A control method and system for formwork construction trolley
By real-time monitoring and automatic adjustment of the equipment status and working parameters of the mold frame construction trolley, the problems of low construction accuracy and high safety risks in the existing technology are solved, and a higher level of automation and construction efficiency are achieved.
Patent Information
- Application Number
- CN202411098039.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2044-08-12
AI Technical Summary
The existing mold frame construction trolleys adopt open-loop control method, and cannot monitor the equipment status and construction environment in real time, resulting in low construction accuracy and high safety risks.
Real-time monitoring of the status of functional components of the mold frame construction trolley, generate equipment status monitoring data, and determine whether the data is abnormal. When data is abnormal, control commands and alarms are issued. At the same time, the mold frame position monitoring is started according to the control command, the mold frame position monitoring data is obtained, the mold frame position monitoring data is determined whether it meets the retaining wall design requirements, and the mold frame position is automatically adjusted. According to the construction progress of the retaining wall and the river embankment conditions, the working parameters of the mold frame construction trolley are dynamically adjusted.
The construction accuracy and safety of the mold frame construction trolley has been improved, and the automation level and overall benefits of river embankment retaining wall construction have been enhanced.
Smart Images

Figure CN119087849B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of automated control, and in particular to a control method and system for a formwork construction trolley. Background Art
[0002] With the continuous expansion of the scale of water conservancy project construction, river embankment retaining wall construction has become a key link in water conservancy project construction. Traditional river embankment retaining wall construction mainly adopts manual operation, which has low construction efficiency, difficult to ensure project quality, and great safety hazards. In order to improve the automation level and construction quality of retaining wall construction, formwork construction trolleys are gradually used in river embankment retaining wall construction.
[0003] At present, there are many kinds of formwork construction trolleys on the market. For example, patent No. CN114000539A discloses a side formwork trolley, which includes a bracket, a first side formwork and a second side formwork, a plurality of first driving devices and a plurality of second driving devices. The first driving device can drive the first side formwork to approach or move away from the bracket in a horizontal direction, and the second driving device can drive the second side formwork to approach or move away from the bracket in a horizontal direction, so as to facilitate the side formwork trolley to erect or demold during construction, thereby reducing the labor intensity of workers.
[0004] In the prior art, in order to facilitate the movement and construction of the formwork construction trolley, a variety of functional components are added to the formwork construction trolley, such as a walking mechanism, a lifting mechanism, a concrete pouring system, a formwork positioning system, a safety protection device, etc. However, most of the existing formwork construction trolleys adopt an open-loop control method, which cannot monitor the equipment status and construction environment in real time, and is difficult to adapt to complex and changeable construction conditions. There are problems such as low construction accuracy and high safety risks, which need to be further improved. Summary of the invention
[0005] In order to solve the problems of low construction accuracy and high safety risks of existing formwork construction trolleys, the present application provides a formwork construction trolley control method and system, which adopts the following technical solutions:
[0006] In a first aspect, the present application provides a method for controlling a formwork construction trolley, comprising the following steps:
[0007] Monitor the status of functional components of the formwork construction trolley in real time, and generate equipment status monitoring data according to the status of the functional components;
[0008] Determine whether the equipment status monitoring data is abnormal, and when the equipment status monitoring data is abnormal, issue a control instruction and sound an alarm;
[0009] When the equipment status monitoring data is abnormal, a formwork position monitoring instruction is issued according to the control instruction, the formwork position of the formwork construction trolley is monitored and formwork position monitoring data is generated;
[0010] Determine whether the formwork position monitoring data meets the preset retaining wall design requirements, and when the formwork position monitoring data does not meet the preset retaining wall design requirements, control the formwork construction trolley to adjust the formwork position;
[0011] The working parameters of the formwork construction trolley are dynamically adjusted according to the progress of the retaining wall construction and the characteristics of the river bank conditions in the construction area.
[0012] By adopting the above-mentioned technical scheme, the present application first monitors the functional component status of the formwork construction trolley in real time, generates equipment status monitoring data, and determines whether the data is abnormal; when the data is abnormal, a control instruction and an alarm are issued to prompt the operator to deal with it in time; at the same time, the formwork position monitoring is started according to the control instruction, and the formwork position monitoring data is obtained to determine whether it meets the retaining wall design requirements. If not, the formwork construction trolley is controlled to automatically adjust the formwork position to improve construction accuracy; in addition, the river bank condition characteristics in the construction area are monitored in real time, and according to the changes in river bank conditions and the progress of retaining wall construction, the working parameters of the formwork construction trolley are dynamically optimized, such as walking speed, lifting height, concrete pouring rate, etc., to adapt to the complex and changeable construction environment and improve construction safety; through the automated control of the formwork construction trolley, the automation level and overall benefits of river bank retaining wall construction are greatly improved.
[0013] Optionally, real-time monitoring of the functional component status of the formwork construction trolley and generating equipment status monitoring data according to the functional component status specifically include the following steps:
[0014] Real-time monitoring of the operating parameters of the traveling mechanism, lifting mechanism, formwork positioning system and concrete pouring system of the formwork construction trolley, and generating status data of corresponding functional components according to the operating parameters;
[0015] Based on the preset functional component status threshold, determine whether the status data is within the normal range, and obtain the operating status evaluation result of each functional component;
[0016] According to the evaluation results of the operating status of each functional component, the equipment status of the formwork construction trolley is determined and equipment status monitoring data is generated.
[0017] By adopting the above-mentioned technical scheme, the present application first uses sensors to monitor the operating parameters of the traveling mechanism, lifting mechanism, formwork positioning system and concrete pouring system of the formwork construction trolley in real time, such as traveling speed, lifting displacement, formwork deviation, pouring pressure, etc., and generates status data of each functional component; then, according to the pre-set functional component status threshold, it is judged whether the status data of each functional component is within the normal range, and the operating status evaluation results of each functional component are obtained, such as normal, abnormal or fault level; finally, the operating status evaluation results of all functional components are integrated to determine the overall equipment status of the formwork construction trolley, generate equipment status monitoring data, and improve the accuracy and reliability of equipment status diagnosis by comprehensively detecting the equipment status of the traveling, lifting, positioning and pouring functions of the formwork construction trolley.
[0018] Optionally, judging whether the formwork position monitoring data meets the preset retaining wall design requirements, when the formwork position monitoring data does not meet the preset retaining wall design requirements, controlling the formwork construction trolley to adjust the formwork position, specifically includes the following steps:
[0019] Obtaining the horizontal position coordinates and elevation data of the mold frame positioning system;
[0020] Determine the three-dimensional formwork position model based on the formwork installation position requirements in the retaining wall design drawings;
[0021] Calculating the formwork position deviation of the formwork construction trolley according to the horizontal position coordinates, the elevation data and the three-dimensional formwork position model;
[0022] Compare the formwork position deviation with a preset formwork position error threshold to determine whether the formwork position monitoring data meets the preset retaining wall design requirements;
[0023] When the formwork position monitoring data does not meet the preset retaining wall design requirements, the module position monitoring data is determined to be abnormal, and a formwork position abnormality alarm message is generated;
[0024] The formwork position adjustment amount of the formwork construction trolley is calculated according to the formwork position deviation and the formwork installation position requirement, and the formwork construction trolley is controlled to adjust the formwork position according to the formwork position adjustment amount.
[0025] By adopting the above-mentioned technical solution, the present application obtains the position coordinate data of the mold frame positioning system, combines it with the three-dimensional mold frame position model, calculates the mold frame position deviation, and determines whether it meets the design requirements. If not, it automatically calculates the position adjustment amount and controls the mold frame construction trolley to make adjustments, thereby achieving precise control of the mold frame position.
[0026] Optionally, according to the progress of retaining wall construction and the characteristics of riverbank conditions in the construction area, the working parameters of the formwork construction trolley are dynamically adjusted, which specifically includes the following steps:
[0027] Real-time monitoring of riverbank condition characteristics in the construction area, judging whether the riverbank condition is abnormal based on preset thresholds, and generating riverbank condition abnormality alarms when the riverbank condition is abnormal;
[0028] Obtaining the planned progress and actual progress data of the retaining wall construction, calculating the construction progress deviation, and determining the working parameter adjustment plan of the formwork construction trolley according to the construction progress deviation and the abnormal alarm of the river bank condition;
[0029] According to the working parameter adjustment scheme, a walking speed adjustment instruction, a lifting speed adjustment instruction and a concrete pouring speed adjustment instruction are generated;
[0030] The working parameters of the formwork construction trolley are dynamically adjusted according to the walking speed adjustment instruction, the lifting speed adjustment instruction and the concrete pouring speed adjustment instruction.
[0031] By adopting the above-mentioned technical scheme, this application monitors the characteristics of river embankment conditions in real time, determines whether the river embankment conditions are abnormal, obtains the planned progress and actual progress of retaining wall construction, calculates the construction progress deviation, and dynamically generates the working parameter adjustment plan of the formwork construction trolley by comprehensively considering the characteristics of river embankment conditions and progress factors. It also issues corresponding control instructions to achieve real-time optimization of process parameters such as walking, lifting, and pouring, and can timely discover and respond to river embankment condition risks to ensure construction safety. At the same time, by dynamically controlling the speeds of walking, lifting, and pouring, it maximizes construction efficiency while ensuring construction quality.
[0032] Optionally, obtaining the planned progress and actual progress data of the retaining wall construction, calculating the construction progress deviation, and determining the working parameter adjustment plan of the formwork construction trolley according to the construction progress deviation and the abnormal embankment condition alarm, specifically includes the following steps:
[0033] Obtain the planned and actual progress data of retaining wall construction and calculate the construction progress deviation;
[0034] Obtain an abnormal embankment condition alarm, and determine the risk level of the current embankment condition based on the preset embankment condition risk level standard; calculate the adjustment range and direction of the working parameters of the formwork construction trolley based on the construction progress deviation and the current embankment condition risk level, and determine the working parameter adjustment plan of the formwork construction trolley.
[0035] By adopting the above-mentioned technical scheme, this application first obtains the planned progress and actual progress data of the retaining wall construction, calculates the construction progress deviation, and grasps the progress of the construction. At the same time, by monitoring the slope, soil quality, terrain and other conditions of the embankment, it determines whether the embankment conditions are abnormal, and determines the risk level of the current embankment conditions according to the preset risk level standard, quantifies the degree of influence of the embankment conditions on the construction, comprehensively considers the construction progress deviation and the embankment condition risk level, and calculates the adjustment range and adjustment direction of various working parameters of the formwork construction trolley such as walking speed, lifting speed, concrete pouring speed, etc., to form a complete working parameter adjustment plan.
[0036] Optionally, according to the construction progress deviation and the risk level of the current riverbank conditions, the adjustment range and adjustment direction of the working parameters of the formwork construction trolley are calculated, which specifically includes the following steps:
[0037] According to the construction progress deviation and the risk level of the current riverbank conditions, the walking speed adjustment range is calculated.
[0038]
[0039] According to the construction progress deviation and the risk level of the current river bank conditions, the adjustment range of the lifting speed is calculated.
[0040]
[0041] According to the construction progress deviation and the risk level of the current riverbank conditions, the adjustment range of the concrete pouring speed is calculated.
[0042]
[0043] Among them, λ w , l , p are the adjustment direction coefficients of walking speed, lifting speed and concrete pouring speed, Δp is the construction progress deviation, r is the risk level of the current riverbank conditions, are the initial values of walking speed, lifting speed and concrete pouring speed, p0 is the planned progress, and r0 is the risk level when the embankment conditions are normal.
[0044] By adopting the above-mentioned technical scheme, the present application establishes a mathematical relationship between working parameters and influencing factors by setting adjustment coefficients and variables, thereby achieving precise control of the working parameters of the formwork construction trolley, and can adaptively generate the optimal adjustment plan according to actual conditions, thereby ensuring the efficiency and safety of retaining wall construction.
[0045] In a second aspect, the present application provides a formwork construction trolley control system, comprising:
[0046] An equipment status monitoring data generating module is used to monitor the status of functional components of the formwork construction trolley in real time and generate equipment status monitoring data according to the status of the functional components;
[0047] The device status monitoring data abnormality judgment module is used to judge whether the device status monitoring data is abnormal, and when the device status monitoring data is abnormal, issue a control instruction and sound an alarm;
[0048] A formwork position monitoring data generating module, which is used to issue a formwork position monitoring instruction according to the control instruction when the equipment status monitoring data is abnormal, monitor the formwork position of the formwork construction trolley and generate formwork position monitoring data;
[0049] The formwork position adjustment module is used to determine whether the formwork position monitoring data meets the preset retaining wall design requirements. When the formwork position monitoring data does not meet the preset retaining wall design requirements, the formwork construction trolley is controlled to adjust the formwork position; the working parameter adjustment module is used to dynamically adjust the working parameters of the formwork construction trolley according to the progress of the retaining wall construction and the characteristics of the river embankment conditions in the construction area.
[0050] Optionally, the equipment status monitoring data generating module includes:
[0051] A status data generating unit is used to monitor the operating parameters of the traveling mechanism, lifting mechanism, formwork positioning system and concrete pouring system of the formwork construction trolley in real time, and generate status data of corresponding functional components according to the operating parameters;
[0052] An operation status evaluation unit, used to determine whether the status data is within a normal range based on a preset functional component status threshold, and obtain an operation status evaluation result of each functional component;
[0053] The equipment status monitoring data generating unit is used to determine the equipment status of the formwork construction trolley according to the operating status evaluation results of each functional component and generate equipment status monitoring data.
[0054] Optionally, the mold frame position adjustment module includes:
[0055] A position information acquisition unit, used to acquire the horizontal position coordinates and elevation data of the mold frame positioning system;
[0056] A position model determination unit is used to determine the three-dimensional formwork position model based on the formwork installation position requirements in the retaining wall design drawings; a position deviation calculation unit is used to calculate the formwork position deviation of the formwork construction trolley according to the horizontal position coordinates, the elevation data and the three-dimensional formwork position model;
[0057] A design requirement judgment unit, used to compare the formwork position deviation with a preset formwork position error threshold to judge whether the formwork position monitoring data meets the preset retaining wall design requirements;
[0058] An abnormal alarm unit is used to determine that the module position monitoring data is abnormal and generate a formwork position abnormal alarm message when the formwork position monitoring data does not meet the preset retaining wall design requirements;
[0059] The formwork position adjustment unit is used to calculate the formwork position adjustment amount of the formwork construction trolley according to the formwork position deviation and the formwork installation position requirement, and control the formwork construction trolley to adjust the formwork position according to the formwork position adjustment amount.
[0060] Optionally, the working parameter adjustment module includes:
[0061] A riverbank condition abnormality alarm generating unit is used to monitor the riverbank condition characteristics in the construction area in real time, determine whether the riverbank condition is abnormal according to a preset threshold, and generate a riverbank condition abnormality alarm when the riverbank condition is abnormal;
[0062] A working parameter adjustment scheme determining unit is used to obtain the planned progress and actual progress data of the retaining wall construction, calculate the construction progress deviation, and determine the working parameter adjustment scheme of the formwork construction trolley according to the construction progress deviation and the abnormal embankment condition alarm;
[0063] An adjustment instruction generating unit, used for generating a walking speed adjustment instruction, a lifting speed adjustment instruction and a concrete pouring speed adjustment instruction according to the working parameter adjustment scheme;
[0064] The working parameter adjustment unit is used to dynamically adjust the working parameters of the formwork construction trolley according to the walking speed adjustment instruction, the lifting speed adjustment instruction and the concrete pouring speed adjustment instruction.
[0065] Optionally, the working parameter adjustment scheme determining unit includes:
[0066] The progress deviation calculation subunit is used to obtain the planned progress and actual progress data of the retaining wall construction and calculate the construction progress deviation; the risk level determination subunit is used to obtain abnormal alarms of river bank conditions and determine the risk level of the current river bank conditions according to the preset river bank condition risk level standards;
[0067] The parameter adjustment scheme determination subunit is used to calculate the adjustment range and direction of the working parameters of the formwork construction trolley according to the construction progress deviation and the risk level of the current riverbank conditions, and determine the working parameter adjustment scheme of the formwork construction trolley.
[0068] Optionally, the parameter adjustment scheme determination subunit performs the following steps:
[0069] According to the construction progress deviation and the risk level of the current riverbank conditions, the walking speed adjustment range is calculated.
[0070]
[0071] According to the construction progress deviation and the risk level of the current river bank conditions, the adjustment range of the lifting speed is calculated.
[0072]
[0073] According to the construction progress deviation and the risk level of the current riverbank conditions, the adjustment range of the concrete pouring speed is calculated.
[0074]
[0075] Among them, λ w , l , p are the adjustment direction coefficients of walking speed, lifting speed and concrete pouring speed, Δp is the construction progress deviation, r is the risk level of the current riverbank conditions, are the initial values of walking speed, lifting speed and concrete pouring speed, p0 is the planned progress, and r0 is the risk level when the embankment conditions are normal.
[0076] In summary, the present application includes at least one of the following beneficial technical effects:
[0077] 1. This application first monitors the status of functional components of the formwork construction trolley in real time, generates equipment status monitoring data, and determines whether the data is abnormal; when the data is abnormal, it issues control instructions and alarms to prompt the operator to deal with it in time; at the same time, according to the control instructions, the formwork position monitoring is started, the formwork position monitoring data is obtained, and it is determined whether it meets the retaining wall design requirements. If not, the formwork construction trolley is controlled to automatically adjust the formwork position to improve construction accuracy; in addition, the river embankment condition characteristics in the construction area are monitored in real time, and according to the changes in river embankment conditions and the progress of retaining wall construction, the working parameters of the formwork construction trolley are dynamically optimized, such as walking speed, lifting height, concrete pouring rate, etc., to adapt to the complex and changeable construction environment and improve construction safety; through the automated control of the formwork construction trolley, the river embankment retaining wall is greatly improved. The automation level and overall benefits of construction; 2. This application first uses sensors to monitor the operating parameters of the walking mechanism, lifting mechanism, formwork positioning system and concrete pouring system of the formwork construction trolley in real time, such as walking speed, lifting displacement, formwork deviation, pouring pressure, etc., and generates status data of each functional component; then, according to the pre-set functional component status threshold, it is judged whether the status data of each functional component is within the normal range, and the operating status evaluation results of each functional component are obtained, such as normal, abnormal or fault level; finally, the operating status evaluation results of all functional components are integrated to determine the overall equipment status of the formwork construction trolley, generate equipment status monitoring data, and improve the accuracy and reliability of equipment status diagnosis by comprehensively detecting the equipment status of the walking, lifting, positioning and pouring functions of the formwork construction trolley;
[0078] 3. This application monitors the characteristics of river embankment conditions in real time to determine whether the river embankment conditions are abnormal, obtains the planned and actual progress of retaining wall construction, calculates the construction progress deviation, and dynamically generates a working parameter adjustment plan for the formwork construction trolley based on the characteristics of river embankment conditions and progress factors. It also issues corresponding control instructions to achieve real-time optimization of process parameters such as walking, lifting, and pouring, and can promptly detect and respond to river embankment condition risks to ensure construction safety. At the same time, by dynamically controlling the speeds of walking, lifting, and pouring, it maximizes construction efficiency while ensuring construction quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0079] Figure 1 It is a flow chart of a method for controlling a formwork construction trolley according to an embodiment of the present application;
[0080] Figure 2 It is a flowchart of step S100 in a method for controlling a formwork construction trolley in an embodiment of the present application;
[0081] Figure 3 It is a flowchart of step S200 in a method for controlling a formwork construction trolley in an embodiment of the present application;
[0082] Figure 4 It is a flowchart of step S500 in a method for controlling a formwork construction trolley in an embodiment of the present application;
[0083] Figure 5 It is a flowchart of step S520 in a method for controlling a formwork construction trolley in an embodiment of the present application;
[0084] Figure 6 It is a flowchart of step S523 in a method for controlling a formwork construction trolley in an embodiment of the present application;
[0085] Figure 7 It is a module schematic diagram of a formwork construction trolley control system according to an embodiment of the present application. DETAILED DESCRIPTION
[0086] The terms used in the following embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to be used as limitations to the present application. As used in the specification and appended claims of the present application, the singular expressions "one", "a kind of", "said", "above", "the" and "this" are intended to also include plural expressions, unless there is a clear indication to the contrary in the context. It should also be understood that the term "and / or" used in the present application refers to any or all possible combinations comprising one or more listed items.
[0087] In the following, the terms "first" and "second" are used for descriptive purposes only and are not to be understood as suggesting or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features, and in the description of the embodiments of the present application, unless otherwise specified, "plurality" means two or more.
[0088] The embodiments of the present application are further described in detail below in conjunction with the drawings in the specification.
[0089] In the first aspect, the present application provides a method for controlling a formwork construction trolley, referring to Figure 1 , including the following steps:
[0090] S100, monitor the status of functional components of the formwork construction trolley in real time, and generate equipment status monitoring data according to the status of the functional components.
[0091] In this embodiment, the functional components include but are not limited to a walking mechanism, a lifting mechanism, a formwork positioning system, and a concrete pouring system.
[0092] Specifically, sensors are installed at key positions of functional components, such as speed sensors on the walking mechanism, pressure sensors on the lifting mechanism, etc., to collect the operating parameters of each component in real time, and generate equipment status monitoring data after data processing.
[0093] S200, determining whether the equipment status monitoring data is abnormal, and when the equipment status monitoring data is abnormal, issuing a control instruction and sounding an alarm.
[0094] Among them, anomaly refers to the deviation of equipment status monitoring data from the normal range or exceeding the preset threshold, indicating that functional components may have faults or safety hazards and need to be dealt with in a timely manner.
[0095] Specifically, the status monitoring data is compared with the pre-set normal value range. Once a deviation is found, an alarm signal is triggered and corresponding control instructions are sent to the control system of the formwork construction trolley, such as reducing the driving speed, stopping the operation, etc., to avoid accidents.
[0096] S300. When the equipment status monitoring data is abnormal, a formwork position monitoring instruction is issued according to the control instruction to monitor the formwork position of the formwork construction trolley and generate formwork position monitoring data.
[0097] The formwork position refers to the spatial position and posture of the formwork system on the formwork construction trolley used to pour retaining wall concrete. When the equipment status is abnormal, the formwork position may be offset or deformed, so the accuracy of the formwork position needs to be monitored in real time.
[0098] Specifically, a GPS positioning device and an inclination sensor are installed on the formwork construction trolley to collect the three-dimensional coordinates and inclination angle of the formwork in real time. After coordinate conversion and error compensation, monitoring data reflecting the actual position of the formwork is generated. At the same time, the monitoring data is compared with the theoretical position in the design drawing to calculate the position deviation.
[0099] S400, determining whether the formwork position monitoring data meets the preset retaining wall design requirements, and when the formwork position monitoring data does not meet the preset retaining wall design requirements, controlling the formwork construction trolley to adjust the formwork position.
[0100] Among them, the retaining wall design requirements refer to the allowable deviation range of technical parameters such as the retaining wall's geometric dimensions, flatness, verticality, etc.
[0101] Specifically, the formwork position monitoring data is compared with the retaining wall design requirements to determine whether it is within the allowable deviation range. When the monitoring data exceeds the design requirements, the formwork position adjustment program is started to restore the formwork position to the design state by controlling the movement, lifting, and pushing of the formwork construction trolley.
[0102] S500, dynamically adjusting the working parameters of the formwork construction trolley according to the progress of the retaining wall construction and the characteristics of the river bank conditions in the construction area.
[0103] Among them, the construction progress reflects the completion status and planned arrangements of the retaining wall construction. The characteristics of the river embankment conditions include riverbed topography, hydrological conditions, meteorological conditions and other environmental factors that affect the construction. By reasonably adjusting the working parameters of the formwork construction trolley, the construction efficiency and economy can be improved while ensuring the quality and safety of the project.
[0104] Specifically, 3D laser scanning and other technologies are used to obtain the digital terrain model of the construction site, which is matched with the retaining wall design model to automatically generate the optimal construction path and operation plan. At the same time, the Internet of Things technology is used to collect real-time data on river water level, flow rate, weather, river bank slope, soil quality, etc., to assess the risk of their impact on construction, and dynamically optimize operating parameters such as the travel speed of the formwork construction trolley and daily pouring volume, so as to maximize the construction progress while ensuring safety and quality.
[0105] In one embodiment, referring to Figure 2 In step S100, the functional component status of the formwork construction trolley is monitored in real time, and equipment status monitoring data is generated according to the functional component status, which specifically includes the following steps:
[0106] S110, real-time monitoring of the operating parameters of the traveling mechanism, lifting mechanism, formwork positioning system and concrete pouring system of the formwork construction trolley, and generating status data of corresponding functional components according to the operating parameters.
[0107] Among them, operating parameters refer to physical quantities such as speed, pressure, and temperature of functional components during operation, which can intuitively reflect the working conditions and performance of the components. By installing sensors at key locations, these parameter values can be collected in real time.
[0108] Specifically, for the walking mechanism, the operating speed of the crawler and the current of the driving motor are monitored; for the lifting mechanism, the pressure and displacement of the hydraulic cylinder are monitored; for the formwork positioning system, the coordinate value and attitude angle of the positioning device are monitored; for the concrete pouring system, the operating frequency and power of the concrete placing boom and vibrator are monitored.
[0109] S120: Based on a preset functional component status threshold, determine whether the status data is within a normal range, and obtain an evaluation result of the operating status of each functional component.
[0110] Among them, the status threshold is the normal operating range set according to the technical parameters of the functional components and historical experience. When the status data exceeds this range, it means that the component may be abnormal or faulty.
[0111] S130. Determine the equipment status of the formwork construction trolley based on the evaluation results of the operating status of each functional component, and generate equipment status monitoring data.
[0112] In one embodiment, referring to Figure 3 In step S200, it is determined whether the formwork position monitoring data meets the preset retaining wall design requirements. When the formwork position monitoring data does not meet the preset retaining wall design requirements, the formwork construction trolley is controlled to adjust the formwork position, which specifically includes the following steps:
[0113] S210, obtaining the horizontal position coordinates and elevation data of the mold frame positioning system.
[0114] Among them, the horizontal position coordinate reflects the spatial position of the mold frame in the horizontal plane, and the elevation reflects the vertical height of the mold frame. The two together determine the three-dimensional installation position of the mold frame.
[0115] S220. Determine the three-dimensional formwork position model based on the formwork installation position requirements in the retaining wall design drawings.
[0116] Among them, the retaining wall design drawings include the geometric parameters of the retaining wall such as the plane layout, elevation direction, cross-sectional dimensions, as well as the construction requirements such as the installation position of the formwork, support method, and pouring sequence. They are an important basis for guiding the positioning and operation of the formwork construction trolley.
[0117] Specifically, BIM technology is used to convert the design drawings into three-dimensional digital models, which include the theoretical installation position coordinates of the formwork, forming parameterized construction instructions; and then three-dimensional visualization software is used to generate the formwork position model.
[0118] S230, calculating the formwork position deviation of the formwork construction trolley according to the horizontal position coordinates, the elevation data and the three-dimensional formwork position model.
[0119] Among them, the mold frame position deviation refers to the difference between the actual installation position of the mold frame and the designed theoretical position, including two components: plane deviation and elevation deviation.
[0120] S240, comparing the formwork position deviation with a preset formwork position error threshold to determine whether the formwork position monitoring data meets the preset retaining wall design requirements.
[0121] Among them, the formwork position error threshold is the upper limit of the allowable deviation set according to the structural characteristics of the retaining wall and the construction process requirements. It usually includes two aspects: plane position error and elevation error, reflecting the minimum accuracy requirement for formwork installation.
[0122] S250: When the formwork position monitoring data does not meet the preset retaining wall design requirements, the module position monitoring data is determined to be abnormal, and a formwork position abnormality alarm message is generated.
[0123] Specifically, when the mold base position deviation exceeds the error threshold, the system automatically records the abnormal data, generates alarm information, issues an alarm through the sound and light alarm, and pops up an alarm window on the control interface, showing the 3D schematic diagram of the abnormal position and the key deviation value, guiding the operator to make corrections. In addition, the alarm information can also be pushed to the on-site management personnel via SMS, email, etc., to achieve remote monitoring and scheduling.
[0124] S260, calculating the formwork position adjustment amount of the formwork construction trolley according to the formwork position deviation and the formwork installation position requirement, and controlling the formwork construction trolley to adjust the formwork position according to the formwork position adjustment amount.
[0125] Among them, the mold frame position adjustment amount refers to the distance or angle required to move to eliminate the position deviation, and the adjustment direction is opposite to the deviation direction.
[0126] Specifically, the present application takes into account the stiffness and position sensing accuracy of the mold frame itself and adopts a graded adjustment strategy, that is, first performing a large-scale coarse adjustment and then a small-scale fine adjustment until the deviation value converges to within the threshold range.
[0127] In one embodiment, referring to Figure 4 In step S500, according to the progress of retaining wall construction and the characteristics of riverbank conditions in the construction area, the working parameters of the formwork construction trolley are dynamically adjusted, which specifically includes the following steps:
[0128] S510. Monitor the riverbank condition characteristics in the construction area in real time, determine whether the riverbank condition is abnormal based on a preset threshold, and generate an abnormal riverbank condition alarm when the riverbank condition is abnormal.
[0129] Among them, the characteristics of river embankment conditions include river water level, flow velocity, sand content, weather, river embankment slope, soil quality and other data that affect construction safety and technology.
[0130] Specifically, online monitoring instruments such as radar water level gauges, flow meters, and turbidity meters are used to automatically collect river water level, flow velocity, sand content and other data at regular intervals, and collect them to the monitoring center through wireless transmission; at the same time, meteorological information such as wind speed and rainfall is obtained through the weather station, and correlated with the river bank monitoring data for analysis. When the monitoring value exceeds the pre-set safety threshold (such as the water level exceeds the warning value, the flow velocity is greater than the allowable value), the system automatically generates an abnormal alarm, notifies the on-site personnel through sound and light alarms, SMS push, etc., and makes linkage adjustments with the construction schedule to activate the emergency plan.
[0131] S520, obtaining the planned progress and actual progress data of the retaining wall construction, calculating the construction progress deviation, and determining the working parameter adjustment plan of the formwork construction trolley according to the construction progress deviation and abnormal embankment condition alarm.
[0132] The construction progress deviation refers to the difference between the actual amount of work completed and the planned amount of work. When the deviation is too large, measures need to be taken to adjust the construction organization and resource allocation to ensure that the project is completed on schedule.
[0133] S530. Generate a walking speed adjustment instruction, a lifting speed adjustment instruction, and a concrete pouring speed adjustment instruction according to the working parameter adjustment plan.
[0134] Among them, the speed adjustment instruction is a control command issued to each executive component of the formwork construction trolley to implement the working parameter adjustment plan, which directly determines the operating efficiency and energy consumption level of the trolley.
[0135] Specifically, an intelligent optimization algorithm is adopted, with construction progress, energy consumption, safety, etc. as optimization targets, and the structural parameters of the formwork construction trolley such as maximum walking speed, rated lifting speed, standard pouring speed, etc. as constraints, to solve the optimal value of each speed instruction.
[0136] S540, dynamically adjusting the working parameters of the formwork construction trolley according to the walking speed adjustment instruction, the lifting speed adjustment instruction and the concrete pouring speed adjustment instruction.
[0137] In one embodiment, referring to Figure 5 In step S520, the planned progress and actual progress data of the retaining wall construction are obtained, the construction progress deviation is calculated, and the working parameter adjustment plan of the formwork construction trolley is determined according to the construction progress deviation and the abnormal alarm of the river bank condition, which specifically includes the following steps:
[0138] S521. Obtain the planned progress and actual progress data of the retaining wall construction, and calculate the construction progress deviation.
[0139] Among them, the system obtains the planned progress data of the retaining wall construction by connecting with the construction management system, including the planned start time, planned completion time, key nodes, etc. of each construction stage; at the same time, through various construction sensors and manual entry, the actual construction progress data is obtained, including the actual start time, actual completion percentage, completed cubic meters, etc.
[0140] S522. Obtain an abnormal riverbank condition alarm, and determine the risk level of the current riverbank condition according to a preset riverbank condition risk level standard.
[0141] The system receives abnormal embankment condition alarms, including alarm information and parameter values such as water level exceeding the standard, too fast flow rate, too high sand content, bad weather, abnormal embankment slope, and soft soil. At the same time, the system pre-sets the risk level standard for embankment conditions, comprehensively considering the risk level description and response measures under different water levels, flow rates, sand content, weather, slope, and soil combinations.
[0142] Specifically, the analytic hierarchy process is adopted to establish a risk assessment model based on the analytic hierarchy process in advance, taking water level and flow velocity as the first-level features, sand content as the second-level features, and meteorology, slope, and soil quality as the third-level features. Through the stratification and combination of features, the risk level determination rules are formed. Taking water level and flow velocity as the first-level features, the basic risk level is set according to the combination of different water levels and flow velocities. For example, when the water level exceeds the warning value by 10% and the flow velocity is greater than 2 meters per second, the basic risk level is level II. Then, taking sand content as the second-level feature, the correction coefficient of the risk level is set according to the sand content. For example, when the sand content is higher than 5 kilograms per cubic meter, the risk level is increased by one level; when the sand content is lower than 2 kilograms per cubic meter, the risk level is reduced by one level. Then, taking meteorology, slope, and soil quality as the third-level features, the risk level is further corrected. For example, when accompanied by strong winds and rainstorms, the risk level is increased by one level; when the slope of the river bank is greater than 1:2, the risk level is increased by one level; when the soil is loose sand, the risk level is increased by one level.
[0143] S523. According to the construction progress deviation and the risk level of the current riverbank conditions, the adjustment range and direction of the working parameters of the formwork construction trolley are calculated, and the working parameter adjustment plan of the formwork construction trolley is determined.
[0144] In one embodiment, referring to Figure 6 In step S523, the adjustment range and direction of the working parameters of the formwork construction trolley are calculated according to the construction progress deviation and the risk level of the current river bank conditions, which specifically includes the following steps:
[0145] S5231. Calculate the walking speed adjustment range based on the construction progress deviation and the risk level of the current riverbank conditions.
[0146] in,
[0147] S5232. Calculate the adjustment range of the lifting and lowering speed based on the construction progress deviation and the risk level of the current riverbank conditions.
[0148] in,
[0149] S5233. Calculate the adjustment range of concrete pouring speed based on the construction progress deviation and the risk level of the current riverbank conditions.
[0150] in,
[0151] Among them, λ w , l , p are the adjustment direction coefficients of walking speed, lifting speed and concrete pouring speed, Δp is the construction progress deviation, r is the risk level of the current riverbank conditions, are the initial values of walking speed, lifting speed and concrete pouring speed, p0 is the planned progress, and r0 is the risk level when the embankment conditions are normal.
[0152] Specifically, the application first determines the safety threshold and optimization direction of speed adjustment according to the construction process and equipment performance requirements, and then pre-establishes the mapping relationship between the speed adjustment direction coefficient and the construction progress deviation and risk level based on expert experience, and uses a piecewise linear function to convert the speed adjustment direction coefficient λ w , l , p Expressed as a function of Δp / p0 and r / r0. For example: when Δp / p0≤-10% and r / r0≤1, λ w =0.2,λ l =0.15,λ p =0.1; when -10%<Δp / p0≤0 and r / r0≤1, λ w =0.1,λ l =0.05,λ p =0.
[0153] Through this, the mathematical relationship between working parameters and influencing factors is established, which enables precise control of the working parameters of the formwork construction trolley. It can also adaptively generate the optimal adjustment plan based on actual conditions to ensure the efficiency and safety of retaining wall construction.
[0154] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0155] In the second aspect, the present application provides a formwork construction trolley control system. The formwork construction trolley control system of the present application is described below in combination with the above-mentioned formwork construction trolley control method.
[0156] Reference Figure 7 , a formwork construction trolley control system, comprising:
[0157] Equipment status monitoring data generation module, used to monitor the status of functional components of the formwork construction trolley in real time and generate equipment status monitoring data according to the status of the functional components;
[0158] The equipment status monitoring data abnormality judgment module is used to judge whether the equipment status monitoring data is abnormal. When the equipment status monitoring data is abnormal, a control instruction is issued and an alarm is sounded;
[0159] The formwork position monitoring data generation module is used to issue a formwork position monitoring instruction according to the control instruction when the equipment status monitoring data is abnormal, monitor the formwork position of the formwork construction trolley and generate formwork position monitoring data;
[0160] The formwork position adjustment module is used to determine whether the formwork position monitoring data meets the preset retaining wall design requirements. When the formwork position monitoring data does not meet the preset retaining wall design requirements, the formwork construction trolley is controlled to adjust the formwork position;
[0161] The working parameter adjustment module is used to dynamically adjust the working parameters of the formwork construction trolley according to the progress of the retaining wall construction and the characteristics of the river bank conditions in the construction area.
[0162] Optionally, the equipment status monitoring data generation module includes:
[0163] A status data generating unit is used to monitor the operating parameters of the traveling mechanism, lifting mechanism, formwork positioning system and concrete pouring system of the formwork construction trolley in real time, and to generate status data of corresponding functional components according to the operating parameters;
[0164] An operation status evaluation unit is used to determine whether the status data is within a normal range based on a preset functional component status threshold, and obtain an operation status evaluation result of each functional component;
[0165] The equipment status monitoring data generating unit is used to determine the equipment status of the formwork construction trolley according to the operating status evaluation results of each functional component and generate equipment status monitoring data.
[0166] Optionally, the mold base position adjustment module includes:
[0167] A position information acquisition unit, used to acquire the horizontal position coordinates and elevation data of the mold frame positioning system;
[0168] The position model determination unit is used to determine the three-dimensional formwork position model based on the formwork installation position requirements in the retaining wall design drawings; the position deviation calculation unit is used to calculate the formwork position deviation of the formwork construction trolley according to the horizontal position coordinates, elevation data and the three-dimensional formwork position model;
[0169] A design requirement judgment unit is used to compare the formwork position deviation with a preset formwork position error threshold to determine whether the formwork position monitoring data meets the preset retaining wall design requirements;
[0170] The abnormal alarm unit is used to determine that the module position monitoring data is abnormal and generate the formwork position abnormal alarm information when the formwork position monitoring data does not meet the preset retaining wall design requirements;
[0171] The formwork position adjustment unit is used to calculate the formwork position adjustment amount of the formwork construction trolley according to the formwork position deviation and the formwork installation position requirements, and control the formwork construction trolley to adjust the formwork position according to the formwork position adjustment amount.
[0172] Optionally, the working parameter adjustment module includes:
[0173] A riverbank condition abnormality alarm generating unit is used to monitor the riverbank condition characteristics in the construction area in real time, determine whether the riverbank condition is abnormal according to a preset threshold, and generate a riverbank condition abnormality alarm when the riverbank condition is abnormal;
[0174] The working parameter adjustment scheme determination unit is used to obtain the planned progress and actual progress data of the retaining wall construction, calculate the construction progress deviation, and determine the working parameter adjustment scheme of the formwork construction trolley according to the construction progress deviation and the abnormal alarm of the river bank condition; the adjustment instruction generation unit is used to generate the walking speed adjustment instruction, the lifting speed adjustment instruction and the concrete pouring speed adjustment instruction according to the working parameter adjustment scheme;
[0175] The working parameter adjustment unit is used to dynamically adjust the working parameters of the formwork construction trolley according to the walking speed adjustment instruction, the lifting speed adjustment instruction and the concrete pouring speed adjustment instruction.
[0176] Optionally, the working parameter adjustment scheme determining unit includes:
[0177] The progress deviation calculation subunit is used to obtain the planned progress and actual progress data of the retaining wall construction and calculate the construction progress deviation; the risk level determination subunit is used to obtain abnormal alarms of river bank conditions and determine the risk level of the current river bank conditions according to the preset river bank condition risk level standards;
[0178] The parameter adjustment scheme determination subunit is used to calculate the adjustment range and direction of the working parameters of the formwork construction trolley according to the construction progress deviation and the risk level of the current riverbank conditions, and determine the working parameter adjustment scheme of the formwork construction trolley.
[0179] Optionally, the parameter adjustment scheme determination subunit performs the following steps:
[0180] Calculate the walking speed adjustment range based on the construction progress deviation and the risk level of the current river bank conditions.
[0181]
[0182] Calculate the adjustment range of lifting speed according to the construction progress deviation and the risk level of the current river bank conditions.
[0183]
[0184] Calculate the adjustment range of concrete pouring speed according to the construction progress deviation and the risk level of the current river bank conditions.
[0185]
[0186] Among them, λ w , l , p are the adjustment direction coefficients of walking speed, lifting speed and concrete pouring speed, Δp is the construction progress deviation, r is the risk level of the current riverbank conditions, are the initial values of walking speed, lifting speed and concrete pouring speed, p0 is the planned progress, and r0 is the risk level when the embankment conditions are normal.
[0187] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A control method for a formwork construction trolley, characterized in that: The steps include: Monitor the status of functional components of the formwork construction trolley in real time, and generate equipment status monitoring data according to the status of the functional components; Determine whether the equipment status monitoring data is abnormal, and when the equipment status monitoring data is abnormal, issue a control instruction and sound an alarm; When the equipment status monitoring data is abnormal, a formwork position monitoring instruction is issued according to the control instruction, the formwork position of the formwork construction trolley is monitored and formwork position monitoring data is generated; Determine whether the formwork position monitoring data meets the preset retaining wall design requirements, and when the formwork position monitoring data does not meet the preset retaining wall design requirements, control the formwork construction trolley to adjust the formwork position; Dynamically adjust the working parameters of the formwork construction trolley according to the progress of the retaining wall construction and the characteristics of the river bank conditions in the construction area; According to the progress of retaining wall construction and the characteristics of riverbank conditions in the construction area, the working parameters of the formwork construction trolley are dynamically adjusted, which specifically includes the following steps: Monitor the riverbank conditions in the construction area in real time, determine whether the riverbank conditions are abnormal based on preset thresholds, and generate an abnormal riverbank condition alarm when the riverbank conditions are abnormal; Obtain the planned and actual progress data of retaining wall construction and calculate the construction progress deviation; Obtain abnormal embankment condition alerts and determine the risk level of the current embankment condition based on the preset embankment condition risk level standards; According to the construction progress deviation and the risk level of the current riverbank conditions, the adjustment range and direction of the working parameters of the formwork construction trolley are calculated, and the working parameter adjustment plan of the formwork construction trolley is determined; According to the working parameter adjustment scheme, a walking speed adjustment instruction, a lifting speed adjustment instruction and a concrete pouring speed adjustment instruction are generated; Dynamically adjust the working parameters of the formwork construction trolley according to the walking speed adjustment instruction, the lifting speed adjustment instruction and the concrete pouring speed adjustment instruction; According to the construction progress deviation and the risk level of the current riverbank conditions, the adjustment range and direction of the working parameters of the formwork construction trolley are calculated, which specifically includes the following steps: According to the construction progress deviation and the risk level of the current riverbank conditions, the walking speed adjustment range is calculated. According to the construction progress deviation and the risk level of the current river bank conditions, the adjustment range of the lifting speed is calculated. According to the construction progress deviation and the risk level of the current riverbank conditions, the adjustment range of the concrete pouring speed is calculated. Among them, λ w , l , p are the adjustment direction coefficients of walking speed, lifting speed and concrete pouring speed, Δp is the construction progress deviation, r is the risk level of the current riverbank conditions, are the initial values of walking speed, lifting speed and concrete pouring speed, p0 is the planned progress, and r0 is the risk level when the embankment conditions are normal.
2. The control method of the formwork construction trolley according to claim 1, characterized in that: Real-time monitoring of the functional component status of the formwork construction trolley and generation of equipment status monitoring data according to the functional component status specifically include the following steps: Real-time monitoring of the operating parameters of the traveling mechanism, lifting mechanism, formwork positioning system and concrete pouring system of the formwork construction trolley, and generating status data of corresponding functional components according to the operating parameters; Based on the preset functional component status threshold, determine whether the status data is within the normal range, and obtain the operating status evaluation result of each functional component; According to the evaluation results of the operating status of each functional component, the equipment status of the formwork construction trolley is determined and equipment status monitoring data is generated.
3. The control method of the formwork construction trolley according to claim 2, characterized in that: Determining whether the formwork position monitoring data meets the preset retaining wall design requirements, and when the formwork position monitoring data does not meet the preset retaining wall design requirements, controlling the formwork construction trolley to adjust the formwork position, specifically includes the following steps: Obtaining the horizontal position coordinates and elevation data of the mold frame positioning system; Determine the three-dimensional formwork position model based on the formwork installation position requirements in the retaining wall design drawings; Calculating the formwork position deviation of the formwork construction trolley according to the horizontal position coordinates, the elevation data and the three-dimensional formwork position model; Compare the formwork position deviation with a preset formwork position error threshold to determine whether the formwork position monitoring data meets the preset retaining wall design requirements; When the formwork position monitoring data does not meet the preset retaining wall design requirements, the module position monitoring data is determined to be abnormal, and a formwork position abnormality alarm message is generated; The formwork position adjustment amount of the formwork construction trolley is calculated according to the formwork position deviation and the formwork installation position requirement, and the formwork construction trolley is controlled to adjust the formwork position according to the formwork position adjustment amount.
4. A formwork construction trolley control system, characterized in that: include: An equipment status monitoring data generating module is used to monitor the status of functional components of the formwork construction trolley in real time and generate equipment status monitoring data according to the status of the functional components; The device status monitoring data abnormality judgment module is used to judge whether the device status monitoring data is abnormal, and when the device status monitoring data is abnormal, issue a control instruction and sound an alarm; A formwork position monitoring data generating module, which is used to issue a formwork position monitoring instruction according to the control instruction when the equipment status monitoring data is abnormal, monitor the formwork position of the formwork construction trolley and generate formwork position monitoring data; A formwork position adjustment module is used to determine whether the formwork position monitoring data meets the preset retaining wall design requirements, and when the formwork position monitoring data does not meet the preset retaining wall design requirements, control the formwork construction trolley to adjust the formwork position; A working parameter adjustment module, used to dynamically adjust the working parameters of the formwork construction trolley according to the progress of the retaining wall construction and the characteristics of the river bank conditions in the construction area; Wherein, the working parameter adjustment module includes: A riverbank condition abnormality alarm generating unit is used to monitor the riverbank condition characteristics in the construction area in real time, determine whether the riverbank condition is abnormal according to a preset threshold, and generate a riverbank condition abnormality alarm when the riverbank condition is abnormal; A working parameter adjustment scheme determination unit is used to obtain the planned progress and actual progress data of the retaining wall construction, calculate the construction progress deviation, and determine the working parameter adjustment scheme of the formwork construction trolley according to the construction progress deviation and abnormal embankment condition alarm; An adjustment instruction generating unit, used for generating walking speed adjustment instructions, lifting speed adjustment instructions and concrete pouring speed adjustment instructions according to the working parameter adjustment plan; A working parameter adjustment unit, used to dynamically adjust the working parameters of the formwork construction trolley according to a walking speed adjustment instruction, a lifting speed adjustment instruction and a concrete pouring speed adjustment instruction; Wherein, the working parameter adjustment scheme determination unit includes: The progress deviation calculation subunit is used to obtain the planned progress and actual progress data of the retaining wall construction and calculate the construction progress deviation; The risk level determination subunit is used to obtain abnormal riverbank condition alarms and determine the risk level of the current riverbank condition according to the preset riverbank condition risk level standard; The parameter adjustment scheme determination subunit is used to calculate the adjustment range and direction of the working parameters of the formwork construction trolley according to the construction progress deviation and the risk level of the current river bank conditions, and determine the working parameter adjustment scheme of the formwork construction trolley; The parameter adjustment scheme determination subunit performs the following steps: According to the construction progress deviation and the risk level of the current riverbank conditions, the walking speed adjustment range is calculated. According to the construction progress deviation and the risk level of the current river bank conditions, the adjustment range of the lifting speed is calculated. According to the construction progress deviation and the risk level of the current riverbank conditions, the adjustment range of the concrete pouring speed is calculated. Among them, λ w , l , p are the adjustment direction coefficients of walking speed, lifting speed and concrete pouring speed, Δp is the construction progress deviation, r is the risk level of the current riverbank conditions, are the initial values of walking speed, lifting speed and concrete pouring speed, p0 is the planned progress, and r0 is the risk level when the embankment conditions are normal.
5. The formwork construction trolley control system according to claim 4, characterized in that: The equipment status monitoring data generation module includes: A status data generating unit is used to monitor the operating parameters of the traveling mechanism, lifting mechanism, formwork positioning system and concrete pouring system of the formwork construction trolley in real time, and generate status data of corresponding functional components according to the operating parameters; An operation status evaluation unit, used to determine whether the status data is within a normal range based on a preset functional component status threshold, and obtain an operation status evaluation result of each functional component; The equipment status monitoring data generating unit is used to determine the equipment status of the formwork construction trolley according to the operating status evaluation results of each functional component and generate equipment status monitoring data.
6. The formwork construction trolley control system according to claim 5, characterized in that: The mold frame position adjustment module comprises: A position information acquisition unit, used to acquire the horizontal position coordinates and elevation data of the mold frame positioning system; A position model determination unit, used to determine a three-dimensional formwork position model based on formwork installation position requirements in the retaining wall design drawing; A position deviation calculation unit, used to calculate the formwork position deviation of the formwork construction trolley according to the horizontal position coordinates, the elevation data and the three-dimensional formwork position model; A design requirement judgment unit, used to compare the formwork position deviation with a preset formwork position error threshold to judge whether the formwork position monitoring data meets the preset retaining wall design requirements; An abnormal alarm unit is used to determine that the module position monitoring data is abnormal and generate a formwork position abnormal alarm message when the formwork position monitoring data does not meet the preset retaining wall design requirements; The formwork position adjustment unit is used to calculate the formwork position adjustment amount of the formwork construction trolley according to the formwork position deviation and the formwork installation position requirement, and control the formwork construction trolley to adjust the formwork position according to the formwork position adjustment amount.
Citation Information
Patent Citations
Method for optimizing surface measurement of curved surface template based on three-dimensional laser scanning technology
CN114577141A
Engineering project management system
CN116402465A
Intelligent positioning and monitoring system and method for lining trolley
CN116405640A