Conference process time arrangement management system and method
By using logical rule engines and artificial intelligence technologies for database, client and server in the meeting schedule management system, we optimize the meeting schedule, and solve the problem that existing systems cannot effectively integrate meetings and intermediate transaction points, and improve meeting efficiency and Customer satisfaction.
Patent Information
- Application Number
- CN202411509316.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-28
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When handling complex itinerary, the existing meeting schedule management system cannot effectively integrate meeting transaction points and intermediate transaction points, resulting in reduced meeting efficiency and participation rate, and the inability to update itinerary information in a timely manner, affecting the smoothness of the itinerary.
By setting up databases, clients and servers, using logical rules engines and artificial intelligence technology, priority sorting and time matrix analysis, process planning information is generated, automated information synchronization and verification are achieved, and it is necessary to ensure the smooth progress of schedule.
Improves meeting efficiency and participation rate, reduces delays caused by itinerary conflicts, and enhances customer satisfaction and smoothness of itinerary.
Smart Images

Figure CN119027085A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of conference process management, and in particular to a conference process time arrangement management system and method. Background Art
[0002] Large business meetings usually involve multiple participating customers and complex itineraries, including coordination of meeting locations, accommodation, travel, and transportation. With the advancement of technology, intelligent time management systems have become an important tool for improving meeting efficiency. Participating customers enter their itinerary information through a client (such as a mobile phone APP), and use technologies that support instant messaging and geo-location services to enable participating customers to receive navigation information and precautions at any time to manage their time accordingly. However, in the process of time management, traditional systems and methods may only consider a certain condition in the process of scheduling management, such as automatically planning the shortest distance or shortest time between each transaction point. When the customer wants to conduct other transaction points (such as shopping, socializing), a new activity plan is usually established, and multiple intermediate transaction points cannot be added on the basis of the original itinerary information, which reduces customer satisfaction to a certain extent. At the same time, when there is a meeting transaction point at the intermediate transaction point, the scheduling management process of the meeting transaction point may be ignored, which reduces the participation rate and efficiency of the meeting to a certain extent. In addition, the vehicle terminal and the hotel terminal are separated from the system. After confirming the process plan, the hotel terminal and the vehicle terminal are often required to confirm the information alone, which is not intelligent enough. At the same time, when there is a traffic jam and a queue on the way to the transaction point, the corresponding information cannot be updated in time, which reduces the smoothness of the itinerary. If the meeting transaction point is approaching later, it may cause the meeting to be unable to be participated in in time, further reducing the efficiency of time management. Summary of the invention
[0003] 1. Technical issues to be resolved In view of the deficiencies in the prior art, the present invention provides a time scheduling management system and method for a conference process, which comprises setting up a database, a client and a server, inputting a first work instruction to the client, executing a first judgment request, matching a preset time parameter, inputting a second work instruction to the client, executing a second judgment request, building a logic rule engine to analyze and process transaction points, and generating corresponding itinerary plan information. The database creates a first branch and a second branch according to the first storage request and the second storage request, and performs automatic information synchronization and verification functions, thereby further making the entire conference process smoother, ensuring the smooth progress of the meeting, and solving the problems raised in the background technology.
[0004] (II) Technical solution To achieve the above objectives, the present invention is implemented through the following technical solutions: a time arrangement management system for conference process, the management system includes a database, a client and a server, the client includes a user terminal, a hotel terminal and a vehicle terminal; The client receives the first work instruction and generates a first judgment request, wherein the first judgment request is to judge and analyze the first work instruction to match the preset time parameters; when the match is successful, a first storage request is sent to the database and the server; wherein the first storage request is the itinerary arrangement information to be stored; The client receives the second work instruction and generates a second judgment request, wherein the second judgment request is to perform judgment analysis on the second work instruction to perform time arrangement planning, and the judgment analysis includes: the server determines the process plan information according to the time planning conditions and builds a logic rule engine; and at the same time, sends the second judgment request to the server, and after the server completes the judgment analysis, it returns the planning result to the client, and the client sends a second storage request to the server, wherein the second storage request is the process plan information to be stored; The process of building a logic rule engine based on time planning conditions is as follows: First, taking 24 hours a day as the base time, retrieve all transaction points and their corresponding preset time parameters under the base time from the database, perform attribute analysis on the transaction points, extract transaction points with time attributes, and assign them the first priority; where the time attribute indicates that the transaction point specifies the time schedule; Secondly, on the basis of the first priority, the second priority is assigned to the conference affairs point, and the third priority is assigned to other intermediate affairs points, so as to generate a priority ranking table; wherein, when there is a scheduling conflict between affairs points, the scheduling is carried out in the order of the first priority> the second priority> the third priority; Then, according to the priority sorting table and time planning conditions, several time matrices are created to construct corresponding process planning combinations, and the process planning combinations have time attributes. At the same time, artificial intelligence technology is used to analyze the current time matrix, and the time utilization rate of each transaction point is used as the evaluation standard. The corresponding evaluation data under each process planning combination is obtained to obtain the estimated value of the evaluation index corresponding to each process planning combination; wherein the process planning combination is the arrangement order and corresponding arrangement time of each transaction point in the base time; Evaluation data include time utilization and transaction completion rate; The formula for estimating the evaluation indicator is: ; In the formula, adjust is the estimated value of the evaluation indicator, Tu is the time utilization rate, and Tc is the transaction completion rate; β is the weight ratio coefficient, and β is assigned according to the priority level: when the corresponding transaction point is the first priority, the weight is 3; when the corresponding transaction point is the second priority, the weight is 2; when the corresponding transaction point is the third priority, the weight is 1; Finally, the process planning combinations are sorted in descending order according to the estimated values of the evaluation indicators, and the process planning combination with the highest ranking is selected to generate the process plan information; The server responds to the first storage request and the second storage request, and performs synchronization verification according to the first storage request and the second storage request; wherein the first synchronization verification is performed according to the first storage request, and the second synchronization verification is performed according to the second storage request; The database stores the corresponding itinerary arrangement information according to the first storage request that passes the verification; and stores the corresponding process plan information according to the second storage request that passes the verification.
[0005] Furthermore, the process of analyzing the first judgment request is as follows: First, a first work instruction is input to the client, the first work instruction including: a departure location, a meeting serial number, a meeting title, and a meeting location; wherein the departure location is the current location of the user terminal; Then, when the client reads the departure location and the meeting location, it immediately calculates the distance between the two locations, calls the preset standard distance determination table from the database, and there are several types of standard distance determination tables. It searches and analyzes the standard distance determination table. When the distance value exists in the standard distance determination table, it immediately obtains the preset time parameter corresponding to the distance value. Finally, when a preset time parameter corresponds to the departure location and meeting location in the work order, it means that the match is successful and the matching result is returned to the client; among them, the standard distance determination table stores the data required for itinerary scheduling, including the departure location, meeting location, travel distance range and preset time parameters; the preset time parameters refer to the parameter set generated by merging the time parameters required in the itinerary scheduling process.
[0006] Furthermore, the process of analyzing the second judgment request is as follows: First, input a second work instruction to the client, the second work instruction including: an intermediate business point, a departure point of the intermediate business point, and a destination of the intermediate business point; generate a time planning condition according to the second work instruction; wherein the intermediate business point is other business points except the conference business point; Secondly, the server side builds a logic rule engine based on the time planning conditions to determine the process planning information, which includes the itinerary sequence and the scheduling time; and determines the scheduling time corresponding to several hotel terminals and several vehicle terminals based on the process planning information; Thirdly, the driving speed, driving acceleration and driving trajectory of the corresponding vehicle are determined according to the vehicle terminal, the first duration is determined, and the process plan information is updated according to the first duration, and the updated process plan information is returned to the server. The specific process is as follows: The vehicle's speed is marked as V and its acceleration is marked as , mark the driving trajectory as a sequence S, obtain the movement direction of the corresponding driving trajectory point on the sequence S; take the vertical line as the axis, obtain the angle between the movement direction and the axis and mark it as the movement speed inclination angle θ; according to the driving speed V, driving acceleration and the inclination angle θ of the movement speed, and calculate the first duration T1; The formula for the first duration T1 is: ; Wherein, the first duration T1 is the duration required for the corresponding driving speed between two driving trajectory points to change during driving; Then, the sequence S is fitted based on the first duration T1, and a functional relationship F(X) between the travel distance sv and the first duration T1 is constructed; the first arrival time r1 corresponding to the intermediate transaction point is determined according to the functional relationship F(X) to determine the itinerary arrangement of the intermediate transaction point; wherein the first arrival time r1 is the time range for the vehicle to arrive at the corresponding processing transaction point; Finally, the process plan information is updated according to the first duration T1 and the first arrival time r1, and the second duration T2 is determined and sent to the hotel terminal; wherein the second duration T2 is the time range for the vehicle to arrive at the hotel terminal.
[0007] Furthermore, the process of performing the first synchronization verification is: When the client sends a first storage request to the server, a first verification message is immediately generated. The server performs verification processing based on the first verification message, generates a first verification result, and returns the first verification result to the client to complete the synchronous verification; wherein, the first verification message includes the client's identity authentication information, timestamp, and information of the terminal device used, and the first verification result is the server's processing result of the first verification message, including a success or failure status code.
[0008] Furthermore, the process of the second synchronization verification work is: When the client sends a second storage request to the server, a second verification message is additionally generated based on the first verification message. The server performs verification processing based on the first verification message and the second verification message, generates a second verification result, and returns the second verification result to the client to complete the synchronous verification; wherein the second verification message is the secondary identity authentication information for the customer.
[0009] Furthermore, the database creates a first branch and a second branch, the client creates a third branch, and the first branch corresponds to the third branch, specifically including: The client creates a third branch according to the first judgment request, and the third branch stores the itinerary arrangement information; The database creates a first branch according to the first storage request, and synchronizes the itinerary arrangement information stored in the third branch to the first branch, creates a second branch according to the second storage information, the second branch stores the process plan information, and synchronously updates the process plan information stored in the second branch; The database merges the second branch and the first branch to form a main branch.
[0010] A method for managing the time arrangement of a conference process, which is applied to the above-mentioned time arrangement management system for the conference process, comprises the following steps: S1. Receive a first work instruction and generate a first judgment request, wherein the first judgment request judges and analyzes the first work instruction to obtain a match with a preset time parameter; if the match is successful, send a first storage request; wherein the first storage request is the itinerary arrangement information to be stored; S2. Receive the second work instruction and generate a second judgment request. The second judgment request is to perform judgment analysis on the second work instruction to obtain a time arrangement plan. The judgment analysis includes: the server side builds a logic rule engine according to the time planning conditions to determine the process plan information; returns the planning result and sends a second storage request, wherein the second storage request is the process plan information to be stored; The process of building a logic rule engine based on time planning conditions is as follows: First, taking 24 hours a day as the base time, retrieve all transaction points and their corresponding preset time parameters under the base time from the database, perform attribute analysis on the transaction points, extract transaction points with time attributes, and assign them the first priority; where the time attribute indicates that the transaction point specifies the time schedule; Secondly, on the basis of the first priority, the second priority is assigned to the conference affairs point, and the third priority is assigned to other intermediate affairs points, so as to generate a priority ranking table; wherein, when there is a scheduling conflict between affairs points, the scheduling is carried out in the order of the first priority> the second priority> the third priority; Then, according to the priority sorting table and time planning conditions, several time matrices are created to construct corresponding process planning combinations, and the process planning combinations have time attributes. At the same time, artificial intelligence technology is used to analyze the current time matrix, and the time utilization rate of each transaction point is used as the evaluation standard. The corresponding evaluation data under each process planning combination is obtained to obtain the estimated value of the evaluation index corresponding to each process planning combination; wherein the process planning combination is the arrangement order and corresponding arrangement time of each transaction point in the base time; Evaluation data include time utilization and transaction completion rate; The formula for estimating the evaluation indicator is: ; In the formula, adjust is the estimated value of the evaluation indicator, Tu is the time utilization rate, and Tc is the transaction completion rate; β is the weight ratio coefficient, and β is assigned according to the priority level: when the corresponding transaction point is the first priority, the weight is 3; when the corresponding transaction point is the second priority, the weight is 2; when the corresponding transaction point is the third priority, the weight is 1; Finally, the process planning combinations are sorted in descending order according to the estimated values of the evaluation indicators, and the process planning combination with the highest ranking is selected to generate the process plan information; S3, performing synchronous verification on the first storage request and the second storage request, wherein a first synchronous verification is performed according to the first storage request, and a second synchronous verification is performed according to the second storage request; S4. According to the first storage request that passes the verification, store the corresponding itinerary arrangement information; according to the second storage request that passes the verification, store the corresponding process plan information.
[0011] (III) Beneficial effects The present invention provides a conference schedule management system and method, which has the following beneficial effects: 1. The present invention sets a client, a database and a server. The client generates a first judgment request and a second judgment request by receiving a first work instruction and a second work instruction. In the process of executing the first judgment request, the client communicates directly with the database and sends the first storage request to the database for storage without going through the server, thereby reducing the management cost of the itinerary arrangement information and improving the management efficiency. At the same time, the server also temporarily stores the first storage information to facilitate the subsequent first synchronization verification; 2. The present invention executes the first judgment request through the client to match and manage the time parameters required in the itinerary scheduling process, and executes the second judgment request through the server to make detailed time scheduling plans for the itinerary; in this process, the priority of the transaction points is set through the time planning conditions and the logic rule engine is built to reasonably allocate time, effectively reducing the delay of the customer's meeting time due to additional reasons (such as: because the establishment of a new activity plan cannot balance the distance or time arrangement between the transaction points), avoiding conflicts between transaction points, and arranging the intermediate transaction points on the premise of attending the meeting; at the same time, the automated information synchronization and verification functions improve customer demand and satisfaction. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 The figure is a flowchart of a time arrangement management system for a conference process according to an exemplary embodiment.
[0013] Figure 2 The figure is a schematic diagram of a framework of a time arrangement management system for a conference process according to another exemplary embodiment. DETAILED DESCRIPTION
[0014] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Example 1
[0015] This embodiment provides a time arrangement management system for conference progress. Figure 1 The figure is a flowchart of a time arrangement management system for a conference process according to an exemplary embodiment. Figure 2 FIG. 1 is a schematic diagram of a time arrangement management system for a conference process according to another exemplary embodiment. Figure 1 - Figure 2 The time arrangement management system of the conference process includes a database, a client and a server. The client includes a user terminal, a hotel terminal and a vehicle terminal. The whole system is designed for the scenario of business meetings or large-scale meetings. The following are specific descriptions and explanations of each module or component: Client: Receive a first work instruction, generate a first judgment request, the first judgment request is to judge and analyze the first work instruction to match the preset time parameters; when the match is successful, send a first storage request to the server, the server performs a first synchronization verification, and when the verification is passed, the client sends the first storage request to the database; wherein the first storage request is the itinerary arrangement information to be stored; The process of analyzing the first judgment request is as follows: First, a first work instruction is input to the client, the first work instruction including: a departure location, a meeting serial number, a meeting title, and a meeting location; wherein the departure location is the current location of the user terminal; The conference serial numbers are 1, 2, ..., i1, where i1 is the total number of conferences and is a positive integer; The conference titles are M1, M2...Mi, where M1, M2...Mi are conference titles that correspond to the conference serial numbers one by one; The meeting locations are G1, G2...Gi, where G1, G2...Gi are meeting locations that correspond to the meeting numbers one by one; Then, when the client reads the departure location and the meeting location, it immediately calculates the distance between the two locations, calls the preset standard distance determination table from the database, and there are several types of standard distance determination tables. It searches and analyzes the standard distance determination table. When the distance value exists in the standard distance determination table, it immediately obtains the preset time parameter corresponding to the distance value. In the process of calculating the distance value, the city range of the departure location and the meeting location is first determined, and the corresponding distance is selected for calculation according to the city range, and the corresponding standard distance determination table is matched; When the departure location and the meeting location are in the same city, the Manhattan principle is used for distance calculation: The formula is: ; Where d1 represents the distance value obtained based on the plane coordinates, (x1, y1) is the coordinate of the departure point, and (x2, y2) is the coordinate of the meeting place; For example: when the departure location is A1 (3, 4) and the meeting location is B1 (1, 1); Then the distance between the two places is d1=|3-1|+|4-1|=5; When the departure location and the meeting location are not in the same city, the Haversing formula is used to calculate the distance: The formula is: ; Where d2 is the distance value calculated based on the Haversing formula, R is the radius of the earth, (lat1, lon1) is the longitude and latitude coordinates of the departure point, (lat2, lon2) is the longitude and latitude coordinates of the meeting place, and both are in radians; g and c are intermediate variables used to calculate the arc length between the two places; For example: when the departure location is Beijing A2 (39.9042°N, 116.4074°E), the meeting place is Shanghai B2 (31.2304°N, 121.4737°E); Then first convert the longitude and latitude to radians (the result is rounded to four decimal places): 39.9042× (π / 180)=0.7975rad; 116.4074× (π / 180)=2.0324rad; 31.2304× (π / 180)=0.5454rad; 121.4737× (π / 180)=2.1157rad; Then g = 0.0057 + 0.6235 × 0.8841 × 0.001736 = 0.000692; Then the distance d2 = 2.6371 × 0.0831 = 1054.86 km; Finally, when a preset time parameter corresponds to the departure location and meeting location in the work order, it indicates a successful match, and the matching result is returned to the client; It should be noted that: according to the obtained distance value d1 or distance value d2, a search and match is performed. When the distance value d1 or distance value d2 is matched with the corresponding standard distance determination table, the difference e1 between the distance value d1 and the corresponding standard determination table or the difference e2 between the distance value d2 and the corresponding standard determination table is calculated, and a gradient range is set for the difference e1 or the difference e2, for example, a gradient range of ±wc% is set. When the difference is within the gradient range, the corresponding preset time parameter is obtained. At the same time, the departure location and the meeting location are matched and analyzed again, and the results of the matching analysis are stored in the corresponding standard distance determination table to update the standard distance determination table. The standard distance determination table stores the data required for itinerary arrangement, including the departure location, meeting location, itinerary distance range and preset time parameters; the preset time parameters refer to a parameter set generated by combining the time parameters required in the itinerary arrangement process, including the meeting arrangement management preset time, the hotel arrangement management preset time and the vehicle arrangement management preset time; Server: In response to the first storage request, the process of performing the first synchronization verification according to the first storage request is: When the client sends the first storage request to the server, a first verification message is immediately generated, and the server performs verification processing according to the first verification message, generates a first verification result, and returns the first verification result to the client to complete the synchronous verification; wherein the first verification message includes the client's identity authentication information, timestamp, and terminal device information used, and the first verification result is the server's processing result of the first verification message, including a success or failure status code; For example, a client enters a user name and password through a user terminal, generates a first verification message as a credential and sends it to the server. The server verifies whether the credential is correct. When the verification is successful, the server generates an authentication token (e.g., using the JWT standard in identity authentication) and returns the verification processing result to the user terminal in the form of an HTTP response. database: storing corresponding itinerary arrangement information according to the first storage request that passes the verification; Client: Receive a second work instruction, generate a second judgment request, the second judgment request is to perform judgment analysis on the second work instruction to perform time arrangement planning, the judgment analysis includes: the server side builds a logic rule engine according to the time planning conditions to determine the process planning information; at the same time, send the second judgment request to the server side, after the server side completes the judgment analysis, it returns the planning result to the client side, and the client side sends a second storage request to the server side, wherein the second storage request is the process planning information to be stored; The process of analyzing the second judgment request is as follows: First, input a second work instruction to the client, the second work instruction including: an intermediate business point, a departure point of the intermediate business point, and a destination of the intermediate business point; generate a time planning condition according to the second work instruction; wherein the intermediate business point is other business points except the conference business point; Secondly, the server side builds a logic rule engine based on the time planning conditions to determine the process planning information, which includes the itinerary sequence and the scheduling time; and determines the scheduling time corresponding to several hotel terminals and several vehicle terminals based on the process planning information; Thirdly, the driving speed, driving acceleration and driving trajectory of the corresponding vehicle are determined according to the vehicle terminal, the first duration is determined, and the process plan information is updated according to the first duration, and the updated process plan information is returned to the server. The specific process is as follows: The vehicle's speed is marked as V and its acceleration is marked as , mark the driving trajectory as a sequence S, obtain the movement direction of the corresponding driving trajectory point on the sequence S; take the vertical line as the axis, obtain the angle between the movement direction and the axis and mark it as the movement speed inclination angle θ; according to the driving speed V, driving acceleration and the inclination angle θ of the movement speed, and calculate the first duration T1; The formula for the first duration T1 is: ; Wherein, the first duration T1 is the duration required for the corresponding driving speed between two driving trajectory points to change during driving; Then, the sequence S is fitted based on the first duration T1, and a functional relationship F(X) between the travel distance sv and the first duration T1 is constructed: sv=F(T1); the first arrival time r1 corresponding to the intermediate transaction point is determined according to the functional relationship F(X) to determine the itinerary arrangement of the intermediate transaction point; wherein the first arrival time r1 is the time range for the vehicle to arrive at the corresponding processing transaction point; In this embodiment, the process of determining the first arrival time r1 corresponding to the intermediate transaction point according to the functional relationship F(X) can be implemented in a variety of ways, for example: first determine the entire route of the driving trajectory, and calculate the driving distance according to sv=F(T1), and continue to monitor the driving speed, driving acceleration and motion speed inclination corresponding to the vehicle terminal, and by comparing the first time length T1 between any two driving trajectory points, the convenience trend of the vehicle on the driving trajectory can be determined, and the time to arrive at the corresponding transaction point can be estimated; since there is an error in the estimated time, the fastest estimated time and the slowest estimated time are taken to form a time range; in this regard, other implementation methods are not repeated; Finally, the process plan information is updated according to the completion time of the transaction point corresponding to the first duration T1 and the first arrival time r1, and the arrival time and status of the next transaction point are set according to the updated process plan information to determine the second duration T2, and the second duration T2 is sent to the hotel terminal; wherein the second duration T2 is the time range for the vehicle to arrive at the hotel terminal; It should be noted that by obtaining the corresponding data of the vehicle terminal, the journey status of the customer to the intermediate transaction point can be effectively controlled to determine the current status (such as traffic jam, unobstructed traffic), estimate the time to reach the corresponding transaction point, and timely update the first time length T1, further determine the second time length T2, to determine the process plan information, and return it to the client; The process of building a logic rule engine based on time planning conditions is as follows: First, taking 24 hours a day as the base time, retrieve all transaction points and their corresponding preset time parameters under the base time from the database, perform attribute analysis on the transaction points, extract transaction points with time attributes, and assign them the first priority; where the time attribute indicates that the transaction point specifies the time schedule; Secondly, on the basis of the first priority, the second priority is assigned to the conference affairs point, and the third priority is assigned to other intermediate affairs points, so as to generate a priority ranking table; wherein, when there is a scheduling conflict between affairs points, the scheduling is carried out in the order of the first priority> the second priority> the third priority; Then, according to the priority sorting table and time planning conditions, several time matrices are created to construct corresponding process planning combinations, and the process planning combinations have time attributes. At the same time, artificial intelligence technology is used to analyze the current time matrix, and the time utilization rate of each transaction point is used as the evaluation standard. The corresponding evaluation data under each process planning combination is obtained to obtain the estimated value of the evaluation index corresponding to each process planning combination; wherein the process planning combination is the arrangement order and corresponding arrangement time of each transaction point in the base time; The specific process is: Evaluation data include time utilization and transaction completion rate; It should be noted that the time utilization rate is the ratio of the actual time used by a transaction point in a specific time period to the available time. It mainly focuses on the use of time and evaluates whether the transaction point arrangement fully utilizes the available time. The transaction completion rate involves the organization, coordination and execution effect of each transaction point in a day. It not only includes the use of time, but also considers the completion quality of the transaction point, the satisfaction of priorities, and the reasonable allocation of resources. The formula for estimating the evaluation indicator is: ; In the formula, adjust is the estimated value of the evaluation indicator, Tu is the time utilization rate, and Tc is the transaction completion rate; β is the weight ratio coefficient, and β is assigned according to the priority: when the corresponding transaction point is the first priority, it is assigned a weight of 3; when the corresponding transaction point is the second priority, it is assigned a weight of 2; when the corresponding transaction point is the third priority, it is assigned a weight of 1; it should be noted that the higher the value of the time utilization rate Tu, the more effective use of most of the available time is, and the higher the value of the transaction completion rate Tc, the more reasonable the arrangement of transaction points in a day is; Finally, the process planning combinations are sorted in descending order according to the estimated values of the evaluation indicators, and the process planning combination with the highest ranking is selected to generate the process plan information; For example, the following transaction points are set in 24 hours a day, such as meeting 1, meeting 2, shopping 1, shopping 2, social 1 and social 2. Usually, the meeting transaction point has a time attribute. When the meeting transaction point does not have a time attribute, it can be represented as a temporary meeting; meeting 1 and shopping 1 have time attributes, assuming that they are 9:00-10:00 and 10:00-11:00 respectively. According to the above rules, both are marked as the first priority, meeting 2 is marked as the second priority, and shopping 2, social 1 and social 2 are marked as the third priority; Create several time matrices based on the priority list and time planning conditions. The specific process is as follows: Set up the heuristic function: Take the transaction point as the node, and extract the departure and destination points of the transaction point to draw the graph structure; for each node, define the heuristic function based on the distance and priority between the two places; Graph structure traversal: Use the A* algorithm to traverse the graph and calculate the cost of each node; Path selection: Each time, the smallest node is selected for expansion, and nodes corresponding to the first priority > second priority > third priority are selected first, ensuring that high-priority nodes (such as: meeting 1, shopping 1) are visited first, and the second-priority nodes (such as: meeting 2) are visited next; Time constraint: Check the time attribute of the node in real time during the algorithm operation to ensure that the path selection meets this constraint requirement; Preliminary allocation: Allocate an estimated time period to each transaction point, and the same transaction point may have multiple estimated time periods; Create several time matrices based on the expected time periods: A time matrix is a two-dimensional array (matrix), where rows represent time periods and columns represent transaction points; it should be noted that 1 indicates that the activity is within the time period, and 0 indicates no activity; Assume there is a preset time period 1:
[0016] The corresponding time matrix 1 is: ; Then the time utilization rate = {1 / 6, 1 / 6, 0, 1 / 6, 0, 1 / 6}; Then the transaction completion rate = 4 / 6 = 2 / 3; Construct a process planning combination 1 = {meeting 1, shopping 1, social 1, meeting 2}; Then the estimated value of the evaluation index = (1 / 6×3+1 / 6×3+1 / 6×1+1 / 6×2)+2 / 3=13 / 6; Assume there is a preset time period 2:
[0017] Then the corresponding time matrix 2 is: ; Then time utilization = {1 / 6, 1 / 6, 1 / 6, 1 / 6, 1 / 6, 1 / 6}; Then the transaction completion rate = 6 / 6 = 1; Construct process planning combination 2 = {meeting 1, shopping 1, social 1, meeting 2, shopping 2, social 2}; Then the estimated value of the evaluation index = (1 / 6×3+1 / 6×3+1 / 6×1+1 / 6×2+1 / 6×1+1 / 6×1)+1=17 / 6; Among them, 13 / 6<17 / 6, then process planning combination 2 is ranked before process planning combination 1, process planning combination 2 is selected, and the corresponding time arrangement is obtained to generate process plan information; Server: Respond to the second storage request, perform a second synchronization verification according to the second storage request; when the verification is passed, send the second storage request to the database; it should be noted that in this process, the server directly sends the second storage request and sends it to the database to store the corresponding process plan information; different from the process in which the server responds to the first storage request, the server only performs the first synchronization verification, and after the verification is passed, the client directly sends the first storage information to the database to store the corresponding itinerary arrangement information; The process of the second synchronization verification work is: When the client sends a second storage request to the server, a second verification message is additionally generated based on the first verification message. The server performs verification processing according to the first verification message and the second verification message, generates a second verification result, and returns the second verification result to the client to complete the synchronous verification; wherein the second verification message is secondary identity authentication information of the client; For example, based on the first verification message, the customer authenticates his identity again, which is usually used to enhance the security of the system and ensure the authenticity of the customer's identity. Generally, the customer's facial image is collected through a camera for facial recognition. When the match is successful, the customer's identity information is returned. At the same time, the results and related information of each facial recognition will be recorded for future audit and security review; The database stores corresponding process plan information according to the verified second storage request; The database creates a first branch and a second branch, the client creates a third branch, and the first branch corresponds to the third branch, specifically including: The client creates a third branch according to the first judgment request, and the third branch stores the itinerary arrangement information; The database creates a first branch according to the first storage request, and synchronizes the itinerary arrangement information stored in the third branch to the first branch, creates a second branch according to the second storage information, the second branch stores the process plan information, and synchronously updates the process plan information stored in the second branch; The database merges the second branch and the first branch to form a main branch; It should be noted that the client creates a third branch to store the itinerary information, so that the client and the database can communicate directly, reducing the step of sending the itinerary information to the database through the server, and when the client executes the first judgment request and matches the preset time parameters, the management cost of the itinerary information is effectively reduced, and the management efficiency is improved to a certain extent; when executing the second judgment request, the server is used to process and analyze the data, and store the process plan information, the second branch and the first branch are merged to form a main branch, and the information is fed back to the client, so that the client does not need to determine the information alone; through the connection between the above-mentioned client, database and server, the synchronous update of data is achieved.
[0018] Example 2 See also Figure 1 This embodiment provides a method for managing the time arrangement of a conference process, comprising the following steps: S1. Receive a first work instruction and generate a first judgment request, wherein the first judgment request judges and analyzes the first work instruction to obtain a match with a preset time parameter; if the match is successful, send a first storage request; wherein the first storage request is the itinerary arrangement information to be stored; S2. Receive the second work instruction and generate a second judgment request. The second judgment request is to perform judgment analysis on the second work instruction to obtain a time arrangement plan. The judgment analysis includes: the server builds a logic rule engine according to the time planning conditions to determine the process plan information, returns the planning result, and sends a second storage request, wherein the second storage request is the process plan information to be stored; The process of building a logic rule engine based on time planning conditions is as follows: First, taking 24 hours a day as the base time, retrieve all transaction points and their corresponding preset time parameters under the base time from the database, perform attribute analysis on the transaction points, extract transaction points with time attributes, and assign them the first priority; where the time attribute indicates that the transaction point specifies the time schedule; Secondly, on the basis of the first priority, the second priority is assigned to the conference affairs point, and the third priority is assigned to other intermediate affairs points, so as to generate a priority ranking table; wherein, when there is a scheduling conflict between affairs points, the scheduling is carried out in the order of the first priority> the second priority> the third priority; Then, according to the priority sorting table and time planning conditions, several time matrices are created to construct corresponding process planning combinations, and the process planning combinations have time attributes. At the same time, artificial intelligence technology is used to analyze the current time matrix, and the time utilization rate of each transaction point is used as the evaluation standard. The corresponding evaluation data under each process planning combination is obtained to obtain the estimated value of the evaluation index corresponding to each process planning combination; wherein the process planning combination is the arrangement order and corresponding arrangement time of each transaction point in the base time; Evaluation data include time utilization and transaction completion rate; The formula for estimating the evaluation indicator is: ; In the formula, adjust is the estimated value of the evaluation indicator, Tu is the time utilization rate, and Tc is the transaction completion rate; β is the weight ratio coefficient, and β is assigned according to the priority level: when the corresponding transaction point is the first priority, the weight is 3; when the corresponding transaction point is the second priority, the weight is 2; when the corresponding transaction point is the third priority, the weight is 1; Finally, the process planning combinations are sorted in descending order according to the estimated values of the evaluation indicators, and the process planning combination with the highest ranking is selected to generate the process plan information; S3, performing synchronous verification on the first storage request and the second storage request, wherein a first synchronous verification is performed according to the first storage request, and a second synchronous verification is performed according to the second storage request; S4. According to the first storage request that passes the verification, store the corresponding itinerary arrangement information; according to the second storage request that passes the verification, store the corresponding process plan information.
[0019] In the application, the several formulas involved are all calculated by removing dimensions and taking their numerical values, and the formula is a formula obtained by collecting a large amount of data and performing software simulation to obtain the most recent real situation. The formula is set by technical personnel in this field according to actual conditions.
[0020] The above embodiments may be implemented in whole or in part by software, hardware, firmware or any other combination thereof. When implemented using software, the above embodiments may be implemented in whole or in part in the form of a computer program product. A person of ordinary skill in the art may appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein may be implemented in electronic hardware, or in a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution.
[0021] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, and may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0022] The above description is only a specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application.
Claims
1. A time arrangement management system for conference process, characterized in that: The management system includes a database, a client and a server, and the client includes a user terminal, a hotel terminal and a vehicle terminal; The client receives the first work instruction and generates a first judgment request, wherein the first judgment request is to judge and analyze the first work instruction to match the preset time parameters; when the match is successful, a first storage request is sent to the database and the server; wherein the first storage request is the itinerary arrangement information to be stored; The client receives the second work instruction and generates a second judgment request, wherein the second judgment request is to perform judgment analysis on the second work instruction to perform time arrangement planning, wherein the judgment analysis includes the server building a logic rule engine according to the time planning conditions to determine the process planning information; at the same time, the second judgment request is sent to the server, and after the server completes the judgment analysis, the planning result is returned to the client, and the client sends a second storage request to the server, wherein the second storage request is the process planning information to be stored; The process of building a logic rule engine based on time planning conditions is as follows: First, taking 24 hours a day as the base time, retrieve all transaction points and their corresponding preset time parameters under the base time from the database, perform attribute analysis on the transaction points, extract transaction points with time attributes, and assign them the first priority; where the time attribute indicates that the transaction point specifies the time schedule; Secondly, on the basis of the first priority, the second priority is assigned to the conference affairs point, and the third priority is assigned to other intermediate affairs points, so as to generate a priority ranking table; wherein, when there is a scheduling conflict between affairs points, the scheduling is carried out in the order of the first priority> the second priority> the third priority; Then, according to the priority sorting table and time planning conditions, several time matrices are created to construct corresponding process planning combinations, and the process planning combinations have time attributes. At the same time, artificial intelligence technology is used to analyze the current time matrix, and the time utilization rate of each transaction point is used as the evaluation standard. The corresponding evaluation data under each process planning combination is obtained to obtain the estimated value of the evaluation index corresponding to each process planning combination; wherein the process planning combination is the arrangement order and corresponding arrangement time of each transaction point in the base time; Evaluation data include time utilization and transaction completion rate; The formula for estimating the evaluation indicator is: ; In the formula, adjust is the estimated value of the evaluation indicator, Tu is the time utilization rate, and Tc is the transaction completion rate; β is the weight ratio coefficient, and β is assigned according to the priority level: when the corresponding transaction point is the first priority, the weight is 3; when the corresponding transaction point is the second priority, the weight is 2; when the corresponding transaction point is the third priority, the weight is 1; Finally, the process planning combinations are sorted in descending order according to the estimated values of the evaluation indicators, and the process planning combination with the highest ranking is selected to generate the process plan information; The server responds to the first storage request and the second storage request, and performs synchronization verification according to the first storage request and the second storage request; wherein the first synchronization verification is performed according to the first storage request, and the second synchronization verification is performed according to the second storage request; The database stores the corresponding itinerary arrangement information according to the first storage request that passes the verification; and stores the corresponding process plan information according to the second storage request that passes the verification.
2. A time arrangement management system for conference process according to claim 1, characterized in that: The process of analyzing the first judgment request is as follows: First, a first work instruction is input to the client, the first work instruction including: a departure location, a meeting serial number, a meeting title, and a meeting location; wherein the departure location is the current location of the user terminal; Then, when the client reads the departure location and the meeting location, it immediately calculates the distance between the two locations, calls the preset standard distance determination table from the database, and there are several types of standard distance determination tables. It searches and analyzes the standard distance determination table. When the distance value exists in the standard distance determination table, it immediately obtains the preset time parameter corresponding to the distance value. Finally, when a preset time parameter corresponds to the departure location and meeting location in the work order, it means that the match is successful and the matching result is returned to the client; among them, the standard distance determination table stores the data required for itinerary scheduling, including the departure location, meeting location, travel distance range and preset time parameters; the preset time parameters refer to the parameter set generated by merging the time parameters required in the itinerary scheduling process.
3. A time arrangement management system for conference process according to claim 1, characterized in that: The process of analyzing the second judgment request is as follows: First, input a second work instruction to the client, the second work instruction including: an intermediate business point, a departure point of the intermediate business point, and a destination of the intermediate business point; generate a time planning condition according to the second work instruction; wherein the intermediate business point is other business points except the conference business point; Secondly, the server side builds a logic rule engine based on the time planning conditions to determine the process planning information, which includes the itinerary sequence and the scheduling time; and determines the scheduling time corresponding to several hotel terminals and several vehicle terminals based on the process planning information; Thirdly, the driving speed, driving acceleration and driving trajectory of the corresponding vehicle are determined according to the vehicle terminal, the first duration is determined, and the process plan information is updated according to the first duration, and the updated process plan information is returned to the server. The specific process is as follows: The vehicle's speed is marked as V and its acceleration is marked as , mark the driving trajectory as a sequence S, obtain the movement direction of the corresponding driving trajectory point on the sequence S; take the vertical line as the axis, obtain the angle between the movement direction and the axis and mark it as the movement speed inclination angle θ; according to the driving speed V, driving acceleration and the inclination angle θ of the movement speed, and calculate the first duration T1; The formula for the first duration T1 is: ; Wherein, the first duration T1 is the duration required for the corresponding driving speed between two driving trajectory points to change during driving; Then, the sequence S is fitted based on the first duration T1, and a functional relationship F(X) between the travel distance sv and the first duration T1 is constructed; the first arrival time r1 corresponding to the intermediate transaction point is determined according to the functional relationship F(X) to determine the itinerary arrangement of the intermediate transaction point; wherein the first arrival time r1 is the time range for the vehicle to arrive at the corresponding processing transaction point; Finally, the process plan information is updated according to the first duration T1 and the first arrival time r1, and the second duration T2 is determined and sent to the hotel terminal; wherein the second duration T2 is the time range for the vehicle to arrive at the hotel terminal.
4. A time arrangement management system for conference process according to claim 1, characterized in that: The first synchronization verification process is: When the client sends a first storage request to the server, a first verification message is immediately generated. The server performs verification processing based on the first verification message, generates a first verification result, and returns the first verification result to the client to complete the synchronous verification; wherein, the first verification message includes the client's identity authentication information, timestamp, and information of the terminal device used, and the first verification result is the server's processing result of the first verification message, including a success or failure status code.
5. A time arrangement management system for conference process according to claim 1, characterized in that: The second synchronization verification process is: When the client sends a second storage request to the server, a second verification message is additionally generated based on the first verification message. The server performs verification processing based on the first verification message and the second verification message, generates a second verification result, and returns the second verification result to the client to complete the synchronous verification; wherein the second verification message is the secondary identity authentication information for the customer.
6. A time arrangement management system for conference process according to claim 1, characterized in that: The database creates a first branch and a second branch, and the client creates a third branch, and the first branch and the third branch correspond to each other, specifically including: The client creates a third branch according to the first judgment request, and the third branch stores the itinerary arrangement information; The database creates a first branch according to the first storage request, and synchronizes the itinerary arrangement information stored in the third branch to the first branch, creates a second branch according to the second storage information, the second branch stores the process plan information, and synchronously updates the process plan information stored in the second branch; The database merges the second branch and the first branch to form a main branch.
7. A method for managing the time arrangement of a conference process, characterized in that: The management method is applied to the time arrangement management system of the conference process as described in any one of claims 1 to 6 above, and comprises the following steps: S1. Receive a first work instruction and generate a first judgment request, wherein the first judgment request judges and analyzes the first work instruction to obtain a match with a preset time parameter; if the match is successful, send a first storage request; wherein the first storage request is the itinerary arrangement information to be stored; S2. Receive the second work instruction and generate a second judgment request, wherein the second judgment request is to perform judgment analysis on the second work instruction to obtain a time arrangement plan, wherein the judgment analysis includes the server building a logic rule engine according to the time planning conditions to determine the process plan information; return the planning result and send a second storage request, wherein the second storage request is the process plan information to be stored; The process of building a logic rule engine based on time planning conditions is as follows: First, taking 24 hours a day as the base time, retrieve all transaction points and their corresponding preset time parameters under the base time from the database, perform attribute analysis on the transaction points, extract transaction points with time attributes, and assign them the first priority; where the time attribute indicates that the transaction point specifies the time schedule; Secondly, on the basis of the first priority, the second priority is assigned to the conference affairs point, and the third priority is assigned to other intermediate affairs points, so as to generate a priority ranking table; wherein, when there is a scheduling conflict between affairs points, the scheduling is carried out in the order of the first priority> the second priority> the third priority; Then, according to the priority sorting table and time planning conditions, several time matrices are created to construct corresponding process planning combinations, and the process planning combinations have time attributes. At the same time, artificial intelligence technology is used to analyze the current time matrix, and the time utilization rate of each transaction point is used as the evaluation standard. The corresponding evaluation data under each process planning combination is obtained to obtain the estimated value of the evaluation index corresponding to each process planning combination; wherein the process planning combination is the arrangement order and corresponding arrangement time of each transaction point in the base time; Evaluation data include time utilization and transaction completion rate; The formula for estimating the evaluation indicator is: ; In the formula, adjust is the estimated value of the evaluation indicator, Tu is the time utilization rate, and Tc is the transaction completion rate; β is the weight ratio coefficient, and β is assigned according to the priority level: when the corresponding transaction point is the first priority, the weight is 3; when the corresponding transaction point is the second priority, the weight is 2; when the corresponding transaction point is the third priority, the weight is 1; Finally, the process planning combinations are sorted in descending order according to the estimated values of the evaluation indicators, and the process planning combination with the highest ranking is selected to generate the process plan information; S3, performing synchronous verification on the first storage request and the second storage request, wherein a first synchronous verification is performed according to the first storage request, and a second synchronous verification is performed according to the second storage request; S4. According to the first storage request that passes the verification, store the corresponding itinerary arrangement information; according to the second storage request that passes the verification, store the corresponding process plan information.
Citation Information
Patent Citations
Transaction overall-management method and terminal and device
CN107545406A
Schedule planning method and device based on navigation system
CN117745253A
Calendar management method and device, equipment and storage medium
CN117974085A
Dynamic location-aware coordination method and system
US20130283211A1
Itinerary generation and adjustment system
US20170059337A1