Gas pipe network boosting method, device and equipment and storage medium

After the design pressure and equipment of the gas pipeline network meet the boosting needs, it divides and tests the pressure and boosts it in stages, and solves the problem of insufficient gas supply pressure in the pipeline network of a small gas company, improves the gas supply capacity and safety, and is in line with the The scale demand of urban gas business.

CN118935259AActive Publication Date: 2024-11-12GUANGZHOU GAS GROUP CO LTD +1
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202411229854.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-11-12
Estimated Expiration
2044-09-03

AI Technical Summary

Technical Problem

The prior art lacks effective methods to safely and effectively boost the gas pipeline network, especially after the integration of urban gas supply, the pipeline network supply pressure originally belonged to small gas companies is insufficient.

Method used

After the pipeline design pressure and equipment meet the boosting needs, the pipeline network area is divided into partitions, some gas pipe sections are selected for boosting tests, and all areas are boosted in stages after meeting the test needs, and at the same time, whether the pipeline network is checked whether it is There is a leak.

Benefits of technology

It has improved the gas supply capacity of the gas pipeline network, ensured the safety of gas supply, met the requirements of intensive and scaled urban gas business, and solved the problem of insufficient supply capacity of the pipeline network of small gas companies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118935259A_ABST
    Figure CN118935259A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of gas pipe network boosting detection, and discloses a gas pipe network boosting method, device and equipment and a storage medium. The method comprises the steps that after the design pressure of a pipe network and related equipment of the pipe network meet the boosting requirement, districts of the pipe network planned to be boosted are partitioned; selecting a part of the gas pipe section of one area from the plurality of divided areas to carry out a pressure boosting test, and recovering the gas pipe section to the original operation pressure after the test is completed; if the selected areas meet the pressure boosting test requirement, overall pressure boosting is conducted on all the areas in stages, and whether leakage exists in the pipe network or not is detected in the pressure boosting process, in this way, the problem that the supply capacity of the pipe network originally belonging to a small gas company is insufficient is solved, the gas supply capacity of an existing pipe network is improved, gas supply safety is guaranteed, and the service life of the pipe network is prolonged. Gas pipe network pressure boosting also meets the essential requirements of intensive and large-scale urban gas services.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of gas pipeline network pressure boosting detection, and in particular to a gas pipeline network pressure boosting method, device, equipment and storage medium. Background Art

[0002] After the integration agreement of gas companies in the same city is reached, a gas supply pattern of one company per city will be formed. Then the gas pipelines originally belonging to different gas companies in the entire city will also be merged to form a gas supply pattern of one network for the entire city. Before the integration, due to the limited construction and gas storage capacity of small gas companies, the gas supply and operation pressure of their gas pipelines often cannot meet the needs of the city. After the integration, the overall operation pressure of this part of the pipeline network needs to be increased to meet the needs of urban development.

[0003] Currently, there is no effective solution for boosting the pressure of gas pipelines. How to boost the pressure of gas pipelines safely and effectively has become a technical problem that needs to be solved urgently.

[0004] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention

[0005] The main purpose of the present invention is to provide a gas pipeline network pressure boosting method, device, equipment and storage medium, aiming to solve the technical problem that there is currently no effective solution to the gas pipeline network pressure boosting.

[0006] To achieve the above object, the present invention provides a gas pipeline network pressure boosting method, the gas pipeline network pressure boosting method comprising the following steps:

[0007] After the design pressure of the pipeline network and the relevant equipment of the pipeline network meet the pressure-boosting requirements, the area of ​​the planned pressure-boosting pipeline network shall be divided into zones;

[0008] Select a portion of the gas pipeline section in one area from the divided areas to perform a pressure increase test, and restore the gas pipeline section to the original operating pressure after the test is completed;

[0009] If the selected area meets the pressure boost test requirements, all areas will be pressure boosted in stages, and the pipeline network will be checked for leaks during the pressure boost process.

[0010] In some embodiments, the partitioning of the area of ​​the planned booster pipe network includes:

[0011] Determine the distribution and equipment connection of the planned booster pipe network, which at least includes the distribution and connection of the pipeline direction and the equipment associated with the pipe network;

[0012] Based on the distribution and equipment connection conditions, the areas of the planned booster network are divided according to preset area boundaries. The preset area boundaries need to facilitate hidden danger inspection, risk control and rapid positioning during and after boosting, including rivers, railways, main roads and overpasses.

[0013] In some embodiments, the step of selecting a portion of a gas pipe section in one area from the divided areas for pressure boosting test includes:

[0014] Test the pipe sections in each area;

[0015] Based on the detection results, a partial gas pipeline section in one area is selected from several areas for pressure boost test. The detection results include at least the service time and operating status parameters of the pipeline sections in each area. The pipeline section in the selected area has the longest service time and the worst operating status.

[0016] In some embodiments, the partial gas pipe section is the pipe section with the least number of users or the least impact on users in the selected area.

[0017] In some embodiments, the step of boosting the voltage of all the slices in stages includes:

[0018] Determine the pipeline operating pressure after each stage of pressure boosting;

[0019] Based on the pipeline operating pressure after the pressure boosting is completed in each stage, the original pipeline operating pressure of all areas is boosted in stages.

[0020] In some embodiments, determining the pipeline operating pressure after the pressure increase in each stage is completed includes:

[0021] Determine the pressure difference between the original pipeline operating pressure and the target pipeline operating pressure in all zones;

[0022] The pipeline operating pressure after the pressure boosting is completed in each stage is determined according to the pressure difference and the preset ratio corresponding to each stage.

[0023] In some embodiments, the stages include a first stage, a second stage and a third stage, the first stage corresponds to a preset ratio of 30%, the second stage corresponds to a preset ratio of 60%, and the third stage corresponds to a preset ratio of 100%.

[0024] In addition, in order to achieve the above-mentioned purpose, the present invention also proposes a gas pipe network pressure boosting device, the gas pipe network pressure boosting device comprising:

[0025] The zoning module is used to divide the areas of the planned boosted pipeline network after the design pressure of the pipeline network and the relevant equipment of the pipeline network meet the boosting demand;

[0026] A test module, used for selecting a part of a gas pipeline section in one area from the divided areas for a pressure-raising test, and restoring the gas pipeline section to the original operating pressure after the test is completed;

[0027] The boost module is used to boost the pressure of all areas in stages if the selected area meets the boost test requirements, and detect whether there is leakage in the pipeline network during the boost process.

[0028] In addition, to achieve the above-mentioned purpose, the present invention also proposes a gas pipeline boosting device, which includes: a memory, a processor, and a gas pipeline boosting program stored in the memory and executable on the processor, and the gas pipeline boosting program is configured to implement the steps of the gas pipeline boosting method described above.

[0029] In addition, to achieve the above objectives, the present invention also proposes a storage medium, on which a gas pipeline network pressure boosting program is stored, and when the gas pipeline network pressure boosting program is executed by a processor, the steps of the gas pipeline network pressure boosting method described above are implemented.

[0030] The present invention divides the areas of the planned boosted pipeline network into zones after the design pressure of the pipeline network and the pipeline network related equipment meet the boosting demand; selects part of the gas pipeline section in one area from the divided areas for a boosting test, and restores the gas pipeline section to the original operating pressure after the test is completed; if the selected area meets the boosting test demand, all areas are boosted as a whole in stages, and the pipeline network is detected for leaks during the boosting process, which solves the problem of insufficient pipeline supply capacity of small gas companies, improves the gas supply capacity of the existing pipeline network, and ensures gas supply safety. The boosting of the gas pipeline network also meets the essential requirements of the intensification and scale of urban gas business. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a schematic diagram of the process of the first embodiment of the gas pipeline network pressure boosting method of the present invention;

[0032] Figure 2 It is a schematic diagram of the division of medium-pressure zones in the gas pipe network pressure boosting method of the present invention;

[0033] Figure 3 A schematic diagram of the layout of equipment related to the pressure boost test and the selection of the test section in the gas network pressure boost method of the present invention;

[0034] Figure 4 It is a schematic diagram of pressure changes in the pressure boosting test stage in the gas pipe network pressure boosting method of the present invention;

[0035] Figure 5 It is a schematic diagram of pressure changes in the formal pressure boosting stage of the gas pipeline network pressure boosting method of the present invention;

[0036] Figure 6 This is a structural block diagram of the first embodiment of the gas pipe network pressure boosting device of the present invention.

[0037] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0038] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0039] The embodiment of the present invention provides a method for boosting gas pipe network pressure, referring to Figure 1 , Figure 1 The figure is a flow chart of a first embodiment of a gas pipeline network pressure boosting method according to the present invention.

[0040] In this embodiment, the gas network pressure boosting method comprises the following steps:

[0041] Step S10: After the design pressure of the pipeline network and the pipeline network-related equipment meet the pressure-boosting demand, the area of ​​the planned pressure-boosting pipeline network is divided into zones.

[0042] In this embodiment, the executor of this embodiment is a gas pipe network boosting device, wherein the gas pipe network boosting device has functions such as data processing, data communication and program running. The gas pipe network boosting device can be a computer terminal device or other network device, and of course it can also be other devices with similar functions, and this embodiment does not limit this.

[0043] It should be noted that after the integration agreement of gas companies in the same city is reached, a gas supply pattern of one city and one company will be formed. Then the gas pipelines originally belonging to different gas companies in the entire city will also be merged to form a gas supply pattern of one network for the entire city. Due to the limited construction and gas storage capabilities of small gas companies before the integration, the gas supply and operating pressure of their gas pipelines often cannot meet the needs of the city. After the integration, it is necessary to increase the operating pressure of this part of the pipeline network as a whole to meet the needs of urban development. At present, there is no effective solution to the pressure increase of the gas pipeline network. How to safely and effectively increase the pressure of the gas pipeline network has become a technical problem that needs to be solved urgently.

[0044] In this embodiment, after the design pressure of the pipeline network and the pipeline network-related equipment meet the pressure boosting demand, the area of ​​the planned pressure-boosting pipeline network is divided into zones; a part of the gas pipeline section in one area is selected from the divided areas for a pressure boosting test, and the gas pipeline section is restored to the original operating pressure after the test is completed; if the selected area meets the pressure boosting test demand, the overall pressure of all areas is boosted in stages, and the pipeline network is detected for leaks during the pressure boosting process, which solves the problem of insufficient supply capacity of the pipeline network originally belonging to small gas companies, improves the gas supply capacity of the existing pipeline network, and ensures gas supply safety. The gas pipeline network pressure boost also meets the essential requirements of the intensive and large-scale development of urban gas business, and can be specifically achieved in the following ways.

[0045] In a specific implementation, in this embodiment, before boosting the pressure, it is necessary to first ensure that the design pressure of the pipeline network and the pipeline network-related equipment meet the boosting requirements.

[0046] Specifically, in this embodiment, an example is given to illustrate that the proposed boosted pipeline network consists of two parts: 8.2km of LPG steel pipes of the original small gas enterprise + 9.5km of PE pipes. The design pressure of the LPG pipeline network is 0.3MPa (medium pressure A grade 0.2~0.4MPa, medium pressure B grade 0.01~0.2MPa), and the design pressure of the PE pipe is 0.4MPa. The current operating pressure of these two parts of the pipeline network is 0.07MPa, and it is planned to be boosted to 0.25MPa. The pipeline network design pressure meets the technical requirements for the proposed boost (i.e., the pipeline network design pressure>operating pressure).

[0047] For pipeline network-related equipment, it is necessary to clarify the number and status of the pressure regulating equipment, valves, etc. of the existing pipeline network, and then maintain or transform the relevant equipment to meet the pressure increase demand. Specifically, the proposed medium-pressure pipeline network adopts the pressure regulation method of "regional pressure regulation, low-pressure into the home", without indoor pressure regulators, and uses building pressure regulating boxes or building pressure regulating cabinets. The proposed boosted pipeline network involves 68 in-service valves, 15 condensate cylinders, and 72 pressure regulating equipment. Before boosting, it is necessary to complete a comprehensive investigation, maintenance, maintenance and transformation of the proposed boosted medium-pressure pipeline network and its ancillary facilities. The specific measures are as follows:

[0048] ① For medium-pressure pipelines to be boosted: arrange line inspection workers to use S660 pipe detectors and emergency rescue teams to use laser detectors to conduct an overall inspection of the proposed boosted pipelines and equipment facilities. At the same time, arrange laser methane leak detection vehicles to inspect the pipelines on the roadway, with the aim of discovering and handling pipeline leakage hazards in advance before the formal boost. A total of two inspections were conducted, the last of which was a few days before the proposed boost.

[0049] ② Valves and condensate cylinders: including pumping water and desilting the valve well, comprehensively checking valves, flanges, relief ball valves and threaded connections for leaks, handling related hidden dangers and keeping records;

[0050] ③ Pressure regulating equipment: including whether the equipment is leaking, whether the threaded interface of the pressure gauge is loose, whether the pressure regulator, filter, valve body of the pressure regulating equipment, flange gaskets at the connection are aging and leaking, etc. If leakage, suspected leakage, loose interface, aging gasket and other hidden dangers are found, they should be repaired immediately or the gas supply should be stopped and replaced. For key users, pressure regulating equipment with a long service life and frequent failures in daily operation, the shut-off valves and safety valves should be tested once, and the problematic equipment accessories should be replaced, and records should be kept;

[0051] ④ Pressure reducing valve installed behind the riser tenon: Check the situation of pressure reducing valve installed behind the riser tenon of the pipeline network, communicate with users to understand the subsequent gas demand, and seal and abolish it if there is no need to continue using gas, eliminate safety hazards and record them;

[0052] ⑤ Old pipe networks without potential users. Block and abolish several sections of medium-pressure pipe networks without potential users in the original pipe network, optimize the pipe network layout, eliminate possible leakage hazards and keep records.

[0053] Furthermore, after the pressure-boosting demand is met, in this embodiment, the area of ​​the planned pressure-boosting pipeline network is divided into zones, and the distribution and equipment connection conditions of the planned pressure-boosting pipeline network are specifically determined, and the distribution and equipment connection conditions at least include the distribution and connection of the pipeline direction and the equipment associated with the pipeline network; based on the distribution and equipment connection conditions, the area of ​​the planned pressure-boosting pipeline network is divided into zones according to preset area boundaries, and the preset area boundaries need to facilitate the hidden danger investigation, risk control and rapid positioning during and after the pressure boosting, and the preset area boundaries may include rivers, railways, main roads and overpasses. In this embodiment, further combined Figure 2 This section describes the partitioning example. Figure 2 As shown, Figure 2 Only the gas main is shown in the figure. Due to the influence of rivers and railways, in order to ensure the smooth progress of the pressure boosting process, the medium-pressure pipeline network in the boosting area is divided into the following three areas: ① Area 1: south of the river and east of the railway, the pipeline network in this area is LPG steel pipe + PE pipe; ② Area 2: west of the railway, the pipeline network in this area is LPG steel pipe; ③ Area 3: north of the river and east of the railway, the pipeline network in this area is PE pipe.

[0054] Step S20: a portion of a gas pipeline section in one area is selected from the divided areas to perform a pressure boost test, and after the test is completed, the gas pipeline section is restored to the original operating pressure.

[0055] It should be noted that before the formal pressure boosting, in order to verify the reliability and safety of the pressure boosting scheme, check the cooperation of the pressure boosting team, and improve the efficiency of the formal pressure boosting stage, a gas pipeline section with no users in an area is selected for pressure boosting testing in this embodiment.

[0056] Specifically, the pipe sections in each area can be inspected; based on the inspection results, some gas pipe sections in one area are selected from several areas for pressure boost test, and the inspection results at least include the service time and operating status parameters of the pipe sections in each area. The pipe sections in the selected area have the longest service time and the worst operating status. It should be noted that pipe sections with long service time and poor condition are selected for pressure boost test. If these pipe sections meet the test requirements, then other pipe sections also meet the requirements.

[0057] Furthermore, the selected pipe sections in this embodiment are the pipe sections with the least number of users or the least impact on users, so that when the subsequent pressure test is performed, the impact on residents' gas consumption can be minimized.

[0058] Reference Figure 3 As shown, the specific test plan is as follows: The test plan is as follows: ① Install a pressure regulating gas passing device at branch valve 1, close branch valve 2 as a temporary isolation valve, and install a discharge pipe and a pressure gauge at the vent on both sides of branch valve 2 to monitor the pressure and record it in detail (Table 1). ② Perform a three-stage (i.e. 0.07MPa→0.12MPa→0.17MPa→0.25MPa) pressure increase test on the test section of the gas pipeline in the area 2 through the gas pipe of branch valve 1 (refer to Figure 4 ③After the test is completed, close the gas passing equipment at valve 1 and gradually discharge and reduce the pressure to 0.07MPa. Open branch valve 2. Remove all the pressure regulating gas pipes and discharge pressure monitoring equipment except valve 1, restore the original gas supply mode (0.07MPa) of the test section of the gas pipeline in the area 2, and complete the pressure increase test.

[0059] Table 1:

[0060] Serial number stage Monitoring Points Pressure(MPa) Inspection date Recorder 1 Phase 1 <![CDATA[P 1 ]]> X YY / MM / DD XXX 2 Phase II <![CDATA[P 2 ]]> Y YY / MM / DD XXX ... ... ... ... ... ...

[0061] Step S30: If the selected area meets the pressure boost test requirements, all areas are pressure boosted in stages, and the pipeline network is tested for leaks during the pressure boost process.

[0062] After the test is completed, all the zones in this embodiment are officially boosted. The specific boosting process is to boost the voltage in stages, for example Figure 5 As shown, this embodiment is divided into the first stage, the second stage and the third stage, each stage has a pipeline operating pressure after the boost is completed, for example, the first stage corresponds to P 1 , the second stage corresponds to P 2 , the third stage corresponds to P 最终The pipeline operating pressure after each stage of boosting is determined by the pressure difference between the original pipeline operating pressure and the target pipeline operating pressure of all areas and the preset ratio corresponding to each stage. For example, in the first stage: P 原始 →P 1 , P 1 =P 原始 +30%(P 最终 -P 原始 ), Phase II: P 1 →P 2 , P 2 =P 原始 +60%(P 最终 -P 原始) , the third stage: P 2 →P 最终 , P 2 =P 原始 +100%(P 最终 -P 原始 ), P 最终 -P 原始 It indicates the pressure difference, 30%, 60% and 100% are the preset ratios, the preset ratio corresponding to the first stage is 30%, the preset ratio corresponding to the second stage is 60%, and the preset ratio corresponding to the third stage is 100%. It should be noted that the ratio is only for example, and in actual situations, it can be adjusted accordingly according to the boosting demand, and this is not limited in this embodiment.

[0063] This embodiment divides the areas of the planned boosted pipeline network into zones after the design pressure of the pipeline network and the pipeline network-related equipment meet the boosting demand; selects part of the gas pipeline section in one area from the divided areas for a boosting test, and restores the gas pipeline section to the original operating pressure after the test is completed; if the selected area meets the boosting test demand, all areas are boosted as a whole in stages, and the pipeline network is checked for leaks during the boosting process, which solves the problem of insufficient pipeline supply capacity of small gas companies, improves the gas supply capacity of the existing pipeline network, and ensures gas supply safety. The boosting of the gas pipeline network also meets the essential requirements of the intensive and large-scale development of urban gas business.

[0064] In addition, an embodiment of the present invention further proposes a storage medium, on which a gas pipeline network pressure boosting program is stored. When the gas pipeline network pressure boosting program is executed by a processor, the steps of the gas pipeline network pressure boosting method described above are implemented.

[0065] Reference Figure 6 , Figure 6 This is a structural block diagram of the first embodiment of the gas pipe network pressure boosting device of the present invention.

[0066] like Figure 6As shown, the gas pipe network pressure boosting device proposed in the embodiment of the present invention includes:

[0067] The partitioning module 10 is used to partition the areas of the planned boosted pipeline network after the design pressure of the pipeline network and the pipeline network related equipment meet the boosting demand.

[0068] The test module 20 is used to select a part of the gas pipeline section in one area from the divided areas for pressure boost test, and restore the gas pipeline section to the original operating pressure after the test is completed.

[0069] The boost module 30 is used to boost the pressure of all the areas in stages if the selected area meets the boost test requirements, and detect whether there is leakage in the pipeline network during the boost process.

[0070] This embodiment divides the areas of the planned boosted pipeline network into zones after the design pressure of the pipeline network and the pipeline network-related equipment meet the boosting demand; selects part of the gas pipeline section in one area from the divided areas for a boosting test, and restores the gas pipeline section to the original operating pressure after the test is completed; if the selected area meets the boosting test demand, all areas are boosted as a whole in stages, and the pipeline network is checked for leaks during the boosting process, which solves the problem of insufficient pipeline supply capacity of small gas companies, improves the gas supply capacity of the existing pipeline network, and ensures gas supply safety. The boosting of the gas pipeline network also meets the essential requirements of the intensive and large-scale development of urban gas business.

[0071] In some embodiments, the zoning module 10 is used to determine the distribution and equipment connection status of the planned booster network, and the distribution and equipment connection status at least include the distribution and connection of the pipeline direction and the equipment associated with the network; based on the distribution and equipment connection status, the areas of the planned booster network are divided according to preset area boundaries, and the preset area boundaries need to facilitate hidden danger inspection, risk control and rapid positioning during and after boosting, including rivers, railways, main roads and overpasses.

[0072] In some embodiments, the test module 20 is used to test the pipe sections in each area; based on the test results, a part of the gas pipe sections in one area is selected from several areas for pressure boost test, and the test results at least include the service time and operating status parameters of the pipe sections in each area, and the pipe section in the selected area has the longest service time and the worst operating status.

[0073] In some embodiments, the partial gas pipe section is the pipe section with the least number of users or the least impact on users in the selected area.

[0074] In some embodiments, the boosting module 30 is used to determine the pipeline operating pressure after the boosting is completed in each stage; and boost the original pipeline operating pressure of all areas in stages based on the pipeline operating pressure after the boosting is completed in each stage.

[0075] In some embodiments, the boosting module 30 is used to determine the pressure difference between the original pipeline operating pressure and the target pipeline operating pressure of all areas; and determine the pipeline operating pressure after the boosting is completed in each stage based on the pressure difference and the preset ratio corresponding to each stage.

[0076] In some embodiments, the stages include a first stage, a second stage and a third stage, the first stage corresponds to a preset ratio of 30%, the second stage corresponds to a preset ratio of 60%, and the third stage corresponds to a preset ratio of 100%.

[0077] An embodiment of the present application also provides a gas pipeline network pressure boosting device, including a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other through the communication bus, and the memory is used to store computer programs; the processor is used to implement the above-mentioned gas pipeline network pressure boosting method when executing the program stored in the memory.

[0078] The communication bus mentioned in the gas network boosting device can be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. The communication bus can be divided into an address bus, a data bus, a control bus, etc.

[0079] The communication interface is used for communication between the above-mentioned gas network boosting equipment and other equipment.

[0080] The memory may include a random access memory (RAM) or a non-volatile memory (NVM), such as at least one disk memory. Optionally, the memory may also be at least one storage device located away from the aforementioned processor.

[0081] The above-mentioned processor can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, and discrete hardware components.

[0082] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium, for example, the computer instructions may be transmitted from a website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode to another website site, computer, server or data center. The computer-readable storage medium may be any available medium that a computer can access or a data storage device such as a server or data center that includes one or more available media integrated. The available medium may be a magnetic medium, (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state drive Solid State Disk (SSD)), etc.

[0083] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0084] Each embodiment in this specification is described in a related manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0085] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

[0086] It should be understood that the above is only an example and does not constitute any limitation on the technical solution of the present invention. In specific applications, technicians in this field can make settings as needed, and the present invention does not limit this.

[0087] It should be noted that the workflow described above is merely illustrative and does not limit the scope of protection of the present invention. In practical applications, technicians in this field can select part or all of them according to actual needs to achieve the purpose of the present embodiment, and no limitation is made here.

[0088] In addition, for technical details that are not described in detail in this embodiment, reference can be made to the gas pipeline network pressure boosting method provided in any embodiment of the present invention, and will not be repeated here.

[0089] In addition, it should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.

[0090] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0091] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as a read-only memory (ROM) / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention.

[0092] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

[0093] It is understandable that the system provided by the embodiment of the present invention corresponds to the method provided by the embodiment of the present invention, and the explanation, examples and beneficial effects of the relevant contents can refer to the corresponding parts in the above method.

Claims

1. A method for boosting gas pipeline network pressure, It is characterized in that The gas network pressure boosting method comprises: After the design pressure of the pipeline network and the relevant equipment of the pipeline network meet the pressure-boosting requirements, the area of ​​the planned pressure-boosting pipeline network shall be divided into zones; Select a portion of the gas pipeline section in one area from the divided areas to perform a pressure increase test, and restore the gas pipeline section to the original operating pressure after the test is completed; If the selected area meets the pressure boost test requirements, all areas will be pressure boosted in stages, and the pipeline network will be checked for leaks during the pressure boost process.

2. The gas network pressure boosting method according to claim 1, It is characterized in that The zoning of the area of ​​the planned booster pipe network includes: Determine the distribution and equipment connection of the planned booster pipe network, which at least includes the distribution and connection of the pipeline direction and the equipment associated with the pipe network; Based on the distribution and equipment connection conditions, the areas of the planned booster network are divided according to preset area boundaries. The preset area boundaries need to facilitate hidden danger inspection, risk control and rapid positioning during and after boosting, including rivers, railways, main roads and overpasses.

3. The gas network pressure boosting method according to claim 1, It is characterized in that The step of selecting a gas pipeline section in one area from the divided areas for pressure boosting test includes: Test the pipe sections in each area; Based on the detection results, a partial gas pipeline section in one area is selected from several areas for pressure boost test. The detection results include at least the service time and operating status parameters of the pipeline sections in each area. The pipeline section in the selected area has the longest service time and the worst operating status.

4. The gas network pressure boosting method according to claim 3, It is characterized in that The partial gas pipeline section is the pipeline section with the least number of users or the least impact on users in the selected area.

5. The gas network pressure boosting method according to claim 1, It is characterized in that The overall voltage boosting of all areas in stages includes: Determine the pipeline operating pressure after each stage of pressure boosting; Based on the pipeline operating pressure after the pressure boosting is completed in each stage, the original pipeline operating pressure of all areas is boosted in stages.

6. The gas network pressure boosting method according to claim 5, It is characterized in that Determining the pipeline operating pressure after the pressure increase in each stage includes: Determine the pressure difference between the original pipeline operating pressure and the target pipeline operating pressure in all zones; The pipeline operating pressure after the pressure boosting is completed in each stage is determined according to the pressure difference and the preset ratio corresponding to each stage.

7. The gas network pressure boosting method according to claim 6, It is characterized in that The stages include a first stage, a second stage and a third stage. The preset ratio corresponding to the first stage is 30%, the preset ratio corresponding to the second stage is 60%, and the preset ratio corresponding to the third stage is 100%.

8. A gas pipeline network pressure boosting device, It is characterized in that The gas network pressure boosting device comprises: The zoning module is used to divide the areas of the planned boosted pipeline network after the design pressure of the pipeline network and the relevant equipment of the pipeline network meet the boosting demand; A test module, used to select a portion of a gas pipeline section in one area from the divided areas for a pressure-raising test, and restore the gas pipeline section to the original operating pressure after the test is completed; The boost module is used to boost the pressure of all areas in stages if the selected area meets the boost test requirements, and detect whether there is leakage in the pipeline network during the boost process.

9. A gas pipeline network pressure boosting device, It is characterized in that The gas pipeline boosting device comprises: a memory, a processor and a gas pipeline boosting program stored in the memory and executable on the processor, wherein the gas pipeline boosting program is configured to implement the steps of the gas pipeline boosting method according to any one of claims 1 to 7.

10. A storage medium, It is characterized in that The storage medium stores a gas pipeline network pressure boosting program, and when the gas pipeline network pressure boosting program is executed by the processor, the steps of the gas pipeline network pressure boosting method according to any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Airport apron pipe network impermeability testing device and method based on pressure correlation method

    CN104535281A

  • Method for efficiently screening leakage region of water supply pipe network

    CN107230021A

  • LeakView leakage control and management system for urban water supply pipe network

    CN107355688A

  • City water supply pipe network-based artificial water quality monitoring point addressing method

    CN108320060A

  • Pipeline safety state evaluation method and stepped boosting pipeline safety reproduction method

    CN110822297A