Performance data processing method and device for second-class equipment of transformer substation and storage medium

By collecting and analyzing the performance data of substation type II equipment and performing over-limit analysis, the problem of inability to effectively process these data in the existing technology is solved, the automated monitoring and management of equipment is realized, and the operation efficiency is improved.

CN119089350APending Publication Date: 2024-12-06GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411138877.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The prior art cannot effectively analyze and process the performance data of substation type II equipment, resulting in the inability to monitor and manage the operating status of these equipment in real time.

Method used

By collecting performance data of batteries and other equipment of substation type II equipment, generating files and parsing them, and performing over-limit analysis to determine whether there is abnormal behavior in the data, thereby generating alarm information and processing.

Benefits of technology

The analysis and processing of performance data of Class II equipment in the substation is realized, the monitoring and management efficiency of equipment is improved, the defects of manual inspection are avoided, and the normal operation of the equipment is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119089350A_ABST
    Figure CN119089350A_ABST
Patent Text Reader

Abstract

The invention discloses a performance data processing method and device for second-class equipment of a transformer substation and a storage medium. The method comprises the following steps: acquiring first performance data of a storage battery in the second-class equipment of the transformer substation and second performance data of other equipment except the storage battery in the second-class equipment; generating a first file based on the first performance data; analyzing the first file to obtain first analysis data, and analyzing the second performance data to obtain second analysis data; and performing out-of-limit analysis on the first analysis data and the second analysis data to obtain an analysis result of the target performance data, the target performance data including the first performance data and the second performance data, and the analysis result being used for representing whether the first analysis data has an out-of-limit behavior and / or whether the second analysis data has an out-of-limit behavior. The technical problem that the second-class equipment performance data of the transformer substation cannot be analyzed and processed is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data processing of substations, and in particular to a method, device and storage medium for processing performance data of Class II equipment in substations. Background Art

[0002] The monitoring data of Class II equipment in substations refers to the equipment environment data and equipment status monitoring data that do not directly affect the real-time operation of the equipment, including battery current and voltage, battery internal resistance, equipment environment temperature and humidity, sulfur hexafluoride (SF6) meter data, single-point grounding status of voltage transformer (PT), solenoid valve control power switch status of gas drive bottle, fire water tank level, fire water pipe pressure, etc. However, the above data do not fall within the scope of responsibility of the dispatching and monitoring center, and the relevant data cannot be connected to the automation system of the dispatching and monitoring center for centralized monitoring. The traditional method can only be carried out through regular manual on-site inspections, resulting in technical problems such as the inability to analyze and process the performance data of Class II equipment in substations.

[0003] With respect to the above-mentioned technical problem of being unable to analyze and process the performance data of the second type of equipment in the substation, no effective solution has been proposed so far. Summary of the invention

[0004] The embodiments of the present invention provide a method, device and storage medium for processing performance data of Class II equipment in a substation, so as to at least solve the technical problem that the performance data of Class II equipment in a substation cannot be analyzed and processed.

[0005] According to one aspect of the embodiments of the invention, a method for processing performance data of Class II equipment in a substation is provided. The method may include: collecting first performance data of batteries in Class II equipment in a substation, and second performance data of other equipment in Class II equipment except batteries; generating a first file based on the first performance data; parsing the first file to obtain first parsed data, and parsing the second performance data to obtain second parsed data; performing over-limit analysis on the first parsed data and the second parsed data to obtain analysis results of target performance data, wherein the target performance data includes the first performance data and the second performance data, and the analysis results are used to characterize whether the first parsed data has over-limit behavior, and / or whether the second parsed data has over-limit behavior.

[0006] Optionally, an out-of-limit analysis is performed on the first parsed data and the second parsed data to obtain an analysis result of the target performance data, including: determining a target data set of the target parsed data based on the first parsed data and the second parsed data, wherein the target parsed data includes the first parsed data and the second parsed data, and the target data set is a data set that meets the target time; determining a first telemetry code of a first target record from the target data set, wherein the first target record is any record in the target data set; obtaining a second target record corresponding to a second telemetry code that is the same as the first telemetry code from a limit table of a monitoring auxiliary database of the second category of equipment; and determining an analysis result based on a first collected value of the first target record and a second collected value of the second target record.

[0007] Optionally, based on the first acquisition value of the first target record and the second acquisition value of the second target record, an analysis result is determined, including: in response to the first acquisition value being less than the second acquisition value, reading a third target record from the over-limit number set of the target resolution data to obtain a first reading result of the target resolution data, wherein the first reading result is used to characterize whether there is a third target record in the over-limit number set, the third target record being a target record corresponding to a third telemetry code that is the same as the first telemetry code; in response to the first reading result being that the third target record exists in the over-limit number set, resetting the over-limit number of the third target record, and performing over-limit analysis on other target records in the target data set except the first target record to obtain an analysis result; in response to the first reading result being that the third target record does not exist in the over-limit number set, performing over-limit analysis on other target records in the target data set to obtain an analysis result.

[0008] Optionally, based on the first collected value of the first target record and the second collected value of the second target record, an analysis result is determined, including: in response to the first collected value being greater than or equal to the second collected value, reading a third target record from the set of over-limit times of the target parsed data to obtain a second reading result of the parsed data, wherein the second reading result is used to characterize whether the third target record exists in the set of over-limit times; in response to the second reading result being that the third target record exists in the set of over-limit times, performing a summation operation on the over-limit times of the third target record to obtain the over-limit times after the summation operation; adjusting the over-limit times after the summation operation using the target weight to obtain the initial over-limit times; in response to the initial over-limit times exceeding the target over-limit times, determining the analysis result using the monitoring auxiliary database.

[0009] Optionally, in response to the initial number of over-limit times exceeding the target number of over-limit times, the monitoring auxiliary database is used to determine the analysis results, including: when the initial number of over-limit times exceeds the target number of over-limit times, obtaining a fourth target record corresponding to a telemetry code identical to the first telemetry code from the telemetry table of the monitoring auxiliary database; obtaining a fifth target record corresponding to a plant station code identical to the plant station code of the fourth target record from the plant station table of the monitoring auxiliary database; obtaining a sixth target record corresponding to an attributed plant station code identical to the attributed plant station code of the fifth target record from the telephone table of the monitoring auxiliary database; generating an alarm message based on the first target record, the second target record, the third target record, the fourth target record, the fifth target record and the sixth target record; and determining, based on the alarm message, that the analysis result is that there is an over-limit behavior in the first parsed data, and / or that there is an over-limit behavior in the second parsed data.

[0010] Optionally, the method further includes: sending the warning information to the target object in text form.

[0011] Optionally, the method further includes: in response to the second reading result being that the third target record does not exist, storing the first target record in a limit-crossing number set, and updating the limit-crossing number of the first target record.

[0012] Optionally, the method also includes: obtaining a remote control command record of the battery from a remote control table of a monitoring auxiliary database; determining a target message of the battery based on the remote control command record; determining the remote control command of the battery based on the target message; and performing a remote control operation on the battery in response to the remote control command to obtain an operation result of the battery, wherein the operation result is used to characterize the working status of the battery.

[0013] According to one aspect of an embodiment of the present invention, a performance data processing device for a second type of substation equipment is provided. The device may include: a collection unit for collecting first performance data of a battery in the second type of substation equipment, and second performance data of other equipment in the second type of equipment except the battery; a generation unit for generating a first file based on the first performance data; a parsing unit for parsing the first file to obtain first parsed data, and parsing the second performance data to obtain second parsed data; a first acquisition unit for performing an over-limit analysis on the first parsed data and the second parsed data to obtain an analysis result of the target performance data, wherein the target performance data includes the first performance data and the second performance data, and the analysis result is used to characterize whether the first parsed data has an over-limit behavior, and / or whether the second parsed data has an over-limit behavior.

[0014] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided. The computer-readable storage medium includes a stored program, wherein when the program is executed by a processor, the device where the storage medium is located is controlled to execute the method in the embodiment of the present invention.

[0015] According to another aspect of an embodiment of the present invention, a processor is provided. The processor is used to run a program, wherein the method in the embodiment of the present invention is executed when the program is run.

[0016] According to another aspect of the embodiments of the present invention, a computer program product is provided, including a computer program. When the computer program is executed by a processor, the method in the embodiments of the present invention is implemented.

[0017] According to another aspect of an embodiment of the present invention, an electronic device is provided, the electronic device comprising a processor and a memory for storing instructions executable by the processor, wherein the processor is configured to execute the instructions to implement the method in the embodiment of the present invention.

[0018] In an embodiment of the present invention, first performance data of batteries in Class II equipment of a substation and second performance data of other equipment in Class II equipment except batteries are collected; a first file is generated based on the first performance data; the first file is parsed to obtain first parsed data, and the second performance data is parsed to obtain second parsed data; an over-limit analysis is performed on the first parsed data and the second parsed data to obtain an analysis result of target performance data, wherein the target performance data includes the first performance data and the second performance data, and the analysis result is used to characterize whether the first parsed data has an over-limit behavior, and / or whether the second parsed data has an over-limit behavior. That is to say, the embodiment of the present invention can collect the first performance data of the battery in the second type of equipment in the substation, and the second performance data of other equipment in the second type of equipment except the battery, and then generate a first file according to the first performance data, parse the first file to obtain the first parsed data, and parse the second performance data to obtain the second parsed data, and perform an over-limit analysis on the first parsed data and the second parsed data to achieve the purpose of determining the analysis result of the target performance data. Considering that after parsing the first file to obtain the first parsed data and parsing the second performance data to obtain the second parsed data, an over-limit analysis is performed on the first parsed data and the second parsed data to obtain the analysis result for the first parsed data and the second parsed data, so as to obtain the analysis result for characterizing whether the first parsed data has an over-limit behavior and / or whether the second parsed data has an over-limit behavior, the technical problem that the performance data of the second type of equipment in the substation cannot be analyzed and processed is solved, and the technical effect that the performance data of the second type of equipment in the substation can be analyzed and processed is achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0020] Figure 1 is a flow chart of a method for processing performance data of a second type of equipment in a substation according to an embodiment of the present invention;

[0021] Figure 2 is a schematic diagram of a monitoring system for type II equipment in a substation according to an embodiment of the present invention;

[0022] Figure 3 is a flow chart of a monitoring method for Class II equipment in a substation according to an embodiment of the present invention;

[0023] Figure 4 It is a schematic diagram of a performance data processing device for type II equipment in a substation according to an embodiment of the present invention. DETAILED DESCRIPTION

[0024] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0025] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0026] According to an embodiment of the present invention, a method for processing performance data of Class II equipment in a substation is provided. It should be noted that in the flowchart in the accompanying drawings, the steps shown therein can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.

[0027] The following is an introduction to the performance data processing method of the second type of substation equipment according to an embodiment of the present invention.

[0028] Figure 1 is a flow chart of a method for processing performance data of a second type of substation equipment according to an embodiment of the present invention. Figure 1 As shown, the method may include the following steps:

[0029] Step S101, collecting first performance data of batteries in the second type of equipment in the substation, and second performance data of other equipment in the second type of equipment except the batteries.

[0030] In the technical solution provided in the above step S101 of the present invention, the first performance data of the battery in the second type of equipment of the substation and the second performance data of other equipment in the second type of equipment except the battery can be collected. Among them, the battery can be a battery pack. Among them, the second type of equipment of the substation refers to the equipment used in the substation to control, protect, measure and monitor the operating status of the power system of the substation, such as batteries, circuit breakers, grounding switches, relays, protection devices, metering devices, monitoring systems, etc. Here, only examples of the second type of equipment are given, and the second type of equipment is not specifically limited.

[0031] Optionally, the first performance data may be the current and voltage data of the battery collected by the first sensor in the monitoring system of the substation, wherein the first sensor may be represented by sensor 1 and deployed in zone 2 of the monitoring system. The second performance data may be the temperature and humidity, current and voltage, and SF6 gas pressure data of the environment in which other equipment is located collected by the second sensor in the monitoring system, wherein the second sensor may be represented by sensor 2 and deployed in zone 3 of the monitoring system.

[0032] For example, the first performance data is obtained through the second zone sensor 1. The second zone sensor 1 will continuously collect the current, voltage, and resistance values ​​of each battery in the battery pack. These values ​​will be sent to the edge gateway 1 through the power carrier technology. After receiving these data, the edge gateway 1 converts the data into 104 messages according to the order of the point code in the edge gateway, and sends them to the data acquisition module 1. The data acquisition module 1 obtains the serial number information in the telemetry table from the real-time memory library, and then binds the serial number information with the data parsed in the received 104 message in sequence, that is, the telemetry point with the serial number 1 in the telemetry table is bound to the first parsed data in the 104 message, and the telemetry point with the serial number 2 is bound to the second parsed data in the 104 message, and so on. Then the parsed data is stored as a record in the data format of the telemetry code, the collected value and the current time in the collection data table of the real-time memory library. If the data of the telemetry code already exists in the collection data table, the record is replaced, otherwise the record is added to the collection data table.

[0033] For another example, the second performance data can be obtained through the three-zone sensor 2. The three-zone sensor 2 will continuously collect data such as temperature, humidity, SF6 pressure, etc. of the environment where other devices are located. These values ​​will be sent to the edge gateway 2 through the power carrier technology. After receiving these data, the edge gateway 2 converts the data into 104 messages according to the order of point codes in the edge gateway, and sends them to the data acquisition module 2. The data acquisition module 2 obtains the serial number information in the telemetry table from the monitoring auxiliary database, and then binds the data parsed in the received 104 message in sequence according to the serial number order of the serial number information, that is, the telemetry point with serial number 1 in the telemetry table is bound to the first parsed data in the 104 message, and the telemetry point with serial number 2 is bound to the second parsed data in the 104 message, and so on. Then the parsed data is stored as a record in the data format of the telemetry code, the collected value and the current time in the collection data table of the monitoring auxiliary database.

[0034] It should be noted that this is only a preferred implementation for obtaining the first performance data of the battery and the second performance data of other devices, and does not specifically limit the process and method for obtaining the first performance data of the battery and the second performance data of other devices.

[0035] Step S102: Generate a first file based on the first performance data.

[0036] In the technical solution provided in the above step S102 of the present invention, after obtaining the first performance data of the storage battery, a first file can be generated according to the first performance data, wherein the first file can be represented by an E file.

[0037] Optionally, after obtaining the first performance data through the first sensor, the first performance data can be sent to the first edge gateway. After converting the first performance data, the first edge gateway obtains a data message and sends the data message to the first data acquisition module. The first data acquisition module can parse the data message and store the parsed data in a real-time memory library. The data forwarding service module can obtain the latest collected data from the real-time memory library and write the collected data into the first file.

[0038] Optionally, the first edge gateway may be represented by edge gateway 1. The first data acquisition module may be represented by data acquisition module 1. The data forwarding service module may be referred to as data forwarding service. The edge gateway 1, the data acquisition module 1, the real-time memory library, and the data forwarding service module are all deployed in zone 2 of the monitoring system.

[0039] Optionally, the sensor 1 can collect current and voltage data of the battery pack and send the data to the edge gateway 1 via carrier technology; on the other hand, it can receive instructions issued by the edge gateway 1 and perform related operations according to the instructions.

[0040] Optionally, the edge gateway 1 can, on the one hand, receive the collected data sent by the sensor 1, and obtain the data message (104 message) through the forwarding protocol (104 protocol), and send the above-obtained data message to the data acquisition module 1; on the other hand, it can receive the control instructions issued by the data acquisition module 1, and send the control instructions to the sensor 1.

[0041] Optionally, the data acquisition module 1 can receive the message 104 sent by the edge gateway 1, and store the data in the real-time memory library after parsing the message.

[0042] Optionally, the real-time memory library can store the collected data stored in the data collection module 1, and the real-time memory library includes a telemetry table, a remote control table, a plant station table, a collected data table, etc.

[0043] Optionally, the data forwarding service module can obtain the latest collected data from the real-time memory library, write the collected data into an E file, and send the E file to the data receiving service module through forward isolation. The data receiving service module can be referred to as a data receiving service.

[0044] Step S103, parsing the first file to obtain first parsed data, and parsing the second performance data to obtain second parsed data.

[0045] In the technical solution provided in the above step S103 of the present invention, after the first file is obtained in step S102, the first file can be parsed using the data receiving service module to obtain first parsed data, wherein the first parsed data can be referred to as parsed data of the battery.

[0046] For example, the data receiving service module may receive the E file sent by the data forwarding service module, parse the E file, and store the parsed data into the monitoring auxiliary database.

[0047] For another example, the data forwarding service module in zone 2 will read all current data from the collection data table in the real-time memory library every 10 seconds, and write it into the E file in the format of one line of record of telemetry code, collection value and collection time, and then send the E file to the data receiving service module in zone 3 through forward isolation.

[0048] Furthermore, after receiving the E file, the three-zone data receiving service module parses the data in the file, and the parsed format is a data record consisting of telemetry code, collection value and collection time, and the data record is stored in the collection data table of the three-zone monitoring auxiliary database.

[0049] In the embodiment of the present invention, the second performance data may be directly parsed to obtain the second parsed data, where the second parsed data may be referred to as parsed data of other devices.

[0050] Optionally, a second sensor in the monitoring system is used to collect second performance data of other devices, and the second performance data is sent to a second edge gateway through power carrier technology. The second edge gateway can generate a data message (104 message) from the second performance data through the 104 protocol, and send the data message to a second data acquisition module. The second data acquisition module can receive the 104 message sent from the second edge gateway, parse the message, obtain second parsed data, and store the second parsed data in the monitoring auxiliary database.

[0051] Optionally, the second edge gateway may be represented by an edge gateway 2. The second data acquisition module may be represented by a data acquisition module 2. The edge gateway 2, the data acquisition module 2, the data receiving service module and the monitoring auxiliary database are all deployed in three zones of the monitoring system.

[0052] Optionally, the sensor 2 can collect data such as temperature and humidity, current and voltage, and SF6 gas pressure of the environment in which other devices in the second category of equipment are located except for the battery, and send these data to the edge gateway 2 through the power carrier technology.

[0053] Optionally, the edge gateway 2 may collect the collected data sent by the sensor 2 , and generate a message ( 104 message) from the collected data through the 104 protocol and send it to the data collection module 2 .

[0054] Optionally, the data acquisition module 2 may receive the message 104 sent by the edge gateway 2, and after parsing the message, store the parsed data in the monitoring auxiliary database.

[0055] Optionally, the monitoring auxiliary database can store the data collected by the data collection module 2, and the monitoring auxiliary database includes a telemetry table, a plant station table, a telephone table, a limit table, a collection data table and a text message table.

[0056] It can be understood that this is only a preferred implementation method for obtaining the first analysis data and the second analysis data, and the process and method for obtaining the first analysis data and the second analysis data are not specifically limited. As long as the first analysis data is obtained according to the first file, and the second performance data is analyzed, the process and method for obtaining the second analysis data are within the scope of protection of the present invention and are not listed here.

[0057] Step S104: performing an over-limit analysis on the first analysis data and the second analysis data to obtain an analysis result of the target performance data.

[0058] In the technical solution provided in the above step S104 of the present invention, the first analysis data and the second analysis data can be subjected to an out-of-limit analysis to obtain an analysis result of the target performance data, wherein the target performance data includes the first performance data and the second performance data, and the analysis result is used to characterize whether the first analysis data has an out-of-limit behavior, and / or whether the second analysis data has an out-of-limit behavior.

[0059] Optionally, the first parsed data and the second parsed data may be subjected to an out-of-limit analysis using a data analysis module, so as to obtain analysis results of target performance data, wherein the data analysis module is deployed in three zones of the monitoring system.

[0060] For example, after obtaining the first analysis data and the second analysis data, the data analysis module is used to obtain the collected data of different devices from the monitoring auxiliary database to perform off-limit data analysis, and generate an alarm message and send it to the SMS platform, where the SMS platform is used to receive text messages and mobile phone numbers sent by the data analysis module, and send text messages to the mobile phone number, and is deployed in the three zones of the monitoring system.

[0061] The above steps S101 to S104 of the present invention can collect the first performance data of the battery in the second type of equipment in the substation, and the second performance data of other equipment in the second type of equipment except the battery, and then generate a first file according to the first performance data, parse the first file to obtain the first parsed data, and parse the second performance data to obtain the second parsed data, and perform an over-limit analysis on the first parsed data and the second parsed data to achieve the purpose of determining the analysis result of the target performance data. Considering that after parsing the first file to obtain the first parsed data and parsing the second performance data to obtain the second parsed data, an over-limit analysis is performed on the first parsed data and the second parsed data to obtain the analysis result for characterizing whether the first parsed data has an over-limit behavior and / or whether the second parsed data has an over-limit behavior, the technical problem of being unable to analyze and process the performance data of the second type of equipment in the substation is solved, and the technical effect of being able to analyze and process the performance data of the second type of equipment in the substation is achieved.

[0062] The above method of this embodiment is further introduced below.

[0063] As an optional implementation method, an over-limit analysis is performed on the first parsed data and the second parsed data to obtain an analysis result of the target performance data, including: determining a target data set of the target parsed data based on the first parsed data and the second parsed data, wherein the target parsed data includes the first parsed data and the second parsed data, and the target data set is a data set that meets the target time; determining a first telemetry code of a first target record from the target data set, wherein the first target record is any record in the target data set; obtaining a second target record corresponding to a second telemetry code that is the same as the first telemetry code from a limit value table of a monitoring auxiliary database of the second category of equipment; and determining an analysis result based on a first collected value of the first target record and a second collected value of the second target record.

[0064] In this embodiment, the target data set of the target parsed data can be determined based on the first parsed data and the second parsed data, and then the first telemetry code of the first target record can be determined from the target data set. Then, the second telemetry code that is the same as the first telemetry code can be obtained from the limit value table of the monitoring auxiliary database of the second category of equipment. Finally, the purpose of determining the analysis result can be achieved based on the first collected value of the first target record and the second collected value of the second target record corresponding to the second telemetry code.

[0065] Optionally, the target data set may be referred to as a data set, which may be represented by T, and the target time may be a preset time, such as the latest collection time. The first target record may be any record in the target data set, which may be represented by a record R. The second target record may be represented by a record R2. The first telemetry code and the second telemetry code may both be referred to as telemetry codes. The second collection value may be referred to as a collection upper limit.

[0066] For example, the data analysis module obtains a data set T of the latest collection time of all telemetry codes from the collection data table of the monitoring auxiliary database every 30 seconds, and then analyzes each telemetry code in the data set accordingly. Take a record R in the data set T as an example: the data analysis module obtains record R2 whose telemetry code is consistent with the telemetry code of record R from the limit table of the monitoring auxiliary database.

[0067] As an optional implementation method, based on the first acquisition value of the first target record and the second acquisition value of the second target record, an analysis result is determined, including: in response to the first acquisition value being less than the second acquisition value, reading a third target record from the over-limit number set of the target parsing data to obtain a first reading result of the target parsing data, wherein the first reading result is used to characterize whether there is a third target record in the over-limit number set, the third target record being a target record corresponding to a third telemetry code that is the same as the first telemetry code; in response to the first reading result being that the third target record exists in the over-limit number set, resetting the over-limit number of the third target record, and performing over-limit analysis on other target records in the target data set except the first target record to obtain an analysis result; in response to the first reading result being that the third target record does not exist in the over-limit number set, performing over-limit analysis on other target records in the target data set to obtain an analysis result.

[0068] In this embodiment, after obtaining the first acquisition value and the second acquisition value, the first acquisition value and the second acquisition value can be compared. If the first acquisition value is less than the second acquisition value, the third target record corresponding to the third telemetry code that is the same as the first telemetry code can be read from the over-limit times set of the target parsed data, so as to obtain the first reading result of the target parsed data. The over-limit times set can be represented by T2. For example, if the acquisition value of record R is less than the acquisition upper limit of record R2, the record with the same telemetry code as the telemetry code in record R is read from the over-limit times set T2.

[0069] Optionally, if the first reading result is that there is a third target record in the limit-crossing count set, it is necessary to reset the limit-crossing count of the third target record, and then perform limit-crossing analysis on other target records in the target data set except the first target record, so as to obtain the analysis result. For example, after reading a record whose telemetry code is the same as the telemetry code in record R from the limit-crossing count set T2, if such a record exists, reset the limit-crossing count of the telemetry code from the limit-crossing count set T2 to 0, and then analyze the next record in the data set T.

[0070] Optionally, if the first reading result is that the third target record does not exist in the limit-crossing number set, it is necessary to perform limit-crossing analysis on other target records in the target data set to obtain the analysis result. For example, after reading a record whose telemetry code is the same as the telemetry code in record R from the limit-crossing number set T2, if this record does not exist, directly continue to analyze the next record in the data set T.

[0071] As an optional implementation method, an analysis result is determined based on a first collected value of a first target record and a second collected value of a second target record, including: in response to the first collected value being greater than or equal to the second collected value, reading a third target record corresponding to a third telemetry code that is the same as the first telemetry code from the over-limit number set of target parsed data, and obtaining a second reading result of the parsed data, wherein the second reading result is used to characterize whether there is a third target record in the over-limit number set; in response to the second reading result being that there is a third target record in the over-limit number set, performing a summation operation on the over-limit number of the third target record to obtain the over-limit number after the summation operation; adjusting the over-limit number after the summation operation using the target weight to obtain the initial over-limit number; in response to the initial over-limit number exceeding the target over-limit number, determining the analysis result using the monitoring auxiliary database.

[0072] In this embodiment, after comparing the first collected value and the second collected value, if the first collected value is greater than or equal to the second collected value, the third target record corresponding to the third telemetry code that is the same as the first telemetry code can be read from the over-limit number set of the target analysis data to obtain a second reading result of the target analysis data. If the second reading result is that there is a third target record in the over-limit number set, an addition operation can be performed on the over-limit number of the third target record to obtain the over-limit number after the addition operation is performed, and then the over-limit number after the addition operation is multiplied by the target weight to obtain the initial over-limit number. When the initial over-limit number exceeds the target over-limit number, the monitoring auxiliary database can be used to achieve the purpose of determining the analysis result.

[0073] Optionally, the addition operation is performed on the number of limit violations recorded in the third target, which may be an addition operation on the number of limit violations. The target weight may be a preset value, such as 0.5. The initial number of limit violations may be represented by the number of limit violations after adding 1*0.5. The target number of limit violations may be referred to as the limit violation duration, and the limit violation duration is in minutes.

[0074] For example, if the collection value of record R ≥ the collection upper limit of record R2, the data analysis module reads the record with the same telemetry code as the telemetry code of record R from the over-limit number set T2. If such a record exists, the over-limit number of the telemetry code is increased by 1. If the over-limit number after addition of 1*0.5 exceeds the over-limit duration of record R2 (the over-limit duration is in minutes), the monitoring auxiliary database can be used to achieve the purpose of determining the analysis results.

[0075] Optionally, in response to the comparison result that the initial limit-crossing times do not exceed the target limit-crossing times, a limit-crossing analysis is performed on other target records in the target data set except the first target record to obtain an analysis result.

[0076] For example, if the comparison result is that the initial number of limit crossings does not exceed the target number of limit crossings, it is necessary to perform limit crossing analysis on the target records in the target data set except the first target record to obtain the analysis result. For example, if the number of limit crossings after adding 1*0.5 does not exceed the limit crossing duration of record R2, then the next record in the data set T is analyzed.

[0077] As an optional implementation method, in response to the initial number of over-limit times exceeding the target number of over-limit times, the monitoring auxiliary database is used to determine the analysis results, including: when the initial number of over-limit times exceeds the target number of over-limit times, obtaining a fourth target record corresponding to a telemetry code that is the same as the first telemetry code from the telemetry table of the monitoring auxiliary database; obtaining a fifth target record corresponding to a plant station code that is the same as the plant station code of the fourth target record from the plant station table of the monitoring auxiliary database; obtaining a sixth target record corresponding to an attribute plant station code that is the same as the attribute plant station code of the fifth target record from the telephone table of the monitoring auxiliary database; generating an alarm message based on the first target record, the second target record, the third target record, the fourth target record, the fifth target record and the sixth target record; and determining, based on the alarm message, that the analysis result is that the first parsed data has an over-limit behavior, and / or that the second parsed data has an over-limit behavior.

[0078] In this embodiment, when the initial number of over-limit times exceeds the target number of over-limit times, a fourth target record corresponding to a telemetry code identical to the first telemetry code can be obtained from the telemetry table of the monitoring auxiliary database, and then a fifth target record corresponding to a plant station code identical to the plant station code of the fourth target record can be obtained from the plant station table of the monitoring auxiliary database. After obtaining the fifth target record, a sixth target record corresponding to an attribution plant station code identical to the attribution plant station code of the fifth target record can be obtained from the telephone table of the monitoring auxiliary database. Alarm information can be generated based on the acquired first target record, second target record, third target record, fourth target record, fifth target record and sixth target record, so as to achieve the purpose of determining that the analysis result is that the first parsed data has over-limit behavior, and / or that the second parsed data has over-limit behavior according to the alarm information obtained above.

[0079] Optionally, alarm information is generated based on the first target record, the second target record, the fourth target record, the fifth target record, the sixth target record, and the initial number of limit crossings obtained according to the third target record.

[0080] Optionally, the fourth target record may be represented by data record R3, referred to as record R3 for short. The fifth target record may be represented by data record R4, referred to as record R4 for short. The sixth target record may be represented by data record R5, referred to as record R5 for short.

[0081] For example, if the number of over-limit times after adding 1*0.5 exceeds the over-limit duration of record R2, the data analysis module obtains data record R3 whose telemetry code is the same as the telemetry code of record R from the telemetry table of the monitoring auxiliary database, and then obtains data record R4 whose plant station code is the same as the plant station code of record R3 from the plant station table of the monitoring auxiliary database, and then obtains data record R5 whose plant station code is the same as the plant station code of record R4 from the telephone table of the monitoring auxiliary database, and generates an alarm message.

[0082] For another example, the alarm information is: the XX point (telemetry point description of record R3) of XX station (plant station name of record R4) has exceeded the limit for more than XX minutes (the number of limit violations after adding 1 * 0.5), the limit value is XX (the collection upper limit of record R2), and the current value is XX (the collection value of record R).

[0083] As an optional implementation manner, the method further includes: sending the warning information to the target object in text form.

[0084] In this embodiment, after the alarm information is obtained, the alarm information can be sent to the target object in text form. The target object can be a staff member of the substation. Here, only an example is given for the target object, and the target object is not specifically limited.

[0085] For example, the telephone number and alarm information of record R5 are sent to the zone 3 SMS platform in text form. After receiving the telephone number and alarm information text sent by the data analysis module, the zone 3 SMS platform sends the alarm information to the telephone in the form of a text message.

[0086] As an optional embodiment, the method further includes: in response to the second reading result being that the third target record does not exist, storing the first target record in the limit-crossing number set, and updating the limit-crossing number of the first target record.

[0087] In this embodiment, after obtaining the second reading result, if the second reading result is that the third target record does not exist, the first target record can be stored in the limit crossing number set, and the limit crossing number of the first target record can be updated. For example, if there is no record in the limit crossing number set T2 whose telemetry code is the same as the telemetry code of record R, then a record whose telemetry code is the telemetry code of record R and whose limit crossing number is 1 is stored in the limit crossing number set T2.

[0088] As an optional implementation mode, the method also includes: obtaining a remote control command record of the battery from a remote control table of a monitoring auxiliary database; determining a target message of the battery based on the remote control command record; determining a remote control command of the battery based on the target message; and performing a remote control operation on the battery in response to the remote control command to obtain an operation result of the battery, wherein the operation result is used to characterize the working state of the battery.

[0089] In this embodiment, the remote control command record of the battery can be first obtained from the remote control table of the monitoring auxiliary database, and then the target message of the battery can be determined according to the remote control command record obtained above. According to the target message, the remote control command of the battery can be determined, and in response to the remote control command, the remote control operation can be performed on the battery to obtain the operation result used to characterize the working state of the battery. Among them, the remote control command record can be represented by R6, which can be called record R6, and the record includes a network address (IP address) and a remote control code.

[0090] For example, the data acquisition module 1 obtains the remote control command record R6 from the remote control table of the real-time memory library, and obtains the IP address and remote control code from the record R6, and then converts the remote control code into a 104 message, and sends it with the IP address in R6 (the IP address is an edge-independent IP address). After the edge gateway 1 receives the 104 message, it parses the remote control code in the message, and obtains the remote control command preset in the gateway according to the remote control code (the remote control command includes the remote control address and action information), and then sends the remote control command to the corresponding remote control address and performs the corresponding remote control operation.

[0091] In this embodiment, the first performance data of the battery in the second type of equipment in the substation and the second performance data of other equipment in the second type of equipment except the battery can be collected, and then a first file is generated according to the first performance data, and the first file is parsed to obtain the first parsed data, and the second performance data is parsed to obtain the second parsed data, and an over-limit analysis is performed on the first parsed data and the second parsed data to achieve the purpose of determining the analysis result of the target performance data. Considering that after the first file is parsed to obtain the first parsed data, and the second performance data is parsed to obtain the second parsed data, an over-limit analysis is performed on the first parsed data and the second parsed data to obtain the analysis result for the first parsed data, so as to obtain the analysis result for characterizing whether the first parsed data has an over-limit behavior, and / or whether the second parsed data has an over-limit behavior, the technical problem of being unable to analyze and process the performance data of the second type of equipment in the substation is solved, and the technical effect of being able to analyze and process the performance data of the second type of equipment in the substation is achieved.

[0092] The technical solution of the embodiment of the present invention is illustrated below in conjunction with preferred implementation modes.

[0093] The monitoring data of Class II equipment in substations refers to the equipment environment data and equipment status monitoring data that do not directly affect the real-time operation of the equipment, including battery current and voltage, battery internal resistance, equipment environment temperature and humidity, SF6 meter data, single-point grounding status of voltage transformer (PT), solenoid valve control power switch status of gas drive bottle, fire water tank level, fire water pipe pressure, etc. However, the above data does not belong to the monitoring responsibilities of the dispatching and monitoring center, and the relevant data cannot be connected to the automation system of the dispatching and monitoring center for centralized monitoring. The traditional method is to monitor Class II equipment in substations through regular manual on-site inspections, which leads to the technical problem of being unable to analyze and process the performance data of Class II equipment in substations.

[0094] Therefore, in order to solve the above problems, the present invention proposes a performance data processing method for Class II equipment in a substation, which can collect the first performance data of the battery in the Class II equipment of the substation, and the second performance data of other equipment in the Class II equipment except the battery, and then generate a first file according to the first performance data, parse the first file to obtain the first parsed data, and parse the second performance data to obtain the second parsed data, and perform an over-limit analysis on the first parsed data and the second parsed data to achieve the purpose of determining the analysis result of the target performance data. Considering that after parsing the first file to obtain the first parsed data and parsing the second performance data to obtain the second parsed data, an over-limit analysis is performed on the first parsed data and the second parsed data to obtain the analysis result for the first parsed data and the second parsed data, so as to obtain the analysis result for characterizing whether the first parsed data has an over-limit behavior and / or whether the second parsed data has an over-limit behavior, the technical problem that the performance data of Class II equipment in the substation cannot be analyzed and processed is solved, and the technical effect that the performance data of Class II equipment in the substation can be analyzed and processed is achieved.

[0095] In an embodiment of the present invention, Figure 2 is a schematic diagram of a monitoring system for Class II equipment in a substation according to an embodiment of the present invention. Figure 2 As shown, the schematic diagram includes: a first sensor 201, a first edge gateway 202, a first data acquisition module 203, a real-time memory library 204, a data forwarding service module 205, a second sensor 206, a second edge gateway 207, a second data acquisition module 208, a data receiving service module 209, a monitoring auxiliary database 210, a data analysis module 211 and a text message platform 212.

[0096] In this embodiment, the first sensor may be sensor 1. The first edge gateway may be edge gateway 1. The first data acquisition module may be data acquisition module 1. Edge gateway 1, data acquisition module 1, real-time memory library, and data forwarding service module are all deployed in zone 2 of the monitoring system. The second sensor may be sensor 2. The second edge gateway may be edge gateway 2. The second data acquisition module may be data acquisition module 2. Sensor 2, edge gateway 2, data acquisition module 2, data receiving service module, monitoring auxiliary database, data analysis module, and SMS platform are all deployed in zone 3 of the monitoring system. There is forward and reverse isolation between zone 2 and zone 3.

[0097] The first sensor 201 is used to collect current and voltage data of the battery pack and send the data to the edge gateway 1 through carrier technology; it is used to receive instructions sent by the edge gateway 1 and perform related operations according to the instructions.

[0098] The first edge gateway 202 is used to receive the collected data sent by sensor 1, and obtain the data message (104 message) through the forwarding protocol (104 protocol), and send the above-obtained data message to the data acquisition module 1; on the other hand, it can receive the control instructions issued by the data acquisition module 1, and send the control instructions to the sensor 1.

[0099] The first data acquisition module 203 is used to receive the message 104 sent by the edge gateway 1, and store the data in the real-time memory after parsing the message.

[0100] The real-time memory library 204 is used to store the collected data stored in the data collection module 1. At the same time, the real-time memory library contains telemetry tables, remote control tables, plant station tables, collected data tables, etc.

[0101] The data forwarding service module 205 is used to obtain the latest collected data from the real-time memory library, write the collected data into the E file, and send the E file to the data receiving service module through forward isolation.

[0102] The second sensor 206 is used to collect data such as temperature and humidity, current and voltage, and SF6 gas pressure of the environment in which other devices in the second category of equipment are located except for the battery, and send these data to the edge gateway 2 through the power carrier technology.

[0103] The second edge gateway 207 is used to collect the collected data sent by the sensor 2, and generate a message (104 message) from the collected data through the 104 protocol and send it to the data collection module 2.

[0104] The second data acquisition module 208 is used to receive the message 104 sent by the edge gateway 2, parse the message, and store the parsed data in the monitoring auxiliary database.

[0105] The data receiving service module 209 is used to receive the E file sent by the data forwarding service module, parse the E file, and store the parsed data into the monitoring auxiliary database.

[0106] The monitoring auxiliary database 210 is used to store the data collected by the data collection module 2. The monitoring auxiliary database also includes a telemetry table, a plant station table, a telephone table, a limit table, a collection data table and a text message table.

[0107] The data analysis module 211 is used to obtain the collected data of different devices from the monitoring auxiliary database to perform off-limit data analysis, and generate alarm information and send it to the SMS platform.

[0108] The SMS platform 212 is used to receive the text message and mobile phone number sent by the data analysis module, and send the text message to the mobile phone number.

[0109] Optionally, the telemetry table may include telemetry code, serial number, point description, plant station code and telemetry type; the remote control table may include remote control code, plant station code, IP address and remote control type; the plant station table may include plant station code and plant station name; the collection data table may include telemetry code, collection value and collection time; the telephone table may include telephone number and affiliated plant station code; the limit value table may include telemetry code, collection upper limit, over-limit time and number of alarms; the SMS table may include telephone number, SMS content and sending time.

[0110] In an embodiment of the present invention, Figure 3 is a flow chart of a monitoring method for a type II substation device according to an embodiment of the present invention. Figure 3 As shown, the monitoring method comprises the following steps:

[0111] Step S301, collecting data using the second zone sensor.

[0112] In this embodiment, the second zone sensor 1 will continuously collect the current, voltage and resistance values ​​of each battery in the battery pack, and these values ​​will be sent to the edge gateway 1 through the power carrier technology. After receiving these data, the edge gateway 1 converts the data into 104 messages according to the order of the point code in the edge gateway, and sends them to the data acquisition module 1. The data acquisition module 1 obtains the serial number information in the telemetry table from the real-time memory library, and then binds the data parsed in the received 104 message in sequence according to the serial number order of the serial number information, that is, the telemetry point with the serial number 1 in the telemetry table is bound to the first parsed data in the 104 message, and the telemetry point with the serial number 2 is bound to the second parsed data in the 104 message, and so on. Then the parsed data is stored as a record in the data format of the telemetry code, the collected value and the current time in the collection data table of the real-time memory library. If the data of the telemetry code already exists in the collection data table, the record is replaced, otherwise the record is added to the collection data table.

[0113] Step S302: forwarding data in zone 2.

[0114] In this embodiment, the data forwarding service module of the second zone reads all current data from the collection data table in the real-time memory library every 10 seconds, and writes it into the E file in the format of a line of records consisting of telemetry code, collection value and collection time, and then sends the E file to the data receiving service module of the third zone through forward isolation. Furthermore, after receiving the E file, the data receiving service module of the third zone parses the data of the file, and the format parsed is a data record consisting of telemetry code, collection value and collection time, and the data record is stored in the collection data table of the monitoring auxiliary database of the third zone.

[0115] Step S303, collecting data using the three-zone sensor.

[0116] In this embodiment, the three-zone sensor 2 will continuously collect data such as temperature, humidity, SF6 pressure, etc. of the environment where other devices are located. These values ​​will be sent to the edge gateway 2 through the power carrier technology. After receiving these data, the edge gateway 2 converts the data into 104 messages according to the order of the point code in the edge gateway, and sends it to the data acquisition module 2. The data acquisition module 2 obtains the serial number information in the telemetry table from the monitoring auxiliary database, and then binds the data parsed in the received 104 message in sequence according to the serial number order of the serial number information, that is, the telemetry point with serial number 1 in the telemetry table is bound to the first parsed data in the 104 message, the telemetry point with serial number 2 is bound to the second parsed data in the 104 message, and so on. Then the parsed data is stored as a record in the data format of the telemetry code, the collected value and the current time in the collection data table of the monitoring auxiliary database.

[0117] Step S304: perform an out-of-limit analysis on the collected data.

[0118] In this embodiment, the data analysis module obtains a data set T of the latest collection time of all telemetry codes from the collection data table of the monitoring auxiliary database every 30 seconds, and then analyzes each telemetry code in the data set accordingly. Take a record R in the data set T as an example: the data analysis module obtains record R2 whose telemetry code is consistent with the telemetry code of record R from the limit table of the monitoring auxiliary database. If the collection value of record R is ≥ the collection upper limit of record R2, execute step S3041.

[0119] Optionally, if the collection value of record R is less than the collection upper limit of record R2, then read the record whose telemetry code is the same as the telemetry code in record R from the limit-crossing times set T2. If such a record exists, reset the limit-crossing times of the telemetry code to 0 from the limit-crossing times set T2, and then analyze the next record in data set T. If such a record does not exist, directly continue to analyze the next record in data set T.

[0120] Step S3041, based on the telemetry code of record R, analyze the number of times the limit is exceeded in record R to obtain the analysis result.

[0121] In this embodiment, if the collection value of record R is ≥ the collection upper limit of record R2, the data analysis module reads the record with the same telemetry code as the telemetry code of record R from the over-limit number set T2. If such a record exists, the over-limit number of the telemetry code is increased by 1. If the over-limit number after addition of 1*0.5 exceeds the over-limit duration of record R2 (the over-limit duration is in minutes), step S3042 is executed.

[0122] Optionally, if the number of limit violations*0.5 after adding 1 does not exceed the limit violation duration of record R2, then the next record in data set T is analyzed. If there is no record in the limit violation set T2 whose telemetry code is the same as the telemetry code of record R, then the record whose telemetry code is the telemetry code of record R and whose limit violation number is 1 is stored in the limit violation set T2.

[0123] Step S3042: Generate warning information based on the analysis results.

[0124] In this embodiment, if the number of over-limit times after adding 1*0.5 exceeds the over-limit duration of record R2, the data analysis module obtains data record R3 whose telemetry code is the same as the telemetry code of record R from the telemetry table of the monitoring auxiliary database, and then obtains data record R4 whose plant station code is the same as the plant station code of record R3 from the plant station table of the monitoring auxiliary database, and then obtains data record R5 whose plant station code is the same as the plant station code of record R4 from the telephone table of the monitoring auxiliary database, and generates an alarm message.

[0125] Optionally, the alarm information is: XX point (record R3 telemetry point description) of XX station (record R4 plant station name) exceeds the limit for more than XX minutes (number of limit violations after adding 1 * 0.5), the limit value is XX (record R2 collection upper limit), and the current value is XX (record R collection value). The telephone number of record R5 and the alarm information are sent to the SMS platform of the third zone in text form.

[0126] Step S305: SMS alarm notification.

[0127] In this embodiment, after receiving the phone number and the alarm information text sent by the data analysis module, the three-zone SMS platform sends the alarm information to the phone in the form of a text message.

[0128] Step S306: remote core capacity of zone 2.

[0129] In this embodiment, the data acquisition module 1 obtains the remote control command record R6 from the remote control table of the real-time memory library, and obtains the IP address and remote control code from the record R6, and then converts the remote control code into a 104 message, and sends it with the IP address in R6 (the IP address is an edge-independent IP address). After receiving the 104 message, the edge gateway 1 parses the remote control code in the message, and obtains the remote control command preset in the gateway according to the remote control code, and then sends the remote control command to the corresponding remote control address and performs the corresponding remote control operation.

[0130] In this embodiment, the first performance data of the battery in the second type of equipment in the substation and the second performance data of other equipment in the second type of equipment except the battery can be collected, and then a first file is generated according to the first performance data, and the first file is parsed to obtain the first parsed data, and the second performance data is parsed to obtain the second parsed data, and an over-limit analysis is performed on the first parsed data and the second parsed data to achieve the purpose of determining the analysis result of the target performance data. Considering that after the first file is parsed to obtain the first parsed data, and the second performance data is parsed to obtain the second parsed data, an over-limit analysis is performed on the first parsed data and the second parsed data to obtain the analysis result for the first parsed data, so as to obtain the analysis result for characterizing whether the first parsed data has an over-limit behavior, and / or whether the second parsed data has an over-limit behavior, the technical problem of being unable to analyze and process the performance data of the second type of equipment in the substation is solved, and the technical effect of being able to analyze and process the performance data of the second type of equipment in the substation is achieved.

[0131] According to an embodiment of the present invention, a performance data processing device for a type II substation device is provided. It should be noted that the performance data processing device for a type II substation device can be used to execute a performance data processing method for a type II substation device in embodiment 1.

[0132] Figure 4 Schematic diagram of a performance data processing device for a type II substation device according to an embodiment of the present invention. Figure 4 As shown, a performance data processing device 400 for a type II device in a substation may include: a collection unit 401 , a generation unit 402 , a parsing unit 403 and a first acquisition unit 404 .

[0133] The collection unit 401 is used to collect the first performance data of the storage battery in the second type of equipment in the substation, and the second performance data of other equipment in the second type of equipment except the storage battery.

[0134] The generating unit 402 is configured to generate a first file based on the first performance data.

[0135] The parsing unit 403 is used to parse the first file to obtain first parsed data, and to parse the second performance data to obtain second parsed data.

[0136] The first acquisition unit 404 is used to perform an out-of-limit analysis on the first parsed data and the second parsed data to obtain an analysis result of the target performance data, wherein the target performance data includes the first performance data and the second performance data, and the analysis result is used to characterize whether the first parsed data has an out-of-limit behavior and / or whether the second parsed data has an out-of-limit behavior.

[0137] Optionally, the first acquisition unit 404 includes: a first determination module, used to determine a target data set of target parsed data based on the first parsed data and the second parsed data, wherein the target parsed data includes the first parsed data and the second parsed data, and the target data set is a data set that meets the target time; a second determination module, used to determine a first telemetry code of a first target record from the target data set, wherein the first target record is any record in the target data set; a first acquisition module, used to obtain a second target record corresponding to a second telemetry code that is the same as the first telemetry code from a limit table of a monitoring auxiliary database of a Class II device; a third determination module, used to determine an analysis result based on a first collected value of the first target record and a second collected value of the second target record.

[0138] Optionally, the third determination module may include: a first reading submodule, for reading a third target record from the over-limit number set of the target parsing data in response to the first acquisition value being less than the second acquisition value, and obtaining a first reading result of the target parsing data, wherein the first reading result is used to characterize whether there is a third target record in the over-limit number set, and the third target record is a target record corresponding to a third telemetry code that is the same as the first telemetry code; a first acquisition submodule, for resetting the over-limit number of the third target record in response to the first reading result being that the third target record exists in the over-limit number set, and performing an over-limit analysis on other target records in the target data set except the first target record to obtain an analysis result; and a second acquisition submodule, for performing an over-limit analysis on other target records in the target data set to obtain an analysis result in response to the first reading result being that the third target record does not exist in the over-limit number set.

[0139] Optionally, the third determination module also includes: a second reading submodule, for responding to the first acquisition value being greater than or equal to the second acquisition value, reading a third target record corresponding to a third telemetry code that is the same as the first telemetry code from the over-limit number set of the target parsing data, and obtaining a second reading result of the parsing data, wherein the second reading result is used to characterize whether there is a third target record in the over-limit number set; a third acquisition submodule, for responding to the second reading result being that the third target record exists in the over-limit number set, performing a summation operation on the over-limit number of the third target record, and obtaining the over-limit number after the summation operation; a fourth acquisition submodule, for adjusting the over-limit number after the summation operation using the target weight to obtain the initial over-limit number; a determination submodule, for responding to the initial over-limit number exceeding the target over-limit number, and determining the analysis result using the monitoring auxiliary database.

[0140] Optionally, the determination submodule can be used to obtain, when the initial number of over-limit times exceeds the target number of over-limit times, a fourth target record corresponding to a telemetry code that is the same as the first telemetry code from the telemetry table of the monitoring auxiliary database; to obtain, from the plant station table of the monitoring auxiliary database, a fifth target record corresponding to a plant station code that is the same as the plant station code of the fourth target record; to obtain, from the telephone table of the monitoring auxiliary database, a sixth target record corresponding to an attribution plant station code that is the same as the attribution plant station code of the fifth target record; to generate an alarm message based on the first target record, the second target record, the third target record, the fourth target record, the fifth target record and the sixth target record; and to determine, based on the alarm message, that the analysis result is that there is an over-limit behavior in the first parsed data and / or that there is an over-limit behavior in the second parsed data.

[0141] Optionally, the determination submodule may also be used to send the warning information to the target object in text form.

[0142] Optionally, the determination submodule may be configured to, in response to the second reading result indicating that the third target record does not exist, store the first target record in the limit-crossing times set and update the limit-crossing times of the first target record.

[0143] Optionally, the device may include: a second acquisition unit, used to acquire the remote control command record of the battery from the remote control table of the monitoring auxiliary database; a first determination unit, used to determine the target message of the battery based on the remote control command record; a second determination unit, used to determine the remote control command of the battery based on the target message; a third acquisition unit, used to perform remote control operation on the battery in response to the remote control command, and obtain the operation result of the battery, wherein the operation result is used to characterize the working state of the battery.

[0144] In this embodiment, the first performance data of the battery in the second type of equipment in the substation and the second performance data of other equipment in the second type of equipment except the battery are collected by the collection unit; the first file is generated based on the first performance data by the generation unit; the first file is parsed by the parsing unit to obtain the first parsed data, and the second performance data is parsed to obtain the second parsed data; the first acquisition unit performs an over-limit analysis on the first parsed data and the second parsed data to obtain the analysis result of the target performance data, wherein the target performance data includes the first performance data and the second performance data, and the analysis result is used to characterize whether the first parsed data has over-limit behavior, and / or whether the second parsed data has over-limit behavior, thereby solving the technical problem of being unable to analyze and process the performance data of the second type of equipment in the substation, and achieving the technical effect of being able to analyze and process the performance data of the second type of equipment in the substation.

[0145] According to an embodiment of the present invention, a computer-readable storage medium is also provided, which includes a stored program, wherein when the program is executed by a processor, the device where the readable storage medium is located is controlled to execute the performance data processing method of the second type of substation equipment in the embodiment.

[0146] According to an embodiment of the present invention, a processor is further provided, and the processor is used to run a program, wherein when the program is run, the performance data processing method of the second type of substation equipment in the embodiment is executed.

[0147] According to an embodiment of the present invention, a computer program product is also provided, including a computer program, and when the computer program is executed by a processor, the performance data processing method of the second type of substation equipment in the embodiment of the present invention is implemented.

[0148] According to an embodiment of the present invention, an electronic device is also provided, the electronic device comprising a processor and a memory for storing instructions executable by the processor, wherein the processor is configured to execute instructions to implement the performance data processing method of the second type of substation equipment in the embodiment of the present invention.

[0149] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0150] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0151] In the several embodiments provided by the present invention, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic, for example, the division of units can be a logical function division, and there can be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point, the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0152] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed over multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0153] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0154] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the methods of each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.

[0155] The above are only preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for processing performance data of Class II equipment in a substation, characterized in that: include: Collecting first performance data of batteries in the second type of equipment in the substation, and second performance data of other equipment in the second type of equipment except the batteries; generating a first file based on the first performance data; Parsing the first file to obtain first parsed data, and parsing the second performance data to obtain second parsed data; An out-of-limit analysis is performed on the first parsed data and the second parsed data to obtain an analysis result of the target performance data, wherein the target performance data includes the first performance data and the second performance data, and the analysis result is used to characterize whether the first parsed data has an out-of-limit behavior, and / or whether the second parsed data has the out-of-limit behavior.

2. The method according to claim 1, characterized in that Performing an over-limit analysis on the first parsed data and the second parsed data to obtain an analysis result of the target performance data includes: Determine a target data set of target parsed data based on the first parsed data and the second parsed data, wherein the target parsed data includes the first parsed data and the second parsed data, and the target data set is a data set that meets a target time; Determine a first telemetry code of a first target record from the target data set, wherein the first target record is any record in the target data set; Obtaining, from the limit value table of the monitoring auxiliary database of the second type of equipment, a second target record corresponding to a second telemetry code that is the same as the first telemetry code; The analysis result is determined based on a first collected value of the first target record and a second collected value of the second target record.

3. The method according to claim 2, characterized in that Determining the analysis result based on the first collected value of the first target record and the second collected value of the second target record includes: In response to the first acquisition value being less than the second acquisition value, a third target record is read from the limit-crossing times set of the target parsing data to obtain a first reading result of the target parsing data, wherein the first reading result is used to indicate whether the third target record exists in the limit-crossing times set, and the third target record is a target record corresponding to a third telemetry code that is the same as the first telemetry code; In response to the first reading result indicating that the third target record exists in the limit-crossing times set, resetting the limit-crossing times of the third target record, and performing the limit-crossing analysis on other target records in the target data set except the first target record to obtain the analysis result; In response to the first reading result being that the third target record does not exist in the limit-crossing number set, the limit-crossing analysis is performed on the other target records in the target data set to obtain the analysis result.

4. The method according to claim 2, characterized in that: Determining the analysis result based on the first collected value of the first target record and the second collected value of the second target record includes: In response to the first acquisition value being greater than or equal to the second acquisition value, reading a third target record corresponding to a third telemetry code that is the same as the first telemetry code from the limit-crossing number set of the target parsing data, to obtain a second reading result of the target parsing data, wherein the second reading result is used to indicate whether the third target record exists in the limit-crossing number set; In response to the second reading result being that the third target record exists in the limit-crossing number set, performing a sum operation on the limit-crossing number of the third target record to obtain the limit-crossing number after performing the sum operation; The target weight is used to adjust the number of limit crossings after the sum operation is performed to obtain an initial number of limit crossings; In response to the initial number of limit crossings exceeding the target number of limit crossings, the analysis result is determined using the monitoring auxiliary database.

5. The method according to claim 4, characterized in that In response to the initial number of limit crossings exceeding the target number of limit crossings, determining the analysis result using the monitoring auxiliary database includes: When the initial number of limit crossings exceeds the target number of limit crossings, obtaining a fourth target record corresponding to a telemetry code identical to the first telemetry code from a telemetry table of the monitoring auxiliary database; Acquire, from the plant station table of the monitoring auxiliary database, a fifth target record corresponding to the plant station code which is the same as the plant station code of the fourth target record; Acquire, from the telephone table of the monitoring auxiliary database, a sixth target record corresponding to the home plant station code which is the same as the home plant station code of the fifth target record; generating warning information based on the first target record, the second target record, the third target record, the fourth target record, the fifth target record and the sixth target record; Based on the alarm information, it is determined that the analysis result is that the first parsed data has the over-limit behavior, and / or that the second parsed data has the over-limit behavior.

6. The method according to claim 5, characterized in that The method further comprises: The warning information is sent to the target object in text form.

7. The method according to claim 4, characterized in that The method further comprises: In response to the second reading result being that the third target record does not exist, the first target record is stored in the limit-crossing number set, and the limit-crossing number of the first target record is updated.

8. The method according to any one of claims 1 to 7, characterized in that The method further comprises: Obtaining the remote control command record of the battery from the remote control table of the monitoring auxiliary database; Determining a target message for the battery based on the remote control command record; Determining a remote control instruction of the battery based on the target message; In response to the remote control instruction, a remote control operation is performed on the storage battery to obtain an operation result of the storage battery, wherein the operation result is used to characterize the working state of the storage battery.

9. A performance data processing device for Class II equipment in a substation, characterized in that: include: A collection unit, used for collecting first performance data of batteries in the second type of equipment in the substation, and second performance data of other equipment in the second type of equipment except the batteries; A generating unit, configured to generate a first file based on the first performance data; A parsing unit, configured to parse the first file to obtain first parsed data, and parse the second performance data to obtain second parsed data; A first acquisition unit is used to perform an out-of-limit analysis on the first parsed data and the second parsed data to obtain an analysis result of target performance data, wherein the target performance data includes the first performance data and the second performance data, and the analysis result is used to characterize whether the first parsed data has an out-of-limit behavior, and / or whether the second parsed data has the out-of-limit behavior.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein when the program is executed by a processor, the device where the storage medium is located is controlled to execute the method according to any one of claims 1 to 8.