Deepened design collaboration method and device under different ecological software
By using IFC file format for data interoperability and version management between BIM software, the problem of design collaboration between different professions is solved, the consistency and real-time sharing of design data is achieved, and the design efficiency and collaboration effect are improved.
Patent Information
- Application Number
- CN202410937957.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2024-11-29
AI Technical Summary
The poor interoperability of design data between BIM software of different professionals leads to difficult design collaboration and prone to design conflicts and errors, which increases time and cost.
The IFC file format is used as the intermediate exchange file to convert formats, rendering, component selection and version management of various professional BIM source files, form reference base map files, and realize deepened design collaboration under different ecological software.
It improves data interoperability and design consistency between different professional teams, reduces design conflicts and errors, realizes real-time data sharing and collaborative work, and improves design efficiency and collaboration efficiency.
Smart Images

Figure CN119047026A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of BIM technology, and specifically relates to a method and device for in-depth design collaboration under different ecological software. Background Art
[0002] The current in-depth design faces the following problems:
[0003] Difficulty in multi-disciplinary collaboration: In construction and engineering projects, multiple professional fields are involved, such as architecture, structure, electromechanical, etc. The design data and information between different disciplines need to be effectively coordinated and integrated to ensure the consistency and coordination of the design. However, due to the use of different BIM software and data formats, collaboration between different professional teams becomes difficult.
[0004] Data interoperability issues: There are multiple BIM software on the market, each using different data formats and structures. This leads to data compatibility and interoperability issues when exchanging and sharing design data between different software. Design teams may need to perform complex data conversion and processing, which increases time and labor costs and is prone to introducing data errors or loss.
[0005] Design conflicts and errors: In the detailed design stage, due to the lack of effective coordination mechanism between various disciplines, design conflicts and errors often occur. For example, inconsistencies between architectural design and structural engineering, conflicts between mechanical and electrical equipment and building layout, etc. These problems are usually only discovered in the later construction stage or operation stage, resulting in additional costs and delays.
[0006] Efficiency and collaboration requirements: As construction projects become more complex, design teams need more efficient and collaborative ways of working. Real-time data sharing, conflict detection and resolution, team communication and other functions become necessary to ensure the smooth progress of the design process and minimize errors and changes. Summary of the invention
[0007] In order to overcome the above-mentioned deficiencies of the prior art, the present invention provides a method and device for in-depth design collaboration under different ecological software, using IFC as the central exchange file to achieve in-depth design collaboration under different ecological software.
[0008] According to one aspect of the present invention, a method for in-depth design collaboration under different ecological software is provided, including:
[0009] Obtain BIM source files from different professional ecological software and convert the formats to form IFC files;
[0010] Perform joint model rendering on IFC files of various disciplines;
[0011] Based on the combined model rendering results, select the BIM components that need to be referenced to form a component set;
[0012] Generate an IFC file containing all components in the component set as a reference base map file;
[0013] With reference to the reference base map file, the BIM source file to be deepened is designed in depth.
[0014] The above technical solution is applied to the in-depth design collaboration scenarios of multiple BIM software in different professions. The IFC file format is used as the reference base map file. After starting the in-depth design task, the designer selects the BIM components to be referenced according to the needs and generates a reference base map file in the IFC format. Then, the reference base map file is used as a reference to perform in-depth design under the original BIM ecological software, solving the problem of multi-person collaborative in-depth design under cross-professional and multi-BIM software.
[0015] Furthermore, the above technical solution is not limited to the same BIM ecological software. Different professional BIM ecological software exchange files based on IFC format files, select the components to be referenced by each other to generate reference base map files, and carry out in-depth design collaboration at the same time. The data between different ecological software can be seamlessly communicated and shared, which improves the interoperability between different professional teams or designers, and ensures the consistency and accuracy of the in-depth design data.
[0016] As a further technical solution, when forming an IFC file, it also includes: recording the mapping relationship between the component IDs of the BIM model source file and the IFC file. By recording the mapping relationship between the component IDs of the BIM model source file and the IFC file, it is convenient to find the components of the BIM model source file according to the IFC components after the subsequent modeling and rendering, so as to facilitate the selection of the BIM components to be referenced.
[0017] As a further technical solution, version management is performed on the BIM model source file and the converted IFC file respectively. This technical solution takes into account that the BIM model will form a new BIM model after in-depth design, and the new BIM model will form a new IFC file after conversion. Therefore, file version management is used to distinguish files at different times, which is conducive to historical query and tracing.
[0018] As a further technical solution, after completing the detailed design of the current source BIM file, it also includes: converting the new BIM source file formed after the detailed design into IFC format, forming a new version of the IFC file and saving it. In this way, every time the designer starts a detailed task, the reference base map file he takes is the latest result, realizing real-time data sharing and collaborative work functions, and improving collaboration efficiency.
[0019] As a further technical solution, when starting the in-depth design task, select the latest version of IFC files of each discipline for joint model rendering.
[0020] As a further technical solution, after the in-depth design of the BIM source files, it also includes: review and approve the BIM source files after the in-depth design and conduct collaborative review. If passed, the model version will be updated to continue the next round of in-depth design.
[0021] As a further technical solution, if it is not passed, we will return to the original BIM software ecosystem for further deepening.
[0022] As a further technical solution, after the BIM source files after the in-depth design are approved and funded, it also includes: performing collision detection on the BIM source files after the in-depth design and generating a collision report. This technical solution is based on a collaborative platform, and each design team can perform real-time collision detection and resolve conflicts between different disciplines, reducing problems and changes in the subsequent construction phase, saving time and costs.
[0023] According to one aspect of the present invention, a detailed design collaboration device under different ecological software is provided, including:
[0024] The format conversion module is used to obtain BIM source files under different ecological software of various professions and convert the formats to form IFC files;
[0025] The mold rendering module is used to perform mold rendering on the IFC files of various disciplines;
[0026] The component selection module is used to select the BIM components that need to be referenced based on the mold rendering results to form a component set;
[0027] A reference base map file generation module is used to generate an IFC file containing all components in a component set as a reference base map file;
[0028] The in-depth design module is used to perform in-depth design on the BIM source file to be in-depth with reference to the reference base map file.
[0029] Compared with the prior art, the present invention has the following beneficial effects:
[0030] The present invention is applied to the in-depth design collaboration scenario of multiple BIM software of different professions. The IFC file format is used as the reference base map file. After starting the in-depth design task, the designer selects the BIM component to be referenced according to the needs and generates a reference base map file in the IFC format. Then, the in-depth design is performed under the original BIM ecological software with the reference base map file as a reference, so as to solve the problem of multi-person collaborative in-depth design under cross-professional and multi-BIM software.
[0031] The present invention uses the central exchange file as the basis for collaborative work, and the detailed design personnel only need to interact with the system, thus avoiding the difficulty of collaboration among detailed design personnel of different professions in traditional projects.
[0032] The present invention provides data management and version control capabilities to ensure the timeliness of BIM data.
[0033] The present invention provides a key function of conflict detection to verify the results of collaborative work. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 The figure is a flowchart of a method for in-depth design collaboration under different ecological software according to an embodiment of the present invention. DETAILED DESCRIPTION
[0035] The technical problem solved by the present invention is: under the application of multiple BIM softwares of different professions, the deepening of the model of one profession needs to refer to the models of other professions, and the model to be deepened and the model to be referenced are in different softwares, and there is a problem of difficulty in coordination. For example, the structural model needs to be referenced when deepening the electromechanical design. When these two models are in different softwares, the deepening design coordination between the electromechanical deepening personnel and the structural deepening personnel is the technical problem to be solved by the present invention. To this end, the present invention provides a deepening design coordination method under different ecological softwares. The focus of the coordination is to use the IFC exchange file format as a reference base map, and to submit the latest results to other people in need in real time, so as to solve the problem of multi-person collaborative deepening design under cross-professional multi-BIM software.
[0036] It should be noted that:
[0037] Version management refers to the version record and management of model files before and after the in-depth design. In fact, in-depth design is the modification and update of the BIM model. The BIM model formed by the subsequent new in-depth design results will be converted into a new IFC file after conversion, so there is the concept of version. After the BIM model has undergone a in-depth design, it may go through a second or third in-depth design. Therefore, version management is performed on each updated file, so that the design team can track and manage the history of design changes, preserve the evolution of the project, and restore to the previous version for comparison and review.
[0038] The combined model rendering is the basic capability of the current lightweight engines (such as bimface, black hole, etc.), and the present invention will not elaborate on it.
[0039] The reference base map file refers to the file used by each design team for reference when deepening the design. The file is in IFC format, and all BIM software supports the import of IFC files (but not editing).
[0040] In some processes described in the specification and claims of the present invention and the above-mentioned drawings, multiple operations appearing in a specific order are included, but it should be clearly understood that these operations may not be performed in the order in which they appear in this document or may be performed in parallel. For example, step 1, step 2, etc. are only used to distinguish different operations, and the sequence number itself does not represent any execution order. In addition, these processes may include more or fewer operations, and these operations may be performed in sequence or in parallel.
[0041] The following will clearly and completely describe the technical solutions of various embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0042] Example 1
[0043] This embodiment provides a method for in-depth design collaboration under different ecological software. By using IFC as a neutral exchange file format, the design team can achieve cross-disciplinary data sharing and collaborative work.
[0044] like Figure 1 As shown, the method includes:
[0045] Step 1: Obtain the BIM source files under different professional ecological software and convert the formats to form IFC files.
[0046] It should be noted that when building a BIM model, there may be different professional BIM files in the same format, or different professional BIM files may be used, depending on the modeling habits. For example, in a certain project, RVT can model electromechanical and civil engineering; while in other projects, electromechanical is built by RVT, and civil engineering is built by P3D.
[0047] Before step 1, the method also includes: obtaining source files of various professional BIM models; converting the source files of various professional BIM models into IFC files, and recording the mapping relationship between the component IDs of the BIM model source files and the IFC files.
[0048] It should be noted that a BIM model source file is converted into an IFC file, so there is a one-to-one mapping relationship between the component ID of the BIM model source file and the component ID of the IFC file.
[0049] Specifically, after the IFC file is rendered by the lightweight engine, all component selection work is to first find the IFC components, and then find the BIM model source file components based on the IFC components. Therefore, the component ID mapping relationship between the BIM model source file and the IFC file is recorded here to facilitate finding the BIM model source file components based on the IFC components.
[0050] Furthermore, after uploading the source files of each professional BIM model, file version management is also performed to record the current file version. For example, the first uploaded BIM model can be recorded as version 0, and the new BIM model formed after in-depth design can be recorded as version 1, and so on, recording the version changes of the BIM model.
[0051] Similarly, the IFC file converted from the BIM model source file is also recorded in version. For example, the IFC file obtained from the first BIM model conversion is recorded as version 0, and the new IFC file formed by the subsequent BIM model formed by the new detailed design results after conversion is recorded as version 1, and so on, recording the version changes of the IFC file.
[0052] Step 2: Render the IFC files of each discipline together.
[0053] After the detailed design personnel start the detailed design task, they will select the latest version of IFC files of each discipline for combined model rendering, so that each detailed design task can be implemented based on the latest design results.
[0054] Thanks to the version management of IFC files, the history of design changes can be tracked at any time and restored to the previous version for comparison and review.
[0055] Perform mold rendering, obtain the mold rendering result, and display the mold rendered model to the user.
[0056] Step 3: Based on the model rendering results, select the BIM components that need to be referenced to form a component set.
[0057] After the user sees the combined model, he can perform the following steps:
[0058] Select the IFC component to be referenced;
[0059] Find the BIM component based on the component ID mapping relationship between the BIM model source file and the IFC file;
[0060] Based on the found BIM components, a component ID set is formed.
[0061] Step 4, generating an IFC file containing all components in the component set as a reference base map file.
[0062] Specifically, based on the component ID set, an IFC file containing these components is produced or generated as a reference base map file.
[0063] Just as an example, when deepening the mechanical and electrical design of the second floor, it is necessary to refer to all the components on the second, first and third floors. At this time, the system can form a component set based on these components, and then generate an IFC file containing all the components in the component set and give it to the design user.
[0064] Step 5: refer to the reference base map file to carry out in-depth design of the BIM source file to be in-depth.
[0065] It should be noted that the reference base map file is only used for reference, and the original BIM file is still used for in-depth design and modification. The purpose of the reference base map is to solve the problem of cross-disciplinary collaboration when multiple people are working together.
[0066] Furthermore, the reason for reference is that it is necessary to adjust the mechanical and electrical pipes and other components so that they do not collide with the structural components (wall beams, slabs and columns), which may have been deepened and modified in other people's tasks. Therefore, it is necessary to obtain the latest and time-sensitive component generation reference base map.
[0067] After completing the detailed design of the current source BIM file, it also includes: converting the new BIM source file formed after the detailed design into IFC format, forming a new version of the IFC file and saving it. In this way, every time the designer starts a detailed task, the reference base map file he takes is the latest result, realizing real-time data sharing and collaborative work functions, and improving collaboration efficiency.
[0068] Optionally, after the in-depth design, it also includes: review and approve the BIM source files after the in-depth design and conduct collaborative review. If passed, the model version is updated to continue the next round of in-depth design.
[0069] Approval, funding and collaborative review are the processes of in-depth design. After the in-depth design personnel complete the in-depth design, it needs to be reviewed. If it fails the review, it needs to be modified.
[0070] Furthermore, if the collaborative review fails, it will return to the original BIM software ecosystem for further deepening.
[0071] Optionally, after the BIM source files after the in-depth design are approved and raised, it also includes: performing collision detection on the BIM source files and generating a collision report. Existing collision capabilities can be called here, such as rvt, p3d software both support collision checking.
[0072] This embodiment proposes a method for deepening design collaboration under different ecological software based on IFC as the central exchange file, making data interoperability between different BIM software easier with a unified data exchange standard. By using IFC as a neutral exchange file format, the design team can achieve cross-disciplinary data sharing and collaborative work, and promote design consistency and coordination. This will improve design efficiency, reduce errors and conflicts, and drive the project towards successful delivery.
[0073] Example 2
[0074] Based on the same inventive concept as that of Example 1, this embodiment provides a detailed design collaboration device under different ecological software, including:
[0075] The format conversion module is used to obtain BIM source files under different ecological software of various professions and convert the formats to form IFC files;
[0076] The mold rendering module is used to perform mold rendering on the IFC files of various disciplines;
[0077] The component selection module is used to select the BIM components that need to be referenced based on the mold rendering results to form a component set;
[0078] A reference base map file generation module is used to generate an IFC file containing all components in a component set as a reference base map file;
[0079] The in-depth design module is used to perform in-depth design on the BIM source file to be in-depth with reference to the reference base map file.
[0080] The above modules can be implemented by referring to the method embodiment, which will not be described in detail here. It should be noted that:
[0081] The format conversion module is also used to convert the new BIM source file formed after the in-depth design of the current source BIM file is completed to the IFC format, form a new version of the IFC file and save it. This allows designers to use the latest reference base map files every time they start a in-depth task, realize real-time data sharing and collaborative work functions, and improve collaboration efficiency.
[0082] The mold rendering module is also used to select the latest version of IFC files of each discipline for mold rendering when starting a detailed design task.
[0083] It should be noted that the implementation solution provided by the device to solve the problem is similar to the implementation solution recorded in the above method. Therefore, the specific limitations in the implementation methods of the aforementioned modules can be referred to the limitations of the in-depth design collaboration method under the different ecological software implemented above, and will not be repeated here.
[0084] In summary, the present invention achieves the following technical effects:
[0085] Interoperability and data consistency: Using IFC as the exchange file format, data between different ecological software can be seamlessly communicated and shared, improving the interoperability between different professional teams. This ensures the consistency and accuracy of design data and reduces the risk of data conversion and loss.
[0086] Conflict detection and resolution: By using an IFC-based collaborative platform, the design team can perform conflict detection and resolution in real time. This enables timely discovery and resolution of conflicts between different disciplines during the detailed design phase, reducing problems and changes in the subsequent construction phase, saving time and costs.
[0087] Real-time collaboration and instant feedback: The IFC-based collaborative platform provides real-time data sharing and collaborative work functions. The design team can access and edit IFC files at the same time and provide instant feedback and discussions through real-time communication tools. This greatly improves the team's collaboration efficiency and communication effectiveness.
[0088] Version control and history: IFC-based collaboration platforms can perform version control and history on IFC files. In this way, the design team can track and manage the history of design changes, preserve the evolution of the project, and restore to the previous version for comparison and review.
[0089] Software flexibility and selectivity: The IFC-based collaborative approach does not restrict the use of specific BIM software. Design teams can choose the BIM software that suits them according to their preferences and project needs without being restricted by collaborative work. This provides greater flexibility and selectivity.
[0090] Improve design quality and efficiency: By achieving in-depth design collaboration under different ecological software, the invention can promote close cooperation and information sharing among design teams, thereby improving design quality and efficiency, reducing errors and conflicts, accelerating project progress, and promoting overall design coordination and consistency.
[0091] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0092] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0093] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0094] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0095] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the technical solutions of the embodiments of the present invention.
Claims
1. The in-depth design collaboration method under different ecological software is characterized by: include: Obtain BIM source files from different professional ecological software and convert the formats to form IFC files; Perform joint model rendering on IFC files of various disciplines; Based on the combined model rendering results, select the BIM components that need to be referenced to form a component set; Generate an IFC file containing all components in the component set as a reference base map file; With reference to the reference base map file, the BIM source file to be deepened is designed in depth.
2. The in-depth design collaboration method under different ecological software according to claim 1 is characterized in that: When forming the IFC file, it also includes: recording the mapping relationship between the component ID between the BIM model source file and the IFC file.
3. The in-depth design collaboration method under different ecological software according to claim 2 is characterized in that: Version management is performed separately for the BIM model source files and the converted IFC files.
4. The in-depth design collaboration method under different ecological software according to claim 1 is characterized in that: After completing the detailed design of the current source BIM file, the process also includes: converting the new BIM source file formed after the detailed design into an IFC format, forming a new version of the IFC file and saving it.
5. The in-depth design collaboration method under different ecological software according to claim 4 is characterized in that: When starting the detailed design task, select the latest version of IFC files of each discipline for joint model rendering.
6. The in-depth design collaboration method under different ecological software according to claim 1 is characterized in that: After the in-depth design of the BIM source files, it also includes: review and approve the BIM source files after the in-depth design and conduct collaborative review. If passed, the model version will be updated and the next round of in-depth design will continue.
7. The in-depth design collaboration method under different ecological software according to claim 6 is characterized in that: If it fails, return to the original BIM software ecosystem for further deepening.
8. The in-depth design collaboration method under different ecological software according to claim 6 is characterized in that: After the approval and funding of the BIM source files after the in-depth design, it also includes: collision detection of the BIM source files after the in-depth design and forming a collision report.
9. The in-depth design collaboration device under different ecological software is characterized by: include: The format conversion module is used to obtain BIM source files under different ecological software of various professions and convert the formats to form IFC files; The mold rendering module is used to perform mold rendering on the IFC files of various disciplines; The component selection module is used to select the BIM components that need to be referenced based on the mold rendering results to form a component set; A reference base map file generation module is used to generate an IFC file containing all components in a component set as a reference base map file; The in-depth design module is used to perform in-depth design on the BIM source file to be in-depth with reference to the reference base map file.