors are unified to the same reference time, the data are converted in the same coordinate system, and the fusion algorithm is used to fuse the sensor data to obtain more comprehensive and accurate information. The fusion algorithm includes but is not limited to: weighted average method, Kalman filter, Bayesian method, machine learning algorithm, etc. Then, key features are extracted from the fused sensor data as safety analysis and evaluation features, which can reflect the safety status of the tunnel construction environment. The safety analysis and evaluation features include but are not limited to: deformation, stress distribution, temperature gradient, humidity change, harmful gas concentration, etc. of the tunnel. The specific method of feature extraction depends on the type and nature of the sensor data. For example, for image data, algorithms such as SIFT (Scale Invariant Feature Transform) or SURF (Speeded Robust Feature) can be used to extract key points in the image; for time series data, methods such as FFT (Fast Fourier Transform) or DWT (Discrete Wavelet Transform) can be used to extract frequency features. Then, a construction safety analysis model is obtained, and the extracted safety analysis and evaluation features are input into the trained construction safety analysis model. The construction safety analysis model performs reasoning and calculation based on the safety analysis and evaluation features, and outputs environmental safety monitoring results. The construction safety analysis model is obtained by training a deep learning model using a large amount of historical data. During the training process, the parameters and structure of the model need to be continuously adjusted to improve the accuracy and generalization ability of the model.
[0052] It can be seen that in the embodiment of the present application, a fusion operation is performed based on each sensor data to obtain fused sensor data, and the sensor data complement each other, thereby improving the accuracy and completeness of the sensor data. Then, feature extraction is performed based on the fused sensor data to obtain safety analysis and evaluation features, and the safety analysis and evaluation features are input into the construction safety analysis model, and the output result of the construction safety analysis model is determined as the environmental safety monitoring result.
[0053] The above-mentioned embodiment introduces a safety monitoring method for tunnel construction from the perspective of method flow, and the following embodiment introduces a safety monitoring device for tunnel construction from the perspective of a virtual module or a virtual unit. For details, please refer to the following embodiments.
[0054] The present application embodiment provides a safety monitoring device for tunnel construction, such as Figure 2 As shown, the safety monitoring device for tunnel construction may specifically include: A monitoring target analysis module 210 is used to obtain tunnel design documents and construction safety specifications, perform monitoring target analysis based on the tunnel design documents and construction safety specifications, and determine safety monitoring targets; The sensor deployment analysis module 220 is used to perform sensor deployment analysis based on the safety monitoring target and the tunnel design file to determine the sensor deployment information, wherein the sensor deployment information includes: sensor type, sensor specification, and sensor installation information; A deployment information sending module 230 is used to send the sensor deployment information to the installer's mobile terminal so that the installer can complete the deployment operation of all sensors according to the sensor deployment information; The construction safety analysis module 240 is used to obtain the sensor data sent by each sensor in real time when the sensor deployment completion instruction is detected, perform construction safety analysis based on each sensor data, and determine the environmental safety monitoring results.
[0055] For the embodiment of the present application, the tunnel design documents and construction safety specifications are obtained, and the monitoring target analysis is performed based on the tunnel design documents and construction safety specifications to determine the safety monitoring target. Then, the sensor deployment analysis is performed based on the safety monitoring target and the tunnel design documents, the sensor deployment information is determined, and the sensor deployment information is sent to the installer's mobile terminal so that the installer can complete the deployment operation of all sensors according to the sensor deployment information. Sensors are scientifically deployed according to the tunnel design documents and safety monitoring targets to ensure that the monitoring points are fully and reasonably covered, and can accurately reflect various safety indicators during the tunnel construction process, thereby improving the accuracy and reliability of the monitoring data. When the sensor deployment completion instruction is detected, the sensor data emitted by each sensor is obtained in real time, and a construction safety analysis is performed based on each sensor data to determine the environmental safety monitoring results. Real-time acquisition of sensor data and construction safety analysis can quickly respond to safety hazards during the construction process, thereby improving the efficiency and accuracy of tunnel construction safety monitoring.
[0056] In a possible implementation of the embodiment of the present application, the safety monitoring device for tunnel construction further includes: A construction operation recognition module is used to obtain tunnel construction site images, perform construction operation recognition based on the tunnel construction site images, and obtain the construction operations corresponding to the construction personnel; Conduct operational safety assessments based on construction operations and construction safety specifications to determine operational safety monitoring results.
[0057] In a possible implementation of the embodiment of the present application, the safety monitoring device for tunnel construction further includes: The risk assessment module is used to integrate the monitoring results based on the environmental safety monitoring results and the operational safety monitoring results to determine the target safety monitoring results; When the target safety monitoring result is abnormal, a risk assessment is performed based on the abnormal data to determine the tunnel risk information, wherein the abnormal data is data determined to be abnormal in the operation safety assessment and / or construction safety analysis; Conduct emergency measures analysis based on tunnel risk information and determine target emergency measures; When the target safety monitoring result is normal, the real-time sensor data and tunnel construction site images are classified and stored to improve the data retrieval speed when there is a subsequent query request.
[0058] In a possible implementation of the embodiment of the present application, the safety monitoring device for tunnel construction further includes: An intelligent robot screening module is used to screen intelligent robots based on tunnel risk information and determine target intelligent robots; Intelligent operation analysis is performed based on the target emergency measures to determine the corresponding work information of the target intelligent robot, and the target intelligent robot is controlled to perform intelligent operations according to the work information to reduce the operational risks of construction personnel.
[0059] In a possible implementation of the embodiment of the present application, the safety monitoring device for tunnel construction further includes: The sensor deployment verification module is used to build a model based on the tunnel design file to obtain a three-dimensional model of the tunnel, and integrate sensors on the three-dimensional model of the tunnel based on the sensor deployment information to obtain a monitoring three-dimensional model; Based on the sensor specifications and sensor types in the sensor deployment information, a field of view simulation is performed in the monitoring three-dimensional model, and a deployment analysis is performed based on the coverage area corresponding to the field of view simulation to obtain a sensor deployment report.
[0060] In a possible implementation of the embodiment of the present application, when the construction safety analysis module 240 performs construction safety analysis based on each sensor data and determines the environmental safety monitoring result, it is used to: Performing a fusion operation based on each sensor data to obtain fused sensor data, wherein the fusion operation is used to accurately and comprehensively characterize the current safety status of the tunnel construction; Extract features based on fused sensor data to obtain safety analysis and evaluation features; A construction safety analysis model is obtained, the safety analysis assessment characteristics are input into the construction safety analysis model, and the output result of the construction safety analysis model is determined as the environmental safety monitoring result.
[0061] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the safety monitoring device for tunnel construction described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0062] An electronic device is provided in an embodiment of the present application, such as Figure 3 As shown, Figure 3 The electronic device 300 shown includes: a processor 301 and a memory 303. The processor 301 and the memory 303 are connected, such as through a bus 302. Optionally, the electronic device 300 may also include a transceiver 304. It should be noted that in actual applications, the transceiver 304 is not limited to one, and the structure of the electronic device 300 does not constitute a limitation on the embodiments of the present application.
[0063] The processor 301 may be a CPU (Central Processing Unit), a general-purpose processor, a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array) or other programmable logic devices, transistor logic devices, hardware components or any combination thereof. It may implement or execute various exemplary logic blocks, modules and circuits described in conjunction with the disclosure of this application. The processor 301 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc.
[0064] The bus 302 may include a path to transmit information between the above components. The bus 302 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus. The bus 302 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 3 Only one thick line is used in the diagram, but it does not mean that there is only one bus or only one type of bus.
[0065] The memory 303 may be a ROM (Read Only Memory) or other types of static storage devices that can store static information and instructions, a RAM (Random Access Memory) or other types of dynamic storage devices that can store information and instructions, or an EEPROM (Electrically Erasable Programmable Read Only Memory), a CD-ROM (Compact Disc Read Only Memory) or other optical disk storage, optical disk storage (including compressed optical disk, laser disk, optical disk, digital versatile disk, Blu-ray disk, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto.
[0066] The memory 303 is used to store the application code for executing the solution of the present application, and the execution is controlled by the processor 301. The processor 301 is used to execute the application code stored in the memory 303 to implement the contents shown in the above method embodiment.
[0067] The electronic devices include, but are not limited to, mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), and fixed terminals such as digital TVs, desktop computers, etc. It can also be a server, etc. Figure 3 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.
[0068] An embodiment of the present application provides a computer-readable storage medium, on which a computer program is stored. When the computer-readable storage medium is run on a computer, the computer can execute the corresponding content in the aforementioned method embodiment.
[0069] The embodiment of the present application provides a computer program product, which includes a computer program, which implements the method in any of the above embodiments when executed by a processor. Compared with the related art, the embodiment of the present application obtains tunnel design documents and construction safety specifications, performs monitoring target analysis based on the tunnel design documents and construction safety specifications, and determines the safety monitoring target. Then, based on the safety monitoring target and the tunnel design document, the sensor deployment analysis is performed, the sensor deployment information is determined, and the sensor deployment information is sent to the installer's mobile terminal, so that the installer can complete the deployment operation of all sensors according to the sensor deployment information. The sensors are scientifically deployed according to the tunnel design documents and the safety monitoring target to ensure that the monitoring points are fully and reasonably covered, and the various safety indicators in the tunnel construction process can be accurately reflected, thereby improving the accuracy and reliability of the monitoring data. When the sensor deployment completion instruction is detected, the sensor data sent by each sensor is obtained in real time, and the construction safety analysis is performed based on each sensor data to determine the environmental safety monitoring result. Real-time acquisition of sensor data and construction safety analysis can quickly respond to safety hazards in the construction process, thereby improving the efficiency and accuracy of tunnel construction safety monitoring.
[0070] It should be understood that, although the steps in the flowchart of the accompanying drawings are displayed in sequence as indicated by the arrows, these steps are not necessarily executed in sequence in the order indicated by the arrows. Unless otherwise specified herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least a part of the steps in the flowchart of the accompanying drawings may include multiple sub-steps or multiple stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and their execution order is not necessarily sequential, but can be executed in turn or alternately with other steps or at least a part of the sub-steps or stages of other steps.
[0071] The above are only some implementation methods of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.
Claims
1. A safety monitoring method for tunnel construction, characterized in that: include: Obtaining tunnel design documents and construction safety specifications, performing monitoring target analysis based on the tunnel design documents and the construction safety specifications, and determining safety monitoring targets; Performing sensor deployment analysis based on the safety monitoring target and the tunnel design file to determine sensor deployment information, wherein the sensor deployment information includes: sensor type, sensor specification, and sensor installation information; Sending the sensor deployment information to the installer's mobile terminal so that the installer can complete the deployment operation of all sensors according to the sensor deployment information; When the sensor deployment completion instruction is detected, the sensor data emitted by each sensor is acquired in real time, and a construction safety analysis is performed based on each of the sensor data to determine the environmental safety monitoring results.
2. The tunnel construction safety monitoring method according to claim 1, characterized in that: After the real-time acquisition of sensor data sent by each sensor, the method further includes: Acquire a tunnel construction site image, perform construction operation recognition based on the tunnel construction site image, and obtain construction operations corresponding to construction personnel; An operation safety assessment is performed based on the construction operation and the construction safety specification to determine an operation safety monitoring result.
3. The tunnel construction safety monitoring method according to claim 2, characterized in that: After performing construction safety analysis based on each of the sensor data and determining the environmental safety monitoring results, the method further includes: Based on the environmental safety monitoring results and the operational safety monitoring results, the monitoring results are integrated to determine the target safety monitoring results; When the target safety monitoring result is abnormal, risk assessment is performed based on abnormal data to determine tunnel risk information, wherein the abnormal data is data determined to be abnormal in the operation safety assessment and / or construction safety analysis; Perform emergency measures analysis based on the tunnel risk information and determine target emergency measures; When the target safety monitoring result is normal, the sensor data and tunnel construction site images acquired in real time are classified and stored, so as to improve the data retrieval speed when there is a subsequent query request.
4. The tunnel construction safety monitoring method according to claim 3, characterized in that: After analyzing the emergency measures based on the tunnel risk information and determining the target emergency measures, the method further includes: Screening intelligent robots based on the tunnel risk information and determining target intelligent robots; Based on the target emergency measures, intelligent operation analysis is performed to determine the work information corresponding to the target intelligent robot, and the target intelligent robot is controlled to perform intelligent operations according to the work information to reduce the operational risks of construction personnel.
5. The tunnel construction safety monitoring method according to claim 1, characterized in that: After performing sensor deployment analysis based on the safety monitoring target and the tunnel design file and determining sensor deployment information, the method further includes: Building a model based on the tunnel design file to obtain a three-dimensional model of the tunnel, and integrating sensors on the three-dimensional model of the tunnel based on the sensor deployment information to obtain a three-dimensional monitoring model; Based on the sensor specifications and the sensor type in the sensor deployment information, a field of view simulation is performed in the monitoring three-dimensional model, and a deployment analysis is performed based on the coverage area corresponding to the field of view simulation to obtain a sensor deployment report.
6. The method for safety monitoring of tunnel construction according to claim 1, characterized in that: The performing of construction safety analysis based on each of the sensor data to determine the environmental safety monitoring results includes: Performing a fusion operation based on each of the sensor data to obtain fused sensor data, wherein the fusion operation is used to accurately and comprehensively characterize the current safety status of the tunnel construction; Perform feature extraction based on the fused sensor data to obtain safety analysis and evaluation features; A construction safety analysis model is obtained, the safety analysis assessment feature is input into the construction safety analysis model, and an output result of the construction safety analysis model is determined as an environmental safety monitoring result.
7. An electronic device, characterized in that: include: at least one processor; Memory; At least one application, wherein the at least one application is stored in a memory and configured to be executed by at least one processor, and the at least one application is configured to: execute the tunnel construction safety monitoring method according to any one of claims 1 to 6.
8. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the computer program is executed in a computer, the computer is caused to execute the tunnel construction safety monitoring method according to any one of claims 1 to 6.
9. A computer program product, characterized in that The invention comprises a computer program, wherein the computer program is executed by a processor to implement the tunnel construction safety monitoring method according to any one of claims 1 to 6.
Citation Information
Cited By
Rail transit construction operation guidance method and system based on set pair analysis
CN119250539A
Safety detection method, device and equipment of nuclear power plant control system and medium
CN119556673A
Surge shaft surrounding rock detection method based on intelligent early warning and early warning system
CN122024436A
