Intelligent early warning method, system and equipment for chemical water system and medium

By acquiring and processing the stable operation data of the water chemical system and using the GMM algorithm to establish a parameter model, the technical difficulties of intelligent early warning of water chemical system are solved, and more accurate status monitoring and early warning are achieved, avoiding accidents.

CN119068650APending Publication Date: 2024-12-03浙江浙能绍兴滨海热电有限责任公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411086494.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Existing technologies have not yet provided an effective intelligent early warning method to monitor and prevent abnormal states of chemical water systems, resulting in accidents.

Method used

By obtaining the stable operation data of the water chemical system, dividing the data under different working conditions, using the GMM algorithm to establish a parameter model, determine the health of the system and issue an intelligent early warning signal. The method includes data preprocessing, dimensionality reduction processing and the use of Gaussian hybrid models to reflect the different working conditions of the system.

Benefits of technology

It has achieved a more comprehensive and accurate monitoring of the operating status of the water chemical system, issued early warnings to avoid accidents, and improved the initiative and preventiveness of handling risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119068650A_ABST
    Figure CN119068650A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of intelligent early warning, and discloses an intelligent early warning method, system and device for a chemical water system and a medium. The intelligent early warning method for the chemical water system comprises the following steps: acquiring stable operation data when the chemical water system is in a stable operation state; dividing the stable operation data to obtain stable operation data corresponding to different working conditions of the chemical water system; establishing a parameter model of stable operation data corresponding to all working conditions of the chemical water system by using a GMM algorithm; wherein the parameter model comprises a plurality of Gaussian functions, one Gaussian function corresponds to one working condition, and the mean value of each Gaussian function is used for representing the characteristics of stable operation data of the chemical water system under the corresponding working condition; the health degree of the chemical water system is determined through the characteristics of the stable operation data of the chemical water system under all working conditions, and whether the intelligent early warning signal of the chemical water system is sent out or not is determined according to the health degree of the chemical water system, so that the intelligent early warning effect of the chemical water system is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent early warning technology, and in particular to an intelligent early warning method, system, equipment and medium for a chemical water system. Background Art

[0002] The intelligent early warning system is designed to dynamically monitor the operating status of the chemical water system and issue early warnings when an abnormality occurs but has not yet deteriorated into a serious fault, leaving operators with enough time to deal with the abnormality and avoid accidents. The risk handling model has changed from traditional passive response to active avoidance, advance planning and preparation, and effective avoidance.

[0003] However, the composition and structure of the chemical water system is relatively complex, and there is currently no method that can effectively provide intelligent early warning for the chemical water system. Summary of the invention

[0004] The purpose of the present invention is to provide an intelligent early warning method, system, equipment and medium for a chemical water system, which can realize the intelligent early warning of the chemical water system.

[0005] In order to solve the above technical problems, an embodiment of the present invention provides an intelligent early warning method for a water treatment system, comprising the following steps:

[0006] Obtain stable operation data when the chemical water system is in a stable operation state;

[0007] Divide the stable operation data to obtain the stable operation data corresponding to different working conditions of the chemical water system;

[0008] A parameter model of stable operation data corresponding to all working conditions of the chemical water system is established by using the GMM algorithm; wherein the parameter model includes a plurality of Gaussian functions, one Gaussian function corresponds to one working condition, and the mean value of each Gaussian function is used to characterize the characteristics of the stable operation data of the chemical water system under the corresponding working condition;

[0009] The health of the chemical water system is determined through the characteristics of the stable operation data of the chemical water system under all working conditions, and based on the health of the chemical water system, it is determined whether to issue an intelligent early warning signal for the chemical water system.

[0010] In some optional embodiments, before obtaining the stable operation data of the water treatment system when it is in a stable operation state, the method further includes:

[0011] Obtain the pressure value of the chemical water system at each moment within a preset time period;

[0012] When the variance of all pressure values ​​is less than or equal to a preset threshold, it is determined that the chemical water system is in a stable operating state.

[0013] In some optional embodiments, the method of using the GMM algorithm to establish a parameter model of stable operation data corresponding to all operating conditions of the chemical water system includes:

[0014] The principal component analysis method is used to reduce the dimension of the stable operation data corresponding to different working conditions of the chemical water system;

[0015] The GMM algorithm is used to establish a parameter model of the stable operating data corresponding to different operating conditions of the chemical water system after dimensionality reduction.

[0016] In some optional embodiments, before using the GMM algorithm to establish a parameter model of stable operation data corresponding to all working conditions of the chemical water system, the method further includes:

[0017] Data preprocessing operations are performed on the stable operation data corresponding to different operating conditions of the chemical water system, and the data preprocessing operations include: eliminating missing values ​​and noise data in the stable operation data corresponding to different operating conditions of the chemical water system, or performing standard processing on the stable operation data corresponding to different operating conditions of the chemical water system to standardize all data to the same interval.

[0018] In some optional embodiments, determining the health of the chemical water system by characteristics of stable operation data of the chemical water system under corresponding working conditions includes:

[0019] The joint probability density of stable operation data corresponding to different operating conditions of the chemical water system is obtained through the GMM probability density function of the parameter model, and the joint probability density is used to indicate the health of the chemical water system.

[0020] In some optional embodiments, the operating conditions of the water treatment system include at least the following:

[0021] Automatic start and stop of each subsystem in the chemical water system, normal operation of the chemical water system, failure of important equipment in the chemical water system, and abnormal operating parameters of the chemical water system.

[0022] In some optional embodiments, the intelligent early warning signal includes: an intelligent early warning signal of the water chemical system, an intelligent early warning signal of each water chemical equipment in the water chemical system, and an intelligent early warning signal of operation data.

[0023] The embodiment of the present invention further provides an intelligent early warning system for a water treatment system, comprising:

[0024] A data acquisition module, used to acquire stable operation data of the chemical water system when it is in a stable operation state;

[0025] A data division module is used to divide the stable operation data to obtain the stable operation data corresponding to different working conditions of the chemical water system;

[0026] A model building module, used to establish a parameter model of stable operation data corresponding to all working conditions of the chemical water system using a GMM algorithm; wherein the parameter model includes a plurality of Gaussian functions, one Gaussian function corresponds to one working condition, and the mean value of each Gaussian function is used to characterize the characteristics of the stable operation data of the chemical water system under the corresponding working condition;

[0027] The intelligent early warning module is used to determine the health of the chemical water system through the characteristics of the stable operation data of the chemical water system under all working conditions, and determine whether to issue an intelligent early warning signal of the chemical water system based on the health of the chemical water system.

[0028] An embodiment of the present invention also provides a computer device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the above-mentioned intelligent early warning method for the chemical water system.

[0029] An embodiment of the present invention further provides a computer-readable storage medium storing a computer program, wherein the computer program, when executed by a processor, implements the intelligent early warning method for the chemical water system.

[0030] The intelligent early warning method for the water treatment system provided by the present invention has at least the following beneficial effects:

[0031] The stable operation data of the chemical water system when it is in a stable operation state is obtained, and the stable operation data is divided to obtain the stable operation data corresponding to different working conditions of the chemical water system, so as to establish a parameter model of the stable operation data corresponding to all working conditions of the chemical water system by using the GMM algorithm. The parameter model includes multiple Gaussian functions, one Gaussian function corresponds to one working condition, and the mean of each Gaussian function is used to characterize the characteristics of the stable operation data of the chemical water system under the corresponding working condition. Based on the stable operation data that can reflect the actual operation of the system and taking into account the different working conditions of the system, the obtained data characteristics (i.e., the characteristics of the stable operation data of the chemical water system under all working conditions) can more comprehensively and accurately reflect the operating state of the chemical water system, so as to determine the health of the chemical water system, and determine whether to issue an intelligent early warning signal of the chemical water system according to the health of the chemical water system, so that the effect of intelligent early warning is better. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] One or more embodiments are exemplarily described by the pictures in the corresponding drawings, and these exemplary descriptions do not constitute limitations on the embodiments.

[0033] Figure 1 is a flow chart of an intelligent early warning method for a chemical water system provided according to an embodiment of the present invention;

[0034] Figure 2 is a schematic diagram of three modes of intelligent early warning provided according to an embodiment of the present invention;

[0035] Figure 3 is a schematic diagram of an intelligent early warning system for a chemical water system provided according to an embodiment of the present invention;

[0036] Figure 4 It is a structural schematic diagram of a computer device provided according to an embodiment of the present invention. DETAILED DESCRIPTION

[0037] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. However, it will be appreciated by those skilled in the art that in the embodiments of the present invention, many technical details are proposed in order to enable the reader to better understand the present invention. However, even without these technical details and various changes and modifications based on the following embodiments, the technical scheme claimed in the present invention can be implemented. The division of the following embodiments is for the convenience of description and should not constitute any limitation on the specific implementation of the present invention. The various embodiments can be combined and referenced with each other without contradiction.

[0038] An embodiment of the present invention relates to an intelligent early warning method for a chemical water system. The implementation details of the intelligent early warning method for a chemical water system of this embodiment are specifically described below. The following content is only the implementation details provided for easy understanding and is not necessary for implementing this solution.

[0039] The specific process of the intelligent early warning method for the water treatment system of this embodiment can be as follows: Figure 1 As shown, including:

[0040] Step 101, obtaining stable operation data of the chemical water system when it is in a stable operation state.

[0041] Specifically, if you want to select parameters that can reflect the actual operation of the chemical water system, you must first ensure that the system is in a stable operating state within a certain range. Therefore, you first need to obtain data when the chemical water system is in a relatively stable state, that is, obtain stable operating data when the chemical water system is in a stable operating state.

[0042] In the specific implementation, it is first necessary to determine whether the chemical water system is currently in a stable operating state, and pressure is the most sensitive measurement point, so the pressure value of the chemical water system at each moment in the preset time period is obtained, and then according to the pressure value of the chemical water system at each moment in the preset time period, it is determined whether the chemical water system is currently in a stable operating state. Specifically, when the variance of all pressure values ​​is less than or equal to the preset threshold, it is determined that the chemical water system is in a stable operating state, and the judgment formula is as follows:

[0043]

[0044] In the formula, Indicates the pressure value within the preset time period, MPa; It represents the average value of the pressure value in the preset time period, MPa; δ represents the preset threshold value.

[0045] Step 102, dividing the stable operation data to obtain stable operation data corresponding to different operating conditions of the chemical water system.

[0046] Specifically, the K-means algorithm is used to cluster the above stable operation data according to the actual analysis situation to obtain stable operation data corresponding to different working conditions. Among them, the working conditions of the chemical water system include at least the following: automatic start and stop of each subsystem in the chemical water system, normal operation of the chemical water system, failure of important equipment in the chemical water system, and abnormal operation parameters of the chemical water system.

[0047] Step 103, using the GMM algorithm to establish a parameter model of stable operating data corresponding to all operating conditions of the chemical water system; wherein the parameter model includes multiple Gaussian functions, one Gaussian function corresponds to one operating condition, and the mean of each Gaussian function is used to characterize the characteristics of the stable operating data of the chemical water system under the corresponding operating condition.

[0048] Specifically, Gaussian Mixture Model (GMM) is a multivariate distribution function, which combines multiple Gaussian functions in the form of assigning weights to each component. Its advantage is that it can simulate data distribution of any shape. Gaussian mixture model can be used to classify data sets to determine whether the system is in a normal state. At the same time, GMM is a mathematical representation of the essence of raw data, and fault warning can be performed. Therefore, in this embodiment, the GMM algorithm is used to establish a parameter model of stable operating data corresponding to all operating conditions of the chemical water system. Each Gaussian function in the parameter model corresponds to a certain operating condition. The mean of each Gaussian function is called a multidimensional data feature point, which is the main research object and is the core feature of this operating condition. The migration of multidimensional data feature points can be regarded as the degradation of the health state of the chemical water system.

[0049] In one example, first, the principal component analysis method is used to reduce the dimension of the stable operation data corresponding to different working conditions of the water treatment system, and then the GMM algorithm is used to establish a parameter model of the stable operation data corresponding to different working conditions of the water treatment system after dimension reduction.

[0050] Among them, for a specific water treatment system, there are n variables such as X1, X2, …, Xn for description. Through principal component analysis, m new parameters Y1, Y2, …, Ym (m < n) can be obtained. Yi is a linear combination of X1, X2, …, Xn, and Yi = a1iX1 + a2iX2 + … + aniXn is the i-th principal component of the original variables. Through principal component processing, the original n variables are changed to m variables, achieving the purpose of dimension reduction.

[0051] In principal component analysis, Y1, Y2, …, Ym are uncorrelated with each other, and at the same time, the variances of Y1, Y2 to Ym gradually decrease, indicating that the original information contained is less and less. Generally, it is required that the cumulative variance contribution rate of all principal components after screening should reach more than 80%.

[0052] Let it be n groups of sample historical data, and each group of sample data has m characteristic variables, forming a sample matrix X:

[0053]

[0054] The steps for performing principal component analysis on the sample matrix X are as follows:

[0055] (1) Standardize the original data

[0056] (2) Calculate the correlation coefficient matrix of the data samples

[0057]

[0058] (3) Use the Jacobi method to solve the characteristic equation of the correlation coefficient matrix R to obtain m eigenvalues. The larger the variance value of the main component, the greater its contribution to the total variance.

[0059] (4) When selecting p principal components in descending order of variance and accounting for more than 80% of the total variance, they are the principal components required by the system.

[0060] Step 104: Determine the health status of the water treatment system based on the characteristics of the stable operation data of the water treatment system under all working conditions, and determine whether to issue an intelligent warning signal for the water treatment system according to the health status of the water treatment system.

[0061] Specifically, through the GMM probability density function of the parameter model, the joint probability density of the stable operation data corresponding to different working conditions of the water treatment system is obtained, and the joint probability density is used to indicate the health status of the water treatment system.

[0062] In the specific implementation, the probability density expression of a Gaussian component of GMM is:

[0063]

[0064] In the formula, x represents the D-dimensional input variable of GMM; μ represents the D-dimensional mean of GMM; Σ represents the D*D-dimensional covariance matrix of GMM.

[0065] The GMM probability density function expression is:

[0066]

[0067] Where K represents the number of Gaussian components in GMM, and 0≤πk≤1

[0068] When the joint probability density of the system's real-time measurement point data is less than the expected value and the corresponding health level is less than the set limit, an intelligent warning signal is given.

[0069] Among them, the intelligent early warning signal includes: the intelligent early warning signal of the chemical water system, the intelligent early warning signal of each chemical water device in the chemical water system, and the intelligent early warning signal of the operation data. That is to say, the intelligent early warning method of the chemical water system of this embodiment can realize the intelligent early warning method of the chemical water system, the intelligent early warning of each chemical water device in the chemical water system, the intelligent early warning of each chemical water device in the chemical water system, and the intelligent early warning of the operation data of the chemical water system.

[0070] In this embodiment, stable operation data of the chemical water system when it is in a stable operation state is obtained, and the stable operation data is divided to obtain stable operation data corresponding to different working conditions of the chemical water system, so as to establish a parameter model of stable operation data corresponding to all working conditions of the chemical water system by using the GMM algorithm, and the parameter model includes multiple Gaussian functions, one Gaussian function corresponds to one working condition, and the mean of each Gaussian function is used to characterize the characteristics of the stable operation data of the chemical water system under the corresponding working condition. Based on the stable operation data that can reflect the actual operation of the system and taking into account the different working conditions of the system, the obtained data characteristics (i.e., the characteristics of the stable operation data of the chemical water system under all working conditions) can more comprehensively and accurately reflect the operating state of the chemical water system, so as to determine the health of the chemical water system, and determine whether to issue an intelligent early warning signal for the chemical water system according to the health of the chemical water system, so that the effect of intelligent early warning is better.

[0071] In some embodiments, before using the GMM algorithm to establish a parameter model of stable operation data corresponding to all working conditions of the chemical water system, a data preprocessing operation is first performed on the stable operation data corresponding to different working conditions of the chemical water system. The data preprocessing operation includes: eliminating vacancy values ​​and noise data in the stable operation data corresponding to different working conditions of the chemical water system, or performing standard processing on the stable operation data corresponding to different working conditions of the chemical water system to standardize all data to the same interval.

[0072] Specifically, in order to obtain higher quality data, data cleaning is required after obtaining steady-state data under specific working conditions. The purpose of data cleaning is to remove or repair noisy, inconsistent, and incomplete data. The main problems solved by data cleaning are to deal with missing values ​​and remove noise in the data.

[0073] (1) Processing of missing values

[0074] The main methods are deletion and filling. When the sample size is relatively small (<5%), you can consider deleting the data that accounts for a relatively small proportion of all the data. On the contrary, in order to avoid data waste, the missing values ​​are processed by filling methods. At present, the commonly used methods for filling missing values ​​are mean or median filling methods and manual filling methods. In addition, regression methods can also be used to obtain the most likely filling value to fill the missing values. Avoid weakening the integrity of the data and wasting data information.

[0075] (2) Processing of Noise Data

[0076] Due to the existence of measurement errors, noise will appear in the data record. When the noise deviates too much from the actual value, it is called an outlier. The technology for processing noise is often called smoothing technology. At present, there are three main methods for processing noise: regression. Linear regression and multi-linear regression analysis in regression methods can remove noise data in the data; clustering. The data can be divided into multiple clusters by clustering to find and remove noise in the data, and outliers can also be processed by clustering. In view of the large amount of operating parameter data and the highly nonlinear coupling between each other, the K-means algorithm is used to cluster the data composed of each operating parameter. If the proportion of outliers is greater than a certain threshold, it is considered that a minority is an outlier. The clustering results are displayed through a scatter plot, and the outliers are deleted.

[0077] In actual operation of equipment or system, a large amount of operation data of various dimensions will be stored. Therefore, the acquired data (i.e., stable operation data corresponding to different working conditions of chemical water system) must be normalized so that it can be used by mining algorithm, making the mining process more effective and the mining pattern easier to understand. Minimum-maximum normalization performs linear transformation on the original data and can maintain the connection between the original data. This method is selected to process the above operation data and normalize it to [a, b]. The specific algorithm formula is as follows:

[0078]

[0079] In the formula, v i represents the data before standardization, max(v i ) represents the maximum value of the data before standardization, min(v i ) represents the minimum value of the data before standardization, v' i Represents the normalized data.

[0080] In this embodiment, after all data are standardized to the same interval by the minimum-maximum normalization method, errors caused by different dimensions in the data can be effectively avoided.

[0081] In some embodiments, the intelligent early warning method for the chemical water system of the present invention adopts a three-level early warning mode, including "system" → "equipment" → "measurement point", where the "system" is divided according to the division principle of the functional groups it undertakes in the system, such as Figure 2 shown.

[0082] When equipment anomalies, control adjustment anomalies, etc. occur, process parameters will change accordingly and deviate from normal operating values. Intelligent early warning of the process system is to warn of abnormal changes in process parameters caused by the above anomalies, which helps operators to deal with anomalies as soon as possible. Specifically, intelligent early warning is implemented for the following process systems, as shown in Table 1:

[0083] Table 1

[0084]

[0085]

[0086] When an abnormality or failure occurs in the equipment, the equipment parameters (such as frequency, temperature, current, etc.) will deviate from the normal state. The intelligent early warning system of the equipment can issue an early warning within a short period of time after the equipment is abnormal or fails, avoiding abnormal shutdown and reducing equipment maintenance costs. The early warning function is implemented for the following equipment, as shown in Table 2:

[0087] Table 2

[0088]

[0089]

[0090] The measurement point health assessment module is mainly based on data mining and analysis, intelligent algorithms, online modeling and other technologies. The system software uses the equipment operation data of a certain historical period of the chemical water system as the data source for big data analysis and mining, and gives the normal operating parameter range of the equipment under different load conditions. Based on this, the dynamic alarm threshold of the operating parameter is set, and the corresponding limit-crossing consequences are prompted. The specific measurement point list is shown in Table 3:

[0091]

[0092]

[0093]

[0094]

[0095]

[0096]

[0097]

[0098]

[0099]

[0100]

[0101]

[0102]

[0103]

[0104]

[0105]

[0106]

[0107]

[0108]

[0109]

[0110]

[0111] The step division of the various methods above is only for clear description. When implemented, they can be combined into one step or some steps can be split and decomposed into multiple steps. As long as they include the same logical relationship, they are all within the protection scope of the present invention. Adding insignificant modifications or introducing insignificant designs to the algorithm or process without changing the core design of the algorithm and process are all within the protection scope of the invention.

[0112] Another embodiment of the present invention relates to an intelligent early warning system for a water treatment system. The implementation details of the intelligent early warning system for a water treatment system of this embodiment are described in detail below. The following content is only provided for the convenience of understanding the implementation details and is not necessary for implementing this solution. The schematic diagram of the intelligent early warning system for a water treatment system of this embodiment can be as follows: Figure 3 As shown, it includes: a data acquisition module 301, a data division module 302, a model building module 303 and an intelligent early warning module 304.

[0113] Specifically, the data acquisition module 301 is used to acquire stable operation data when the chemical water system is in a stable operation state.

[0114] The data division module 302 is used to divide the stable operation data to obtain the stable operation data corresponding to different operating conditions of the chemical water system.

[0115] The model building module 303 is used to use the GMM algorithm to establish a parameter model of stable operating data corresponding to all operating conditions of the chemical water system; wherein the parameter model includes multiple Gaussian functions, one Gaussian function corresponds to one operating condition, and the mean of each Gaussian function is used to characterize the characteristics of the stable operating data of the chemical water system under the corresponding operating condition.

[0116] The intelligent warning module 304 is used to determine the health of the chemical water system through the characteristics of the stable operation data of the chemical water system under all working conditions, and determine whether to issue an intelligent warning signal of the chemical water system based on the health of the chemical water system.

[0117] It is not difficult to find that this embodiment is a system embodiment corresponding to the above method embodiment, and this embodiment can be implemented in conjunction with the above method embodiment. The relevant technical details and technical effects mentioned in the above embodiment are still valid in this embodiment, and in order to reduce repetition, they are not repeated here. Accordingly, the relevant technical details mentioned in this embodiment can also be applied in the above embodiment.

[0118] It is worth mentioning that all modules involved in this embodiment are logic modules. In practical applications, a logic unit can be a physical unit, a part of a physical unit, or a combination of multiple physical units. In addition, in order to highlight the innovative part of the present invention, this embodiment does not introduce units that are not closely related to solving the technical problem proposed by the present invention, but this does not mean that there are no other units in this embodiment.

[0119] Another embodiment of the present invention relates to a computer device, such as Figure 4 As shown, it includes: at least one processor 401; and a memory 402 that is communicatively connected to the at least one processor 401; wherein the memory 402 stores instructions that can be executed by the at least one processor 401, and the instructions are executed by the at least one processor 401 so that the at least one processor 401 can execute the above-mentioned embodiments.

[0120] Among them, the memory and the processor are connected in a bus manner, and the bus may include any number of interconnected buses and bridges, and the bus connects various circuits of one or more processors and memories together. The bus can also connect various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. The bus interface provides an interface between the bus and the transceiver. The transceiver can be one element or multiple elements, such as multiple receivers and transmitters, providing a unit for communicating with various other devices on a transmission medium. The data processed by the processor is transmitted on a wireless medium via an antenna, and further, the antenna also receives data and transmits the data to the processor.

[0121] The processor is responsible for managing the bus and general processing, and can also provide various functions, including timing, peripheral interfaces, voltage regulation, power management, and other control functions. Memory can be used to store data used by the processor when performing operations.

[0122] Another embodiment of the present invention relates to a computer-readable storage medium storing a computer program, which implements the above method embodiment when executed by a processor.

[0123] That is, those skilled in the art can understand that all or part of the steps in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a program, and the program is stored in a storage medium, including a number of instructions for a device (which can be a single-chip microcomputer, chip, etc.) or a processor (processor) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, referred to as: ROM), random access memory (Random Access Memory, referred to as: RAM), disk or optical disk and other media that can store program codes.

[0124] Those skilled in the art will appreciate that the above embodiments are specific embodiments for implementing the present invention, and in actual applications, various changes may be made thereto in form and detail without departing from the spirit and scope of the present invention.

Claims

1. An intelligent early warning method for a water treatment system, characterized in that: The method comprises: Obtain stable operation data when the chemical water system is in a stable operation state; Divide the stable operation data to obtain the stable operation data corresponding to different working conditions of the chemical water system; A parameter model of stable operation data corresponding to all working conditions of the chemical water system is established by using the GMM algorithm; wherein the parameter model includes a plurality of Gaussian functions, one Gaussian function corresponds to one working condition, and the mean value of each Gaussian function is used to characterize the characteristics of the stable operation data of the chemical water system under the corresponding working condition; The health of the chemical water system is determined through the characteristics of the stable operation data of the chemical water system under all working conditions, and based on the health of the chemical water system, it is determined whether to issue an intelligent early warning signal for the chemical water system.

2. The intelligent early warning method for chemical water system according to claim 1 is characterized in that: Before obtaining the stable operation data of the water treatment system when it is in a stable operation state, the method further includes: Obtain the pressure value of the chemical water system at each moment within a preset time period; When the variance of all pressure values ​​is less than or equal to a preset threshold, it is determined that the chemical water system is in a stable operating state.

3. The intelligent early warning method for chemical water system according to claim 1 is characterized in that: The method of using the GMM algorithm to establish a parameter model of stable operation data corresponding to all working conditions of the chemical water system includes: The principal component analysis method is used to reduce the dimension of the stable operation data corresponding to different working conditions of the chemical water system; The GMM algorithm is used to establish a parameter model of the stable operating data corresponding to different operating conditions of the chemical water system after dimensionality reduction.

4. The closed-loop control method of plasma surface parameters according to claim 3, characterized in that: Before the GMM algorithm is used to establish a parameter model of stable operation data corresponding to all working conditions of the chemical water system, the method further includes: Data preprocessing operations are performed on the stable operation data corresponding to different operating conditions of the chemical water system, and the data preprocessing operations include: eliminating missing values ​​and noise data in the stable operation data corresponding to different operating conditions of the chemical water system, or performing standard processing on the stable operation data corresponding to different operating conditions of the chemical water system to standardize all data to the same interval.

5. The intelligent early warning method for chemical water system according to claim 1 is characterized in that: The health of the chemical water system is determined by the characteristics of the stable operation data of the chemical water system under the corresponding working conditions, including: The joint probability density of stable operation data corresponding to different operating conditions of the chemical water system is obtained through the GMM probability density function of the parameter model, and the joint probability density is used to indicate the health of the chemical water system.

6. The intelligent early warning method for a chemical water system according to any one of claims 1 to 5, characterized in that: The working conditions of the water treatment system include at least the following: Automatic start and stop of each subsystem in the chemical water system, normal operation of the chemical water system, failure of important equipment in the chemical water system, and abnormal operating parameters of the chemical water system.

7. The intelligent early warning method for chemical water system according to claim 1 is characterized in that: The intelligent early warning signal includes: an intelligent early warning signal of the water treatment system, an intelligent early warning signal of each water treatment equipment in the water treatment system, and an intelligent early warning signal of operation data.

8. An intelligent early warning system for a water treatment system, characterized in that: The intelligent early warning system comprises: A data acquisition module, used to acquire stable operation data of the chemical water system when it is in a stable operation state; A data division module is used to divide the stable operation data to obtain the stable operation data corresponding to different working conditions of the chemical water system; A model building module, used to establish a parameter model of stable operation data corresponding to all working conditions of the chemical water system using a GMM algorithm; wherein the parameter model includes a plurality of Gaussian functions, one Gaussian function corresponds to one working condition, and the mean value of each Gaussian function is used to characterize the characteristics of the stable operation data of the chemical water system under the corresponding working condition; The intelligent early warning module is used to determine the health of the chemical water system through the characteristics of the stable operation data of the chemical water system under all working conditions, and determine whether to issue an intelligent early warning signal of the chemical water system based on the health of the chemical water system.

9. A computer device, characterized in that: include: at least one processor; And, a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the intelligent early warning method for the chemical water system as described in any one of claims 1 to 6.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the intelligent early warning method for the chemical water system according to any one of claims 1 to 6 is implemented.