Rigid-flexible combined permanent sealing structure and construction method

Through a permanently sealed structure combining rigidity and flexibility, combined with flexible walls and high-pressure expansion capsules, the safety and cost problems of coal mine goaf enclosure technology are solved, high-quality enclosure and circulating resealing are achieved, and the unsealing process is simplified.

CN118959081APending Publication Date: 2024-11-15ZHALAI NUOER COAL IND CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411287562.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-08-21
Filing Date
2024-09-14
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing coal mine goaf enclosure technology cannot fully meet safety needs. The flexible sealed wall has weak compressive resistance, the rigid sealed wall is difficult and costly, and the unsealing process is dangerous and has poor results.

Method used

A permanently sealed structure with a combination of rigidity and flexibility, including an expansion deformation unit and a rigid support unit. By combining a flexible wall and a high-pressure expansion capsule, auxiliary units such as grouting pipes, gas observation tubes, etc., achieve high-quality sealing and circulating resealing.

Benefits of technology

It realizes high-quality closure of goaf, reduces construction costs, improves the compressive resistance and sealing efficiency of the sealed structure, simplifies the unsealing process, and ensures safe production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959081A_ABST
    Figure CN118959081A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of coal mine safety construction, and particularly provides a rigid-flexible combined permanent sealing structure which comprises an expansion deformation unit, a rigid supporting unit and an auxiliary unit, the rigid supporting unit comprises two wall assemblies and a filling body, and the expansion deformation unit comprises a flexible wall and a high-pressure expansion capsule. The auxiliary unit comprises a grouting pipe, a goaf gas observation pipe, a surge chamber gas observation pipe, a gas conveying pipe, a liquid conveying pipe, a water discharging pipe and a gas injection pressure adjusting pipe. The invention discloses a construction method of a rigid-flexible combined permanent closed structure. The construction method comprises the following specific steps: constructing a flexible wall; a wall assembly located on the inner side is constructed; mounting a high-pressure expansion capsule; a wall body assembly located on the outer side is constructed; grouting is conducted between the two wall assemblies; and the internal pressure of the pressure regulating chamber is regulated. Sealing treatment is conducted in a rigid-flexible combined mode, the flexible wall is firstly constructed to seal the roadway, then the wall assembly is constructed to conduct rigid sealing, and high-quality sealing of the goaf is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of coal mine safety construction, and in particular provides a rigid-flexible permanent closed structure and a construction method. Background Art

[0002] In my country, most coal mines adopt underground mining, that is, coal mining operations are carried out underground. Due to the limitations of geological conditions and coal seam depth, the underground working environment is complex and safety hazards are frequent. In view of the sealing of underground goafs in coal mines, according to the provisions of the Coal Mine Safety Regulations, after the coal mining face is advanced or mining is completed, all tunnels connected to the goaf must be closed in time; within 45 days after the mining of the mining area is completed, firewalls must be set up in all tunnels connected to the mining area to fully seal the mining area. This shows that the sealing of underground goafs is crucial to the safe production of coal mines. The main reason is that goafs will be formed during the mining process of the coal mining face, and these areas may have floating coal left. In the case of sufficient oxygen, these floating coals are prone to oxidation and spontaneous combustion, which will cause fires. By sealing the goaf, air inflow can be effectively prevented, avoiding the provision of oxidation and spontaneous combustion conditions for floating coal, thereby preventing spontaneous combustion in the goaf; at the same time, high concentrations of gas and harmful gases may accumulate in the goaf. If the goaf is not closed in time, when the atmospheric pressure changes or a large area of ​​the roof in the goaf collapses, these harmful gases may be quickly squeezed out and enter the tunnels connected to the goaf, causing poisoning and suffocation of people, and may even cause a gas explosion.

[0003] At present, the closure of goaf usually requires the construction of goaf airtight walls, which generally include two airtight walls, which are completed by filling concrete, loess and other materials in the middle. The types of airtight walls are mainly divided into two types: flexible airtight walls and rigid airtight walls: flexible airtight walls are mainly composed of airbags, skirt-shaped pleated edges and stabilizing tension ropes, etc., and are usually used for temporary sealing. They are light in weight and fast in construction, but their pressure bearing capacity and impact resistance are weak and they are easy to deform; rigid airtight walls are mainly made of wooden boards, masonry or concrete pouring, and are usually used for permanent sealing. They have strong pressure bearing capacity, but are difficult to construct. If cracks occur later, it is difficult and costly to reseal them, and it is usually necessary to rebuild the airtight wall to deal with it. In addition, if the airtight wall of the goaf needs to be unsealed due to special reasons, the danger increases significantly, and it is usually necessary to remove harmful gases on the goaf side of the airtight wall. This process has a long cycle and poor results, and existing technologies cannot fully meet the needs. Summary of the invention

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a rigid-flexible permanent closed structure, including an expansion deformation unit and a rigid support unit;

[0005] The rigid support unit comprises two wall components and a filling body, wherein the wall component is composed of two closed walls and a sandwich, the two closed walls are arranged in parallel, the sandwich is arranged in the gap between the two closed walls, and the two wall components are arranged on the inner and outer sides of the filling body respectively;

[0006] The expansion deformation unit includes a flexible wall and a high-pressure expansion capsule. The high-pressure expansion capsule is sleeved on the middle part of the filling body. The flexible wall is arranged between the goaf and the rigid support unit, and a gap is left between the flexible wall and the inner wall assembly.

[0007] Furthermore, a rigid-flexible permanent sealed structure also includes an auxiliary unit, which includes a grouting pipe, a gas observation pipe in the goaf, a gas observation pipe in the pressure regulating chamber, a gas transmission pipe, a liquid transmission pipe, a water discharge pipe and a gas injection pressure regulating pipe. The grouting pipe runs through the outer wall component from the outside to the inside, and its end extends into the filling body. The gas observation pipe in the goaf runs through the outer wall component, the filling body, the inner wall component and the flexible wall from the outside to the inside, and its end extends to the inside of the flexible wall. The gas observation pipe in the pressure regulating chamber runs through the outer wall component, the filling body and the inner wall component from the outside to the inside, and its end extends to In the gap between the flexible wall and the inner wall component, the air supply pipe penetrates the outer wall component, the filling body and the inner wall component from the outside to the inside, and its end extends to the inside of the flexible wall. The liquid supply pipe penetrates the outer wall component from the outside to the inside, and its end extends to the inside of the high-pressure expansion capsule. The drain pipe penetrates the outer wall component, the filling body, the inner wall component and the flexible wall from the outside to the inside, and its end extends to the inside of the flexible wall. The gas injection pressure regulating pipe penetrates the outer wall component, the filling body and the inner wall component from the outside to the inside, and its end extends to the gap between the flexible wall and the inner wall component.

[0008] Furthermore, the length and height of the grouting pipe match the expanded position of the high-pressure expansion capsule. When the high-pressure expansion capsule expands, the port of the grouting pipe abuts against the high-pressure expansion capsule, so that the port of the grouting pipe is completely blocked.

[0009] Furthermore, a plurality of fixing wings are evenly spaced on the inner and outer end surfaces of the flexible wall and the high-pressure expansion capsule, and the two wall components and the high-pressure expansion capsule are positioned by the fixing wings.

[0010] Furthermore, the material of the interlayer is any one of loess, fly ash or concrete or a mixture of them.

[0011] A construction method of a rigid-flexible permanent closed structure, the specific steps are as follows:

[0012] Step 1: Build a flexible wall to isolate the goaf;

[0013] Constructing a fourth cut in the tunnel, and constructing a flexible wall in the fourth cut;

[0014] At the same time, water discharge pipes and gas observation pipes in goaf areas are deployed;

[0015] Step 2: construct the inner wall assembly to form a surge chamber;

[0016] Constructing a third cutout in the tunnel, and constructing the wall assembly in the third cutout;

[0017] At the same time, the water discharge pipe, gas transmission pipe and gas observation pipe in the goaf are extended, and the gas injection pressure regulating pipe and gas observation pipe in the pressure regulating room are deployed;

[0018] Step 3: Install the high pressure expansion capsule;

[0019] Construct a second cut in the tunnel, install the high-pressure expansion capsule in the second cut, and conduct a pressure test;

[0020] Step 4: construct the wall components located on the outside;

[0021] Constructing a first cutout in the tunnel, and constructing the wall assembly in the first cutout;

[0022] At the same time, further extend the gas injection and pressure regulating pipe, water discharge pipe, liquid infusion pipe, gas transmission pipe, gas observation pipe in the pressure regulating room and gas observation pipe in the goaf, and deploy grouting pipe;

[0023] Step 5: inject grout between two wall components to form a filling body;

[0024] After the grouting pipe is connected to the external grouting equipment, the relevant valve is opened to inject the slurry between the two wall components;

[0025] After the slurry fills the space between the two wall components, the external liquid injection equipment is started to inject high-pressure liquid into the high-pressure expansion capsule until the high-pressure expansion capsule expands to the limit state and then the liquid injection is stopped;

[0026] Subsequently, the slurry in the grouting pipe is depressurized and the grouting pipe is flushed;

[0027] Step 6: Adjust the internal pressure of the pressure regulating chamber to isolate the contact between the gas in the goaf and the wall components.

[0028] Furthermore, a construction method of a rigid-flexible permanent closed structure also includes:

[0029] Step 7: Circularly seal the internal cracks of the filling body and the cracks of the rock mass around the tunnel;

[0030] When cracks appear around the tunnel and inside the filling body, implement step seven.

[0031] Furthermore, the specific implementation process of step seven is as follows:

[0032] The high-pressure expansion capsule is controlled to shrink, and slurry is injected again into the space between the two wall components through the grouting pipe until the cracks connected thereto are filled, and then the high-pressure expansion capsule is controlled to expand.

[0033] Furthermore, a construction method of a rigid-flexible permanent closed structure also includes:

[0034] Step 8: Unseal the sealed structure and dismantle it;

[0035] When special working conditions occur and the rigid-flexible sealed structure needs to be unsealed, implement step eight.

[0036] Furthermore, the specific implementation process of step eight is as follows:

[0037] While maintaining the stability of the flexible wall, first remove the external wall components, then reduce the gas pressure in the goaf, and at the same time control the contraction of the flexible wall to increase the fresh air flow into the goaf, and gradually remove the flexible wall.

[0038] The beneficial effects of using the present invention are:

[0039] 1. The present invention adopts a combination of rigidity and flexibility to perform sealing treatment, first constructing a flexible wall to seal the tunnel, and then constructing a wall assembly for rigid sealing, thereby achieving high-quality sealing of the goaf;

[0040] 2. A pressure regulating chamber is provided between the flexible wall and the inner wall assembly, and the air pressure in the pressure regulating chamber can be fine-tuned by injecting nitrogen into the pressure regulating chamber, thereby facilitating the air exchange between the goaf and the tunnel;

[0041] 3. Arrange high-pressure expansion capsules between two wall components. By controlling the contraction and expansion of the high-pressure expansion capsules, the high-pressure expansion capsules are controlled to detach from or support the filling body, thereby realizing the function of cyclically sealing the filling body and its surrounding cracks; at the same time, the high-pressure expansion capsules can seal the grouting pipes, making the grouting pipes reusable and reducing construction costs.

[0042] 4. The wall components are mainly composed of bricks and loess, and the raw materials are in sufficient supply and cheap; the filling between the two closed layers is mainly composed of fly ash, cement, sand, gangue and quicklime, which is low in cost and achieves the effect of waste utilization. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a structural schematic diagram of the present invention;

[0044] Figure 2 A schematic diagram of the rock mass and tunnels in the construction area of ​​the present invention;

[0045] Figure 3 It is a cross-sectional view of the rock mass and tunnel in the construction area of ​​the present invention;

[0046] Figure 4 A schematic diagram of the pipeline deployment relationship of the present invention;

[0047] Figure 5 It is a schematic diagram of the structure of the high-pressure expansion capsule of the present invention;

[0048] Figure 6 It is a schematic diagram of a state in which the high-pressure expansion capsule is contracted and not grouted in the resealing process of the present invention;

[0049] Figure 7 It is a schematic diagram of the state after the high-pressure expansion capsule shrinks and grouting is completed in the resealing process of the present invention;

[0050] Figure 8 It is a schematic diagram of a state in which grouting is completed and the high-pressure expansion capsule is expanded in the resealing process of the present invention;

[0051] The reference numerals include: 1. flexible wall; 2. closed wall; 3. interlayer; 4. filling body; 5. high-pressure expansion capsule; 6. grouting pipe; 7. gas observation pipe in goaf; 8. gas observation pipe in surge chamber; 9. gas pipeline; 10. liquid pipeline; 11. drain pipe; 12. gas injection and pressure regulating pipe; 13. rock mass; 14. tunnel; 15. first slot; 16. second slot; 17. third slot; 18. fourth slot; 19. fixed wing; 20. fissure. DETAILED DESCRIPTION

[0052] The present invention is described in detail below with reference to the accompanying drawings.

[0053] Reference Figure 1-Figure 5 , a rigid-flexible permanent closed structure is arranged in the lane 14;

[0054] A rigid-flexible permanent closed structure, composed of an expansion deformation unit, a rigid support unit and an auxiliary unit;

[0055] The rigid support unit includes two wall components and a filling body 4. The wall component is composed of two closed walls 2 and a sandwich 3. The two closed walls 2 are arranged in parallel. The sandwich 3 is arranged in the gap between the two closed walls 2. The two wall components are arranged on the inner and outer sides of the filling body 4 respectively.

[0056] The expansion and deformation unit includes a flexible wall 1 and a high-pressure expansion capsule 5. The high-pressure expansion capsule 5 is sleeved on the middle of the filling body 4. The flexible wall 1 is arranged between the goaf and the rigid support unit, and a gap is left between the flexible wall 1 and the inner wall assembly.

[0057] Specifically, the gap is a surge chamber;

[0058] The auxiliary unit includes a grouting pipe 6, a gas observation pipe in the goaf 7, a gas observation pipe in the pressure regulating room 8, a gas transmission pipe 9, a liquid transmission pipe 10, a water discharge pipe 11 and a gas injection pressure regulating pipe 12;

[0059] The grouting pipe 6 penetrates the outer wall assembly from the outside to the inside, and its end extends into the filling body 4, and the length and height of the grouting pipe 6 match the position of the high-pressure expansion capsule 5. When the high-pressure expansion capsule 5 expands, the port of the grouting pipe 6 abuts against the high-pressure expansion capsule 5, so that the port of the grouting pipe 6 is completely blocked;

[0060] The goaf gas observation pipe 7 penetrates the outer wall assembly, the filling body 4, the inner wall assembly and the flexible wall 1 from the outside to the inside, and its end extends to the inner side of the flexible wall 1;

[0061] The gas observation pipe 8 of the pressure regulating chamber penetrates the outer wall component, the filling body 4 and the inner wall component from the outside to the inside, and its end extends into the gap between the flexible wall 1 and the inner wall component;

[0062] The gas delivery pipe 9 passes through the outer wall component, the filling body 4 and the inner wall component from the outside to the inside, and its end extends to the inside of the flexible wall 1;

[0063] The infusion tube 10 penetrates the outer wall assembly from the outside to the inside, and its end extends to the inside of the high-pressure expansion capsule 5;

[0064] The drain pipe 11 penetrates the outer wall component, the filling body 4, the inner wall component and the flexible wall 1 from the outside to the inside, and its end extends to the inner side of the flexible wall 1;

[0065] The gas injection pressure regulating pipe 12 penetrates the outer wall component, the filling body 4 and the inner wall component from the outside to the inside, and its end extends into the gap between the flexible wall 1 and the inner wall component.

[0066] Specifically, the flexible wall 1 is an airbag structure, which can expand and fit tightly to the tunnel wall after being filled with gas;

[0067] The confined wall 2 is constructed of bricks;

[0068] The material of the interlayer 3 is loess, fly ash or concrete;

[0069] The high-pressure expansion capsule 5 is a double-layer structure, which can expand and deform when high-pressure liquid is injected into it; the outer shape is a ring structure, and its shape and size are adjusted according to the cross section of the tunnel;

[0070] The grouting pipe 6 is located at the top of the tunnel 14, and is made of a steel pipe with a diameter of 120-150 mm. The length of the grouting pipe exposed in the tunnel is generally not less than 500 mm, and one end is provided with a pressure gauge, a valve and other connection structures;

[0071] The exposed end of the goaf gas observation pipe 7 is provided with a pressure gauge, a valve and other connection structures;

[0072] The exposed end of the gas observation pipe 8 in the pressure regulating chamber is provided with a pressure gauge, a valve and other connecting structures;

[0073] The drain pipe 11 is located at a height of 300mm on the bottom plate of the tunnel 14, and its diameter is generally not less than 150mm. Its length exposed in the tunnel 14 is generally not less than 500mm, and it is provided with a valve and other structures that can be connected to the external pumping and drainage pipeline to facilitate the pumping and drainage of the accumulated water in the goaf. Its exposed length penetrating the flexible wall 1 on the goaf side is generally not less than 2m;

[0074] The gas injection pressure regulating pipe 12 is generally located 500-1000mm above the tunnel floor, and its diameter is generally not less than 50mm; its length exposed in the tunnel is generally not less than 500mm, and it is provided with valves and other structures that can be connected to the external nitrogen injection pipeline. Its exposed length after passing through the inner wall assembly is generally not less than 1 / 3 of the depth of the pressure regulating chamber.

[0075] A plurality of fixing wings 19 are evenly spaced on the inner and outer end surfaces of the flexible wall 1 and the high-pressure expansion capsule 5 , and the two wall components and the high-pressure expansion capsule 5 are positioned by the fixing wings 19 .

[0076] Reference Figure 1-Figure 8 , a construction method of a rigid-flexible permanent closed structure, the specific steps are as follows:

[0077] Step 1: construct a flexible wall 1 to isolate the goaf;

[0078] Specifically, a groove is cut at the location where the flexible wall 1 is constructed in the tunnel 14, and the groove is the fourth groove 18;

[0079] Preferably, the fourth cutout 18 has a depth of not less than 300 mm and a width of not less than 500 mm;

[0080] Deploy the flexible wall 1 into the fourth cutout 18, and lay the gas pipeline 9, with one end of the pipeline extending into the flexible wall 1 and the other end connected to the external gas injection unit;

[0081] Injecting gas into the flexible wall 1 to expand it and fill the space in the fourth cutout 18 until it fits tightly with the inner wall of the fourth cutout 18;

[0082] At the same time, the drainage pipe 11 and the goaf gas observation pipe 7 are deployed to the designated position, and the connection between them and the flexible wall 1 is blocked, so that the construction site will be isolated from the goaf.

[0083] Furthermore, after the flexible wall 1 is deployed, one side of the flexible wall 1 (the side away from the goaf) is first fixed, and its upper part is generally fixed to the inner wall of the tunnel 14 using anchor rods, anchor cables or fixing screws.

[0084] Step 2: construct the inner wall assembly to form a surge chamber;

[0085] Specifically, a groove is cut at the location where the inner wall assembly is constructed in the tunnel 14, and the groove is the third groove 17;

[0086] Preferably, the third cutout 17 has a depth of not less than 500 mm and a width of not less than 1000 mm;

[0087] Construct the inner and outer closed walls in sequence, and fill the interlayer 3 between them;

[0088] During the construction process, the water discharge pipe 11, the gas transmission pipe 9 and the goaf gas observation pipe 7 are extended, the gas injection pressure regulating pipe 12 and the pressure regulating room gas observation pipe 8 are deployed, and the connections between each pipeline and the wall components are sealed.

[0089] Step 3: Install the high pressure expansion capsule 5;

[0090] Specifically, a groove is cut at the position where the high-pressure expansion capsule 5 is installed in the tunnel 14, and the groove is the second groove 16;

[0091] Preferably, the second undercut 16 has a depth of not less than 300 mm and a width of not less than 1000 mm;

[0092] Place the high-pressure expansion capsule 5 into the second cutout 16, fix it in the second cutout 16 with an anchor rod, anchor cable or fixing screw, and lay an infusion tube 10, with one end connected to the high-pressure expansion capsule 5 and the other end connected to an external injection device;

[0093] The high pressure expansion capsule 5 is pressure tested.

[0094] Specifically, the external liquid injection device is started to test the high-pressure expansion capsule 5 to observe its expansion deformation and its fit with the inner wall of the second cutout 16;

[0095] After expansion, if the high-pressure expansion capsule 5 can fit tightly with the inner wall of the second cutout 16, it proves that the high-pressure expansion capsule 5 is deployed normally, and the subsequent steps can be carried out after the pressure is released;

[0096] If the high-pressure expansion capsule 5 cannot fit tightly with the inner wall of the second groove 16, it means that there is a deviation in the deployment of the high-pressure expansion capsule 5. After pressure relief, adjust the assembly position of the high-pressure expansion capsule 5 and repeat the pressure test process.

[0097] Step 4: construct the wall components located on the outside;

[0098] Specifically, a groove is cut at the location where the outer wall assembly is constructed in the tunnel 14, and the groove is the first groove 15;

[0099] Preferably, the first cutout 15 has a depth of not less than 500 mm and a width of not less than 1000 mm;

[0100] Construct the inner and outer closed walls in sequence, and fill the interlayer 3 between them;

[0101] During the construction process, the gas injection pressure regulating pipe 12, the water discharge pipe 11, the liquid delivery pipe 10, the gas delivery pipe 9, the pressure regulating room gas observation pipe 8 and the goaf gas observation pipe 7 are further extended, the grouting pipe 6 is deployed, and the connection between each pipe and the wall assembly is blocked;

[0102] The grouting pipes 6 are respectively connected to external grouting equipment.

[0103] Step 5: inject grout between two wall components to form a filling body 4;

[0104] Specifically, the grouting pipe 6 is connected to the external grouting equipment, the relevant valve is opened, and the slurry is injected between the two wall components, and the valve is closed after the slurry is filled;

[0105] Subsequently, the external liquid injection equipment is started to inject high-pressure liquid into the high-pressure expansion capsule 5, and the indication of the pressure gauge on the grouting pipe 6 is observed simultaneously. When the indication does not increase, it indicates that the high-pressure expansion capsule 5 is completely sealed after expansion (the conventional grouting output pressure is 5MPa. During the continuous injection of slurry, the pressure in the pipe is less than 5MPa. As the space between the two wall components tends to be full, the pressure in the pipe gradually increases. When the pressure in the pipe is completely equal to the output pressure, it indicates that the slurry in the pipe has completely lost its fluidity, that is, the space between the two wall components is completely filled);

[0106] Then, the slurry in the grouting pipe 6 is depressurized and the grouting pipe 6 is flushed.

[0107] Preferably, the slurry is prepared from fly ash, cement, sand and quicklime.

[0108] Step 6: Adjust the internal pressure of the surge chamber to isolate the contact between the gas in the goaf and the wall components, thus completing the deployment of the closed structure;

[0109] Specifically, as the service time of the rigid-flexible sealed system continues to increase, micro cracks may appear around the flexible wall, causing some gas from the goaf to enter the surge chamber. This situation needs to be identified by testing the gas composition in the surge chamber and the goaf.

[0110] Nitrogen is injected into the pressure regulating chamber through the gas injection pressure regulating pipe 12 for fine adjustment, so that the gas pressure in the pressure regulating chamber is slightly higher than the gas pressure on the goaf side, so that the gas on the goaf side cannot enter the pressure regulating chamber.

[0111] Affected by the factors of mining and roof stress concentration, when cracks appear around the tunnel 14 and inside the filling body, step seven is implemented.

[0112] Step 7: cyclically seal the internal fissures 20 of the filling body 4 and the fissures 20 of the rock mass 13 around the tunnel 14;

[0113] The high-pressure expansion capsule 5 is controlled to shrink, and slurry is injected again into the space between the two wall components through the grouting pipe 6 until the cracks 20 connected thereto are filled;

[0114] Subsequently, the high-pressure expansion capsule 5 is controlled to expand, squeezing the slurry around it, increasing the internal power of the slurry, thereby increasing its diffusion range around the crack 20 and enhancing the sealing performance;

[0115] When the crack 20 appears again, step seven is performed again for sealing.

[0116] When special working conditions occur and the rigid-flexible sealed structure needs to be unsealed, implement step eight.

[0117] Step 8: Unseal the sealed structure and dismantle it;

[0118] While maintaining the stability of the flexible wall 1, first remove the external wall components, then reduce the gas pressure in the goaf, and at the same time control the contraction of the flexible wall 1 to increase the fresh air flow into the goaf, and gradually remove the flexible wall 1.

[0119] The above contents are only preferred embodiments of the present invention. For ordinary technicians in this field, many changes can be made in the specific implementation methods and application scopes based on the ideas of the present invention. As long as these changes do not deviate from the concept of the present invention, they all belong to the protection scope of the present invention.

Claims

1. A rigid-flexible permanent closed structure, characterized in that: It includes an expansion deformation unit and a rigid support unit; The rigid support unit comprises two wall components and a filling body, wherein the wall component is composed of two closed walls and a sandwich, the two closed walls are arranged in parallel, the sandwich is arranged in the gap between the two closed walls, and the two wall components are arranged on the inner and outer sides of the filling body respectively; The expansion deformation unit includes a flexible wall and a high-pressure expansion capsule. The high-pressure expansion capsule is sleeved on the middle part of the filling body. The flexible wall is arranged between the goaf and the rigid support unit, and a gap is left between the flexible wall and the inner wall assembly.

2. A rigid-flexible permanent sealed structure according to claim 1, characterized in that: It also includes an auxiliary unit, which includes a grouting pipe, a gas observation pipe in the goaf, a gas observation pipe in the pressure regulating room, a gas transmission pipe, a liquid transmission pipe, a water discharge pipe and a gas injection pressure regulating pipe. The grouting pipe runs through the outer wall component from the outside to the inside, and its end extends into the filling body. The gas observation pipe in the goaf runs through the outer wall component, the filling body, the inner wall component and the flexible wall from the outside to the inside, and its end extends to the inside of the flexible wall. The gas observation pipe in the pressure regulating room runs through the outer wall component, the filling body and the inner wall component from the outside to the inside, and its end extends to the flexible wall and the inner wall. In the gap between the components, the air supply pipe penetrates the outer wall component, the filling body and the inner wall component from the outside to the inside, and its end extends to the inside of the flexible wall. The liquid supply pipe penetrates the outer wall component from the outside to the inside, and its end extends to the inside of the high-pressure expansion capsule. The drain pipe penetrates the outer wall component, the filling body, the inner wall component and the flexible wall from the outside to the inside, and its end extends to the inside of the flexible wall. The gas injection pressure regulating pipe penetrates the outer wall component, the filling body and the inner wall component from the outside to the inside, and its end extends to the gap between the flexible wall and the inner wall component.

3. A rigid-flexible permanent sealed structure according to claim 2, characterized in that: The length and height of the grouting pipe match the expanded position of the high-pressure expansion capsule. When the high-pressure expansion capsule expands, the port of the grouting pipe abuts against the high-pressure expansion capsule, so that the port of the grouting pipe is completely blocked.

4. A rigid-flexible permanent sealed structure according to claim 1, characterized in that: A plurality of fixing wings are evenly spaced on the inner and outer end surfaces of the flexible wall and the high-pressure expansion capsule, and the two wall components and the high-pressure expansion capsule are positioned by the fixing wings.

5. A rigid-flexible permanent sealed structure according to claim 1, characterized in that: The material of the interlayer is any one of loess, fly ash or concrete or a mixture of them.

6. A construction method of a rigid-flexible permanent closed structure, the specific steps are as follows: Step 1: Build a flexible wall to isolate the goaf; Constructing a fourth cut in the tunnel, and constructing a flexible wall in the fourth cut; At the same time, water discharge pipes and gas observation pipes in goaf areas are deployed; Step 2: construct the inner wall assembly to form a surge chamber; Constructing a third cutout in the tunnel, and constructing the wall assembly in the third cutout; At the same time, the water discharge pipe, gas transmission pipe and gas observation pipe in the goaf are extended, and the gas injection pressure regulating pipe and gas observation pipe in the pressure regulating room are deployed; Step 3: Install the high pressure expansion capsule; Construct a second cut in the tunnel, install the high-pressure expansion capsule in the second cut, and conduct a pressure test; Step 4: construct the wall components located on the outside; Constructing a first cutout in the tunnel, and constructing the wall assembly in the first cutout; At the same time, further extend the gas injection and pressure regulating pipe, water discharge pipe, liquid infusion pipe, gas transmission pipe, gas observation pipe in the pressure regulating room and gas observation pipe in the goaf, and deploy grouting pipe; Step 5: inject grout between two wall components to form a filling body; After the grouting pipe is connected to the external grouting equipment, the relevant valve is opened to inject the slurry between the two wall components; After the slurry fills the space between the two wall components, the external liquid injection equipment is started to inject high-pressure liquid into the high-pressure expansion capsule until the high-pressure expansion capsule expands to the limit state and then the liquid injection is stopped; Subsequently, the slurry in the grouting pipe is depressurized and the grouting pipe is flushed; Step 6: Adjust the internal pressure of the pressure regulating chamber to isolate the contact between the gas in the goaf and the wall components.

7. A construction method for a rigid-flexible permanent closed structure according to claim 6, characterized in that: Also includes: Step 7: Circularly seal the internal cracks of the filling body and the cracks of the rock mass around the tunnel; When cracks appear around the tunnel and inside the filling body, implement step seven.

8. A construction method for a rigid-flexible permanent closed structure according to claim 7, characterized in that: The specific implementation process of step seven is: control the high-pressure expansion capsule to shrink, and inject slurry again into the gap between the two wall components through the grouting pipe until the cracks connected thereto are filled, and then control the high-pressure expansion capsule to expand.

9. The construction method of a rigid-flexible permanent closed structure according to claim 6, characterized in that: Also includes: Step 8: Unseal the sealed structure and dismantle it; When special working conditions occur and the rigid-flexible sealed structure needs to be unsealed, implement step eight.

10. A construction method for a rigid-flexible permanent closed structure according to claim 9, characterized in that: The specific implementation process of step eight is: while maintaining the stability of the flexible wall, first remove the external wall components, then reduce the gas pressure in the goaf, and at the same time control the contraction of the flexible wall to increase the fresh air flow into the goaf, and gradually remove the flexible wall.