Marine pile foundation scouring disaster assessment method based on grading system

By constructing a deep learning model or multivariate equation system, comprehensively assessing the erosion parameters, soil parameters and load parameters of marine pile foundations, solving the problems of evaluation complexity and accuracy in the existing technology, and achieving rapid and accurate erosion disasters of marine pile foundations Assessment and safety level judgment.

CN119026962AActive Publication Date: 2024-11-26OCEAN UNIV OF CHINA
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411509872.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-28
Publication Date
2024-11-26
Estimated Expiration
2044-10-28

AI Technical Summary

Technical Problem

The existing technology lacks a systematic evaluation index system and convenient grading evaluation methods in marine pile foundation erosion disaster assessment. It only considers a single factor, and the evaluation method is complex, high cost, and difficult to guarantee calculation accuracy, which cannot meet the needs of timely assessment.

Method used

The marine pile foundation erosion disaster assessment method is adopted based on the hierarchical system. By obtaining multiple sets of historical data, deep learning models or multiple equations are constructed, and the erosion parameters, soil parameters, pile foundation parameters and load parameters are comprehensively considered, and the bearing capacity and cumulative deformation are calculated. The ratio to natural frequency establishes a relationship between safety factor and hazard level to achieve accurate and rapid evaluation of marine pile foundations.

Benefits of technology

A more comprehensive evaluation index system has been formed, taking into account the joint impact of multiple parameters, improving the accuracy and convenience of evaluation, avoiding single indicator errors, and achieving rapid and accurate assessment of marine pile foundation erosion disasters, providing reasonable governance timing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026962A_ABST
    Figure CN119026962A_ABST
Patent Text Reader

Abstract

The invention provides an ocean pile foundation scouring disaster assessment method based on a grading system, and belongs to the technical field of ocean pile foundation scouring disaster assessment based on computer data processing. According to the method, a layered evaluation system is constructed, and an analysis model of a sub-target layer and a sub-index layer is established. And then obtaining a sub-index parameter of a certain project to be evaluated, and calculating to obtain a specific numerical value of a sub-target parameter of the project to be evaluated. And obtaining the safety coefficient of the project to be evaluated before initial scouring, and obtaining a safety coefficient set of the sub-target parameters in combination with the calculated specific numerical values of the sub-target parameters. And obtaining a final danger level of the to-be-evaluated project based on the relationship between the safety coefficient and the danger level, and selecting a governance opportunity accordingly. According to the method, the common influence of more than ten seed indexes is considered, and a multi-factor, systematic and comprehensive evaluation index system is formed. Parameters adopt a dimensionless ratio form instead of absolute values, so that the difference of different projects is ingeniously avoided, and the universality of the analysis model is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of marine pile foundation scour disaster assessment based on computer data processing, and in particular relates to a marine pile foundation scour disaster assessment method based on a grading system. Background Art

[0002] In harsh marine environments, scour disasters are inevitable around marine foundations. Foundation scour may lead to reduced foundation bearing capacity, increased cyclic cumulative deformation, and reduced natural frequency, inducing structural resonance, and even causing wind turbine damage and failure, seriously threatening the safe operation of wind turbines. Therefore, it is of great significance to develop marine foundation scour disaster evaluation indicators and graded evaluation methods, timely evaluate the scour disaster of pile foundations, and determine whether scour control measures are needed to ensure the stability of wind turbine structures. However, the current evaluation indicators only consider a single factor, and the evaluation method only evaluates the impact of scour factors, and is relatively complex to apply. Therefore, a systematic evaluation index system and a graded evaluation method that is more convenient to apply and considers the role of more indicators should be established.

[0003] Attempts and shortcomings of existing technologies: 1. Evaluation indicators and evaluation methods Most of the existing research focuses on scour indicators (depth, angle), and has not yet formed a classification evaluation index system consisting of more than ten parameters in four categories, including scour, foundation, soil, and load. Existing research mainly focuses on the impact of scour parameters (depth, angle) on the static-dynamic characteristics of the foundation, and has not yet formed a scour disaster assessment method that considers the coupling effects of the four parameters of scour, foundation, soil, and load; 2. Experimental evaluation method The existing test evaluation methods require similar experiments to be carried out for specific problems. The experimental process requires high costs, and the research process is subject to many restrictions on test conditions and test equipment. 3. Numerical simulation evaluation method In the existing numerical simulation evaluation methods, accurate modeling is difficult, the calculation accuracy is difficult to guarantee, the calculation amount is large, the evaluation cycle is long, and it cannot meet the needs of timely evaluation; 4. Theoretical evaluation method There is currently no reasonable theoretical calculation and evaluation method.

[0004] Therefore, it is urgent to establish a systematic evaluation index system to form a more universally applicable evaluation method to achieve accurate and rapid evaluation of marine pile foundation scour disasters. Summary of the invention

[0005] In order to solve the deficiencies of the prior art, the present invention proposes a marine pile foundation scour disaster assessment method based on a classification system, which includes the following processes: S1, obtain multiple sets of historical data on bearing capacity, cumulative deformation and natural frequency of marine pile foundations before and after scouring, construct three sets of corresponding sub-target parameters, bearing capacity parameter H, cumulative deformation parameter Y and natural frequency parameter F, for calculating target parameters; and obtain scouring parameters, soil parameters, pile foundation parameters and load parameters corresponding to the sub-target parameters as indicator parameters, and the four indicator parameters correspond to the corresponding obtained sub-indicator parameters; S2, constructing three groups of analysis models based on the sub-goal parameters and the corresponding sub-indicator parameters, wherein the analysis model is a deep learning model or a constructed multivariate equation group; using the obtained multiple groups of sub-goal parameters and the corresponding sub-indicator parameters to train the model or solve the coefficients of the multivariate equation group to obtain a mature analysis model; S3, obtaining sub-index parameters of a pile foundation of a certain project to be evaluated, inputting them into the mature analysis model obtained in S2, and obtaining the result of the sub-target parameters of the pile foundation of the project to be evaluated; S4, obtain the initial pre-scour safety factor of the pile foundation of the project to be evaluated , and combined with the sub-goal parameters obtained in S3, the set of safety factors of the sub-goal parameters is calculated ; S5, based on safety factor and hazard level The final hazard level of the pile foundation of the project to be evaluated is obtained by .

[0006] Preferably, the sub-index parameters corresponding to the scour parameters include scour depth and flushing angle ; The sub-index parameters corresponding to the soil parameters include the relative density of sand and undrained shear strength of clay ; The sub-index parameters corresponding to the pile foundation parameters include the pile foundation diameter , Pile length ; The sub-index parameters corresponding to the load parameters include vertical load , horizontal load and moment load .

[0007] Preferably, the bearing capacity parameter H, cumulative deformation parameter Y and natural frequency parameter F are expressed in dimensionless ratio form, and the corresponding sub-index parameters used for model training or solving include: ; The bearing capacity parameters H Bearing capacity after scouring Bearing capacity before scour The analysis model formula is: ; in It is the calculation function of the bearing capacity parameter H and the corresponding sub-index parameter; The cumulative deformation parameter Y is the cumulative deformation after scouring Cumulative deformation before scouring The analysis model formula is: ; in It is the calculation function of the cumulative deformation parameter Y and the corresponding sub-index parameter; The natural frequency parameter F is the natural frequency after flushing The natural frequency before flushing The analysis model formula is: ; in It is the calculation function of the natural frequency parameter F and the corresponding sub-index parameter.

[0008] Preferably, according to the soil type and the type of scour pit, the analysis model is divided into the following four cases: For the overall scouring situation in sandy soil, it is necessary to eliminate the scouring angle in the sub-index parameter. , Undrained Shear Strength of Clay ; For local scouring in sandy soil, the undrained shear strength of clay in the sub-index parameters needs to be eliminated. ; For the overall scouring situation in clay, it is necessary to eliminate the scouring angle in the sub-index parameter. , relative density of sand ; For local scouring in clay, the relative density of sand in the sub-index parameter needs to be eliminated. .

[0009] Preferably, the three groups of analysis models constructed based on the sub-goal parameters and the corresponding sub-indicator parameters are constructed as a multivariate equation group: The calculation equation of the bearing capacity parameter H is: ; is the constant coefficient to be solved, and multiple sets of historical data are used to solve it. is the effective unit weight of the soil, is the atmospheric pressure; The calculation equation of the cumulative deformation parameter Y is: ; 、 is the constant coefficient to be solved, and multiple sets of historical data are used to solve it; The calculation equation of the natural frequency parameter F is: ; 、 is the constant coefficient to be solved, and multiple sets of historical data are used to solve it; In the above three calculation equations, according to the soil type and the type of scour pit, the constant coefficients of the calculation equations are divided into the following four cases: For the overall scouring situation in sandy soil, it is necessary to eliminate the scouring angle in the sub-index parameter. , Undrained Shear Strength of Clay , then there exists , , , , , ; For local scouring in sandy soil, the undrained shear strength of clay in the sub-index parameters needs to be eliminated. , then there exists , , ; For the overall scouring situation in clay, it is necessary to eliminate the scouring angle in the sub-index parameter. , relative density of sand , then there exists , , , , , ; For local scouring in clay, the relative density of sand in the sub-index parameter needs to be eliminated. , then there exists , , .

[0010] Preferably, the specific process of S4 is: Based on the initial design data of the marine pile foundation, obtain the pre-scour safety factor of the three sub-target parameters ; Specifically including the bearing capacity safety factor of pile foundation before scouring , Deformation safety factor of pile foundation before scouring , Safety factor of natural frequency before pile foundation scour ; Safety factor before scour based on three sub-target parameters , the specific values ​​of the sub-target parameters of the pile foundation of the project to be evaluated, and the sub-target safety factor after scour of the evaluated project are obtained, including: Safety factor of pile foundation bearing capacity after scouring , ; Safety factor of pile foundation deformation after scouring ; Safety factor of natural frequency of pile foundation after scouring , ; Summarize the three sub-target safety factors after the scouring of the marine pile foundation to obtain the safety factor set after the scouring of the marine pile foundation .

[0011] Preferably, the specific process of S5 is: Based on the safety factor set after scouring of marine pile foundation , get the marine pile foundation scour disaster risk level set ;in, It is the dangerous level of pile foundation bearing capacity after scouring. It is the cumulative deformation danger level after pile foundation scouring. It is the natural frequency danger level after pile foundation scouring; The marine pile foundation scour disaster hazard level set The three sub-target danger levels ( The specific grading evaluation criteria include: When the safety factor of a sub-target after pile foundation scouring When ; Then the hazard level of this sub-target after pile foundation scouring is IV; When the safety factor of a sub-target after pile foundation scouring When , the hazard level of this sub-target after pile foundation scouring is III; When the safety factor of a sub-target after pile foundation scouring When , the hazard level of this sub-target after pile foundation scouring is II; When the safety factor of a sub-target after pile foundation scouring When , the hazard level of this sub-target after pile foundation scouring is Ⅰ; Marine pile foundation scour disaster risk level collection The maximum risk level in , as the final level of scour disasters, and determine the timing of governance based on the final danger level.

[0012] Compared with the prior art, the present invention has the following beneficial effects: 1. The evaluation index of the present invention is more comprehensive, integrating four types of indexes, namely, scour parameters, soil parameters, pile foundation parameters, and load parameters, and considering the common influence of more than ten seed indexes to form a multi-factor, systematic, and comprehensive evaluation index system; 2. Considering the differences in soil types and scouring types, the analysis models of sub-target layers and sub-index layers under different conditions were established, and the bearing capacity after scouring, the cumulative deformation after scouring, and the natural frequency after scouring in the form of dimensionless ratios were obtained. The diversity of sub-indexes was fully considered to avoid the error of only considering a certain type of parameters. The sub-target is in dimensionless form, focusing on the ratio before and after scouring, rather than the absolute value after scouring, which cleverly avoids the differences between different projects and enhances the universality of the analysis model; 3. The parameters in the initial design data of the marine pile foundation (safety factor before scouring) were introduced, and the analysis model of the sub-target layer and the target layer was established, and the safety factor set of the marine pile foundation after scouring was obtained. The initial safety factor before scouring is easy to obtain, avoiding tedious calculations. Introducing the safety factor before scouring is the key to calculating the safety factor after scouring; 4. Considering the complexity of marine pile foundation scour disasters, a comprehensive analysis of bearing capacity, cyclic cumulative deformation, and natural frequency is used to achieve a hierarchical assessment of marine pile foundation scour disasters. However, the existing technology only uses a certain sub-indicator as a standard, which is incomplete and unsafe; 5. At present, there is a lack of post-scour disaster classification assessment methods. Theoretical, numerical, experimental and other methods for scour disaster assessment have long cycles, high costs, and large errors in single data. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] In order to more clearly illustrate the technical solutions of the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, what is described below is only one embodiment of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0014] Figure 1 It is a pile foundation scour disaster classification assessment index system diagram constructed by the present invention.

[0015] Figure 2 It is an overall flow chart of the marine pile foundation scour disaster classification assessment of the present invention. DETAILED DESCRIPTION

[0016] The present invention first provides an evaluation index system for marine foundation scour disasters, such as Figure 1 The evaluation index system includes four layers: target layer, sub-target layer, indicator layer, and sub-indicator layer, including three inter-layer correspondences: target-sub-target, sub-target-indicator, and indicator-sub-indicator.

[0017] The target layer includes scour hazard assessment; the sub-target layer includes bearing capacity, cumulative deformation, and natural frequency; the indicator layer includes scour parameters, soil parameters, pile foundation parameters, and load parameters; the sub-indicator layer includes scour depth (overall scour depth and local scour depth) and scour angle, relative density of sand, undrained shear strength of clay, pile foundation diameter, pile foundation length, vertical load, horizontal load, and moment load. Some of the above sub-indicators are mutually exclusive. For example, overall scour and local scour in scour parameters are mutually exclusive and cannot exist at the same time. Non-mutually exclusive sub-indicators can exist at the same time.

[0018] The inter-layer relationship between the goal and sub-goal is that one goal corresponds to three sub-goals, namely: the pile foundation scour disaster assessment includes the bearing capacity assessment, cumulative deformation assessment and natural frequency assessment.

[0019] The inter-layer relationship between sub-goals and indicators is that one sub-goal corresponds to four indicators, namely: the change in the bearing capacity of the pile foundation is jointly affected by the scouring parameters, soil parameters, pile foundation parameters and load parameters; the cyclic cumulative deformation degree of the pile foundation is jointly affected by the scouring parameters, soil parameters, pile foundation parameters and load parameters; the change in the natural frequency of the pile foundation is jointly affected by the scouring parameters, soil parameters, pile foundation parameters and load parameters.

[0020] The relationship between indicators and sub-indicators is one-to-one, and each indicator corresponds to its corresponding sub-indicator, namely: scour parameters include scour depth and scour angle; soil parameters include relative density of sand and undrained shear strength of clay; pile foundation parameters include pile foundation diameter and pile foundation length; load parameters include vertical load, horizontal load and bending moment load.

[0021] The evaluation index of the present invention comprehensively integrates four types of indexes, namely, scour parameters, soil parameters, pile foundation parameters, and load parameters, and considers the common influence of more than ten sub-indicators to form a multi-factor, systematic, and comprehensive evaluation index system.

[0022] Based on the above evaluation system, the present invention provides a method for evaluating marine pile foundation scour disasters. The overall process is as follows: Figure 2 As shown: S1, obtain multiple sets of historical data on bearing capacity, cumulative deformation and natural frequency of marine pile foundations before and after scouring, construct three sets of corresponding sub-target parameters, bearing capacity parameter H, cumulative deformation parameter Y and natural frequency parameter F, for calculating target parameters; and obtain scouring parameters, soil parameters, pile foundation parameters and load parameters corresponding to the sub-target parameters as indicator parameters, and the four indicator parameters correspond to the corresponding obtained sub-indicator parameters; S2, constructing three groups of analysis models based on the sub-goal parameters and the corresponding sub-indicator parameters, wherein the analysis model is a deep learning model or a constructed multivariate equation group; using the obtained multiple groups of sub-goal parameters and the corresponding sub-indicator parameters to train the model or solve the coefficients of the multivariate equation group to obtain a mature analysis model; S3, obtaining sub-index parameters of a pile foundation of a certain project to be evaluated, inputting them into the mature analysis model obtained in S2, and obtaining the result of the sub-target parameters of the pile foundation of the project to be evaluated; S4, obtain the initial pre-scour safety factor of the pile foundation of the project to be evaluated , and combined with the sub-goal parameters obtained in S3, the set of safety factors of the sub-goal parameters is calculated ; S5, based on safety factor and hazard level The final hazard level of the pile foundation of the project to be evaluated is obtained by .

[0023] 1. Get sub-goal parameters and sub-indicator parameters Based on model tests, numerical simulations and field tests, we obtain historical data on the bearing capacity, cumulative deformation and natural frequency of multiple groups of marine pile foundations after scouring, and construct three groups of corresponding sub-target parameters: bearing capacity parameter H, cumulative deformation parameter Y and natural frequency parameter F, which are used to calculate the target parameters. The sub-indicator parameters corresponding to the scour parameters include scour depth and flushing angle ; The sub-index parameters corresponding to the soil parameters include the relative density of sand and undrained shear strength of clay ; The sub-index parameters corresponding to the pile foundation parameters include the pile foundation diameter , Pile length ; The sub-index parameters corresponding to the load parameters include vertical load , horizontal load and moment load .

[0024] 2. Establish an analysis model for sub-goal parameters and sub-indicator parameters Establish the analysis model of sub-goal parameters and sub-indicator parameters, and obtain the calculation formula of sub-goal parameters; The sub-goals are expressed as functions of sub-indicators, and the analysis models of three sub-goal layers and sub-indicator layers are obtained, including: the analysis model of bearing capacity H and sub-indicators, the analysis model of cumulative deformation Y and sub-indicators, and the analysis model of natural frequency F and sub-indicators. The details are as follows: Analytical model of pile foundation bearing capacity H and sub-indexes after scouring: ; Analysis model of cumulative deformation Y and sub-indicators after pile foundation scouring: ; Analysis model of natural frequency F and sub-indexes after pile foundation scouring: ; in is the bearing capacity after scour; is the bearing capacity before scour; It is the accumulated deformation before scouring; The accumulated deformation after scouring is; is the natural frequency after flushing; is the natural frequency before flushing.

[0025] The obtained multiple groups of sub-goal parameters and corresponding sub-indicator parameters are used to train the model or solve the coefficients of the multivariate equation group to obtain a mature analysis model.

[0026] According to the soil type and the type of scour pit, the analysis model can be divided into the following four cases: For the overall scouring situation in sandy soil, it is necessary to eliminate the scouring angle in the sub-index parameter. , Undrained Shear Strength of Clay ; For local scouring in sandy soil, the undrained shear strength of clay in the sub-index parameters needs to be eliminated. ; For the overall scouring situation in clay, it is necessary to eliminate the scouring angle in the sub-index parameter. , relative density of sand ; For local scouring in clay, the relative density of sand in the sub-index parameter needs to be eliminated. .

[0027] 3. Calculate real-time sub-goal parameters Obtain the sub-index parameters of the pile foundation of a certain project to be evaluated, substitute them into the analysis model of the sub-target layer and the sub-index layer, and calculate the specific values ​​of the sub-target parameters of the project to be evaluated; Obtain the sub-index parameters of a pile foundation of a project to be evaluated, mainly including scour parameters (scour depth of overall scour , Depth of local scour and flushing angle ), soil parameters (relative density of sand , Undrained Shear Strength of Clay ), pile foundation parameters (pile foundation diameter , Pile length ), load parameters (vertical load , horizontal load , Bending moment load ); Substitute the sub-index parameters of a project to be evaluated into the analysis model of the sub-target layer and the sub-index layer to calculate the specific values ​​of the sub-target parameters of the project to be evaluated (bearing capacity after scouring , cumulative deformation , natural frequency ).

[0028] 4. Calculate real-time target parameters Obtain the initial (pre-scour) safety factor of the project to be assessed , and combined with the specific values ​​of the sub-target parameters of the pile foundation of the project to be evaluated, the set of safety factors of the sub-target parameters is obtained .

[0029] Based on the initial design data of the marine pile foundation, obtain the pre-scour safety factors of the three sub-targets . Specifically including the bearing capacity safety factor of pile foundation before scouring , Deformation safety factor of pile foundation before scouring , Safety factor of natural frequency before pile foundation scour ; Safety factor before scour based on three sub-goals , the specific values ​​of the sub-target parameters of the project to be evaluated, and the safety factor after scour of the sub-target of the project to be evaluated. Specifically include: Safety factor of pile foundation bearing capacity after scouring , ; Safety factor of pile foundation deformation after scouring ; Safety factor of natural frequency of pile foundation after scouring , .

[0030] Summarize the three sub-target safety factors after the scouring of the marine pile foundation to obtain the safety factor set after the scouring of the marine pile foundation .

[0031] 5. Hazard level assessment Based on the safety factor set after scouring of marine pile foundation , get the marine pile foundation scour disaster risk level set .in, It is the dangerous level of pile foundation bearing capacity after scouring. It is the cumulative deformation danger level after pile foundation scouring. It is the natural frequency hazard level after pile foundation scouring.

[0032] The marine pile foundation scour disaster hazard level set The three sub-target danger levels ( The specific grading evaluation criteria include: When the safety factor of a sub-target after pile foundation scouring When , the hazard level of this sub-target after pile foundation scouring is IV; ; When the safety factor of a sub-target after pile foundation scouring When , the hazard level of this sub-target after pile foundation scouring is III; When the safety factor of a sub-target after pile foundation scouring When , the hazard level of this sub-target after pile foundation scouring is II; When the safety factor of a sub-target after pile foundation scouring When , the hazard level of this sub-target after pile foundation scouring is Ⅰ; Finally, the marine pile foundation scour disaster hazard level is combined The maximum risk level in , as the final level of scour disaster, and judge the timing of pile foundation management according to the final danger level.

[0033] The method for determining the timing of pile foundation treatment specifically includes: When the pile foundation danger level is IV, emergency treatment is required within three days; When the pile foundation hazard level is III, it needs to be treated in time within 30 days; When the pile foundation hazard level is II, it needs to be treated as needed within 90 days; When the pile foundation hazard level is Ⅰ, no treatment is required temporarily.

[0034] The evaluation method of the present invention is further described below in conjunction with specific embodiments.

[0035] Part 1: Get sub-target layer parameters and sub-indicator layer parameters.

[0036] Taking the model test of the bearing capacity characteristics of a marine pile foundation after scouring as an example, multiple sets of sub-index parameter data such as scouring depth, scouring angle, pile foundation diameter, pile foundation length, vertical load, horizontal load, moment load, and sub-target parameter data such as horizontal ultimate bearing capacity before scouring and horizontal ultimate bearing capacity after scouring are obtained.

[0037] The acquired data is preliminarily analyzed and processed: Since the test is a local scouring test, the scouring parameters include scouring depth and flushing angle ; The soil used for the test seabed is sand, so the soil parameters are the relative density of sand ; Pile foundation diameter and pile foundation length are calculated using pile foundation embedment depth With diameter The pile foundation does not bear vertical external load, so the vertical load is the deadweight of the pile foundation. , horizontal load on pile foundation and moment load Available eccentricity Represents the relation Indicates: The bearing capacity of pile foundation before scouring and the bearing capacity of pile foundation after scouring express.

[0038] Select , , As the basic variable, the above seven groups of parameters are dimensionlessly processed, and the obtained parameter data are shown in columns 2-8 of Table 1. is the effective unit weight of the soil, is the atmospheric pressure.

[0039] Table 1 Parameter data after dimensionless processing

[0040] Note: In working conditions 1, 2-1, and 2-2, (0) The data should be 1 under ideal conditions. However, due to the limitations of actual test conditions, the data has certain errors.

[0041] Part 2: Establish the analysis model of sub-goal layer and sub-indicator layer.

[0042] Establish the analytical model of bearing capacity parameter H and sub-indicators: ; According to the soil type and the type of scour pit, this is a local scour in sandy soil. The undrained shear strength of clay in the sub-target parameters needs to be eliminated in the analysis model. , the analytical model degenerates into: ; After dimensionless processing of the parameters, the analysis model formula of the horizontal bearing capacity of pile foundation after scouring can be further expressed in the following dimensionless form: ; For local scouring in sandy soil, the undrained shear strength of clay in the sub-index parameters needs to be eliminated. , then there exists , the above formula degenerates into: ; in, 、 are the constant coefficients to be solved.

[0043] In order to facilitate multiple regression analysis, we take the logarithm of both sides of the above formula and get: ; Using the dozens of experiments that have been conducted, the data series are calculated , , , , , ,

[0044] According to the above formula and calculated data series, the coefficients are obtained by multiple regression analysis: , , , , , , ; Therefore, the horizontal bearing capacity analysis model of pile foundation after scouring can be obtained: ; In the regression process of this model formula, the correlation coefficient is 0.88 ( ), so the regression effect is significant.

[0045] Substitute the test condition data into the established analysis model formula to obtain the model data (1) and initial test data (0) By comparison, it is found that the error value is small, as shown in columns 8-10 of Table 1.

[0046] Part 3: Obtain the sub-indicator parameters of a project to be evaluated and substitute them into the analysis model.

[0047] For a single pile foundation, the pile diameter , total length of pile According to the pile foundation design data and the monitoring data after scouring, the sub-indicators of this single pile foundation can be obtained, including scouring depth , flushing angle , the relative density of soil , pile foundation embedment depth , deadweight of single pile foundation , eccentricity .

[0048] Substitute the obtained sub-index parameters into the horizontal bearing capacity analysis model to obtain ; ; have to:

[0049] Part 4: Calculate the set of safety factors of sub-goal parameters.

[0050] Obtain the horizontal bearing capacity safety factor of the pile foundation before scouring of the project to be evaluated .Will , , substitute ,have to:

[0051] The same treatment method can be used to calculate the cyclic cumulative deformation and natural frequency of pile foundation after scouring, and the cyclic cumulative deformation safety factor can also be obtained. and the natural frequency safety factor .

[0052] Summary , , , and obtain the safety factor set after pile foundation scouring Since this is not specifically calculated , , so the safety factor set after pile foundation scouring is .

[0053] Part V: Calculation of the final hazard level of the project to be assessed .

[0054] Safety factor of horizontal bearing capacity of pile foundation after scouring As shown in Table 2, the horizontal bearing capacity safety factor of the pile foundation after scouring is , the horizontal bearing capacity danger level of the pile foundation after scouring can be obtained .

[0055] Summarize the hazard levels to get the scour disaster hazard level set , take the set Maximum danger level As the final level of pile foundation scour disaster. Therefore, the final level of pile foundation scour disaster is level and requires emergency treatment within three days.

[0056] Table 2 Scour disaster classification assessment

[0057] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

[0058] Although the above describes the specific implementation methods of the present invention, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.

Claims

1. A marine pile foundation scour disaster assessment method based on a classification system, characterized in that: The process includes: S1, obtain multiple sets of historical data on bearing capacity, cumulative deformation and natural frequency of marine pile foundations before and after scouring, construct three sets of corresponding sub-target parameters, bearing capacity parameter H, cumulative deformation parameter Y and natural frequency parameter F, for calculating target parameters; and obtain scouring parameters, soil parameters, pile foundation parameters and load parameters corresponding to the sub-target parameters as indicator parameters, and the four indicator parameters correspond to the corresponding obtained sub-indicator parameters; S2, constructing three groups of analysis models based on the sub-goal parameters and the corresponding sub-indicator parameters, wherein the analysis model is a deep learning model or a constructed multivariate equation group; using the obtained multiple groups of sub-goal parameters and the corresponding sub-indicator parameters to train the model or solve the coefficients of the multivariate equation group to obtain a mature analysis model; S3, obtaining sub-index parameters of a pile foundation of a certain project to be evaluated, inputting them into the mature analysis model obtained in S2, and obtaining the result of the sub-target parameters of the pile foundation of the project to be evaluated; S4, obtain the initial pre-scour safety factor of the pile foundation of the project to be evaluated , and combined with the sub-goal parameters obtained in S3, the set of safety factors of the sub-goal parameters is calculated ; S5, based on safety factor and hazard level The final hazard level of the pile foundation of the project to be evaluated is obtained by .

2. A marine pile foundation scour disaster assessment method based on a grading system as claimed in claim 1, characterized in that: The sub-index parameters corresponding to the scour parameters include scour depth and flushing angle ; The sub-index parameters corresponding to the soil parameters include the relative density of sand and undrained shear strength of clay ; The sub-index parameters corresponding to the pile foundation parameters include the pile foundation diameter , Pile length ; The sub-index parameters corresponding to the load parameters include vertical load , horizontal load and moment load .

3. A marine pile foundation scour disaster assessment method based on a grading system as claimed in claim 2, characterized in that: The bearing capacity parameter H, cumulative deformation parameter Y and natural frequency parameter F are expressed in dimensionless ratio form. The corresponding sub-index parameters used for model training or solution include ; The bearing capacity parameters H Bearing capacity after scouring Bearing capacity before scour The analysis model formula is: ; in is the calculation function of the bearing capacity parameter H and the corresponding sub-index parameter; The cumulative deformation parameter Y is the cumulative deformation after scouring Cumulative deformation before scouring The analysis model formula is: ; in It is the calculation function of the cumulative deformation parameter Y and the corresponding sub-index parameter; The natural frequency parameter F is the natural frequency after flushing The natural frequency before flushing The analysis model formula is: ; in It is the calculation function of the natural frequency parameter F and the corresponding sub-index parameter.

4. A marine pile foundation scour disaster assessment method based on a grading system as claimed in claim 3, characterized in that: According to the soil type and the type of scour pit, the analysis model is divided into the following four cases: For the overall scouring situation in sandy soil, it is necessary to eliminate the scouring angle in the sub-index parameter. , Undrained Shear Strength of Clay ; For local scouring in sandy soil, the undrained shear strength of clay in the sub-index parameters needs to be eliminated. ; For the overall scouring situation in clay, it is necessary to eliminate the scouring angle in the sub-index parameter. , relative density of sand ; For local scouring in clay, the relative density of sand in the sub-index parameter needs to be eliminated. .

5. The marine pile foundation scour disaster assessment method based on a grading system as claimed in claim 3, characterized in that: The three groups of analysis models constructed based on the sub-goal parameters and the corresponding sub-indicator parameters are the constructed multivariate equation groups: The calculation equation of the bearing capacity parameter H is: ; is the constant coefficient to be solved, and multiple sets of historical data are used to solve it. is the effective unit weight of the soil, is the atmospheric pressure; The calculation equation of the cumulative deformation parameter Y is: ; 、 is the constant coefficient to be solved, and multiple sets of historical data are used to solve it; The calculation equation of the natural frequency parameter F is: ; 、 is the constant coefficient to be solved, and multiple sets of historical data are used to solve it; In the above three calculation equations, according to the soil type and the type of scour pit, the constant coefficients of the calculation equations are divided into the following four cases: For the overall scouring situation in sandy soil, it is necessary to eliminate the scouring angle in the sub-index parameter. , Undrained Shear Strength of Clay , then there exists , , , , , ; For local scouring in sandy soil, the undrained shear strength of clay in the sub-index parameters needs to be eliminated. , then there exists , , ; For the overall scouring situation in clay, it is necessary to eliminate the scouring angle in the sub-index parameter. , relative density of sand , then there exists , , , , , ; For local scouring in clay, the relative density of sand in the sub-index parameter needs to be eliminated. , then there exists , , .

6. A marine pile foundation scour disaster assessment method based on a grading system as claimed in claim 1, characterized in that: The specific process of S4 is as follows: Based on the initial design data of the marine pile foundation, obtain the pre-scour safety factor of the three sub-target parameters ; Specifically including the bearing capacity safety factor of pile foundation before scouring , Deformation safety factor of pile foundation before scouring , Natural frequency safety factor of pile foundation before scouring ; Safety factor before scour based on three sub-target parameters , the specific values ​​of the sub-target parameters of the pile foundation of the project to be evaluated, and the sub-target safety factor after scour of the evaluated project are obtained, including: Safety factor of pile foundation bearing capacity after scouring , ; Safety factor of pile foundation deformation after scouring ; Safety factor of natural frequency of pile foundation after scouring , ; Summarize the three sub-target safety factors after the scouring of the marine pile foundation to obtain the safety factor set after the scouring of the marine pile foundation .

7. A marine pile foundation scour disaster assessment method based on a grading system as claimed in claim 6, characterized in that: The specific process of S5 is as follows: Based on the safety factor set after scouring of marine pile foundation , get the marine pile foundation scour disaster risk level set ;in, The dangerous level of pile foundation bearing capacity after scouring. It is the cumulative deformation danger level after pile foundation scouring. It is the natural frequency danger level after pile foundation scouring; The marine pile foundation scour disaster hazard level set The three sub-target danger levels ( The specific grading evaluation criteria include: When the safety factor of a sub-target after pile foundation scouring When , the hazard level of this sub-target after pile foundation scouring is IV; ; When the safety factor of a sub-target after pile foundation scouring When , the hazard level of this sub-target after pile foundation scouring is III; When the safety factor of a sub-target after pile foundation scouring When , the hazard level of this sub-target after pile foundation scouring is II; When the safety factor of a sub-target after pile foundation scouring When , the hazard level of this sub-target after pile foundation scouring is Ⅰ; Marine pile foundation scour disaster risk level collection The maximum risk level in , as the final level of scour disasters, and determine the timing of governance based on the final danger level.

Citation Information

Patent Citations

  • A bridge pile health state evaluation method based on real-time monitoring data processing

    CN109271662A

  • Method for accurately predicting bearing capacity of ocean pile foundation before and after liquefaction

    CN111310319A

  • Monitoring system and method for supporting structure of offshore wind turbine unit

    CN115306648A

  • Risk assessment method, device and equipment for scouring state of offshore pile foundation

    CN116090303A

  • Safety assessment method, system and equipment for supporting structure of offshore wind turbine generator

    CN118607302A