Satellite navigation assisted power grid emergency repair path planning method and device

Through satellite navigation-assisted power grid emergency repair path planning method, combined with regional risk assessment and road traffic capacity assessment, emergency repair paths are dynamically adjusted, which solves the problem of failure to effectively consider dynamic traffic flow and risks in the existing technology, and improves the efficiency of power grid emergency repairs and security.

CN119026776APending Publication Date: 2024-11-26GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202411146412.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing power grid emergency repair path selection method fails to effectively consider dynamic traffic flow and risk conditions, resulting in low maintenance path efficiency.

Method used

Satellite navigation assisted methods are adopted to build a regional risk assessment model and a path selection rule library, combine the Unity3D digital twin platform to evaluate road traffic capabilities, generate dynamically adjusted grid emergency repair paths, and transmit them to the emergency repair fleet in real time through satellite communications of vehicle-mounted terminals.

Benefits of technology

It realizes accurate emergency repair path selection under the conditions of changes in risks and traffic flow, improves emergency repair efficiency and safety, and ensures timely repair of power grid fault points and the safety of power facilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026776A_ABST
    Figure CN119026776A_ABST
Patent Text Reader

Abstract

The invention provides a satellite navigation assisted power grid emergency repair path planning method and device, and the method comprises the steps: constructing a regional risk assessment model, inputting the current parameter information and the current meteorological parameter information into the model, and obtaining a risk prediction result; acquiring ground traffic flow and road information, and evaluating road traffic capacity by adopting a digital twin platform so as to determine the trafficability priority of each road; based on a path selection rule base, according to the risk prediction result and the trafficability priority and the first-aid repair priority of each road, generating a current power grid first-aid repair path; and sending the current power grid first-aid repair path to a first-aid repair fleet through satellite communication, so that the first-aid repair fleet carries out first-aid repair on the power grid fault point according to the current power grid first-aid repair path. According to the method, a power grid first-aid repair path selection system adopting technologies such as power grid monitoring, weather prediction and traffic flow monitoring can be used, accurate power grid first-aid repair path selection suggestions can be provided, and the first-aid repair efficiency and safety are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of information technology, and in particular to a satellite navigation-assisted power grid emergency repair path planning method, a satellite navigation-assisted power grid emergency repair path planning device, a computer-readable storage medium, and an electronic device. Background Art

[0002] With the development of power systems and the continuous growth of urban traffic, the emergency repair of power facilities and the management of traffic conditions have become an important task. However, there are some problems in the current selection of power grid repair paths and traffic flow management. Using satellite navigation technology to achieve real-time monitoring and precise positioning is an important means to improve the efficiency of repair path planning. However, the stability of satellite signals is affected by many factors, including atmospheric conditions, terrain, and building obstructions. Therefore, achieving highly real-time monitoring may face the problem of position deviation or signal loss caused by unstable signals.

[0003] Traditional methods for selecting power grid repair paths only consider the shortest distance between the fault point and the repair site, ignoring the potential threat of surrounding meteorological parameters to power facilities. For example, under severe meteorological conditions such as strong winds, thunderstorms or rain, power facilities may face risks such as fallen trees and broken wires, which are not taken into account in path selection. Secondly, traffic flow management often lacks real-time and accuracy, and cannot accurately assess the capacity and priority of roads. Finally, existing path selection and repair planning methods do not consider dynamic traffic flow and risk conditions, resulting in poor path selection results. The complexity of the traffic environment also leads to challenges in real-time and accuracy. There are variable traffic conditions in the road network, such as congestion, accidents, temporary construction, etc. These emergencies will make it difficult to collect and analyze data, which in turn affects the real-time assessment of traffic conditions by traffic management departments. Summary of the invention

[0004] The main purpose of the present application is to provide a satellite navigation-assisted power grid emergency repair path planning method, a satellite navigation-assisted power grid emergency repair path planning device, a computer-readable storage medium and an electronic device, so as to at least solve the problem that the existing path selection and repair planning methods do not take into account the dynamic traffic flow and risk conditions, resulting in low maintenance efficiency of the planned maintenance path.

[0005] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a satellite navigation-assisted power grid emergency repair path planning method is provided, including: constructing a regional risk assessment model, and inputting current parameter information and current meteorological parameter information of a power grid fault point into the regional risk assessment model to obtain a risk prediction result of the power grid fault point, wherein the current meteorological parameter information is weather parameter information within a first preset range with the power grid fault point as the center point at the current moment, and the current parameter information includes the current location information of the power grid fault point and the type of power facility where the power grid fault point is located; obtaining ground traffic flow and road information, and using U The entity3D digital twin platform evaluates the road capacity according to the ground traffic flow and the road information to determine the priority of the passability of each road; based on the path selection rule library, according to the risk prediction result of the power grid fault point, the passability priority of each road and the repair priority of each power grid fault point, a current power grid repair path is generated, and the repair priority of the power grid fault point is related to the risk prediction result of the power grid fault point; the current power grid repair path is sent to the repair team through the satellite communication of the vehicle-mounted terminal, so that the repair team can repair the power grid fault point according to the current power grid repair path based on satellite navigation.

[0006] Optionally, constructing a regional risk assessment model includes: obtaining historical parameter information of the power grid fault point, the historical parameter information including historical location information of the power grid fault point, the type of power facility and historical fault data, the historical fault data including the fault type and fault cause of the power grid fault point at historical moments, and the type of power facility is the type of power facility where the power grid fault point is located; determining a second preset range with the power grid fault point as the center point based on the historical location information of the power grid fault point; obtaining historical meteorological parameter information within the second preset range, the historical meteorological parameter information including temperature, humidity, wind speed, cloud cover and precipitation parameters of weather information at historical moments; matching the historical fault data of the power grid fault point with the historical meteorological parameter information to determine the cloud map information of the location of each of the power facilities; using a gradient boosting decision tree algorithm, using the cloud map information of the location of the power facility, the historical meteorological parameter information, the historical fault data and the type of power facility to perform model training to construct the regional risk assessment model.

[0007] Optionally, obtaining ground traffic flow and road information, and using the Unity3D digital twin platform to evaluate road capacity based on the ground traffic flow and the road information to determine the priority of road accessibility of each road, including: obtaining regional road traffic real-time monitoring data and road basic database information, the regional road traffic real-time monitoring data including the traffic flow and speed of each road within the first preset range, the road basic database information including the road category and number of lanes of each road within the first preset range; using the Unity3D digital twin platform to construct a road three-dimensional model based on the regional road traffic real-time monitoring data and the road basic database information to establish a package A virtual space containing road entity parameters; setting simulation scenes with different traffic flows and generating a vehicle model in the virtual space; running several groups of simulation tests based on the simulation scenes and the vehicle model, obtaining index data of the simulation process, and analyzing the average vehicle speed of the road under different traffic flows according to the index data; determining a target traffic flow ratio in which the average vehicle speed is less than a lower speed limit according to the average vehicle speed corresponding to the road under different traffic flows, and determining the road capacity of the road according to the target traffic flow ratio, wherein the target traffic flow ratio is inversely proportional to the road capacity; determining the passability priority of each road according to the road capacity of each road.

[0008] Optionally, a path selection rule base is established based on the accessibility priority of each of the roads and the repair priority of each of the power grid fault points to generate the current power grid repair path, including: determining the repair priority of the power grid fault point based on the risk prediction result of the power grid fault point; determining the product of the number of the repair fleet and the average repair speed as the repair level of the repair fleet, and matching the repair priority with the repair level to form a repair index; establishing a path selection rule base, taking the repair index and the accessibility priority as rule base inputs to generate the current power grid repair path, the path selection rule base including path length, repair time and risk of damage to power equipment.

[0009] Optionally, after generating the current power grid repair path and before sending the current power grid repair path to the repair team through the satellite communication of the vehicle terminal, the method also includes: obtaining the video stream of the real-time traffic camera within the first preset range, using the background subtraction algorithm provided by OpenCV to remove the static background information in the video stream, and using Haar-like features and cascade classifiers to detect vehicles in the video stream to determine the real-time traffic flow; recording the benchmark traffic flow of different sections in the Unity3D digital twin platform, and determining the difference between the real-time traffic flow and the benchmark traffic flow as the traffic change; when the traffic change exceeds a preset threshold, determining that the road capacity of the road is changed to the latest road capacity; determining the updated passable priority of each of the roads according to the latest road capacity of each of the roads; based on the path selection rule library, generating a first updated power grid repair path according to the risk prediction result of the power grid fault point, the updated passable priority of each of the roads and the repair priority of each of the power grid fault points.

[0010] Optionally, after generating the current power grid repair path and before sending the current power grid repair path to the repair team via the satellite communication of the vehicle-mounted terminal, the method also includes: when it is detected that the current meteorological parameters of the power grid fault point have changed, adjusting the operating parameters of the regional risk assessment model accordingly according to the changed meteorological parameters to obtain an updated risk assessment model; using the updated risk assessment model to re-predict the risk of the power grid fault point to obtain an updated prediction result; determining an updated path selection rule base and an updated repair priority of the power grid fault point according to the updated prediction result; based on the updated path selection rule base, generating a second updated power grid repair path according to the updated prediction result of the power grid fault point, the accessibility priority of each of the roads and the updated repair priority of each of the power grid fault points.

[0011] Optionally, the emergency repair team is equipped with satellite communication and global positioning chips. The emergency repair team realizes remote data transmission with the cloud platform through satellite communication, and uses the navigation function of the global positioning chip to accurately locate the position of the emergency repair team.

[0012] According to another aspect of the present application, a satellite navigation-assisted power grid emergency repair path planning device is provided, comprising: a first processing unit, used to construct a regional risk assessment model, and input current parameter information and current meteorological parameter information of a power grid fault point into the regional risk assessment model to obtain a risk prediction result of the power grid fault point, wherein the current meteorological parameter information is weather parameter information within a first preset range with the power grid fault point as the center point at the current moment, and the current parameter information includes current location information of the power grid fault point and the type of power facility where the power grid fault point is located; a second processing unit, used to obtain ground traffic flow and road information, and adopt Unity3 D digital twin platform evaluates the road capacity according to the ground traffic flow and the road information to determine the priority of the passability of each road; the third processing unit is used to generate the current power grid repair path based on the path selection rule library according to the risk prediction result of the power grid fault point, the passability priority of each road and the repair priority of each power grid fault point, and the repair priority of the power grid fault point is related to the risk prediction result of the power grid fault point; the fourth processing unit is used to send the current power grid repair path to the repair team through the satellite communication of the vehicle-mounted terminal, so that the repair team can repair the power grid fault point according to the current power grid repair path based on satellite navigation.

[0013] According to another aspect of the present application, a computer-readable storage medium is provided, which includes a stored program, wherein when the program is running, the device where the computer-readable storage medium is located is controlled to execute any one of the satellite navigation-assisted power grid emergency repair path planning methods.

[0014] According to another aspect of the present application, an electronic device is provided, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a method for executing any one of the above-mentioned satellite navigation-assisted power grid emergency repair path planning methods.

[0015] Applying the technical solution of the present application, the above-mentioned satellite navigation-assisted power grid emergency repair path planning method first constructs a regional risk assessment model, and inputs the current parameter information and current meteorological parameter information of the power grid fault point into the regional risk assessment model to obtain the risk prediction result of the power grid fault point, the current meteorological parameter information is the weather parameter information within the first preset range with the power grid fault point as the center point at the current moment, and the current parameter information includes the current location information of the power grid fault point and the type of power facilities where the power grid fault point is located; then, the ground traffic flow and road information are obtained, and the Unity3D digital twin platform is used to evaluate the road capacity according to the ground traffic flow and road information to determine the passability priority of each road; then, based on the path selection rule library, according to the risk prediction result of the power grid fault point, the passability priority of each road and the repair priority of each power grid fault point, the current power grid repair path is generated, and the repair priority of the power grid fault point is related to the risk prediction result of the power grid fault point; finally, the current power grid repair path is sent to the repair team through the satellite communication of the vehicle-mounted terminal, so that the repair team can repair the power grid fault point based on the satellite navigation according to the current power grid repair path. The method can comprehensively use the power grid emergency repair path selection system of technologies such as power grid monitoring, weather forecasting and traffic flow monitoring, and can provide accurate power grid emergency repair path selection suggestions, and can dynamically adjust according to actual conditions when the risk situation increases to ensure emergency repair efficiency and safety. In addition, it can predict the potential threat of meteorology to power facilities, establish the accessibility priority of different roads, and at the same time, match the road accessibility assessment results with the emergency repair priority to generate power grid emergency repair path selection suggestions. In order to ensure real-time performance, the road accessibility assessment will be updated in real time, and the path matching process will be repeated continuously to dynamically adjust the power grid emergency repair path selection suggestions. If the risk situation is monitored to be increased, the power grid emergency repair path selection suggestions will be regenerated to solve the problem that the existing path selection and emergency repair planning methods do not take into account the dynamic traffic flow and risk situation, resulting in low maintenance efficiency of the planned maintenance path. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0017] Figure 1 A hardware structure block diagram of a mobile terminal for executing a satellite navigation-assisted power grid emergency repair path planning method provided in an embodiment of the present application is shown;

[0018] Figure 2 A schematic flow chart of a satellite navigation-assisted power grid emergency repair path planning method provided in accordance with an embodiment of the present application is shown;

[0019] Figure 3 A schematic diagram of a satellite navigation-assisted power grid emergency repair path planning method provided according to an embodiment of the present application is shown;

[0020] Figure 4 A schematic flow chart of another satellite navigation-assisted power grid emergency repair path planning method provided according to an embodiment of the present application is shown;

[0021] Figure 5 A structural block diagram of a satellite navigation-assisted power grid emergency repair path planning device provided according to an embodiment of the present application is shown.

[0022] The above drawings include the following reference numerals:

[0023] 102, processor; 104, memory; 106, transmission device; 108, input and output devices. DETAILED DESCRIPTION

[0024] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0025] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0026] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0027] As introduced in the background technology, the traditional power grid emergency repair path selection method in the prior art only considers the shortest distance between the fault point and the emergency repair site, ignoring the potential threat of surrounding meteorological parameters to power facilities. Traffic flow management often lacks real-time and accuracy, and cannot accurately evaluate the road's capacity and priority. In addition, the existing path selection and emergency repair planning methods do not consider dynamic traffic flow and risk conditions, resulting in poor path selection effects. In order to solve the problem that the existing path selection and emergency repair planning methods do not consider dynamic traffic flow and risk conditions, resulting in low maintenance efficiency of the planned maintenance path, the embodiments of the present application provide a satellite navigation-assisted power grid emergency repair path planning method, a satellite navigation-assisted power grid emergency repair path planning device, a computer-readable storage medium and an electronic device.

[0028] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0029] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal of a satellite navigation-assisted power grid emergency repair path planning method according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations shown.

[0030] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the satellite navigation-assisted power grid emergency repair path planning method in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, the above method is implemented. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories may be connected to the mobile terminal via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The above-mentioned specific network example may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.

[0031] In this embodiment, a satellite navigation-assisted power grid emergency repair route planning method running on a mobile terminal, a computer terminal or a similar computing device is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.

[0032] Figure 2 FIG. 1 is a flow chart of a method for planning a satellite navigation-assisted power grid emergency repair path according to an embodiment of the present application. Figure 2 As shown, the method comprises the following steps:

[0033] Step S201, constructing a regional risk assessment model, and inputting current parameter information and current meteorological parameter information of the power grid fault point into the regional risk assessment model to obtain a risk prediction result of the power grid fault point, wherein the current meteorological parameter information is weather parameter information within a first preset range with the power grid fault point as the center point at the current moment, and the current parameter information includes current location information of the power grid fault point and the type of power facility where the power grid fault point is located;

[0034] Specifically, by constructing a regional risk assessment model and inputting the current parameter information of the power grid fault point and the current meteorological parameter information into the model, the risk of the fault point can be analyzed more comprehensively, the accuracy of the risk assessment is improved, and the potential threat of meteorology to power facilities can be predicted.

[0035] Among them, building a regional risk assessment model includes the following steps:

[0036] Step S301, obtaining historical parameter information of the above-mentioned power grid fault point, the above-mentioned historical parameter information includes historical location information of the above-mentioned power grid fault point, the type of power facility and historical fault data, the above-mentioned historical fault data includes the fault type and fault cause of the above-mentioned power grid fault point at a historical moment, and the above-mentioned power facility type is the type of power facility where the above-mentioned power grid fault point is located;

[0037] Step S302, determining a second preset range with the power grid fault point as a center point according to the historical location information of the power grid fault point;

[0038] Step S303, obtaining historical meteorological parameter information within the second preset range, wherein the historical meteorological parameter information includes temperature, humidity, wind speed, cloud cover and precipitation parameters of weather information at historical moments;

[0039] Step S304, matching the historical fault data of the above-mentioned power grid fault point with the above-mentioned historical meteorological parameter information to determine the cloud map information of the location of each of the above-mentioned power facilities;

[0040] Step S305, adopting the gradient boosting decision tree algorithm, using the cloud map information of the location of the above-mentioned power facilities, the above-mentioned historical meteorological parameter information, the above-mentioned historical fault data and the above-mentioned power facility types to perform model training, so as to construct the above-mentioned regional risk assessment model.

[0041] Specifically, by predicting the risk of power grid fault points through historical data and comprehensively considering meteorological parameters and fault data, risks can be assessed more accurately and the accuracy and reliability of predictions can be improved. In addition, the use of the gradient boosting decision tree algorithm for model training can effectively process complex information and improve the prediction performance of the model.

[0042] Among them, the grid fault point information is obtained, and the above grid fault point information includes the grid fault location coordinates and the type of power facility; according to the above grid fault point information, the regional scope of analysis is set; the meteorological parameters and historical power facility failure data observed by the meteorological station in the region are obtained, and the above meteorological parameters include temperature, humidity, wind speed, cloud cover and precipitation parameters, and the above historical power facility failure data includes the type of failure and the cause of the failure; the above grid fault point information and the above meteorological parameters are matched to determine the cloud map information of the location of each power facility. The gradient boosting decision tree algorithm is used to build a regional risk assessment model, and the above meteorological parameters and the above historical power facility failure data are used for training to obtain the potential threat prediction results of meteorology to different types of power facilities.

[0043] In some instances, the grid fault point information includes a fault point location coordinate of (31.234, -125.678) and a power facility type of transformer. Based on this fault point information, the analysis area can be set to an area with a radius of 10 kilometers centered on the fault point. Obtain the meteorological parameters observed by the meteorological station in the area. The temperature observed by the meteorological station in the area is 25°C, the humidity is 70%, the wind speed is 10 meters per second, the cloud cover is 50%, and the precipitation is 1 mm / hour. At the same time, historical power facility failure data is also collected. Historical data show that the most common transformer failure type in the area is overload, and the main cause of the failure is lightning strike. Based on the above information, the grid fault point information and meteorological parameter information can be matched to determine the cloud map information of the location of the power facility, that is, the cloud cover is 50% and the precipitation is 1 mm / hour. Next, the regional risk assessment model is constructed using the gradient boosting decision tree algorithm. The model is trained using temperature, humidity, wind speed, cloud cover, precipitation, and historical power facility failure data. The model output shows that the potential threats to transformers in this area are that high wind speeds may cause overload failures, and high cloud cover and precipitation may increase the risk of lightning strikes.

[0044] Step S202, obtaining ground traffic flow and road information, and using the Unity3D digital twin platform to evaluate road capacity based on the ground traffic flow and the road information, so as to determine the priority of the passability of each road;

[0045] Specifically, by evaluating road capacity through an automated digital twin platform, the priority of each road's accessibility can be quickly determined, decision-making efficiency can be improved, and the priority of different roads' accessibility can be established. By matching the road accessibility evaluation results with the repair priority, a recommendation for the selection of power grid repair paths can be generated.

[0046] The following steps are used to obtain ground traffic flow and road information, and use the Unity3D digital twin platform to evaluate road capacity based on the ground traffic flow and road information to determine the priority of each road's accessibility:

[0047] Step S401, obtaining regional road traffic real-time monitoring data and road basic database information, wherein the regional road traffic real-time monitoring data includes the traffic volume and speed of each road within the first preset range, and the road basic database information includes the road type and number of lanes of each road within the first preset range;

[0048] Step S402, using the Unity3D digital twin platform to construct a three-dimensional road model based on the real-time monitoring data of road traffic in the area and the road basic database information, so as to establish a virtual space containing road entity parameters;

[0049] Step S403, setting simulation scenes of different traffic flows and generating vehicle models in the virtual space;

[0050] Step S404, running several groups of simulation tests based on the simulation scenario and the vehicle model, obtaining index data of the simulation process, and analyzing the average vehicle speed of the road under different traffic flows according to the index data;

[0051] Step S405, determining a target traffic flow ratio where the average speed is less than a lower speed limit according to the average vehicle speed of the road under different traffic flows, and determining the road capacity of the road according to the target traffic flow ratio, wherein the target traffic flow ratio is inversely proportional to the road capacity;

[0052] Step S406: Determine the priority of the passability of each of the above roads according to the road capacity of each of the above roads.

[0053] Specifically, the digital twin platform is used to simulate the actual conditions of roads under different traffic flows, quickly obtain road capacity and accessibility priority information, match the road accessibility assessment results with the repair priority, and generate power grid repair path selection recommendations.

[0054] Among them, obtain regional road traffic real-time monitoring data and road basic database information, the above-mentioned regional road traffic real-time monitoring data includes vehicle flow and vehicle speed, the above-mentioned road basic database information includes road category and number of lanes; use Unity3D digital twin platform to build a three-dimensional road model, and establish a virtual space containing road entity parameters; set up simulation scenes with different traffic flows, and generate vehicle models in the digital twin space; run several groups of simulation tests, obtain indicator data of the simulation process, and analyze the average vehicle speed under different traffic flows; judge the road capacity by evaluating the proportion of traffic that exceeds the lower speed limit; summarize the evaluation results of different roads, and establish the accessibility priority of different roads.

[0055] In some instances, it is necessary to obtain the real-time monitoring data of a city's road traffic and the basic database information of the road. Among them, the traffic volume and speed belong to the real-time monitoring data of traffic, and the road category and the number of lanes belong to the basic database information of the road. Through the monitoring equipment, the traffic volume and speed data on a certain section of road were obtained. The traffic volume of the road is 500 vehicles / hour, and the average speed is 60 kilometers / hour. According to the basic database information of the road, the road belongs to the main road of the city and has 4 lanes. Next, the Unity3D digital twin platform is used to build a three-dimensional model of the road, and simulation scenes with different traffic flows are set in the virtual space. The peak hours and off-peak hours of the simulated road are selected, and the traffic flow is set to 800 vehicles / hour and 300 vehicles / hour respectively. After generating the vehicle model in the digital twin space, several groups of simulation tests are run. During the peak hours, the simulation results show that the average speed is 40 kilometers / hour; while during the off-peak hours, the simulation results show that the average speed is 50 kilometers / hour. By analyzing the indicator data of the simulation process, the average speed under different traffic flows can be compared. The speed of vehicles during peak hours is 20 km / h lower than that during off-peak hours. At the same time, the capacity of the road can be determined by evaluating the proportion of vehicles exceeding the lower speed limit. The lower speed limit is 30 km / h, and the evaluation results during peak hours show that 30% of the vehicles exceed this speed; while the evaluation results during off-peak hours show that only 10% of the vehicles exceed this speed. Finally, the evaluation results of different roads are summarized, and the accessibility priorities of different roads are established according to the capacity. For roads with heavy traffic during peak hours, low speeds, and a high proportion of speeding, their priority can be set to low, indicating that the road has weak capacity and needs to be prioritized for traffic improvement measures.

[0056] Step S203, based on the path selection rule base, according to the risk prediction result of the above-mentioned power grid fault point, the passability priority of each of the above-mentioned roads and the emergency repair priority of each of the above-mentioned power grid fault points, the emergency repair priority of the above-mentioned power grid fault point is related to the risk prediction result of the above-mentioned power grid fault point;

[0057] Specifically, by considering the risk prediction results and repair priorities of power grid fault points, the repair path can be effectively determined, thereby minimizing the repair time and improving the reliability and stability of the power grid. Taking the repair priority of power grid fault points into consideration can ensure that important nodes and key equipment receive priority repair.

[0058] According to the priority of the passability of each of the above roads and the priority of the emergency repair of each of the above power grid fault points, a path selection rule base is established to generate the current power grid emergency repair path, including the following steps:

[0059] Step S501, determining the emergency repair priority of the above-mentioned power grid fault point according to the risk prediction result of the above-mentioned power grid fault point;

[0060] Step S502, determining the product of the number of the emergency repair fleet and the average emergency repair speed as the emergency repair level of the emergency repair fleet, and matching the emergency repair priority with the emergency repair level to form an emergency repair index;

[0061] Step S503, establishing a path selection rule base, taking the emergency repair index and the accessibility priority as rule base inputs, and generating the current power grid emergency repair path. The path selection rule base includes path length, emergency repair time and power equipment damage risk.

[0062] Specifically, determining the emergency repair level by combining the number of emergency repair fleets and the average emergency repair speed can better evaluate the overall emergency repair capabilities of the emergency repair team, facilitate the rational allocation of resources, establish a path selection rule library, and combine emergency repair indicators with accessibility priorities. This can more objectively determine the emergency repair path and improve emergency repair efficiency.

[0063] Among them, obtain the forecast results of potential threats to power facilities from the weather and determine the priority of emergency repair; obtain the number and capacity parameters of the emergency repair team and calculate the emergency repair level; match the above emergency repair priority with the above emergency repair level to form an emergency repair index; obtain real-time traffic data for road accessibility assessment and update the above accessibility priority; establish a path selection rule base, use the above emergency repair index and the above accessibility priority as rule base input, and generate an emergency repair path. The above path selection rule base includes length, time and risk of damage to power equipment. If the path selection rule is updated, rematch the path; if the road capacity changes, re-evaluate the path.

[0064] In some instances, meteorological factors are a potential threat to the emergency repair of power facilities in a certain area. Based on meteorological data and forecast results, the following forecast results of potential threats to power facilities from meteorological factors can be determined. According to meteorological data, it is predicted that there will be continuous strong winds today, which may cause the risk of tree collapse or power line breakage. The forecast results show that strong winds will peak between 2 pm and 6 pm, posing a high potential threat to power facilities. According to meteorological data, it is predicted that heavy rain will occur today, which may cause the risk of short circuit of power lines or moisture in equipment. The forecast results show that heavy rain will peak between 4 pm and 8 pm, posing a medium potential threat to power facilities. Based on the potential threat forecast results of the above meteorological factors, the priority of emergency repair can be determined. The potential threat of strong winds is high, so its priority is set to 1. The potential threat of heavy rain is medium, so its priority is set to 2. Next, by obtaining the number and capacity parameters of the emergency repair team, the emergency repair level can be calculated. There are 3 emergency repair teams, and the average emergency repair capacity of each team is 10 facilities / hour. Based on these parameters, the emergency repair level can be calculated, which is the number of emergency repair teams × average emergency repair capacity. According to the above data, the emergency repair level = 3 × 10 = 30 facilities / hour. Match the emergency repair priority with the emergency repair level to form an emergency repair index. Emergency repair index 1 is strong wind priority 1, emergency repair level 30 facilities / hour. Emergency repair index 2 is heavy rain priority 2, emergency repair level 30 facilities / hour. Next, obtain real-time traffic data for road accessibility assessment. The capacity of a certain road is 100 vehicles per hour. According to real-time traffic data, the accessibility priority can be updated. Establish a path selection rule base, use the emergency repair index and accessibility priority as rule base input, and generate an emergency repair path. The rule base includes length, time, and risk of damage to power equipment. A rule in the rule base can be that if the emergency repair index is strong wind priority 1 and the emergency repair level is 30 facilities / hour, then select path A. If the path selection rule is updated, for example, a new rule is added, the path needs to be re-matched. If the road capacity changes, for example, the capacity of a certain road becomes 80 vehicles per hour, then the path needs to be re-evaluated.

[0065] Among them, after generating the current power grid repair path and before sending the current power grid repair path to the repair team through the satellite communication of the vehicle terminal, the method further includes the following steps:

[0066] Step S601, obtaining a video stream of a real-time traffic camera within the first preset range, using a background subtraction algorithm provided by OpenCV to remove static background information in the video stream, and using Haar-like features and a cascade classifier to detect vehicles in the video stream to determine real-time traffic flow;

[0067] Step S602, recording the benchmark traffic flow of different road sections in the Unity3D digital twin platform, and determining the difference between the real-time traffic flow and the benchmark traffic flow as the traffic change;

[0068] Step S603, when the traffic change exceeds a preset threshold, determining that the road capacity of the road is changed to the latest road capacity;

[0069] Step S604, determining the updated passability priority of each of the above roads according to the latest road capacity of each of the above roads;

[0070] Step S605, based on the path selection rule base, according to the risk prediction result of the power grid fault point, the updated passability priority of each of the above roads and the repair priority of each of the above power grid fault points, a first updated power grid repair path is generated.

[0071] Specifically, this method uses real-time traffic cameras to obtain traffic flow information, combines background information and Haar-like features to perform vehicle detection, and can accurately and quickly obtain real-time traffic flow information on roads. By recording the benchmark traffic flow on different sections and calculating the difference between the real-time traffic flow and the benchmark traffic flow, this method can promptly detect traffic changes and achieve real-time monitoring and prediction of traffic conditions.

[0072] Among them, the real-time traffic camera video stream of the regional roads is obtained, and the background subtraction algorithm provided by OpenCV is used to remove static background information, and the Haar-like features and cascade classifiers are used to detect vehicles and count the traffic flow; the benchmark traffic flow of different sections is recorded in the Unity3D digital twin platform to determine the normal level; the real-time traffic flow is compared with the benchmark level, and the change in traffic flow is calculated; if the change in traffic flow exceeds the preset threshold, it is determined that the road capacity has changed; the latest road capacity parameters are obtained, and the power grid repair path is evaluated.

[0073] In some examples, the edge computing server is first used to obtain the video of the cameras along the route in real time, and the number of vehicles is counted and identified through the OpenCV algorithm, and the traffic volume is summarized every 5 minutes. In addition, a three-dimensional scene of the highway is constructed in the Unity3D digital twin platform, and the traffic volume benchmark values ​​of different sections in different time periods are recorded at ordinary times. For example, after a toll station around 10 am, it is usually 1500 vehicles / h. Then compare the real-time statistics with the benchmark value. If the difference exceeds 20%, it is judged that the traffic conditions have changed significantly. At this time, the new traffic flow parameters are used to restart the multi-round simulation of the digital twin scene to update and evaluate the road capacity under different traffic volumes. For example, if the traffic volume increases by 30%, the average speed drops from 100km / h to 80km / h, and the capacity score is reduced from 0.8 to 0.65. Then the newly generated road capacity score is written into the road attribute table of the geographic information database. The database is queried for updated road capacity at regular intervals. If changes are detected, the Dijkstra algorithm is started using the latest traffic attribute data to recalculate the optimal path, update the alternative path results, and dynamically adapt to changes in traffic flow.

[0074] Among them, after generating the current power grid repair path and before sending the current power grid repair path to the repair team through the satellite communication of the vehicle terminal, the method further includes the following steps:

[0075] Step S701, when it is detected that the current meteorological parameters of the above-mentioned power grid fault point have changed, the operating parameters of the above-mentioned regional risk assessment model are correspondingly adjusted according to the changed meteorological parameters to obtain an updated risk assessment model;

[0076] Step S702, re-predicting the risk of the power grid fault point using the updated risk assessment model to obtain an updated prediction result;

[0077] Step S703, determining an update path selection rule base and an update repair priority of the power grid fault point according to the update prediction result;

[0078] Step S704, based on the updated path selection rule base, a second updated power grid repair path is generated according to the updated prediction result of the power grid fault point, the passability priority of each of the above roads and the updated repair priority of each of the above power grid fault points.

[0079] Specifically, in order to ensure real-time performance, the road accessibility assessment will be updated in real time, and the path matching process will be repeated continuously to dynamically adjust the power grid repair path selection suggestions. If the risk situation is monitored to be increased, the power grid repair path selection suggestions will be regenerated.

[0080] The power grid repair path selection system, which integrates technologies such as power grid monitoring, weather forecasting and traffic flow monitoring, can provide accurate power grid repair path selection recommendations, and can dynamically adjust according to actual conditions when the risk situation increases, ensuring repair efficiency and safety.

[0081] If the weather station detects an increase in wind speed, a strong cold air warning will be issued; the regional risk assessment model will be started, the latest meteorological parameters will be loaded and run to predict the potential threat of meteorology to power facilities. Based on the prediction results of the potential threat of meteorology to power facilities, the priority of emergency repair will be re-determined; the above-mentioned path selection rule base will be updated to increase the weight coefficient of the risk of damage to power equipment, and the emergency repair path of the power grid will be re-selected.

[0082] In some instances, the weather station monitors that the wind speed level has increased to 10 meters per second. According to the correspondence between historical data and wind force levels, the strong cold air warning level corresponding to this wind speed level is level 3. When the regional risk assessment model is started, the latest meteorological parameters are loaded for operation. The latest meteorological parameters include rainfall, temperature, and wind speed. Among them, the rainfall is 20 mm, the temperature is 10 degrees Celsius, and the wind speed is 8 meters per second. According to the algorithm and historical data of the assessment model, it can be calculated that the potential threat index of the meteorological parameters to the power facilities is 6. According to the forecast results of the potential threat of meteorology to the power facilities, the repair priority is re-determined. If the potential threat index of a power facility is 6, while the indexes of other facilities are 4 and 5, then the repair priority of the facility will be adjusted to a high priority. When updating the path selection rule base, increase the weight coefficient of the risk of damage to power equipment. The original weight coefficient of the risk of damage to power equipment in the path selection rule base is 3. According to the latest assessment results, this coefficient can be increased to 5 to more accurately reflect the potential threat to power facilities. When reselecting the power grid repair path, for example, there are two optional paths, path A passes through an area with high wind speed, while path B passes through an area with low wind speed. According to the updated rule base, the power equipment damage risk weight coefficient of path A is 5, while the weight coefficient of path B is 3. Based on these weight coefficients, path B can be selected as a safer repair path.

[0083] Figure 3 A schematic diagram of a satellite navigation-assisted power grid emergency repair path planning method provided in accordance with an embodiment of the present application is shown. First, the potential forecast results of meteorology for power equipment are obtained, the repair priority is determined, the number and capability parameters of the repair team are obtained, and then the repair level is calculated, the repair priority is matched with the repair level, and a repair index is formed. Real-time traffic data for road feasibility estimation is obtained, the accessibility priority is updated, a path selection rule base is established, and the repair index accessibility priority is used to generate a repair path, update the path selection rule base, rematch the path, evaluate the road capacity, update the path selection rule base, and re-evaluate the path.

[0084] Step S204, sending the above-mentioned current power grid repair path to the repair team through the satellite communication of the vehicle-mounted terminal, so that the above-mentioned repair team can repair the above-mentioned power grid fault point according to the above-mentioned current power grid repair path based on satellite navigation.

[0085] Specifically, by sending the repair route via satellite communication, information can be conveyed to the repair team in real time, reducing the time for information transmission and improving the efficiency of repair.

[0086] Among them, the above-mentioned emergency repair team is equipped with satellite communication and global positioning chips. The above-mentioned emergency repair team realizes remote data transmission through satellite communication and cloud platform, and uses the navigation function of the global positioning chip to accurately locate the position of the above-mentioned emergency repair team.

[0087] Specifically, this method integrates satellite communication and satellite navigation technology to achieve rapid information transmission and precise positioning, improve emergency repair efficiency, shorten emergency repair time, and reduce power outage time.

[0088] Among them, satellite communication and global positioning chips are installed to build an on-board intelligent terminal; the terminal is initialized, the information collection and transmission functions are activated, the camera is turned on, and real-time images inside and outside the car are obtained; the control panel is started to collect multi-source data, summarize the vehicle operation status, and form a data packet; the satellite broadband is used to send the data packet to the cloud platform to realize remote transmission; the cloud platform parses and verifies the data packet to confirm the content integrity; the positioning and status information of different vehicles is stored for centralized management and monitoring.

[0089] In some instances, satellite communication and global positioning chips are installed to build an in-vehicle intelligent terminal. Initialize the terminal and activate the information collection and transmission functions. The time for initializing the terminal is 2 minutes. Turn on the camera to obtain real-time images inside and outside the vehicle. The number of image frames obtained per second is 30. Start the control board to collect multi-source data, summarize the vehicle operation status, and form a data packet. Collect speed data from the engine control unit, temperature data from the on-board sensor, and location data from the GPS module, and summarize these data into one data packet per second. Use satellite broadband to send data packets to the cloud platform for remote transmission. The time for sending a data packet is 1 second. The cloud platform parses and verifies the data packet to confirm the content integrity. The time for parsing and verifying a data packet is 5 seconds. Store the location and status information of different vehicles for centralized management and monitoring. The storage space occupied by storing the location and status information of a vehicle is 1MB, and the cloud platform stores information on a total of 10,000 vehicles.

[0090] The above-mentioned satellite navigation-assisted power grid emergency repair path planning method of the present application first constructs a regional risk assessment model, and inputs the current parameter information and current meteorological parameter information of the power grid fault point into the regional risk assessment model to obtain the risk prediction result of the power grid fault point, the current meteorological parameter information is the weather parameter information within the first preset range with the power grid fault point as the center point at the current moment, and the current parameter information includes the current location information of the power grid fault point and the type of power facilities where the power grid fault point is located; then, the ground traffic flow and road information are obtained, and the Unity3D digital twin platform is used to evaluate the road capacity according to the ground traffic flow and road information to determine the passability priority of each road; then, based on the path selection rule library, according to the risk prediction result of the power grid fault point, the passability priority of each road and the repair priority of each power grid fault point, the current power grid repair path is generated, and the repair priority of the power grid fault point is related to the risk prediction result of the power grid fault point; finally, the current power grid repair path is sent to the repair team through the satellite communication of the vehicle-mounted terminal, so that the repair team can repair the power grid fault point according to the current power grid repair path based on satellite navigation. The method can comprehensively use the power grid emergency repair path selection system of technologies such as power grid monitoring, weather forecasting and traffic flow monitoring, and can provide accurate power grid emergency repair path selection suggestions, and can dynamically adjust according to actual conditions when the risk situation increases to ensure emergency repair efficiency and safety. In addition, it can predict the potential threat of meteorology to power facilities, establish the accessibility priority of different roads, and at the same time, match the road accessibility assessment results with the emergency repair priority to generate power grid emergency repair path selection suggestions. In order to ensure real-time performance, the road accessibility assessment will be updated in real time, and the path matching process will be repeated continuously to dynamically adjust the power grid emergency repair path selection suggestions. If the risk situation is monitored to be increased, the power grid emergency repair path selection suggestions will be regenerated to solve the problem that the existing path selection and emergency repair planning methods do not take into account the dynamic traffic flow and risk situation, resulting in low maintenance efficiency of the planned maintenance path.

[0091] Among them, the vehicle-mounted terminal is used to continuously detect signal strength and evaluate the connection quality in real time; if the quality strength is lower than the business demand threshold, it is judged to be of poor quality; the quality of different types of connections is graded to form a standard judgment basis; the distance between positioning points is compared through Beidou navigation to check the trajectory offset; if the distance exceeds the accuracy threshold, it is judged that the positioning deviation is too large; several levels of alarms are set for connection quality and positioning accuracy to improve fault tolerance; if it is judged that the quality is poor or the positioning deviation is too large, the automatic switching mechanism is triggered to quickly access the satellite communication and navigation network to ensure fleet command and contact.

[0092] In some instances, the vehicle terminal is used to continuously detect the signal strength and evaluate the connection quality in real time. The signal strength is expressed as a value from 0 to 100, where 0 indicates no signal and 100 indicates the strongest signal. If the current vehicle's signal strength is 70 and the set service demand threshold is 80, it can be judged that the connection quality is poor. The quality of different types of connections is graded to form a standard judgment basis. Signal strengths above 90 can be classified as high-quality connections, 80 to 89 as good connections, 70 to 79 as general connections, and below 60 as poor connections. Compare the distance between positioning points through Beidou navigation to check the track offset. Use Beidou navigation to obtain the vehicle's location information and measure it in meters. If the distance between two positioning points is 100 meters and the set accuracy threshold is 50 meters, it can be judged that the positioning deviation is too large. Set several levels of alarms for connection quality and positioning accuracy to improve fault tolerance. Connection quality and positioning accuracy can be divided into five levels, namely excellent, good, general, poor, and poor. When the connection quality or positioning accuracy reaches a poor level, the alarm mechanism is triggered to alert the user or system administrator. If the quality is judged to be poor or the positioning deviation is too large, the automatic switching mechanism is triggered to quickly access the satellite communication and navigation network to ensure the command and communication of the fleet.

[0093] In order to enable those skilled in the art to more clearly understand the technical solution of the present application, the implementation process of the satellite navigation-assisted power grid emergency repair path planning method of the present application will be described in detail below in combination with specific embodiments.

[0094] This embodiment relates to a specific satellite navigation-assisted power grid emergency repair path planning method, such as Figure 4 As shown, the following steps are included:

[0095] Step S1: Obtain information on meteorological parameters of power grid fault points and surrounding areas, build a regional risk assessment model, and predict potential threats to power facilities caused by meteorology;

[0096] Step S2: Obtain ground traffic flow and road information, use the Unity3D digital twin platform to evaluate road capacity, and establish the priority of accessibility of different roads;

[0097] Step S3: According to the road accessibility assessment results, matching with the emergency repair priority, establishing a path selection rule base, and generating power grid emergency repair path selection suggestions;

[0098] Step S4: updating the road accessibility assessment in real time and repeating the path matching process to dynamically adjust the power grid repair path selection suggestion;

[0099] Step S5: If the risk situation is monitored to be increased, the regional risk assessment model is used to re-predict and re-generate the power grid repair path selection suggestion;

[0100] Step S6: Realize real-time monitoring and precise positioning of the repair vehicle through satellite communication of the vehicle-mounted terminal;

[0101] Step S7: If the connection quality is poor or the positioning deviation is too large, the communication and navigation functions of the satellite are automatically switched to ensure the connection and monitoring between the fleet and the command center.

[0102] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0103] The embodiment of the present application also provides a satellite navigation-assisted power grid emergency repair path planning device. It should be noted that the satellite navigation-assisted power grid emergency repair path planning device of the embodiment of the present application can be used to execute the satellite navigation-assisted power grid emergency repair path planning method provided in the embodiment of the present application. The device is used to implement the above-mentioned embodiments and preferred implementation modes, and those that have been described will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware for a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceived.

[0104] The following introduces the satellite navigation-assisted power grid emergency repair path planning device provided in an embodiment of the present application.

[0105] Figure 5 Schematic diagram of a satellite navigation-assisted power grid emergency repair path planning device according to an embodiment of the present application. Figure 5As shown, the device includes: a first processing unit 10, a second processing unit 20, a third processing unit 30 and a fourth processing unit 40, the first processing unit 10 is used to construct a regional risk assessment model, and input the current parameter information and current meteorological parameter information of the power grid fault point into the above-mentioned regional risk assessment model to obtain the risk prediction result of the above-mentioned power grid fault point, the above-mentioned current meteorological parameter information is the weather parameter information within a first preset range with the above-mentioned power grid fault point as the center point at the current moment, and the above-mentioned current parameter information includes the current location information of the above-mentioned power grid fault point and the type of power facility where the above-mentioned power grid fault point is located; the second processing unit 20 is used to obtain ground traffic flow and road information, and adopts Uni The ty3D digital twin platform evaluates the road capacity according to the above-mentioned ground traffic flow and the above-mentioned road information to determine the priority of the passability of each road; the third processing unit 30 is used to generate the current power grid repair path based on the path selection rule library according to the risk prediction results of the above-mentioned power grid fault points, the passability priorities of each of the above-mentioned roads and the repair priority of each of the above-mentioned power grid fault points. The repair priority of the above-mentioned power grid fault points is related to the risk prediction results of the above-mentioned power grid fault points; the fourth processing unit 40 is used to send the above-mentioned current power grid repair path to the repair team through the satellite communication of the vehicle-mounted terminal, so that the above-mentioned repair team can repair the above-mentioned power grid fault points based on the satellite navigation according to the above-mentioned current power grid repair path.

[0106] The above-mentioned satellite navigation-assisted power grid emergency repair path planning method of the present application includes: a first processing unit, a second processing unit, a third processing unit and a fourth processing unit, the first processing unit is used to construct a regional risk assessment model, and input the current parameter information and current meteorological parameter information of the power grid fault point into the regional risk assessment model to obtain the risk prediction result of the power grid fault point, the current meteorological parameter information is the weather parameter information within a first preset range with the power grid fault point as the center point at the current moment, and the current parameter information includes the current location information of the power grid fault point and the type of power facilities where the power grid fault point is located; the second processing unit is used to obtain ground traffic flow and road The system uses the Unity3D digital twin platform to evaluate the road capacity according to the ground traffic flow and road information to determine the priority of the accessibility of each road; the third processing unit is used to generate the current power grid repair path based on the path selection rule library, according to the risk prediction result of the power grid fault point, the accessibility priority of each road and the repair priority of each power grid fault point. The repair priority of the power grid fault point is related to the risk prediction result of the power grid fault point; the fourth processing unit is used to send the current power grid repair path to the repair team through the satellite communication of the vehicle-mounted terminal, so that the repair team can repair the power grid fault point according to the current power grid repair path based on satellite navigation. The device can comprehensively use the power grid repair path selection system of technologies such as power grid monitoring, weather forecasting and traffic flow monitoring, and can provide accurate power grid repair path selection suggestions, and can dynamically adjust according to actual conditions when the risk situation increases to ensure repair efficiency and safety. In addition, it can predict potential meteorological threats to power facilities, establish accessibility priorities for different roads, and at the same time, match the road accessibility assessment results with the repair priority to generate power grid repair path selection suggestions. In order to ensure real-time performance, the road accessibility assessment will be updated in real time, and the path matching process will be repeated continuously to dynamically adjust the power grid repair path selection suggestions. If the risk situation is monitored to be increased, the power grid repair path selection suggestions will be regenerated to solve the problem that the existing path selection and repair planning methods do not take into account dynamic traffic flow and risk conditions, resulting in low maintenance efficiency of the planned maintenance path.

[0107] In some instances, the first processing unit includes a first acquisition module, a first determination module, a second acquisition module, a second determination module and a first training module, the first acquisition module is used to acquire the historical parameter information of the above-mentioned power grid fault point, the above-mentioned historical parameter information includes the historical location information of the above-mentioned power grid fault point, the type of power facility and the historical fault data, the above-mentioned historical fault data includes the fault type and fault cause of the above-mentioned power grid fault point at the historical moment, and the above-mentioned power facility type is the type of power facility where the above-mentioned power grid fault point is located; the first determination module is used to determine the second preset range with the above-mentioned power grid fault point as the center point according to the historical location information of the above-mentioned power grid fault point; the second acquisition module is used to acquire the historical meteorological parameter information within the above-mentioned second preset range, and the above-mentioned historical meteorological parameter information includes the temperature, humidity, wind speed, cloud cover and precipitation parameters of the weather information at the historical moment; the second determination module is used to match the historical fault data of the above-mentioned power grid fault point with the above-mentioned historical meteorological parameter information to determine the cloud map information of the location of each of the above-mentioned power facilities; the first training module is used to adopt the gradient boosting decision tree algorithm, and use the cloud map information of the location of the above-mentioned power facility, the above-mentioned historical meteorological parameter information, the above-mentioned historical fault data and the above-mentioned power facility type for model training to construct the above-mentioned regional risk assessment model. By predicting the risk of power grid fault points through historical data and comprehensively considering meteorological parameters and fault data, risks can be assessed more accurately and the accuracy and reliability of predictions can be improved.

[0108] In some instances, the second processing unit includes a third acquisition module, a first construction module, a first setting module, a first processing module, a third determination module and a fourth determination module, the third acquisition module is used to obtain regional road traffic real-time monitoring data and road basic database information, the above-mentioned regional road traffic real-time monitoring data includes the traffic volume and speed of each road within the above-mentioned first preset range, and the above-mentioned road basic database information includes the road type and number of lanes of each road within the above-mentioned first preset range; the first construction module is used to use the above-mentioned Unity3D digital twin platform to construct a road three-dimensional model according to the above-mentioned regional road traffic real-time monitoring data and the above-mentioned road basic database information, so as to establish a virtual space containing road entity parameters; the first setting module It is used to set simulation scenarios with different traffic flows and generate vehicle models in the above virtual space; the first processing module is used to run several groups of simulation tests based on the above simulation scenarios and the above vehicle models, obtain the index data of the simulation process, and analyze the average speed of the above roads under different traffic flows according to the above index data; the third determination module is used to determine the target traffic ratio of the above average speed less than the lower speed limit according to the average speed corresponding to the above roads under different traffic flows, and determine the road capacity of the above roads according to the above target traffic ratio, wherein the above target traffic ratio is inversely proportional to the road capacity; the fourth determination module is used to determine the priority of accessibility of each of the above roads according to the road capacity of each of the above roads. The actual situation of the road under different traffic flows is simulated through the digital twin platform, and the road capacity and accessibility priority information are quickly obtained. According to the road accessibility evaluation results, the emergency repair priority is matched to generate a recommendation for the selection of power grid emergency repair paths.

[0109] In some instances, the third processing unit includes a fifth determination module, a sixth determination module, and a second construction module. The fifth determination module is used to determine the emergency repair priority of the above-mentioned power grid fault point according to the risk prediction result of the above-mentioned power grid fault point; the sixth determination module is used to determine the product of the number of the above-mentioned emergency repair fleet and the average emergency repair speed as the emergency repair level of the above-mentioned emergency repair fleet, and match the above-mentioned emergency repair priority with the above-mentioned emergency repair level to form an emergency repair index; the second construction module is used to establish a path selection rule base, and use the above-mentioned emergency repair index and the above-mentioned accessibility priority as rule base inputs to generate the above-mentioned current power grid emergency repair path. The above-mentioned path selection rule base includes path length, emergency repair time, and risk of damage to power equipment. Determining the emergency repair level by combining the number of emergency repair fleets and the average emergency repair speed can better evaluate the overall emergency repair capability of the emergency repair team, which is conducive to the rational allocation of resources.

[0110] In some instances, the device further includes a fourth acquisition module, a seventh determination module, an eighth determination module, a ninth determination module and a first generation module. The fourth acquisition module is used to obtain the video stream of the real-time traffic camera within the first preset range after generating the current power grid repair path and before sending the current power grid repair path to the repair team through the satellite communication of the vehicle-mounted terminal, use the background subtraction algorithm provided by OpenCV to remove the static background information in the video stream, and use Haar-like features and cascade classifiers to detect vehicles in the video stream to determine the real-time traffic flow; the seventh determination module is used to generate the Unity3D data The benchmark traffic volume of different sections is recorded in the digital twin platform, and the difference between the real-time traffic volume and the benchmark traffic volume is determined as the traffic change; the eighth determination module is used to determine that the road capacity of the above-mentioned road is changed to the latest road capacity when the above-mentioned traffic change exceeds the preset threshold; the ninth determination module is used to determine the updated passable priority of each of the above-mentioned roads according to the latest road capacity of each of the above-mentioned roads; the first generation module is used to generate the first updated power grid repair path based on the above-mentioned path selection rule library, according to the risk prediction results of the above-mentioned power grid fault points, the updated passable priority of each of the above-mentioned roads and the repair priority of each of the above-mentioned power grid fault points. This method uses real-time traffic cameras to obtain traffic flow information, combines background information and Haar-like features for vehicle detection, and can accurately and quickly obtain real-time road traffic flow information.

[0111] In some examples, the device further includes a second processing module, a third processing module, a fourth processing module and a second generation module. The second processing module is used to adjust the operating parameters of the regional risk assessment model according to the changed meteorological parameters after generating the current power grid repair path and before sending the current power grid repair path to the repair team through the satellite communication of the vehicle terminal, when the current meteorological parameters of the power grid fault point are detected to change, so as to obtain an updated risk assessment model; the third processing module is used to re-predict the risk of the power grid fault point using the updated risk assessment model to obtain an updated prediction result; the fourth processing module is used to determine the updated path selection rule base and the updated repair priority of the power grid fault point according to the updated prediction result; the second generation module is used to generate a second updated power grid repair path based on the updated path selection rule base, according to the updated prediction result of the power grid fault point, the passability priority of each of the above roads and the updated repair priority of each of the above power grid fault points. In order to ensure real-time performance, the road passability assessment will be updated in real time, and the path matching process will be repeated continuously to dynamically adjust the power grid repair path selection suggestion. If the risk situation is detected to be increased, the power grid repair path selection suggestion is regenerated.

[0112] In some instances, the repair team is equipped with satellite communication and global positioning chips. The repair team realizes remote data transmission with the cloud platform through satellite communication, and uses the navigation function of the global positioning chip to accurately locate the position of the repair team.

[0113] The satellite navigation-assisted power grid emergency repair path planning device includes a processor and a memory, and the first processing unit and the like are stored in the memory as program units, and the processor executes the program units stored in the memory to implement corresponding functions. The modules are all located in the same processor; or, the modules are located in different processors in any combination.

[0114] The processor includes a kernel, which retrieves the corresponding program unit from the memory. One or more kernels can be set, and the kernel parameters can be adjusted to solve the problem that the existing path selection and emergency repair planning methods do not consider the dynamic traffic flow and risk conditions, resulting in low maintenance efficiency of the planned maintenance path.

[0115] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.

[0116] An embodiment of the present invention provides a computer-readable storage medium, which includes a stored program, wherein when the program is running, the device where the computer-readable storage medium is located is controlled to execute the satellite navigation-assisted power grid emergency repair path planning method.

[0117] Specifically, the satellite navigation-assisted power grid emergency repair path planning method includes:

[0118] Step S201, constructing a regional risk assessment model, and inputting current parameter information and current meteorological parameter information of the power grid fault point into the regional risk assessment model to obtain a risk prediction result of the power grid fault point, wherein the current meteorological parameter information is weather parameter information within a first preset range with the power grid fault point as the center point at the current moment, and the current parameter information includes current location information of the power grid fault point and the type of power facility where the power grid fault point is located;

[0119] Specifically, by constructing a regional risk assessment model and inputting the current parameter information of the power grid fault point and the current meteorological parameter information into the model, the risk of the fault point can be analyzed more comprehensively, the accuracy of the risk assessment is improved, and the potential threat of meteorology to power facilities can be predicted.

[0120] Step S202, obtaining ground traffic flow and road information, and using the Unity3D digital twin platform to evaluate road capacity based on the ground traffic flow and the road information, so as to determine the priority of the passability of each road;

[0121] Specifically, by evaluating road capacity through an automated digital twin platform, the priority of each road's accessibility can be quickly determined, decision-making efficiency can be improved, and the priority of different roads' accessibility can be established. By matching the road accessibility evaluation results with the repair priority, a recommendation for the selection of power grid repair paths can be generated.

[0122] Step S203, based on the path selection rule base, according to the risk prediction result of the above-mentioned power grid fault point, the passability priority of each of the above-mentioned roads and the emergency repair priority of each of the above-mentioned power grid fault points, the emergency repair priority of the above-mentioned power grid fault point is related to the risk prediction result of the above-mentioned power grid fault point;

[0123] Specifically, by considering the risk prediction results and repair priorities of power grid fault points, the repair path can be effectively determined, thereby minimizing the repair time and improving the reliability and stability of the power grid. Taking the repair priority of power grid fault points into consideration can ensure that important nodes and key equipment receive priority repair.

[0124] Step S204, sending the above-mentioned current power grid repair path to the repair team through the satellite communication of the vehicle-mounted terminal, so that the above-mentioned repair team can repair the above-mentioned power grid fault point according to the above-mentioned current power grid repair path based on satellite navigation.

[0125] Specifically, by sending the repair route via satellite communication, information can be conveyed to the repair team in real time, reducing the time for information transmission and improving the efficiency of repair.

[0126] An embodiment of the present invention provides a processor, which is used to run a program, wherein the program executes the satellite navigation-assisted power grid emergency repair path planning method when running.

[0127] Specifically, the satellite navigation-assisted power grid emergency repair path planning method includes:

[0128] Step S201, constructing a regional risk assessment model, and inputting current parameter information and current meteorological parameter information of the power grid fault point into the regional risk assessment model to obtain a risk prediction result of the power grid fault point, wherein the current meteorological parameter information is weather parameter information within a first preset range with the power grid fault point as the center point at the current moment, and the current parameter information includes current location information of the power grid fault point and the type of power facility where the power grid fault point is located;

[0129] Specifically, by constructing a regional risk assessment model and inputting the current parameter information of the power grid fault point and the current meteorological parameter information into the model, the risk of the fault point can be analyzed more comprehensively, the accuracy of the risk assessment is improved, and the potential threat of meteorology to power facilities can be predicted.

[0130] Step S202, obtaining ground traffic flow and road information, and using the Unity3D digital twin platform to evaluate road capacity based on the ground traffic flow and the road information, so as to determine the priority of the passability of each road;

[0131] Specifically, by evaluating road capacity through an automated digital twin platform, the priority of each road's accessibility can be quickly determined, decision-making efficiency can be improved, and the priority of different roads' accessibility can be established. By matching the road accessibility evaluation results with the repair priority, a recommendation for the selection of power grid repair paths can be generated.

[0132] Step S203, based on the path selection rule base, according to the risk prediction result of the above-mentioned power grid fault point, the passability priority of each of the above-mentioned roads and the emergency repair priority of each of the above-mentioned power grid fault points, the emergency repair priority of the above-mentioned power grid fault point is related to the risk prediction result of the above-mentioned power grid fault point;

[0133] Specifically, by considering the risk prediction results and repair priorities of power grid fault points, the repair path can be effectively determined, thereby minimizing the repair time and improving the reliability and stability of the power grid. Taking the repair priority of power grid fault points into consideration can ensure that important nodes and key equipment receive priority repair.

[0134] Step S204, sending the above-mentioned current power grid repair path to the repair team through the satellite communication of the vehicle-mounted terminal, so that the above-mentioned repair team can repair the above-mentioned power grid fault point according to the above-mentioned current power grid repair path based on satellite navigation.

[0135] Specifically, by sending the repair route via satellite communication, information can be conveyed to the repair team in real time, reducing the time for information transmission and improving the efficiency of repair.

[0136] An embodiment of the present invention provides a device, the device includes a processor, a memory, and a program stored in the memory and executable on the processor, and the processor implements at least the following steps when executing the program: Step S201, constructing a regional risk assessment model, and inputting current parameter information and current meteorological parameter information of a power grid fault point into the above-mentioned regional risk assessment model to obtain a risk prediction result of the above-mentioned power grid fault point, wherein the above-mentioned current meteorological parameter information is weather parameter information within a first preset range with the above-mentioned power grid fault point as a center point at the current moment, and the above-mentioned current parameter information includes current location information of the above-mentioned power grid fault point and the type of power facility where the above-mentioned power grid fault point is located;

[0137] Specifically, by constructing a regional risk assessment model and inputting the current parameter information of the power grid fault point and the current meteorological parameter information into the model, the risk of the fault point can be analyzed more comprehensively, the accuracy of the risk assessment is improved, and the potential threat of meteorology to power facilities can be predicted.

[0138] Step S202, obtaining ground traffic flow and road information, and using the Unity3D digital twin platform to evaluate road capacity based on the ground traffic flow and the road information, so as to determine the priority of the passability of each road;

[0139] Specifically, by evaluating road capacity through an automated digital twin platform, the priority of each road's accessibility can be quickly determined, decision-making efficiency can be improved, and the priority of different roads' accessibility can be established. By matching the road accessibility evaluation results with the repair priority, a recommendation for the selection of power grid repair paths can be generated.

[0140] Step S203, based on the path selection rule base, according to the risk prediction result of the above-mentioned power grid fault point, the passability priority of each of the above-mentioned roads and the emergency repair priority of each of the above-mentioned power grid fault points, the emergency repair priority of the above-mentioned power grid fault point is related to the risk prediction result of the above-mentioned power grid fault point;

[0141] Specifically, by considering the risk prediction results and repair priorities of power grid fault points, the repair path can be effectively determined, thereby minimizing the repair time and improving the reliability and stability of the power grid. Taking the repair priority of power grid fault points into consideration can ensure that important nodes and key equipment receive priority repair.

[0142] Step S204, sending the above-mentioned current power grid repair path to the repair team through the satellite communication of the vehicle-mounted terminal, so that the above-mentioned repair team can repair the above-mentioned power grid fault point according to the above-mentioned current power grid repair path based on satellite navigation.

[0143] Specifically, by sending the repair route via satellite communication, information can be conveyed to the repair team in real time, reducing the time for information transmission and improving the efficiency of repair.

[0144] The devices in this article can be servers, PCs, PADs, mobile phones, etc.

[0145] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing the program steps of the method for initializing the planning of an emergency repair path for a power grid assisted by at least satellite navigation.

[0146] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.

[0147] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0148] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0149] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0150] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0151] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0152] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0153] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0154] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0155] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:

[0156] 1) The satellite navigation-assisted power grid emergency repair path planning method of the present application first constructs a regional risk assessment model, and inputs the current parameter information and current meteorological parameter information of the power grid fault point into the regional risk assessment model to obtain the risk prediction result of the power grid fault point, the current meteorological parameter information is the weather parameter information within the first preset range with the power grid fault point as the center point at the current moment, and the current parameter information includes the current location information of the power grid fault point and the type of power facilities where the power grid fault point is located; then, the ground traffic flow and road information are obtained, and the Unity3D digital twin platform is used to evaluate the road capacity according to the ground traffic flow and road information to determine the passability priority of each road; then, based on the path selection rule library, according to the risk prediction result of the power grid fault point, the passability priority of each road and the repair priority of each power grid fault point, the current power grid repair path is generated, and the repair priority of the power grid fault point is related to the risk prediction result of the power grid fault point; finally, the current power grid repair path is sent to the repair team through the satellite communication of the vehicle-mounted terminal, so that the repair team can repair the power grid fault point based on the satellite navigation according to the current power grid repair path. The method can comprehensively use the power grid emergency repair path selection system of technologies such as power grid monitoring, weather forecasting and traffic flow monitoring, and can provide accurate power grid emergency repair path selection suggestions, and can dynamically adjust according to actual conditions when the risk situation increases to ensure emergency repair efficiency and safety. In addition, it can predict the potential threat of meteorology to power facilities, establish the accessibility priority of different roads, and at the same time, match the road accessibility assessment results with the emergency repair priority to generate power grid emergency repair path selection suggestions. In order to ensure real-time performance, the road accessibility assessment will be updated in real time, and the path matching process will be repeated continuously to dynamically adjust the power grid emergency repair path selection suggestions. If the risk situation is monitored to be increased, the power grid emergency repair path selection suggestions will be regenerated to solve the problem that the existing path selection and emergency repair planning methods do not take into account the dynamic traffic flow and risk situation, resulting in low maintenance efficiency of the planned maintenance path.

[0157] 2) The satellite navigation-assisted power grid emergency repair route planning method of the present application comprises: a first processing unit, a second processing unit, a third processing unit and a fourth processing unit. The first processing unit is used to construct a regional risk assessment model, and input the current parameter information and the current meteorological parameter information of the power grid fault point into the regional risk assessment model to obtain the risk prediction result of the power grid fault point. The current meteorological parameter information is the weather parameter information within a first preset range with the power grid fault point as the center point at the current moment. The current parameter information includes the current location information of the power grid fault point and the type of power facility where the power grid fault point is located. The second processing unit is used to obtain ground traffic flow and road information, and uses the Unity3D digital twin platform to evaluate road capacity according to ground traffic flow and road information to determine the priority of the accessibility of each road; the third processing unit is used to generate the current power grid repair path based on the path selection rule library, according to the risk prediction results of the power grid fault point, the accessibility priority of each road and the repair priority of each power grid fault point. The repair priority of the power grid fault point is related to the risk prediction results of the power grid fault point; the fourth processing unit is used to send the current power grid repair path to the repair team through the satellite communication of the on-board terminal, so that the repair team can repair the power grid fault point according to the current power grid repair path based on satellite navigation. The device can comprehensively use the power grid repair path selection system of technologies such as power grid monitoring, weather forecasting and traffic flow monitoring, and can provide accurate power grid repair path selection suggestions, and can dynamically adjust according to actual conditions when the risk situation increases to ensure repair efficiency and safety. In addition, it can predict potential meteorological threats to power facilities, establish accessibility priorities for different roads, and at the same time, match the road accessibility assessment results with the repair priority to generate power grid repair path selection suggestions. In order to ensure real-time performance, the road accessibility assessment will be updated in real time, and the path matching process will be repeated continuously to dynamically adjust the power grid repair path selection suggestions. If the risk situation is monitored to be increased, the power grid repair path selection suggestions will be regenerated to solve the problem that the existing path selection and repair planning methods do not take into account dynamic traffic flow and risk conditions, resulting in low maintenance efficiency of the planned maintenance path.

[0158] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A satellite navigation-assisted power grid emergency repair path planning method, characterized in that: include: Constructing a regional risk assessment model, and inputting current parameter information and current meteorological parameter information of a power grid fault point into the regional risk assessment model to obtain a risk prediction result of the power grid fault point, wherein the current meteorological parameter information is weather parameter information within a first preset range with the power grid fault point as the center point at the current moment, and the current parameter information includes current location information of the power grid fault point and the type of power facility where the power grid fault point is located; Obtaining ground traffic flow and road information, and using the Unity3D digital twin platform to evaluate road capacity based on the ground traffic flow and the road information, so as to determine the priority of the accessibility of each road; Based on the path selection rule base, according to the risk prediction result of the power grid fault point, the passability priority of each road and the emergency repair priority of each power grid fault point, a current power grid emergency repair path is generated, and the emergency repair priority of the power grid fault point is related to the risk prediction result of the power grid fault point; The current power grid repair path is sent to the repair team through the satellite communication of the vehicle-mounted terminal, so that the repair team can repair the power grid fault point according to the current power grid repair path based on satellite navigation.

2. The method according to claim 1, characterized in that Construct a regional risk assessment model, including: Acquire historical parameter information of the power grid fault point, the historical parameter information including historical location information, power facility type and historical fault data of the power grid fault point, the historical fault data including the fault type and fault cause of the power grid fault point at a historical moment, the power facility type being the type of power facility where the power grid fault point is located; Determining a second preset range with the power grid fault point as a center point according to the historical location information of the power grid fault point; Acquire historical meteorological parameter information within the second preset range, wherein the historical meteorological parameter information includes temperature, humidity, wind speed, cloud cover and precipitation parameters of weather information at historical moments; Matching the historical fault data of the power grid fault point with the historical meteorological parameter information to determine the cloud map information of the location of each of the power facilities; A gradient boosting decision tree algorithm is adopted to perform model training using the cloud map information of the location of the power facility, the historical meteorological parameter information, the historical fault data and the type of power facility to construct the regional risk assessment model.

3. The method according to claim 1, characterized in that Obtain ground traffic flow and road information, and use the Unity3D digital twin platform to evaluate road capacity based on the ground traffic flow and road information to determine the priority of each road's accessibility, including: Acquire regional road traffic real-time monitoring data and road basic database information, wherein the regional road traffic real-time monitoring data includes the traffic volume and speed of each road within the first preset range, and the road basic database information includes the road type and number of lanes of each road within the first preset range; The Unity3D digital twin platform is used to construct a three-dimensional road model according to the real-time monitoring data of regional road traffic and the road basic database information, so as to establish a virtual space containing road entity parameters; Setting simulation scenarios with different traffic flows and generating vehicle models in the virtual space; Running several groups of simulation tests based on the simulation scenario and the vehicle model, obtaining index data of the simulation process, and analyzing the average vehicle speed of the road under different traffic flows according to the index data; Determine a target traffic flow ratio in which the average speed is less than a lower speed limit according to the average vehicle speed corresponding to the road under different traffic flows, and determine the road capacity of the road according to the target traffic flow ratio, wherein the target traffic flow ratio is inversely proportional to the road capacity; The priority of the passability of each of the roads is determined according to the road capacity of each of the roads.

4. The method according to claim 1, characterized in that: According to the priority of the passability of each road and the priority of the emergency repair of each power grid fault point, a path selection rule base is established to generate the current power grid emergency repair path, including: Determining the priority of emergency repair of the power grid fault point according to the risk prediction result of the power grid fault point; The product of the number of the emergency repair fleet and the average emergency repair speed is determined as the emergency repair level of the emergency repair fleet, and the emergency repair priority is matched with the emergency repair level to form an emergency repair index; A path selection rule base is established, and the emergency repair index and the accessibility priority are used as rule base inputs to generate the current power grid emergency repair path. The path selection rule base includes path length, emergency repair time and power equipment damage risk.

5. The method according to claim 1, characterized in that After generating the current power grid repair path and before sending the current power grid repair path to the repair team through the satellite communication of the vehicle-mounted terminal, the method further includes: Obtain a video stream of a real-time traffic camera within the first preset range, use a background subtraction algorithm provided by OpenCV to remove static background information in the video stream, and use Haar-like features and a cascade classifier to detect vehicles in the video stream to determine real-time traffic flow; Recording the benchmark traffic flow of different road sections in the Unity3D digital twin platform, and determining the difference between the real-time traffic flow and the benchmark traffic flow as the traffic change; When the traffic change exceeds a preset threshold, determining that the road capacity of the road is changed to the latest road capacity; Determining updated traffic priority of each of the roads according to the latest road traffic capacity of each of the roads; Based on the path selection rule base, a first updated power grid repair path is generated according to the risk prediction result of the power grid fault point, the updated passability priority of each of the roads and the repair priority of each of the power grid fault points.

6. The method according to claim 1, characterized in that After generating the current power grid repair path and before sending the current power grid repair path to the repair team through the satellite communication of the vehicle-mounted terminal, the method further includes: When it is detected that the current meteorological parameters of the power grid fault point have changed, the operating parameters of the regional risk assessment model are correspondingly adjusted according to the changed meteorological parameters to obtain an updated risk assessment model; Re-predicting the risk of the power grid fault point using the updated risk assessment model to obtain an updated prediction result; Determine an update path selection rule base and an update repair priority of the power grid fault point according to the update prediction result; Based on the update path selection rule base, a second updated power grid repair path is generated according to the updated prediction result of the power grid fault point, the passability priority of each of the roads and the updated repair priority of each of the power grid fault points.

7. The method according to claim 1, characterized in that The repair team is equipped with satellite communication and global positioning chips. The repair team realizes remote data transmission with the cloud platform through satellite communication, and uses the navigation function of the global positioning chip to accurately locate the position of the repair team.

8. A satellite navigation-assisted power grid emergency repair path planning device, characterized in that: include: A first processing unit is used to construct a regional risk assessment model, and input current parameter information and current meteorological parameter information of a power grid fault point into the regional risk assessment model to obtain a risk prediction result of the power grid fault point, wherein the current meteorological parameter information is weather parameter information within a first preset range with the power grid fault point as a center point at the current moment, and the current parameter information includes current location information of the power grid fault point and the type of power facility where the power grid fault point is located; The second processing unit is used to obtain ground traffic flow and road information, and use the Unity3D digital twin platform to evaluate the road capacity according to the ground traffic flow and the road information to determine the priority of the passability of each road; A third processing unit is used to generate a current power grid emergency repair path based on a path selection rule base according to the risk prediction result of the power grid fault point, the passability priority of each of the roads and the emergency repair priority of each of the power grid fault points, wherein the emergency repair priority of the power grid fault point is related to the risk prediction result of the power grid fault point; The fourth processing unit is used to send the current power grid repair path to the repair team through the satellite communication of the vehicle-mounted terminal, so that the repair team can repair the power grid fault point according to the current power grid repair path based on satellite navigation.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the satellite navigation-assisted power grid emergency repair path planning method as described in any one of claims 1 to 7.

10. An electronic device, characterized in that: include: One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a method for planning a satellite navigation-assisted power grid emergency repair path as described in any one of claims 1 to 7.

Citation Information

Cited By

  • Direct communication method and device of satellite and ground terminal, electronic equipment and medium

    CN119341630A

  • Multi-cabin cooperative scheduling method, medium and equipment for shared service cabin in electric power operation site

    CN119849899A

  • Multi-cabin collaborative dispatching method, medium and equipment for shared service cabins at power operation sites

    CN119849899B

  • Typhoon disaster emergency repair resource intelligent scheduling method based on real-time prediction and dynamic path planning

    CN122367086A