New energy automobile gas storage cylinder assembly tool and assembly method
By designing the assembly tooling of gas storage bottles in new energy vehicles, using adjustable positioning mechanisms and screw threads to cooperate, the installation process of gas storage bottles is simplified, the complex installation problems in the existing technology are solved, and the efficient and safe assembly process is achieved , reduces costs and risks.
Patent Information
- Application Number
- CN202411253748.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-09-09
AI Technical Summary
The installation process of existing new energy vehicle gas storage cylinders is too complicated, resulting in high operational difficulty, high safety risks, low work efficiency and high maintenance costs, and lack of effective assembly and tooling and methods.
A new energy vehicle gas storage bottle assembly tool is designed, using adjustable positioning mechanism and screw thread matching, optimized assembly sequence, and simplified the installation process of gas storage bottles through digital angle sensors and hoop locking mechanism, which is suitable for Similar specifications of gas storage cylinders.
It reduces assembly difficulty and safety risks, saves assembly time, improves work efficiency and assembly quality, has a simple structure, short development cycle and low development costs.
Smart Images

Figure CN119057465A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of new energy vehicles, and in particular to an assembly tool and an assembly method for a gas cylinder of a new energy vehicle. Background Art
[0002] The demand for automobiles in the market is increasing day by day, resulting in increasingly serious environmental pollution caused by automobile exhaust and oil resource shortage. Under the constraints of energy shortage, environmental pollution and other factors, the development of new energy has become an important measure to improve the environment and save costs. In the new energy automobile industry, natural gas is easy to diffuse and easily mixed with air in the engine. It burns more completely and cleanly, is not easy to produce carbon deposits, has good anti-knock performance, and does not dilute the lubricating oil, thereby greatly reducing the wear of parts in the engine cylinder, and greatly increasing the life of the engine and the service life of the lubricating oil. New energy vehicles have shown a good development momentum, and vigorously support the promotion of new clean energy vehicles such as gas vehicles.
[0003] For new energy vehicles, whether the gas cylinders storing compressed natural gas are firmly and reliably installed is of utmost importance. The installation of gas cylinders is the basis and key to whether gas vehicles can run normally. The installation of existing gas cylinders for new energy vehicles is too complicated, which is not conducive to the current requirements for lightweight body, and will also bring about problems such as high gas consumption, difficult maintenance, and high maintenance costs. The research and development of new energy vehicles fueled by gases such as hydrogen and methane is in its infancy. For the solution of arranging gas cylinders under the floor of the car, there is currently no effective gas cylinder assembly tooling, nor a reliable assembly method. It relies on the operator's personal experience, which is difficult to operate, has high safety risks, low work efficiency, and poor assembly quality. Summary of the invention
[0004] In view of the problems existing in the prior art, the present invention conceives an assembly tool and assembly method for new energy vehicle gas cylinders. For new energy vehicle gas cylinders with similar specifications, only adaptive adjustments are required to carry out assembly, which optimizes the assembly sequence, reduces the difficulty of assembly, and saves assembly time.
[0005] One of the technical solutions adopted to realize the present invention is: a new energy vehicle gas cylinder assembly tool, which includes: a lifting vehicle 1, characterized in that it also includes: an adjustable positioning mechanism 2, the adjustable positioning mechanism 2 includes: a bottom plate 2.1, a slide rail 2.2, a slider 2.3, a locking nut 2.4, a Y-direction positioning plate 2.6, a Y-direction first positioning support block 2.7, a Y-direction second positioning support block 2.8, a Y-direction third positioning support block 2.9, a screw 2.10, a bearing 2.11, a bearing bracket 2.12 and a ruler 2.13, on the bottom plate 2.1 Two identical slide rails 2.2 are arranged parallel to each other, the bottom plate 2.1 is threadedly connected to the slide rails 2.2, three identical sliders 2.3 are arranged on the slide rails 2.2, the slide rails 2.2 are clamped with the sliders 2.3, locking nuts 2.4 are arranged on the sliders 2.3, the sliders 2.3 are threadedly connected to the locking nuts 2.4, a scale 2.13 is arranged on the outside of the slide rails 2.2, the bottom plate 2.1 is threadedly connected to the scale 2.13, and a Y-axis positioning plate 2.1 is arranged at the end of the bottom plate 2.1 between the two identical slide rails 2.2. 6, the bottom plate 2.1 is threadedly connected with the Y-direction positioning plate 2.6, and the three pairs of identical sliders 2.3 are threadedly connected with the first Y-direction positioning support block 2.7, the second Y-direction positioning support block 2.8, and the third Y-direction positioning support block 2.9 in sequence from front to back, and two through holes and one threaded hole are sequentially arranged at the bottom of the first Y-direction positioning support block 2.7, a through hole, a threaded hole and a through hole are sequentially arranged at the bottom of the second Y-direction positioning support block 2.8, and a threaded hole and two through holes are sequentially arranged at the bottom of the third Y-direction positioning support block 2.9. The three identical lead screws 2.10 are respectively threadedly connected with the first Y-axis positioning support block 2.7, the second Y-axis positioning support block 2.8 and the third Y-axis positioning support block 2.9. Bearing brackets 2.12 are arranged at both ends of the lead screw 2.10. Three through holes are arranged in sequence on the bearing bracket 2.12. The through holes of the bearing bracket 2.12 are connected with the outer ring of the bearing 2.11 with clearance fit. The shaft head of the lead screw 2.10 is connected with the inner ring of the bearing 2.11 with clearance fit. The lower bottom surface of the base plate 2.1 is threadedly connected with the lifting mechanism of the lifting vehicle 1.
[0006] Furthermore, the base plate 2.1 is made of Q235, and the flatness of the upper surface of the base plate 2.1 is ≤0.5 mm.
[0007] Furthermore, the Y-axis positioning plate 2.6 is manufactured by a steel plate stamping process.
[0008] Furthermore, the material of the lead screw 2.10 is 45# steel, quenched and tempered 235.
[0009] Furthermore, the bearing 2.11 is a deep groove ball bearing.
[0010] The second technical solution adopted by the present invention is: a method for assembling a gas cylinder for a new energy vehicle, characterized in that it comprises the following steps:
[0011] 1) Packaging of gas cylinders for new energy vehicles:
[0012] The digital angle sensor bracket 4.1 is threadedly installed on the head of the new energy vehicle gas cylinder 4, the digital angle sensor bracket 4.1 is detachably connected with the digital angle sensor 4.2, the new energy vehicle gas cylinder 4 is rotated axially until the reading of the digital angle sensor 4.2 is zero, and the new energy vehicle gas cylinder 4 is locked with three identical bands 3, the upper band 3.1 and the lower band 3.2 of the band 3 are fixedly connected by bolts 3.3, and then the digital angle sensor bracket 4.1 and the digital angle sensor 4.2 are removed;
[0013] 2) Adjust the assembly tooling for gas cylinders for new energy vehicles:
[0014] The new energy vehicle gas cylinder 4 is positioned according to the Y-direction positioning plate 2.6, and then the position of the new energy vehicle gas cylinder 4 is locked according to the three identical bands 3, and the screw 2.10 is adjusted using the adjusting rod 2.5. The three identical screws 2.10 respectively drive the first Y-direction positioning support block 2.7, the second Y-direction positioning support block 2.8, and the third Y-direction positioning support block 2.9, so that the first Y-direction positioning support block 2.7, the second Y-direction positioning support block 2.8, and the third Y-direction positioning support block 2.9 correspond to the band 3 on the new energy vehicle gas cylinder 4, and then, the scale 2.13 reading is confirmed, the locking nut 2.4 is tightened, the positioning slide block 2.3, and the new energy vehicle gas cylinder assembly tool is positioned and clamped to the new energy vehicle gas cylinder 4;
[0015] 3) Installing new energy vehicle gas cylinders on the body of the vehicle:
[0016] Raise the new energy vehicle gas cylinder assembly tool under the body-in-white 5, adjust the Z-axis height of the lifting vehicle 1, gradually lift the new energy vehicle gas cylinder sub-assembly assembly, ensure that the new energy vehicle gas cylinder 4 enters the inside of the body-in-white 5, align the upper end surface 3.21 of the lower hoop with the mounting surface of the body-in-white 5, adjust the position of the lower hoop mounting hole 3.22, use the bolt 3.3 to thread the hoop 3 and the body-in-white 5, and after completing the assembly of the new energy vehicle gas cylinder 4, evacuate the new energy vehicle gas cylinder assembly tool.
[0017] Furthermore, the digital display angle sensor 4.2 is a digital angle sensor CJH1DA10B.
[0018] Furthermore, the lifting vehicle 1 is a hydraulic lifting vehicle.
[0019] Furthermore, the digital angle sensor bracket 4.1 is a steel plate stamping part.
[0020] The beneficial effects of the new energy vehicle gas cylinder assembly tool and assembly method of the present invention are embodied in:
[0021] 1. A new energy vehicle gas cylinder assembly tool, which adopts a screw and a thread to adjust the Y-axis position of the tool, and realize the Y-axis positioning of the hoop and the gas cylinder. For gas cylinders with similar specifications, only adaptive adjustments need to be made to carry out assembly. It has a simple structure, a short development cycle, low development costs, and easy operation. 2. A new energy vehicle gas cylinder assembly method optimizes the gas cylinder assembly sequence and is suitable for the characteristics of many types of prototype vehicles and frequent changes in the layout of gas cylinders in the product development stage. It reduces safety risks and assembly difficulties, saves assembly time, and improves work efficiency and assembly quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a schematic diagram of the connection position between the gas cylinder and the body-in-white of a new energy vehicle;
[0023] Figure 2 This is an exploded view of a new energy vehicle gas cylinder;
[0024] Figure 3 It is a schematic diagram of installing a new energy vehicle gas cylinder assembly tool on a new energy vehicle gas cylinder;
[0025] Figure 4 yes Figure 3 Exploded view of middle piece 2;
[0026] Figure 5 is a connection relationship diagram of the lead screw and the first Y-axis positioning support block, the second Y-axis positioning support block and the third Y-axis positioning support block;
[0027] Figure 6 It is a position relationship diagram of the gas cylinder and the adjustable positioning mechanism of the new energy vehicle;
[0028] In the figure: 1. Lifting vehicle, 2. Adjustable positioning mechanism, 2.1. Bottom plate, 2.2. Slide rail, 2.3. Slider, 2.4. Locking nut, 2.5. Adjusting rod, 2.6. Y-axis positioning plate, 2.7. First Y-axis positioning support block, 2.8. Second Y-axis positioning support block, 2.9. Third Y-axis positioning support block, 2.10. Lead screw, 2.11. Bearing, 2.12. Bearing bracket, 2.13. Ruler, 3. Hoop, 3.1. Upper hoop, 3.2. Lower hoop, 3.21. Upper end face of lower hoop, 3.22. Lower hoop mounting hole, 3.3. Bolt, 4. New energy vehicle gas cylinder, 4.1. Digital angle sensor bracket, 4.2. Digital angle sensor, 5. Body in white, 5.1. Body in white mounting hole, 5.2. End face of body in white mounting hole. DETAILED DESCRIPTION
[0029] The following is combined with Figures 1 to 6 The present invention will be further described in detail with reference to the specific implementation methods. To make the purpose, technical solutions and advantages of the implementation methods clearer, the technical solutions in the implementation methods will be clearly and completely described in combination with the embodiments of the present invention. The specific implementation methods described herein are only used to explain the present invention and are not used to limit the scope of the present invention.
[0030] As attached Figure 1 As shown, the new energy vehicle gas cylinder 4 enters the body-in-white 5, the upper end surface 3.21 of the lower band is aligned with the end surface 5.2 of the body-in-white mounting hole of the body-in-white 5, the position of the lower band mounting hole 3.22 is adjusted, the lower band mounting hole 3.22 is coaxial with the body-in-white mounting hole 5.1, the bolt 3.3 passes through the lower band mounting hole 3.22 and is threadedly connected with the body-in-white mounting hole 5.1, and the band 3 is threadedly connected with the body-in-white 5 using the bolt 3.3. Figure 2 As shown, the digital angle sensor bracket 4.1 is threadedly installed on the head of the new energy vehicle gas cylinder 4, and the digital angle sensor bracket 4.1 is detachably connected to the digital angle sensor 4.2. The digital angle sensor 4.2 has its own magnetism and can be adsorbed on the digital angle sensor bracket 4.1.
[0031] As attached Figure 3 As shown, a new energy vehicle gas cylinder assembly tool comprises: a lifting vehicle 1, an adjustable positioning mechanism 2, as shown in the attached Figure 4 As shown, the adjustable positioning mechanism 2 includes: a base plate 2.1, a slide rail 2.2, a slider 2.3, a locking nut 2.4, a Y-direction positioning plate 2.6, a first Y-direction positioning support block 2.7, a second Y-direction positioning support block 2.8, a third Y-direction positioning support block 2.9, a lead screw 2.10, a bearing 2.11, a bearing bracket 2.12 and a ruler 2.13. Two identical slide rails 2.2 are arranged in parallel on the upper surface of the base plate 2.1. The base plate 2.1 is threadedly connected to the slide rails 2.2. Three identical sliders 2.3 are arranged on the slide rails 2.2. The slide rails 2.2 are clamped with the sliders 2.3. A locking nut 2.4 is arranged on the slider 2.3, and the slider 2.3 is threadedly connected to the locking nut 2.4. A scale 2.13 is arranged on the outer side of the slide rail 2.2, and the bottom plate 2.1 is threadedly connected to the scale 2.13. Between two identical slide rails 2.2, a Y-direction positioning plate 2.6 is arranged at the end of the bottom plate 2.1, and the bottom plate 2.1 is threadedly connected to the Y-direction positioning plate 2.6. Three pairs of identical sliders 2.3 are threadedly connected to the first Y-direction positioning support block 2.7, the second Y-direction positioning support block 2.8, and the third Y-direction positioning support block 2.9 from front to back, respectively, as shown in the attached figure. Figure 5As shown, two through holes and a threaded hole are sequentially arranged at the bottom of the first Y-direction positioning support block 2.7, a through hole, a threaded hole and a through hole are sequentially arranged at the bottom of the second Y-direction positioning support block 2.8, and a threaded hole and two through holes are sequentially arranged at the bottom of the third Y-direction positioning support block 2.9. Three identical lead screws 2.10 are threadedly connected with the first Y-direction positioning support block 2.7, the second Y-direction positioning support block 2.8 and the third Y-direction positioning support block 2.9 respectively. Bearing brackets 2.12 are arranged at both ends of the lead screw 2.10. Three through holes are sequentially arranged on the bearing bracket 2.12. The through hole of the bearing bracket 2.12 is connected with the outer ring of the bearing 2.11 in a clearance fit. The shaft head of the lead screw 2.10 is connected with the inner ring of the bearing 2.11 in a clearance fit. The lower bottom surface of the base plate 2.1 is threadedly connected with the lifting mechanism of the lifting vehicle 1.
[0032] A method for assembling a gas cylinder for a new energy vehicle comprises the following steps:
[0033] 1) Packaging of gas cylinders for new energy vehicles:
[0034] The digital angle sensor bracket 4.1 is threadedly installed on the head of the new energy vehicle gas cylinder 4, the digital angle sensor bracket 4.1 is detachably connected with the digital angle sensor 4.2, the new energy vehicle gas cylinder 4 is rotated axially until the reading of the digital angle sensor 4.2 is zero, and the new energy vehicle gas cylinder 4 is locked with three identical bands 3, the upper band 3.1 and the lower band 3.2 of the band 3 are fixedly connected by bolts 3.3, and then the digital angle sensor bracket 4.1 and the digital angle sensor 4.2 are removed;
[0035] 2) Adjust the assembly tooling for gas cylinders for new energy vehicles:
[0036] As attached Figure 6 As shown, the new energy vehicle gas cylinder 4 is positioned according to the Y-direction positioning plate 2.6, and then, the position of the new energy vehicle gas cylinder 4 is locked according to the three identical bands 3, and the screw 2.10 is adjusted using the adjusting rod 2.5. The three identical screws 2.10 respectively drive the first Y-direction positioning support block 2.7, the second Y-direction positioning support block 2.8, and the third Y-direction positioning support block 2.9, so that the first Y-direction positioning support block 2.7, the second Y-direction positioning support block 2.8, and the third Y-direction positioning support block 2.9 correspond to the band 3 on the new energy vehicle gas cylinder 4, and then, the scale 2.13 reading is confirmed, the locking nut 2.4 is tightened, the positioning slide block 2.3, and the new energy vehicle gas cylinder assembly tooling positions and clamps the new energy vehicle gas cylinder 4;
[0037] 3) Installing new energy vehicle gas cylinders on the body of the vehicle:
[0038] As attached Figure 3 As shown, the new energy vehicle gas cylinder assembly tool is raised under the body-in-white 5, the Z-axis height of the lifting vehicle 1 is adjusted, and the new energy vehicle gas cylinder sub-assembly assembly is gradually lifted to ensure that the new energy vehicle gas cylinder 4 enters the body-in-white 5, and the upper end surface 3.21 of the lower hoop is aligned with the mounting surface of the body-in-white 5, and the position of the lower hoop mounting hole 3.22 is adjusted, and the hoop 3 is threadedly connected to the body-in-white 5 with the bolt 3.3. After completing the assembly work of the new energy vehicle gas cylinder 4, the new energy vehicle gas cylinder assembly tool is evacuated.
[0039] The above is only a preferred embodiment of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A new energy vehicle gas cylinder assembly tool, which includes: A lifting vehicle (1), characterized in that it also includes: an adjustable positioning mechanism (2), the adjustable positioning mechanism (2) including: a base plate (2.1), a slide rail (2.2), a slider (2.3), a locking nut (2.4), a Y-direction positioning plate (2.6), a first Y-direction positioning support block (2.7), a second Y-direction positioning support block (2.8), a third Y-direction positioning support block (2.9), a lead screw (2.10), a bearing (2.11), a bearing bracket (2.12) and a ruler (2.13), two identical slide rails (2.2) are arranged in parallel on the upper surface of the base plate (2.1), and the base plate (2.1) is provided with a plurality of slide rails (2.2) and a plurality of slide rails (2.3). The plate (2.1) is threadedly connected to the slide rail (2.2), three identical sliders (2.3) are arranged on the slide rail (2.2), the slide rail (2.2) and the slider (2.3) are clamped, a locking nut (2.4) is arranged on the slider (2.3), the slider (2.3) and the locking nut (2.4) are threadedly connected, a scale (2.13) is arranged on the outside of the slide rail (2.2), the bottom plate (2.1) and the scale (2.13) are threadedly connected, a Y-direction positioning plate (2.6) is arranged at the end of the bottom plate (2.1) between two identical slide rails (2.2), and the The bottom plate (2.1) is threadedly connected to the Y-direction positioning plate (2.6); three pairs of identical sliding blocks (2.3) are threadedly connected to the first Y-direction positioning support block (2.7), the second Y-direction positioning support block (2.8), and the third Y-direction positioning support block (2.9) in sequence from front to back; two through holes and one threaded hole are sequentially arranged at the bottom of the first Y-direction positioning support block (2.7); one through hole, one threaded hole, and one through hole are sequentially arranged at the bottom of the second Y-direction positioning support block (2.8); and one threaded hole and two through holes are sequentially arranged at the bottom of the third Y-direction positioning support block (2.9). The three identical sliding blocks (2.3) are threadedly connected to the first Y-direction positioning support block (2.7), the second Y-direction positioning support block (2.8), and the third Y-direction positioning support block (2.9). The lead screw (2.10) is respectively threadedly connected to the first Y-direction positioning support block (2.7), the second Y-direction positioning support block (2.8), and the third Y-direction positioning support block (2.9); bearing brackets (2.12) are arranged at both ends of the lead screw (2.10); three through holes are arranged in sequence on the bearing bracket (2.12); the through holes of the bearing bracket (2.12) are connected with the outer ring of the bearing (2.11) in a clearance fit; the shaft head of the lead screw (2.10) is connected with the inner ring of the bearing (2.11) in a clearance fit; and the lower bottom surface of the base plate (2.1) is threadedly connected to the lifting mechanism of the lifting vehicle (1).
2. The new energy vehicle gas cylinder assembly tool according to claim 1 is characterized in that: The base plate (2.1) is made of Q235, and the flatness of the upper surface of the base plate (2.1) is ≤0.5 mm.
3. The new energy vehicle gas cylinder assembly tool according to claim 1 is characterized in that: The Y-direction positioning plate (2.6) is manufactured by a steel plate stamping process.
4. The new energy vehicle gas cylinder assembly tool according to claim 1 is characterized in that: The material of the lead screw (2.10) is 45# steel, quenched and tempered 235.
5. The new energy vehicle gas cylinder assembly tool according to claim 1 is characterized in that: The bearing (2.11) is a deep groove ball bearing.
6. A method for assembling a gas cylinder for a new energy vehicle, characterized in that: It includes the following steps: 1) Packaging of gas cylinders for new energy vehicles: The digital angle sensor bracket (4.1) is threadedly mounted on the head of the new energy vehicle gas cylinder (4), the digital angle sensor bracket (4.1) and the digital angle sensor (4.2) are detachably connected, the new energy vehicle gas cylinder (4) is rotated axially until the reading of the digital angle sensor (4.2) is zero, three identical bands (3) are used to lock the new energy vehicle gas cylinder (4), the upper band (3.1) and the lower band (3.2) of the band (3) are fixedly connected by bolts (3.3), and then the digital angle sensor bracket (4.1) and the digital angle sensor (4.2) are removed; 2) Adjust the assembly tooling for gas cylinders for new energy vehicles: The new energy vehicle gas cylinder (4) is positioned according to the Y-direction positioning plate (2.6), and then the position of the new energy vehicle gas cylinder (4) is locked according to the three identical bands (3), and the screw (2.10) is adjusted using the adjusting rod (2.5). The three identical screws (2.10) respectively drive the first Y-direction positioning support block (2.7), the second Y-direction positioning support block (2.8), and the third Y-direction positioning support block (2.9), so that the first Y-direction positioning support block (2.7), the second Y-direction positioning support block (2.8), and the third Y-direction positioning support block (2.9) correspond to the band (3) on the new energy vehicle gas cylinder (4), and then the scale (2.13) reading is confirmed, the locking nut (2.4) is tightened, the positioning slide block (2.3), and the new energy vehicle gas cylinder assembly tooling positions and clamps the new energy vehicle gas cylinder (4); 3) Installing new energy vehicle gas cylinders on the body of the vehicle: Raise the new energy vehicle gas cylinder assembly tool under the body-in-white (5), adjust the Z-direction height of the lifting vehicle (1), gradually lift the new energy vehicle gas cylinder subassembly assembly, ensure that the new energy vehicle gas cylinder (4) enters the body-in-white (5), align the upper end surface (3.21) of the lower hoop with the mounting surface of the body-in-white (5), adjust the position of the lower hoop mounting hole (3.22), use bolts (3.3) to thread the hoop (3) and the body-in-white (5), and after completing the assembly work of the new energy vehicle gas cylinder (4), evacuate the new energy vehicle gas cylinder assembly tool.
7. A method for assembling a gas cylinder for a new energy vehicle according to claim 6, characterized in that: The digital display angle sensor (4.2) is a digital angle sensor CJH1DA10B.
8. A method for assembling a gas cylinder for a new energy vehicle according to claim 6, characterized in that: The lifting vehicle (1) is a hydraulic lifting vehicle.
9. A method for assembling a gas cylinder for a new energy vehicle according to claim 6, characterized in that: The digital display angle sensor bracket (4.1) is a steel plate stamping part.
Citation Information
Patent Citations
Installation tool for liquefied natural gas (LNG) bottle of passenger car
CN105172938A
Automatic assembling mechanism and method for engine crankshaft and camshaft thrust plate
CN116060900A
Take big slide of twin post lift and carry assembly line thereof
CN205345126U
Case post feed mechanism of electronic drainage valve case kludge
CN205834617U
Part assembling apparatus for vehicle
US20160096243A1
