Wet smelting plant micro-grid control method and device based on energy storage frequency converter

By using a combination of energy storage inverters and renewable energy in wet smelting plants to dynamically control circuit breakers and inverters, the impact of poor regional power grid reliability on frequency conversion equipment is solved, and the operation stability of equipment is improved. Energy efficiency.

CN119093423AActive Publication Date: 2024-12-06TIANJIN UNIV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411138656.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-12-06
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

The poor reliability of the regional power grid has affected the production and operation of large frequency conversion equipment in the wet smelter, resulting in a long soft start when the equipment is started, high energy consumption and unstable operation.

Method used

By using the microgrid control method based on the energy storage inverter, by detecting the frequency changes of the power grid, using energy storage units and renewable energy to provide power to the frequency converter motor, realizing dynamic opening and closing of the circuit breaker and inverter of the energy storage inverter to ensure that The stability of power supply.

Benefits of technology

It improves the production and operation stability of frequency conversion equipment in the wet smelter, reduces the power supply gap, reduces the starting energy consumption, and enhances the ability to respond to frequency fluctuations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119093423A_ABST
    Figure CN119093423A_ABST
Patent Text Reader

Abstract

The invention provides a wet smelting plant micro-grid control method and device based on an energy storage frequency converter, and relates to the technical field of micro-grids, and the energy storage frequency converter comprises an energy storage unit, a first AC-DC converter and an inverter. The input end of the first alternating current-direct current converter is connected to an external power grid through an alternating current bus, a first circuit breaker is arranged between the first alternating current-direct current converter and the external power grid, the input end of the inverter is connected with the output end of the first alternating current-direct current converter, and the output end is connected with the variable frequency motor. The energy storage unit is connected between the output end of the first alternating current-direct current converter and the input end of the inverter through a branch circuit provided with a second circuit breaker, the energy storage unit and the renewable energy source are connected to the direct current bus, and the alternating current bus and the direct current bus are connected through a second branch circuit provided with a second alternating current-direct current converter. The method comprises the step of controlling the opening and closing of the first circuit breaker and the second circuit breaker based on the frequency change data of the AC bus in the factory microgrid. The stability of production and operation of frequency conversion equipment in a plant can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of microgrids, and in particular to a control method and device for a hydrometallurgical plant microgrid based on an energy storage inverter. Background Art

[0002] If the reliability of the power grid in the factory area is poor, such as frequent power outages, fault shocks, frequency fluctuations and other problems, causing power outages in the factory, it will have a great impact on the large-scale frequency conversion equipment in the factory. For example, large rotary power equipment such as ball mills in hydrometallurgical plants need to undergo a long soft start after power outages. During this period, the equipment needs to be cranked, the frequency conversion motor is put into use, the equipment is accelerated, and it is put into production with load. During this process, the operating status of the equipment during the startup phase needs to be continuously monitored and adjusted. In addition, these large equipment have a large inertia during the startup process, and the energy consumption required for startup is high. In short, the poor reliability of the regional power grid will seriously affect the production and operation of the frequency conversion equipment in the factory. Summary of the invention

[0003] The present invention provides a microgrid control method and device for a wet smelter based on an energy storage inverter, which is used to solve the problem in the prior art that poor reliability of the regional power grid seriously affects the production and operation of the frequency conversion equipment in the factory, and achieves the effect of improving the production and operation stability of the frequency conversion equipment in the factory.

[0004] The present invention provides a hydrometallurgical plant microgrid control method based on an energy storage inverter, wherein the energy storage inverter comprises an energy storage unit, a first AC-DC converter and an inverter, wherein the input end of the first AC-DC converter is connected to an external power grid through an AC bus, and a first circuit breaker is provided between the first AC-DC converter and the external power grid, the output end of the first AC-DC converter is connected to the input end of the inverter, the output end of the inverter is connected to a variable frequency motor, the energy storage unit is connected between the output end of the first AC-DC converter and the input end of the inverter through a branch, a second circuit breaker is provided on the branch, the energy storage unit and the renewable energy are both connected to the DC bus, the AC bus is connected to the DC bus through a second branch, and a second AC-DC converter is provided on the second branch; The method comprises: Detecting frequency changes of the AC bus in the factory microgrid to obtain frequency change data; The first circuit breaker and the second circuit breaker are controlled to be opened and closed based on the frequency change data.

[0005] According to a hydrometallurgical plant microgrid control method based on an energy storage inverter provided by the present invention, the control of the opening and closing of the first circuit breaker and the second circuit breaker based on the frequency change data includes: When the detected frequency change data is within a preset first range, controlling the first circuit breaker to remain turned on and the second circuit breaker to remain turned off; When the frequency change data detected is within a preset second range, the power of the energy storage unit is detected, and the opening and closing of the first circuit breaker and the second circuit breaker are controlled based on the detection result, and the frequency change degree corresponding to the second range is greater than the frequency change degree corresponding to the first range; When the detected frequency change data is within a preset third range, the first circuit breaker is controlled to be disconnected and the second circuit breaker is controlled to be turned on, and the frequency change degree corresponding to the third range is greater than the frequency change degree corresponding to the second range.

[0006] According to a hydrometallurgical plant microgrid control method based on an energy storage inverter provided by the present invention, the control of the opening and closing of the first circuit breaker and the second circuit breaker based on the detection result includes: When the detection result shows that the power of the energy storage unit meets the power demand of the variable frequency motor within a preset time, the first circuit breaker is controlled to remain on, the second circuit breaker is controlled to remain off, and the generator in the factory microgrid is controlled to standby; When the detection result is that the power of the energy storage unit does not meet the power demand of the variable frequency motor within the preset time period, the opening and closing of the first circuit breaker and the second circuit breaker are controlled based on the frequency margin of the generator in the factory microgrid.

[0007] According to a hydrometallurgical plant microgrid control method based on an energy storage inverter provided by the present invention, the first circuit breaker and the second circuit breaker are controlled to be opened and closed based on the frequency margin of the generator in the plant microgrid, including: When the generator in the factory microgrid has a frequency margin and the frequency margin meets the power requirement of the variable frequency motor, controlling the first circuit breaker to remain turned on and the second circuit breaker to remain turned off; When the generator in the factory microgrid has a frequency margin, but the frequency margin does not meet the power requirement of the variable frequency motor, and the energy storage unit has energy storage capacity, the first circuit breaker and the second circuit breaker are controlled to remain turned on, so that the generator in the factory microgrid and the energy storage inverter are cross-synchronously powered; When the generator in the factory microgrid does not have a frequency margin and the output of the renewable energy meets the operating power requirement of the variable frequency motor in the current period, the first circuit breaker is controlled to be disconnected and the second circuit breaker is controlled to be turned on, so that the renewable energy supplies power to the variable frequency motor through the energy storage unit; When the generator in the factory microgrid has no frequency margin, the energy storage unit has no energy storage capacity, and the output of the renewable energy does not meet the operating power requirement of the variable frequency motor in the current period, the load of other electrical equipment in the factory microgrid is controlled or the variable frequency motor is shut down based on the feasibility of load reduction of other electrical equipment in the factory microgrid.

[0008] According to a hydrometallurgical plant microgrid control method based on an energy storage inverter provided by the present invention, the method further includes: Based on the power demand of other electrical equipment in the factory microgrid except the variable frequency motor, the power supply priority in the factory microgrid is determined, and the power output change of the energy storage unit and / or the power output change of the generator in the factory microgrid is controlled based on the power supply priority.

[0009] According to a hydrometallurgical plant microgrid control method based on an energy storage inverter provided by the present invention, the method further includes: Detecting the variable frequency motor control information; When the control information of the variable frequency motor reflects that the control frequency of the variable frequency motor is greater than a frequency threshold, the first circuit breaker and the second circuit breaker are controlled to remain turned on.

[0010] The present invention also provides a hydrometallurgical plant microgrid control device based on an energy storage inverter, wherein the energy storage inverter comprises an energy storage unit, a first AC-DC converter and an inverter, wherein the input end of the AC-DC converter is connected to an external power grid through an AC bus, and a first circuit breaker is provided between the first AC-DC converter and the external power grid, the output end of the first AC-DC converter is connected to the input end of the inverter, the output end of the inverter is connected to a variable frequency motor, the energy storage unit is connected between the output end of the AC-DC converter and the input end of the inverter through a branch, a second circuit breaker is provided on the branch, the energy storage unit and the renewable energy are both connected to the DC bus, the AC bus is connected to the DC bus through a second branch, and a second AC-DC converter is provided on the second branch; The device comprises: A data acquisition module, used to detect the frequency change of the AC bus in the factory microgrid and obtain frequency change data; A control module is used to control the opening and closing of the first circuit breaker and the second circuit breaker based on the frequency change data.

[0011] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, a hydrometallurgical plant microgrid control method based on an energy storage inverter as described in any one of the above-mentioned methods is implemented.

[0012] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the microgrid control method for a hydrometallurgical plant based on an energy storage inverter as described in any one of the above is implemented.

[0013] The present invention also provides a computer program product, comprising a computer program, which, when executed by a processor, implements any of the above-mentioned methods for controlling a hydrometallurgical plant microgrid based on an energy storage inverter.

[0014] The present invention provides a hydrometallurgical plant microgrid control method and device based on an energy storage inverter. The energy storage inverter includes an energy storage unit, a first AC-DC converter and an inverter. The input end of the first AC-DC converter is connected to an external power grid through an AC bus, and a first circuit breaker is provided between the first AC-DC converter and the external power grid. The output end of the first AC-DC converter is connected to the input end of the inverter, and the output end of the inverter is connected to a variable frequency motor. The energy storage unit is connected between the output end of the first AC-DC converter and the input end of the inverter through a branch. A second circuit breaker is provided on the branch. The energy storage unit and renewable energy are both connected to the DC bus. The AC bus and the DC bus are connected through a second branch. A second AC-DC converter is provided on the second branch. The frequency change of the AC bus is detected to obtain frequency change data, and the opening and closing of the first circuit breaker and the second circuit breaker are controlled based on the frequency change data. The present invention adds an energy storage inverter to the factory power grid and actively monitors the frequency changes of the factory microgrid. The first circuit breaker and the second circuit breaker in the energy storage inverter can be opened and closed according to the actual situation of the power grid. When frequency fluctuations or power outages occur on the AC bus, the energy storage inverter is promptly converted to the inverter working mode, releasing the stored energy to power the variable frequency motor, thereby improving the production and operation stability of the variable frequency equipment in the factory microgrid. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 It is a flow chart of a hydrometallurgical plant microgrid control method based on an energy storage inverter provided by the present invention.

[0017] Figure 2 It is a wiring schematic diagram of an energy storage frequency converter in a hydrometallurgical plant microgrid control method based on an energy storage frequency converter provided by the present invention.

[0018] Figure 3 It is a structural schematic diagram of a hydrometallurgical plant microgrid control device based on an energy storage inverter provided by the present invention.

[0019] Figure 4 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] Combine the following Figure 1-2 The present invention describes the hydrometallurgical plant microgrid control method based on energy storage inverter. In the hydrometallurgical plant microgrid control method based on energy storage inverter provided by the present invention, the energy storage inverter and renewable energy (such as photovoltaic, wind power, etc.) are connected. The renewable energy and the energy storage unit are combined to provide power supply for the factory microgrid. The wiring schematic diagram of the energy storage inverter in the hydrometallurgical plant microgrid control method based on energy storage inverter provided by the present invention is as follows: Figure 2As shown. The energy storage inverter includes an energy storage unit, a first AC-DC converter (to realize AC-DC conversion) and an inverter (to realize DC-AC conversion). The input end of the first AC-DC converter is connected to an external power grid (for example, a park power grid of a park where the factory is located) through an AC bus, and a first circuit breaker is provided between the first AC-DC converter and the external power grid. The output end of the first AC-DC converter is connected to the input end of the inverter, and the output end of the inverter is connected to the variable frequency motor. The energy storage unit is connected between the output end of the first AC-DC converter and the input end of the inverter through a branch, and a second circuit breaker is provided on the branch. The energy storage unit and renewable energy are both connected to the DC bus, and the AC bus is connected to the DC bus through a second branch, and a second AC-DC converter is provided on the second branch. The method provided by the present invention can be executed by an active detection unit connected to the energy storage inverter. The active detection unit is connected to the energy storage inverter to form a network-type energy storage inverter. The active detection unit can detect the frequency changes in the factory microgrid in real time, provide grid operation status monitoring for the energy storage unit, and provide real-time data support for its network construction. At the same time, it can also judge the switching status of the energy storage unit. When the external power grid of the factory is limited, affected by the imbalance between the power equipment and the power supply, frequency fluctuations will occur on the rated AC bus in the factory microgrid. At this time, after detection by the active detection unit, the network-type energy storage inverter can be directly converted from the conventional working mode to the inverter working mode, releasing the stored energy to power the variable frequency motor, reducing the length of the power supply gap period.

[0022] like Figure 1 As shown, the hydrometallurgical plant microgrid control method based on energy storage inverter provided by the present invention comprises the following steps: S110, detecting a frequency change of an AC bus in a factory microgrid to obtain frequency change data; S120. Control opening and closing of the first circuit breaker and the second circuit breaker based on the frequency change data.

[0023] The method provided by the present invention provides control instructions suitable for different conditions for the energy storage inverter according to different power supply architectures and working modes that may exist in the factory microgrid, thereby improving the working capacity and applicability of the energy storage inverter. Specifically, the opening and closing of the first circuit breaker and the second circuit breaker are controlled based on the frequency change data, including: When the detected frequency change data is within a preset first range, controlling the first circuit breaker to remain turned on and the second circuit breaker to remain turned off; When the detected frequency change data is within a preset second range, the power of the energy storage unit is detected, and the opening and closing of the first circuit breaker and the second circuit breaker are controlled based on the detection result, and the frequency change degree corresponding to the second range is greater than the frequency change degree corresponding to the first range; When the detected frequency change data is within a preset third range, the first circuit breaker is controlled to be disconnected and the second circuit breaker is controlled to be turned on, and the frequency change degree corresponding to the third range is greater than the frequency change degree corresponding to the second range.

[0024] In the method provided by the present invention, different frequency change nodes are used as constraints for controlling the working state of the energy storage inverter. The frequency change node can be represented by three ranges. The settings of the first range, the second range and the third range can be set based on the actual power grid conditions. In a possible implementation, the first range can be between ±0.2 Hz, the second range can be between ±0.2-0.5 Hz, and the third range can be outside ±0.5 Hz.

[0025] When the frequency change data is within the preset first range, the first circuit breaker is turned on and the second circuit breaker is opened. At this time, the energy storage unit of the energy storage inverter relies on the DC bus for charging or standby operation, and the energy storage capacity of the energy storage unit is controlled to be above 50% of the total capacity as much as possible.

[0026] When the frequency change data is within the preset third range, it indicates that there is a power system failure in the factory microgrid, and the voltage and frequency of the external power grid may not meet the subsequent variable frequency motor operation requirements. At this time, the first circuit breaker should be opened quickly, and the second circuit breaker should be turned on. The energy storage unit should be used to supply power to the inverter and the frequency conversion equipment. At the same time, the current real-time variable frequency power grid power data should be read in the frequency conversion control system to control the power output of the energy storage unit and realize the functional transition of the frequency conversion motor with as little fluctuation and delay time as possible.

[0027] When the frequency change data is within the preset second range, the power of the variable frequency motor is detected by the variable frequency motor power detection signal in the variable frequency control system, and the power in the energy storage unit is checked by the control system of the energy storage unit, and the opening and closing of the first circuit breaker and the second circuit breaker are controlled according to the power detection result, specifically including: Control the first circuit breaker to remain on, the second circuit breaker to remain off, and control the generator in the factory microgrid to standby; When the detection result shows that the power of the energy storage unit does not meet the power demand of supporting the variable frequency motor within a preset time, the opening and closing of the first circuit breaker and the second circuit breaker are controlled based on the frequency margin of the generator in the factory microgrid.

[0028] The preset duration is a shorter time period, such as 3-5 minutes. When the frequency change data is within the second range, it is necessary to prepare for the situation where the frequency data of the AC bus continues to fluctuate and the frequency change data is within the third range. First, the first circuit breaker is kept on and the second circuit breaker is disconnected, and a suitable number of generators are prepared for standby based on the operating parameters of the current factory self-contained power generation system (including at least one generator). Since the energy storage inverter has the characteristics of short delay time, when the external power grid cannot directly supply power, the generator can be quickly put into use to ensure the normal operation of the variable frequency motor. Since the energy storage inverter has the characteristics of a delay time period, it is particularly suitable for instantaneous protection of the variable frequency unit when the frequency of the factory microgrid drops due to power outages of the external power grid. Therefore, when the frequency change data is within the second range, the output of renewable energy should also be adjusted, and the energy storage unit should be powered first to ensure that the energy storage inverter contains at least the power reserve that can be supplied to the variable frequency motor within the preset duration, and provide the necessary intermediate transition for the subsequent start-up of the generator in the factory self-generation system.

[0029] If it is detected that the power of the energy storage unit does not meet the power demand of the variable frequency motor within the preset time, that is, it cannot provide short-term stable power support for the variable frequency motor, there will be multiple operating conditions based on the frequency margin of the generator in the factory microgrid, which are explained below.

[0030] Controlling the opening and closing of a first circuit breaker and a second circuit breaker based on a frequency margin of a generator in a factory microgrid includes: When the generator in the factory microgrid has a frequency margin and the frequency margin meets the power requirement of the variable frequency motor, the first circuit breaker is controlled to remain on and the second circuit breaker is controlled to remain off; When the generator in the factory microgrid has a frequency margin, but the frequency margin does not meet the power requirement of the variable frequency motor, and the energy storage unit has energy storage capacity, the first circuit breaker and the second circuit breaker are controlled to remain turned on, so that the generator and the energy storage inverter in the factory microgrid can supply power in a cross-synchronous manner; When there is no frequency margin in the generator in the factory microgrid and the output of renewable energy meets the operating power requirement of the variable frequency motor in the current period, the first circuit breaker is controlled to be disconnected and the second circuit breaker is controlled to be turned on, so that the renewable energy can supply power to the variable frequency motor through the energy storage unit.

[0031] The first working condition is that the factory's self-contained generator has been prepared or the existing generator still has a certain amount of power generation surplus, which can directly increase the power to supply power to the variable frequency motor and meet the power requirements of the variable frequency motor. The first circuit breaker can be controlled to remain on and the second circuit breaker can remain off. When the power is off, the first circuit breaker can be kept on and the second circuit breaker can be kept off. The generator directly increases the power to supply power to the variable frequency motor.

[0032] The second working condition is that the factory's self-contained generator has been prepared or the existing generator still has a certain amount of power reserve, but cannot fully meet the power requirement of the variable frequency motor under this working condition, and the energy storage unit still has some energy storage capacity. In this case, the first circuit breaker and the second circuit breaker can be turned on at the same time to realize cross-synchronous power supply of the generator and the energy storage inverter. However, the balance of the generator and energy storage output should be strictly controlled at this time to ensure voltage balance.

[0033] The third working condition is that the factory's self-provided generator is not ready or the existing generator has no surplus power, but the processing of renewable energy is capable of meeting the operating power requirements of the variable frequency motor during this period. At this time, the first circuit breaker can be quickly controlled to disconnect and the second circuit breaker to turn on, and the energy storage unit outputs the power of the renewable energy to the variable frequency motor through the second circuit breaker.

[0034] The fourth operating condition is that the factory's self-contained generator is not ready or the existing generator has no power reserve, and the energy storage unit does not have any energy storage capacity, and renewable energy cannot provide a stable and reliable power supply (for example, there is no photovoltaic power generation at night or on rainy days, and the wind power output is 0 or has great power fluctuations). At this time, it should be determined whether other electrical equipment in the factory can operate at a reduced load. If so, the power of other electrical equipment in the factory should be appropriately reduced to provide basic power supply guarantee for the variable frequency motor. If not, the variable frequency motor should be controlled to shut down.

[0035] Under the first, second and third working conditions mentioned above, if the frequency of the factory's own generator fluctuates, the power output of the energy storage unit should be adjusted in time.

[0036] It can be seen that the method provided by the present invention detects the frequency output and frequency conditions of power sources such as external power grids or factory-provided generators, and provides factory microgrid characteristic data to the energy storage inverter in real time according to the power system operation status of the factory microgrid, provides data support for the energy storage inverter to supply power to the selected factory, and further adjusts the output according to the scheduling and energy surplus in the energy storage unit, so that the working state of the variable frequency motor can meet the requirements of the production link at that time as much as possible.

[0037] The energy storage inverter in the method provided by the present invention is configured for the variable frequency motor. Other electrical equipment in the factory is connected to the DC or AC bus. Although other electrical equipment in the factory is not connected to the energy storage inverter, the power demand of other electrical equipment in the factory will affect the power distribution of the external power grid and the generator, thereby affecting the variable frequency motor. Considering the power demand of other electrical equipment in the factory during actual operation, the power supplied to other electrical equipment in the factory can be provided to the variable frequency motor in different situations. Based on this, the method provided by the present invention also determines the power supply priority in the factory microgrid based on the power demand of other electrical equipment in the factory microgrid except the variable frequency motor, and controls the power output change of the energy storage unit and / or the power output change of the generator in the factory microgrid based on the power supply priority.

[0038] Specifically, when the adjustable margin of other electrical equipment in the factory is less than the first preset threshold, that is, the adjustable margin is small, in order to ensure the normal operation of the variable frequency motor and other electrical equipment, the factory microgrid should be controlled to operate with the first priority strategy. The first priority corresponds to the priority energy storage supply, so that the generator in the factory microgrid can be mainly used to ensure the operation of other electrical equipment. At this time, the control instruction of the power output change of the energy storage unit is as follows: ; in, Indicates the power output change of the energy storage unit, Indicates the change in generator power output in kW. Indicates the actual change in power of the variable frequency motor, in kW. represents the Laplace operator, Represents the time constant of the saturation filter.

[0039] When the adjustable margin of other electrical equipment in the factory is greater than the second preset threshold, that is, the adjustable margin is large, but the battery capacity of the energy storage unit is insufficient, the second priority strategy should be used to ensure the normal operation of the variable frequency motor and other electrical equipment. The second priority corresponds to the priority generator supply. At this time, the generator power output change control instruction is detailed in the following formula: .

[0040] When the adjustable threshold of other electrical equipment in the factory is greater than the first preset threshold and less than the second preset threshold, that is, the adjustable margin is moderate, the battery of the energy storage unit has a certain capacity, and the renewable energy has a relatively stable working output, the renewable energy can be connected synchronously, and the third priority strategy is used to ensure the normal operation of the variable frequency motor and other electrical equipment. The third priority corresponds to the same priority of energy storage supply and generator supply. At this time, the control instructions for the change in power output of the energy storage unit and the generator are as follows: ; ; ; in, It indicates the change in power output of renewable energy power generation system, in kW. Indicates the actual power supply of the energy storage unit after calculation, in kW. Indicates the actual power supply of the generator after calculation, in kW. It represents the actual power supply of the renewable energy power generation system in kW.

[0041] The variable frequency motor in the method provided by the present invention can be a variable frequency motor of a large-scale equipment such as a ball mill. The operating state of the variable frequency motor of such equipment usually does not have frequent regulation. It can be seen from the previous description that the method provided by the present invention can control the frequency output of each power supply source in the microgrid according to the operating state of the external power grid, the factory's own generator and the variable frequency motor under the soft start or variable frequency operation state of the variable frequency motor (such as the motor of the ball mill and other equipment), so as to ensure the stable operation of the variable frequency motor. Further, the variable frequency motor in the method provided by the present invention can be a motor of a device that will have frequent regulation (such as a semi-autonomous device, etc.). Through the method provided by the present invention, the power disturbance caused to the power grid by the variable frequency motor connected to the power grid when there is frequent regulation can also be reduced. Specifically, during the normal operation of the factory microgrid, the variable frequency motor regulation information is detected; when the regulation information of the variable frequency motor reflects that the regulation frequency of the variable frequency motor is greater than the frequency threshold, the first circuit breaker and the second circuit breaker are controlled to remain on. In this way, energy storage can be used to perform fine-grained control of the frequent operation of variable-frequency motors (similar to the cross-function in the second working condition mentioned above), without the need to control the power grid outside the energy storage inverter to participate in the control, thereby improving the stability of the power grid when the variable-frequency motors in the factory microgrid are frequently controlled.

[0042] The following is a description of the hydrometallurgical plant microgrid control device based on the energy storage inverter provided by the present invention. The hydrometallurgical plant microgrid control device based on the energy storage inverter described below and the hydrometallurgical plant microgrid control method based on the energy storage inverter described above can be referred to each other. Figure 3 As shown, the hydrometallurgical plant microgrid control device based on energy storage inverter provided by the present invention includes the following modules: The data acquisition module 310 is used to detect the frequency change of the AC bus in the factory microgrid and obtain frequency change data; The control module 320 is used to control the opening and closing of the first circuit breaker and the second circuit breaker based on the frequency change data.

[0043] Figure 4An example of a physical structure diagram of an electronic device is shown in FIG. Figure 4 As shown, the electronic device may include: a processor 410, a communications interface 420, a memory 430 and a communication bus 440, wherein the processor 410, the communications interface 420 and the memory 430 communicate with each other through the communication bus 440. The processor 410 may call the logic instructions in the memory 430 to execute a hydrometallurgical plant microgrid control method based on an energy storage inverter, the method comprising: detecting a frequency change of an AC bus in a plant microgrid to obtain frequency change data; and controlling the opening and closing of a first circuit breaker and a second circuit breaker based on the frequency change data.

[0044] In addition, the logic instructions in the above-mentioned memory 430 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0045] On the other hand, the present invention also provides a computer program product, which includes a computer program, which can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the hydrometallurgical plant microgrid control method based on the energy storage inverter provided by the above methods. The method includes: detecting the frequency change of the AC bus in the factory microgrid to obtain frequency change data; and controlling the opening and closing of the first circuit breaker and the second circuit breaker based on the frequency change data.

[0046] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, it is implemented to execute the hydrometallurgical plant microgrid control method based on the energy storage inverter provided by the above-mentioned methods. The method includes: detecting the frequency change of the AC bus in the factory microgrid to obtain frequency change data; and controlling the opening and closing of the first circuit breaker and the second circuit breaker based on the frequency change data.

[0047] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0048] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0049] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A hydrometallurgical plant microgrid control method based on energy storage inverter, characterized in that: The energy storage inverter includes an energy storage unit, a first AC-DC converter and an inverter, the input end of the first AC-DC converter is connected to an external power grid through an AC bus, and a first circuit breaker is provided between the first AC-DC converter and the external power grid, the output end of the first AC-DC converter is connected to the input end of the inverter, the output end of the inverter is connected to a variable frequency motor, the energy storage unit is connected between the output end of the first AC-DC converter and the input end of the inverter through a branch, a second circuit breaker is provided on the branch, the energy storage unit and the renewable energy are both connected to the DC bus, the AC bus is connected to the DC bus through a second branch, and a second AC-DC converter is provided on the second branch; The method comprises: Detecting frequency changes of the AC bus in the factory microgrid to obtain frequency change data; The first circuit breaker and the second circuit breaker are controlled to be opened and closed based on the frequency change data.

2. The hydrometallurgical plant microgrid control method based on energy storage inverter according to claim 1 is characterized in that: The controlling the opening and closing of the first circuit breaker and the second circuit breaker based on the frequency change data comprises: When the detected frequency change data is within a preset first range, controlling the first circuit breaker to remain turned on and the second circuit breaker to remain turned off; When the frequency change data detected is within a preset second range, the power of the energy storage unit is detected, and the opening and closing of the first circuit breaker and the second circuit breaker are controlled based on the detection result, and the frequency change degree corresponding to the second range is greater than the frequency change degree corresponding to the first range; When the detected frequency change data is within a preset third range, the first circuit breaker is controlled to be disconnected and the second circuit breaker is controlled to be turned on, and the frequency change degree corresponding to the third range is greater than the frequency change degree corresponding to the second range.

3. The hydrometallurgical plant microgrid control method based on energy storage inverter according to claim 2 is characterized in that: The controlling the opening and closing of the first circuit breaker and the second circuit breaker based on the detection result includes: When the detection result shows that the power of the energy storage unit meets the power demand of the variable frequency motor within a preset time, the first circuit breaker is controlled to remain on, the second circuit breaker is controlled to remain off, and the generator in the factory microgrid is controlled to standby; When the detection result is that the power of the energy storage unit does not meet the power demand of the variable frequency motor within the preset time period, the opening and closing of the first circuit breaker and the second circuit breaker are controlled based on the frequency margin of the generator in the factory microgrid.

4. The hydrometallurgical plant microgrid control method based on energy storage inverter according to claim 3 is characterized in that: The controlling the opening and closing of the first circuit breaker and the second circuit breaker based on the frequency margin of the generator in the factory microgrid includes: When the generator in the factory microgrid has a frequency margin and the frequency margin meets the power requirement of the variable frequency motor, controlling the first circuit breaker to remain turned on and the second circuit breaker to remain turned off; When the generator in the factory microgrid has a frequency margin, but the frequency margin does not meet the power requirement of the variable frequency motor, and the energy storage unit has energy storage capacity, the first circuit breaker and the second circuit breaker are controlled to remain turned on, so that the generator in the factory microgrid and the energy storage inverter are cross-synchronously powered; When the generator in the factory microgrid does not have a frequency margin and the output of the renewable energy meets the operating power requirement of the variable frequency motor in the current period, the first circuit breaker is controlled to be disconnected and the second circuit breaker is controlled to be turned on, so that the renewable energy supplies power to the variable frequency motor through the energy storage unit; When the generator in the factory microgrid has no frequency margin, the energy storage unit has no energy storage capacity, and the output of the renewable energy does not meet the operating power requirement of the variable frequency motor in the current period, the load of other electrical equipment in the factory microgrid is controlled or the variable frequency motor is shut down based on the feasibility of load reduction of other electrical equipment in the factory microgrid.

5. The hydrometallurgical plant microgrid control method based on energy storage inverter according to claim 4 is characterized in that: The method further comprises: Based on the power demand of other electrical equipment in the factory microgrid except the variable frequency motor, the power supply priority in the factory microgrid is determined, and the power output change of the energy storage unit and / or the power output change of the generator in the factory microgrid is controlled based on the power supply priority.

6. The hydrometallurgical plant microgrid control method based on energy storage inverter according to claim 1 is characterized in that: The method further comprises: Detecting control information of the variable frequency motor; When the control information of the variable frequency motor reflects that the control frequency of the variable frequency motor is greater than a frequency threshold, the first circuit breaker and the second circuit breaker are controlled to remain turned on.

7. An energy storage inverter suitable for factory microgrid A hydrometallurgical plant microgrid control device based on an energy storage inverter, characterized in that: The energy storage inverter includes an energy storage unit, a first AC-DC converter and an inverter, the input end of the AC-DC converter is connected to an external power grid through an AC bus, and a first circuit breaker is provided between the first AC-DC converter and the external power grid, the output end of the first AC-DC converter is connected to the input end of the inverter, the output end of the inverter is connected to a variable frequency motor, the energy storage unit is connected between the output end of the AC-DC converter and the input end of the inverter through a branch, a second circuit breaker is provided on the branch, the energy storage unit and the renewable energy are both connected to the DC bus, the AC bus is connected to the DC bus through a second branch, and a second AC-DC converter is provided on the second branch; The device comprises: A data acquisition module, used to detect the frequency change of the AC bus in the factory microgrid and obtain frequency change data; A control module is used to control the opening and closing of the first circuit breaker and the second circuit breaker based on the frequency change data.

8. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the computer program, the hydrometallurgical plant microgrid control method based on the energy storage inverter as described in any one of claims 1 to 6 is implemented.

9. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by the processor, the hydrometallurgical plant microgrid control method based on the energy storage inverter as described in any one of claims 1 to 6 is implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by the processor, the hydrometallurgical plant microgrid control method based on the energy storage inverter as described in any one of claims 1 to 6 is implemented.

Citation Information

Patent Citations

  • Frequency-conversion power saver for three-phase bender

    CN101977018A

  • Charging pile staggering peak parameter adjustment control system and method

    CN107634529A

  • Household energy storage system and control method thereof

    CN117394415A

  • Power grid automatic dispatching management device, control method thereof, control device and medium

    CN117856251A