Power balance adjusting method and system of new energy hydrogen production system
By building optimization functions and constraints in the new energy hydrogen production system, we find optimization solutions to determine the optimal solution for hydrogen production load scheduling, and solve the system's response problem under fluctuating loads, and achieve power balance and stability improvement.
Patent Information
- Application Number
- CN202411175180.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-26
AI Technical Summary
When facing fluctuating loads, the real-time response rate of the new energy hydrogen production system is low, which makes it difficult to maintain power balance between the new energy power generation power and the real-time load power, resulting in unstable power supply.
By constructing a target optimization function, it is determined that the minimum deviation between the change in the hydrogen production load scheduling volume of the new energy hydrogen production system and the current hydrogen production load scheduling plan is the optimization goal. Combining the system power balance constraints and other constraints, a genetic algorithm is used to find the best solution. , determine the optimal hydrogen production load scheduling scheme, and execute and update within the scheduling cycle to achieve balance.
The real-time response rate of the new energy hydrogen production system to fluctuating loads is improved, ensuring the continuous power balance between the new energy power generation power and the real-time load power, and improving the stability of power supply.
Smart Images

Figure CN119029830A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of hydrogen production process optimization, and in particular to a power balance adjustment method and system for a new energy hydrogen production system. Background Art
[0002] With the annual increase in installed capacity of new energy power generation devices such as wind power generation and photovoltaic power generation, the amount of wind and solar power abandoned is also increasing. Hydrogen energy, as a green energy with great development prospects and wide application, has received extensive attention in the field of clean energy utilization. Using wind and solar power generation to achieve green hydrogen production can effectively increase the new energy consumption rate and become an effective way to alleviate the problems of wind and solar power consumption difficulties caused by large-scale replacement of fossil energy by new energy. The rational optimization and scheduling of new energy and new energy hydrogen production systems is one of the key technologies to achieve efficient support of hydrogen energy for new energy power generation systems.
[0003] For the application of power grid frequency regulation auxiliary services in seconds, the high-temperature electric new energy hydrogen production system supported by high-temperature solid oxide fuel cells (SOEC) needs to respond quickly and accurately track the changing power instructions. To this end, it is necessary to have a quantitative understanding of the dynamic characteristics of the high-temperature electric new energy hydrogen production system and deepen the dynamic response time scale to achieve balanced regulation applications. However, the current new energy hydrogen production system has a low real-time response rate to adapt to fluctuating loads. At the same time, it is difficult to maintain power balance between new energy power generation power and real-time load power, which easily leads to unstable power supply. Summary of the invention
[0004] The present invention provides a power balance adjustment method and system for a new energy hydrogen production system, which solves the technical problems that the current new energy hydrogen production system has a low real-time response rate to adapt to fluctuating loads, and at the same time, it is difficult to maintain power balance between the new energy power generation power and the real-time load power, which easily leads to unstable power supply.
[0005] In view of this, the first aspect of the present invention provides a power balance adjustment method for a new energy hydrogen production system, comprising:
[0006] By determining the structure of the new energy hydrogen production system, taking the minimum deviation between the hydrogen production load scheduling change of the new energy hydrogen production system and the current hydrogen production load scheduling plan as the optimization goal, a target optimization function is constructed;
[0007] Determining the power operation balance of the new energy hydrogen production system as a constraint condition of the objective optimization function;
[0008] Under the constraints of the constraints, the objective optimization function is optimized and solved, and the optimal solution for hydrogen production load scheduling of the new energy hydrogen production system is determined according to the optimal solution;
[0009] The optimal solution for hydrogen production load scheduling of the new energy hydrogen production system is sent to the new energy hydrogen production system for execution.
[0010] Preferably, the new energy hydrogen production system structure includes a new energy power supply, an energy storage power supply, an electric load, an electrolyzer, a hydrogen storage tank, a fuel cell, a hydrogen load and a pulse width modulator;
[0011] The new energy power source, the energy storage power source, and the electric load are all connected to the DC bus through the frequency converter, the DC bus is respectively connected to the electrolyzer and the fuel cell through the frequency converter, the electrolyzer is connected to the fuel cell through the hydrogen storage tank, and the electrolyzer and the hydrogen storage tank are both connected to the hydrogen load;
[0012] The pulse width modulator is electrically connected to the frequency converter.
[0013] Preferably, the step of constructing a target optimization function with the minimum deviation between the change in hydrogen production load scheduling of the new energy hydrogen production system and the current hydrogen production load scheduling plan as the optimization target comprises:
[0014] Establish state change equations corresponding to the electrolyzer, the hydrogen storage tank and the fuel cell respectively; wherein the state change equation of the electrolyzer is:
[0015]
[0016] In the formula, m′ H2,d is the hydrogen production mass of the electrolyzer, m′ H2,v is the unit hydrogen production rate of the electrolyzer, m′ H2,g is the unit hydrogen production mass of the electrolyzer, η el is the electrolysis efficiency, P in is the working power of the electrolytic cell, E H2 is the energy required to produce hydrogen per unit;
[0017] Among them, P in =P RE +P bat -P bat / η bat
[0018] Where P RE is the output power of the new energy source, P bat is the charging or discharging power of the energy storage battery, η bat The charging and discharging efficiency of the energy storage battery;
[0019] The state change equation of the hydrogen storage tank is:
[0020]
[0021] Where M H2 is the mass of hydrogen in the hydrogen storage tank, t is the time, M H2,out is the mass of hydrogen output from the hydrogen storage tank;
[0022] The state change equation of the fuel cell is:
[0023]
[0024] Where P out is the output power of the fuel cell, η fc for the efficiency of the fuel cell;
[0025] Determine the change in hydrogen production load scheduling within the scheduling period using the state change equation;
[0026] Taking the minimum square error between the hydrogen production load scheduling change and the current hydrogen production load scheduling plan as the optimization goal, a target optimization function is constructed, and the target optimization function is:
[0027]
[0028] In the formula, ΔP is the square error value, P in(t) is the change in hydrogen production load scheduling, P in(t) =P out , P plan(t) is the current hydrogen production load scheduling plan, and T is the scheduling period.
[0029] Preferably, the constraints include system power balance constraints, new energy battery output constraints, energy storage battery state of charge constraints, electrolyzer operation constraints, hydrogen storage tank hydrogen storage quality constraints and fuel cell power constraints.
[0030] Preferably, the method further comprises:
[0031] The objective optimization function is optimized and solved based on a genetic algorithm.
[0032] Preferably, after the step of sending the optimal hydrogen production load scheduling solution of the new energy hydrogen production system to the new energy hydrogen production system for execution, the method further includes:
[0033] Determining whether the scheduling cycle of the new energy hydrogen production system has ended;
[0034] If it is determined that the scheduling cycle of the new energy hydrogen production system has not ended, the operating parameters of the new energy hydrogen production system are updated according to the optimal hydrogen production load scheduling plan, and the process returns to the step of determining the structure of the new energy hydrogen production system, taking the minimum deviation between the hydrogen production load scheduling change of the new energy hydrogen production system and the current hydrogen production load scheduling plan as the optimization goal, and constructing the target optimization function for rolling optimization until it is determined that the scheduling cycle of the new energy hydrogen production system has ended.
[0035] In a second aspect, the present invention further provides a power balance regulation system for a new energy hydrogen production system, comprising:
[0036] A target optimization module is used to determine the structure of the new energy hydrogen production system, take the minimum deviation between the hydrogen production load scheduling change of the new energy hydrogen production system and the current hydrogen production load scheduling plan as the optimization target, and construct a target optimization function;
[0037] A constraint module, used to determine the power operation balance of the new energy hydrogen production system as a constraint condition of the target optimization function;
[0038] An optimization solution module, used for optimizing and solving the target optimization function under the constraints of the constraints, and determining the optimal solution for hydrogen production load scheduling of the new energy hydrogen production system according to the optimal solution;
[0039] The execution scheduling module is used to send the optimal hydrogen production load scheduling plan of the new energy hydrogen production system to the new energy hydrogen production system for execution.
[0040] In a third aspect, the present invention further provides an electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, the processor executes the steps of the power balance adjustment method of the new energy hydrogen production system as described in the first aspect.
[0041] In a fourth aspect, the present invention further provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed, the steps of the power balance regulation method for the new energy hydrogen production system as described in the first aspect are implemented.
[0042] In a fifth aspect, the present invention further provides a computer program product, comprising a computer program stored on a non-transitory computer-readable storage medium, wherein the computer program comprises program instructions, wherein when the program instructions are executed by a computer, the computer executes the steps of the power balance regulation method for a new energy hydrogen production system as described in the first aspect.
[0043] It can be seen from the above technical solutions that the present invention has the following advantages:
[0044] The present invention optimizes the hydrogen production load scheduling change of the new energy hydrogen production system by minimizing the deviation between the current hydrogen production load scheduling plan, thereby reducing the scheduling deviation, adapting to load fluctuations, and achieving stable tracking of the day-ahead scheduling optimization. The present invention also determines the power operation balance of the new energy hydrogen production system as a constraint condition, and performs optimal solution to the target optimization function to determine the optimal hydrogen production load scheduling plan for the new energy hydrogen production system for execution, thereby improving the real-time response rate of the new energy hydrogen production system to adapt to fluctuating loads, and achieving continuous maintenance of power balance between the new energy power generation power and the real-time load power. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 A flow chart of a power balance adjustment method for a new energy hydrogen production system provided in an embodiment of the present invention;
[0046] Figure 2 A schematic diagram of the electrical structure of a new energy hydrogen production system provided by an embodiment of the present invention;
[0047] Figure 3 A mass transfer flow chart of a new energy hydrogen production system provided by an embodiment of the present invention;
[0048] Figure 4 A schematic diagram of the structure of a power balance regulation system for a new energy hydrogen production system provided by an embodiment of the present invention;
[0049] Figure 5 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0050] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0051] An embodiment of the present invention provides a power balance adjustment method for a new energy hydrogen production system. This embodiment can be applicable to the situation of power balance adjustment of a new energy hydrogen production system. The method can be executed by a power balance adjustment device of the new energy hydrogen production system. The power balance adjustment device of the new energy hydrogen production system can be implemented in the form of hardware and / or software. The power balance adjustment device of the new energy hydrogen production system can be configured in a computer device.
[0052] like Figure 1 As shown, a power balance adjustment method for a new energy hydrogen production system provided in an embodiment of the present invention includes steps S1 to S4:
[0053] Step S1, by determining the structure of the new energy hydrogen production system, taking the minimum deviation between the hydrogen production load scheduling change of the new energy hydrogen production system and the current hydrogen production load scheduling plan as the optimization goal, constructing a target optimization function.
[0054] The structure of the new energy hydrogen production system includes a new energy power source, an energy storage power source, an electric load, an electrolyzer, a hydrogen storage tank, a fuel cell, a hydrogen load and a pulse width modulator;
[0055] The new energy power source, energy storage power source and electric load are all connected to the DC bus through the inverter, the DC bus is connected to the electrolyzer and the fuel cell respectively through the inverter, the electrolyzer is connected to the fuel cell through the hydrogen storage tank, and the electrolyzer and the hydrogen storage tank are connected to the hydrogen load;
[0056] The pulse width modulator is electrically connected to the frequency converter.
[0057] like Figure 2 As shown, the new energy power sources include wind power generation and photovoltaic power generation, and the energy storage power source adopts lithium batteries. Wind power generation and photovoltaic power generation supply electrical loads and electrolyzer hydrogen production through AC / DC converters and DC / DC converters respectively. Due to the volatility and uncertainty of new energy power generation, lithium battery energy storage is used to smooth the volatility of wind and solar power output.
[0058] Each wind turbine / photovoltaic unit is equipped with an independent DC / DC inverter to achieve independent maximum power point tracking and synchronize the unstable new energy output to the DC bus voltage. Each electrolyzer is synchronously equipped with a DC / DC inverter to stabilize the balance of the electrolysis voltage of the electrolyzer, and then the voltage and current output of the DC / DC inverter is controlled by the pulse width modulation module according to the hydrogen load variation demand, thereby realizing the variable load operation of the electrolyzer.
[0059] In the new energy hydrogen production system, the mass transfer process of water, hydrogen, oxygen and other substances corresponds to the time scale of seconds, which is a dynamic control process of the diffusion of substances in the porous electrodes and flow channels of the battery stack, convective transport and the response rate of the pump group. Specific process: First, monitor the inlet water flow and circulating water flow, and then control the speed of the water pump by pulse (select a 3000r / min servo motor and set it to 500 pulses per revolution) to achieve water circulation rate control in the electrolyzer. Secondly, monitor the hydrogen pressure and flow rate output by the separator, control the compressor speed by the inlet pressure, and stabilize the cathode hydrogen concentration.
[0060] like Figure 3As shown in the figure, in the structure of the new energy hydrogen production system, the electric energy of the DC bus is supplied to the electrolyzer for hydrogen production through the DC / DC converter. The hydrogen produced by the electrolyzer can flow to the hydrogen storage tank or supply the hydrogen load. The hydrogen storage tank, as an energy storage device, is similar to the energy storage battery and can play a role in smoothing the fluctuation of hydrogen energy. When the hydrogen produced by the electrolyzer is less than that of the current hydrogen load, the hydrogen storage tank can release hydrogen to make up for the difference in the hydrogen load.
[0061] In addition, in the new energy hydrogen production system, the heat transfer process of heating water vapor and stack electrolyte by the heater corresponds to a time scale of minutes, and the thermal inertia of the system needs to be considered. At the same time, due to the physical characteristics of thermal inertia, it has passive heat storage capacity, which can improve the regulation capacity of the hydrogen production system and provide space for large-scale renewable energy grid connection and consumption. The balance regulation constraints of thermal transmission mainly include two parts: one is the heat loss and transmission delay of pipeline thermal transmission; the other is the flow and heat diversion and convergence process of thermal transmission medium at each network node. The electric and thermal joint scheduling model is established through the node method, and the electric and thermal supply and demand curves are optimally matched to obtain the optimal inlet and outlet temperatures. Based on the thermal model of the heating pipeline network, the heat and power joint flow calculation is performed by analogy with the power system flow calculation. The control nodes are shown in Table 1. The inlet and outlet temperature balance is controlled by the node flow balance, loop pressure balance, and head loss equation.
[0062] Table 1
[0063]
[0064] To this end, high-temperature electrolytic hydrogen production technology provides peak shaving and valley regulation services for the power grid, which needs to meet hourly balancing and regulation applications. The load change cycle in this application scenario must be greater than the short-term response time constant in the high-temperature electrolytic hydrogen production system, so that the hydrogen production system can reach a steady state after the load changes.
[0065] In some embodiments, the target optimization function is constructed with the minimum deviation between the change in hydrogen production load scheduling of the new energy hydrogen production system and the current hydrogen production load scheduling plan as the optimization goal. Specifically, it includes:
[0066] Step S101, establishing state change equations corresponding to the electrolyzer, hydrogen storage tank and fuel cell respectively; wherein the state change equation of the electrolyzer is:
[0067]
[0068] In the formula, m′ H2,d is the hydrogen production mass of the electrolyzer, m′ H2,v is the unit hydrogen production rate of the electrolyzer, m′ H2,g is the unit hydrogen production mass of the electrolyzer, η el is the electrolysis efficiency, P in is the working power of the electrolytic cell, EH2 is the energy required to produce hydrogen per unit;
[0069] Among them, P in =P RE +P bat -P bat / η bat
[0070] Where P RE is the output power of the new energy source, P bat is the charging or discharging power of the energy storage battery, η bat The charging and discharging efficiency of the energy storage battery;
[0071] Among them, the output power of the new energy power source plus the discharge power of the energy storage battery is equal to the input power of the electrolyzer plus the charging power of the energy storage system.
[0072] Among them, the state of charge SOC(t) of the energy storage battery needs to be updated according to the charging and discharging conditions of the energy storage system. The update equation of the state of charge is:
[0073]
[0074] In the formula, SOC(t+1) represents the updated state of charge of the energy storage battery, Δt is the time step (usually hours), and E bat is the total energy storage capacity of the energy storage battery, P bat(t) The charging or discharging power of the energy storage battery at time t.
[0075] The state change equation of the hydrogen storage tank is:
[0076]
[0077] Where M H2 is the mass of hydrogen in the hydrogen storage tank, t is the time, M H2,out is the mass of hydrogen output from the hydrogen storage tank.
[0078] Among them, all the hydrogen produced by the electrolyzer is input into the hydrogen storage tank for storage.
[0079] The state change equation of the fuel cell is:
[0080]
[0081] Where P out is the output power of the fuel cell, η fc for the efficiency of the fuel cell;
[0082] Among them, all the hydrogen stored in the hydrogen storage tank enters the fuel cell for operation.
[0083] Step S102: Determine the change in hydrogen production load scheduling within the scheduling period using a state change equation.
[0084] The change in hydrogen production load scheduling within the scheduling period is the total output electrical power of the fuel cell within the scheduling period.
[0085] Step S103, taking the minimum square error between the change in hydrogen production load scheduling and the current hydrogen production load scheduling plan as the optimization target, constructing a target optimization function, the target optimization function is:
[0086]
[0087] In the formula, ΔP is the square error value, P in(t) is the change in hydrogen production load scheduling, P in(t) =P out , P plan(t) is the current hydrogen production load scheduling plan, and T is the scheduling period.
[0088] Step S2: determining the power operation balance of the new energy hydrogen production system as a constraint condition of the target optimization function.
[0089] Among them, the constraints include system power balance constraints, new energy battery output constraints, energy storage battery charge state constraints, electrolyzer operation constraints, hydrogen storage tank hydrogen storage quality constraints and fuel cell power constraints.
[0090] Specifically, the system power balance constraint is:
[0091] P PV (t)+P w (t)+P bat (t)+P grid (t) = P in (t)+P load (t)
[0092] Where P PV (t), P w (t), P grid (t), P load (t) are photovoltaic output power, wind power output power, electric load power and hydrogen load power respectively.
[0093] The output constraints of new energy batteries are:
[0094] P PV,min (t)≤P PV (t)≤P PV,max (t)
[0095] P w,min (t)≤P w (t)≤P w,max (t)
[0096] Where P PV,min (t), P PV,max (t) are the minimum and maximum photovoltaic output power limits, respectively. w,min (t), P w,max (t) are the minimum output power limit of wind power and the maximum output power limit of wind power respectively.
[0097] The state of charge constraint of the energy storage battery is:
[0098] SOC min (t)≤SOC(t)≤SOC max (t)
[0099] In the formula, SOC min (t), SOC max (t) are the minimum state of charge limit of the energy storage battery and the maximum state of charge limit of the energy storage battery respectively.
[0100] The electrolyzer operating constraints are:
[0101] P min,in (t)≤P in (t)≤P max,in (t)
[0102] Where P min,in (t), P max,in (t) are the minimum input power limit and the maximum input power limit of the electrolytic cell respectively.
[0103] The hydrogen storage mass constraint of the hydrogen storage tank is:
[0104] M min,H2 ≤M H2 ≤M max,H2
[0105] Where M min,H2 、M max,H2 They are the minimum and maximum mass of hydrogen stored in a hydrogen storage tank respectively.
[0106] The fuel cell power constraint is:
[0107] P min,out (t)≤P out (t)≤P max,out (t)
[0108] Where P min,out (t), P max,out (t) are the minimum output power limit and maximum output power limit of the fuel cell respectively.
[0109] Step S3: Under the constraints of the constraints, the target optimization function is optimized and solved, and the optimal solution for hydrogen production load scheduling of the new energy hydrogen production system is determined according to the optimal solution.
[0110] Among them, the target optimization function can be optimized and solved based on a genetic algorithm, such as a particle swarm algorithm.
[0111] Among them, the optimal solution for hydrogen production load scheduling includes the output power of new energy batteries, the charging or discharging power of energy storage batteries, and the working power of electrolyzers.
[0112] Step S4: Send the optimal hydrogen production load scheduling solution of the new energy hydrogen production system to the new energy hydrogen production system for execution.
[0113] In some embodiments, the entire scheduling cycle is used to achieve real-time correction of system unbalanced power and implement intra-day rolling optimization scheduling. The method further includes:
[0114] Step S501: determine whether the scheduling cycle of the new energy hydrogen production system is completed.
[0115] Step S502: If it is determined that the scheduling cycle of the new energy hydrogen production system has not ended, the operating parameters of the new energy hydrogen production system are updated according to the optimal hydrogen production load scheduling plan, and the process returns to step S1 for rolling optimization until it is determined that the scheduling cycle of the new energy hydrogen production system has ended.
[0116] It should be noted that the present invention optimizes the hydrogen production load scheduling change of the new energy hydrogen production system by minimizing the deviation between the current hydrogen production load scheduling plan, thereby reducing the scheduling deviation, adapting to load fluctuations, and achieving stable tracking of the day-ahead scheduling optimization. By determining the power operation balance of the new energy hydrogen production system as a constraint condition and optimizing the target optimization function, the optimal hydrogen production load scheduling plan of the new energy hydrogen production system is determined and executed, thereby improving the real-time response rate of the new energy hydrogen production system to adapt to fluctuating loads and achieving continuous maintenance of power balance between new energy power generation power and real-time load power.
[0117] Based on the same inventive concept, an embodiment of the present invention further provides a power balance regulation system for a new energy hydrogen production system for implementing the power balance regulation method for the new energy hydrogen production system mentioned above.
[0118] The implementation solution to the problem provided by the power balance regulation system of the new energy hydrogen production system is similar to the implementation solution recorded in the above method. Therefore, the specific limitations in the power balance regulation system embodiments of one or more new energy hydrogen production systems provided below can be referred to the limitations on the power balance regulation method of the new energy hydrogen production system above, and will not be repeated here.
[0119] like Figure 4As shown, an embodiment of the present invention provides a power balance regulation system for a new energy hydrogen production system, which includes:
[0120] The target optimization module 100 is used to determine the structure of the new energy hydrogen production system, take the minimum deviation between the hydrogen production load scheduling change of the new energy hydrogen production system and the current hydrogen production load scheduling plan as the optimization target, and construct a target optimization function;
[0121] Constraint module 200, used to determine the power operation balance of the new energy hydrogen production system as a constraint condition of the target optimization function;
[0122] The optimization solution module 300 is used to optimize the target optimization function under the constraints of the constraints, and determine the optimal solution for hydrogen production load scheduling of the new energy hydrogen production system according to the optimal solution;
[0123] The execution scheduling module 400 is used to send the optimal hydrogen production load scheduling solution of the new energy hydrogen production system to the new energy hydrogen production system for execution.
[0124] like Figure 5 As shown, an electronic device provided by an embodiment of the present invention, the electronic device 10 includes a memory 20 and a processor 30, the memory 20 stores a computer program, and when the computer program is executed by the processor 30, the processor 30 executes the steps of the power balance adjustment method of the new energy hydrogen production system in any of the above embodiments.
[0125] An embodiment of the present invention provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed, the steps of the power balance adjustment method of the new energy hydrogen production system in any of the above embodiments are implemented.
[0126] A computer program product provided in an embodiment of the present invention includes a computer program stored on a non-transitory computer-readable storage medium, and the computer program includes program instructions. When the program instructions are executed by a computer, the computer executes the steps of the power balance regulation method of a new energy hydrogen production system in any of the above embodiments.
[0127] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the above-described systems, electronic devices, computer storage media and computer program products can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0128] It should be noted that the terms "including" and "having" and any variations thereof in the specification and claims of the present invention and the above-mentioned drawings are intended to cover non-exclusive inclusions. For example, a process, method, system, product or apparatus comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or apparatus.
[0129] In several embodiments provided by the present invention, it is understood that each box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, a program segment or a part of a code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from that marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved.
[0130] In the several embodiments provided by the present invention, it should be understood that the disclosed systems, electronic devices, computer storage media, computer program products and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.
[0131] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0132] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0133] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for executing all or part of the steps of the method described in each embodiment of the present invention through a computer device (which can be a personal computer, a server, or a network device, etc.). The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (full name in English: Read-Only Memory, English abbreviation: ROM), random access memory (full name in English: Random Access Memory, English abbreviation: RAM), disk or optical disk and other media that can store program codes.
[0134] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A power balance adjustment method for a new energy hydrogen production system, characterized in that: include: By determining the structure of the new energy hydrogen production system, taking the minimum deviation between the hydrogen production load scheduling change of the new energy hydrogen production system and the current hydrogen production load scheduling plan as the optimization goal, a target optimization function is constructed; Determining the power operation balance of the new energy hydrogen production system as a constraint condition of the objective optimization function; Under the constraints of the constraints, the objective optimization function is optimized and solved, and the optimal solution for hydrogen production load scheduling of the new energy hydrogen production system is determined according to the optimal solution; The optimal solution for hydrogen production load scheduling of the new energy hydrogen production system is sent to the new energy hydrogen production system for execution.
2. The power balance adjustment method of the new energy hydrogen production system according to claim 1 is characterized in that: The new energy hydrogen production system structure includes a new energy power supply, an energy storage power supply, an electric load, an electrolyzer, a hydrogen storage tank, a fuel cell, a hydrogen load and a pulse width modulator; The new energy power source, the energy storage power source, and the electric load are all connected to the DC bus through the frequency converter, the DC bus is respectively connected to the electrolyzer and the fuel cell through the frequency converter, the electrolyzer is connected to the fuel cell through the hydrogen storage tank, and the electrolyzer and the hydrogen storage tank are both connected to the hydrogen load; The pulse width modulator is electrically connected to the frequency converter.
3. The power balance adjustment method of the new energy hydrogen production system according to claim 2 is characterized in that: The step of constructing a target optimization function with the minimum deviation between the change amount of hydrogen production load scheduling of the new energy hydrogen production system and the current hydrogen production load scheduling plan amount as the optimization target comprises: Establish state change equations corresponding to the electrolyzer, the hydrogen storage tank and the fuel cell respectively; wherein the state change equation of the electrolyzer is: Where m′ H2,d is the hydrogen production mass of the electrolyzer, m′ H2,v is the unit hydrogen production rate of the electrolyzer, m′ H2,g is the unit hydrogen production mass of the electrolyzer, η el is the electrolysis efficiency, P in is the working power of the electrolytic cell, E H2 is the energy required to produce hydrogen per unit; Among them, P in =P RE +P bat -P bat / η bat Where P RE is the output power of the new energy source, P bat is the charging or discharging power of the energy storage battery, η bat The charging and discharging efficiency of the energy storage battery; The state change equation of the hydrogen storage tank is: Where M H2 is the mass of hydrogen in the hydrogen storage tank, t is the time, M H2,out is the mass of hydrogen output from the hydrogen storage tank; The state change equation of the fuel cell is: Where P out is the output power of the fuel cell, η fc for the efficiency of the fuel cell; Determine the change in hydrogen production load scheduling within the scheduling period using the state change equation; Taking the minimum square error between the hydrogen production load scheduling change and the current hydrogen production load scheduling plan as the optimization goal, a target optimization function is constructed, and the target optimization function is: In the formula, ΔP is the square error value, P in(t) is the change in hydrogen production load scheduling, P in(t) =P out , P plan(t) is the current hydrogen production load scheduling plan, and T is the scheduling period.
4. The power balance adjustment method of the new energy hydrogen production system according to claim 1 is characterized in that: The constraints include system power balance constraints, new energy battery output constraints, energy storage battery charge state constraints, electrolyzer operation constraints, hydrogen storage tank hydrogen quality constraints and fuel cell power constraints.
5. The power balance adjustment method of the new energy hydrogen production system according to claim 1 is characterized in that: Also includes: The objective optimization function is optimized and solved based on a genetic algorithm.
6. The power balance adjustment method of the new energy hydrogen production system according to claim 1 is characterized in that: After the step of sending the optimal hydrogen production load scheduling solution of the new energy hydrogen production system to the new energy hydrogen production system for execution, the method further includes: Determining whether the scheduling cycle of the new energy hydrogen production system has ended; If it is determined that the scheduling cycle of the new energy hydrogen production system has not ended, the operating parameters of the new energy hydrogen production system are updated according to the optimal hydrogen production load scheduling plan, and the process returns to the step of determining the structure of the new energy hydrogen production system, taking the minimum deviation between the hydrogen production load scheduling change of the new energy hydrogen production system and the current hydrogen production load scheduling plan as the optimization goal, and constructing the target optimization function for rolling optimization until it is determined that the scheduling cycle of the new energy hydrogen production system has ended.
7. A power balance regulation system for a new energy hydrogen production system, characterized in that: include: A target optimization module is used to determine the structure of the new energy hydrogen production system, take the minimum deviation between the hydrogen production load scheduling change of the new energy hydrogen production system and the current hydrogen production load scheduling plan as the optimization target, and construct a target optimization function; A constraint module, used to determine the power operation balance of the new energy hydrogen production system as a constraint condition of the target optimization function; An optimization solution module, used for optimizing and solving the target optimization function under the constraints of the constraints, and determining the optimal solution for hydrogen production load scheduling of the new energy hydrogen production system according to the optimal solution; The execution scheduling module is used to send the optimal hydrogen production load scheduling plan of the new energy hydrogen production system to the new energy hydrogen production system for execution.
8. An electronic device, characterized in that: The electronic device includes a memory and a processor, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the processor executes the steps of the power balance adjustment method for the new energy hydrogen production system as described in any one of claims 1 to 6.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed, the steps of the power balance adjustment method of the new energy hydrogen production system as described in any one of claims 1 to 6 are implemented.
10. A computer program product, characterized in that The computer program product includes a computer program stored on a non-transitory computer-readable storage medium, and the computer program includes program instructions, wherein when the program instructions are executed by a computer, the computer is caused to execute the steps of the power balance regulation method for a new energy hydrogen production system as described in any one of claims 1 to 6.
Citation Information
Cited By
Multi-energy fusion hydrogen production power supply system, energy control method, medium and computer device
CN121727070A