A calculation data management system and method based on road construction energy consumption assessment

By designing a road construction energy consumption evaluation system, the problem of poorly consumption statistics in the existing technologies in the existing technology has been solved, real -time prediction and optimization of energy consumption of energy consumption in the construction link, and improved the energy saving and emission reduction effect. Essence

CN119005764BActive Publication Date: 2025-01-24NANJING PUJIANG ENG TESTING CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411498956.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2025-01-24
Estimated Expiration
2044-10-25

AI Technical Summary

Technical Problem

In the prior art, the energy consumption statistics of road construction rely on manual processing, resulting in poor real-time data, affecting the energy consumption tracking and energy conservation and emission reduction effects during construction.

Method used

Design an accounting data management system based on road construction energy consumption assessment. By evaluating and predicting the energy consumption of the construction link, setting priority and process start time, real -time collection and predicting energy consumption data, optimizing the construction process, generating construction construction Energy consumption log.

Benefits of technology

Real -time prediction and optimization of energy consumption of construction links have been realized, the construction unit has improved the energy consumption management capabilities, reduced energy consumption waste, and improved the energy conservation and emission reduction effect in road construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005764B_ABST
    Figure CN119005764B_ABST
Patent Text Reader

Abstract

The present invention relates to a calculation data management system and method based on road construction energy consumption assessment, belonging to the technical field of data management. The method specifically comprises: obtaining the construction period of a construction link, presetting a time node according to the construction period, setting a planned construction volume according to the time node, collecting the construction energy consumption and the construction volume in real time according to the time node, predicting the total energy consumption of the construction link according to the construction energy consumption and the construction volume to obtain the predicted energy consumption of the construction link, optimizing the construction process according to the energy consumption assessment of the construction link and the predicted energy consumption of the construction link to obtain process optimization information, uploading the process optimization information to a handheld terminal, making the energy consumption assessment of the construction link, the predicted energy consumption of the construction link and the process optimization information into a construction energy consumption log, realizing real-time calculation and prediction of the energy consumption of the construction link, facilitating the construction unit to track, manage and adjust the construction energy consumption in a timely manner, and improving the energy conservation and emission reduction effect during road construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of data management, and in particular relates to a calculation data management system and method based on road construction energy consumption assessment. Background Art

[0002] With the acceleration of urbanization and the continuous advancement of infrastructure construction, municipal roads not only constitute an important vein of urban vitality, but also the energy consumption of municipal road construction has increased significantly. However, in the face of global energy shortage and environmental pollution, energy conservation and emission reduction have become a global consensus. In recent years, the Ministry of Transport has attached great importance to green and low-carbon road construction, especially to find out the bottom line of energy consumption in road construction, statistical monitoring of energy consumption during the construction period, and quantification of energy consumption level of road construction;

[0003] Before the start of road construction, energy consumption assessment is an important link, which helps the construction unit understand the energy consumption in the whole construction process. During the construction process, the construction unit calculates and monitors the construction energy consumption based on the energy consumption assessment, which is conducive to adjusting the construction plan and energy-saving measures. At present, the energy consumption statistics of road construction are manually summarized based on the types of energy consumed in the section every month, the actual energy consumption data and the energy consumption of construction equipment. Due to the large amount of energy consumption data involved in road construction, the low efficiency of manual processing, the gap in data real-time, data lag and other problems, this affects the tracking and accounting of energy consumption in the construction process, which is not conducive to energy conservation and emission reduction. Summary of the invention

[0004] In order to solve the above problems existing in the prior art, the present invention provides a calculation data management system and method based on road construction energy consumption assessment, which evaluates the energy consumption of the construction links in the road construction to obtain the energy consumption assessment of the construction links; sets priorities for the construction links according to the construction period to obtain the construction link priorities; sets the process start time for the construction process in the construction link to obtain the construction process set, obtains the construction period of the construction link, presets the time node according to the construction period, and sets the planned construction volume according to the time node, collects the construction energy consumption and construction volume in real time according to the time node, predicts the total energy consumption of the construction link according to the construction energy consumption and construction volume, and obtains the predicted energy consumption of the construction link; The energy consumption assessment of the construction link and the energy consumption forecast of the construction link are used to optimize the construction process, obtain the process optimization information, and upload the process optimization information to the handheld terminal. The energy consumption assessment of the construction link, the energy consumption forecast of the construction link and the process optimization information are made into a construction energy consumption log and saved to the server, realizing the real-time prediction of the energy consumption of the construction link, which is beneficial for the construction unit to track, manage and adjust the energy consumption in the construction process in time. According to the energy consumption forecast of the construction link, the construction process is optimized, and the energy waste caused by the conflict in the construction process is solved. By calculating the conflict of the construction process in the construction link, the rapid management of the construction energy consumption in the road construction is realized, and the energy saving and emission reduction effect in the road construction process is improved.

[0005] The purpose of the present invention can be achieved through the following technical solutions:

[0006] A method for managing accounting data based on road construction energy consumption assessment includes the following steps:

[0007] S1: Evaluate the energy consumption of the construction link in the road construction to obtain the energy consumption evaluation of the construction link; set the priority of the construction link according to the construction period to obtain the priority of the construction link; set the process start time for the construction process in the construction link to obtain the construction process set;

[0008] S2: Obtain the construction period of the construction link, preset time nodes according to the construction period, set the planned construction volume according to the time nodes, collect the construction energy consumption and construction volume in real time according to the time nodes, and predict the total energy consumption of the construction link according to the construction energy consumption and the construction volume to obtain the predicted energy consumption of the construction link;

[0009] S3: Optimize the construction process according to the energy consumption assessment amount and the energy consumption forecast amount of the construction process, obtain process optimization information, and upload the process optimization information to the handheld terminal;

[0010] S4: The energy consumption assessment of the construction stage, the energy consumption forecast of the construction stage and the process optimization information are made into a construction energy consumption log and saved to the server.

[0011] Preferably, step S2 specifically includes the following steps:

[0012] S201: Obtain a time node set from the preset time nodes, where the time node set is expressed as: , where T represents the time node set, m and n represent the node numbers of the time nodes, and m <n;

[0013] S202: Acquire historical construction information of the current construction phase, wherein the historical construction information includes a historical construction energy consumption set and a historical construction quantity set, wherein the historical construction energy consumption set is expressed as: , where Q represents the historical energy consumption of construction equipment, Indicates at time node The historical construction energy consumption is expressed as: , where W represents the historical construction volume set, Indicates at time node Historical construction volume;

[0014] S203: construct an energy consumption prediction model based on the historical construction energy consumption set, and obtain the construction energy consumption prediction according to the planned construction volume through the energy consumption prediction model. The energy consumption prediction model is expressed as: , where EY represents the predicted construction energy consumption, and represents the parameter factor, Indicates time node The planned construction volume, the construction energy consumption forecast represents the time node The predicted amount of construction energy consumption is processed by the least square method to obtain the parameter factor;

[0015] S204: Obtain the predicted energy consumption of the construction link according to the predicted construction energy consumption and the historical construction energy consumption.

[0016] Preferably, the specific calculation method of the predicted energy consumption of the construction link is: according to the historical construction energy consumption set, the total historical construction energy consumption is obtained, and the total historical construction energy consumption is expressed as: ,in, Indicates time node The total historical construction energy consumption, Indicates at time node The historical construction energy consumption is calculated based on the total historical construction energy consumption and the predicted construction energy consumption. The predicted energy consumption of the construction link is calculated, where: It represents the predicted energy consumption of the construction link, and EY represents the predicted construction energy consumption.

[0017] Preferably, step S3 specifically includes the following steps:

[0018] S301: According to the predicted energy consumption of the construction stage and the assessed energy consumption of the construction stage, the formula The energy consumption difference is calculated, where Indicates the energy consumption difference, represents the energy consumption assessment of the construction process, Indicates the predicted energy consumption of the construction link;

[0019] S302: When the energy consumption difference is greater than or equal to a preset threshold, the energy consumption is abnormal, and energy consumption abnormality warning information is generated; when the energy consumption difference is less than the preset threshold, the energy consumption is normal;

[0020] S303: According to the abnormal energy consumption warning information, feature extraction is performed on the construction process in the construction process set to obtain a process feature vector, a process feature vector set is obtained based on the process feature vector, two process feature vector sets are randomly selected, and the process similarity of the two process feature vectors in the process feature vector set is calculated. The calculation formula is: ,in, Indicates the process similarity, and represents the process feature vector, i and j represent the process start time, Represents the modular operation of vectors;

[0021] S304: When the process similarity is less than the preset threshold, it means that there is no conflict in the process. When the process similarity is greater than the preset threshold, it means that there is a conflict in the process. When there is a conflict in the process, the process start time is adjusted according to the priority of the construction link where the construction process is located to obtain process optimization information.

[0022] Preferably, according to the construction link priority of the construction process, adjusting the process start time specifically includes: obtaining the preset buffer time of the construction process, when there is a conflict between two construction processes, and the construction process and construction process Satisfy the conditions When the construction process starts, the process start time is adjusted according to the preset buffer time to obtain process optimization information, which is expressed as: , where v and z represent the priority of the construction link, i and j represent the start time of the process, and It indicates the conflicting construction procedures, and t indicates the preset buffer time.

[0023] Furthermore, the present application also provides a calculation data management system based on road construction energy consumption assessment, including:

[0024] The data acquisition module is used to evaluate the energy consumption of the construction link in the road construction and obtain the energy consumption evaluation of the construction link; set the priority of the construction link according to the construction period and obtain the priority of the construction link; set the process start time for the construction process in the construction link and obtain the construction process set;

[0025] The energy consumption prediction module is used to obtain the construction period of the construction link, preset the time node according to the construction period, and set the planned construction volume according to the time node, collect the construction energy consumption and construction volume in real time according to the time node, and predict the total energy consumption of the construction link according to the construction energy consumption and the construction volume to obtain the predicted energy consumption of the construction link;

[0026] An energy consumption accounting module is used to optimize the construction process according to the energy consumption assessment amount of the construction link and the energy consumption forecast amount of the construction link, obtain process optimization information, and upload the process optimization information to the handheld terminal;

[0027] The data management module is used to generate the energy consumption assessment of the construction stage, the energy consumption forecast of the construction stage and the process optimization information into a construction energy consumption log and save it to the server.

[0028] Preferably, the specific calculation method of the predicted energy consumption in the construction process is as follows:

[0029] A time node set is obtained from a preset time node, and historical construction information of the current construction link is obtained based on the time node set, wherein the historical construction information includes a historical construction energy consumption set and a historical construction quantity set, and an energy consumption prediction model is constructed according to the historical construction energy consumption set. The planned construction quantity is processed by the energy consumption prediction model to obtain a construction energy consumption prediction;

[0030] The total historical construction energy consumption is obtained according to the historical construction energy consumption set, and the predicted energy consumption of the construction link is obtained by summing the total historical construction energy consumption and the predicted construction energy consumption.

[0031] Preferably, the specific calculation method of the process optimization information is as follows:

[0032] An energy consumption difference is obtained according to the predicted energy consumption of the construction link and the assessed energy consumption of the construction link. When the energy consumption difference is greater than or equal to a preset threshold, the energy consumption is abnormal, and abnormal energy consumption warning information is generated. When the energy consumption difference is less than the preset threshold, the energy consumption is normal.

[0033] According to the abnormal energy consumption warning information, feature extraction is performed on the construction process in the construction process set to obtain a process feature vector, a process feature vector set is obtained based on the process feature vector, two process feature vector sets are randomly selected, and the process similarity of the two process feature vectors in the process feature vector set is calculated;

[0034] When the process similarity is less than the preset threshold, it means that there is no conflict in the process. When the process similarity is greater than the preset threshold, it means that there is a conflict in the process. When there is a conflict in the process, the preset buffer time of the construction process is obtained, and the construction process with a low priority in the construction link is selected. The process start time of this construction process is added with the preset buffer time to obtain the process optimization information.

[0035] Furthermore, the present application also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, the above-mentioned accounting data management method based on road construction energy consumption assessment is implemented.

[0036] Furthermore, the present application also provides a storage medium containing computer executable instructions, which, when executed by a computer processor, are used to execute the above-mentioned accounting data management method based on road construction energy consumption assessment.

[0037] The beneficial effects of the present invention are:

[0038] By setting up an energy consumption prediction module, by obtaining the construction period of the construction link, presetting the time node according to the construction period, and setting the planned construction volume according to the time node, the construction energy consumption and construction volume are collected in real time according to the time node, and the total energy consumption of the construction link is predicted according to the construction energy consumption and the construction volume, and the energy consumption prediction of the construction link is obtained, so as to realize the real-time prediction of the energy consumption of the construction link, which is conducive to the construction unit to track, manage and adjust the energy consumption in the construction process in a timely manner;

[0039] By providing an energy consumption accounting module, the construction process is optimized according to the energy consumption assessment of the construction link and the energy consumption forecast of the construction link, and the process optimization information is obtained. The process optimization information is uploaded to the handheld terminal, and the construction process is optimized according to the energy consumption forecast of the construction link, which solves the problem of energy waste caused by conflicts in the construction process. By calculating the conflicts in the construction process of the construction link, the rapid management of construction energy consumption in road construction is realized, and the energy saving and emission reduction effect in road construction is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0041] Figure 1 It is a flow chart of the accounting data management method based on road construction energy consumption assessment of the present invention. DETAILED DESCRIPTION

[0042] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation methods, structures, features and effects of the present invention are described in detail below in conjunction with the accompanying drawings and preferred embodiments.

[0043] See also Figure 1 , a calculation data management method based on road construction energy consumption assessment, comprising the following steps:

[0044] S1: Evaluate the energy consumption of the construction link in the road construction to obtain the energy consumption evaluation of the construction link; set the priority of the construction link according to the construction period to obtain the priority of the construction link; set the process start time for the construction process in the construction link to obtain the construction process set;

[0045] S2: Obtain the construction period of the construction link, preset time nodes according to the construction period, set the planned construction volume according to the time nodes, collect the construction energy consumption and construction volume in real time according to the time nodes, and predict the total energy consumption of the construction link according to the construction energy consumption and the construction volume to obtain the predicted energy consumption of the construction link;

[0046] S3: Optimize the construction process according to the energy consumption assessment amount and the energy consumption forecast amount of the construction process, obtain process optimization information, and upload the process optimization information to the handheld terminal;

[0047] S4: The energy consumption assessment of the construction stage, the energy consumption forecast of the construction stage and the process optimization information are made into a construction energy consumption log and saved to the server.

[0048] It should be noted that before the start of road construction, the construction unit will conduct energy consumption assessment on each construction link according to the construction project, and obtain the energy consumption assessment of the construction link. During the construction process, the construction unit will track and manage the energy consumption data of the construction according to the energy consumption assessment of the construction link, and implement energy conservation and emission reduction work. The construction process set is expressed as: , where a represents the priority of the construction link, a=1,2,3...,a, the smaller the number of the construction link priority, the higher the priority. Indicates that the construction link priority is a and the process start time is construction process.

[0049] Specifically, step S2 includes the following steps:

[0050] S201: Obtain a time node set from the preset time nodes, where the time node set is expressed as: , where T represents the time node set, m and n represent the node numbers of the time nodes, and m <n;

[0051] S202: Acquire historical construction information of the current construction phase, wherein the historical construction information includes a historical construction energy consumption set and a historical construction quantity set, wherein the historical construction energy consumption set is expressed as: , where Q represents the historical energy consumption of construction equipment, Indicates at time node The historical construction energy consumption is expressed as: , where W represents the historical construction volume set, Indicates at time node Historical construction volume;

[0052] S203: construct an energy consumption prediction model based on the historical construction energy consumption set, and obtain the construction energy consumption prediction according to the planned construction volume through the energy consumption prediction model. The energy consumption prediction model is expressed as: , where EY represents the predicted construction energy consumption, and represents the parameter factor, Indicates time node The planned construction volume, the construction energy consumption forecast represents the time node The predicted amount of construction energy consumption is processed by the least square method to obtain the parameter factor;

[0053] S204: Obtain the predicted energy consumption of the construction link according to the predicted construction energy consumption and the historical construction energy consumption.

[0054] Specifically, the specific calculation method of the predicted energy consumption of the construction link is: according to the historical construction energy consumption set, the total historical construction energy consumption is obtained, and the total historical construction energy consumption is expressed as: ,in, Indicates time node The total historical construction energy consumption, Indicates at time node The historical construction energy consumption is calculated based on the total historical construction energy consumption and the predicted construction energy consumption. The predicted energy consumption of the construction link is calculated, where: It represents the predicted energy consumption of the construction link, and EY represents the predicted construction energy consumption.

[0055] It should be further explained that the construction energy consumption is collected according to the preset time nodes, and the energy consumption forecast of the construction link is predicted according to the construction energy consumption. The preset time nodes are evenly divided according to the construction period of the construction link. In this embodiment, the historical construction information obtained refers to the time nodes in the current construction link. The historical construction energy consumption set and the historical construction quantity set are obtained based on the historical construction energy consumption and the historical construction quantity collected at the historical time nodes, and the parameter factors are obtained by least squares processing based on the historical construction energy consumption and the historical construction quantity. The parameter factors obtained through the historical construction information are used to predict the construction energy consumption prediction, thereby realizing the real-time prediction of the energy consumption of the construction link, which is beneficial for the construction unit to timely track, manage and adjust the energy consumption during the construction process;

[0056] For example, a time node set is set for the construction phase. The time node set has , based on the time node set, collect the time nodes The historical construction energy consumption set is: Q = {22, 27, 42, 32}, and the corresponding historical construction volume set is: W = {4, 5, 8, 6}. The time node needs to be predicted The predicted construction energy consumption, corresponding to the time node The corresponding planned construction volumes are {3, 7, 12, 9, 6}, and the energy consumption prediction model is: , α and β in the model are obtained by processing the historical energy consumption set and the historical construction volume set by the least squares method, where α=2, β=5, then the time node The predicted energy consumption of construction = 2×5+5×3+5×7+5×12+5×9+5×6=195, then the predicted energy consumption of construction link = 22+27+42+32+195=318.

[0057] Specifically, step S3 includes the following steps:

[0058] S301: According to the predicted energy consumption of the construction stage and the assessed energy consumption of the construction stage, the formula The energy consumption difference is calculated, where Indicates the energy consumption difference, represents the energy consumption assessment of the construction process, Indicates the predicted energy consumption of the construction link;

[0059] S302: When the energy consumption difference is greater than or equal to a preset threshold, the energy consumption is abnormal, and energy consumption abnormality warning information is generated; when the energy consumption difference is less than the preset threshold, the energy consumption is normal;

[0060] S303: According to the abnormal energy consumption warning information, feature extraction is performed on the construction process in the construction process set to obtain a process feature vector, a process feature vector set is obtained based on the process feature vector, two process feature vector sets are randomly selected, and the process similarity of the two process feature vectors in the process feature vector set is calculated. The calculation formula is: ,in, Represents the process similarity, and represents the process feature vector, i and j represent the process start time, Represents the modular operation of vectors;

[0061] S304: When the process similarity is less than the preset threshold, it means that there is no conflict in the process. When the process similarity is greater than the preset threshold, it means that there is a conflict in the process. When there is a conflict in the process, the process start time is adjusted according to the priority of the construction link where the construction process is located to obtain process optimization information.

[0062] Specifically, according to the construction link priority of the construction process, adjusting the process start time specifically includes: obtaining the preset buffer time of the construction process, when there is a conflict between two construction processes, and the construction process and construction process Satisfy the conditions When the construction process starts, the process start time is adjusted according to the preset buffer time to obtain process optimization information, which is expressed as: , where v and z represent the priority of the construction link, i and j represent the start time of the process, and It indicates the conflicting construction procedures, and t indicates the preset buffer time.

[0063] It should be further explained that when the energy consumption difference between the predicted energy consumption of the construction link and the assessed energy consumption of the construction link is greater than or equal to the preset threshold, it indicates that there is an abnormality in the energy consumption of the construction link. In this embodiment, the construction process already includes the priority of the construction link and the start time of the process. During the road construction process, the construction process includes the spatial location information of the construction process. According to the priority of the construction link, the start time of the process and the spatial location information, it is judged whether there is a conflict in the construction process. If there is a conflict, the construction process of the construction link with a low priority is adjusted and optimized, thereby reducing the energy waste of waiting for the construction process. By adjusting and optimizing the construction process, the road construction efficiency is improved.

[0064] For example, in the embodiment of the above step S2, the predicted energy consumption of the construction link has been calculated. Based on this, since the energy consumption assessment of the construction link is 300, the energy consumption difference = |energy consumption assessment of the construction link - predicted energy consumption of the construction link| = 18. When the preset threshold is 10, if the energy consumption difference is greater than the preset threshold, it is judged that the energy consumption is abnormal, and an abnormal energy consumption warning information is generated;

[0065] According to the abnormal energy consumption warning information, the construction process in the construction process set is feature extracted to obtain the process feature vector, and the process feature vector set is obtained based on the process feature vector. The process feature vector set A and the process feature vector set B are randomly selected, and there are process feature vectors belonging to the process feature vector set A. , the process feature vector belonging to the process feature vector set B , according to the process characteristic vector and process feature vector By formula The process similarity is calculated. When the preset threshold is 0.80, the process similarity is greater than the preset threshold, then the process feature vector and process feature vector There are conflicts in the corresponding construction processes. By comparing the priorities of the construction links in which the two construction processes are located, the preset buffer time is added to the start time of the construction process with a low priority in the construction link, so as to obtain the process optimization information, solve the energy waste problem caused by cross-process conflicts, and make the construction links and construction processes smoother.

[0066] Furthermore, the present application also provides a calculation data management system based on road construction energy consumption assessment, including:

[0067] The data acquisition module is used to evaluate the energy consumption of the construction link in the road construction and obtain the energy consumption evaluation of the construction link; set the priority of the construction link according to the construction period and obtain the priority of the construction link; set the process start time for the construction process in the construction link and obtain the construction process set;

[0068] The energy consumption prediction module is used to obtain the construction period of the construction link, preset the time node according to the construction period, and set the planned construction volume according to the time node, collect the construction energy consumption and construction volume in real time according to the time node, and predict the total energy consumption of the construction link according to the construction energy consumption and the construction volume to obtain the predicted energy consumption of the construction link;

[0069] An energy consumption accounting module is used to optimize the construction process according to the energy consumption assessment amount of the construction link and the energy consumption forecast amount of the construction link, obtain process optimization information, and upload the process optimization information to the handheld terminal;

[0070] The data management module is used to generate the energy consumption assessment of the construction stage, the energy consumption forecast of the construction stage and the process optimization information into a construction energy consumption log and save it to the server.

[0071] Specifically, the specific calculation method of the predicted energy consumption in the construction process is as follows:

[0072] A time node set is obtained from a preset time node, and historical construction information of the current construction link is obtained based on the time node set, wherein the historical construction information includes a historical construction energy consumption set and a historical construction quantity set, and an energy consumption prediction model is constructed according to the historical construction energy consumption set. The planned construction quantity is processed by the energy consumption prediction model to obtain a construction energy consumption prediction;

[0073] The total historical construction energy consumption is obtained according to the historical construction energy consumption set, and the predicted energy consumption of the construction link is obtained by summing the total historical construction energy consumption and the predicted construction energy consumption.

[0074] Specifically, the specific calculation method of the process optimization information is as follows:

[0075] An energy consumption difference is obtained according to the predicted energy consumption of the construction link and the assessed energy consumption of the construction link. When the energy consumption difference is greater than or equal to a preset threshold, the energy consumption is abnormal, and abnormal energy consumption warning information is generated. When the energy consumption difference is less than the preset threshold, the energy consumption is normal.

[0076] According to the abnormal energy consumption warning information, feature extraction is performed on the construction process in the construction process set to obtain a process feature vector, a process feature vector set is obtained based on the process feature vector, two process feature vector sets are randomly selected, and the process similarity of the two process feature vectors in the process feature vector set is calculated;

[0077] When the process similarity is less than the preset threshold, it means that there is no conflict in the process. When the process similarity is greater than the preset threshold, it means that there is a conflict in the process. When there is a conflict in the process, the preset buffer time of the construction process is obtained, and the construction process with a low priority in the construction link is selected. The process start time of this construction process is added with the preset buffer time to obtain the process optimization information.

[0078] Furthermore, the present application also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, the above-mentioned accounting data management method based on road construction energy consumption assessment is implemented.

[0079] Furthermore, the present application also provides a storage medium containing computer executable instructions, which, when executed by a computer processor, are used to execute the above-mentioned accounting data management method based on road construction energy consumption assessment.

[0080] The working principle and use process of the present invention:

[0081] The energy consumption of the construction link in road construction is evaluated to obtain the energy consumption evaluation of the construction link; according to the construction period, the priority of the construction link is set to obtain the priority of the construction link; the start time of the construction process in the construction link is set to obtain the construction process set, and the construction period of the construction link is obtained. The time node is preset according to the construction period, and the planned construction volume is set according to the time node. The construction energy consumption and construction volume are collected in real time according to the time node. According to the construction energy consumption and construction volume, the total energy consumption of the construction link is predicted to obtain the energy consumption prediction of the construction link; according to the energy consumption evaluation of the construction link and the energy consumption prediction of the construction link, the construction process is optimized to obtain the process optimization information, and the process optimization information is uploaded to the handheld terminal, and the energy consumption evaluation of the construction link, the energy consumption prediction of the construction link and the process optimization information are made into a construction energy consumption log and saved to the server.

[0082] The computer storage medium of the embodiment of the present invention may adopt any combination of one or more computer-readable media. The computer-readable medium may be a computer-readable signal medium or a computer-readable storage medium. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples (non-exhaustive list) of computer-readable storage media include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this document, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in combination with an instruction execution system, device or device.

[0083] Computer-readable signal media may include data signals propagated in baseband or as part of a carrier wave, which carry computer-readable program code. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than a computer-readable storage medium, which may send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, apparatus, or device.

[0084] The program code included in the computer-readable medium can be transmitted with any appropriate medium, including but not limited to wireless, wire, optical cable, etc., or any suitable combination of the above. The computer program code for performing the operation of the present invention can be written in one or more programming languages ​​or their combinations, and the programming language includes object-oriented programming languages-such as Java, Smalltalk, C++, and also includes conventional procedural programming languages-such as "C" language or similar programming languages. The program code can be executed completely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on the remote computer, or completely on the remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet).

[0085] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. A method for managing accounting data based on road construction energy consumption assessment, characterized in that: The following steps are involved: S1: Evaluate the energy consumption of the construction link in the road construction to obtain the energy consumption evaluation of the construction link; set the priority of the construction link according to the construction period to obtain the priority of the construction link; set the process start time for the construction process in the construction link to obtain the construction process set; S2: Obtain the construction period of the construction link, preset time nodes according to the construction period, set the planned construction volume according to the time nodes, collect the construction energy consumption and construction volume in real time according to the time nodes, and predict the total energy consumption of the construction link according to the construction energy consumption and the construction volume to obtain the predicted energy consumption of the construction link; S3: Optimize the construction process according to the energy consumption assessment amount and the energy consumption forecast amount of the construction process, obtain process optimization information, and upload the process optimization information to the handheld terminal; S4: The energy consumption assessment of the construction stage, the energy consumption forecast of the construction stage and the process optimization information are made into a construction energy consumption log and saved to the server; Step S2 specifically includes the following steps: S201: Obtain a time node set from the preset time nodes, where the time node set is expressed as: , where T represents the time node set, m and n represent the node numbers of the time nodes, and m <n; S202: Acquire historical construction information of the current construction phase, wherein the historical construction information includes a historical construction energy consumption set and a historical construction quantity set, wherein the historical construction energy consumption set is expressed as: , where Q represents the historical energy consumption of construction equipment, Indicates at time node The historical construction energy consumption is expressed as: , where W represents the historical construction volume set, Indicates at time node Historical construction volume; S203: construct an energy consumption prediction model based on the historical construction energy consumption set, and obtain the construction energy consumption prediction according to the planned construction volume through the energy consumption prediction model. The energy consumption prediction model is expressed as: , where EY represents the predicted construction energy consumption, and represents the parameter factor, Indicates time node The planned construction volume, the construction energy consumption forecast represents the time node The predicted amount of construction energy consumption is processed by the least square method to obtain the parameter factor; S204: Obtaining the predicted energy consumption of the construction link according to the predicted construction energy consumption and the historical construction energy consumption; The specific calculation method of the predicted energy consumption of the construction link is: according to the historical construction energy consumption set, the total historical construction energy consumption is obtained, and the total historical construction energy consumption is expressed as: ,in, Indicates time node The total historical construction energy consumption, Indicates at time node The historical construction energy consumption is calculated based on the total historical construction energy consumption and the predicted construction energy consumption. The predicted energy consumption of the construction link is calculated, where: represents the predicted energy consumption of the construction link, and EY represents the predicted construction energy consumption; Step S3 specifically includes the following steps: S301: According to the predicted energy consumption of the construction stage and the assessed energy consumption of the construction stage, the formula The energy consumption difference is calculated, where Indicates the energy consumption difference, represents the energy consumption assessment of the construction process, Indicates the predicted energy consumption of the construction link; S302: When the energy consumption difference is greater than or equal to a preset threshold, the energy consumption is abnormal, and energy consumption abnormality warning information is generated; when the energy consumption difference is less than the preset threshold, the energy consumption is normal; S303: According to the abnormal energy consumption warning information, feature extraction is performed on the construction process in the construction process set to obtain a process feature vector, a process feature vector set is obtained based on the process feature vector, two process feature vector sets are randomly selected, and the process similarity of the two process feature vectors in the process feature vector set is calculated. The calculation formula is: ,in, Represents the process similarity, and represents the process feature vector, i and j represent the process start time, Represents the modular operation of vectors; S304: When the process similarity is less than the preset threshold, it means that there is no conflict in the process. When the process similarity is greater than the preset threshold, it means that there is a conflict in the process. When there is a conflict in the process, the process start time is adjusted according to the priority of the construction link where the construction process is located to obtain process optimization information.

2. A method for managing accounting data based on road construction energy consumption assessment according to claim 1, characterized in that: According to the construction link priority of the construction process, the process start time is adjusted, specifically including: obtaining the preset buffer time of the construction process, when there is a conflict between two construction processes, and the construction process and construction process Satisfy the conditions When the construction process starts, the process start time is adjusted according to the preset buffer time to obtain process optimization information, which is expressed as: , where v and z represent the priority of the construction link, i and j represent the start time of the process, and It indicates the conflicting construction procedures, and t indicates the preset buffer time.

3. A calculation data management system based on road construction energy consumption assessment, the system adopts a calculation data management method based on road construction energy consumption assessment as claimed in claim 1, characterized in that: include: The data acquisition module is used to evaluate the energy consumption of the construction link in the road construction and obtain the energy consumption evaluation of the construction link; set the priority of the construction link according to the construction period and obtain the priority of the construction link; set the process start time for the construction process in the construction link and obtain the construction process set; The energy consumption prediction module is used to obtain the construction period of the construction link, preset the time node according to the construction period, and set the planned construction volume according to the time node, collect the construction energy consumption and construction volume in real time according to the time node, and predict the total energy consumption of the construction link according to the construction energy consumption and the construction volume to obtain the predicted energy consumption of the construction link; An energy consumption accounting module is used to optimize the construction process according to the energy consumption assessment amount of the construction link and the energy consumption forecast amount of the construction link, obtain process optimization information, and upload the process optimization information to the handheld terminal; The data management module is used to generate the energy consumption assessment of the construction stage, the energy consumption forecast of the construction stage and the process optimization information into a construction energy consumption log and save it to the server.

4. The accounting data management system based on road construction energy consumption assessment according to claim 3 is characterized in that: The specific calculation method of the predicted energy consumption in the construction process is as follows: A time node set is obtained from a preset time node, and historical construction information of the current construction link is obtained based on the time node set, wherein the historical construction information includes a historical construction energy consumption set and a historical construction quantity set, and an energy consumption prediction model is constructed according to the historical construction energy consumption set. The planned construction quantity is processed by the energy consumption prediction model to obtain a construction energy consumption prediction; The total historical construction energy consumption is obtained according to the historical construction energy consumption set, and the predicted energy consumption of the construction link is obtained by summing the total historical construction energy consumption and the predicted construction energy consumption.

5. The accounting data management system based on road construction energy consumption assessment according to claim 3 is characterized in that: The specific calculation method of the process optimization information is as follows: An energy consumption difference is obtained according to the predicted energy consumption of the construction link and the assessed energy consumption of the construction link. When the energy consumption difference is greater than or equal to a preset threshold, the energy consumption is abnormal, and abnormal energy consumption warning information is generated. When the energy consumption difference is less than the preset threshold, the energy consumption is normal. According to the abnormal energy consumption warning information, feature extraction is performed on the construction process in the construction process set to obtain a process feature vector, a process feature vector set is obtained based on the process feature vector, two process feature vector sets are randomly selected, and the process similarity of the two process feature vectors in the process feature vector set is calculated; When the process similarity is less than the preset threshold, it means that there is no conflict in the process. When the process similarity is greater than the preset threshold, it means that there is a conflict in the process. When there is a conflict in the process, the preset buffer time of the construction process is obtained, and the construction process with a low priority in the construction link is selected. The process start time of the selected construction process is added with the preset buffer time to obtain the process optimization information.

Citation Information

Patent Citations

  • Intelligent energy-saving building management method, device and equipment and storage medium

    CN113723920A

  • Passenger car production line energy consumption intelligent monitoring and energy efficiency improving method and system

    CN118393962A