Integral bridge road transition section structure suitable for steep slope soft soil layer

By connecting pile plate walls, drilled piles and raft plates into an integral structure, the deformation and settlement problems of railway transition sections caused by weak soil layers on steep slopes are solved, and the effect of reducing costs and improving deformation resistance is achieved, satisfying the stability of high-speed railways Require.

CN118997191APending Publication Date: 2024-11-22CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411326004.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

In steep slope areas, weak soil layers cause large deformation or uneven settlement during the construction and operation of railway transition sections. The prior art requires a larger cross-sectional area or a larger number of pile walls and foundation reinforcement to meet stability requirements.

Method used

By connecting pile plate walls, drilled piles and raft plates into an integral structure, the pile plate walls and drilled piles assist each other, reducing the number of drilled piles and the cross-sectional area of ​​pile plate walls, reducing the amount of concrete, forming a suitable for The overall bridge transition section structure of weak soil layer on steep slopes.

Benefits of technology

It has achieved the improvement of the safety and stability of the roadbed and resistance to deformation while reducing project costs and concrete usage, meeting the deformation and stability requirements of high-speed railways above 400km/h, and significantly improving economic and environmental benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997191A_ABST
    Figure CN118997191A_ABST
Patent Text Reader

Abstract

The invention discloses an integral bridge road transition section structure suitable for a steep slope soft soil layer, comprising: a sheet-pile wall structure comprising a first sheet-pile wall and a second sheet-pile wall arranged in sequence along the slope direction, the top of the first sheet-pile wall extending upward to the surface of a steep slope; the raft plate is arranged between the two sheet-pile walls through a plurality of drilled piles, the two ends of the raft plate are connected with the two sheet-pile walls correspondingly, and the end, close to the second sheet-pile wall, of the raft plate is connected with the top of the second sheet-pile wall; the distance between the connecting point of the end, close to the first sheet-pile wall, of the raft and the first sheet-pile wall and the vertex of the first sheet-pile wall is 1 / 3-1 / 2 of the overall length of the first sheet-pile wall. According to the integral bridge road transition section structure, the sheet-pile wall, the bored piles and the raft are connected into a whole, so that the sheet-pile wall and the bored piles assist each other, the number of the bored piles, the section area of the sheet-pile wall and the use amount of concrete can be reduced, and meanwhile the construction cost is reduced. The safety and the stability of the steep slope soft soil layer roadbed are ensured; and the anti-deformation capability of the transition section for resisting the overlying load is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geotechnical engineering, and in particular to an integral bridge-road transition section structure suitable for steep slope soft soil layers. Background Art

[0002] The speed of railway trains has been updated from 160km / h and 250km / h to 350km / h. With the continuous increase in railway speed, higher requirements have been placed on the settlement control and stability of roadbed projects.

[0003] The railway line inevitably needs to pass through steep slope fill, expansive soil, and water-rich fully weathered granite areas. However, due to the looseness, expansion, and water-softening properties of the fill, expansive soil, and water-rich fully weathered granite, it often causes large deformation or uneven settlement during the construction or operation of the railway transition section.

[0004] The existing high-speed railway soft soil bridge-road transition section roadbed often uses pile-sheet wall to support the slope to resist the downward force of the slope; pile-sheet (raft) structure or composite foundation is used to reinforce the foundation to prevent large or uneven settlement of the roadbed. However, the retaining project and the foundation reinforcement project are independent projects, each playing its own role, so that the geotechnical structure needs a larger cross-sectional area or a larger number to meet the stable deformation requirements of the bridge-road transition section in steep slope areas.

[0005] In view of this, it is necessary to design an integral bridge-road transition section structure suitable for steep slope soft soil layers to solve the above problems. Summary of the invention

[0006] The object of the present invention is to provide an integral bridge-road transition section structure suitable for soft soil layers on steep slopes, which is achieved by connecting pile-sheet walls, bored piles and raft slabs into a whole so that the pile-sheet walls and bored piles assist each other, thereby reducing the number of bored piles, the cross-sectional area of ​​the pile-sheet walls and the amount of concrete used in the transition section project, while ensuring the safety and stability of the roadbed in soft soil layers on steep slopes and enhancing the deformation resistance of the transition section against overlying loads.

[0007] To achieve the above-mentioned purpose, the present invention provides an integral bridge-road transition section structure suitable for steep slope soft soil layers, comprising: The pile-sheet wall structure comprises a first pile-sheet wall and a second pile-sheet wall arranged in sequence along the slope direction, wherein the top of the first pile-sheet wall extends upward to the steep slope surface; A raft is arranged between two pile-board walls through a plurality of bored piles, and both ends of the raft are respectively connected to the two pile-board walls, so that the pile-board walls, the bored piles and the raft form an integral structure, wherein one end of the raft close to the second pile-board wall is connected to the top of the second pile-board wall, and the distance between the connection point of the one end of the raft close to the first pile-board wall and the first pile-board wall and the vertex of the first pile-board wall is 1 / 3-1 / 2 of the overall length of the first pile-board wall; a fill body is also arranged above the raft.

[0008] As a further improvement of the present invention, the top of the second pile-sheet wall extends outside the steep slope, the bottom extends into the rock and soil layer, and the length of the second pile-sheet wall extending into the rock and soil layer is greater than or equal to 1 / 2 of the overall length of the second pile-sheet wall.

[0009] As a further improvement of the present invention, the raft slab is a reinforced concrete slab.

[0010] As a further improvement of the present invention, the thickness of the reinforced concrete slab is 0.6-1.0m.

[0011] As a further improvement of the present invention, a plurality of pile-sheet connecting bars for connecting to the longitudinal steel bars on the reinforced concrete slab are arranged at intervals along the longitudinal direction of the roadbed on the pile-sheet wall.

[0012] As a further improvement of the present invention, the concrete strength grade used for the reinforced concrete slab and the pile-sheet wall is greater than or equal to C35.

[0013] As a further improvement of the present invention, the slope rate of the steep slope is greater than or equal to 1:2.5.

[0014] As a further improvement of the present invention, a drainage ditch is also provided on the filling layer along the longitudinal direction of the roadbed.

[0015] A construction method for an integral bridge-road transition section structure suitable for steep slope soft soil layers comprises the following steps: S1. Construction of pile-sheet wall: stake out the pile position of the pile-sheet wall, construct the pile-sheet wall retaining wall after excavating the pile hole, and reserve the pile-sheet connecting reinforcement at the designed elevation of the pile-sheet wall close to the raft slab side; finally, pour the pile-sheet wall concrete to complete the pile-sheet wall construction; S2. Bored pile construction: excavate to the designed elevation and construct bored piles; S3, raft slab construction: connect the steel bars on both sides of the raft slab to the pile-slab connecting bars of the two pile-slab walls respectively; then pour the concrete of the raft slab, and finally further reinforce the connection between the raft slab and the pile-slab wall to achieve foundation reinforcement and fixed connection with the slope retaining structure; S4. Construction of filling layer: Use a composition of graded crushed stone and cement to construct two layers of filling on the raft slab, and reserve drainage ditches on the filling layer to complete the construction of the filling layer.

[0016] As a further improvement of the present invention, in step S3, the further reinforcement treatment of the connection between the raft slab and the pile-sheet wall is specifically: the connection between the raft slab and the pile-sheet wall is bonded, grouted, and filled with mortar using M40 cement mortar.

[0017] The beneficial effects of the present invention are: 1. The present invention connects the two ends of the raft slab to the pile-sheet walls on both sides thereof respectively, so that the pile-sheet walls, bored piles and the raft slab are connected into a whole, and the shear strength and compressive strength of the pile-sheet walls can be brought into play, so that the pile-sheet walls can bear the horizontal thrust of the slope to prevent landslides, and can also bear part of the upper load of the roadbed transmitted by the raft slab, so that the pile-sheet walls and the bored piles work together to prevent the road cutting from settling or uplifting, thereby reducing the number of bored piles or increasing the spacing between bored piles; at the same time, the bored piles can also assist in enhancing the anti-landslide capability of the pile-sheet walls, and because the pile-sheet walls on both sides are connected into a whole through the raft slab, the pile-sheet walls on both sides can jointly resist the downward sliding force of the steep slope roadbed, thereby achieving the effect of reducing the size of the pile-sheet walls while improving the anti-landslide capability of the pile-sheet walls.

[0018] 2. Compared with the foundation reinforcement and roadbed support separate structure, the integral bridge-road transition section structure of the present invention can reduce the amount of concrete by nearly 45%, with significant economic and environmental benefits. The integral bridge-road transition section structure of the present invention has good anti-deformation and anti-settlement capabilities, and can meet the deformation and stability requirements of high-speed railway roadbed projects above 400km / h. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 The schematic diagram of the structure of the integral bridge-road transition section of the present invention is applicable to soft soil layers on steep slopes.

[0020] Figure 2 It is a plan view of the pile-sheet wall and the pile-sheet connecting reinforcement.

[0021] Figure 3 This is the construction plan of the overall bridge-road transition section structure.

[0022] Reference numerals 11. First pile-sheet wall; 12. Second pile-sheet wall; 13. Pile-sheet connecting bars; 20. Bored piles; 30. Reinforced concrete slab; 31. Longitudinal reinforcement; 41. First layer of compacted material; 42. Second layer of compacted material; 43. Drainage ditch; 50. Steep slope; 51. Geotechnical layer. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0024] It should also be noted that, in order to avoid obscuring the present invention due to unnecessary details, only structures and / or processing steps closely related to the scheme of the present invention are shown in the drawings, while other details that are not closely related to the present invention are omitted.

[0025] In addition, it should be noted that the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.

[0026] like Figure 1 As shown, the present invention provides an integral bridge-road transition section structure suitable for steep slope soft soil layers, comprising: The pile-sheet wall structure comprises a first pile-sheet wall 11 and a second pile-sheet wall 12 which are arranged at intervals along the roadbed in a transverse direction, and the first pile-sheet wall 11 and the second pile-sheet wall 12 are arranged in sequence along the slope direction, and the top of the first pile-sheet wall 11 extends upward to the surface of the steep slope 50; The raft is arranged between two pile-sheet walls through a plurality of bored piles 20, and the two ends of the raft are respectively connected to the two pile-sheet walls, so that the pile-sheet walls, the bored piles 20 and the raft form an integral structure, wherein the end of the raft close to the second pile-sheet wall 12 is connected to the top of the second pile-sheet wall 12, and the distance between the connection point of the end of the raft close to the first pile-sheet wall 11 and the first pile-sheet wall 11 and the vertex of the first pile-sheet wall 11 is 1 / 3-1 / 2 of the overall length of the first pile-sheet wall 11; a fill body is also arranged above the raft.

[0027] Specifically, the first pile-sheet wall 11 , the second pile-sheet wall 12 and the bored piles 20 all extend downward to a certain depth in the rock and soil layer 51 of the steep slope 50 .

[0028] Specifically, the raft slab is a reinforced concrete slab 30, and the strength grade of the concrete used in the reinforced concrete slab 30 is greater than or equal to C35; illustratively, the thickness of the reinforced concrete slab 30 is 0.6-1.0 m.

[0029] like Figure 2 As shown, a plurality of pile-sheet connecting ribs 13 for connecting to the longitudinal reinforcement 31 on the reinforced concrete slab 30 are arranged at intervals along the longitudinal direction of the roadbed on the pile-sheet wall. By connecting the pile-sheet connecting ribs 13 to the longitudinal reinforcement 31 on the reinforced concrete slab 30, the pile-sheet wall and the reinforced concrete slab 30 can be firmly connected to form an integral structure.

[0030] Specifically, the distance between the connection point between the left end of the reinforced concrete slab 30 and the first pile-sheet wall 11 and the vertex of the first pile-sheet wall 11 is 1 / 3-1 / 2 of the overall length of the first pile-sheet wall 11; the top of the second pile-sheet wall 12 extends outside the steep slope 50, and the bottom extends into the rock and soil layer 51, and the length of the second pile-sheet wall 12 extending into the rock and soil layer 51 is greater than or equal to 1 / 2 of the overall length of the second pile-sheet wall 12. Since the first pile-sheet wall 11 and the second pile-sheet wall 12 are connected as a whole through the reinforced concrete slab 30, the first pile-sheet wall 11 and the second pile-sheet wall 12 can be used to jointly resist the downward force of the roadbed of the steep slope 50. Compared with the existing foundation reinforcement and roadbed support separate structure, the two pile-sheet walls of the present invention can use the reinforced concrete slab 30 to transmit horizontal force, so that the two pile-sheet walls can support each other, effectively improving the anti-landslide ability of the pile-sheet wall structure. At the same time, by making the distance between the connection point between the left end of the reinforced concrete slab 30 and the first pile-sheet wall 11 and the vertex of the first pile-sheet wall 11 1 / 3-1 / 2 of the overall length of the first pile-sheet wall 11, the second pile-sheet wall 12 can better transmit horizontal force through the reinforced concrete slab 30, so that the second pile-sheet wall 12 can provide sufficient horizontal support for the first pile-sheet wall 11, thereby improving the ability of the first pile-sheet wall 11 to resist the slide of the steep slope 50. In addition, by making the length of the second pile-sheet wall 12 extending into the rock and soil layer 51 greater than or equal to 1 / 2 of the overall length of the second pile-sheet wall 12, the center of gravity of the second pile-sheet wall 12 can be located in the steep slope 50, thereby enhancing the supporting effect of the second pile-sheet wall 12. When the horizontal force of the first pile-sheet wall 11 sliding down the steep slope 50 is transmitted to the second pile-sheet wall 12 through the reinforced concrete slab 30, the second pile-sheet wall 12 can be prevented from being easily loosened due to the excessively high center of gravity of the second pile-sheet wall 12.

[0031] Specifically, the first pile-sheet wall 11 and the second pile-sheet wall 12 are connected into an integral structure through the reinforced concrete slab 30. In addition to enhancing the anti-landslide ability of the overall bridge-road transition section structure, the pile-sheet wall can also be used to bear the upper load force of the roadbed transmitted by the reinforced concrete slab 30, so that the pile-sheet wall and the bored piles 20 work together to prevent settlement or uplift of the road cutting, thereby reducing the number of bored piles 20 or increasing the spacing between bored piles 20 to reduce construction costs while enhancing the overall bridge-road transition section structure's ability to resist deformation against overlying loads.

[0032] For example, Figure 3 As shown, along the longitudinal direction of the roadbed, the first pile-sheet wall 11 and the second pile-sheet wall 12 are spaced apart; along the transverse direction of the roadbed, a number of bored piles 20 can be spaced apart according to support requirements. In this exemplary embodiment, a bored pile 20 is disposed between the first pile-sheet wall 11 and the second pile-sheet wall 12 along the transverse direction of the roadbed, and along the longitudinal direction of the roadbed, a number of bored piles 20 are spaced apart.

[0033] Since the two ends of the reinforced concrete slab 30 are connected to the two pile-sheet walls, and the bottom is connected to the bored piles 20, that is, the pile-sheet wall, the reinforced concrete slab 30 and the bored piles 20 are an integral structure, so that the bored piles 20 can provide vertical support for the reinforced concrete slab 30, and can also use the reinforced concrete slab 30 as a transmission medium to provide horizontal support for the pile-sheet wall, so that the bored piles 20 can assist in enhancing the anti-landslide ability of the pile-sheet wall, thereby reducing the size of the pile-sheet wall to reduce the construction cost while ensuring the stability of the overall bridge-road transition section structure, that is, the pile-sheet wall and the bored piles 20 can be mutually Mutual assistance, while reducing the number of bored piles 20, the cross-sectional area of ​​the pile-sheet wall and the amount of concrete used in the transition section project, ensures the safe and stable shape of the steep slope 50 soft soil layer roadbed and enhances the deformation resistance of the transition section to the overlying load, so that compared with the foundation reinforcement and roadbed support separate structure, the integral bridge-road transition section structure of the present invention can reduce the amount of concrete by nearly 45%, with significant economic and environmental benefits, and the integral bridge-road transition section structure of the present invention has better deformation resistance and anti-subsidence ability, which can meet the deformation and stability requirements of high-speed railway roadbed projects above 400km / h.

[0034] Specifically, the filling layer includes a first layer of filling body 41 and a second layer of filling body 42 arranged in sequence along the vertical upward direction, wherein the first layer of filling body 41 uses graded crushed stone + 3% cement, and the second layer of filling body 42 uses graded crushed stone + 5% cement. A drainage ditch 43 is also arranged on the filling layer along the longitudinal direction of the roadbed.

[0035] Specifically, the first pile-sheet wall 11 and the second pile-sheet wall 12 are both reinforced concrete pile-sheet walls, and the strength grade of the concrete used in the reinforced concrete pile-sheet walls is greater than or equal to C35.

[0036] Specifically, the construction steps of the integral bridge-road transition section structure of the present invention are as follows: S1. Pile-sheet wall construction: The pile position of the reinforced concrete pile-sheet wall is set out, and the pile-sheet wall protection wall is constructed after the pile hole is excavated. Then the pile hole position is checked and the pile-sheet connecting reinforcement 13 is reserved at the design elevation of the reinforced concrete pile-sheet wall near the reinforced concrete slab 30 side, and the steel bar is protected from corrosion; finally, the pile-sheet wall concrete is poured to complete the pile-sheet wall construction; S2, construction of bored piles 20: excavation to the designed elevation, construction of bored piles 20; S3, construction of reinforced concrete slab 30: tie the longitudinal steel bars 31 of reinforced concrete slab 30, weld the reserved pile-slab connecting bars 13 to the longitudinal steel bars 31 of reinforced concrete slab 30; then pour the concrete of reinforced concrete slab 30, use M40 cement mortar to bond, point and squeeze the mortar at the connection between reinforced concrete slab 30 and pile-slab wall, so as to realize the foundation reinforcement and the fixed connection of slope retaining structure; S4, filling layer construction, using graded crushed stone + 3% cement to form the first filling body 41, using graded crushed stone + 5% cement to form the second filling body 42, forming a filling layer, and at the same time reserving a drainage ditch 43 on the filling layer.

[0037] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. An integral bridge-road transition section structure suitable for steep slope soft soil layers, characterized in that: include: The pile-sheet wall structure comprises a first pile-sheet wall and a second pile-sheet wall arranged in sequence along the slope direction, wherein the top of the first pile-sheet wall extends upward to the steep slope surface; A raft is arranged between two pile-board walls through a plurality of bored piles, and both ends of the raft are respectively connected to the two pile-board walls, so that the pile-board walls, the bored piles and the raft form an integral structure, wherein one end of the raft close to the second pile-board wall is connected to the top of the second pile-board wall, and the distance between the connection point of one end of the raft close to the first pile-board wall and the first pile-board wall and the vertex of the first pile-board wall is 1 / 3-1 / 2 of the overall length of the first pile-board wall; a fill body is also arranged above the raft.

2. The integral bridge-road transition section structure suitable for steep slope soft soil layer according to claim 1 is characterized in that: The top of the second pile-sheet wall extends outside the steep slope, and the bottom extends into the rock and soil layer, and the length of the second pile-sheet wall extending into the rock and soil layer is greater than or equal to 1 / 2 of the entire length of the second pile-sheet wall.

3. The integral bridge-road transition section structure suitable for steep slope soft soil layer according to claim 1 is characterized in that: The raft slab is a reinforced concrete slab.

4. The integral bridge-road transition section structure suitable for steep slope and soft soil layer according to claim 3 is characterized in that: The thickness of the reinforced concrete slab is 0.6-1.0m.

5. The integral bridge-road transition section structure applicable to steep slope and soft soil layer according to claim 3 is characterized in that: A plurality of pile-sheet connecting bars for connecting with the longitudinal steel bars on the reinforced concrete slab are arranged at intervals along the longitudinal direction of the roadbed on the pile-sheet wall.

6. The integral bridge-road transition section structure applicable to steep slope and soft soil layer according to claim 3 is characterized in that: The concrete strength grade used for the reinforced concrete slab and pile-sheet wall is greater than or equal to C35.

7. The integral bridge-road transition section structure applicable to steep slope and soft soil layer according to claim 1 is characterized in that: The slope of the steep slope is greater than or equal to 1:2.

5.

8. The integral bridge-road transition section structure applicable to steep slope and soft soil layer according to claim 1 is characterized in that: A drainage ditch is also arranged on the filling layer along the longitudinal direction of the roadbed.

9. A construction method for an integral bridge-road transition section structure suitable for steep slope soft soil layers according to claim 1, characterized in that: The following steps are involved: S1. Construction of pile-sheet wall: stake out the pile position of the pile-sheet wall, construct the pile-sheet wall retaining wall after excavating the pile hole, and reserve the pile-sheet connecting reinforcement at the designed elevation of the pile-sheet wall close to the raft slab side; finally, pour the pile-sheet wall concrete to complete the pile-sheet wall construction; S2. Bored pile construction: excavate to the designed elevation and construct bored piles; S3, raft slab construction: connect the steel bars on both sides of the raft slab to the pile-slab connecting bars of the two pile-slab walls respectively; then pour the concrete of the raft slab, and finally further reinforce the connection between the raft slab and the pile-slab wall to achieve foundation reinforcement and fixed connection with the slope retaining structure; S4. Construction of filling layer: Use a composition of graded crushed stone and cement to construct two layers of filling on the raft slab, and reserve drainage ditches on the filling layer to complete the construction of the filling layer.

10. The construction method of the integral bridge-road transition section structure applicable to steep slope and soft soil layer according to claim 9 is characterized in that: In step S3, the further reinforcement treatment of the connection between the raft slab and the pile-sheet wall is specifically as follows: the connection between the raft slab and the pile-sheet wall is bonded, grouted, and filled with mortar using M40 cement mortar.