Method and system for determining ecological water demand process suitable for fish breeding

By constructing a method and system for determining the ecological water demand process adapted to fish reproduction, and combining the ecological objective function and the power generation objective function, a dynamic programming method with a penalty factor is adopted to resolve the contradiction between power generation benefits and ecological benefits in reservoir scheduling, improve the calculation of ecological membership degree, and provide ecological scheduling decisions for fish reproduction.

CN119005614APending Publication Date: 2024-11-22WUHAN UNIV

Patent Information

Application Number
CN202411098289.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Traditional reservoir scheduling models neglect ecological needs in pursuit of power generation benefits, resulting in damage to fish breeding environments and making it difficult to balance the contradiction between power generation benefits and ecological benefits.

Method used

A method and system for determining the ecological water demand process adapted to fish reproduction is constructed. This is achieved by determining the ecological demand indicators during the fish breeding season, constructing an ecological scheduling model, and solving it using a dynamic programming method based on penalty factors. A multi-objective optimization scheduling model is then established by combining the ecological objective function and the power generation objective function.

Benefits of technology

The method for determining ecological membership degree has been improved, which solves the problem of the lack of distinguishability of traditional membership degree function for minimum or maximum values, alleviates the contradiction between reservoir power generation benefits and ecological benefits, and provides an ecological scheduling decision reference for fish reproduction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005614A_ABST
    Figure CN119005614A_ABST
Patent Text Reader

Abstract

The invention discloses a method and a system for determining an ecological water demand process suitable for fish breeding, and relates to the field of reservoir dispatching research. Based on the method, firstly, ecological demand indexes of the fish breeding period are determined, and the water temperature condition and the water rising process are involved; secondly, determining a fish breeding season ecological demand index range and membership, and quantifying a membership value of each index; then constructing an ecological scheduling model, including determining an objective function and constraint conditions; and finally, determining a model solving algorithm, and obtaining a non-inferior solution set which is relatively uniformly and widely distributed. According to the method and system for determining the ecological water demand process suitable for fish breeding, the ecological membership degree determination method is improved and used for calculating the ecological target membership degree, the problem that a traditional membership degree function has no distinction degree for the situation exceeding the minimum value or the maximum value is solved, the contradiction between the reservoir power generation benefit and the ecological benefit is relieved, and the economic benefit of the reservoir is improved. And decision reference is provided for ecological scheduling of spawning periods of the four major Chinese carps.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of reservoir regulation research, in particular to a method and system for determining an ecological water demand process adapted to fish reproduction in ecological regulation. Background Art

[0002] As an important water conservancy project facility, reservoirs play an indispensable role in flood control, irrigation, water supply, power generation, etc. However, while these projects change the hydrological situation of natural rivers, they also have adverse effects on river biological resources, especially fish and their living environment. With the improvement of ecological environmental protection awareness, reservoirs are facing the challenge of meeting ecological needs while pursuing power generation benefits.

[0003] As a beneficial facility, the economic benefits of reservoirs should be considered as an important indicator in scheduling. Generally, the optimization scheduling model is established with the maximum power generation as the goal. The scheduling process obtained can fully guarantee the power generation benefits, but it does not take into account the requirements related to river ecology. The scheduling method that considers ecological needs can guarantee the ecological benefits of the basin, but it also leads to the loss of some power generation benefits. The contradiction between the two has become a problem that needs to be solved urgently in the current reservoir management.

[0004] In recent years, in order to alleviate this contradiction, ecological regulation has gradually become an important direction of reservoir regulation, among which the methods and systems for determining the ecological water demand process that adapts to fish reproduction have become a research hotspot. Summary of the invention

[0005] The purpose of the present invention is to propose a method and system for determining an ecological water demand process adapted to fish reproduction, which solves the problem of the traditional membership function having no discrimination for values ​​exceeding a minimum or maximum value, and alleviates the contradiction between the power generation benefit and the ecological benefit of the reservoir.

[0006] To achieve the above object, the present invention proposes a method and system for determining an ecological water demand process adapted to fish reproduction, the steps of which are as follows:

[0007] S1. Determine the ecological demand indicators of fish during the breeding period;

[0008] S2. Determine the range and degree of ecological demand indicators for fish during the breeding season;

[0009] S3. Constructing an ecological scheduling model, including determining the objective function and determining the constraints;

[0010] S4. Determine the model solving algorithm.

[0011] Preferably, in step S1, the ecological demand index of fish breeding period is determined by the following steps:

[0012] S11. Determine the ecological water temperature conditions during the fish breeding period. The lower water temperature threshold for spawning of the four major carps is 18°C;

[0013] S12. Determine the ecological water rise process during the fish breeding season.

[0014] Preferably, in step S12, the factors of the stimulation degree of the ecological flooding process on the reproductive behavior of fish can be summarized as intensity, intensity change rate and time accumulation; the intensity factor can be characterized by initial flow and peak flow, the intensity change rate factor can be characterized by the daily increase in flow, and the time accumulation factor can be characterized by the duration of the flooding and the total increase in flow.

[0015] Preferably, in step S2, after determining the evaluation index of each factor, a membership function is established according to the appropriate range of the index to quantify the membership value of each index. The formula is as follows:

[0016]

[0017] Among them, FZ n,t is the membership degree of the river flow on the tth day of the nth month, Q n,t is the river flow on the tth day of the nth month; q1 and q4 are the recommended minimum and maximum environmental flow values ​​for each period, respectively; q2 and q3 are the upper and lower limits of the recommended suitable environmental flow for each period, respectively.

[0018] Preferably, in step S3, the objective function includes an ecological objective function and a power generation objective function, and the ecological objective function is as follows:

[0019]

[0020] Among them, f eco is the ecological objective function, FZ n,t is the membership degree of the river flow on the tth day of the nth month; T n is the number of days in the nth month of the scheduling period;

[0021] The power generation objective function is as follows:

[0022]

[0023] Among them, E is the total power generation of the reservoir during the dispatch period, in kW·h; T is the total number of time periods during the dispatch period, and the time period sequence number t=1,2,3...T; K is the comprehensive output coefficient of the hydropower station; Q fd (t) is the power generation flow of the hydropower station in period t, in m 3 / s; H(t) is the generating head of the hydropower station in period t, in m; Δt is the calculation period length of period t in hours, in h.

[0024] Preferably, in step S3, the constraints include scheduling period constraints and flood period constraints.

[0025] Preferably, the scheduling period constraints include:

[0026] Water balance constraints:

[0027] V(t+1)=V(t)+3600×(Q rk (t)-Q ck (t))Δt (4)

[0028] Water level constraints:

[0029] Z min (t)≤Z(t)≤Z max (t) (5)

[0030] Output constraints:

[0031] N min (t)≤N(t)≤N max (t) (6)

[0032] Boundary constraints:

[0033] Z(0)=Z start ,Z(T)=Z end (7)

[0034] Traffic constraints:

[0035]

[0036] Non-negative constraints: All variables are non-negative;

[0037] Where V(t) is the water storage capacity of the hydropower station in period t, in m 3 ;Q rk (t), Q ck (t) are the inflow and outflow of the hydropower station in period t, in m 3 / s; Z min (t), Z max (t) are the minimum and maximum values ​​of the water level allowed in the hydropower station during the period t, in m; N min (t), N max (t) are the minimum and maximum output values ​​of the hydropower station in period t, in kW; Z start , Z end are the initial and final water levels of the hydropower station dispatch period, in m; are the minimum and maximum discharge flows allowed by the reservoir of the hydropower station during period t, in m 3 / s.

[0038] Preferably, the flood period constraint conditions include:

[0039] Initial flow constraints during flooding:

[0040] Q ck,start ≥7000 (9)

[0041] Peak flow constraints during flood regulation:

[0042] Q ck,end ≥19610 (10)

[0043] Constraints on daily flow increase during flooding regulation:

[0044] Q ck,6.n+1 -Q ck,6.n >900,n=start,start+1,...end-1 (11)

[0045] Constraints on total flow growth during flooding operation:

[0046] Q ck,end -Q ck,start >4050 (12)

[0047] Among them, Q ck,start is the average daily outflow of the hydropower station on the first day of ecological dispatch, Q ck,end The average daily outflow on the last day of ecological dispatching of the hydropower station.

[0048] Preferably, in step S4, a penalty factor-based dynamic programming method (CPF-DP) is used to solve the problem, that is, a penalty function with a penalty factor of is established and added to the cumulative value target. This method can convert the multi-objective problem into a single-value problem for recursive calculation when the recursive formula of the optimal value function of the dynamic programming recursive calculation is used, that is, a certain modification is made on the basis of the DP algorithm, that is, the state transfer equation of the DP during iterative calculation is:

[0049]

[0050] Among them, f * (t+1,k) is the total optimal power generation of the reservoir from period 1 to t when it is in the kth state at the end of period t; E(t,j,k) is the power generation in the tth period when it is in the jth state at the beginning of period t and in the kth state at the end of period t; FZ(t,j,k) is the ecological membership in the tth period when it is in the jth state at the beginning of period t and in the kth state at the end of period t; o1 is the penalty factor.

[0051] Preferably, the value of the penalty factor directly affects the result of the optimization to obtain the non-inferior solution set. Therefore, it is necessary to further analyze the influence range and discrete width of the penalty factor to obtain a non-inferior solution set with a relatively uniform and wide distribution. The specific value selection process is divided into the following two stages:

[0052] Phase 1: Detection of the impact range of penalty factors, including:

[0053] 1. Draw a point-curve and examine the changing trend of the curve. After analyzing and excluding the area close to no influence, further obtain the influence range of the penalty factor to ensure that the factor value is determined within the effective range;

[0054] 2. In the effective range, select discrete values ​​of the factor according to the gradient of the target changing with the factor; select more points in places where the change is drastic, and reduce the number of selected points appropriately in places where the change is gentle, so as to obtain the corresponding set of penalty factor value ranges, corresponding to the number of elements of the penalty factor in each interval.

[0055] The second stage: Substitute each element in the obtained penalty factor value set into the comprehensive objective one by one, and use the dynamic programming algorithm to obtain the optimal solution for each. After solving the comprehensive objective function corresponding to all penalty factors, multi-objective screening is performed to further obtain a non-inferior solution set.

[0056] Therefore, the present invention proposes a method and system for determining an ecological water demand process adapted to fish reproduction, and its beneficial effects are as follows:

[0057] (1) The present invention improves the determination method of ecological membership for calculating ecological target membership, solving the problem that the traditional membership function has no discrimination for values ​​exceeding the minimum or maximum value;

[0058] (2) A multi-objective optimization scheduling model for reservoirs was established, which embedded the coordinated ecological requirements and power generation benefits in response to the spawning demand of the "four major carps". The model aims to maximize power generation and maximize the ecological water demand membership of the river channel. The model is solved using a dynamic programming method based on a penalty factor to obtain a set of non-inferior solutions under each scenario.

[0059] (3) A method and system for the ecological water demand process that adapts to fish reproduction was determined, which alleviated the contradiction between the reservoir's power generation benefits and ecological benefits, and can provide a decision-making reference for the ecological scheduling of the "four major carps" during the spawning period.

[0060] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 It is a method for determining an ecological water demand process adapted to fish reproduction and a schematic diagram of a system flow chart of the present invention;

[0062] Figure 2 It is a method for determining an ecological water demand process adapted to fish reproduction and a schematic diagram of setting the system membership of the present invention;

[0063] Figure 3 It is a method for determining an ecological water demand process adapted to fish reproduction of the present invention and a schematic diagram of the relationship between the total power generation in the system scheduling period and the sum of the ecological membership; wherein, a is a schematic diagram of the relationship between the total power generation in the scheduling period when the water rise time is 4 days and the sum of the ecological membership; b is a schematic diagram of the relationship between the total power generation in the scheduling period when the water rise time is 5 days and the sum of the ecological membership; c is a schematic diagram of the relationship between the total power generation in the scheduling period when the water rise time is 6 days and the sum of the ecological membership; d is a schematic diagram of the relationship between the total power generation in the scheduling period when the water rise time is 7 days and the sum of the ecological membership. DETAILED DESCRIPTION

[0064] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments.

[0065] Unless otherwise defined, technical or scientific terms used in the present invention shall have the common meanings understood by one having ordinary skills in the field to which the present invention belongs.

[0066] like Figure 1 As shown, the present invention provides a method and system for determining an ecological water demand process adapted to fish reproduction, the steps are as follows:

[0067] S1. Determine the ecological demand indicators of fish during the breeding season, including the following indicators:

[0068] Regarding water temperature conditions, the lower water temperature threshold for spawning of the four major carps is 18℃.

[0069] The factors of the degree of stimulation of the reproductive behavior of the four major carps during the flooding process can be summarized as intensity, intensity change rate and time accumulation. The intensity factor can be characterized by initial flow and peak flow, the intensity change rate factor can be characterized by the daily increase in flow, and the time accumulation factor can be characterized by the duration of the flooding and the total increase in flow.

[0070] S2. Determine the range and membership of the ecological demand index of fish breeding season, establish the membership function according to the appropriate range of the index, and quantify the membership value of each index. The formula is as follows:

[0071]

[0072] S3. Construct an ecological scheduling model, determine the objective function and determine the constraints, where the objective function includes the ecological objective function, and the formula is as follows:

[0073]

[0074] The power generation objective function is as follows:

[0075]

[0076] The constraints include scheduling period constraints and flood period constraints.

[0077] S4. Determine the model solution algorithm and use the penalty factor-based dynamic programming method (CPF-DP) to solve it, that is, establish a penalty function with a penalty factor and add it to the cumulative value target. The formula is as follows:

[0078]

[0079] The value of the penalty factor directly affects the optimization result of the non-inferior solution set, so it is necessary to further analyze the influence range and discrete width of , so as to obtain a non-inferior solution set with a relatively uniform and wide distribution. The specific value selection process of the penalty factor is divided into the following two stages.

[0080] (1) Phase 1: Detection of the impact range of penalty factors:

[0081] ① Plot the curve and examine the changing trend of the curve. After analyzing and excluding the area close to no influence, further obtain the influence range of the penalty factor to ensure that the factor value is determined within the effective range;

[0082] ② In the effective range, select discrete values ​​of the factor according to the gradient of the target changing with the factor; select more points in places where the change is drastic, and reduce the number of selected points appropriately in places where the change is gentle, and obtain the corresponding set of penalty factor value ranges, corresponding to the number of elements of the penalty factor in each interval.

[0083] (2) The second stage: Substitute each element in the obtained penalty factor value set into the comprehensive objective and use the dynamic programming algorithm to obtain the optimal solution for each element. After solving the comprehensive objective function corresponding to all penalty factors, multi-objective screening is performed to further obtain a non-inferior solution set.

[0084] Example 1

[0085] The construction of the Three Gorges Dam has deteriorated the natural ecological environment of the river, resulting in ecological security issues such as regional water quality protection, survival and reproduction of key species, and ecological restoration of lakes and wetlands in the Three Gorges Reservoir and the middle and lower reaches of the Yangtze River. Among them, the "four major carps" are the cornerstone of my country's freshwater fishery farming and are representative species that adapt to the complex river and lake ecosystems in the middle and lower reaches of the Yangtze River. Their resource dynamics are an important representation of the health of the water ecosystem in the Yangtze River Basin.

[0086] The spawning and reproduction activities of the "four major carps" downstream of the Three Gorges Reservoir are closely related to the changes in the basin's hydrological conditions. Water temperature conditions and water rise processes are key hydrological factors that affect the growth, reproduction and other life activities of the four major carps, including:

[0087] 1. Water temperature conditions:

[0088] The lower water temperature threshold for spawning of the four major carps is 18°C. Relevant literature shows that due to the construction of the Three Gorges Reservoir, the date when the water temperature downstream of the Three Gorges reaches 18°C ​​has been postponed from mid-April to early May before the reservoir construction to early to mid-May. Therefore, the implementation time of ecological scheduling to adapt to the spawning and reproduction of the "four major carps" should be at least later than mid-May.

[0089] 2. Water Rising Process:

[0090] The spawning activities of fish that lay drifting eggs, such as the "four major carps", are generally accompanied by the process of rising water. Rising water is the most important external condition to stimulate the natural reproduction of domestic fish. The longer the river water rises, the longer the spawning duration of the "four major carps", and the number of eggs and fry is closely related to hydrological conditions such as water temperature, duration of river water rise and daily rise rate. Since 2011, the Three Gorges Reservoir has organized and implemented ecological scheduling experiments for the natural reproduction of the four major carps in the middle reaches of the Yangtze River. As of 2023, a total of 17 ecological scheduling experiments have been implemented, and the time of implementation is almost all after mid-to-late May, mainly concentrated in early June. The ecological scheduling experiments have achieved good results. The fish have obvious spawning behavior, and with the accumulation of ecological scheduling experiment years, the total amount of eggs has increased.

[0091] The factors of the degree of stimulation of the reproductive behavior of the four major carps during the flooding process can be summarized as intensity, intensity change rate and time accumulation. The intensity factor can be characterized by the initial flow and peak flow, the time accumulation factor can be characterized by the duration of the flooding and the total increase in flow, and the intensity change rate factor can be characterized by the daily increase in flow. The relevant indicators and their suitable ranges of the ecological environment water requirements for the spawning of the four major carps are shown in Table 1.

[0092] Table 1 Summary of relevant literature on the relevant indicators and suitable ranges of the spawning resource environment requirements of the four major carps

[0093]

[0094] In order to better integrate the above research results, this study set the starting time as June 1, and the duration of flooding was divided into four flooding schemes of 4 days, 5 days, 6 days and 7 days. Except for the duration of flooding, the other four indicators were selected by combining the union of the given ranges in various literatures as special constraints, as shown in Table 2. The four schemes were optimized and dispatched respectively to obtain the non-inferior solution set for the two objectives of power generation and ecological membership.

[0095] Table 2 Constraints of indicators for each scheme

[0096]

[0097]

[0098] Firstly, the historical flow sequence before the construction of the Three Gorges Dam was divided into horizontal years. Based on the multi-year average flow series, it was divided into flood years, normal water years and dry years. Years with a corresponding frequency of more than 75% were defined as dry years; years with a frequency between 25% and 75% were defined as normal water years; and years with a frequency below 25% were defined as flood years.

[0099] The environmental flow in the river channel of each typical year is calculated based on the historical runoff data of the Three Gorges Reservoir dam site for many years. The monthly frequency P = 90% is recommended as the minimum environmental flow (q1); P = 75% ~ 25% is recommended as the appropriate environmental flow (q2 ~ q3); the frequency P = 10% is recommended as the maximum environmental flow (q4). The calculation results are shown in Table 3.

[0100] Table 3 Calculation results of environmental flow in the river

[0101]

[0102] like Figure 2 As shown in the figure, the improved ecological membership determination method is used to calculate the ecological target membership. When the flow is less than the minimum environmental flow, the membership is set to a negative value. Among them, the horizontal axis Q is the flow, and the vertical axis FZ is the membership, which indicates the friendliness of the flow to the ecology. The flows q1, q2, q3, and q4 are characteristic values, where q1 and q4 are the recommended minimum and maximum environmental flow values ​​for each period, respectively, and q2 and q3 are the upper and lower limits of the recommended suitable environmental flow for each period, respectively.

[0103] Suppose the river flow Q on the tth day of the nth month is n,t The membership degree is FZ n,t , and its calculation formula is as follows:

[0104]

[0105] The ecological objective of reservoir operation is eco It can be expressed as:

[0106]

[0107] Where FZ n,t is the river flow Q on the tth day of the nth month n,t The membership degree of n is the day of the nth month in the scheduling period.

[0108] Power generation is the most important task of the Three Gorges Reservoir besides flood control, and it is also an important manifestation of the economic benefits of the Three Gorges Hydropower Station. The goal is to maximize the power generation of the hydropower station during the dispatch period, and its expression is as follows:

[0109]

[0110] Where, E is the total power generation of the reservoir during the dispatch period, in kW h; T is the total number of time periods during the dispatch period, with the time period sequence number t = 1, 2, ..., T; K is the comprehensive output coefficient of the hydropower station; Q fd (t) is the power generation flow of the hydropower station in period t, in m 3 / s; H(t) is the generating head of the hydropower station in period t, and its unit is m; Δt is the calculation period length of period t in hours, and its unit is h.

[0111] According to the constraints of the dispatching period and the flooding period, after considering the water temperature variation law of the reservoir discharge and relevant literature, the start time of the ecological flow flooding process is set as June 1, and the union of the initial flow, peak flow, daily flow increase and total flow increase indicators obtained from the literature in Table 2 is reflected in the model as a constraint. The specific form is as follows:

[0112] Initial flow constraints during flooding:

[0113] Q ck,start ≥7000

[0114] Peak flow constraints during flood regulation:

[0115] Q ck,end ≥19610

[0116] Constraints on daily flow increase during flooding regulation:

[0117] Q ck,6.n+1 -Q ck,6.n >900,n=start,start+1,...end-1

[0118] Constraints on total flow growth during flooding operation:

[0119] Q ck,end -Q ck,start >4050

[0120] like Figure 3 As shown in the figure, the penalty factor-based dynamic programming method (CPF-DP) is used to solve the problem, and the influence range and discrete width of the penalty factor are further analyzed to obtain a non-inferior solution set with a relatively uniform and wide distribution. The specific analysis is as follows:

[0121] (1) By Figure 3 The calculation results of the four schemes show that there is an obvious competitive relationship between the total power generation E during the dispatch period and the sum of the ecological membership FZ.

[0122] (2) When the penalty factor o1 is 0, that is, when the single-objective optimization scheduling is carried out with the maximum total power generation as the goal, the total power generation obtained by the four schemes decreases with the increase of the number of days, and the total power generation from 4 days to 7 days of flooding is 13.936, 13.921, 13.896 and 13.841 billion kW·h respectively; when the power generation weight o1 is the maximum value, the model is close to the single-objective optimization scheduling with the maximum ecological membership as the goal, and the average ecological membership of the results obtained by the four schemes also decreases with the increase of the number of days, which are 0.945, 0.916, 0.902 and 0.888 respectively. It can be seen that the longer the flooding process is, the stricter the constraint on the outflow flow is, and the smaller the target value is.

[0123] Therefore, the present invention proposes a method and system for determining an ecological water demand process that is suitable for fish reproduction, which improves the method for determining ecological membership for calculating ecological target membership, and solves the problem that traditional membership functions have no distinction for values ​​exceeding the minimum or maximum value; a method and system for determining an ecological water demand process that is suitable for fish reproduction is determined, which alleviates the contradiction between the power generation efficiency and the ecological benefit of the reservoir, and can provide a decision-making reference for the ecological scheduling of the "four major carps" during the spawning period.

[0124] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.

Claims

1. A method and system for determining an ecological water demand process adapted to fish reproduction, characterized in that: Here are the steps: S1. Determine the ecological demand indicators of fish during the breeding period; S2. Determine the range and degree of ecological demand indicators for fish during the breeding season; S3. Constructing an ecological scheduling model, including determining the objective function and determining the constraints; S4. Determine the model solving algorithm.

2. A method and system for determining an ecological water demand process adapted to fish reproduction according to claim 1, characterized in that: In step S1, the ecological demand index of fish breeding period is determined, and the steps are as follows: S11. Determine the ecological water temperature conditions during the fish breeding period; S12. Determine the ecological water rise process during the fish breeding season.

3. A method and system for determining an ecological water demand process adapted to fish reproduction according to claim 2, characterized in that: In step S12, the elements of the stimulation degree of the ecological flooding process on the fish breeding behavior can be summarized as intensity, intensity change rate and time accumulation.

4. The method and system for determining the ecological water demand process adapted to fish reproduction according to claim 1, characterized in that: In step S2, the evaluation index of each factor is determined, and a membership function is established according to the range of the index to quantify the membership value of each index. The formula is as follows: Among them, FZ n,t is the membership degree of the river flow on the tth day of the nth month, Q n,t is the river flow on the tth day of the nth month; q1 and q4 are the recommended minimum and maximum environmental flow values ​​for each period, respectively; q2 and q3 are the upper and lower limits of the recommended suitable environmental flow for each period, respectively.

5. The method and system for determining the ecological water demand process adapted to fish reproduction according to claim 1, characterized in that: In step S3, the objective function includes an ecological objective function and a power generation objective function, and the ecological objective function is as follows: Among them, f eco is the ecological objective function, FZ n,t is the membership degree of the river flow on the tth day of the nth month; T n is the number of days in the nth month of the scheduling period; The power generation objective function is as follows: Among them, E is the total power generation of the reservoir during the dispatch period, in kW·h; T is the total number of time periods during the dispatch period, and the time period sequence number t=1,2,3...T; K is the comprehensive output coefficient of the hydropower station; Q fd (t) is the power generation flow of the hydropower station in period t, in m 3 / s; H(t) is the generating head of the hydropower station in period t, in m; Δt is the calculation period length of period t in hours, in h.

6. The method and system for determining the ecological water demand process adapted to fish reproduction according to claim 1, characterized in that: In step S3, the constraints include scheduling period constraints and flood period constraints.

7. A method and system for determining an ecological water demand process adapted to fish reproduction according to claim 6, characterized in that: The scheduling period constraints include: Water balance constraints: V(t+1)=V(t)+3600×(Q rk (t)-Q ck (t))Δt (4) Water level constraints: Z min (t)≤Z(t)≤Z max (t) (5) Output constraints: N min (t)≤N(t)≤N max (t) (6) Boundary constraints: Z(0)=Z start ,Z(T)=Z end (7) Traffic constraints: Non-negative constraints: All variables are non-negative; Where V(t) is the water storage capacity of the hydropower station in period t, in m 3 ;Q rk (t), Q ck (t) are the inflow and outflow of the hydropower station in period t, in m 3 / s; Z min (t), Z max (t) are the minimum and maximum values ​​of the water level allowed in the hydropower station during the period t, in m; N min (t), N max (t) are the minimum and maximum output values ​​of the hydropower station in period t, in kW; Z start , Z end are the initial and final water levels of the hydropower station dispatch period, in m; are the minimum and maximum discharge flows allowed by the reservoir of the hydropower station during period t, in m 3 / s.

8. A method and system for determining an ecological water demand process adapted to fish reproduction according to claim 6, characterized in that: The flood period constraints include: Initial flow constraints during flooding: Q ck,start ≥7000(9) Peak flow constraints during flood regulation: Q ck,end ≥19610(10) Constraints on daily flow increase during flooding regulation: Q ck,6.n+1 -Q ck,6.n >900,n=start,start+1,...end-1(11) Constraints on total flow growth during flooding operation: Q ck,end -Q ck,start >4050(12) Among them, Q ck,start is the average daily outflow of the hydropower station on the first day of ecological dispatch, Q ck,end The average daily outflow on the last day of ecological dispatching of the hydropower station.

9. The method and system for determining the ecological water demand process adapted to fish reproduction according to claim 1, characterized in that: In step S4, the penalty factor-based dynamic programming method CPF-DP is used to solve the problem, and the formula is as follows: Among them, f * (t+1,k) is the total optimal power generation of the reservoir from period 1 to t when it is in the kth state at the end of period t; E(t,j,k) is the power generation in the tth period when it is in the jth state at the beginning of period t and in the kth state at the end of period t; FZ(t,j,k) is the ecological membership in the tth period when it is in the jth state at the beginning of period t and in the kth state at the end of period t; o1 is the penalty factor.

10. A method and system for determining an ecological water demand process adapted to fish reproduction according to claim 9, characterized in that: The value of the penalty factor directly affects the result of optimizing the non-inferior solution set. The specific value selection process is divided into the following two stages: Phase 1: Detection of the impact range of penalty factors; The second stage: Substitute each element in the obtained penalty factor value set into the comprehensive objective one by one, and use the dynamic programming algorithm to obtain the optimal solution for each.

Citation Information

Patent Citations

  • Method for constructing river ecological flow membership function

    CN111241469A

  • Cascade reservoir group optimization scheduling method and system giving consideration to generating capacity and minimum output

    CN114722709A

  • Reservoir ecological scheduling method fusing fish ecological flow process water temperature process requirements

    CN117973706A

Cited By

  • Ecological scheduling double-layer optimization model construction method for water-wind-light operation cascade reservoir

    CN121580591A