Parameter maintenance method and device, equipment and storage medium
By establishing parameter association timing topological relationships and generating maintenance reminder information, the problem of difficult to ensure the order and integrity of parameter maintenance in large information systems is solved, and an efficient and automated parameter maintenance process is achieved.
Patent Information
- Application Number
- CN202411190320.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-08-28
AI Technical Summary
In large information systems, parameters are distributed in different systems or functional modules, which makes it difficult to ensure the orderly progress of parameter changes when there are time-series requirements and a large number of parameters are maintained, which affects the integrity and effectiveness of parameter maintenance.
By determining the correlation relationship between parameters, establishing the correlation timing topological relationship, generating maintenance parameter reminder information, reminding operation and maintenance personnel to check and maintain the associated parameters to ensure the order and integrity of parameter changes.
It realizes automated reminders and efficient maintenance, improves the integrity and reliability of parameter maintenance, and reduces the risk of service interruptions or performance degradation caused by improper parameter adjustment.
Smart Images

Figure CN119066716A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the field of computer software operation and maintenance, and in particular to a parameter maintenance method, device, equipment, medium and program product. Background Art
[0002] Currently, large-scale bank information systems widely adopt parameterized settings, and the parameters of different information systems are extracted. Intensive maintenance and effectiveness have become a trend.
[0003] Parameters, as data entities that control system functions, are increasingly being used in information systems. Since parameters are distributed in different systems or functional modules of the system, it is currently necessary to manually ensure the orderly progress of parameter changes when there are time requirements and a large number of parameters are maintained, making it difficult to ensure the integrity and effectiveness of parameter maintenance. Summary of the invention
[0004] In view of the above problems, embodiments of the present disclosure provide a parameter maintenance method, apparatus, device, medium, and program product.
[0005] According to the first aspect of the present disclosure, a parameter maintenance method is provided, comprising: determining an association relationship between at least some of the parameters in a plurality of parameters. Based on the association relationship and the historical change record of the parameters, determining an association time series topology relationship for maintaining at least some of the parameters, wherein the association time series topology relationship represents a parameter topology relationship based on the historical maintenance time series and having a direct and indirect association with the current maintenance parameters. Based on the association time series topology relationship, determining maintenance parameter reminder information, wherein the maintenance parameter reminder information is used to remind the operation and maintenance personnel to perform maintenance checks on non-current parameters associated with the current maintenance parameters.
[0006] According to an embodiment of the present disclosure, determining the association relationship between at least some of the multiple parameters includes: obtaining a parameter table containing the multiple parameters, and determining the association relationship based on the same field information in the parameter table.
[0007] According to an embodiment of the present disclosure, determining the association relationship according to the same field information in the parameter table includes: determining the field information corresponding to each parameter. Determining a parameter vertical table according to the field information and the parameter name of each parameter, the parameter vertical table representing the classification sequence of the field information. Traversing the parameter vertical table to determine the associated parameters and associated parameters corresponding to each of the same field information. And determining a parameter association relationship table according to the associated parameters, the associated parameters and the corresponding same field information.
[0008] According to an embodiment of the present disclosure, the parameter includes one or more field information. Before traversing the parameter vertical table, the parameter maintenance method further includes: deleting data that is unique to the field information.
[0009] According to an embodiment of the present disclosure, determining the associated temporal topological relationship of maintaining at least part of the parameters according to the associated relationship and the parameter historical change record includes: determining at least part of the field information of the parameter to be maintained. According to the parameter name and at least part of the field information of the parameter to be maintained, cyclically calling the parameter association relationship table to determine the associated parameters of the parameter to be maintained. Obtaining the historical change record of the parameter to be maintained and the associated parameters of the parameter to be maintained. And determining the associated temporal topological relationship of the parameter to be maintained according to the parameter to be maintained and the historical change record of the associated parameters of the parameter to be maintained.
[0010] According to an embodiment of the present disclosure, the associated parameters of the parameter to be maintained include directly associated parameters that belong to the same associated field as the parameter to be maintained, and indirectly associated parameters that do not belong to the same associated field as the parameter to be maintained and belong to the same associated field as the directly associated parameters. According to the historical change records of the parameter to be maintained and the associated parameters of the parameter to be maintained, determining the associated temporal topological relationship of the parameter to be maintained includes: determining the historical change time of the parameter to be maintained, the directly associated parameter, and the indirectly associated parameter, respectively. According to the historical change time, the parameter to be maintained, the directly associated parameter, and the indirectly associated parameter are sorted in time sequence to obtain the associated temporal topological relationship.
[0011] According to an embodiment of the present disclosure, determining maintenance parameter reminder information according to the associated timing topological relationship includes at least one of the following: determining a timing-previous associated parameter of a current maintenance parameter. Checking a maintenance status of the timing-previous associated parameter. Determining a timing-later associated parameter of the current maintenance parameter. Reminding an operation and maintenance personnel to maintain the timing-later associated parameter.
[0012] According to an embodiment of the present disclosure, the parameter maintenance method further includes: in a case where the timing-related parameters have been maintained, reminding the operation and maintenance personnel to check for timing errors.
[0013] According to an embodiment of the present disclosure, before calling the parameter association relationship table each time, the parameter maintenance method further includes: deleting the traversed association parameters.
[0014] According to an embodiment of the present disclosure, a parameter maintenance method is used in a banking information system.
[0015] The second aspect of the present disclosure provides a parameter maintenance device, including: a first determination module, used to determine the association relationship between at least some of the multiple parameters. A second determination module, used to determine the association time series topology relationship of maintaining at least some of the parameters based on the association relationship and the historical change record of the parameters, the association time series topology relationship represents the parameter topology relationship based on the historical maintenance time series and having direct and indirect associations with the current maintenance parameters. A third determination module, used to determine maintenance parameter reminder information based on the association time series topology relationship, the maintenance parameter reminder information is used to remind the operation and maintenance personnel to perform maintenance checks on non-current parameters associated with the current maintenance parameters.
[0016] A third aspect of the present disclosure provides an electronic device, comprising: one or more processors; and a memory for storing one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors execute the above method.
[0017] The fourth aspect of the present disclosure also provides a computer-readable storage medium having executable instructions stored thereon, which, when executed by a processor, causes the processor to execute the above method.
[0018] The fifth aspect of the present disclosure also provides a computer program product, including a computer program, which implements the above method when executed by a processor.
[0019] According to the parameter maintenance method, device, equipment, medium and program product provided by the present disclosure, by establishing an association relationship between multiple parameters, and then adjusting the associated parameters in time sequence according to the historical change sequence of each parameter, the associated time sequence topological relationship of the parameters is obtained, which is convenient for performing integrity checks according to the time sequence of the associated parameters when performing parameter maintenance. Since operation and maintenance only need to pay attention to the parameter association time sequence topological relationship automatically generated by the system, and the system will automatically remind the associated parameters that need to be maintained, the problem of poor integrity and low reliability of manually maintained parameters is at least partially solved, and the technical effect of efficient maintenance of parameters is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The above contents and other objects, features and advantages of the present disclosure will become more apparent through the following description of the embodiments of the present disclosure with reference to the accompanying drawings, in which:
[0021] Figure 1 The application scenario diagram of the parameter maintenance method, apparatus, device, medium and program product according to the embodiment of the present disclosure is schematically shown;
[0022] Figure 2 A flow chart of a parameter maintenance method according to an embodiment of the present disclosure is schematically shown;
[0023] Figure 3 A flowchart of a method for determining an association relationship according to an embodiment of the present disclosure is schematically shown;
[0024] Figure 4A A flowchart of a method for determining an association relationship according to another embodiment of the present disclosure is schematically shown; Figure 4B Schematically shows a flow chart of constructing a parameter vertical table according to an embodiment of the present disclosure; Figure 4C A flowchart of constructing a parameter association relationship table according to an embodiment of the present disclosure is schematically shown;
[0025] Figure 5A flowchart of a method for determining an association relationship according to another embodiment of the present disclosure is schematically shown;
[0026] Fig. 6A A flowchart of a method for determining an associated temporal topological relationship according to an embodiment of the present disclosure is schematically shown; Figure 6B A flowchart of a method for cyclically calling a parameter association relationship table according to an embodiment of the present disclosure is schematically shown; Figure 6C Schematically shows an associated parameter result diagram of parameters to be maintained according to an embodiment of the present disclosure; Fig.6D A flowchart of a method for determining an associated temporal topological relationship of parameters to be maintained according to an embodiment of the present disclosure is schematically shown;
[0027] Figure 7 A flowchart of a method for determining an associated temporal topological relationship according to another embodiment of the present disclosure is schematically shown;
[0028] Figure 8 A flowchart of a method for determining maintenance parameter reminder information according to an embodiment of the present disclosure is schematically shown;
[0029] Fig. 9 A flowchart of a method for determining maintenance parameter reminder information according to another embodiment of the present disclosure is schematically shown;
[0030] Fig.10 A flowchart of a method for determining an associated temporal topological relationship according to another embodiment of the present disclosure is schematically shown;
[0031] Fig.11 A structural block diagram of a parameter maintenance device according to an embodiment of the present disclosure is schematically shown; and
[0032] Fig.12 A block diagram of an electronic device suitable for implementing a parameter maintenance method according to an embodiment of the present disclosure is schematically shown. DETAILED DESCRIPTION
[0033] Hereinafter, embodiments of the present disclosure will be described with reference to the accompanying drawings. However, it should be understood that these descriptions are exemplary only and are not intended to limit the scope of the present disclosure. In the following detailed description, for ease of explanation, many specific details are set forth to provide a comprehensive understanding of the embodiments of the present disclosure. However, it is apparent that one or more embodiments may also be implemented without these specific details. In addition, in the following description, descriptions of known structures and technologies are omitted to avoid unnecessary confusion of the concepts of the present disclosure.
[0034] The terms used herein are only for describing specific embodiments and are not intended to limit the present disclosure. The terms "comprise", "include", etc. used herein indicate the existence of the features, steps, operations and / or components, but do not exclude the existence or addition of one or more other features, steps, operations or components.
[0035] All terms (including technical and scientific terms) used herein have the meanings commonly understood by those skilled in the art unless otherwise defined. It should be noted that the terms used herein should be interpreted as having a meaning consistent with the context of this specification and should not be interpreted in an idealized or overly rigid manner.
[0036] When using expressions such as "at least one of A, B, and C, etc.", they should generally be interpreted according to the meaning of the expression commonly understood by those skilled in the art (for example, "a system having at least one of A, B, and C" should include but is not limited to a system having A alone, B alone, C alone, A and B, A and C, B and C, and / or A, B, C, etc.).
[0037] In the technical solution of this disclosure, the collection, storage, use, processing, transmission, provision, disclosure and application of the data involved (including but not limited to user personal information) are in compliance with the relevant laws and regulations, necessary confidentiality measures are taken, and they do not violate public order and good morals. The acquisition, transmission, storage, use and processing of data in the technical solution of this disclosure are in compliance with the relevant provisions of national laws and regulations.
[0038] It should be noted that in the embodiments of the present disclosure, certain software, components, models and other existing solutions in the industry may be mentioned, which should be regarded as exemplary. Their purpose is only to illustrate the feasibility of implementing the technical solution of the present disclosure, but it does not mean that the applicant has or will necessarily use the solution.
[0039] The embodiment of the present disclosure provides a parameter maintenance method, including: determining the association relationship between at least some of the parameters in a plurality of parameters. According to the association relationship and the historical change record of the parameters, determining the association time sequence topology relationship for maintaining at least some of the parameters. According to the association time sequence topology relationship, determining maintenance parameter reminder information, the maintenance parameter reminder information is used to remind the operation and maintenance personnel to perform maintenance checks on non-current parameters associated with the current parameters. The parameter maintenance method of the present disclosure can automatically remind the operation and maintenance personnel to maintain the associated parameters, with strong integrity and high efficiency.
[0040] Figure 1 The application scenario diagram of the parameter maintenance method, apparatus, device, medium and program product according to the embodiments of the present disclosure is schematically shown.
[0041] like Figure 1As shown, the application scenario 100 according to this embodiment may include a first terminal device 101, a second terminal device 102, a third terminal device 103, a network 104, and a server 105. The network 104 is used to provide a medium for a communication link between the first terminal device 101, the second terminal device 102, the third terminal device 103, and the server 105. The network 104 may include various connection types, such as wired, wireless communication links, or optical fiber cables, etc.
[0042] The user may use at least one of the first terminal device 101, the second terminal device 102, and the third terminal device 103 to interact with the server 105 through the network 104 to receive or send messages, etc. Various communication client applications may be installed on the first terminal device 101, the second terminal device 102, and the third terminal device 103, such as software operation and maintenance applications, shopping applications, web browser applications, search applications, instant messaging tools, email clients, social platform software, etc. (only for example).
[0043] The first terminal device 101, the second terminal device 102, and the third terminal device 103 may be various electronic devices having display screens and supporting web browsing, including but not limited to smart phones, tablet computers, laptop computers, desktop computers, and the like.
[0044] The server 105 may be a server that provides various services, such as a background management server (only as an example) that provides support for websites browsed by users using the first terminal device 101, the second terminal device 102, and the third terminal device 103. The background management server may analyze and process the received data such as user requests, and feed back the processing results (such as web pages, information, or data obtained or generated according to user requests) to the terminal device.
[0045] It should be noted that the parameter maintenance method provided in the embodiment of the present disclosure can generally be executed by the server 105. Accordingly, the parameter maintenance device provided in the embodiment of the present disclosure can generally be set in the server 105. The parameter maintenance method provided in the embodiment of the present disclosure can also be executed by a server or server cluster that is different from the server 105 and can communicate with the first terminal device 101, the second terminal device 102, the third terminal device 103 and / or the server 105. Accordingly, the parameter maintenance device provided in the embodiment of the present disclosure can also be set in a server or server cluster that is different from the server 105 and can communicate with the first terminal device 101, the second terminal device 102, the third terminal device 103 and / or the server 105.
[0046] It should be understood that Figure 1The number of terminal devices, networks and servers in the embodiment is only for illustration. Any number of terminal devices, networks and servers may be provided according to implementation requirements.
[0047] The following will be based on Figure 1 The scene described by Figure 2~Figure 10 The parameter maintenance method of the disclosed embodiment is described in detail.
[0048] Figure 2 The flowchart of the parameter maintenance method according to the embodiment of the present disclosure is schematically shown.
[0049] like Figure 2 As shown, the parameter maintenance method of this embodiment includes, for example, operations S210 to S230.
[0050] In operation S210, an association relationship between at least some of the multiple parameters is determined.
[0051] In operation S220, an associated temporal topological relationship for maintaining at least part of the parameters is determined according to the associated relationship and the parameter historical change record, where the associated temporal topological relationship represents a parameter topological relationship directly and indirectly associated with the current maintenance parameter based on the historical maintenance temporal relationship.
[0052] In operation S230, maintenance parameter reminder information is determined according to the associated temporal topological relationship, where the maintenance parameter reminder information is used to remind the operation and maintenance personnel to perform maintenance inspection on non-current parameters associated with the current maintenance parameters.
[0053] In some embodiments, for example, a method for managing parameter changes in a complex system (such as an IT system, an industrial control system, or a network infrastructure) is provided to ensure that parameter changes do not cause system instability or failure. The following is a specific embodiment to illustrate this process:
[0054] For example, in the network device configuration management of a data center, consider a data center network architecture that includes routers, switches, firewalls, and load balancers. Parameters may include the IP address of the device, routing table, security policy, bandwidth allocation, etc.
[0055] For example, if the routing table of a router is modified, the configuration of the switches and firewalls connected to it may also need to be adjusted to maintain network connectivity and security.
[0056] Assume that during a past maintenance, in order to optimize network traffic, some interface bandwidth limits of the router were adjusted and the corresponding switch port settings were updated.
[0057] Based on the above change records, the system can infer a sequence, which is to adjust the configuration of the router first, then the switch directly connected to it, and finally the firewall rules that are indirectly affected.
[0058] If the operator plans to change the routing table of the router, the system will automatically generate a reminder message, suggesting to check and possibly adjust the following parameters after the change:
[0059] Directly associated switch port configuration;
[0060] Firewall security policies, especially those rules related to new routes;
[0061] The traffic distribution strategy of the load balancer.
[0062] When the operation and maintenance personnel log in to the management system to make changes to the router configuration, the system pops up a reminder message listing all affected devices and parameters.
[0063] The operation and maintenance personnel execute the changes in the order of the reminder information, and perform functional tests after each step to ensure that the changes do not cause any problems.
[0064] After each maintenance action is completed, the system will automatically record the change details, including parameter values, execution time and results before and after the change, to facilitate future analysis and auditing.
[0065] In this way, the method can help the operation and maintenance team to more systematically manage and predict the impact of parameter changes, reducing the risk of service interruption or performance degradation caused by improper parameter adjustment.
[0066] Figure 3 A flowchart of a method for determining an association relationship according to an embodiment of the present disclosure is schematically shown. Figure 2 In addition to the operations S210 to S230 described above, the operations S311 to S312 are also included. For the sake of brevity, the description of operations S210 to S230 is omitted here, and the subsequent related method embodiments are similar and will not be repeated.
[0067] According to the embodiments of the present disclosure, Figure 3 As shown, for example, the association relationship between at least some of the multiple parameters is determined through operations S311 to S312.
[0068] In operation S311, a parameter table including a plurality of parameters is acquired.
[0069] In operation S312, an association relationship is determined according to the same field information in the parameter table.
[0070] In some embodiments, a product distribution system of an e-commerce platform is used as an example to illustrate how to use the above parameter maintenance method. In this system, there are many parameters related to product information, inventory management, price strategy, promotion activities, etc. Each parameter contains multiple fields, and there is a certain correlation between these fields. For example, the ID of a product may appear in both the product information parameter and the inventory management parameter.
[0071] Get a parameter table containing multiple parameters, where the parameter examples are as follows:
[0072] Product information parameters: including product ID, product name, product description, supplier ID and other fields.
[0073] Inventory management parameters: including product ID, inventory quantity, warehouse location and other fields.
[0074] Price strategy parameters: including product ID, standard price, promotional price, discount rate and other fields.
[0075] Promotion activity parameters: including activity ID, product ID, start date, end date and other fields.
[0076] Product ID is the key field that connects different parameters. It appears in multiple parameters such as product information, inventory management, pricing strategy, and promotion activities.
[0077] Therefore, if the product ID in the product information parameter changes (for example, a new product is added), then all fields in other parameters that refer to that product ID will need to be reviewed and possibly updated.
[0078] Assume that there was a promotion in the past, and the promotion price in the price strategy parameters needs to be adjusted, while the inventory management parameters also update the inventory quantity accordingly.
[0079] In this case, if a promotion is launched again, the system should first check and update the price strategy parameters, and then check whether the inventory management parameters are sufficient to support the new promotion needs.
[0080] When a new promotion is planned, the system will remind maintenance staff to check the following parameters:
[0081] Price strategy parameters, confirm that the promotion price is set correctly;
[0082] Inventory management parameters to confirm sufficient inventory;
[0083] Product information parameters confirm that the product description and status are up to date.
[0084] Maintenance personnel check and update parameters one by one based on reminder information to ensure that all related parameters are accurate before the promotion is launched.
[0085] After each change, functional tests are performed, for example, to check whether inventory is deducted correctly and prices are displayed correctly.
[0086] With this approach, maintenance personnel can manage parameter changes more efficiently and systematically, avoiding business problems caused by inconsistent parameters or missed updates. In addition, this relationship-based parameter maintenance method can also help teams better plan and execute complex business processes, such as product launches and promotions.
[0087] It should be noted that this solution, for example, is based on the bank's enterprise-level information system architecture, intensively manages business parameters, automatically calculates parameter associations based on parameter data assets, and pre-checks the integrity and accuracy of parameter maintenance work on this basis. Among them, it is necessary to centrally manage parameters and uniformly deploy parameter data. Fields with the same meaning of different parameters are also uniformly defined.
[0088] Figure 4A A flowchart of a method for determining an association relationship according to another embodiment of the present disclosure is schematically shown. Figure 4B The flowchart of constructing a parameter vertical table according to an embodiment of the present disclosure is schematically shown. Figure 4C The flowchart of constructing a parameter association relationship table according to an embodiment of the present disclosure is schematically shown.
[0089] According to the embodiments of the present disclosure, Figure 4A As shown, for example, through operations S4121 to S4124, the association relationship is determined based on the same field information in the parameter table.
[0090] In operation S4121, field information corresponding to each parameter is determined.
[0091] In operation S4122, a parameter vertical table is determined according to the field information and the parameter name of each parameter, and the parameter vertical table represents the classification sequence of the field information.
[0092] In operation S4123, the parameter vertical table is traversed to determine the associated parameters and associated parameters corresponding to each identical field information.
[0093] In operation S4124, a parameter association relationship table is determined according to the associated parameters, the associated parameters, and the corresponding identical field information.
[0094] In some embodiments, when the parameter maintenance method is discussed in depth, it can be refined into more specific steps, especially how to determine the association relationship between parameters based on the same field information in the parameter table. The following is a detailed description of parameter maintenance of an e-commerce platform as an example:
[0095] Determine the field information corresponding to each parameter. Examples of parameters and fields are as follows:
[0096] Product information parameters: product ID, product name, product description, supplier ID;
[0097] Inventory management parameters: product ID, inventory quantity, warehouse location;
[0098] Price strategy parameters: product ID, standard price, promotional price, discount rate;
[0099] Promotion parameters: activity ID, product ID, start date, end date.
[0100] The parameter table is a data structure that sorts all parameters according to their field information to form a serialized view. Figure 4B As shown, extract the field information and parameter name of the parameter, traverse the table structure information of all parameters, merge and extract all fields with the same meaning during the scheduled batch processing at the end of the day, and use this as a basis to establish the connection between parameters and change the parameters into a vertical table.
[0101] In this embodiment, the constructed parameter table is shown in Table 1:
[0102] Table 1 Parameter vertical table
[0103]
[0104] By traversing the parameter vertical table, you can identify all parameters that contain the same field information. For example, the "Product ID" field appears in multiple parameters, which means that product information parameters, inventory management parameters, price strategy parameters, etc. are related to each other.
[0105] During the traversal process, if a field (such as product ID) is found to appear in two or more parameters, these parameters are marked as related parameters.
[0106] Based on the traversal results, create an association table to clearly indicate which parameters are associated because of the same field information. Figure 4C As shown, the parameter association relationships are traversed and merged according to the same fields, and the associated parameters, associated parameters and associated fields are used as the basis for uniqueness judgment to record the relationship data to form a parameter association relationship table.
[0107] For example, if you need to update the product description in the product information parameter, since the product ID is an associated field, the system will generate a reminder message based on the associated relationship table to inform the maintenance personnel to check and possibly update the following parameters:
[0108] Inventory management parameters, confirm whether the inventory information corresponding to the product ID needs to be updated synchronously;
[0109] Price strategy parameters, confirm whether the price strategy of the product ID needs to be adjusted;
[0110] Promotion activity parameters, confirm whether the promotion information of the ongoing promotion activity needs to be adjusted.
[0111] In this way, maintenance personnel can clearly see the dependencies between parameters, so that when changing any parameter, they can fully consider other parameters that may be affected, ensuring the consistency and integrity of system parameters.
[0112] Figure 5 A flowchart of a method for determining an association relationship according to another embodiment of the present disclosure is schematically shown.
[0113] According to an embodiment of the present disclosure, a parameter includes one or more field information. Before traversing the parameter vertical table, Figure 5 As shown, the parameter maintenance method, for example, also includes operation S5125.
[0114] Operation S5125, delete the data that is unique to the field information.
[0115] In some embodiments, it is possible to further determine how to process independent field information that is not associated with other parameters during the parameter maintenance process. This is specifically described below with an example:
[0116] In the parameter maintenance of the e-commerce platform, there are many parameters on the platform, such as product information, inventory information, price strategy and user evaluation, etc. Each parameter consists of one or more fields. For example, the product information parameter includes product ID, product name, product description and other fields.
[0117] First, list all parameters and the fields they contain.
[0118] Before traversing the parameter table, filter out the field information that only appears once in all parameters and temporarily remove them from parameter maintenance considerations, because these fields will not be associated with other parameters. For example, Figure 4B As shown, only when different parameters have the same fields can an association relationship be established, so the data with unique field values must be deleted (the bold ones are deleted items).
[0119] For example, there is a field "Evaluation ID" in the "User Evaluation Parameters", which is unique and does not appear in any other parameters. Therefore, before establishing the association relationship, the "Evaluation ID" field is temporarily ignored.
[0120] Build a parameter vertical table, classify and sort all parameters according to field information, and then traverse this vertical table to identify all parameters containing the same field information.
[0121] For example, the product ID exists in the product information parameter, inventory information parameter, and price strategy parameter, so these parameters will be grouped together in the vertical table.
[0122] By traversing the parameter vertical table, find out the parameters with the same field information, that is, associated parameters, and record these associated relationships.
[0123] In actual operation, when a parameter is updated, all associated parameters are checked and updated according to the association table to ensure data consistency.
[0124] For example, you need to update the product description in the product information parameter. Before doing this, you first confirm through the parameter vertical table that the product information parameter is associated with the inventory information parameter and the price strategy parameter because they share the product ID field. However, the "Review ID" field in the "User Review Parameter" is not considered because it is an independent and unique field and does not participate in the association between any parameters.
[0125] After updating the product description, you also need to check the inventory information parameters and price strategy parameters associated with the product ID to ensure that their information is still accurate. At the same time, you don’t have to worry about the user review parameter because it is not associated with the product information parameter through any field.
[0126] In this way, complex relationships between parameters can be handled effectively, while simplifying the maintenance process, avoiding unnecessary work and focusing on those parameters that are truly related.
[0127] Fig. 6A The flowchart of the method for determining the associated timing topology relationship according to an embodiment of the present disclosure is schematically shown. Figure 6B The flowchart of the method for cyclically calling the parameter association relationship table according to an embodiment of the present disclosure is schematically shown. Figure 6C The diagram schematically shows an associated parameter result diagram of parameters to be maintained according to an embodiment of the present disclosure. Fig.6D The flowchart of the method for determining the associated temporal topological relationship of the parameters to be maintained according to the embodiment of the present disclosure is schematically shown.
[0128] According to the embodiments of the present disclosure, Fig. 6A As shown, for example, through operations S621 to S624, the associated temporal topological relationship of maintaining at least part of the parameters is determined according to the associated relationship and the historical change record of the parameters.
[0129] In operation S621, at least part of field information of the parameter to be maintained is determined.
[0130] In operation S622, the parameter association table is cyclically called according to the parameter name and at least part of the field information of the parameter to be maintained to determine the associated parameters of the parameter to be maintained.
[0131] In operation S623, the historical change records of the parameter to be maintained and the parameters associated with the parameter to be maintained are obtained.
[0132] In operation S624, the associated temporal topological relationship of the parameter to be maintained is determined according to the historical change records of the parameter to be maintained and the associated parameters of the parameter to be maintained.
[0133] In some embodiments, in the previously set e-commerce platform parameter maintenance scenario, the following will describe in detail how to determine the associated temporal topological relationship of the maintenance parameters based on the associated relationship and the parameter historical change record. The following are specific steps and examples:
[0134] Suppose that what needs to be maintained is the "product information parameters", which include fields such as product ID, product name, product description, etc.
[0135] Based on the field information of "Product Information Parameters", query the association table to find all parameters that are associated with the product information parameters through the same field (such as product ID). For example, inventory management parameters, price strategy parameters, and promotion activity parameters. Figure 6B As shown, for example, according to the associated parameter and the associated field, the association table is called and it is determined whether the associated parameter can be obtained. If the associated parameter can be obtained, it is checked whether the associated parameter is in the result set of the previous call. And when the associated parameter is not in the previous result set, the association table is called. Figure 6C As shown, for example, to maintain Figure 4C For example, the field_1 and field_3 fields of the param_a parameter in the call process are param_a, field_1, and field_3 as input, and the call process traverses the association table to calculate the dynamic association topology. This process involves loop calls, and to avoid falling into an infinite loop, the traversed factors are not allowed to enter the subsequent loops.
[0136] Retrieve change records related to "Product Information Parameters" and all associated parameters (such as inventory management parameters, price strategy parameters, promotion activity parameters) from the parameter change log. This may include the most recent change time, change content, and parameter values before and after the change.
[0137] Analyze the historical change records to identify the order in which the parameters were changed. For example, if the historical records show that in a past change, the product description in the product information parameter was adjusted first, and then the inventory quantity in the inventory management parameter was updated, then a similar order should be followed in future maintenance. Fig.6D As shown, the parameters involved in the filtered association relationship are used to generate a time series relationship according to the historical values and change times of the associated fields.
[0138] For example, you need to update the product description in the "Product Information Parameters". According to the above steps:
[0139] First, determine the field information. The "Product Information Parameters" include fields such as product ID, product name, and product description.
[0140] Then, through the association relationship table, it is determined that the "product information parameters" are associated with the inventory management parameters, price strategy parameters and promotion activity parameters.
[0141] Looking at the historical change records again, I found that in the past, after updating the product description, the inventory quantity in the inventory management parameters would usually be checked and possibly updated to ensure that the inventory status in the description was consistent with the actual situation.
[0142] Based on historical records, the maintenance sequence should be:
[0143] Update the product description in the product information parameter;
[0144] Check and possibly update inventory quantities in inventory management parameters;
[0145] Check the price strategy parameters and promotion activity parameters to see if there are any adjustments that need to be made.
[0146] In this way, maintainers can follow an orderly process based on historical experience, ensuring that all relevant change requirements are taken into account when maintaining parameters, reducing potential errors and inconsistencies, and improving the stability and efficiency of the overall system.
[0147] Figure 7 A flowchart of a method for determining an associated timing topology relationship according to another embodiment of the present disclosure is schematically shown.
[0148] According to an embodiment of the present disclosure, the associated parameters of the parameter to be maintained include, for example, directly associated parameters that belong to the same associated field as the parameter to be maintained, and indirectly associated parameters that do not belong to the same associated field as the parameter to be maintained but belong to the same associated field as the directly associated parameters. Figure 7 As shown, for example, through operation S7241 to operation S7242, the associated temporal topological relationship of the parameter to be maintained is determined according to the historical change records of the parameter to be maintained and the associated parameters of the parameter to be maintained.
[0149] In operation S7241, the historical change times of the parameters to be maintained, the directly associated parameters, and the indirectly associated parameters are respectively determined.
[0150] In operation S7242, the parameters to be maintained, the directly associated parameters, and the indirectly associated parameters are sorted in time sequence according to the historical change time to obtain an associated time sequence topological relationship.
[0151] In some embodiments, it is possible to further refine how to determine the associated temporal topological relationship of parameter maintenance, especially when distinguishing between directly associated parameters and indirectly associated parameters. The following is a specific description of the parameter maintenance scenario of an e-commerce platform:
[0152] Determine the directly associated parameters and indirectly associated parameters of the parameter to be maintained, wherein the directly associated parameters are parameters directly connected to the parameter to be maintained through the same associated field, and the indirectly associated parameters are parameters that do not belong to the same associated field as the parameter to be maintained but belong to the same associated field as the directly associated parameters.
[0153] Check the parameter change log and record the timestamp of each change, including the change time of the parameter to be maintained, the change time of the directly related parameters, and the change time of the indirectly related parameters.
[0154] Based on the historical change time, the parameters to be maintained, the directly associated parameters and the indirectly associated parameters are arranged in chronological order to form a time series topology relationship diagram.
[0155] For example, the product description field in the "Product Information Parameters" needs to be maintained.
[0156] First, determine the directly associated parameters among the associated parameters: inventory management parameters (associated through product ID). Indirectly associated parameters: price strategy parameters and promotion activity parameters (associated with inventory management parameters through product ID).
[0157] Then, collect the historical change times, for example:
[0158] Product Information Parameters: Last changed on June 20, 2024.
[0159] Inventory Management Parameters: Last changed on June 21, 2024.
[0160] Price strategy parameters: Last changed on June 22, 2024.
[0161] Promotion parameters: Last changed on June 23, 2024.
[0162] Get the timing sorting and associated timing topology relationship:
[0163] Time series sorting: product information parameters → inventory management parameters → price strategy parameters → promotion activity parameters.
[0164] Associative temporal topological relationship: This indicates that when maintaining product information parameters, the product description should be updated first, and then the inventory management parameters, price strategy parameters, and promotion activity parameters should be checked in sequence to ensure data consistency in the entire system.
[0165] Through such a process, operation and maintenance personnel can follow a clear order to perform parameter maintenance tasks, ensuring that each change can take into account all relevant parameters and avoid problems caused by improper parameter update order. In addition, this temporal topological relationship based on historical change records also helps new operation and maintenance personnel quickly understand the logical connection between parameters and improve the efficiency and accuracy of maintenance work.
[0166] Figure 8 A flow chart of a method for determining maintenance parameter reminder information according to an embodiment of the present disclosure is schematically shown.
[0167] According to the embodiments of the present disclosure, Figure 8 As shown, for example, maintenance parameter reminder information is determined according to the associated timing topological relationship through at least one of operations S831 to S834.
[0168] In operation S831, a chronologically preceding associated parameter of a current maintenance parameter is determined.
[0169] In operation S832, a maintenance state of a timing-previous associated parameter is checked.
[0170] In operation S833, a sequentially subsequent associated parameter of the current maintenance parameter is determined.
[0171] In operation S834, the operation and maintenance personnel are reminded to maintain the parameters associated with the subsequent timing.
[0172] In some embodiments, the focus will be on how to generate reminder information for maintenance parameters based on the associated temporal topological relationship to guide the actions of the operation and maintenance personnel. The following is a specific description of the parameter maintenance scenario of the e-commerce platform:
[0173] Based on the associated temporal topological relationship, the parameters before the current maintenance parameters are identified, which may have been changed or need to be maintained before the current parameters.
[0174] Ensure that pre-conditions are properly maintained and there are no outstanding issues or unresolved change requirements.
[0175] And / or, also based on the associated temporal topology relationship, identify the parameters after the current maintenance parameters, which may be affected by the current parameter change and need to be checked or maintained after the current parameter change. For example, based on the parameter associated temporal topology relationship generated above, provide work integrity reminders to business personnel when maintaining parameters. For example, when maintaining param_a, the system checks whether param_b has been maintained, and recommends continuing to maintain param_c\e\f. If param_c has been maintained in advance, remind the user whether the timing is wrong.
[0176] The system generates reminder information to inform the operation and maintenance personnel which subsequent parameters need to be paid attention to and maintained after completing the maintenance of the current parameters to ensure the parameter consistency of the entire system.
[0177] For example, you need to maintain the product description in the "Product Information Parameters".
[0178] In this example, since the product information parameter is usually updated first, there may be no direct preceding parameter. However, in some cases, such as changes in product categories, it may affect the update of product information parameters. In this case, the product category parameter is the preceding parameter.
[0179] If there are pre-set parameters, the operation and maintenance personnel need to check whether these parameters have been correctly maintained to avoid introducing errors when updating product information parameters.
[0180] Determine the timing and then associate the parameters. Directly associate the parameters: inventory management parameters. Indirectly associate the parameters: price strategy parameters and promotion activity parameters.
[0181] After completing the maintenance of product information parameters, the operation and maintenance personnel will receive a reminder message instructing them to:
[0182] Check the inventory management parameters to confirm that the inventory information is consistent with the updated product description.
[0183] Check the price strategy parameters and promotion parameters to confirm that the price and promotion information match the product description. In particular, for promotions, make sure that the discount information mentioned in the description is reflected in the promotion.
[0184] Through such a reminder mechanism, operation and maintenance personnel can perform parameter maintenance tasks in an orderly manner, ensuring that each change can fully cover all relevant parameters and reduce business problems caused by inconsistencies between parameters. This reminder information based on temporal topological relationships helps the operation and maintenance team manage parameter changes more systematically and efficiently, ensuring the smooth operation of business processes.
[0185] Fig. 9 A flowchart of a method for determining maintenance parameter reminder information according to another embodiment of the present disclosure is schematically shown.
[0186] According to the embodiments of the present disclosure, Fig. 9 As shown, the parameter maintenance method, for example, also includes operation S935.
[0187] In operation S935 , when the timing sequence is later associated with parameters that have been maintained, the operation and maintenance personnel are reminded to check for timing sequence errors.
[0188] In some embodiments, when performing parameter maintenance, it is very important to ensure that the parameters are maintained in the correct sequence, because the dependencies between parameters may affect the stability of the system and the consistency of the data. If the order of parameter maintenance is not appropriate, it may cause logical sequence errors, which in turn affect the business process. Therefore, adding a check for sequence errors to the parameter maintenance method can help operation and maintenance personnel to promptly discover and correct such problems.
[0189] The following example uses an e-commerce website's order processing system to explain how to implement this maintenance method:
[0190] Parameter sequence includes, for example: Order Placement Parameters: including order creation time, order status, etc. Stock Check Parameters: used to confirm whether the stock is sufficient. Payment Processing Parameters: including payment status, payment method, etc. Logistics and delivery parameters: involving logistics selection, delivery address, etc.
[0191] The maintenance of customer order parameters occurs when the user places an order, which is the beginning of the entire order process. The inventory check parameters are maintained immediately after receiving the order to ensure that there is enough inventory to meet the order requirements. The payment processing parameters are maintained after the inventory check passes to ensure that the payment process goes smoothly. The logistics delivery parameters are maintained after the payment is successful to arrange logistics delivery.
[0192] In the case where the timing is later associated with the maintenance of the parameters, for example, if the logistics delivery parameters have been maintained in advance, but the inventory check parameters or payment processing parameters have not been maintained at that point in time, this indicates a timing error.
[0193] Before maintaining any parameters, the operation and maintenance personnel should check the status of its predecessor parameters. For example, when preparing to maintain the logistics and delivery parameters, they should check whether the payment processing parameters have been maintained and the status is "Payment Successful".
[0194] If a timing error is found, the operation and maintenance system should automatically issue a warning to remind the operation and maintenance personnel to suspend the current operation and check and correct the timing problem.
[0195] For example, if an attempt is made to maintain logistics delivery parameters when payment processing parameters have not been completed, the operation and maintenance system should block this operation and send a reminder to the operation and maintenance personnel, indicating that the payment processing parameters have not been completed and that the payment processing parameters need to be maintained first.
[0196] The operator will receive a message such as: "Note: Maintenance of logistics and delivery parameters is attempted before maintenance of payment processing parameters. Please complete maintenance of payment processing parameters first, then retry maintenance of logistics and delivery parameters."
[0197] In this way, operation and maintenance personnel can avoid system failures or data inconsistencies caused by timing errors, ensure that each parameter is maintained at the right time, and thus maintain system stability and data integrity. In addition, this maintenance method also helps improve operation and maintenance efficiency and reduce errors caused by human negligence or misunderstanding of parameter dependencies.
[0198] Fig.10 A flowchart of a method for determining an associated timing topology relationship according to yet another embodiment of the present disclosure is schematically shown.
[0199] According to the embodiments of the present disclosure, Fig.10 As shown, before calling the parameter association relationship table each time, the parameter maintenance method further includes, for example, operation S1025.
[0200] In operation S1025, the traversed associated parameters are deleted.
[0201] In some embodiments, in complex systems, there are often multiple levels of associations between parameters, which means that the update of one parameter may depend on the current status of multiple other parameters. In order to avoid falling into an infinite loop when recursively or cyclically calling the parameter association table, a strategy can be adopted, that is, before each call to the parameter association table, the traversed associated parameters are deleted. This ensures that each associated parameter is processed only once, thereby avoiding repeated calculations or infinite loops.
[0202] The following example uses a purchase order process in an enterprise resource planning (ERP) system to illustrate how this approach can be applied when maintaining parameters:
[0203] Parameter association example:
[0204] Purchase Request Parameters: Contains the description and quantity of the purchased items.
[0205] Vendor Parameters: Includes the vendor's name, contact information, and price list.
[0206] Purchase Order Parameters: Detailed information about the order, such as item list, unit price, and total amount.
[0207] Receiving Report Parameters: Record the actual items and quantities received.
[0208] Among them, the purchase request parameters trigger the selection of supplier parameters. After the supplier parameters are determined, the purchase order parameters are generated based on the supplier's price list. After the purchase order parameters are confirmed, the maintenance of the receipt parameters is triggered.
[0209] Suppose that when maintaining purchase order parameters, the system needs to check supplier parameters to get the latest price information. If the update of supplier parameters depends on purchase request parameters, which in turn depend on supplier parameters indirectly, then without proper control mechanisms, the system may fall into an infinite loop, repeatedly trying to update these interdependent parameters.
[0210] To prevent this, you can take the following steps:
[0211] All parameters and their directly related parameters are logged.
[0212] When starting the maintenance process, create an empty list of traversed parameters.
[0213] Before calling the parameter association table, all parameters in the traversed parameter list are removed from the association table.
[0214] After maintaining a parameter, add it to the list of traversed parameters.
[0215] For example, when you start maintaining purchase order parameters, you first check the vendor parameters.
[0216] Before checking the supplier parameters, delete all traversed parameters from the parameter association table to avoid repeated checks.
[0217] Maintain the supplier parameters and then add them to the list of traversed parameters.
[0218] Next, maintain the purchase order parameters using the updated vendor parameters.
[0219] When the parameter association table is called again, since the supplier parameter has been marked as traversed, the system will not try to maintain it again, thus avoiding an infinite loop.
[0220] By deleting the traversed associated parameters before calling the parameter association table each time, the system can effectively avoid falling into an infinite loop in a complex parameter network, ensuring the efficiency and accuracy of the parameter maintenance process. This method is particularly suitable for systems with multi-level and complex dependencies between parameters.
[0221] According to an embodiment of the present disclosure, the parameter maintenance method is used in, for example, a banking business information system.
[0222] In some embodiments, in the banking information system, parameter maintenance methods are essential to ensure data consistency and smooth operation of business processes. Especially in the scenario of banks selling financial products, the correlation between parameters is particularly complex because different product characteristics, risk assessments, pricing strategies, etc. may affect each other. The following are specific steps on how to use parameter maintenance methods to manage this complexity:
[0223] In the process of banks selling financial products, multiple parameters are involved, such as:
[0224] Product types: deposits, loans, investments, insurance, etc.
[0225] Interest rate parameters: fixed rate, floating rate, interest rate range, etc.
[0226] Term parameters: short-term, medium-term, long-term.
[0227] Risk parameters: risk level, guarantee requirements, credit assessment standards, etc.
[0228] Income parameters: expected rate of return, dividend method, income cycle, etc.
[0229] Customer qualification parameters: age, income level, occupation, credit score, etc.
[0230] There are complex correlations between these parameters. For example, the interest rates of different product types may be affected by market interest rates, while risk parameters may determine whether a customer is eligible to purchase certain high-risk products.
[0231] Based on the historical change records and associations of parameters, the system needs to build a time-series topology diagram to determine the order of parameter maintenance. For example:
[0232] If market interest rates change, then all product interest rate parameters that rely on market interest rates will need to be reassessed.
[0233] When risk parameters are adjusted, it may be necessary to recalculate expected returns and check whether customer qualifications still meet the new risk level requirements.
[0234] Based on the above time-series topology relationship, the system can automatically generate maintenance parameter reminder information to guide the workflow of operation and maintenance personnel. For example:
[0235] When market interest rates rise, the system should automatically remind operations and maintenance personnel to check the interest rates of all affected financial products and consider whether adjustments are needed.
[0236] If a bank decides to raise the risk threshold for a certain type of product, the system should remind operations staff to review the qualifications of all relevant customers and notify customers of changes in new product conditions.
[0237] For example, a bank decides to adjust the interest rate of its time deposit product because market interest rates have risen. At this point, the system first identifies the parameters related to time deposits, such as interest rate parameters, term parameters, and customer qualification parameters. Then, based on historical records and associations, the system determines that after the market interest rate changes, all parameters related to time deposits may need to be re-evaluated. The system generates a maintenance reminder to notify the operation and maintenance team:
[0238] Review and update interest rate parameters for term deposits.
[0239] Verify the eligibility of all term deposit customers to ensure they still qualify for the new interest rates.
[0240] Adjust marketing materials and online product descriptions to reflect the latest interest rate information.
[0241] In this way, banks can ensure that all associated business processes are updated promptly and accurately when parameters are changed, thereby avoiding potential business risks and customer dissatisfaction. The parameter maintenance method greatly improves the efficiency and accuracy of bank operations through automation and intelligence.
[0242] Based on the above parameter maintenance method, the present disclosure also provides a parameter maintenance device. Fig.11 The device is described in detail.
[0243] Fig.11 The structural block diagram of the parameter maintenance device according to the embodiment of the present disclosure is schematically shown.
[0244] like Fig.11 As shown, the parameter maintenance device 1100 of this embodiment includes, for example: a first determination module 1110 , a second determination module 1120 and a third determination module 1130 .
[0245] The first determining module 1110 is used to determine the association relationship between at least some of the multiple parameters. In one embodiment, the first determining module 1110 can be used to perform the operation S210 described above, which will not be described in detail here.
[0246] The second determination module 1120 is used to determine the associated time sequence topological relationship of maintaining at least part of the parameters according to the associated relationship and the parameter historical change record, and the associated time sequence topological relationship represents the parameter topological relationship that is directly and indirectly associated with the current maintenance parameter based on the historical maintenance time sequence. In one embodiment, the second determination module 1120 can be used to perform the operation S220 described above, which will not be repeated here.
[0247] The third determination module 1130 is used to determine maintenance parameter reminder information according to the associated temporal topological relationship, and the maintenance parameter reminder information is used to remind the operation and maintenance personnel to perform maintenance inspection on non-current parameters associated with the current maintenance parameters. In one embodiment, the third determination module 1130 can be used to perform the operation S230 described above, which will not be repeated here.
[0248] According to an embodiment of the present disclosure, any multiple modules of the first determination module 1110, the second determination module 1120, and the third determination module 1130 can be combined into one module for implementation, or any one of the modules can be split into multiple modules. Alternatively, at least part of the functions of one or more of these modules can be combined with at least part of the functions of other modules and implemented in one module. According to an embodiment of the present disclosure, at least one of the first determination module 1110, the second determination module 1120, and the third determination module 1130 can be at least partially implemented as a hardware circuit, such as a field programmable gate array (FPGA), a programmable logic array (PLA), a system on a chip, a system on a substrate, a system on a package, an application-specific integrated circuit (ASIC), or can be implemented by hardware or firmware such as any other reasonable way of integrating or packaging the circuit, or implemented in any one of the three implementation methods of software, hardware, and firmware, or in any appropriate combination of any of them. Alternatively, at least one of the first determination module 1110, the second determination module 1120, and the third determination module 1130 can be at least partially implemented as a computer program module, and when the computer program module is run, the corresponding function can be executed.
[0249] According to an embodiment of the present disclosure, the first determination module 1110 , for example, includes a first acquisition submodule 1111 and a first determination submodule 1112 .
[0250] The first acquisition submodule 1111 is used to acquire a parameter table containing multiple parameters. In one embodiment, the first acquisition submodule 1111 can be used to perform the operation S311 described above, which will not be described in detail here.
[0251] The first determination submodule 1112 is used to determine the association relationship according to the same field information in the parameter table. In one embodiment, the first determination submodule 1112 can be used to perform the operation S312 described above, which will not be described in detail here.
[0252] According to an embodiment of the present disclosure, the first determining submodule 1112 , for example, includes a first determining unit 2121 , a second determining unit 2122 , a third determining unit 2123 and a fourth determining unit 2124 .
[0253] The first determining unit 2121 is used to determine the field information corresponding to each parameter. In one embodiment, the first determining unit 2121 can be used to perform the operation S4121 described above, which will not be described in detail here.
[0254] The second determining unit 2122 is used to determine a parameter vertical table according to the field information and the parameter name of each parameter, wherein the parameter vertical table represents the classification sequence of the field information. In one embodiment, the second determining unit 2122 can be used to perform the operation S4122 described above, which will not be described in detail here.
[0255] The third determining unit 2123 is used to traverse the parameter vertical table to determine the associated parameters and associated parameters corresponding to each identical field information. In one embodiment, the third determining unit 2123 can be used to perform the operation S4123 described above, which will not be described in detail here.
[0256] The fourth determining unit 2124 is used to determine the parameter association relationship table according to the associated parameters, the associated parameters and the corresponding same field information. In one embodiment, the fourth determining unit 2124 can be used to perform the operation S4124 described above, which will not be described in detail here.
[0257] According to an embodiment of the present disclosure, the first determining submodule 1112 , for example, further includes a deleting unit 2125 .
[0258] The deletion unit 2125 is used to delete data that is unique to the field information. In one embodiment, the deletion unit 2125 can be used to perform the operation S5125 described above, which will not be described in detail here.
[0259] According to an embodiment of the present disclosure, the second determination module 1120 includes, for example, a second determination submodule 1121 , a calling submodule 1122 , a second acquisition submodule 1123 and a third determination submodule 1124 .
[0260] The second determination submodule 1121 is used to determine at least part of the field information of the parameter to be maintained. In one embodiment, the second determination submodule 1121 can be used to perform the operation S621 described above, which will not be described in detail here.
[0261] The calling submodule 1122 is used to cyclically call the parameter association table according to the parameter name and at least part of the field information of the parameter to be maintained to determine the associated parameters of the parameter to be maintained. In one embodiment, the calling submodule 1122 can be used to perform the operation S622 described above, which will not be repeated here.
[0262] The second acquisition submodule 1123 is used to acquire the historical change records of the parameter to be maintained and the associated parameters of the parameter to be maintained. In one embodiment, the second acquisition submodule 1123 can be used to perform the operation S623 described above, which will not be described in detail here.
[0263] The third determination submodule 1124 is used to determine the associated temporal topological relationship of the parameters to be maintained according to the historical change records of the parameters to be maintained and the associated parameters of the parameters to be maintained. In one embodiment, the third determination submodule 1124 can be used to perform the operation S624 described above, which will not be repeated here.
[0264] According to an embodiment of the present disclosure, the third determining submodule 1124 , for example, includes a fifth determining unit 2241 and a sorting unit 2242 .
[0265] The fifth determining unit 2241 is used to determine the historical change time of the parameter to be maintained, the directly associated parameter and the indirectly associated parameter respectively. In one embodiment, the fifth determining unit 2241 can be used to perform the operation S7241 described above, which will not be described in detail here.
[0266] The sorting unit 2242 is used to sort the parameters to be maintained, directly associated parameters and indirectly associated parameters in time sequence according to the historical change time to obtain the associated time sequence topological relationship. In one embodiment, the sorting unit 2242 can be used to perform the operation S7242 described above, which will not be repeated here.
[0267] According to an embodiment of the present disclosure, the third determining module 1130 , for example, includes a fourth determining submodule 1131 , a checking submodule 1132 , a fifth determining submodule 1133 and a first reminding submodule 1134 .
[0268] The fourth determination submodule 1131 is used to determine the time sequence preceding associated parameter of the current maintenance parameter. In one embodiment, the fourth determination submodule 1131 can be used to perform the operation S831 described above, which will not be described in detail here.
[0269] The checking submodule 1132 is used to check the maintenance status of the timing-previous associated parameter. In one embodiment, the checking submodule 1132 can be used to perform the operation S832 described above, which will not be described in detail here.
[0270] The fifth determination submodule 1133 is used to determine the sequentially subsequent associated parameter of the current maintenance parameter. In one embodiment, the fifth determination submodule 1133 may be used to perform the operation S833 described above, which will not be described in detail herein.
[0271] The first reminder submodule 1134 is used to remind the operation and maintenance personnel to maintain the parameters associated with the later time sequence. In one embodiment, the first reminder submodule 1134 can be used to perform the operation S834 described above, which will not be repeated here.
[0272] According to an embodiment of the present disclosure, the third determining module 1130 , for example, further includes a second reminding submodule 1135 .
[0273] The second reminder submodule 1135 is used to remind the operation and maintenance personnel to check the timing error when the timing is later associated with the parameter that has been maintained. In one embodiment, the second reminder submodule 1135 can be used to perform the operation S935 described above, which will not be repeated here.
[0274] According to an embodiment of the present disclosure, the second determining module 1120 , for example, further includes a deleting submodule 1125 .
[0275] The deletion submodule 1125 is used to delete the traversed associated parameters. In one embodiment, the deletion submodule 1125 can be used to perform the operation S1025 described above, which will not be described in detail here.
[0276] The unfinished details in the product example section are similar to those in the method example section. Please refer to the method example section and will not be repeated here.
[0277] Fig.12 A block diagram of an electronic device suitable for implementing a parameter maintenance method according to an embodiment of the present disclosure is schematically shown.
[0278] like Fig.12 As shown, the electronic device 1200 according to an embodiment of the present disclosure includes a processor 1201, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 1202 or a program loaded from a storage part 1208 to a random access memory (RAM) 1203. The processor 1201 may include, for example, a general-purpose microprocessor (e.g., a CPU), an instruction set processor and / or a related chipset and / or a dedicated microprocessor (e.g., an application-specific integrated circuit (ASIC)), etc. The processor 1201 may also include an onboard memory for caching purposes. The processor 1201 may include a single processing unit or multiple processing units for performing different actions of the method flow according to an embodiment of the present disclosure.
[0279] In RAM 1203, various programs and data required for the operation of electronic device 1200 are stored. Processor 1201, ROM 1202 and RAM 1203 are connected to each other via bus 1204. Processor 1201 performs various operations of the method flow according to the embodiment of the present disclosure by executing the program in ROM 1202 and / or RAM 1203. It should be noted that the program can also be stored in one or more memories other than ROM 1202 and RAM 1203. Processor 1201 can also perform various operations of the method flow according to the embodiment of the present disclosure by executing the program stored in the one or more memories.
[0280] According to an embodiment of the present disclosure, the electronic device 1200 may further include an input / output (I / O) interface 1205, which is also connected to the bus 1204. The electronic device 1200 may further include one or more of the following components connected to the I / O interface 1205: an input portion 1206 including a keyboard, a mouse, etc.; an output portion 1207 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage portion 1208 including a hard disk, etc.; and a communication portion 1209 including a network interface card such as a LAN card, a modem, etc. The communication portion 1209 performs communication processing via a network such as the Internet. A drive 1210 is also connected to the I / O interface 1205 as needed. A removable medium 1211, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 1210 as needed, so that a computer program read therefrom is installed into the storage portion 1208 as needed.
[0281] The present disclosure also provides a computer-readable storage medium, which may be included in the device / apparatus / system described in the above embodiments; or may exist independently without being assembled into the device / apparatus / system. The above computer-readable storage medium carries one or more programs, and when the above one or more programs are executed, the parameter maintenance method according to the embodiment of the present disclosure is implemented.
[0282] According to an embodiment of the present disclosure, a computer-readable storage medium may be a non-volatile computer-readable storage medium, for example, may include but is not limited to: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In the present disclosure, a computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, an apparatus, or a device. For example, according to an embodiment of the present disclosure, a computer-readable storage medium may include the ROM 1202 and / or RAM 1203 described above and / or one or more memories other than ROM 1202 and RAM 1203.
[0283] The embodiment of the present disclosure also includes a computer program product, which includes a computer program, and the computer program contains program code for executing the method shown in the flowchart. When the computer program product is run in a computer system, the program code is used to enable the computer system to implement the parameter maintenance method provided by the embodiment of the present disclosure.
[0284] The above functions defined in the system / device of the embodiment of the present disclosure are performed when the computer program is executed by the processor 1201. According to the embodiment of the present disclosure, the system, device, module, unit, etc. described above can be implemented by a computer program module.
[0285] In one embodiment, the computer program may rely on tangible storage media such as optical storage devices, magnetic storage devices, etc. In another embodiment, the computer program may also be transmitted and distributed in the form of signals on a network medium, and downloaded and installed through the communication part 1209, and / or installed from the removable medium 1211. The program code contained in the computer program may be transmitted using any appropriate network medium, including but not limited to: wireless, wired, etc., or any suitable combination of the above.
[0286] In such an embodiment, the computer program can be downloaded and installed from the network through the communication part 1209, and / or installed from the removable medium 1211. When the computer program is executed by the processor 1201, the above functions defined in the system of the embodiment of the present disclosure are performed. According to the embodiment of the present disclosure, the system, device, means, module, unit, etc. described above can be implemented by a computer program module.
[0287] According to an embodiment of the present disclosure, the program code for executing the computer program provided by the embodiment of the present disclosure can be written in any combination of one or more programming languages. Specifically, these computing programs can be implemented using high-level process and / or object-oriented programming languages, and / or assembly / machine languages. Programming languages include, but are not limited to, Java, C++, python, "C" language or similar programming languages. The program code can be executed entirely on the user computing device, partially on the user device, partially on the remote computing device, or entirely on the remote computing device or server. In the case of a remote computing device, the remote computing device can be connected to the user computing device through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computing device (for example, using an Internet service provider to connect through the Internet).
[0288] The flow charts and block diagrams in the accompanying drawings illustrate the possible architecture, functions and operations of the systems, methods and computer program products according to various embodiments of the present disclosure. In this regard, each box in the flow chart or block diagram can represent a module, a program segment, or a part of a code, and the above-mentioned module, program segment, or a part of a code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flow chart, and the combination of the boxes in the block diagram or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0289] It will be appreciated by those skilled in the art that the features described in the various embodiments and / or claims of the present disclosure may be combined and / or combined in a variety of ways, even if such combinations and / or combinations are not explicitly described in the present disclosure. In particular, the features described in the various embodiments and / or claims of the present disclosure may be combined and / or combined in a variety of ways without departing from the spirit and teachings of the present disclosure. All of these combinations and / or combinations fall within the scope of the present disclosure.
[0290] The embodiments of the present disclosure are described above. However, these embodiments are only for illustrative purposes and are not intended to limit the scope of the present disclosure. Although the embodiments are described above separately, this does not mean that the measures in the various embodiments cannot be used in combination to advantage. The scope of the present disclosure is defined by the attached claims and their equivalents. Without departing from the scope of the present disclosure, those skilled in the art may make a variety of substitutions and modifications, which should all fall within the scope of the present disclosure.
Claims
1. A parameter maintenance method, characterized in that: include: Determining a correlation relationship between at least some of the multiple parameters; Determine, according to the association relationship and the parameter historical change record, an association time sequence topological relationship for maintaining at least part of the parameters, wherein the association time sequence topological relationship represents a parameter topological relationship that is directly and indirectly associated with the current maintenance parameter based on the historical maintenance time sequence; Maintenance parameter reminder information is determined according to the associated temporal topological relationship, and the maintenance parameter reminder information is used to remind operation and maintenance personnel to perform maintenance inspection on non-current parameters associated with current maintenance parameters.
2. The method according to claim 1, characterized in that Determining the association relationship between at least some of the multiple parameters includes: Obtaining a parameter table including the plurality of parameters; The association relationship is determined according to the same field information in the parameter table.
3. The method according to claim 2, characterized in that The determining the association relationship according to the same field information in the parameter table includes: Determine the field information corresponding to each parameter; Determine a parameter vertical table according to the field information and parameter names of each parameter, wherein the parameter vertical table represents a classification sequence of the field information; Traversing the parameter vertical table to determine the associated parameters and associated parameters corresponding to each identical field information; and A parameter association relationship table is determined according to the associated parameters, the associated parameters and the corresponding same field information.
4. The method according to claim 3, characterized in that The parameter includes one or more field information. Before traversing the parameter vertical table, the method further includes: Delete the unique data in the field.
5. The method according to claim 3, characterized in that: Determining, based on the association relationship and the parameter historical change record, to maintain the association time sequence topology relationship of at least part of the parameters comprises: Determining at least part of the field information of the parameter to be maintained; According to the parameter name of the parameter to be maintained and the at least part of the field information, cyclically calling the parameter association relationship table to determine the associated parameters of the parameter to be maintained; Acquire the historical change records of the parameter to be maintained and the associated parameters of the parameter to be maintained; and According to the parameter to be maintained and the historical change records of the parameter associated with the parameter to be maintained, the associated temporal topological relationship of the parameter to be maintained is determined.
6. The method according to claim 5, characterized in that The associated parameters of the parameter to be maintained include directly associated parameters that belong to the same associated field as the parameter to be maintained, and indirectly associated parameters that do not belong to the same associated field as the parameter to be maintained but belong to the same associated field as the directly associated parameters; The determining, according to the historical change records of the parameter to be maintained and the associated parameters of the parameter to be maintained, the associated temporal topological relationship of the parameter to be maintained comprises: respectively determining the historical change time of the parameter to be maintained, the directly associated parameter, and the indirectly associated parameter; The parameters to be maintained, the directly associated parameters, and the indirectly associated parameters are sorted in time sequence according to the historical change time to obtain the associated time sequence topological relationship.
7. The method according to claim 5, characterized in that The determining of the maintenance parameter reminder information according to the associated temporal topological relationship includes at least one of the following: Determine the time sequence preceding associated parameter of the current maintenance parameter; Checking the maintenance status of the sequence-previous associated parameters; Determining a sequentially subsequent associated parameter of the current maintenance parameter; Remind the operation and maintenance personnel to maintain the parameters associated with the timing.
8. The method according to claim 7, characterized in that Also includes: In the case where the timing is later associated with parameters that have been maintained, the operation and maintenance personnel are reminded to check for timing errors.
9. The method according to claim 5, characterized in that Before calling the parameter association relationship table each time, the method further includes: Delete the associated parameters that have been traversed.
10. The method according to claim 1, characterized in that The method is used in a banking information system.
11. A parameter maintenance device, characterized in that: include: A first determining module, used to determine the correlation relationship between at least some of the multiple parameters; A second determination module is used to determine, based on the association relationship and the parameter historical change record, an association time sequence topological relationship for maintaining at least part of the parameters, wherein the association time sequence topological relationship represents a parameter topological relationship that is directly and indirectly associated with the current maintenance parameter based on the historical maintenance time sequence; The third determination module is used to determine maintenance parameter reminder information according to the associated temporal topological relationship, wherein the maintenance parameter reminder information is used to remind the operation and maintenance personnel to perform maintenance inspection on non-current parameters associated with the current maintenance parameters.
12. An electronic device, characterized in that: include: one or more processors; a storage device for storing one or more programs, When the one or more programs are executed by the one or more processors, the one or more processors execute the method according to any one of claims 1 to 10.
13. A computer-readable storage medium having executable instructions stored thereon, characterized in that: When the instruction is executed by a processor, the processor executes the method according to any one of claims 1 to 10.
14. A computer program product comprising a computer program, characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 10 is implemented.
Citation Information
Patent Citations
Banking business parameter maintenance method and device
CN115563079A
Method and system for instantiating a logical network slice for use with an operator-maintained network portion
EP3306987A1
Spime™ host system, process, object, self-determination apparatus, and host device
US20170139788A1
System for processing data using parameters associated with the data for auto-processing
US20170228703A1
Device maintenance apparatus, device maintenance method, and storage medium
US20170308344A1
