Maintenance cost estimation device and maintenance cost estimation method

By simulating the failure occurrence and prevention probability of equipment components, a fault estimation model is generated, which solves the problem that equipment maintenance costs cannot be estimated with high accuracy in the prior art, and achieves more accurate maintenance costs and downtime predictions.

CN119072706APending Publication Date: 2024-12-03MITSUBISHI ELECTRIC CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202280095227.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2022-04-29
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The prior art cannot estimate the maintenance cost of equipment with high accuracy, and fails to consider the effect of inspection operations on failure prevention.

Method used

Through simulation, estimate the probability of failure occurrence and failure prevention probability of equipment components, generate a fault estimation model, and use the maintenance effect comprehensive department to integrate the failure prevention probability into the fault tree, and perform fault simulation to calculate maintenance costs and downtime.

Benefits of technology

It realizes a high-precision estimation of equipment maintenance costs, takes into account the effect of inspection operations on failure prevention, and provides a more realistic simulation of equipment maintenance process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119072706A_ABST
    Figure CN119072706A_ABST
Patent Text Reader

Abstract

A maintenance cost estimation device (100) is provided with a maintenance effect integration unit (140) that estimates, by simulation, whether or not a failure has occurred in a component provided in a facility. A maintenance effect integration unit (140) generates a failure estimation model using a failure prevention probability and a degradation model indicating a failure occurrence probability, which is the probability of a failure of a component at a target time point estimated from the elapsed time from the implementation of a repair work on the component. The failure prevention probability is a probability estimated to be able to prevent a failure of the component by spot inspection work on the component, and the failure estimation model is a model used when estimating whether the component has failed at a target time point by simulation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to a maintenance cost estimation device and a maintenance cost estimation method. Background Art

[0002] There is a technology for making a maintenance plan for equipment in a factory using simulation.

[0003] Prior art literature

[0004] Patent Literature

[0005] Patent Document 1: Japanese Patent Application Laid-Open No. 9-234652 Summary of the invention

[0006] Problem that the invention aims to solve

[0007] According to the technology disclosed in Patent Document 1, the reliability scale and cost of the entire equipment are calculated using a plurality of maintenance plans prepared in advance, and the optimal maintenance plan is selected based on the balance between the calculated scale and cost.

[0008] However, in actual equipment, regular inspections are usually performed. Sometimes, during the inspections, signs of failure of the equipment constituting the equipment are discovered, and the failure of the equipment can be prevented by replacing parts or performing maintenance. Moreover, the cost and downtime are different when the failure of the equipment can be prevented by the inspection and when the failure of the equipment cannot be prevented but an unexpected failure is handled.

[0009] Therefore, in order to estimate the maintenance cost of the equipment with relatively high accuracy, it is necessary to consider not only the maintenance plan prepared in advance, but also the effect of preventing failures by inspection work. However, according to the technology disclosed in Patent Document 1, it is impossible to consider the effect of inspection work to determine the equipment maintenance plan used when estimating the maintenance cost. Therefore, there is a problem that the maintenance cost of the equipment cannot be estimated with high accuracy in this technology.

[0010] The purpose of the present disclosure is to estimate the maintenance cost of equipment with relatively high accuracy.

[0011] Means used to solve problems

[0012] The maintenance cost estimation device disclosed in the present invention estimates whether a component of a device has failed through simulation, wherein the maintenance cost estimation device has a maintenance effect synthesis unit, which uses a degradation model showing the probability of failure and a failure prevention probability to generate a failure estimation model, wherein the failure occurrence probability is the probability of the component failing at an object time point estimated based on the elapsed time from the implementation of a repair operation on the component, and the failure prevention probability is the probability estimated to be able to prevent the failure of the component through an inspection operation on the component, and the failure estimation model is a model used when estimating whether the component has failed at the object time point through the simulation.

[0013] Effects of the Invention

[0014] According to the present disclosure, the maintenance effect synthesis unit uses the failure prevention probability when generating the failure estimation model, and the failure prevention probability is the probability that the failure of the component can be prevented by the inspection work. In addition, the failure estimation model is used when estimating whether the component fails through simulation. Therefore, by using the present disclosure, the maintenance cost of the equipment can be estimated with relatively high accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 1 is a diagram showing a configuration example of the maintenance cost estimation device 100 according to the first embodiment.

[0016] Figure 2 This is a diagram showing a hardware configuration example of the maintenance cost estimation device 100 according to the first embodiment.

[0017] Figure 3 This is a flowchart showing the operation of the maintenance cost estimation device 100 according to the first embodiment.

[0018] Figure 4 This is a diagram for explaining the processing of the fault tree construction unit 120 according to the first embodiment.

[0019] Figure 5 This is a diagram for explaining the processing of the fault tree construction unit 120 according to the first embodiment.

[0020] Figure 6 This is a diagram for explaining the processing of the failure simulation unit 150 according to the first embodiment.

[0021] Figure 7 This is a diagram for explaining the processing of the maintenance cost estimation unit 160 according to the first embodiment.

[0022] Figure 8 This is a diagram for explaining an example of using the simulation results of the first embodiment.

[0023] Fig. 91 is a diagram showing a hardware configuration example of a maintenance cost estimation device 100 according to a modification of the first embodiment. DETAILED DESCRIPTION

[0024] In the description of the embodiments and the accompanying drawings, the same reference numerals are used to identify the same elements and corresponding elements. The description of the elements identified with the same reference numerals is appropriately omitted or simplified. The arrows in the figures mainly show the flow of data or the process. In addition, the word "unit" may be appropriately rewritten as "circuit", "process", "procedure", "processing" or "circuit".

[0025] Implementation method 1.

[0026] Hereinafter, this embodiment will be described in detail with reference to the drawings.

[0027] ***Structure description***

[0028] Figure 1 The following is a structural example of the maintenance cost estimation device 100 of the present embodiment. The maintenance cost estimation device 100 estimates whether a component of a device has failed by simulation. As shown in the figure, the maintenance cost estimation device 100 includes an input unit 110, a fault tree construction unit 120, a maintenance effect calculation unit 130, a maintenance effect synthesis unit 140, a fault simulation unit 150, a maintenance cost estimation unit 160, and an output display unit 170. In addition, the maintenance cost estimation device 100 maintains a degradation model DB (Database) 191, a remote monitoring DB 192, a maintenance information DB 193, and a maintenance effect DB 194. In addition, each DB may also be stored in an external storage device. In addition, the maintenance cost estimation device 100 may not include the maintenance effect DB 194.

[0029] The input unit 110 has a function of accepting information indicating the structure of the equipment to be estimated for the maintenance cost and the conditions of the simulation performed by the fault simulation unit 150. The structure of the equipment is specified by the model of the components constituting the equipment. The conditions of the simulation are the simulation period, the number of samples, the time scale width, etc. The information accepted by the input unit 110 is input by the user.

[0030] The fault tree construction unit 120 has the following functions: extracting the degradation model corresponding to each component indicated by the information representing the input device structure from the degradation model DB191, and constructing a fault tree using each extracted degradation model. The degradation model DB191 records information representing the degradation model corresponding to each component. The degradation model of a certain component represents the probability of failure of the certain component. The probability of failure of the certain component is a probability estimated based on the elapsed time since the repair work on the certain component was implemented, and is a model that represents the probability of failure of the certain component at each object time point. As a specific example, the degradation model is a model constructed based on a physical model and a failure history. In addition, the degradation model can also be constructed according to each failure mode of the component. That is, there can also be multiple degradation models corresponding to a certain component. As a specific example, the repair work for a certain component is the replacement of the certain component or the maintenance of the certain component. As a specific example, the maintenance of a certain component is the adjustment of the position of the certain component, the strengthening of the fastening of the certain component, or the replacement of the lubricating oil for the certain component.

[0031] The fault tree construction unit 120 may use other methods such as Gaussian network instead of the fault tree. Such other methods can calculate the failure probability of each component constituting a machine composed of multiple components and calculate the failure probability of the machine by appropriately integrating the calculated failure probabilities.

[0032] The maintenance effect calculation unit 130 has the following functions: extracting information related to the maintenance history of each component as the object of the inspection operation from the maintenance information DB 193, calculating the failure prevention probability based on the extracted information, and recording the information indicating the calculated failure prevention probability in the maintenance effect DB 194. Here, the maintenance information DB 193 records information related to the maintenance history of each component as the object of the inspection operation. As a specific example, the information related to the maintenance history is information indicating the implementation record of the inspection operation and whether there is a sign of failure. In addition, the maintenance information DB 193 records information indicating the cost and equipment stop time required for the operation and preventive maintenance operation when the failure occurs for each component. The maintenance effect DB 194 records information indicating the failure prevention probability corresponding to each component as the object of the inspection operation. The failure prevention probability is the probability estimated to be able to prevent the failure of each component through the inspection operation, and is the probability estimated to be able to find the sign of failure of each component through the inspection operation. In addition, the inspection operation for each component is to confirm the status of each component, etc., and is usually performed regularly. In addition, maintenance work is a general term for repair work and inspection work.

[0033] The maintenance effect calculation unit 130 can also calculate the failure prevention probability using the information stored in the remote monitoring DB 192 for the equipment or components whose status is monitored remotely. In this case, the operator can also find the failure signs of each component during the inspection work based on the results of remote monitoring. The remote monitoring DB 192 stores information indicating the failure signs detected by remote monitoring. In addition, the maintenance effect calculation unit 130 can also calculate the failure prevention probability using the design information of the component, and can also calculate the failure prevention probability based on the actual performance of preventing the failure of the component through the inspection work.

[0034] The maintenance effect synthesis unit 140 generates a fault estimation model using the degradation model and the fault prevention probability. The fault estimation model is a model used when estimating whether a component has failed at each target time point through simulation. The fault estimation model may also be a model corresponding to multiple components. The fault estimation model may also be a model for implementing fault tree analysis. As a specific example, the maintenance effect synthesis unit 140 has a function of integrating the fault prevention probability calculated by the maintenance effect calculation unit 130 into the fault tree constructed by the fault tree construction unit 120.

[0035] The failure simulation unit 150 simulates the future failure process of each component by considering the failure occurrence probability and failure prevention probability of each component. At this time, the failure simulation unit 150 performs simulation with the target period as the target. The simulation may also be based on stochastic simulation technology.

[0036] The maintenance cost estimation unit 160 calculates the estimated values ​​of the maintenance cost and downtime for each elapsed time using the results of the simulation performed by the fault simulation unit 150 and the information stored in the maintenance information DB 193. The maintenance cost estimation unit 160 is also referred to as a maintenance cost and downtime estimation unit. The maintenance cost estimation unit 160 can also estimate the maintenance cost of each component within the target period based on the results of the simulation performed by the fault simulation unit 150.

[0037] The output display unit 170 has a function of outputting the estimated maintenance cost and downtime to the user.

[0038] Figure 2 The following is a hardware configuration example of the maintenance cost estimation device 100 according to the present embodiment. The maintenance cost estimation device 100 is configured by a computer. The maintenance cost estimation device 100 may be configured by a plurality of computers.

[0039] As shown in the figure, the maintenance cost estimation device 100 is a computer including hardware such as a processor 11, a memory 12, an auxiliary storage device 13, an input interface (Interface) 14, and an output interface 15. These hardware are connected via a signal line 19 as appropriate.

[0040] The processor 11 is an IC (Integrated Circuit) that performs calculation processing and controls the hardware included in the computer. As a specific example, the processor 11 is a CPU (Central Processing Unit), a DSP (Digital Signal Processor), or a GPU (Graphics Processing Unit).

[0041] The maintenance cost estimation device 100 may include a plurality of processors instead of the processor 11. The plurality of processors share the role of the processor 11.

[0042] The memory 12 is typically a volatile storage device, and a specific example is a RAM (Random Access Memory). The memory 12 is also called a main storage device or a main memory. The data stored in the memory 12 is stored in the auxiliary storage device 13 as needed.

[0043] The auxiliary storage device 13 is typically a nonvolatile storage device, and specific examples thereof include ROM (Read Only Memory), HDD (Hard Disk Drive), or flash memory. Data stored in the auxiliary storage device 13 is loaded into the memory 12 as needed.

[0044] The memory 12 and the auxiliary storage device 13 may be integrally configured.

[0045] The input interface 14 is a port connected to the input device 21. As a specific example, the input interface 14 is a USB (Universal Serial Bus) terminal, a communication chip, or a NIC (Network Interface Card). As a specific example, the input device 21 is a keyboard and a mouse.

[0046] The output interface 15 is a port connected to the output device 22. The structure of the output interface 15 may be the same as that of the input interface 14. The input interface 14 and the output interface 15 may be integrally formed. As a specific example, the output device 22 is a display.

[0047] Each unit of the maintenance cost estimation device 100 uses the input interface 14 and the output interface 15 as appropriate when communicating with other devices or the like.

[0048] The auxiliary storage device 13 stores a maintenance cost estimation program. The maintenance cost estimation program is a program that causes a computer to implement the functions of each unit of the maintenance cost estimation device 100. The maintenance cost estimation program is loaded into the memory 12 and executed by the processor 11. The functions of each unit of the maintenance cost estimation device 100 are implemented by software.

[0049] The data used when executing the maintenance cost estimation program and the data obtained by executing the maintenance cost estimation program are appropriately stored in the storage device. Each part of the maintenance cost estimation device 100 appropriately uses the storage device. As a specific example, the storage device is composed of at least one of the memory 12, the auxiliary storage device 13, the register in the processor 11, and the cache memory in the processor 11. In addition, data and information may have the same meaning. The storage device may also be a device independent of the computer.

[0050] The functions of the memory 12 and the auxiliary storage device 13 may also be implemented by other storage devices.

[0051] The maintenance cost estimation program may also be recorded in a computer-readable nonvolatile recording medium. As a specific example, the nonvolatile recording medium is an optical disk or a flash memory. The maintenance cost estimation program may also be provided as a program product.

[0052] ***Action description***

[0053] The operation process of the maintenance cost estimation device 100 corresponds to the maintenance cost estimation method. In addition, the program that realizes the operation of the maintenance cost estimation device 100 corresponds to the maintenance cost estimation program.

[0054] Figure 3 2 is a flowchart showing an example of the operation of the maintenance cost estimation device 100. Figure 3 The operation of the maintenance cost estimation device 100 will be described.

[0055] (Step S101)

[0056] The user inputs information indicating the configuration of the target device, simulation conditions, etc. using the input device 21. The target device is a device for which the user wants to estimate future maintenance costs.

[0057] The input unit 110 receives information input by a user.

[0058] (Step S102)

[0059] The fault tree forming unit 120 forms a fault tree corresponding to the target device based on the information indicating the structure of the target device. Specifically, the fault tree forming unit 120 extracts the degradation model corresponding to each element of the fault tree from the degradation model DB 191, and assigns the extracted degradation model to each element of the fault tree. Each element of the fault tree corresponds to each component constituting the target device.

[0060] Figure 4 A specific example of the fault tree constructed in this step is shown. In this example, the door is composed of door component A, door component B, and door component C, and the fault tree is constructed using the degradation model corresponding to each component. As a specific example, the door is a door of an elevator. In addition, it is shown that the logical value corresponding to "whether there is a fault in door component A" is calculated based on the degradation model. In the degradation model, the relationship between the time t elapsed from the implementation of the repair work on door component A and the probability of failure of door component A is shown. As a specific example, the repair work on door component A is the replacement of door component A or the adjustment of door component A, etc.

[0061] (Step S103)

[0062] The maintenance effect calculation unit 130 extracts information representing the maintenance history of each component that is the object of the inspection operation among the components constituting the object equipment from the maintenance information DB193, and calculates the failure prevention probability corresponding to each component based on the extracted information as follows. Here, A represents the number of times the failure signs of a certain component are discovered through the inspection operation, and B represents the number of times the certain component fails before the next inspection operation. The number of times the certain component fails before the next inspection operation is the number of times the failure of the certain component cannot be prevented through the inspection operation. A is also the failure prevention performance of the certain component, and B is also the failure performance of the certain component. In addition, the maintenance effect calculation unit 130 can also calculate the failure prevention probability before executing step S101. At this time, the maintenance effect calculation unit 130 records the calculated failure prevention probability in the maintenance effect DB194.

[0063] Failure prevention probability C = A / (A+B)

[0064] Thereafter, the maintenance effect integration unit 140 integrates the failure prevention probability calculated by the maintenance effect calculation unit 130 into the fault tree constructed by the fault tree construction unit 120 .

[0065] Figure 5A specific example of this step is shown. In this example, the maintenance effect calculation unit 130 calculates the fault prevention probability based on the fault prevention performance and fault performance related to each component that is the object of the inspection operation. Here, as a specific example, the fault prevention performance and fault performance related to each component are information stored in the maintenance information DB 193, which is the total performance of components with the same model as each component, and is a performance that is counted regardless of whether each component is a component constituting the object equipment. In addition, in the case where the ease of discovering the signs of a fault of a certain component varies greatly depending on conditions such as the specifications of the certain component, the detailed model name of the certain component, or the time elapsed since the manufacture of the certain component, the performance of the certain component can also be classified and counted according to each condition. Here, performance is a general term for fault prevention performance and fault performance. When the performance of each component is classified, the maintenance effect calculation unit 130 may use only the performance of components of the same type as the target component and classified into the same or similar classification as the target component when calculating the failure prevention probability corresponding to the target component for which the failure prevention probability is calculated.

[0066] In addition, since information about a component that is not the object of the inspection operation is not stored in the maintenance information DB 193, the maintenance effect integration unit 140 does not integrate the failure prevention probability about the component into the fault tree. Therefore, in this example, the maintenance effect integration unit 140 does not integrate the failure prevention probability about the door component C into the fault tree.

[0067] Furthermore, the maintenance effect calculation unit 130 may calculate the failure prevention probability by using information stored in the remote monitoring DB 192 for equipment or components whose status is monitored remotely.

[0068] Furthermore, the maintenance effect calculation unit 130 may use insights from maintenance and design when calculating the failure prevention probability. As a specific example, the insights from maintenance on a certain component are the probability that a failure sign can be found for the certain component.

[0069] (Step S104)

[0070] The fault simulation unit 150 uses the information input by the user and the fault tree produced by the maintenance effect synthesis unit 140 to simulate the future fault occurrence process of the target equipment. In the simulation, the fault simulation unit 150 uses a method that can generate random numbers by considering probabilities such as the probability of fault occurrence and the probability of fault prevention. This method can be any method as long as it is a simulation method that can handle probabilistic events. As a specific example, it is the Monte Carlo method, the quasi-Monte Carlo method, the Markov chain Monte Carlo method, or the NUTS (No-U-Turn Sampler) method. The fault simulation unit 150 performs processing below the sampling number for each component located at the end of the fault tree. The sampling number is the number of sample paths. In addition, the fault simulation unit 150 causes the simulation results of the set simulation period to produce the set sampling number for each component. In the following, it is assumed that the fault simulation unit 150 takes the component located at the end of the fault tree, that is, the target component, as the object to illustrate a specific example of the processing of the fault simulation unit 150.

[0071] (Process 1)

[0072] The failure simulation unit 150 calculates the probability of failure of the target component within the elapsed time T by substituting the elapsed time T into the variable t in the degradation model corresponding to the target component. Here, the variable t represents the elapsed time since the repair work was performed on the target component. In addition, the elapsed time T corresponding to a certain component is the elapsed time since the repair work was performed on the certain component. In addition, when the repair work has not been performed on the certain component, as a specific example, the date and time when the equipment equipped with the certain component starts operating is used as the starting time point of the elapsed time T.

[0073] (Process 2)

[0074] The failure simulation unit 150 generates information indicating whether a failure has occurred or not for the target component, using the failure occurrence probability calculated in the process 1 as a part of the sample path of the target component.

[0075] (Process 3)

[0076] When the target component is the target of the inspection work and a failure occurs in the target component in process 2, the failure simulation unit 150 generates information indicating failure prevention success or failure using the failure prevention probability corresponding to the target component.

[0077] (Process 4)

[0078] The fault simulation unit 150 determines whether the state of the target component is "fault occurrence", "fault prevention by inspection work", or "no fault" based on the Boolean algebraic rule of the fault tree.

[0079] (Process 5)

[0080] When the state of the target component is "failure occurrence" or "failure prevention by inspection work", the failure simulation unit 150 resets the elapsed time T as if the target component has been replaced.

[0081] (Process 6)

[0082] The fault simulation unit 150 updates the elapsed time T to T+Ti. Here, Ti represents the simulation interval. The fault simulation unit 150 repeats process 1 to process 5 until the simulation elapsed time reaches the end time point of the set simulation period. The simulation elapsed time is the elapsed time in the simulation from the time point when the simulation started.

[0083] Figure 6 Using a specific example, the situation in which the fault simulation unit 150 generates a sample route is shown. In this example, in the fifth month of a certain sample route, although a fault occurs in door component A based on the degradation model, the fault is prevented by the inspection work. Therefore, the fault simulation unit 150 resets the elapsed time T corresponding to door component A. In addition, in the ninth month, although a fault occurs in door component A based on the degradation model, the fault is not prevented by the inspection work, so the door fails. Therefore, the fault simulation unit 150 resets the elapsed time T corresponding to door component A.

[0084] (Step S105)

[0085] The maintenance cost estimation unit 160 calculates the maintenance cost and downtime in each simulation elapsed time based on the simulation result performed by the failure simulation unit 150. In addition, the simulation result corresponds to the sample path.

[0086] Specifically, the maintenance cost estimation unit 160 counts the number of occurrences of each state of "fault occurrence", "fault prevention by inspection work" and "no fault" for each component within each simulation elapsed time, taking all sample paths as objects. As a specific example, the maintenance cost estimation unit 160 calculates the maintenance cost of the equipment in each year and the expected value of the downtime of the equipment by multiplying the statistical results by each cost pre-set in the maintenance information DB 193. As a specific example, each cost is a cost determined for each component or each fault content.

[0087] Figure 7This is a diagram that uses a specific example to illustrate the process of calculating the maintenance cost and downtime for a certain component within a certain simulated elapsed time. In this example, in the certain simulated elapsed time, in all sample paths for the certain component, "fault occurrence" occurred a total of 2,000 times, "fault prevention based on inspection work" occurred a total of 3,000 times, and "no fault" occurred a total of 5,000 times. In addition, the number of samples is 10,000. The data stored in the maintenance information DB 193 can also be used to calculate the maintenance cost and downtime separately. In this case, the expected maintenance cost and expected downtime are as follows, respectively. Figure 7 Here, the expected maintenance cost is the expected value of the maintenance cost. The expected downtime is the expected value of the downtime.

[0088] The maintenance cost estimation unit 160 calculates the expected maintenance cost and expected downtime for each component in each simulation elapsed time, and adds the calculated expected maintenance cost and expected downtime, thereby estimating the future maintenance cost and downtime for the entire target equipment.

[0089] Figure 8 This is a diagram that explains the results of simulation by changing the implementation interval of the inspection work. As a specific example, the user calculates the expected loss based on the maintenance cost and downtime of each implementation interval, and can select the optimal implementation interval by comparing the calculated expected losses. Here, the maintenance cost is the expected value of the total amount of expenses consumed for component replacement and maintenance. Downtime is the expected value of the total time required to respond to component failures, equipment recovery, and equipment inspections.

[0090] In addition, when performing a simulation corresponding to a certain implementation interval, it is desirable to use only the actual results of the inspection work in the certain implementation interval. That is, as a specific example, when simulating a failure of a certain component under the condition that the inspection work is performed at intervals of 2 months on the certain component, it is desirable to use only the data obtained when the inspection work is performed at intervals of 2 months among the data related to the certain component stored in the maintenance information DB 193.

[0091] **Description of the effects of Embodiment 1**

[0092] As described above, according to the present embodiment, the effect of the inspection work is taken into the fault tree representing the correlation of the equipment failure, and the fault simulation is implemented using the fault tree into which the effect of the inspection work is taken. Here, the effect of the inspection work is estimated as the probability that the signs of failure can be discovered through the inspection work and the failure can be prevented before it happens. Therefore, according to the present embodiment, the maintenance cost and downtime can be estimated by considering the effect of preventing the failure before it happens through the inspection work. That is, according to the present embodiment, compared with the prior art, a fault simulation of the equipment maintenance process that is closer to reality can be implemented. Therefore, according to the present embodiment, the maintenance cost and downtime can be estimated with relatively high accuracy.

[0093] Furthermore, according to the present embodiment, future maintenance costs and downtime can be estimated for each inspection work frequency. Therefore, the present embodiment can be used to select an appropriate inspection work frequency.

[0094] ***Other structures***

[0095] <Variation 1>

[0096] The maintenance effect integration unit 140 may use an arbitrary target value as the failure prevention probability instead of the value calculated based on the data stored in the maintenance information DB 193 .

[0097] By using this variation, it is possible to evaluate a hypothetical inspection operation such as "If a failure sign can be found with a probability of X% through the inspection operation, the maintenance cost can be reduced by Y yen." Therefore, when developing a failure prediction technology, this variation can be used for research on accuracy targets.

[0098] <Variation 2>

[0099] Fig. 9 A hardware configuration example of the maintenance cost estimation device 100 according to the present modification is shown.

[0100] The maintenance cost estimation device 100 includes a processing circuit 18 instead of the processor 11 , the processor 11 and the memory 12 , the processor 11 and the auxiliary storage device 13 , or the processor 11 , the memory 12 , and the auxiliary storage device 13 .

[0101] The processing circuit 18 is hardware that realizes at least a part of each unit included in the maintenance cost estimation device 100 .

[0102] The processing circuit 18 may be dedicated hardware, or may be a processor that executes a program stored in the memory 12 .

[0103] When the processing circuit 18 is dedicated hardware, as a specific example, the processing circuit 18 is a single circuit, a complex circuit, a programmed processor, a parallel programmed processor, an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array), or a combination thereof.

[0104] The maintenance cost estimation device 100 may include a plurality of processing circuits instead of the processing circuit 18. The plurality of processing circuits share the role of the processing circuit 18.

[0105] In the maintenance cost estimation device 100 , part of the functions may be implemented by dedicated hardware, and the remaining functions may be implemented by software or firmware.

[0106] As a specific example, the processing circuit 18 is implemented by hardware, software, firmware, or a combination thereof.

[0107] The processor 11, the memory 12, the auxiliary storage device 13, and the processing circuit 18 are collectively referred to as a “processing circuit.” That is, the functions of the functional components of the maintenance cost estimation device 100 are implemented by the processing circuit.

[0108] ***Other implementation methods***

[0109] Implementation 1 has been described, but multiple parts of this implementation may be implemented in combination. Alternatively, this implementation may be implemented partially. In addition, this implementation may be modified in various ways as needed, and may be implemented in whole or in part in any combination.

[0110] The above-described embodiments are merely preferred examples in nature and are not intended to limit the scope of the present disclosure, its application targets, or its uses. The processes described using flowcharts and the like may be modified as appropriate.

[0111] Description of Reference Numerals

[0112] 11 processor, 12 memory, 13 auxiliary storage device, 14 input interface, 15 output interface, 18 processing circuit, 19 signal line, 21 input device, 22 output device, 100 maintenance cost estimation device, 110 input unit, 120 fault tree construction unit, 130 maintenance effect calculation unit, 140 maintenance effect synthesis unit, 150 fault simulation unit, 160 maintenance cost estimation unit, 170 output display unit, 191 degradation model DB, 192 remote monitoring DB, 193 maintenance information DB, 194 maintenance effect DB.

Claims

1. A maintenance cost estimation device, which estimates whether a component of a device has failed by simulation, wherein: The maintenance cost estimation device includes a maintenance effect synthesis unit, which uses a degradation model showing the probability of failure occurrence and a failure prevention probability to generate a failure estimation model. The failure occurrence probability is the probability that the component will fail at an object time point estimated based on the elapsed time from the implementation of the repair work on the component. The failure prevention probability is the probability that the failure of the component can be prevented by the inspection work on the component. The failure estimation model is a model used when estimating whether the component has failed at the object time point through the simulation.

2. The maintenance cost estimation device according to claim 1, wherein: The fault estimation model is a model for performing fault tree analysis.

3. The maintenance cost estimation device according to claim 1 or 2, wherein: The maintenance cost estimation device further includes a maintenance effect calculation unit that calculates the failure prevention probability.

4. The maintenance cost estimation device according to claim 3, wherein: The maintenance effect calculation unit calculates the failure prevention probability based on actual results of preventing failure of the component by inspection work on the component.

5. The maintenance cost estimation device according to claim 3 or 4, wherein: The maintenance effect calculation unit calculates the failure prevention probability using at least one of information obtained by remotely monitoring the component and design information of the component.

6. The maintenance cost estimation device according to any one of claims 1 to 5, wherein: The maintenance cost estimation device further comprises: a fault simulation unit that performs the simulation with respect to a target period as a target; and a maintenance cost estimating unit that estimates the maintenance cost of the component during the target period based on a result of executing the simulation, The simulation is a simulation based on a stochastic simulation technique.

7. A maintenance cost estimation method, which estimates whether a component of a device has failed by simulation, wherein: The computer uses a degradation model showing the probability of failure occurrence and a failure prevention probability to generate a failure estimation model. The failure occurrence probability is the probability that the component will fail at a target time point estimated based on the elapsed time from the implementation of the repair work on the component. The failure prevention probability is the probability that the failure of the component can be prevented by the inspection work on the component. The failure estimation model is a model used when estimating whether the component has failed at the target time point through the simulation.