Intra-day electricity price real-time settlement optimization method and device

By building forward cost models and economic models, predicting the marginal electricity price of nodes, optimizing the decision-making cycle of the power supplier, the problem of power supplier deviation from the scheduling plan is solved, and the stability and trend safety of the power grid are improved.

CN119090530APending Publication Date: 2024-12-06STATE GRID NINGXIA ELECTRIC POWER CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411063975.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing real-time settlement plan for intraday electricity prices is likely to cause the power supplier to deviate from the power dispatcher's dispatch plan, which is not conducive to the stability of the entire network trend.

Method used

Based on the perspective of the power supplier, the forward cost model including the decision cycle is constructed, and combined with the economic model of the power dispatcher, the marginal electricity price of the node is predicted through the Lagrangian equation, the overall deviation model is determined, and iterative optimization is carried out to obtain the target decision cycle. Determine the target clearing round with the highest priority when rolling clearing within the day, and conduct secondary settlement.

Benefits of technology

Reconstruct the constituent factors of the marginal electricity price of the node, predict the marginal electricity price of the power supplier, assist the power supplier in determining the target decision cycle, reduce the willingness of the power supplier to deviate from the power dispatcher's instructions, and improve the overall stability and trend safety of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090530A_ABST
    Figure CN119090530A_ABST
Patent Text Reader

Abstract

The invention relates to an intra-day electricity price real-time settlement optimization method and device, and the method comprises the steps: constructing a forward cost model containing a decision period based on the angle of a power supplier; based on the angle of a power dispatcher, constructing an economic model containing a decision period; converting constraint conditions of the forward cost model according to the economic model; building a Lagrange equation through the converted constraint condition and the economic model, and predicting the node marginal electricity price based on the angle of the power supplier; determining an overall deviation model including a decision period according to the node marginal electricity price based on the angle of the power supplier; iterating the decision cycle based on the forward cost model, the economic model and the overall deviation model to obtain a target decision cycle meeting a preset condition; according to the target decision cycle, determining a target clearing round when intra-day rolling clearing is carried out; and performing secondary settlement on the basis of the current primary deviation settlement based on the time period electric quantity and the electricity price of the target clearing round.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power clearing optimization, and in particular to a method and device for optimizing intraday electricity price real-time settlement. Background Art

[0002] With the progress of market-oriented reform of my country's power system and the construction of the power spot market, a dual settlement model of "day-ahead-intraday" has been formed. In the day-ahead stage, the market gives the day-ahead clearing result based on the bids and winning bids of the participants, and then performs a deviation settlement within the day based on the real-time output and price of each period and the winning bid price and output of the participants in the day-ahead stage.

[0003] In the day-ahead stage, market participants make bidding decisions based on forecasts of unit conditions, load demand and other factors at different time periods during the day. Therefore, the decision-making process is not only uncertain, but also a decision-making problem that must consider cross-time factors. Therefore, relatively speaking, the market settlement should also have a corresponding rolling optimization mechanism. In addition to one-time settlement, this mechanism also considers the impact of multi-period factors on the clearing price.

[0004] The aforementioned cross-period decision-making problem is generally called a forward optimization problem. In this problem, the market clearing price in each period is a critical factor, because market participants are price receivers. They not only make decisions based on past clearing prices in the day-ahead phase, but also in the intraday phase, changes in real-time clearing prices will prompt participants to respond and adjust their subsequent behavior or strategies. For the intraday clearing price formation mechanism, the industry currently generally adopts the marginal electricity price method.

[0005] Under market clearing conditions, the marginal power price MP is the price quoted by the last power supplier that makes the traded power meet the load demand. Since this price is formed at the trading interface, when it comes to specific nodes, it is also necessary to consider the real value of the blockage and network loss that occurs after the MP is traded and transmitted to the specific flow node through the distribution network. This value is the node marginal power price LMP. LMP is an important factor for the decision-making of market participants, market operators and dispatchers, and is regarded as a key price signal.

[0006] Since the demand on the load side is mainly determined by the behavior of users and external factors in the short term, the formation of LMP mainly depends on the supply side, and the quotation on the supply side is the result of the economic decision of the unit (maximizing benefits or minimizing costs). In the prior art, LMP is often expressed as the sum of the value of node electric energy (which can be expressed as a function of the unit output cost) and the blocking component (generally, in order to reduce the complexity of the problem, network losses are not considered), but the important role of unit performance in forward decision-making is ignored.

[0007] In fact, whether it is a new energy unit or a traditional unit, the power change is not instantaneous as in the ideal state. The climbing and sliding performance of the unit will affect its power change rate, and the start and stop of the unit will generate non-negligible costs. Therefore, the decision cycle of the unit must also consider its power regulation cycle. In SCED decision-making, the power dispatcher often ignores the performance cycle changes of the unit as a power supplier. A large number of empirical studies have shown that the unit may be motivated to deviate from the dispatch plan of the power dispatcher to protect its own interests, resulting in conflicts between the decisions of the power dispatcher and the power supplier. When this conflict expands, it will lead to abnormal prices in the market window.

[0008] In summary, the current real-time settlement scheme for intraday electricity prices can easily cause power suppliers to deviate from the dispatching plan of power dispatchers, which is not conducive to the stability of the power flow of the entire grid. Summary of the invention

[0009] In order to at least to some extent overcome the problem that the real-time settlement scheme of intraday electricity prices in the related art easily causes the power supplier to deviate from the dispatching plan of the power dispatcher, which is not conducive to the stability of the power flow of the entire network, the present application provides an optimization method and device for real-time settlement of intraday electricity prices.

[0010] The scheme of this application is as follows:

[0011] According to a first aspect of an embodiment of the present application, a method for optimizing intraday electricity price real-time settlement is provided, characterized by comprising:

[0012] Based on the perspective of the power supplier, a forward cost model including a decision cycle is constructed; the constraints of the forward cost model include: power balance constraints, power output constraints, ramp constraints, start-stop times constraints and line flow constraints;

[0013] From the perspective of power dispatchers, an economic model including the decision-making cycle is constructed;

[0014] transforming the constraints of the forward cost model according to the economic model;

[0015] Constructing a Lagrangian equation through the constraints of the converted forward cost model and the economic model to predict the node marginal electricity price from the perspective of the power supplier;

[0016] Determine an overall deviation model including a decision cycle according to a node marginal electricity price based on the perspective of an electricity supplier;

[0017] Based on the forward cost model, the economic model and the overall deviation model, the decision cycle is iterated to obtain a target decision cycle that meets the preset conditions;

[0018] Determine the target clearing round with the highest priority when performing intraday rolling clearing according to the target decision cycle;

[0019] The electricity consumption and electricity price in the target clearing round are settled twice based on the current deviation settlement.

[0020] Preferably, based on the perspective of the power supplier, a forward cost model including a decision cycle is constructed, including:

[0021]

[0022] Where F1 represents the objective function of the forward cost model; T represents the decision cycle; N represents the total number of all units of the power supplier; C i (P i,t ) represents the output operating cost of unit i in period t; P i,t represents the active power of unit i in period t; φ i,t A dummy variable representing the start / stop status of unit i in period t, which takes the value 1 when the unit is in the start state and 0 otherwise; represents the cost of a single startup of unit i; i,t is a dummy variable indicating that unit i is in working state during period t, which takes the value of 1 when the unit is unloaded and 0 otherwise; represents the no-load cost of unit i;

[0023] The power balance constraint condition is:

[0024] ∑ i∈U P i,t =∑ j∈L l j,t (2);

[0025] Among them, U represents the set of units; L represents the set of loads; l j,t represents the power of the jth load in period t;

[0026] The power output constraint condition is:

[0027] P i,min ≤P i,t ≤P i,max (3);

[0028] Among them, P i,min represents the minimum power of unit i; P i,max represents the maximum power of unit i;

[0029] The climbing constraint condition is:

[0030]

[0031] Among them, Γi Indicates the maximum power that can be adjusted by unit i in each period; P i,t-1 represents the active power of unit i in period t-1; i,t-1 A dummy variable indicating that unit i is in working state during period t-1;

[0032] The start-stop times constraint condition is:

[0033]

[0034] Among them, φ i,max represents the maximum number of times that unit i can be started within the decision cycle T; ψ i,t is a virtual variable indicating that unit i is in shutdown state during period t. It takes 1 when the unit is shut down, otherwise it takes 0; ψ i,max It represents the maximum number of shutdown times that unit i can have within the decision cycle T;

[0035] The line flow constraints are:

[0036] P s,min ≤P s,t ≤P s,max (6);

[0037] Among them, P s,min Indicates the minimum power of the line section; P s,max Indicates the maximum power of the line section; P s,t represents the power of interface s during time period t.

[0038] Preferably, from the perspective of the power dispatcher, an economic model including a decision cycle is constructed, including:

[0039]

[0040] Among them, F2 represents the objective function of the economic model;

[0041] The constraints of the forward cost model are converted according to the economic model, including:

[0042] The power balance constraint is converted into:

[0043] λ t :∑ i∈U P i,t =∑ j∈L l j,t (8);

[0044] Among them, λ t represents the shadow price in period t;

[0045] The power output constraint is converted into:

[0046]

[0047] in, and They represent the shadow price of unit i operating at maximum / minimum power at time t respectively;

[0048] The climbing constraint condition is converted into:

[0049]

[0050] in, and They represent the shadow price of unit power change when unit i ramps up / down in period t respectively;

[0051] The line flow constraint condition is converted into:

[0052]

[0053] in, and Respectively represent the shadow price when the line cross-section power is at maximum / minimum power.

[0054] Preferably, the Lagrangian equation is constructed by the constraints of the converted forward cost model and the economic model, including:

[0055] With the goal of minimizing cost, the Lagrangian equation is constructed through the constraints of the transformed forward cost model and the economic model:

[0056]

[0057] Where D represents the set of all line sections;

[0058] Predict node marginal electricity prices from the perspective of power suppliers, including:

[0059] Assume that unit i and load j are located at the same node, and take the partial derivative of the Lagrangian equation with respect to load j, we get:

[0060]

[0061] in, Represents the node marginal electricity price of the node where unit i and load j are located; -λ t The electricity price component representing the marginal electricity price at the node; The congestion cost represents the marginal electricity price of the node;

[0062] The condition for the Lagrange equation to take an extreme value is:

[0063]

[0064] in, represents the output quotation given by unit i in period t;

[0065] From the perspective of power transfer:

[0066]

[0067] Combining formulas 13-15, we get:

[0068]

[0069] Among them, ρ t Indicates the node marginal electricity price from the perspective of the power supplier.

[0070] Preferably, the method further comprises: removing the operation of the unit at maximum power and minimum power from the decision of the power supplier, and simplifying Formula 16 to:

[0071]

[0072] Preferably, according to the node marginal electricity price based on the perspective of the power supplier, an overall deviation model including a decision cycle is determined, including:

[0073]

[0074] Among them, Δρ t represents the prediction deviation of the marginal electricity price of the time-sharing node of unit i in period t; ΔP i,t represents the output forecast deviation of unit i in period t; Θ(T) represents the deviation term other than output and time-of-use electricity price.

[0075] Preferably, the deviation term other than output and time-of-use electricity price is expressed as:

[0076]

[0077] Among them, L tot Indicates the total load; represents the variance of the node marginal electricity price; σ L represents the mean square error of short-term load forecast; Represents the mean marginal electricity price of the node within the period.

[0078] Preferably, based on the forward cost model, the economic model and the overall deviation model, the decision cycle is iterated to obtain a target decision cycle that meets the preset conditions, including:

[0079] Initializing the decision cycle T in the forward cost model to T0;

[0080] Substitute the initialized decision cycle T0 and its corresponding variable data into the forward cost model and economic model, and output the unit output and node marginal electricity price in each time period;

[0081] Substitute the output of each unit and the node marginal electricity price in each period into the overall deviation model, and output the decision cycle T in this iteration;

[0082] Determine whether T is equal to T0;

[0083] If T is equal to T0, then update the decision cycle and continue iterating; if T is not equal to T0, then determine whether Ω(T)≤Ω(T-1) holds;

[0084] If it is established, the decision cycle T in this iteration is used as the target decision cycle T * ; If not, then T-1 is used as the target decision cycle T * ;

[0085] Determine whether the maximum iteration period has been reached;

[0086] If the maximum iteration period is reached, the target decision cycle T is output * ; If the maximum iteration period has not been reached, the iteration will continue after updating the decision cycle.

[0087] Preferably, determining the target clearing round with the highest priority when performing intraday rolling clearing according to the target decision cycle includes:

[0088] Determine the incentive level for the unit to deviate from the dispatch instructions:

[0089]

[0090] Among them, C oc Indicates the incentive level of the unit to deviate from the dispatch instruction; Indicates the unit output that executes the dispatcher's instructions; P i,t Indicates the unit output that has not executed the dispatcher's instructions;

[0091] Determine the sum of the forward power adjustment price factors for all units during the day-ahead period:

[0092]

[0093] in, represents the sum of the forward power adjustment price factors of all units in the day-ahead period t;

[0094] Taking the sum of the forward power adjustment price factors of all units in the day-ahead period as the benchmark and taking the decision cycle into account, the overall power adjustment price factor of the system in the decision cycle T is obtained:

[0095]

[0096] Among them, τ t,t+T represents the overall power adjustment price factor of the system within the decision period T;

[0097] Taking the overall power adjustment price factor of the system in the decision cycle T as the reference indicator of the settlement priority of the clearing round, we have:

[0098]

[0099] The target clearing round is the clearing round with the highest settlement priority, and the target clearing round is:

[0100] B={tT * ,t-T+1,…t} (23);

[0101] Among them, B represents the target clearing round.

[0102] According to a second aspect of an embodiment of the present application, a device for optimizing intraday electricity price real-time settlement is provided, including:

[0103] Processor and memory;

[0104] The processor and the memory are connected via a communication bus:

[0105] Wherein, the processor is used to call and execute the program stored in the memory;

[0106] The memory is used to store a program, and the program is used to execute at least one of the methods for optimizing intraday electricity price real-time settlement as described above.

[0107] The technical solution provided by the present application may include the following beneficial effects: the intraday electricity price real-time settlement optimization method in the present application includes: constructing a forward cost model including a decision cycle based on the perspective of the power supplier; constructing an economic model including a decision cycle based on the perspective of the power dispatcher; converting the constraints of the forward cost model according to the economic model; constructing the Lagrangian equation through the constraints of the converted forward cost model and the economic model to predict the node marginal electricity price based on the perspective of the power supplier; determining the overall deviation model including the decision cycle based on the node marginal electricity price based on the perspective of the power supplier; iterating the decision cycle based on the forward cost model, the economic model and the overall deviation model to obtain a target decision cycle that meets the preset conditions; determining the target clearing round for intraday rolling clearing based on the target decision cycle; and performing a secondary settlement based on the current deviation settlement for the time period electricity volume and electricity price of the target clearing round.

[0108] The one-time deviation settlement in the existing technology does not take into account the role of the power supplier's decision-making cycle in its forward rolling decision, ignores the value of cross-period constraints, and regards historical clearing results as sunk costs, which gives the power supplier an incentive to deviate from the power dispatcher's plan.

[0109] The technical solution in this application can reconstruct the component factors of the node marginal electricity price, predict the node marginal electricity price from the perspective of the power supplier, and assist the power supplier in determining the number of target decision cycles. During settlement, the electricity and electricity prices of the previous several cycles (the number of target decision cycles) of the current settlement period are used, and then the target clearing round with the highest priority is determined in these cycles, and the secondary settlement is performed on the basis of the current primary deviation settlement based on the time period electricity and electricity price of the target clearing round, thereby minimizing the target deviation between the power dispatcher and the power supplier, reducing the willingness of the power supplier to deviate from the instructions of the power dispatcher, and improving the overall stability of the system and the safety of the flow.

[0110] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0111] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0112] Figure 1 This is a flow chart of a method for optimizing intraday electricity price real-time settlement provided by an embodiment of the present application;

[0113] Figure 2 It is a structural diagram of a device for optimizing the real-time settlement of intraday electricity prices provided by an embodiment of the present application.

[0114] Reference numerals: processor-21; memory-22. DETAILED DESCRIPTION

[0115] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.

[0116] Embodiment 1

[0117] Figure 1 This is a flow chart of a method for optimizing intraday electricity price real-time settlement provided by an embodiment of the present application, referring to Figure 1, a method for optimizing intraday electricity price real-time settlement, comprising:

[0118] S11: Based on the perspective of the power supplier, a forward cost model including a decision cycle is constructed; the constraints of the forward cost model include: power balance constraints, power output constraints, ramp constraints, start-stop times constraints and line flow constraints;

[0119] S12: From the perspective of the power dispatcher, an economic model including the decision-making cycle is constructed;

[0120] S13: Transform the constraints of the forward cost model according to the economic model;

[0121] S14: Construct the Lagrangian equation through the constraints of the converted forward cost model and the economic model to predict the node marginal electricity price from the perspective of the power supplier;

[0122] S15: determining an overall deviation model including a decision cycle according to a node marginal electricity price based on the perspective of an electricity supplier;

[0123] S16: Based on the forward cost model, the economic model and the overall deviation model, the decision cycle is iterated to obtain a target decision cycle that meets the preset conditions;

[0124] S17: Determine the target clearing round with the highest priority when performing intraday rolling clearing according to the target decision cycle;

[0125] S18: A secondary settlement is performed based on the electricity consumption and electricity price during the target clearing round on the basis of the current deviation settlement.

[0126] It should be noted that without considering the proxy model such as VPP, assuming that the power supplier can directly participate in the market, the power supplier will predict the unit output for the next T cycles and determine its decision on the day before, with the goal of minimizing the output cost. Assuming that the specific form of its output cost function is not considered, its output cost includes not only the cost generated by the unit's operation when it is output, but also the start-stop cost and no-load cost. Then, from the perspective of the power supplier, a forward cost model including the decision cycle is constructed, including:

[0127]

[0128] Where F1 represents the objective function of the forward cost model; T represents the decision cycle; N represents the total number of all units of the power supplier; C i (P i,t ) represents the output operating cost of unit i in period t; P i,t represents the active power of unit i in period t; φ i,tA dummy variable representing the start / stop status of unit i in period t, which takes the value 1 when the unit is in the start state and 0 otherwise; represents the cost of a single startup of unit i; i,t is a dummy variable indicating that unit i is in working state during period t, which takes the value of 1 when the unit is unloaded and 0 otherwise; represents the no-load cost of unit i;

[0129] Without considering network loss, the power balance constraint is:

[0130] ∑ i∈U P i,t =∑ j∈L l j,t (2);

[0131] Among them, U represents the set of units; L represents the set of loads; l j,t represents the power of the jth load in period t;

[0132] The power output constraints are:

[0133] P i,min ≤P i,t ≤P i,max (3);

[0134] Among them, P i,min represents the minimum power of unit i; P i,max represents the maximum power of unit i;

[0135] The climbing constraint is:

[0136]

[0137] Among them, Γ i Indicates the maximum power that can be adjusted by unit i in each period, P i,t-1 represents the active power of unit i in period t-1; i,t-1 A dummy variable indicating that unit i is in working state during period t-1;

[0138] In the ramp constraint condition, the first part represents the power ramp constraint; the second part represents the power ramp constraint;

[0139] The maximum start and stop times of the unit in the entire cycle are constrained by:

[0140]

[0141] Among them, φ i,max represents the maximum number of times that unit i can be started within the decision cycle T; ψ i,t is a virtual variable indicating that unit i is in shutdown state during period t. It takes 1 when the unit is shut down, otherwise it takes 0; ψi,max It represents the maximum number of shutdown times that unit i can have within the decision cycle T;

[0142] The line flow constraints are:

[0143] P s,min ≤P s,t ≤P s,max (6);

[0144] Among them, P s,min Indicates the minimum power of the line section; P s,max Indicates the maximum power of the line section; P s,t represents the power of interface s during time period t.

[0145] Since the power dispatcher makes decisions from the perspective of the system, the start-stop cost and no-load cost of the supplier are not included in the decision-making process of the power dispatcher. Therefore, from the perspective of the power dispatcher, an economic model with a decision-making cycle is constructed, including:

[0146]

[0147] Among them, F2 represents the objective function of the economic model;

[0148] Without considering network losses and congestion costs, for the power dispatcher, the value of the electric energy output by the power supplier should be equal to the value of the electric energy of the active power at the load end. Therefore, according to the economic model, the power balance constraint condition is converted into:

[0149] λ t :∑ i∈U P i,t =∑ j∈L l j,t (8);

[0150] Among them, λ t represents the shadow price in period t;

[0151] λ t That is, LMP only considers the value of electric energy; since both sides of equation (8) are actually multiplied by λ t , can be eliminated, so λ t Place on the left;

[0152] At the same time, when the unit operates at full load power or minimum power according to the dispatcher's requirements, there are corresponding costs or opportunity costs, which are also considered to have shadow prices. Therefore, according to the economic model, the power output constraint is converted into:

[0153]

[0154] in, and They represent the shadow price of unit i operating at maximum / minimum power at time t respectively;

[0155] Similarly, the ramp constraint is converted to:

[0156]

[0157] in, and They represent the shadow price of unit power change when unit i ramps up / down in period t respectively;

[0158] According to the economic model, the line flow constraints are converted into:

[0159]

[0160] in, and Respectively represent the shadow price when the line cross-section power is at maximum / minimum power.

[0161] The Lagrangian equations are constructed through the constraints of the transformed forward cost model and the economic model, including:

[0162] With the goal of minimizing cost, the Lagrange equation is constructed through the constraints of the transformed forward cost model and the economic model:

[0163]

[0164] Where D represents the set of all line sections;

[0165] Predict node marginal electricity prices from the perspective of power suppliers, including:

[0166] Assume that unit i and load j are located at the same node, and take the partial derivative of the Lagrangian equation with respect to load j, we get:

[0167]

[0168] in, Represents the node marginal electricity price of the node where unit i and load j are located; -λ t The electricity price component representing the marginal electricity price at the node; The congestion cost represents the marginal electricity price of the node;

[0169] In order to achieve the dispatcher's goal, it is also necessary to determine the optimal output of the unit. According to the KKT (Karush–Kuhn–Tucker conditions) of linear programming, the condition for the Lagrange equation to take the extreme value is:

[0170]

[0171] in, represents the output quotation given by unit i in period t;

[0172] Since it is assumed that unit i and load j are located at the same node, from the perspective of power transfer, without considering network losses, it can be concluded that:

[0173]

[0174] Combining formulas 13-15, we get:

[0175]

[0176] Among them, ρ t Indicates the node marginal electricity price from the perspective of the power supplier.

[0177] Among them, the operation of the unit at maximum power and minimum power is a low-probability event for the system. In order to simplify the analysis, it is removed from the decision of the power supplier, that is, Formula 16 is simplified to:

[0178]

[0179] Formula 17 shows that from the perspective of the power supplier, LMP depends not only on the unit's quotation, but also on the changes in the ramping / slipping power quotation at different times. The unit's quotation is based on the marginal cost of its output. When there is a difference between LMP and its marginal cost, the unit will weigh whether increasing power / reducing power can bring about an increase in benefits, that is, the changes in the ramping shadow price and the slipping shadow price across time periods, which is and They may represent the value of power regulation resources.

[0180] Due to the above differences, the goals of the power dispatcher and the power supplier may deviate. For example, when the power dispatcher needs the unit to increase power and improve supply, if most of the power suppliers' units are in the landslide stage, the ramp-up resources are scarce, that is, If the power supplier's quotation remains unchanged, increasing the power at this time will increase the power dispatch cost, which may push up the LMP; but if the LMP remains unchanged, the power supplier's unit may have to bear this part of the cost. It is precisely because of the above reasons that the power supplier has the incentive to deviate from the dispatcher's requirements in order to protect its own interests.

[0181] In order to eliminate the above differences, we first need to make the decision cycle of the unit cover its ramp-up and ramp-down cycles, so that it is consistent with the dispatching requirements, and the unit just starts the ramp-up cycle when filling the valley, and just starts the ramp-down cycle when cutting the peak. Only in this way can the economy and stability of the system be improved.

[0182] Considering a single real-time deviation settlement, it is still assumed that the power supplier includes N units; the unit makes a decision in the day-ahead stage to predict the load demand and unit output in the next few time periods, and then the power dispatcher settles according to the real-time deviation in the intraday stage. Assuming that the decision cycle is T, the overall deviation model of the system can be expressed as:

[0183]

[0184] Among them, Δρ t represents the prediction deviation of the marginal electricity price of the time-sharing node of unit i in period t; ΔP i,t represents the output forecast deviation of unit i in period t; Θ(T) represents the deviation term other than output and time-of-use electricity price.

[0185] Specifically, the deviation term other than output and time-of-use electricity price is expressed as:

[0186]

[0187] Among them, L tot Indicates the total load; represents the variance of the node marginal electricity price; σ L represents the mean square error of short-term load forecast; Represents the mean marginal electricity price of the node within the period.

[0188] The above formula (19) can be regarded as the penalty function of the overall deviation model, so the optimal forward decision cycle can be obtained through the following iterative process:

[0189] Initialize the decision cycle T in the forward cost model to T0;

[0190] Substitute the initialized decision cycle T0 and its corresponding variable data into the forward cost model and economic model, and output the unit output and node marginal electricity price in each period;

[0191] Substitute the output of each unit and the node marginal electricity price in each period into the overall deviation model, and output the decision cycle T in this iteration;

[0192] Determine whether T is equal to T0;

[0193] If T is equal to T0, then update the decision cycle and continue iterating; if T is not equal to T0, then determine whether Ω(T)≤Ω(T-1) holds;

[0194] If it is established, the decision cycle T in this iteration is used as the target decision cycle T * ; If not, then T-1 is used as the target decision cycle T * ;

[0195] Determine whether the maximum iteration period has been reached;

[0196] If the maximum iteration period is reached, the target decision cycle T is output * ; If the maximum iteration period has not been reached, the iteration will continue after updating the decision cycle.

[0197] After updating the decision cycle, the iteration continues from the second step, that is, substituting the updated decision cycle and its corresponding variable data into the forward cost model and economic model, and outputting the unit output and node marginal electricity price in each time period.

[0198] It should be noted that when there is a difference between the LMP and the unit's quotation, the power output party has an incentive to deviate from the power dispatcher's instructions to compensate for the costs incurred by calling power regulation resources. The incentive degree of the unit to deviate from the dispatch instruction can be measured by the relevant opportunity cost. The specific expression is as follows:

[0199]

[0200] Among them, C ox Indicates the incentive level of the unit to deviate from the dispatch instruction; Indicates the unit output that executes the dispatcher's instructions; P i,t Indicates the unit output that has not executed the dispatcher's instructions;

[0201] Due to the existence of opportunity costs, the power generator has an incentive to deviate from the instructions of the power dispatcher. In order to align the goals and interests of the power dispatcher with the power generator, it is necessary to consider how to compensate or eliminate the goal differences between the power generator and the power dispatcher during the settlement process.

[0202] According to the result of formula 17, the difference between the power output party and the power dispatcher mainly comes from the decision-making cycle related Two difference terms.

[0203] Since the load forecast has a low deviation in the day-ahead phase and the forecast covers the entire intraday period, the following variables can be constructed in the day-ahead phase:

[0204]

[0205] in, represents the sum of the forward power adjustment price factors of all units in the day-ahead period t;

[0206] Taking the sum of the forward power adjustment price factors of all units in the day-ahead period as the benchmark and taking the decision cycle into account, the overall power adjustment price factor of the system in the decision cycle T is obtained:

[0207]

[0208] Among them, τ t,t+T represents the overall power adjustment price factor of the system within the decision period T;

[0209] τ t,t+T It represents the overall power adjustment price factor of the system within the decision cycle T, and therefore can also represent the overall level of compensation to be paid by the power contributor. If this parameter is used as a reference indicator for settlement priority, the incentive level for the power contributor can be reflected in the settlement mechanism, thereby eliminating the interest deviation between the power dispatcher and the power contributor.

[0210] Therefore, when adjusting the decision cycle T, the first goal of settlement optimization can be summarized as selecting the optimal target decision cycle T * , taking the overall power adjustment price factor of the system in the decision cycle T as the reference indicator of the settlement priority of the clearing round, we have:

[0211]

[0212] The target clearing round is the clearing round with the highest settlement priority, and the target clearing round is:

[0213] B={tT * ,tT * +1,…t} (23);

[0214] Among them, B represents the target clearing round.

[0215] That is to say, in the case of a single settlement, for the settlement of period t, tT * The cleared electricity quantity and electricity price up to period t are used as the basis for clearing.

[0216] For example: the result of clearing 24 hours in the day-ahead stage, and then in the intraday stage, the optimal round of each settlement needs to be determined. Assuming that the target decision cycle obtained by the overall deviation model is 4, then in each round, 1-4 cycles are rolled over to clear. Assuming that the 5th period is to be settled, the existing method is to directly perform deviation settlement based on the time-of-use electricity price and electricity volume of the 5th period of the day and the winning bid price and winning bid volume of the unit in the day-ahead stage. In this technical solution, to settle the 5th period, the electricity price and electricity volume of the first 4 cycles of the 5th period are used. The clearing round with the highest priority among the 4 cycles given by the overall deviation model is selected as the target clearing round for data settlement, and rolling clearing is performed, thereby minimizing the target deviation of the dispatcher and the supplier and maintaining the stability of the power grid.

[0217] It should be noted that the electricity quantity and electricity price in the target clearing round will be settled twice based on the current deviation settlement, including:

[0218]

[0219] in, represents the total settlement amount for unit i in period t under secondary settlement; ρ i,t,1 P represents the reference electricity price for a settlement; i,t,1 Represents the amount of electricity settled at one time; ρ i,t,2 represents the settlement electricity price of the secondary real-time settlement; P i,t,2 -P i,t,1 It indicates the incentive electricity amount to increase the output of the unit under the secondary settlement.

[0220] Assuming that the settlement mechanism takes into account the compensation for the overall power adjustment price factor of the unit within the decision period T, the secondary compensation mechanism is shown in Formula 24 above.

[0221] This technical solution can re-deconstruct the component factors of the node marginal electricity price, predict the node marginal electricity price from the perspective of the power supplier, and assist the power supplier in determining the number of target decision cycles. During settlement, the electricity and electricity prices of the previous several cycles (the number of target decision cycles) of the current settlement period are used, and then the target clearing round with the highest priority is determined in these cycles, and the secondary settlement is performed based on the current primary deviation settlement based on the time period electricity and electricity prices of the target clearing round, thereby minimizing the target deviation between the power dispatcher and the power supplier, reducing the willingness of the power supplier to deviate from the instructions of the power dispatcher, and improving the overall stability of the system and the safety of the flow.

[0222] Embodiment 2

[0223] A real-time settlement optimization device for intraday electricity prices, referring to Figure 2 ,include:

[0224] Processor 21 and memory 22;

[0225] The processor 21 and the memory 22 are connected via a communication bus:

[0226] The processor 21 is used to call and execute the program stored in the memory 22;

[0227] The memory 22 is used to store a program, and the program is used to execute at least one of the intraday electricity price real-time settlement optimization methods in the above embodiments.

[0228] It can be understood that the same or similar parts of the above embodiments can be referenced to each other, and the contents not described in detail in some embodiments can refer to the same or similar contents in other embodiments.

[0229] It should be noted that, in the description of this application, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of this application, unless otherwise specified, the meaning of "plurality" refers to at least two.

[0230] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.

[0231] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0232] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0233] In addition, each functional unit in each embodiment of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0234] The storage medium mentioned above can be a read-only memory, a magnetic disk or an optical disk, etc.

[0235] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0236] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A method for optimizing intraday electricity price real-time settlement. It is characterized in that include: Based on the perspective of the power supplier, a forward cost model including the decision cycle is constructed; The constraints of the forward cost model include: power balance constraints, power output constraints, ramp constraints, start-stop times constraints and line flow constraints; From the perspective of power dispatchers, an economic model including the decision-making cycle is constructed; transforming the constraints of the forward cost model according to the economic model; Constructing a Lagrangian equation through the constraints of the converted forward cost model and the economic model to predict the node marginal electricity price from the perspective of the power supplier; According to the node marginal electricity price based on the perspective of the power supplier, an overall deviation model including a decision cycle is determined; Based on the forward cost model, the economic model and the overall deviation model, the decision cycle is iterated to obtain a target decision cycle that meets the preset conditions; Determine the target clearing round with the highest priority when performing intraday rolling clearing according to the target decision cycle; The electricity consumption and electricity price in the target clearing round are settled twice based on the current deviation settlement.

2. The method according to claim 1, It is characterized in that From the perspective of the power supplier, a forward cost model including the decision cycle is constructed, including: Among them, F 1 represents the objective function of the forward cost model; T represents the decision cycle; N represents the total number of all units of the power supplier; C i (P i,t ) represents the output operating cost of unit i in period t; P i,t represents the active power of unit i in period t; φ i,t A dummy variable representing the start / stop status of unit i in period t, which takes the value 1 when the unit is in the start state and 0 otherwise; represents the cost of a single startup of unit i; i,t is a dummy variable indicating that unit i is in working state during period t, which takes the value of 1 when the unit is unloaded and 0 otherwise; represents the no-load cost of unit i; The power balance constraint condition is: ∑ i∈U P i,t =∑ j∈L l j,t (2); Among them, U represents the set of units; L represents the set of loads; l j,t represents the power of the jth load in period t; The power output constraint condition is: P i,min ≤P i,t ≤P i,max (3); Among them, P i,min represents the minimum power of unit i; P i,max represents the maximum power of unit i; The climbing constraint condition is: Among them, Γ i Indicates the maximum power that can be adjusted by unit i in each period; P i,t-1 represents the active power of unit i in period t-1; i,t-1 A dummy variable indicating that unit i is in working state during period t-1; The start-stop times constraint condition is: Among them, φ i,max represents the maximum number of times that unit i can be started within the decision cycle T; ψ i,t is a virtual variable indicating that unit i is in shutdown state during period t. It takes 1 when the unit is shut down, otherwise it takes 0; ψ i,max It represents the maximum number of shutdown times that unit i can have within the decision cycle T; The line flow constraints are: P s,min ≤P s,t ≤P s,max (6); Among them, P s,min Indicates the minimum power of the line section; P s,max Indicates the maximum power of the line section; P s,t represents the power of interface s during time period t.

3. The method according to claim 2, It is characterized in that From the perspective of power dispatchers, an economic model with a decision-making cycle is constructed, including: Among them, F 2 represents the objective function of the economic model; The constraints of the forward cost model are converted according to the economic model, including: The power balance constraint is converted into: l t :∑ i∈U P i,t =∑ j∈L l j,t (8); Among them, λ t represents the shadow price in period t; The power output constraint is converted into: in, and They represent the shadow price of unit i operating at maximum / minimum power at time t respectively; The climbing constraint condition is converted into: in, and They represent the shadow price of unit power change when unit i ramps up / down in period t respectively; The line flow constraint condition is converted into: in, and Respectively represent the shadow price when the line cross-section power is at maximum / minimum power.

4. The method according to claim 3, It is characterized in that The Lagrangian equation is constructed by the constraints of the transformed forward cost model and the economic model, including: With the goal of minimizing cost, the Lagrangian equation is constructed through the constraints of the transformed forward cost model and the economic model: Where D represents the set of all line sections; Predict node marginal electricity prices from the perspective of power suppliers, including: Assume that unit i and load j are located at the same node, and take the partial derivative of the Lagrangian equation with respect to load j, we get: in, Represents the node marginal electricity price of the node where unit i and load j are located; -λ t The electricity price component representing the marginal electricity price at the node; The congestion cost represents the marginal electricity price of the node; The condition for the Lagrange equation to take an extreme value is: in, represents the output quotation given by unit i in period t; From the perspective of power transfer: Combining formulas 13-15, we get: Among them, ρ t Indicates the node marginal electricity price from the perspective of the power supplier.

5. The method according to claim 4, It is characterized in that The method further includes: removing the operation of the unit at maximum power and minimum power from the decision of the power supplier, and simplifying Formula 16 to:

6. The method according to claim 5, It is characterized in that According to the node marginal electricity price from the perspective of the power supplier, an overall deviation model including a decision cycle is determined, including: Among them, Δρ t represents the prediction deviation of the marginal electricity price of the time-sharing node of unit i in period t; ΔP i,t represents the output forecast deviation of unit i in period t; Θ(T) represents the deviation term other than output and time-of-use electricity price.

7. The method according to claim 6, It is characterized in that The deviation term other than output and time-of-use electricity price is expressed as: Among them, L tot Indicates the total load; represents the variance of the node marginal electricity price; σ L represents the mean square error of short-term load forecast; Represents the mean marginal electricity price of the node within the period.

8. The method according to claim 7, It is characterized in that Based on the forward cost model, economic model and overall deviation model, the decision cycle is iterated to obtain a target decision cycle that meets the preset conditions, including: Initialize the decision cycle T in the forward cost model to T 0 ; The initial decision cycle T 0 Substituting the corresponding variable data into the forward cost model and economic model, outputting the unit output and node marginal electricity price in each time period; Substitute the output of each unit and the node marginal electricity price in each period into the overall deviation model, and output the decision cycle T in this iteration; Determine whether T is equal to T 0 ; If T is equal to T 0 , then update the decision cycle and continue to iterate; if T is not equal to T 0 , then determine whether Ω(T)≤Ω(T-1) holds; If it is established, the decision cycle T in this iteration is used as the target decision cycle T * ; If not, then T-1 is used as the target decision cycle T * ; Determine whether the maximum iteration period has been reached; If the maximum iteration period is reached, the target decision cycle T is output * ; If the maximum iteration period has not been reached, the iteration will continue after updating the decision cycle.

9. The method according to claim 8, It is characterized in that The target clearing round with the highest priority when performing intraday rolling clearing is determined according to the target decision cycle, including: Determine the incentive level for the unit to deviate from the dispatch instructions: Among them, C ox Indicates the incentive level of the unit to deviate from the dispatch instruction; Indicates the unit output that executes the dispatcher's instructions; P i,t Indicates the unit output that has not executed the dispatcher's instructions; Determine the sum of the forward power adjustment price factors for all units during the day-ahead period: in, represents the sum of the forward power adjustment price factors of all units in the day-ahead period t; Taking the sum of the forward power adjustment price factors of all units in the day-ahead period as the benchmark and taking the decision cycle into account, the overall power adjustment price factor of the system in the decision cycle T is obtained: Among them, τ t,t+T represents the overall power adjustment price factor of the system within the decision period T; Taking the overall power adjustment price factor of the system in the decision cycle T as the reference indicator of the settlement priority of the clearing round, we have: max(t t,t+T )=τ t,t+T* (22); The target clearing round is the clearing round with the highest settlement priority, and the target clearing round is: B={t-T * ,t-T * +1,…t} (23); Among them, B represents the target clearing round.

10. A device for optimizing the real-time settlement of intraday electricity prices. It is characterized in that include: Processor and memory; The processor and the memory are connected via a communication bus: Wherein, the processor is used to call and execute the program stored in the memory; The memory is used to store a program, and the program is at least used to execute a method for optimizing intraday electricity price real-time settlement as described in any one of claims 1-9.