Segmented declaration strategy method based on clearing price prediction and transaction probability preference
By adopting the segmented declaration strategy of clearing price prediction and transaction probability preference in the power market, the problem of relying on static data on the formulation of power purchasing strategies in the power market is solved, the optimization of supply and demand matching and the improvement of market forecasts are achieved, and the power is promoted. The healthy development of the market.
Patent Information
- Application Number
- CN202411051823.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-12-06
AI Technical Summary
The current technology relies on static historical data in the power market, and lacks real-time response capabilities, resulting in inaccurate matching of supply and demand, insufficient accuracy in clearing price prediction and transaction probability estimation, which cannot meet the needs of power market-oriented reform.
Adopt segmented declaration strategies based on clearing price prediction and transaction probability preference, and optimize the power purchase strategy of power grid enterprises, reasonably match the electricity price and electricity quantity, and adjust the Market transaction declaration price and transaction rate probability model.
Effectively analyze and predict the supply and demand relationship of the power market, optimize power purchase strategies, ensure reasonable user interests, achieve full utilization of resources, improve market forecasting accuracy, and promote the healthy development of the power market.
Smart Images

Figure CN119090529A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power market transactions, and in particular to a segmented declaration strategy method based on clearing price prediction and transaction probability preference. Background Art
[0002] With the deepening of electricity market reform, the cancellation of industrial and commercial catalog sales electricity prices and the promotion of industrial and commercial users to fully enter the market have become important trends. In order to ensure that industrial and commercial users can enter the electricity market smoothly and orderly, power grid companies have begun to act as agents to purchase electricity through market-oriented methods to help those users who are not directly involved in market transactions. In this context, provincial power grid companies need to formulate reasonable electricity purchasing strategies to ensure the legitimate interests of users, make full use of resources, and meet the expected transaction rate.
[0003] In the existing technology, power grid companies face multiple challenges in formulating power purchasing strategies. Traditional power purchasing strategies often rely on static historical data analysis and lack the ability to respond to market dynamics in real time. In addition, in the existing power purchase and sales market, the supply and demand relationship is complex and changeable. When dealing with insufficient or tight power supply, power grid companies often cannot achieve accurate matching of different user types, resulting in waste of resources or damage to user interests. At the same time, traditional methods have insufficient accuracy in clearing price forecasting and transaction probability estimation, and cannot effectively meet the needs of power market reform.
[0004] The present invention aims to provide a segmented declaration strategy method based on clearing price prediction and transaction probability preference to solve the deficiencies in the prior art. Summary of the invention
[0005] Based on the above objectives, the present invention provides a segmented declaration strategy method based on clearing price prediction and transaction probability preference.
[0006] A segmented declaration strategy method based on clearing price prediction and transaction probability preference includes the following steps:
[0007] S1, data collection: collect spot electricity purchase and sales data within the province from both buyers and sellers, including electricity volume, electricity price and transaction completion rate information;
[0008] S2, scenario construction and supply and demand analysis: Build the spot purchase and sales scenario within the province, and calculate and determine the spot supply and demand scenario within the province on the power generation side based on the collected power purchase and sales data;
[0009] S3, transaction rate probability density estimation: the transaction rate probability density is estimated based on the historical clearing electricity price, and a probability density model based on the clearing electricity price is obtained;
[0010] S4, power purchase declaration strategy formulation: forming a power purchase declaration strategy consisting of clearing price forecasts and transaction probability segments;
[0011] S5. Review and analysis of spot trading results within the province: Based on the results of the clearing price forecast and the transaction rate probability model, the declared effect of the power generation side is reviewed and analyzed, and the market transaction declared price and the transaction rate probability model are adjusted according to the results of the review and analysis.
[0012] Furthermore, the data collection in S1 includes:
[0013] S11, define the total power of the whole system: the calculation formula of the total power of the whole system is:
[0014] Q t,sys =Q t,inter +Q t,intra =Q t,inter,p +Q t,intra,p +Q t,inter,n +Q t,intra,n ;
[0015] Among them, Q t,sys is the total power of the whole system, Q t,inter is the contractual electricity quantity in the period t signed by the government between the sending and receiving power grids, Q t,intra is the contracted electricity volume of the inter-grid power purchase contract signed between the provincial power grid enterprise and the priority power generation enterprise in period t, Q t,inter,p Q is the medium- and long-term electricity consumption between provinces. t,intra,p is the medium- and long-term electricity consumption in the province, Q t,inter,n For the province's spot electricity, Q t,intra,n It is the spot electricity in the province;
[0016] S12, define the power gap: the calculation formula of the power gap is:
[0017] Q u =Q t,s +Q t,d +Q t,m -Q t,sys ;
[0018] Among them, Q t,s To ensure the power consumption of users, Q t,d is the power consumption of the proxy user, Q t,m For market-based trading of user electricity consumption, Q u For power shortage;
[0019] S13, power balance condition: Under the power balance condition, the power supply on the power generation side is equal to the power demand on the power consumption side, and the power gap is zero. At this time, the total power consumption of the whole system in period t is the sum of the power consumption of market-based trading users and the power guarantee users and grid agent industrial and commercial users, expressed as:
[0020] Q t,sys =Q t,s +Q t,d +Q t,m .
[0021] Furthermore, the scenario construction and supply and demand analysis in S2 include:
[0022] S21, analysis of power supply sufficiency: if there is still surplus power supply after the power generation side meets all power demand, the low-price contract will be matched to the guaranteed users first, and the actual power purchase price of guaranteed users, industrial and commercial users and trading users will be calculated;
[0023] S22, power supply shortage analysis: when power supply is insufficient but part of the demand is still met under the principle of priority power generation and purchase, calculate the actual power purchase price for security users, industrial and commercial users, and trading users;
[0024] S23, analysis of power supply shortage: In the case of power supply shortage, priority will be given to matching low-priced power sources and external electricity, and the shortfall will be supplemented by new energy sources. The actual power purchase price for security users, industrial and commercial users, and trading users will be calculated.
[0025] Furthermore, the power supply sufficiency analysis in S21 includes:
[0026] S211, Definition of insufficient power supply: If Q u ≤0, then there is still surplus power supply on the power generation side after meeting all power demand on the power consumption side;
[0027] S212, low-price contract matching: Grid purchasing agents will give priority to matching low-price contracts to residents and agricultural security users;
[0028] S213, contract electricity price and quantity sorting: Sort by electricity price from low to high, obtain the electricity price of the power purchase contract and its corresponding quantity, the calculation formula is:
[0029] P={P t (1),P t (2),...,P t (m),...,P t (K)};
[0030] Q={Q t (1),Q t (2),...,Q t (m),...,Q t (K)};
[0031] P t (m) <P t (m+1);
[0032] Among them, P t (K), Q t (K) are the contract electricity price and electricity quantity with the electricity price order K in period t;
[0033] S214, calculation of power grid agency power purchase price and power quantity: Calculate the power purchase contract price and power quantity information corresponding to the power grid agency power purchase. The calculation formula is:
[0034] P t,dr = {P t (m)...P t (K)};
[0035]
[0036] Where P t,dr is the price matrix of the power purchasing contract during period t, Q t,dr is the electricity matrix of the electricity purchasing contract during period t;
[0037] S215, calculation of electricity purchase price for industrial and commercial users when power supply is sufficient: Calculate the actual price of electricity purchased by the power grid on behalf of industrial and commercial users during period t when power supply is sufficient. The calculation formula is:
[0038]
[0039] S216, calculation of the electricity purchase price for guaranteed users when the power supply is sufficient: Calculate the actual electricity purchase price for guaranteed users in time period t when the power supply is sufficient. The calculation formula is:
[0040] P t,s =min{P t (i)};
[0041] S217, Calculation of electricity purchase price for trading users when electricity supply is sufficient: Calculate the actual electricity purchase price for market trading users in period t when electricity supply is sufficient. The calculation formula is:
[0042]
[0043] in, It is the average market transaction price.
[0044] Furthermore, the power supply shortage analysis in S22 includes:
[0045] S221, Definition of insufficient power supply: If Q u >0, and under the principle of priority power generation and power purchase, Q t,s +Q t,d ≤Q t,sys t,s +Q t,d +Qt,m ;
[0046] S222, calculation of the electricity purchase price for guaranteed users when power supply is insufficient: Calculate the actual electricity purchase price for guaranteed users in period t when power supply is insufficient. The calculation formula is:
[0047] P t,s =min{P t (i)};
[0048] S223, calculation of the electricity purchase price for industrial and commercial users when the power supply is insufficient, calculate the actual price of electricity purchased by the power grid on behalf of industrial and commercial users during period t when the power supply is insufficient, the calculation formula is:
[0049]
[0050] S224, calculation of electricity purchase price for trading users when power supply is insufficient: Calculate the actual price of electricity purchased by market-based trading users during period t when power supply is insufficient. The calculation formula is:
[0051]
[0052] Furthermore, the power supply shortage analysis in S23 includes:
[0053] S231, Definition of power supply shortage: Q u >0, and under the principle of priority power generation and power purchase, Q t,s ≤Q t,sys t,s +Q t,d +Q t,m ;
[0054] S232, Priority in purchasing electricity: In terms of electricity supply, priority is given to purchasing electricity with low-priced power sources within the province and external electricity (including coal-fired power). The shortfall is supplemented by new energy sources within the province, and the remaining difference is purchased uniformly by the power grid company in the market;
[0055] S233, Calculation of the electricity purchase price for guaranteed users when power supply is tight: Calculate the actual electricity purchase price for guaranteed users in period t when power supply is tight. The calculation formula is:
[0056] P t,s =min{P t (i)};
[0057] S234, Calculation of electricity purchase price for commercial users when power supply is tight: Calculate the actual price of electricity purchased by the power grid agent for commercial and industrial users during period t when power supply is tight. The calculation formula is:
[0058]
[0059] S235, Calculation of electricity purchase price for trading users when power supply is tight: Calculate the actual price of electricity purchased by market-based trading users during period t when power supply is tight. The calculation formula is:
[0060]
[0061] Furthermore, the transaction rate probability density estimation in S3 includes:
[0062] S31, neighbor sample point selection: using Euclidean distance to find M neighbors with similar influencing factors to the current sample in the data set consisting of all historical transaction rate data within a predetermined number of days (previous 30 days) of the current sample point;
[0063] S32, transaction rate set construction: The transaction rates of M neighbors selected from the neighboring sample points form a set A km , since the sample x i The transaction rate of i is what actually happened, for sample x i After repeating the sampling Q times, the transaction rate y is obtained i The set B sample ;
[0064] S33, Kernel density estimation: Use kernel density estimation to estimate A km ∩B sample The data set is used to estimate the probability distribution and used as the sample x i The transaction rate of i The kernel function of the kernel density estimation adopts the Epanechnikov kernel function;
[0065] S34, probability density function calculation: Assume that the transaction rate of each transaction conforms to an independent Gaussian distribution, x1, x2, ...x n For independent and identically distributed transaction rate sample points taken from a continuous population, the probability density model is used to calculate the probability density at any transaction rate sample point x.
[0066] Furthermore, the calculation formula of the probability density model is:
[0067]
[0068] Furthermore, the electricity purchase declaration strategy formulation in S4 includes:
[0069] S41, data input: input the predicted clearing electricity price under different power gap scenarios;
[0070] S42, probability density prediction: perform probability density prediction on the transaction rate in time period C;
[0071] S43, result output: output the prediction result, prediction interval and probability density curve of time period C.
[0072] Beneficial effects of the present invention:
[0073] The present invention can effectively analyze and predict the supply and demand relationship in the power market, optimize the power purchase strategy of power grid companies, and ensure that the actual power purchase price of security users, industrial and commercial users, and market-based transaction users is reasonable by reasonably matching electricity prices and electricity quantities, thereby achieving full utilization of resources and meeting the electricity needs of various users.
[0074] The present invention uses kernel density estimation and Euclidean distance algorithm to accurately predict the transaction rate under different power gap scenarios and form a clearing price and transaction probability model. This method not only improves the market forecasting accuracy of power grid companies, but also can continuously adjust the market transaction declaration price and transaction rate probability model through re-analysis to ensure that the reasonable interests of users are protected. At the same time, by optimizing the power purchase strategy, a smooth transition of provincial power grid companies in the market-oriented power purchase process is achieved, industrial and commercial users are promoted to enter the power market in an orderly manner, and the healthy development of the power market is promoted. BRIEF DESCRIPTION OF THE DRAWINGS
[0075] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only for the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0076] Figure 1 A schematic diagram of a segmented declaration strategy method flow chart of an embodiment of the present invention;
[0077] Figure 2 A schematic diagram of a process for constructing a spot purchase and sale scenario within a province on the power generation side according to an embodiment of the present invention;
[0078] Figure 3 A schematic diagram of a method and system for constructing a transaction probability preference model based on clearing electricity prices according to an embodiment of the present invention;
[0079] Figure 4 A schematic diagram of a segmented declaration strategy method and system based on clearing price prediction and transaction probability preference according to an embodiment of the present invention. DETAILED DESCRIPTION
[0080] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments.
[0081] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0082] like Figure 1-Figure 4 As shown, a segmented declaration strategy method based on clearing price prediction and transaction probability preference includes the following steps:
[0083] (1) Collect spot electricity purchase and sales data information within the province from both buyers and sellers, including electricity volume, electricity price and transaction completion rate information.
[0084] Q t,sys is the total power of the whole system, Q t,inter is the contractual electricity quantity in the period t signed by the government between the power grids of the transmitting and receiving ends, Q t,intra is the contracted electricity volume of the inter-grid power purchase contract signed between the provincial power grid enterprise and the priority power generation enterprise in period t, Q t,inter,p Q is the medium- and long-term electricity consumption between provinces. t,intra,p is the medium- and long-term electricity consumption in the province, Q t,inter,n For the province's spot electricity, Q t,intra,n It is the spot electricity in the province.
[0085] Q t,sys =Q t,inter +Q t,intra =Q t,inter,p +Q t,intra,p +Q t,inter,n +Q t,intra,n ;
[0086] Q t,s To ensure the power consumption of users, Q t,d is the power consumption of the proxy user, Q t,m For market-based trading of user electricity consumption, Q u For power shortage.
[0087] Q u =Q t,s +Q t,d +Qt,m -Q t,sys ;
[0088] In the case of power balance, the power supply on the power generation side is equal to the power demand on the power consumption side, and the power gap is zero. At this time, the total power consumption of the whole system in period t is the sum of the power consumption of market-based trading users and the power guarantee users and grid agent industrial and commercial users. The calculation formula is:
[0089] Q t,sys =Q t,s +Q t,d +Q t,m ;
[0090] (2) Establish a spot purchase and sales scenario within the province, and calculate and determine the spot supply and demand scenario within the province on the power generation side based on the collected power purchase and sales data within the province.
[0091] ①Q u ≤0, the power supply on the power generation side is used to meet all the power demands on the power consumption side and there is still surplus.
[0092] The power grid agent will give priority to matching low-price contracts to residential, agricultural and other security users, and the weighted average price of the remaining transaction contracts is the actual power purchase price of the power grid. After sorting the electricity prices from low to high, the electricity prices of the power purchase contracts and the corresponding electricity volume are:
[0093] P={P t (1),P t (2),...,P t (m),...,P t (K)};
[0094] Q={Q t (1),Q t (2),...,Q t (m),...,Q t (K)};
[0095] P t (m) <P t (m+1);
[0096] Where P t (K), Q t (K) is the contract electricity price and quantity with the electricity price order K in period t. The calculation formula for the power purchase contract electricity price and quantity information corresponding to the power grid agent purchasing electricity is:
[0097] P t,dr = {P t (m)...P t (K)};
[0098]
[0099] Where P t,dr is the price matrix of the power purchasing contract during period t, Q t,dr It is the electricity matrix of the electricity purchasing contract in period t.
[0100] The actual price of electricity purchased by the power grid agent for industrial and commercial users during period t is derived from the above formula:
[0101]
[0102] The actual price of electricity purchased by guaranteed users during period t is:
[0103] P t,s =min{P t (i)};
[0104] The actual price of electricity purchased by market-based transaction users during period t is:
[0105]
[0106] It is the average market transaction price.
[0107] ②Q u >0, and under the principle of priority power generation and power purchase, Q t,s +Q t,d ≤Q t,sys t,s +Q t,d +Q t,m ;
[0108] The actual price of electricity purchased by guaranteed users during period t is:
[0109] P t,s =min{P t (i)};
[0110] The actual price of electricity purchased by the power grid agent for industrial and commercial users during period t is:
[0111]
[0112] The actual price of electricity purchased by market-based transaction users during period t is:
[0113]
[0114] ③Q u >0, and under the principle of priority power generation and power purchase, Q t,s ≤Q t,sys t,s +Q t,d +Q t,m ;
[0115] In terms of electricity supply security, priority will be given to purchasing electricity by matching low-priced power sources within the province with external electricity (including coal-fired power). The shortfall will be supplemented by new energy sources within the province, and the remaining difference will be purchased centrally by power grid companies in the market.
[0116] The actual price of electricity purchased by guaranteed users during period t is:
[0117] P t,s =min{P t (i)};
[0118] The actual price of electricity purchased by the power grid agent for industrial and commercial users during period t is:
[0119]
[0120] The actual price of electricity purchased by market-based transaction users during period t is:
[0121]
[0122] (3) Based on the historical clearing electricity prices, the probability density of the transaction rate is estimated, and a transaction probability preference model based on the clearing electricity prices is derived.
[0123] Use the Euclidean distance to find the value that matches the current sample x in the data set consisting of all historical transaction rate data within 30 days before the current sample point. i M neighbors with similar influencing factors, the transaction rates of these neighbors form a set A km Since the sample x i The transaction rate of i is what actually happened, so for sample x i After repeating the sampling Q times, the transaction rate y can be obtained i The set B sample Finally, kernel density estimation is used to estimate A km ∩B sample The probability distribution of the data set is estimated as a sample x i The transaction rate of i Since the Epanechnikov kernel function is optimal in terms of mean square error and has little efficiency loss, the kernel density estimation kernel function uses the Epanechnikov kernel, and the values of M and Q are both 100.
[0124] Assume that the transaction rate of each transaction conforms to an independent Gaussian distribution, x1, x2, ...x n For independent and identically distributed transaction rate sample points taken from a continuous population, the probability density function f(x) at any transaction rate sample point x is:
[0125]
[0126] (4) The above steps form a clearing price forecast and a segmented electricity purchase declaration strategy based on the probability of transaction.
[0127] Input the predicted clearing electricity price under different power gap scenarios, make probability density prediction for the transaction rate in time period C, and output the prediction result, prediction interval and probability density curve for time period C.
[0128] A segmented declaration strategy is given based on clearing price prediction and transaction probability preference
[0129]
[0130]
[0131] (5) Review and evaluate the results of spot transactions within the province. Review and evaluate the declared effects on the power generation side based on the simulation results based on the clearing price forecast and the probability model of the transaction rate. Adjust the market transaction declared prices and probability density equations of steps (2)-(3) based on the review analysis results.
[0132] Those skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present invention is limited to these examples. Under the concept of the present invention, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of the different aspects of the present invention as described above, which are not provided in detail for the sake of simplicity.
[0133] The present invention is intended to cover all such substitutions, modifications and variations that fall within the broad scope of the claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A segmented declaration strategy method based on clearing price prediction and transaction probability preference, It is characterized in that The following steps are involved: S1, data collection: collect spot electricity purchase and sales data within the province from both buyers and sellers, including electricity volume, electricity price and transaction completion rate information; S2, scenario construction and supply and demand analysis: Build the spot purchase and sales scenario within the province, and calculate and determine the spot supply and demand scenario within the province on the power generation side based on the collected power purchase and sales data; S3, transaction rate probability density estimation: the transaction rate probability density is estimated based on the historical clearing electricity price, and a probability density model based on the clearing electricity price is obtained; S4, power purchase declaration strategy formulation: forming a power purchase declaration strategy consisting of clearing price forecasts and transaction probability segments; S5. Review and analysis of spot trading results within the province: Based on the results of the clearing price forecast and the transaction rate probability model, the declared effect of the power generation side is reviewed and analyzed, and the market transaction declared price and the transaction rate probability model are adjusted according to the results of the review and analysis.
2. A segmented declaration strategy method based on clearing price prediction and transaction probability preference according to claim 1, It is characterized in that The data collection in S1 includes: S11, define the total power of the whole system: the calculation formula of the total power of the whole system is: Q t,sys =Q t,inter +Q t,intra =Q t,inter,p +Q t,intra,p +Q t,inter,n +Q t,intra,n ; Among them, Q t,sys is the total power of the whole system, Q t,inter is the contractual electricity quantity in the period t signed by the government between the power grids of the transmitting and receiving ends, Q t,intra is the contracted electricity volume of the inter-grid power purchase contract signed between the provincial power grid enterprise and the priority power generation enterprise in period t, Q t,inter,p Q is the medium- and long-term electricity consumption between provinces. t,intra,p is the medium- and long-term electricity consumption in the province, Q t,inter,n For the province's spot electricity, Q t,intra,n It is the spot electricity in the province; S12, define the power gap: the calculation formula of the power gap is: Q u =Q t,s +Q t,d +Q t,m -Q t,sys ; Among them, Q t,s To ensure the power consumption of users, Q t,d is the power consumption of the proxy user, Q t,m For market-based trading of user electricity consumption, Q u For power shortage; S13, power balance condition: Under the power balance condition, the power supply on the power generation side is equal to the power demand on the power consumption side, and the power gap is zero. At this time, the total power consumption of the whole system in period t is the sum of the power consumption of market-based trading users and the power guarantee users and grid agent industrial and commercial users, expressed as: Q t,sys =Q t,s +Q t,d +Q t,m 。 3. A segmented declaration strategy method based on clearing price prediction and transaction probability preference according to claim 2, It is characterized in that The scenario construction and supply and demand analysis in S2 include: S21, analysis of power supply sufficiency: if there is still surplus power supply after the power generation side meets all power demand, the low-price contract will be matched to the guaranteed users first, and the actual power purchase price of guaranteed users, industrial and commercial users and trading users will be calculated; S22, power supply shortage analysis: when power supply is insufficient but part of the demand is still met under the principle of priority power generation and purchase, calculate the actual power purchase price for security users, industrial and commercial users, and trading users; S23, analysis of power supply shortage: In the case of power supply shortage, priority will be given to matching low-priced power sources and external electricity, and the shortfall will be supplemented by new energy sources. The actual power purchase price for security users, industrial and commercial users, and trading users will be calculated.
4. According to claim 3, a segmented declaration strategy method based on clearing price prediction and transaction probability preference, It is characterized in that The power supply adequacy analysis in S21 includes: S211, Definition of insufficient power supply: If Q u ≤0, then there is still surplus power supply on the power generation side after meeting all power demand on the power consumption side; S212, low-price contract matching: Grid purchasing agents will give priority to matching low-price contracts to residents and agricultural security users; S213, contract electricity price and quantity sorting: Sort by electricity price from low to high, obtain the electricity price of the power purchase contract and its corresponding quantity, the calculation formula is: P={P t (1),P t (2),...,P t (m),...,P t (K)}; Q={Q t (1),Q t (2),...,Q t (m),...,Q t (K)}; P t (m)<P t (m+1); Among them, P t (K), Q t (K) are the contract electricity price and electricity quantity with the electricity price order K in period t; S214, calculation of power grid agency power purchase price and power quantity: Calculate the power purchase contract price and power quantity information corresponding to the power grid agency power purchase. The calculation formula is: P t,dr ={P t (m)...P t (K)}; Where P t,dr is the price matrix of the power purchasing contract during period t, Q t,dr is the electricity matrix of the electricity purchasing contract during period t; S215, calculation of electricity purchase price for industrial and commercial users when power supply is sufficient: Calculate the actual price of electricity purchased by the power grid on behalf of industrial and commercial users during period t when power supply is sufficient. The calculation formula is: S216, calculation of the electricity purchase price for guaranteed users when the power supply is sufficient: Calculate the actual electricity purchase price for guaranteed users in time period t when the power supply is sufficient. The calculation formula is: P t,s =min{P t (in)}; S217, Calculation of electricity purchase price for trading users when electricity supply is sufficient: Calculate the actual electricity purchase price for market trading users in period t when electricity supply is sufficient. The calculation formula is: in, It is the average market transaction price.
5. According to claim 4, a segmented declaration strategy method based on clearing price prediction and transaction probability preference, It is characterized in that The power supply shortage analysis in S22 includes: S221, Definition of insufficient power supply: If Q u >0, and under the principle of priority power generation and power purchase, Q t,s +Q t,d ≤Q t,sys t,s +Q t,d +Q t,m ; S222, calculation of the electricity purchase price for guaranteed users when power supply is insufficient: Calculate the actual electricity purchase price for guaranteed users in period t when power supply is insufficient. The calculation formula is: P t,s =min{P t (in)}; S223, calculation of the electricity purchase price for industrial and commercial users when the power supply is insufficient, calculate the actual price of electricity purchased by the power grid on behalf of industrial and commercial users during period t when the power supply is insufficient, the calculation formula is: S224, calculation of electricity purchase price for trading users when power supply is insufficient: Calculate the actual price of electricity purchased by market-based trading users during period t when power supply is insufficient. The calculation formula is:
6. A segmented declaration strategy method based on clearing price prediction and transaction probability preference according to claim 5, It is characterized in that The power supply shortage analysis in S23 includes: S231, Definition of power supply shortage: Q u >0, and under the principle of priority power generation and power purchase, Q t,s ≤Q t,sys t,s +Q t,d +Q t,m ; S232, Priority in purchasing electricity: In terms of power supply, priority is given to purchasing electricity with low-priced power sources within the province and external power. The shortfall is supplemented by new energy sources within the province, and the remaining difference is purchased uniformly by the power grid company in the market; S233, Calculation of the electricity purchase price for guaranteed users when power supply is tight: Calculate the actual electricity purchase price for guaranteed users in period t when power supply is tight. The calculation formula is: P t,s =min{P t (in)}; S234, Calculation of electricity purchase price for commercial users when power supply is tight: Calculate the actual price of electricity purchased by the power grid agent for commercial and industrial users during period t when power supply is tight. The calculation formula is: S235, Calculation of electricity purchase price for trading users when power supply is tight: Calculate the actual price of electricity purchased by market-based trading users during period t when power supply is tight. The calculation formula is:
7. A segmented declaration strategy method based on clearing price prediction and transaction probability preference according to claim 6, It is characterized in that The transaction rate probability density estimation in S3 includes: S31, neighbor sample point selection: using Euclidean distance to find M neighbors with similar influencing factors to the current sample in the data set consisting of all historical transaction rate data within a predetermined number of days of the current sample point; S32, transaction rate set construction: The transaction rates of M neighbors selected from the neighboring sample points form a set A km , since the sample x i The transaction rate of i is what actually happened, for sample x i After repeating the sampling Q times, the transaction rate y is obtained i The set B sample ; S33, Kernel density estimation: Use kernel density estimation to estimate A km ∩B sample The data set is used to estimate the probability distribution and used as the sample x i The transaction rate of i The kernel function of the kernel density estimation adopts the Epanechnikov kernel function; S34, probability density function calculation: Assume that the transaction rate of each transaction conforms to an independent Gaussian distribution, x 1 ,x 2 ,...x n For independent and identically distributed transaction rate sample points taken from a continuous population, the probability density model is used to calculate the probability density at any transaction rate sample point x.
8. A segmented declaration strategy method based on clearing price prediction and transaction probability preference according to claim 7, It is characterized in that The calculation formula of the probability density model is:
9. A segmented declaration strategy method based on clearing price prediction and transaction probability preference according to claim 8, It is characterized in that The electricity purchase declaration strategy formulation in S4 includes: S41, data input: input the predicted clearing electricity price under different power gap scenarios; S42, probability density prediction: perform probability density prediction on the transaction rate in time period C; S43, result output: output the prediction result, prediction interval and probability density curve of time period C.
