A drainage device for mine construction
By designing a mines including water -absorbing sponge, arched airbags and diversion, drainage drainage devices, solving the problems of existing devices when the existing device is severe and serious when dripping. environment.
Patent Information
- Application Number
- CN202411539755.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2044-10-31
AI Technical Summary
The existing drainage drainage device for mining tunnel construction is prone to noise when water seepage drops, and the dripping sputtering may cause erosion to the tunnel walls and affect construction.
Design a drainage drainage device that includes arched racks, rolling wheels, derivatives, water absorption sponges, arched airbags, gas pipes, air pumps, and collecting components. The water absorption sponge absorbs dripping water. The arched airbags and limited cloth cooperate with the water absorption sponge to be squeezed out. The diversion board guides the water flow into the collecting box to reduce sputtering and noise.
It effectively reduces the noise and splashing when water seeps and drips, protects the tunnel walls, and improves the working environment and construction efficiency of tunnel construction.
Smart Images

Figure CN119041985B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of drainage and drainage, and in particular to a drainage and drainage device for mine construction. Background Art
[0002] A Chinese patent with publication number CN220955710U discloses a mine tunnel roof seepage drainage device, which receives and guides the seepage water dripping in the tunnel through a roof frame. The tunnel usually has a long straight-line distance and a relatively closed space structure. These characteristics make it easy for sound to be reflected back by the wall during propagation, forming an echo, which in turn causes the noise generated by the seepage water dripping on the roof frame to increase, resulting in a worse working environment in the tunnel. At the same time, the seepage water dripping on the roof frame is prone to splashing and scouring the tunnel wall, affecting the tunnel construction. In addition, since the walls are not specially trimmed at the beginning of the tunnel construction, the surface is uneven, and the roof frame must be smaller than the size of the tunnel, while the seepage position in the tunnel is random, and there may be a situation where some of the seepage water dripping positions still have a large height difference with the roof frame, resulting in splashing of the seepage water dripping on the roof frame. Summary of the invention
[0003] In order to overcome the shortcomings that the noise generated by the seepage water dripping on the roof frame increases, resulting in a worse working environment in the tunnel, and the seepage water dripping on the roof frame is prone to splashing and scouring the tunnel wall, thus affecting the tunnel construction, the present invention provides a drainage device for mine construction.
[0004] The technical implementation scheme of the present invention is: a drainage and drainage device for mine construction, including an arch frame, a roller and a guide plate; a plurality of rollers are fixedly connected to both sides of the arch frame; a plurality of guide plates are fixedly connected to the arch frame; it also includes a water-absorbing sponge, an arch air bag, an air guide pipe, an air pump and a collecting component; the arch frame is connected to the arch air bag; the arch air bag is connected to the water-absorbing sponge; the arch frame is connected to a plurality of collecting components for collecting seepage water; a plurality of through-type channels are opened on the arch frame, the guide plate is aligned with the lower edge of the through-type channel, the end of the arch air bag is located above the through-type channel, and the inlet of the collecting component is connected to the through-type channel; each collecting component is connected to an air pump; each air pump air outlet is connected to an air guide pipe; both air guide pipes are connected to the arch air bag.
[0005] More preferably, the collecting assembly includes a collecting box and a drain valve; the collecting box is fixedly connected to the arch frame; the inlet of the collecting box is connected to the through-type channel of the arch frame; and the collecting box is connected to the drain valve.
[0006] More preferably, it further includes a debris box and a filter screen; each collection box is plugged with a debris box; each debris box is provided with a rectangular groove facing the corresponding drain valve; each rectangular groove is provided with a filter screen.
[0007] More preferably, it also includes an electric rope reel, a pull rope, an elastic member and a scraper; an electric rope reel is installed on the collecting box on one side of the arch frame; the pull rope is wound around the rotating part of the electric rope reel; an arched groove is opened on the arch frame, and an elastic member slides in the arched groove; the telescopic end of the elastic member is connected to the scraper; the free end of the pull rope is connected to the fixed end of the elastic member.
[0008] More preferably, it further includes a guide wheel; a guide wheel is rotatably connected to the fixed end of the elastic member; the guide wheel is located in an arched groove on the arch frame, and the guide wheel is in contact with the arch frame.
[0009] More preferably, it further comprises an arc block and a convex block; the scraper is fixedly connected with the arc block; and the arch frame is provided with a convex block which matches with the arc block.
[0010] More preferably, the elastic member is rotatably connected to the scraper via a torsion spring shaft.
[0011] More preferably, the scraper is arranged to be perpendicular to the arc surface of the arch frame, and a convex tooth structure is arranged near the end of the arch frame, and a groove matching the shape of the tooth plate is opened on the water-absorbing sponge.
[0012] More preferably, it also includes an installation box, an electric shaft and a limiting cloth; the installation box is fixedly connected to the right part of the arch frame; the electric shaft is connected to the installation box; the limiting cloth is wound around the middle part of the electric shaft; the free end of the limiting cloth is fixedly connected to the fixed end of the elastic member.
[0013] More preferably, the limiting cloth is configured as a waterproof cloth.
[0014] Compared with the prior art, the present invention has the following advantages: when the present invention is used, the dripping seepage water is absorbed by the water-absorbing sponge, thereby avoiding the problem of noise caused by the seepage water dripping on the top frame of the prior art, and at the same time greatly reducing the probability of splashing after the seepage water drips from a high place, avoiding the large amount of splashing after the seepage water drips to scour the tunnel wall and affect the tunnel construction;
[0015] The arched airbag is inflated through the air guide tube to expand the arched airbag, and then the water-absorbing sponge is squeezed through the arched airbag and the limiting cloth. The drawstring and the limiting cloth themselves can hardly be elastically deformed, so they will not be deformed and stretched, so that the water in the water-absorbing sponge is squeezed out and flows along the surface of the water-absorbing sponge to the guide plates on both sides, and finally collected in the collection boxes on both sides, so as to avoid the water-absorbing sponge from working for a long time and absorbing water, resulting in a decrease in the anti-splashing effect. The water-absorbing sponge is limited by the limiting cloth to avoid the water-absorbing sponge from being damaged by contact and extrusion with the tunnel wall;
[0016] Use a scraper to clean the impurities on the absorbent sponge to prevent the impurities from accumulating on the absorbent sponge for a long time, causing the absorbent sponge to become hardened and affecting the next use of the absorbent sponge. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the three-dimensional structure of the drainage and drainage device for mine construction of the present invention from a first viewing angle;
[0018] Figure 2 It is a schematic diagram of the three-dimensional structure of the drainage and drainage device for mine construction of the present invention from a second viewing angle;
[0019] Figure 3 It is a schematic diagram of the three-dimensional structure of the arch frame of the drainage and drainage device for mine construction of the present invention;
[0020] Figure 4 for Figure 1 Enlarged view of area A in the middle;
[0021] Figure 5 It is a schematic diagram of the three-dimensional structure of the water-absorbing sponge, the arched air bag and the air guide pipe combination of the drainage and drainage device for mine construction of the present invention;
[0022] Figure 6 It is a cross-sectional view of a collection box of a drainage and drainage device for mine construction of the present invention;
[0023] Figure 7 It is a schematic diagram of the combined three-dimensional structure of the collection box and the impurity box of the drainage and drainage device for mine construction of the present invention;
[0024] Figure 8 It is a schematic diagram of the three-dimensional structure of the electric rope reel and the rope pull assembly of the drainage and drainage device for mine construction of the present invention;
[0025] Fig. 9 for Figure 8 Enlarged view of area B in the middle;
[0026] Fig.10 It is a schematic diagram of the combined three-dimensional structure of the elastic member, scraper and guide wheel of the drainage and drainage device for mine construction of the present invention.
[0027] Among them, the above-mentioned drawings include the following drawing marks: 1-arch frame, 2-roller, 3-guide plate, 4-fixed plate, 101-water-absorbing sponge, 102-arch air bag, 103-air guide tube, 104-air pump, 201-collection box, 202-impurity box, 203-filter net, 204-drain valve, 301-electric rope reel, 302-pull rope, 303-elastic part, 304-scraper, 305-guide wheel, 401-arc block, 402-bump, 501-installation box, 502-electric shaft, 503-limiting cloth. DETAILED DESCRIPTION
[0028] First of all, it should be pointed out that in the different described embodiments, the same parts are provided with the same reference numerals or the same component names, wherein the disclosure contained in the entire description can be transferred to the same parts with the same reference numerals or the same component names. Selected positional descriptions in the description, such as top, bottom, lateral, etc., also refer to the directly described and shown figures and are transferred to the new positions in the case of a change in position.
[0029] Embodiment 1
[0030] A drainage device for mine construction, according to Figure 1-Figure 7 As shown, it includes an arch frame 1, a roller 2 and a guide plate 3; two rollers 2 are bolted to both sides of the arch frame 1; a guide plate 3 is welded to the left and right parts of the convex curved surface of the arch frame 1;
[0031] It also includes a water-absorbing sponge 101, an arched airbag 102, an air guide tube 103, an air pump 104 and a collecting component; the arched frame 1 is connected to the arched airbag 102, which is set as a rubber airbag; the water-absorbing sponge 101 is connected to the arched airbag 102; the left and right parts of the concave curved surface of the arched frame 1 are each connected to a collecting component; a plurality of through-type channels are opened on the arched frame 1, the guide plate 3 is aligned with the lower edge of the through-type channel, the end of the arched airbag 102 is located above the through-type channel, and the inlet of the collecting component is connected to the through-type channel; each collecting component is connected to an air pump 104; each air delivery port of the air pump 104 is connected to an air guide tube 103; both air guide tubes 103 are connected to the arched airbag 102.
[0032] The collection assembly includes a collection box 201 and a drain valve 204 ; the collection box 201 is bolted to the concave surface of the arch frame 1 ; the inlet of the collection box 201 is connected to the through-type channel of the arch frame 1 ; and the collection box 201 is connected to the drain valve 204 .
[0033] It also includes an impurity box 202 and a filter screen 203; each collection box 201 is plugged with an impurity box 202; each impurity box 202 is provided with a rectangular groove facing the corresponding drain valve 204; each rectangular groove is provided with a filter screen 203.
[0034] It also includes a fixing plate 4; a fixing plate 4 is welded to the left and right parts of the arch frame 1; and each fixing plate 4 is provided with a bolt hole.
[0035] During operation, the operator pushes the arch frame 1 to make the roller 2 roll on the ground, so that the arch frame 1 moves to the working area, and then fixes the arch frame 1 in the tunnel through bolts and the fixing plate 4. When water drips from the tunnel, the dripping water is absorbed by the absorbent sponge 101, thereby avoiding the problem of noise caused by water dripping on the top frame in the existing device, and greatly reducing the probability of splashing after water dripping from a high place, thereby avoiding the erosion of the tunnel wall by a large amount of splashing after water dripping, thereby affecting the tunnel construction.
[0036] Since the walls of the tunnel were not specially trimmed at the beginning of the tunnel construction process and were in an uneven state, the initial size of the water-absorbing sponge 101 was set smaller than the tunnel size to facilitate its movement in the tunnel. Then, during operation, the air pump 104 was started to inflate the arched airbag 102 through the air guide tube 103 to expand the arched airbag 102. The expansion of the arched airbag 102 simultaneously drives the water-absorbing sponge 101 to deform and expand, so that the water-absorbing sponge 101 is close to the tunnel wall, reducing the distance between the water-absorbing sponge 101 and the tunnel wall, thereby further reducing the possibility of splashing after water seepage drips from a high place. As the amount of water absorbed by the water-absorbing sponge 101 increases, part of the water in the water-absorbing sponge 101 flows downward onto the guide plate 3 due to gravity, and the water is guided by the guide plate 3, passes between the guide plate 3 and the end of the water-absorbing sponge 101, and then passes through the through-type channel on the surface of the arch frame 1 to enter the collection box 201 for collection. At the same time, the water-absorbing sponge 101 is used to receive and buffer impurities such as broken soil and gravel that fall from the tunnel wall, and the guide plate 3 is also used to guide impurities such as broken soil and gravel into the collection box 201, so that the water-absorbing sponge 101 has a certain protective effect while absorbing the seepage effect.
[0037] After the work is completed, the drain valve 204 is opened, and the water collected in the collection box 201 passes through the filter net 203 and is discharged through the drain valve 204 for unified collection and treatment, while impurities such as broken soil and gravel are intercepted by the filter net 203 and remain in the impurity box 202. After all the water collected in the collection box 201 is discharged, the impurity box 202 is taken out of the collection box 201 to treat the impurities such as broken soil and gravel.
[0038] Second embodiment
[0039] On the basis of the first embodiment, according to Figure 1-Figure 5 and Figure 8-Figure 10 As shown,
[0040] It also includes an electric rope reel 301, a pull rope 302, an elastic member 303 and a scraper 304; an electric rope reel 301 is installed on the collecting box 201 on one side of the arch frame 1; the pull rope 302 is wound around the rotating part of the electric rope reel 301; two symmetrically arranged arch grooves are opened on the arch frame 1, and an elastic member 303 slides in each arch groove; the telescopic ends of the two elastic members 303 are commonly connected to the scraper 304; the free ends of the pull rope 302 are respectively connected to the fixed ends of the two elastic members 303.
[0041] It also includes a guide wheel 305; a guide wheel 305 is rotatably connected to the outside of the fixed ends of the two elastic members 303; the two guide wheels 305 are both located in the arched groove on the arch frame 1, and the two guide wheels 305 are in contact with the arch frame 1; the elastic member 303 is supported and guided by the guide wheel 305 to avoid friction damage between the elastic member 303 and the arch frame 1.
[0042] It also includes an arc block 401 and a convex block 402 ; an arc block 401 is fixedly connected to each side of the scraper 304 ; and a convex block 402 cooperating with the arc block 401 is arranged on the arch frame 1 .
[0043] The two elastic members 303 are rotatably connected to the scraper 304 via a torsion spring shaft.
[0044] The scraper 304 is arranged to be perpendicular to the arc surface of the arch frame 1 , and a convex tooth structure is arranged at the end close to the arch frame 1 , and a groove matching the tooth plate shape is opened on the water-absorbing sponge 101 .
[0045] It also includes an installation box 501, an electric shaft 502 and a limiting cloth 503; the installation box 501 is bolted to the right of the arch frame 1; the electric shaft 502 is connected to the installation box 501; the limiting cloth 503 is wound around the middle of the electric shaft 502; the free end of the limiting cloth 503 is fixedly connected to the fixed end of the elastic member 303.
[0046] The limiting cloth 503 is configured as a waterproof cloth to prevent the water squeezed out of the water-absorbing sponge 101 from flowing through the limiting cloth 503 and flowing back into the water-absorbing sponge 101 .
[0047] After impurities such as broken soil and stones fall on the water-absorbing sponge 101, it is inevitable that some impurities will remain on the water-absorbing sponge 101 and will not roll off directly. In order to prevent the accumulation of impurities on the water-absorbing sponge 101 and affect the water-absorbing and splash-proof effect of the water-absorbing sponge 101, the air pump 104 is first controlled by timing to deflate the arched airbag 102 through the air guide tube 103 to restore the water-absorbing sponge 101 to its original position, and then the electric rope reel 301 is started to reel the pull rope 302, so that the pull rope 302 moves in the arched groove, driving the elastic member 303 and the scraper 304 to move along the arched groove on the arch frame 1, and at the same time the electric shaft 502 is started to release the limiting cloth 503, and then the elastic member 303 drives the limiting cloth 503 to unfold along the arch frame 1, When the scraper 304 drives the arc block 401 to move through a plurality of convex blocks 402 of different sizes, the arc block 401 intermittently contacts and is squeezed by the convex blocks 402, so that the arc block 401 drives the scraper 304 to move, and the elastic member 303 is deformed and accumulates elastic force. When the arc block 401 is not squeezed by the convex blocks 402, the elastic member 303 releases the elastic force to make the scraper 304 move in the opposite direction and reset, so that the scraper 304 moves back and forth left and right. If there are large impurities accumulated and stuck on the through-type channel of the arch frame 1 before, the scraper 304 with a toothed plate shape can move back and forth left and right to move the stuck large impurities. Because the large impurities are generally a mixture of soil and sand, the stirring can destroy the mixture, so that the large impurities fall and are collected. The scraper 304 moves along the arched groove on the arch frame 1, and the scraper 304 moves along the surface of the water-absorbing sponge 101. During the process of the scraper 304 adhering to the right half of the water-absorbing sponge 101 and moving upward, if a large amount of impurities are accumulated on the water-absorbing sponge 101, as the scraper 304 scrapes the impurities and accumulates them in the angle formed between the scraper 304 and the water-absorbing sponge 101, after the total weight of the impurities exceeds a predetermined value, the end of the scraper 304 close to the water-absorbing sponge 101 is squeezed, and then the torsion spring shaft at the connection between the elastic member 303 and the scraper 304 is twisted, so that the scraper 304 rotates, and the end of the scraper 304 close to the water-absorbing sponge 101 begins to deflect downward, thereby contacting the absorbent sponge 101. The water sponge 101 is separated, and the deflection separation will form a channel between the scraper 304 and the water-absorbing sponge 101. During the scraping process of the scraper 304, the originally scattered impurities such as mud, soil and soil are gathered together to form a group. These mud, sand and soil that have gathered into a group will roll directly from the formed channel to the guide plate 3, and then fall into the collection box 201, thereby completing the collection of impurities such as mud, soil and soil, and avoiding the scraper 304 forcibly driving the accumulated impurities to move, causing damage to the water-absorbing sponge 101; when the scraper 304 is attached to the left half of the water-absorbing sponge 101 and moves downward, the scraper 304 scrapes off the impurities accumulated on the water-absorbing sponge 101, so that the impurities fall and are collected in the collection box 201 on the left side;When the scraper 304 is attached to the left half of the absorbent sponge 101 and moves downward, because the speed of the electric shaft 502 releasing the limiting cloth 503 is coordinated with the speed of the electric rope reel 301 to reel it in, the electric rope reel 301 and the electric shaft 502 work together to control the movement of the scraper 304, and the scraper 304 will not naturally slide down quickly due to gravity.
[0048] When the scraper 304 moves to the end of the stroke, the limiting cloth 503 unfolds in an arch shape to cover the water-absorbing sponge 101. At this time, the air pump 104 is started again to inflate the arched airbag 102 through the air guide tube 103, so that the arched airbag 102 expands, and then the water-absorbing sponge 101 is squeezed by the arched airbag 102 and the limiting cloth 503. The pull rope 302 and the limiting cloth 503 themselves can hardly be elastically deformed, so they will not be deformed and stretched, so that the water in the water-absorbing sponge 101 is squeezed out and flows along the surface of the water-absorbing sponge 101 to the guide plates 3 on both sides, and finally collected in the collection boxes 201 on both sides, so as to avoid the water-absorbing sponge 101 from working for a long time and absorbing water, resulting in a decrease in the anti-splashing effect. The water-absorbing sponge 101 is limited by the limiting cloth 503 to avoid the water-absorbing sponge 101 from being damaged by contact and extrusion with the tunnel wall.
[0049] Then, the air pump 104 is restarted to deflate the arched airbag 102 through the air pump 104, so that the arched airbag 102 and the water-absorbing sponge 101 are restored to the initial working state, and then the electric shaft 502 is controlled to start to reel in the limiting cloth 503, and the electric rope reel 301 releases the pull rope 302, so that the scraper 304 moves in the opposite direction and resets. At this time, during the movement of the scraper 304 in contact with the right half of the water-absorbing sponge 101, in the process of releasing the accumulated impurities before, some of the soil and sand that are not clumped or very loose will fall back on the surface of the water-absorbing sponge 101, and then the scraper 304 is reset to scrape the impurities remaining on the right half of the water-absorbing sponge 101 and collect them in the collection box 201, so as to avoid the impurities from accumulating on the water-absorbing sponge 101 for a long time, causing the water-absorbing sponge 101 to become hardened, which affects the next use of the water-absorbing sponge 101.
[0050] Those skilled in the art should understand that the above embodiments do not limit the present invention in any form, and any technical solutions obtained by equivalent replacement or equivalent transformation shall fall within the protection scope of the present invention.
Claims
1. A drainage device for mine construction, comprising an arch frame (1), a roller (2) and a guide plate (3); a plurality of rollers (2) are fixedly connected to both sides of the arch frame (1); a plurality of guide plates (3) are fixedly connected to the arch frame (1); the device is characterized in that: It also comprises a water-absorbing sponge (101), an arched airbag (102), an air guide tube (103), an air pump (104) and a collecting component; the arched frame (1) is connected to the arched airbag (102); the arched airbag (102) is connected to the water-absorbing sponge (101); the arched frame (1) is connected to a plurality of collecting components for collecting seepage water; the arched frame (1) is provided with a plurality of through-type channels, the guide plate (3) is aligned with the lower edge of the through-type channels, the end of the arched airbag (102) is located above the through-type channels, and the inlet of the collecting component is connected to the through-type channels; each collecting component is connected to an air pump (104); each air delivery port of the air pump (104) is connected to an air guide tube (103); both air guide tubes (103) are connected to the arched airbag (102); The collection assembly comprises a collection box (201) and a drainage valve (204); the collection box (201) is fixedly connected to the arch frame (1); the inlet of the collection box (201) is connected to the through-type channel of the arch frame (1); the collection box (201) is connected to the drainage valve (204); It also includes an electric rope reel (301), a pull rope (302), an elastic member (303) and a scraper (304); an electric rope reel (301) is installed on a collecting box (201) on one side of the arch frame (1); the pull rope (302) is wound around the rotating part of the electric rope reel (301); an arched groove is provided on the arch frame (1), and an elastic member (303) slides in the arched groove; the telescopic end of the elastic member (303) is connected to the scraper (304); the free end of the pull rope (302) is connected to the fixed end of the elastic member (303); It also includes a guide wheel (305); a guide wheel (305) is rotatably connected to the fixed end of the elastic member (303); the guide wheel (305) is located in an arched groove on the arch frame (1), and the guide wheel (305) is in contact with the arch frame (1); It also includes an arc-shaped block (401) and a convex block (402); the scraper (304) is fixedly connected to the arc-shaped block (401); and the arch frame (1) is provided with a convex block (402) that cooperates with the arc-shaped block (401); The elastic member (303) is rotationally connected to the scraper (304) via a torsion spring shaft; The scraper (304) is arranged to be perpendicular to the arc surface of the arch frame (1), and a convex tooth structure is arranged at the end close to the arch frame (1), and a groove matching the shape of the tooth plate is opened on the water-absorbing sponge (101); It also includes a mounting box (501), an electric shaft (502) and a limiting cloth (503); the mounting box (501) is fixedly connected to the right part of the arch frame (1); the electric shaft (502) is connected to the mounting box (501); the limiting cloth (503) is wound around the middle part of the electric shaft (502); and the free end of the limiting cloth (503) is fixedly connected to the fixed end of the elastic member (303).
2. A drainage device for mine construction according to claim 1, characterized in that: It also includes an impurity box (202) and a filter screen (203); each collection box (201) is plugged with an impurity box (202); each impurity box (202) is provided with a rectangular groove directly facing the corresponding drain valve (204); and each rectangular groove is provided with a filter screen (203).
3. A drainage device for mine construction according to claim 1, characterized in that: The limiting cloth (503) is configured as a waterproof cloth.
Citation Information
Patent Citations
Anti-rockfall temporary support device for coal mine tunnel
CN114592891A
Waterproof drainage mechanism for underground roadway roof
CN212130544U
Roof cornice waterproof device for architectural design
CN216840280U
Anti-collapse supporting device for road, bridge and tunnel construction
CN220336925U
A mine tunnel roof seepage drainage device
CN220955710U