Energy storage control method, energy storage system and computer medium
By monitoring the total and average power of the load, limiting it to the threshold and rated power, allowing over-rated power within a certain period of time to compare the supercapacitance and redundant power, solving the problem of power redundancy and distribution waste in the prior art. , achieving more efficient power utilization.
Patent Information
- Application Number
- CN202410906855.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-12-06
AI Technical Summary
The existing energy storage control methods are too conservative when avoiding the power grid's overcapacitance, resulting in power redundancy and waste of distribution, and the inability to efficiently utilize transformer capacity.
By monitoring the total and average power of the load, limited to the threshold and rated power, allowing over-rated power to be compared for a certain period of time to avoid over-capacitance and redundant power, while maximizing the power.
It realizes more efficient utilization of transformer capacity without overcapacity, avoids power redundancy and distribution waste, and improves the efficiency of power distribution.
Smart Images

Figure CN119093421A_ABST
Abstract
Description
Technical Field
[0001] The present invention mainly relates to the field of electric power, and in particular to an energy storage control method, an energy storage system and a computer medium. Background Art
[0002] At present, electricity generation and supply mostly adopt a unified dispatching method. Electricity is generated by power plants and dispatched to different regions and users on the energy network. Since the power grid company will charge high fines for over-capacity use of electricity, once the power distribution is over-capacity, it will cause great economic losses. Therefore, the energy storage control method in the existing technology is relatively conservative in controlling the load power, and the load power is not allowed to exceed the rated power of the transformer to avoid over-capacity. This method may further lead to redundancy of electricity, thereby causing waste of distribution. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide an energy control method, an energy storage system and a computer medium for more efficiently utilizing the capacity of a transformer while ensuring that the capacity is not exceeded.
[0004] To solve the above technical problems, the present invention provides an energy storage control method suitable for controlling at least one load powered by a transformer, comprising the following steps: monitoring the total power of at least one load in a current monitoring cycle, the total power of at least one load being the sum of the power values of at least one load at each moment in the current monitoring cycle; when the total power of at least one load exceeds a threshold power of the transformer, limiting the total power of at least one load to not exceed the threshold power; when the average power of at least one load in a first sub-time period in the current monitoring cycle exceeds the rated power of the transformer, limiting the total power of at least one load to not exceed the rated power; wherein the threshold power is greater than the rated power.
[0005] In one embodiment of the present invention, the energy storage control method further includes: when the average power of at least one load in the second sub-time period in the current monitoring cycle does not exceed the rated power of the transformer, allowing the total power of at least one load to exceed the rated power; wherein the second sub-time period includes the first sub-time period.
[0006] In one embodiment of the present invention, determining whether the average power of at least one load in the first sub-time period in the current monitoring cycle exceeds the rated power of the transformer includes: when the total power of at least one load in the first sub-time period always exceeds the rated power of the transformer, the average power of at least one load in the first sub-time period exceeds the rated power of the transformer; when the total power of at least one load in the first sub-time period always does not exceed the rated power of the transformer, the average power of at least one load in the first sub-time period does not exceed the rated power of the transformer.
[0007] In one embodiment of the present invention, determining whether the average power of at least one load in the first sub-time period in the current monitoring cycle exceeds the rated power of the transformer further includes: when there is a first time length in the first sub-time period so that the total power of at least one load does not exceed the rated power of the transformer, and there is a second time length so that the total power of at least one load exceeds the rated power of the transformer, calculating the redundant power of at least one load in the first time length and the excess capacity power in the second time length; determining whether the excess capacity power is greater than the redundant power, if so, the average power of at least one load in the first sub-time period exceeds the rated power of the transformer, otherwise, the average power of at least one load in the first sub-time period does not exceed the rated power of the transformer.
[0008] In one embodiment of the present invention, the method for determining whether the excess capacity is greater than the redundant capacity includes: determining Is it greater than A*(T2-T1); where T1 is the start time of the current monitoring cycle, T2 is the end time of the current monitoring cycle, F(t) is the total power of at least one load at time t, and A is the rated power of the transformer.
[0009] In one embodiment of the present invention, the monitoring period satisfies: 5s≤T2-T1≤60s.
[0010] The present invention further provides an energy storage system, comprising a control device, a transformer and at least one load, wherein the control device is suitable for executing the energy storage control method of any of the previous embodiments to control the at least one load.
[0011] In one embodiment of the present invention, the control device is suitable for reducing the total power of at least one load when the total power of at least one load exceeds the threshold power of the transformer or the average power of at least one load in the first sub-time period in the current monitoring cycle exceeds the rated power of the transformer.
[0012] In one embodiment of the present invention, at a first moment in a current monitoring cycle, the total power of at least one load is made greater than the rated power of the transformer.
[0013] The present invention also provides a computer-readable medium storing computer program codes, and when the computer program codes are executed by a processor, the energy storage control method of any of the above embodiments is implemented.
[0014] Compared with the prior art, the energy storage control method provided by the present invention allows the total load power to exceed the rated power of the transformer within a certain period of time. By continuously monitoring the load power, the excess capacity and redundant capacity are compared to ensure maximum utilization of power while not exceeding the capacity. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The accompanying drawings are included to provide a further understanding of the present application. They are included and constitute a part of the present application. The accompanying drawings illustrate embodiments of the present application and together with the present specification serve to explain the principles of the present invention. In the accompanying drawings:
[0016] Figure 1 It is a flow chart of the energy storage control method of the present application.
[0017] Figure 2 It is a flow chart of a method for determining whether the average power of at least one load in a first sub-time period in a current monitoring cycle exceeds the rated power of a transformer according to the present application.
[0018] Figure 3 It is a schematic diagram of the total load power change of the energy storage system of the present application.
[0019] Figure 4 It is a schematic diagram of an energy storage system according to an embodiment of the present invention. DETAILED DESCRIPTION
[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the following is a brief introduction to the drawings required for the description of the embodiments. Obviously, the drawings described below are only some examples or embodiments of the present application. For ordinary technicians in this field, the present application can also be applied to other similar scenarios based on these drawings without creative work. Unless it is obvious from the language environment or otherwise explained, the same reference numerals in the figures represent the same structure or operation.
[0021] As shown in this application and claims, unless the context clearly indicates an exception, the words "a", "an", "an" and / or "the" do not refer to the singular and may also include the plural. Generally speaking, the terms "include" and "comprise" only indicate the inclusion of the steps and elements that have been clearly identified, and these steps and elements do not constitute an exclusive list. The method or device may also include other steps or elements.
[0022] Unless otherwise specifically stated, the relative arrangement, numerical expressions and numerical values of the parts and steps set forth in these embodiments do not limit the scope of the present application. At the same time, it should be understood that, for ease of description, the sizes of the various parts shown in the accompanying drawings are not drawn according to the actual proportional relationship. The technology, method and equipment known to those of ordinary skill in the relevant field may not be discussed in detail, but in appropriate cases, the technology, method and equipment should be considered as a part of the authorization specification. In all examples shown and discussed here, any specific value should be interpreted as being merely exemplary, rather than as a limitation. Therefore, other examples of exemplary embodiments may have different values. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so that once a certain item is defined in an accompanying drawing, it does not need to be further discussed in subsequent drawings.
[0023] In the description of the present application, it should be understood that the directions or positional relationships indicated by directional words such as "front, back, up, down, left, right", "lateral, vertical, perpendicular, horizontal" and "top, bottom" are usually based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present application and simplifying the description. Unless otherwise specified, these directional words do not indicate or imply that the device or element referred to must have a specific direction or be constructed and operated in a specific direction, and therefore cannot be understood as limiting the scope of protection of the present application; the directional words "inside and outside" refer to the inside and outside relative to the contours of each component itself.
[0024] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" can include both "above" and "below". The device can also be positioned in other different ways (rotated 90 degrees or in other orientations), and the spatially relative descriptions used here are interpreted accordingly.
[0025] In addition, it should be noted that the use of words such as "first" and "second" to define components is only for the convenience of distinguishing the corresponding components. If not otherwise stated, the above words have no special meaning and cannot be understood as limiting the scope of protection of this application. In addition, although the terms used in this application are selected from well-known and commonly used terms, some terms mentioned in the specification of this application may be selected by the applicant at his or her discretion, and their detailed meanings are explained in the relevant parts of the description of this article. In addition, it is required to understand this application not only by the actual terms used, but also by the meaning implied by each term.
[0026] Flowcharts are used in the present application to illustrate the operations performed by the system according to the embodiments of the present application. It should be understood that the preceding or following operations are not necessarily performed accurately in order. On the contrary, various steps may be processed in reverse order or simultaneously. At the same time, other operations may be added to these processes, or one or more operations may be removed from these processes.
[0027] Figure 1 is a flow chart of the energy storage control method of the present application, Figure 3 It is a schematic diagram of the total load power change of the energy storage system of this application. Figure 1 , 3 As shown, the present invention provides an energy storage control method 10, which is suitable for controlling at least one load powered by a transformer, comprising the following steps:
[0028] S11: monitoring the total power of at least one load in a current monitoring cycle;
[0029] S12: when the total power of at least one load exceeds the threshold power of the transformer, limiting the total power of at least one load to not exceed the threshold power;
[0030] S13: When the average power of at least one load in the first sub-time period in the current monitoring cycle exceeds the rated power of the transformer, limiting the total power of the at least one load to not exceed the rated power.
[0031] by Figure 3 Take the above steps as an example to explain them in detail. Specifically, Figure 3The figure shows the change curve of the total power of at least one load in the energy storage system within 240 seconds, which is the result obtained by monitoring in step S11. However, it should be noted that the monitoring cycle length at this time is 60 seconds, and the monitoring result will be updated after each monitoring cycle (60 seconds). Taking 0-60 seconds as an example, the total power of the load in the current monitoring cycle shows a trend of first rising and then falling, and the total power of the load in 0-30 seconds does not exceed the rated power of the transformer. Although the total power of the load in 30-60 seconds exceeds the rated power of the transformer, it does not exceed the threshold power of the transformer. The threshold power is the maximum power used to ensure that the transformer can work safely. In this embodiment, it can be preferably 1.2 times the rated power. In some other embodiments, the threshold power can be changed according to actual needs, but it must be greater than the rated power of the transformer.
[0032] Furthermore, in step S12, the total power of at least one load is compared with the threshold power of the transformer. When the total power of the load exceeds the threshold power of the transformer, the transformer may fail to operate. Therefore, the power of the load needs to be limited. At the next moment, the total power of at least one load is limited to not exceed the threshold power. Figure 3 The total power of the load during the time period of 0-60 seconds does not exceed the threshold power, so no limitation is required.
[0033] Furthermore, in step S13, the total power of at least one load is compared with the rated power of the transformer. In the prior art, in order to avoid overcapacity and thus a fine, the total power of the load is usually not allowed to exceed the rated power of the transformer. The energy storage control method 10 provided in the present application allows the total power of the load to exceed the rated power of the transformer for a period of time, but in the current monitoring period (i.e., Figure 3 The overall power consumption (0-60 seconds as shown) cannot exceed the rated power consumption.
[0034] Specifically, in step 13, the method monitors the average power of at least one load in the first sub-time period of the current monitoring cycle, wherein the first sub-time period is a part of the monitoring cycle, and the starting points of the two time periods are the same. Figure 3 As shown in the example, the first sub-time period may be 0-10 seconds, 0-15 seconds or 0-50 seconds, etc. When the average power of at least one load in the first sub-time period exceeds the rated power of the transformer, it can be considered that the total power of at least one load in the next moment may continue to exceed the rated power of the transformer, thereby causing overcapacity. To avoid this phenomenon, the total power of at least one load is limited to not exceed the rated power at the next moment of the first sub-time period.
[0035] It is understandable that even if the average power of the load exceeds the rated power of the transformer in the current first sub-time period, power redundancy may occur after a period of restriction. In order to maximize the use of power, the present application Figure 1 The energy storage control method 10 in the preferred embodiment shown further includes S14: when the average power of at least one load in the second sub-time period in the current monitoring cycle does not exceed the rated power of the transformer, the total power of at least one load is allowed to exceed the rated power, wherein the second sub-time period includes the first sub-time period. That is, when it is detected that the average power of at least one load in the first sub-time period exceeds the rated power of the transformer, the power of the load should first be limited to avoid overcapacity, and in addition, the average power of the load should continue to be monitored. When the power is redundant, that is, the average power of at least one load in the next period of time is less than the rated power of the transformer again, the load power restriction should be lifted, and the total power of at least one load should be allowed to exceed the rated power.
[0036] Figure 2 : is a flow chart of a method for determining whether the average power of at least one load in the first sub-time period of the current monitoring cycle exceeds the rated power of the transformer. Figure 1-3 As shown, step S13 specifically includes:
[0037] S15: Determine whether the total power of at least one load in the first time period always exceeds the rated power of the transformer, if so, execute step S19, if not, execute step S16;
[0038] S16: Determine whether the total power of at least one load does not exceed the rated power of the transformer during the first time period. If yes, the process ends. If no, the process proceeds to step S17.
[0039] S17: Calculating the redundant power of at least one load within a first time period and the excess power within a second time period;
[0040] S18: Determine whether the excess capacity is greater than the redundant capacity, if so, execute step S19, if not, end;
[0041] S19: Limit the total power of at least one load to not exceed the rated power.
[0042] Steps S15 and S16 are to determine whether the total power of the loads is always greater than or less than the rated power of the transformer in the first sub-time period. It can be understood that when the total power of at least one load in the first sub-time period always exceeds the rated power of the transformer, the average power of at least one load in the first sub-time period exceeds the rated power of the transformer. Conversely, when the total power of at least one load in the first sub-time period does not exceed the rated power of the transformer, the average power of at least one load in the first sub-time period does not exceed the rated power of the transformer. Figure 3 For example, within 0-30 seconds, the total power of the load is always less than the rated power of the transformer. Obviously, there is no overcapacity and there is no need to limit the load power. On the other hand, within 30-60 seconds, if 30-60 seconds is set as a monitoring cycle, then in any first sub-time period within this monitoring cycle, the total power of the load is always greater than the rated power of the transformer, then it is judged that overcapacity has occurred and the load power needs to be limited.
[0043] Further, when the judgment results of steps S16 and S17 are both negative, there is a first time duration in the first sub-time period so that the total power of at least one load does not exceed the rated power of the transformer, and there is a second time duration so that the total power of at least one load exceeds the rated power of the transformer, at this time, the redundant power of at least one load in the first time duration and the excess power in the second time duration are calculated, and it is determined whether the excess power is greater than the redundant power. Figure 3 As shown, in the first sub-time period of 0-60 seconds, there is a first time length (0-30 seconds) that makes the total power of at least one load not exceed the rated power of the transformer, and there is a second time length (30-60 seconds) that makes the total power of at least one load exceed the rated power of the transformer. When the excess capacity is greater than the redundant capacity, it means that the average power of at least one load in the first sub-time period exceeds the rated power of the transformer, and it needs to be limited at the next moment, otherwise no restriction is required. Specifically, when there is only a single load, the power of the single load is limited, and when there are multiple loads, the power of multiple loads can be limited to a certain extent, or some of the loads can be turned off. The specific adjustment can be made according to the actual situation, and this application does not make specific restrictions here.
[0044] In one embodiment of the present invention, the method for determining whether the excess capacity is greater than the redundant capacity includes: determining Is it greater than A*(T2-T1), where T1 is the start time of the current monitoring cycle, T2 is the end time of the current monitoring cycle, F(t) is the total power of at least one load at time t, and A is the rated power of the transformer. That is, it represents the sum of the power values of at least one load at each moment in the time period from time T1 to time T2 (ie, the current monitoring period).
[0045] In one embodiment of the present invention, the monitoring period satisfies: 5s≤T2-T1≤60s.
[0046] Figure 4 is a schematic diagram of an energy storage system according to an embodiment of the present invention, with reference to Figure 4 As shown, the present invention further provides an energy storage system, including a control device 30, at least one load 31 and a transformer 32, wherein the control device 30 is adapted to execute the energy storage control method 10 of any of the previous embodiments to control the at least one load 31. In one embodiment of the present invention, the control device 30 is adapted to reduce the total power of the at least one load 31 when the total power of the at least one load 31 exceeds the threshold power of the transformer 32 or the average power of the at least one load 31 in the first sub-time period in the current monitoring cycle exceeds the rated power of the transformer 32.
[0047] In one embodiment of the present invention, the total power of at least one load 31 is made greater than the rated power of the transformer 32 at a first moment in the current monitoring cycle.
[0048] The present invention also provides a computer-readable medium storing computer program code, which implements the energy storage control method of any of the previous embodiments when executed by a processor. The computer-readable medium may include a propagation data signal containing computer program code, such as on a baseband or as part of a carrier. The propagation signal may have a variety of forms, including electromagnetic form, optical form, etc., or a suitable combination. The computer-readable medium can be any computer-readable medium other than a computer-readable storage medium, which can be connected to an instruction execution system, device or equipment to achieve communication, propagation or transmission of a program for use. The program code located on the computer-readable medium can be transmitted through any suitable medium, including radio, cable, fiber optic cable, radio frequency signal, or similar medium, or a combination of any of the above mediums.
[0049] The basic concepts have been described above. Obviously, for those skilled in the art, the above invention disclosure is only used as an example and does not constitute a limitation of the present application. Although not explicitly stated herein, those skilled in the art may make various modifications, improvements and amendments to the present application. Such modifications, improvements and amendments are suggested in the present application, so such modifications, improvements and amendments still belong to the spirit and scope of the exemplary embodiments of the present application.
[0050] At the same time, the present application uses specific words to describe the embodiments of the present application. For example, "one embodiment", "an embodiment", and / or "some embodiments" refer to a certain feature, structure or characteristic related to at least one embodiment of the present application. Therefore, it should be emphasized and noted that "one embodiment" or "an embodiment" or "an alternative embodiment" mentioned twice or more in different positions in this specification does not necessarily refer to the same embodiment. In addition, some features, structures or characteristics in one or more embodiments of the present application can be appropriately combined.
[0051] Some aspects of the present application may be performed entirely by hardware, entirely by software (including firmware, resident software, microcode, etc.), or by a combination of hardware and software. The above hardware or software may be referred to as "data blocks", "modules", "engines", "units", "components" or "systems". The processor may be one or more application specific integrated circuits (ASICs), digital signal processors (DSPs), digital signal processing devices (DAPDs), programmable logic devices (PLDs), field programmable gate arrays (FPGAs), processors, controllers, microcontrollers, microprocessors, or combinations thereof. In addition, various aspects of the present application may be expressed as computer products located in one or more computer-readable media, which include computer-readable program codes. For example, computer-readable media may include, but are not limited to, magnetic storage devices (e.g., hard disks, floppy disks, tapes ...), optical disks (e.g., compact disks CDs, digital versatile disks DVDs ...), smart cards, and flash memory devices (e.g., cards, sticks, key drives ...).
[0052] Similarly, it should be noted that in order to simplify the description of the disclosure of this application and thus help understand one or more embodiments of the invention, in the above description of the embodiments of this application, multiple features are sometimes combined into one embodiment, figure or description thereof. However, this disclosure method does not mean that the features required by the object of this application are more than the features mentioned in the claims. In fact, the features of the embodiments are less than all the features of the single embodiment disclosed above.
[0053] In some embodiments, numbers describing the number of components and attributes are used. It should be understood that such numbers used in the description of the embodiments are modified by the modifiers "about", "approximately" or "substantially" in some examples. Unless otherwise specified, "about", "approximately" or "substantially" indicate that the numbers are allowed to vary by ±20%. Accordingly, in some embodiments, the numerical parameters used in the specification and claims are approximate values, which may change according to the required features of individual embodiments. In some embodiments, the numerical parameters should take into account the specified significant digits and adopt the general method of retaining digits. Although the numerical domains and parameters used to confirm the breadth of their range in some embodiments of the present application are approximate values, in specific embodiments, the setting of such numerical values is as accurate as possible within the feasible range.
[0054] Although the present application has been described with reference to the current specific embodiments, ordinary technicians in this technical field should recognize that the above embodiments are only used to illustrate the present application, and various equivalent changes or substitutions may be made without departing from the spirit of the present application. Therefore, as long as the changes and modifications to the above embodiments are within the essential spirit of the present application, they will fall within the scope of the claims of the present application.
Claims
1. A method for controlling energy storage, adapted to control at least one load powered by a transformer, It is characterized in that The steps include: Monitoring the total power of the at least one load in a current monitoring period, wherein the total power of the at least one load is the sum of power values of the at least one load at each moment in the current monitoring period; When the total power of the at least one load exceeds the threshold power of the transformer, limiting the total power of the at least one load to not exceed the threshold power; When the average power of the at least one load in the first sub-time period of the current monitoring cycle exceeds the rated power of the transformer, the total power of the at least one load is limited to not exceed the rated power; wherein, The threshold power is greater than the rated power.
2. The energy storage control method according to claim 1, It is characterized in that Also includes: When the average power of the at least one load in the second sub-time period in the current monitoring cycle does not exceed the rated power of the transformer, the total power of the at least one load is allowed to exceed the rated power; wherein, The second sub-time period includes the first sub-time period.
3. The energy storage control method according to claim 1, It is characterized in that Determining whether the average power of the at least one load in the first sub-time period in the current monitoring cycle exceeds the rated power of the transformer includes: When the total power of the at least one load in the first sub-time period always exceeds the rated power of the transformer, the average power of the at least one load in the first sub-time period exceeds the rated power of the transformer; When the total power of the at least one load in the first sub-time period does not exceed the rated power of the transformer all the time, the average power of the at least one load in the first sub-time period does not exceed the rated power of the transformer.
4. The energy storage control method according to claim 3, It is characterized in that Determining whether the average power of the at least one load in the first sub-time period in the current monitoring cycle exceeds the rated power of the transformer further includes: When there is a first time duration in the first sub-time period so that the total power of the at least one load does not exceed the rated power of the transformer, and there is a second time duration so that the total power of the at least one load exceeds the rated power of the transformer, calculating the redundant power of the at least one load in the first time duration and the excess power in the second time duration; Determine whether the excess capacity is greater than the redundant capacity; if so, the average power of the at least one load in the first sub-time period exceeds the rated power of the transformer; otherwise, the average power of the at least one load in the first sub-time period does not exceed the rated power of the transformer.
5. The energy storage control method according to claim 4, It is characterized in that The method for determining whether the excess capacity is greater than the redundant capacity includes: judge Is it greater than A*(T2-F1); where, T1 is the starting time of the current monitoring cycle, T2 is the ending time of the current monitoring cycle, F(t) is the total power of the at least one load at time t, and A is the rated power of the transformer.
6. The energy storage control method according to claim 1, It is characterized in that The monitoring period satisfies: 5s≤T2-T1≤60s.
7. An energy storage system, It is characterized in that The invention comprises a control device, a transformer and at least one load, wherein the control device is suitable for executing the energy storage control method according to any one of claims 1 to 6 to control the at least one load.
8. The energy storage system according to claim 7, It is characterized in that The control device is suitable for reducing the total power of the at least one load when the total power of the at least one load exceeds the threshold power of the transformer or the average power of the at least one load in the first sub-time period in the current monitoring cycle exceeds the rated power of the transformer.
9. The energy storage system according to claim 7, It is characterized in that At a first moment in a current monitoring cycle, the total power of the at least one load is made greater than the rated power of the transformer.
10. A computer readable medium storing computer program code, It is characterized in that The computer program code, when executed by a processor, implements the energy storage control method according to any one of claims 1 to 6.