Direct evaporative cooling system for data center with fan and water optimization
By predicting and optimizing the water and energy consumption of the direct evaporation cooling unit, combined with model detection of faults, the problems of high resource consumption and difficulty in fault detection in the data center are solved, and more efficient cooling and resource management are achieved.
Patent Information
- Application Number
- CN202380036699.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2022-09-01
- Filing Date
- 2023-04-27
- Publication Date
- 2024-12-06
AI Technical Summary
Direct evaporative cooling technology consumes water and energy in data centers, especially in some geographical areas, which can be a scarce and valuable resource and is difficult to effectively detect and manage failures, resulting in waste of resources and inefficiency.
By predicting and optimizing the water and energy consumption of the direct evaporation cooling unit, selecting the target supply air temperature, and optimizing resource usage by controlling the bypass baffle position and fan speed; at the same time, the model is used to detect humidity and temperature anomalies in the data center, and identifying Failure and take corresponding measures.
Reduces water and energy consumption in the data center, improves cooling efficiency, extends the service life of the water tank, reduces the time for fault detection and resolution, and optimizes resource management.
Smart Images

Figure CN119096710A_ABST
Abstract
Description
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This application claims the benefit of and priority to U.S. Provisional Application No. 63 / 336,240 filed on April 28, 2022, U.S. Provisional Application No. 63 / 403,016 filed on September 1, 2022, and U.S. Provisional Application No. 63 / 403,018 filed on September 1, 2022, the entire disclosures of which are incorporated herein by reference. Background Art
[0003] The present disclosure generally relates to direct evaporative cooling, such as direct evaporative cooling of a data center. A data center may be a building, facility, or the like, that includes computing hardware (e.g., servers, computer processing units, hard disk drives, etc.). Computing hardware typically generates heat during operation, such as due to electrical resistance within such computing hardware. Additionally, the computing hardware may need to be maintained within an appropriate temperature range in order to function properly. Therefore, there is a need to remove heat from the data center (i.e., to cool the data center).
[0004] One method of cooling a data center may be direct evaporative cooling. Direct evaporative cooling uses the evaporation of water to produce a cooling effect, which may be used to affect the temperature of a data center. However, direct evaporative cooling consumes both water and energy, either or both of which may be scarce and / or valuable resources in certain geographic areas. Therefore, techniques that can reduce resource consumption of direct evaporative cooling units of a data center and / or detect failures in direct evaporative cooling units of a data center would be valuable. Summary of the invention
[0005] One embodiment of the present disclosure is a method for controlling a direct evaporative cooling unit. The method includes predicting the water consumption and energy consumption of the direct evaporative cooling unit based on a possible supply air temperature (or other control variable) of the direct evaporative cooling unit, selecting a target supply air temperature (or a target for other control variables) based on optimization of an objective function: the objective function includes water consumption and energy consumption, and controlling the direct evaporative cooling unit according to the target supply air temperature (or a target for other control variables).
[0006] In some embodiments, the water consumption includes at least one of water evaporated during operation of the direct evaporative cooling unit or water drained from a water tank of the direct evaporative cooling unit. In some embodiments, the predicted water consumption is based on an amount of airflow over an evaporative medium of the direct evaporative cooling unit and an expected change in humidity of the airflow across the evaporative medium. In some embodiments, the energy consumption includes energy consumption of a fan of the direct evaporative cooling unit.
[0007] In some embodiments, a supply air temperature of the direct evaporative cooling unit is associated with a bypass damper position that varies according to an outside air temperature. Predicting energy consumption can be based on the bypass damper position. Controlling the direct evaporative cooling unit according to a target supply air temperature can include controlling the bypass damper to a position determined based on the target supply air temperature and the outside air temperature.
[0008] In some embodiments, predicting water consumption and energy consumption of a direct evaporative cooling unit based on a possible supply air temperature of the direct evaporative cooling unit includes utilizing a plurality of curves representing a relationship between pressure differential and flow rate for a plurality of bypass damper positions.
[0009] Another embodiment of the present disclosure is a method for controlling a group of direct evaporative cooling units serving a data center. The method includes selecting a target supply air temperature for the group of direct evaporative cooling units based on predicted water and energy consumption of the group of direct evaporative cooling units by performing a first optimization of the target, allocating the predicted water and energy consumption among the group of direct evaporative cooling units by performing a second optimization constrained by the target supply air temperature, and controlling the group of direct evaporative cooling units according to the result of the allocation.
[0010] Another embodiment of the present disclosure is a method for fault detection of direct evaporative cooling of a data center. Direct evaporative cooling affects humidity and temperature of the data center. The method includes generating an expected value for humidity of the data center and an expected value for temperature of the data center using a model, and determining a fault condition in response to an actual value for humidity deviating from the expected value for humidity while the actual value for temperature follows the expected value for temperature, or determining a fault condition in response to an actual value for temperature deviating from the expected value for temperature while the actual value for humidity follows the expected value for humidity.
[0011] In some embodiments, the method includes changing control of direct evaporative cooling of the data center to address the fault condition. The model may use inputs including a bypass curve and an outdoor air temperature value. In some embodiments, the model is further based on a design efficiency of the direct evaporative cooling unit. In some embodiments, the method includes determining a cracking of the design efficiency based on a comparison of an expected value with an actual value.
[0012] Another embodiment of the present disclosure is a method for fault detection of a group of direct evaporative cooling units. The method includes detecting one or more of the direct evaporative cooling units as outliers by performing a peer analysis of the performance of the direct evaporative cooling units, detecting the fault by examining the outliers, determining the source of the fault using an analytical method, and initiating a recommended action to address the source of the fault.
[0013] In some embodiments, the performance of the direct evaporative cooling unit is quantified as the efficiency of the direct evaporative cooling unit. In some embodiments, detecting one or more of the direct evaporative cooling units as outliers by performing peer analysis includes using generalized extreme studentized deviations. In some embodiments, using the analytical method to determine the source of the fault also includes performing a model-based calculation. In some embodiments, the recommended action includes one or more of mechanical maintenance, cleaning, replacing a sensor, replacing an evaporative medium, or replacing an air filter.
[0014] Another embodiment of the present disclosure is a method for controlling a group of direct evaporative cooling units serving a data center. The method includes selecting a target supply air temperature for the group of direct evaporative cooling units based on predicted water and energy consumption of the group of direct evaporative cooling units by performing a first optimization of the target, allocating the predicted water and energy consumption among the group of direct evaporative cooling units by performing a second optimization constrained by the target supply air temperature, and controlling the group of direct evaporative cooling units according to the result of the allocation.
[0015] The method may include selecting a target supply air temperature by performing a first optimization including predicting predicted water and energy consumption for a plurality of possible supply air temperatures. The water consumption may include an amount of water evaporated during operation of the set of direct evaporative cooling units. In some embodiments, predicting the predicted water consumption is based on an amount of airflow over an evaporative medium of the set of direct evaporative cooling units and an expected change in humidity of the airflow across the evaporative medium. In some embodiments, the method includes predicting the predicted energy consumption by deriving a fan speed based on a pressure differential and a volumetric flow rate associated with the target supply air temperature.
[0016] In some embodiments, the method includes controlling the group of direct evaporative cooling units based on the results of the allocation, including causing a bypass damper of the group of direct evaporative cooling units to move. In some embodiments, the method includes predicting water and energy consumption based on possible supply air temperatures by utilizing multiple curves representing the relationship between pressure difference and flow rate for multiple bypass damper positions.
[0017] Another embodiment of the present disclosure is a direct evaporative cooling system including a controller. The controller is programmed to predict water consumption and energy consumption of the direct evaporative cooling system based on a selected supply air temperature, adjust the selected supply air temperature to obtain a target supply air temperature so that a value of an objective function including the predicted water consumption and energy consumption of the direct evaporative cooling system is improved, and control the direct evaporative cooling system according to the target supply air temperature.
[0018] In some embodiments, the water consumption includes the amount of water evaporated during operation of the direct evaporative cooling system.In some embodiments, the controller is programmed to predict the water consumption based on the amount of airflow over the evaporative medium of the direct evaporative cooling unit and the expected change in humidity of the airflow across the evaporative medium.
[0019] In some embodiments, the controller is programmed to predict water consumption and energy consumption using a plurality of curves representing the relationship between pressure differential and flow rate for a plurality of bypass damper positions.
[0020] In some embodiments, the direct evaporative cooling unit includes a bypass damper. The controller can be configured to control the direct evaporative cooling system according to the target supply air temperature by causing a change in the position of the bypass damper. The controller can also be programmed to predict energy consumption by deriving a fan speed based on a pressure differential and a volume flow rate associated with a selected supply air temperature.
[0021] One embodiment of the present disclosure is a method for fault detection of direct evaporative cooling of a data center. Direct evaporative cooling affects humidity and temperature of the data center. The method includes generating an expected value for humidity of the data center and an expected value for temperature of the data center using a model, and determining a fault condition in response to an actual value for humidity deviating from the expected value for humidity while the actual value for temperature follows the expected value for temperature, or determining a fault condition in response to an actual value for temperature deviating from the expected value for temperature while the actual value for humidity follows the expected value for humidity.
[0022] In some embodiments, the method includes changing control of direct evaporative cooling of the data center to address the fault condition. The model may use inputs including a bypass curve and an outdoor air temperature value. In some embodiments, the model is further based on a design efficiency of the direct evaporative cooling unit. In some embodiments, the method includes determining a cracking of the design efficiency based on a comparison of an expected value with an actual value.
[0023] Another embodiment of the present disclosure is a method for fault detection of a group of direct evaporative cooling units. The method includes detecting one or more of the direct evaporative cooling units as outliers by performing a peer analysis of the performance of the direct evaporative cooling units, detecting the fault by examining the outliers, determining the source of the fault using an analytical method, and initiating a recommended action to address the source of the fault.
[0024] In some embodiments, the performance of the direct evaporative cooling unit is quantified as the efficiency of the direct evaporative cooling unit. In some embodiments, detecting one or more of the direct evaporative cooling units as outliers by performing peer analysis includes using generalized extreme studentized deviations. In some embodiments, using the analytical method to determine the source of the fault also includes performing a model-based calculation. In some embodiments, the recommended action includes one or more of mechanical maintenance, cleaning, replacing a sensor, replacing an evaporative medium, or replacing an air filter.
[0025] Another embodiment of the present disclosure is a method of controlling a direct evaporative cooling unit. The method includes predicting water consumption and energy consumption of the direct evaporative cooling unit based on a possible supply air temperature of the direct evaporative cooling unit, selecting a target supply air temperature based on optimization of an objective function, the objective function including water consumption and energy consumption, and controlling the direct evaporative cooling device according to the target supply air temperature.
[0026] In some embodiments, the water consumption includes at least one of water evaporated during operation of the direct evaporative cooling unit or water drained from a water tank of the direct evaporative cooling unit. In some embodiments, the predicted water consumption is based on an amount of airflow over an evaporative medium of the direct evaporative cooling unit and an expected change in humidity of the airflow across the evaporative medium. In some embodiments, the energy consumption includes energy consumption of a fan of the direct evaporative cooling unit.
[0027] In some embodiments, a supply air temperature of the direct evaporative cooling unit is associated with a bypass damper position that varies according to an outside air temperature. Predicting energy consumption can be based on the bypass damper position. Controlling the direct evaporative cooling unit according to a target supply air temperature can include controlling the bypass damper to a position determined based on the target supply air temperature and the outside air temperature.
[0028] In some embodiments, predicting water consumption and energy consumption of a direct evaporative cooling unit based on a possible supply air temperature of the direct evaporative cooling unit includes utilizing a plurality of curves representing a relationship between pressure differential and flow rate for a plurality of bypass damper positions.
[0029] Another embodiment of the present disclosure is a method for controlling a group of direct evaporative cooling units serving a data center. The method includes selecting a target supply air temperature for the group of direct evaporative cooling units based on predicted water and energy consumption of the group of direct evaporative cooling units by performing a first optimization of the target, allocating the predicted water and energy consumption among the group of direct evaporative cooling units by performing a second optimization constrained by the target supply air temperature, and controlling the group of direct evaporative cooling units according to the result of the allocation.
[0030] Another embodiment of the present disclosure is a method for fault detection of direct evaporative cooling of a data center. Direct evaporative cooling affects humidity and temperature of the data center. The method includes generating an expected value for humidity of the data center and an expected value for temperature of the data center using a model, and triggering a sensor fault in response to a measured value for humidity deviating from the expected value for humidity while a measured value for temperature follows the expected value for temperature or a measured value for temperature deviating from the expected value for temperature while a measured value for humidity follows the expected value for humidity.
[0031] In some embodiments, the method further includes performing an action to resolve the sensor failure in response to triggering the sensor failure. Performing the action to resolve the sensor failure may include moving the sensor, cleaning the sensor, or replacing the sensor. Performing the action to resolve the failure may include changing control of direct evaporative cooling of the data center to accommodate the fault condition.
[0032] In some embodiments, the model uses inputs including a bypass curve and an outdoor air temperature value. The model may be further based on a design efficiency of the direct evaporative cooling unit. In some embodiments, the method includes determining a degradation in the design efficiency based on a comparison of an expected value with an actual value.
[0033] Another embodiment of the present disclosure is a method for detecting sensor faults for a first sensor measuring a first condition and a second sensor measuring a second condition. A device is operable to affect the first condition and the second condition. The method includes generating an expected value for the first condition and a corresponding expected value for the second condition using a physics-based model that defines a physics-based relationship between the first condition and the second condition, triggering a sensor fault in response to determining that a measured value for the first condition deviates from the expected value for the first condition and a measured value for the second condition follows the expected value for the second condition, and avoiding triggering a sensor fault in response to determining that a measured value for the first condition deviates from the expected value for the first condition and a measured value for the second condition deviates from the expected value for the second condition.
[0034] In some embodiments, the method further comprises performing an action to resolve the sensor failure in response to indicating the sensor failure. Performing the action to resolve the sensor failure may include moving the first sensor or the second sensor, cleaning the first sensor or the second sensor, and / or replacing the first sensor or the second sensor. In some embodiments, the method comprises changing control of direct evaporative cooling of the data center to accommodate the fault condition.
[0035] In some embodiments, the physics-based model uses a bypass position of the direct evaporative cooling unit as an input. The physics-based model may be based on the efficiency of the direct evaporative cooling unit. In some embodiments, the first sensor measures the supply air humidity of the direct evaporative cooling unit and the second sensor measures the supply air temperature of the direct evaporative cooling unit.
[0036] In some embodiments, the method includes controlling the direct evaporative cooling unit by determining a target supply air temperature that minimizes an objective function that takes into account water consumption of the direct evaporative cooling unit.
[0037] Another embodiment of the present disclosure is a method for detecting sensor failures of a first sensor measuring a first indoor air condition and a second sensor measuring a second indoor air condition. The method includes determining an expected relationship between the first indoor air condition and the second indoor air condition based on thermodynamic principles, evaluating a first measurement result of the first indoor air condition from the first sensor and a second measurement result of the second indoor air condition from the second sensor to determine whether the first measurement result and the second measurement result satisfy the expected relationship between the first indoor air condition and the second indoor air condition, and triggering a failure in the first sensor or the second sensor in response to determining that the first measurement result from the first sensor and the second measurement result from the second sensor do not satisfy the expected relationship between the first indoor air condition and the second indoor air condition.
[0038] In some embodiments, the first sensor and the second sensor are associated with a first unit of a plurality of equipment units. The method may also include attributing the fault to the first sensor or the second sensor by performing a peer analysis on the plurality of equipment units. Performing the peer analysis may include determining whether a measurement from the first sensor or a measurement from the second sensor is an outlier. In some embodiments, performing the peer analysis includes using a generalized extreme studentized deviation.
[0039] In some embodiments, the method includes performing one or more of cleaning, moving, or replacing the first sensor or the second sensor in response to the fault. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The present disclosure will be more fully understood from the following detailed description taken in conjunction with the accompanying drawings, wherein like reference numerals refer to like elements, and wherein:
[0041] Figure 1 is a block diagram of a data center according to some embodiments.
[0042] Figure 2 is a diagram of a direct evaporative cooling (DEC) unit, according to some embodiments.
[0043] Figure 3 is a flow chart of a process for controlling a DEC unit according to some embodiments.
[0044] Figure 4 is a diagram showing a control method of a DEC unit according to some embodiments.
[0045] Figure 5 is a set of flow charts providing processes for controlling a DEC unit according to some embodiments.
[0046] Figure 6 is a flow chart of a process for controlling one or more DEC units according to some embodiments.
[0047] Fig. 7A is to show that according to some embodiments Figure 6 A set of graphs of data related to an instance of a process.
[0048] Figure 7B is to show that according to some embodiments Figure 6 A graph of process-related instance data.
[0049] Figure 8 is to show that according to some embodiments Figure 6 A set of graphs of data related to an instance of a process.
[0050] Fig. 9 is a flow chart of a process for model-based fault detection of a DEC unit according to some embodiments.
[0051] Fig. 10A According to some embodiments Fig. 9 A set of graphs related to the instance execution of a process.
[0052] Fig. 10B According to some embodiments Fig. 9 A set of graphs related to the instance execution of a process.
[0053] Fig.11A is a flow chart of a process for modeling the operation of a DEC unit according to some embodiments.
[0054] Fig. 11B is to show that according to some embodiments Fig.11A Diagram of the modeling steps of the process.
[0055] Fig. 11C is to show that according to some embodiments Fig.11A Diagram of the modeling steps of the process.
[0056] Fig.11D is to show that according to some embodiments Fig.11ADiagram of the modeling steps of the process.
[0057] Fig.12 According to some embodiments, for example, using Fig.11A The process model is used to control the process flow chart of the DEC unit.
[0058] Fig.13 is a diagram related to control of a DEC unit according to some embodiments.
[0059] Fig.14 is a set of diagrams related to control of a DEC unit according to some embodiments.
[0060] Fig.15 is a set of diagrams related to control of a DEC unit according to some embodiments.
[0061] Fig.16 is a set of diagrams related to control of a DEC unit according to some embodiments. DETAILED DESCRIPTION
[0062] Referring generally to the drawings, the teachings thereof may be applied to various direct evaporative cooling systems, such as using computer room air conditioning systems as described in U.S. Patent Nos. 9,635,786 (granted April 25, 2017) and 9,521,783 (granted December 13, 2016) and / or U.S. Application Nos. 17 / 482,181, 18 / 071,336, or 18 / 071,327, the entire disclosures of which are incorporated herein by reference. A direct evaporative cooling (DEC) unit (DEC system) uses an evaporative medium, a tank, and a pump that circulates a fluid through a pump. A supply fan is operated to blow air through the evaporative medium, thereby evaporating a fluid provided from the tank. In some embodiments, the pump is operated to push enough fluid through the tank to pull salt or other impurities from the fluid back into the tank (rather than leaving such salt at the evaporative medium when the fluid evaporates). Although salts are described as the primary example of substances that may be present in a fluid, it is contemplated that the fluid may contain any number or types of impurities (e.g., dissolved salts or minerals, particulate matter, other fluids that do not evaporate within the evaporative medium, etc.), the concentration of which may increase as the fluid evaporates. Although salts are described throughout this disclosure for ease of explanation, the same or similar control strategies may be used to treat other impurities in the fluid.
[0063] The tank is filled at an initial time, and the liquid level decreases as evaporation occurs to provide cooling. As the fluid evaporates, the salt concentration will increase. Once the salt in the tank reaches a threshold level (e.g., measured by a sensor), the tank is emptied. In addition, the tank is thoroughly flushed regularly (e.g., for cleaning and sanitation purposes). In some embodiments of the present invention, the controller is programmed to perform a water use control process, such as water use optimization. One goal of the control process is to manage the increase in salt concentration in the tank to coordinate the duration of salt accumulation to a threshold limit and a fixed interface for flushing the tank, thereby reducing the total number of tank flushes (e.g., by preventing the salt concentration from reaching a threshold until a preset flush time). Executing such control can include using a penalty function or constraint based on such terms to make an on / off decision for the DEC system.
[0064] In some embodiments, the control circuitry may also be programmed to provide fan power optimization. The fans on the servers / computers / CPUs / etc. in a data room may control the exhaust temperature (measured by a sensor) from the CPU so that the fans will speed up as the supply temperature increases or as CPU power usage increases. As the CPU fan speeds up, a vacuum forms behind it, so the supply air fan of the cooling (e.g., DEC) system controls the static pressure before the CPU (e.g., using feedback control from a pressure sensor). The supply fan is indirectly controlled by the CPU fan.
[0065] Since the supply air temperature to the CPU thus affects the necessary fan speed, and since the power of the fan is cubically related to the flow, at a certain point, based on the cost of water, power, OAT, fan model, it may be more efficient to turn on evaporative cooling to reduce the supply temperature than to run all fans harder. The bypass damper can be controlled to achieve such a transition (e.g., from free cooling and / or ventilation of outdoor air to cooling the air with the DEC system). At a certain point, 100% of the supply air will pass through the evaporative media, at which point the control circuit system can increase the fan speed again. An optimization process or other control decision process can be performed to make control decisions for the device (fan speed, DEC on / off or other set point, damper position, etc.), and then execute these decisions to improve overall efficiency.
[0066] Additionally, the control circuitry may be programmed to execute control processes to reduce the overall water consumption and fan power consumption of the DEC system (and, in some embodiments, power consumption of other components of the DEC system (e.g., pumps, etc.)) by coordinating the operation of all such systems in an energy-efficient manner. Coordinating water consumption and fan power consumption may include building a model and executing operations to select a supply air temperature to be provided by the DEC system over time that results in minimization of an objective function that takes into account water consumption and fan power consumption. The supply air temperature value may then be used to control the DEC system, such as by controlling an actuator to affect a bypass damper position.
[0067] In some embodiments herein, the controller can detect a fault in a DEC unit by comparing expected temperature and humidity values determined through a model with measured values. Based on certain differences, a fault can be detected. In some embodiments, the fault can be automatically compensated for, for example, by adding an offset to the sensor reading in response to detecting that the faulty sensor provides a value that is offset from the actual value.
[0068] These features improve the operation of the DEC unit and improve the cooling of the data center, for example by reducing the resource usage of cooling the data center. In various embodiments, the controllers, control circuit systems, etc. herein can be provided in a cloud-based system, in an on-site or off-site server, in a CPU / server cooled by the device being controlled, etc., locally on the device (e.g., on an edge device), etc., and / or provided on some combination thereof.
[0069] The features of this document may be used in addition to, in conjunction with, or otherwise supplement the features described in the following document: U.S. Patent Application No. 16 / 579,686, filed on September 23, 2019, the entire disclosure of which is incorporated herein by reference.
[0070] Reference now Figure 1, a diagram of a data center 100 according to some embodiments is shown. The data center 100 includes a plurality of server racks, shown as server racks 102a, 102b, 102c, 102d, 102e, and 102f arranged in parallel with each other. The server racks are positioned with a cold space 104, which provides a cold aisle around or between the server racks 102a. Hot aisles 106a, 106b, and 106c are positioned between the server rack pairs (hot aisle 106a is located between server racks 102a and 102b, hot aisle 106b is located between server racks 102c and 102d, and hot aisle 106c is located between server racks 102e and 102f). The hot aisles 106a, 106b, 106c are sealed and separated from the cooled space 104 except for air that can flow through the server racks 102a-102f. The exhaust fans 110 operate to exhaust hot air from the hot aisles 106a, 106b, 106c. A plurality of direct evaporative cooling units 108a, 108b, 108c, 108d, 108e, 108f are included and provide air (eg, cooled air) into the cold space 104.
[0071] The server racks 102a-102f hold various servers, processors, hard drives, routers, and other computing hardware that generates heat in operation (e.g., due to electrical resistance therein). The server racks 102a-102f may include fans that draw relatively cool air from the cold space 104, across the computing hardware, and into the hot aisles 106a, 106b, 106c. The airflow may also be driven by a pressure differential across the server racks 102a-102f (e.g., a pressure differential created by the operation of the exhaust fans 110). Thus, the air reaching the hot aisles 106a, 106b, 106c is heated by the server racks, so that the hot aisles 106a, 106b, 106c have an air temperature that is higher than the air temperature of the cold space 104. The direct evaporative cooling units 108a, 108b, 108c, 108d, 108e, 108f operate to provide air into the cold space 104, including air cooled by direct evaporative cooling. The server racks 102a - 102f are thereby cooled, for example, such that the server racks 102a - 102f are maintained within a target temperature range.
[0072] Reference now Figure 2 , shows a block diagram of a DEC unit 108 serving a server rack 102 according to some embodiments. In some embodiments, the DEC unit 108 may be Figure 1 Any one of the DEC units 108a-108f, and the server rack 102 may be Figure 1 Any one of the server racks 102a-102f. Figure 1A server rack 102 is shown separating a cold space 104 and a hot space 106, where in some embodiments the hot space 106 may be Figure 1 In other embodiments, the DEC unit 108 serves a single server rack 102 in a data center (e.g., a modular computing room) having a cold space 104 and a hot space 106 separated by the server rack 102. As shown, the server rack 102 may include a plurality of CPU fans 200a, 200b, 200c that are operable to force air from the cold space 104 to the hot space 106, where the air may exit the hot space 106 as exhaust. In some embodiments, fans are additionally or alternatively included at the exhaust port 202 of the hot space 106 to force air from the hot space 106 to the outside of the data room (i.e., to the external environment).
[0073] DEC unit 108 operates to provide air into cold space 104. The air delivered into cold space 104 by DEC unit 104 is referred to as supply air. s The cold space 104 is provided with supply air at a flow rate of 供应 (which can be measured by temperature sensor 204) and supply air humidity (which can be measured by humidity sensor 206). The supply air is a combination of airflow through surface channels 208 where the evaporative medium 210 is located and bypass channels 212 that are open to airflow and allow air to bypass the evaporative medium 210. The supply air flow rate w s can be found as the flow rate (w f ) and the flow rate (w b ) (i.e., w s =w f +w b ).
[0074] The DEC unit 102 includes a supply fan 214 that is operable to force air into the surface channel 208 and the bypass channel 212, and includes one or more baffles to direct airflow from the supply fan 214 into the surface channel 208, the bypass channel 212, or some combination thereof. As shown, the DEC unit 102 includes an actuator 216 that is operable to reposition the bypass baffle 218 and the surface baffle 220. The bypass baffle 218 and the surface baffle 220 can mechanically interoperate and can be referred to herein as a single baffle (e.g., referred to as a bypass baffle), such as to direct air completely through the bypass channel 212 at a maximum baffle position, completely through the surface channel 208 at a minimum baffle position, and partially through the bypass channel 212 and the surface channel 208 in different proportions over a range of baffle positions between the minimum and maximum positions. In some embodiments, the bypass damper 218 and the surface damper 220 are independently controllable and can be set to any position independently of each other (e.g., fully open, fully closed, 20% open, 40% open, 75% open, etc.). Thus, the actuator 216 is controllable so that different amounts of airflow provided by the supply fan 214 flow through the surface channel 208 and the bypass channel 212 at different times, for example, to implement the control strategy described below. Since the airflow resistance in the surface channel 208 is different compared to the bypass channel 212, the power consumed by the supply fan 214 to provide a certain amount of airflow can depend on the damper position.
[0075] The airflow through the surface passages 208 passes through the evaporative medium 210, wherein water evaporates from the evaporative medium 210 into the airflow. The DEC unit 102 includes a water tank 222 configured to hold water and a water pump 224 configured to pump water from the water tank 222 to the evaporative medium. Figure 1 In the process, a certain amount of water (the mass of water pumped m p ) is pumped to the evaporation medium 210, where some of the water (the mass of evaporated water m e ) evaporates into the air stream through the surface passage 208, while the remaining water (return water mass m e ) is returned to tank 222. Tank 222 includes a drain 226 that is controllable to periodically drain tank 222 (i.e., periodically open so that a certain amount of water flows out, shown as the drained water mass m d ), which can be done on a set schedule to ensure that the water in the tank is sanitary (e.g., to prevent algae or bacterial growth, etc.). Tank 222 also receives water from utility 228 or other water source, and the amount of water received from the utility is Figure 1 The water quality of public facilities is shown in m u .
[0076] When water evaporates from the evaporative medium 210, the evaporated water leaves behind salts dissolved in the water. Return water mass m e The salt may be flushed back into the tank. Over time, the concentration of dissolved salt in the tank increases due to evaporation of some of the water, and may eventually become high enough that the water is no longer suitable for use in evaporative medium 210. Tank 222 may be drained and refilled at this time to provide fresh water for evaporative cooling.
[0077] The DEC unit 108 is shown as including a controller 230. The controller 230 may include circuitry configured (e.g., programmed) to perform the operations described herein related to control of the DEC unit 108 and, in some embodiments, control of the CPU fans 200a-200c, and / or operation of the computing hardware of the server rack 102. The controller 230 may also or alternatively provide fault detection for the DEC unit 108. In some embodiments, the controller 230 includes one or more processors and a non-transitory computer-readable medium storing program instructions that, when executed by the one or more processors, cause the one or more processors to perform the operations attributed to the controller 230 herein. In various embodiments, the controller 230 may be included locally as part of the DEC unit 108 (e.g., packaged together with the DEC unit 108, coupled to the DEC unit, etc.), provided on the computing hardware of the server rack 102, provided remotely from the DEC unit 108, and / or some combination thereof. Figure 2 As shown, the controller 230 may communicate with the supply fan 214, the actuator 216, the water pump 224, the drain pipe 226, the temperature sensor 204, the humidity sensor 206, and other sensors (shown as a pressure sensor 232 that measures the pressure difference across the server rack 102, and a temperature sensor 234 positioned in the thermal space 106 and measuring the exhaust air temperature, and a temperature sensor 236 positioned to measure the outdoor air temperature of the outdoor air flowing into the DEC unit 108 and the supply fan 214). Although Figure 2 Several examples of sensors are shown in FIG, but it is contemplated in various embodiments that any number or type of sensors may be present within the DEC unit 108, the server rack 102, the cold space 104, the hot space 106, downstream or upstream of the DEC unit 108, within the box 222, or at any other location within the system. The controller 230 may perform the various processes shown in the figures and described below, including by using the various equations, algorithms, etc. described herein.
[0078] exist Figure 1 to Figure 2In the example of , the cost of cooling a data center can be attributed to three main parts: electricity to power the fans, electricity to power the water pumps, and the cost of water. The CPU fans 200a-200c and the supply fans 214 (and / or the exhaust fans 110) can adjust their speeds and therefore should have a configuration that follows a fan speed-based s 风扇 The fan affinity law of power P 风扇 With flow 风扇 relation:
[0079] P 风扇 =as 风扇 3
[0080] w 风扇 =as 风扇
[0081] The fans 200a-200c, 214 may be controlled by the controller 230 based on the exhaust temperature of the air leaving the server rack 102 (e.g., as measured by the sensor 234) so that the total flow rate desired by the CPU will follow:
[0082]
[0083] in is the heat generation of the computing equipment at the server rack 102, T sp,e is the exhaust temperature set point, and T sp,s is the supply temperature set point, and ρ,c p is a parameter (eg, density, heat transfer coefficient). Supply fan 214 generates flow (ie, w cpu ) plus the static pressure P s Any (small) leakage into the hot aisle 106 occurs as follows:
[0084] w s =w cpu +w 泄露 (P s ).
[0085] The salt concentration in box 222 (c 箱 ) can follow the differential equation, where c u is the salt concentration in the water received from utility 228:
[0086]
[0087] Before the concentration limit is reached, in some embodiments, no water is drained from the water tank 222, and the concentration will integrate as new water from the utility 228 replaces water lost to evaporation:
[0088]
[0089] The chamber will reach the concentration limit if:
[0090]
[0091] or once enough water has evaporated to replace the tank (c 极限 -c u ) / c u times. If the DEC unit 108 has not cooled enough to replace the water a critical number of times before it must be drained for sanitation purposes, the water will be wasted. Once the concentration in the tank 222 reaches the limit, the drain 226 will open to maintain the tank concentration at a steady state. Water from the utility 228 must supplement the drain and evaporated water:
[0092]
[0093] Therefore, the amount of water removed is proportional to the amount evaporated, and that proportion depends on the concentration, just as the number of tank changes depends on the concentration before the drain was opened. The total amount of water evaporated will be governed by the difference between the supply temperature and the outdoor air temperature:
[0094]
[0095] Thus, water is used for two different reasons. The first reason is to evaporate and produce cooling. The second is to dilute the salts left behind when the water evaporates, which includes pre-purchasing to fill tank 222 before cooling occurs. The control process described herein may include optimal use of this water so that its full value is used for cooling before the water tank 222 is emptied.
[0096] In some embodiments, controller 230 is programmed to determine at a given point in time whether to increase cooling by increasing fan speed or by using water in evaporative cooling. For example, at any particular moment, controller 230 can determine the fan energy given the air is at outdoor temperature (e.g., measured by sensor 236) and the fan energy given the temperature achievable through evaporative cooling (e.g., according to the design values of the device). Controller 230 can use logic to indicate that the point at which it makes sense to turn on evaporative cooling occurs when the marginal cost increase from fan power equals the marginal cost increase from water and electricity used by the evaporative cooling system:
[0097]
[0098] This turning point occurs under conditions that depend largely on the pricing structure of electricity and water and the outdoor air conditions, which can be taken into account by the controller 230. The controller 230 can be adjusted to enable this logic to account for situations where evaporative cooling cannot be run at very small loads. Given the trade-offs here, the controller 230 can first run the supply fan 314 at an increased speed, and then when the load becomes higher, evaporative cooling (i.e., using water and surface channels 208) will be turned on to reduce the supply air temperature. When it is no longer possible to achieve the desired supply air temperature using evaporative cooling at the current fan speed, the controller 230 can increase the fan speed, thereby providing more outside air and increasing the amount of ventilation performed. In some embodiments, the controller 230 uses a neural network, reinforcement learning, or other form of machine learning to determine when to turn on evaporative cooling relative to running the fan faster. In addition, once evaporative cooling is used, extreme value search control can be used to obtain the supply air temperature that minimizes the total cost without being affected by any modeling errors.
[0099] Reference now Figure 3 , a flow chart of a process 300 for determining whether to use evaporative cooling according to some embodiments is shown. For example, the process 300 may be performed by the controller 230.
[0100] At step 302, a weather forecast is obtained and a cooling load is predicted. The controller 230 may access the weather forecast from a third-party weather service (e.g., a government weather service), for example, via the Internet. The weather forecast may indicate, for example, the outdoor air temperature and / or the outdoor air humidity for the next hour, the next day, etc. For example, the cooling load may be predicted based on the weather forecast and / or based on a prediction of the operation of the computing devices of the server rack 102.
[0101] At step 304, a penalty function is generated for exceeding a desired temperature. The desired temperature may be the maximum acceptable temperature for the data center (eg, based on building operator rules, etc.). The penalty function may be formulated as: Where h is the time range, e is the function, is the difference between the required heat transfer and the heat transfer that can be provided by evaporative cooling, and is the difference between the desired temperature and the temperature set point. At step 306, if no evaporative cooling is on, a penalty is determined. The equation from step 304 above may be used.
[0102] If the tank 222 has not been filled, the penalty above the horizontal line (which may be equal to the time until the next required tank flush) is compared to a threshold. A small penalty less than the threshold means that the tank 222 does not need to be filled, while a large penalty will indicate that it is necessary to prepare for evaporative cooling by filling the tank 222. Therefore, at step 308, it is determined whether the tank 222 is empty and whether the penalty is greater than the threshold. If so ("yes" at step 308), then at step 310, the tank 222 is filled to prepare for evaporative cooling. If not ("no" at step 308), the process 300 skips step 310 and proceeds to step 312.
[0103] At step 312, it is determined whether the tank 222 is full and the supply air temperature T 供应 Is it greater than the temperature set point T of the data room? 设定点 If yes (i.e., the box 222 is ready for evaporative cooling and the supply air needs to be cooled in order to reach the set point), then evaporative cooling is enabled at step 314. In step 314, the actuator 216 may operate the baffles 218, 220 to direct air through the evaporative medium 210, and the water pump 224 may operate to provide water to the evaporative medium 210 so that the airflow from the supply fan 214 is cooled by direct evaporative cooling in the surface channels 208.
[0104] If "No" at step 312 (ie, the tank is not full or T 供应 Not greater than the temperature set point T 设定点 ), direct evaporative cooling is not enabled and the process proceeds to step 316. Step 316 indicates that the s t repeat process 300, which indicates the amount of time (e.g., number of minutes) between repetitions of process 300. For example, t s The value can be selected by the user.
[0105] Figure 3 The process 300 may thus determine when to use or not use evaporative cooling in an advanced manner that may facilitate water conservation.
[0106] Reference now Figure 4 , shows a graphical representation illustrating a control method that may be performed by the controller 230 according to some embodiments. Figure 4A graph 400 is shown that illustrates the operation of the supply fan 214 and evaporative cooling (e.g., by operation of the pump 224) across a range of cooling demand (demand, load). The graph 400 illustrates that the fan is first operated in a first region 402 without evaporative cooling. Then, in a second region 404, evaporative cooling is gradually turned on at a constant fan speed (by controlling the surface damper 220 and the bypass damper 218 to gradually direct more air through the evaporative medium 210). When the cooling demand increases into a third region 406, both evaporative cooling and fan speed are increased together by increasing the fan speed while directing all airflow across the evaporative medium 210.
[0107] Reference now Figure 5 , shows a pair of flow charts showing a first portion 501 and a second portion 502 of a process 500 according to some embodiments. In some embodiments, the process 500 may be performed by the controller 230. In some embodiments, the first portion 501 is performed before the second portion 502. The first portion 501 may be run offline, and the second portion 502 may be run online to control the DEC unit 108.
[0108] At step 504, the fan model is trained. Training the fan model may include identifying the fan equation P 风扇 =as 风扇 3 and w 风扇 =as 风扇 The parameter a in the fan model can be trained by estimating the leakage and s =w cpu +w 泄露 (P s ). The fan model may be trained using measurements of fan power consumption and training data representing other variables (e.g., temperature, baffle position, airflow measurements, pressure measurements, etc.). Various other equations related to fan operation are provided below and may be used in step 504.
[0109] At step 506, a load prediction model is trained. The load prediction model may predict the amount of heat (i.e., the amount of heat) expected to be generated by the computing devices of the server rack 102 based on the time of day, day of the week, etc., and / or other conditions. ). In some embodiments, the load prediction model can be based on weather forecasts. For example, the load prediction model can be trained based on historical temperature data and / or historical airflow data. The first part 501 thus provides a model for predicting the amount of load on the DEC unit 102 and a model for determining fan power based on fan speed and / or based on airflow rate, which can be used online in the second part 502 of the process 500.
[0110] The model resulting from the first part 501 of the process 500 can be formulated as:
[0111]
[0112] w s =w cpu +w 泄露 (P s )
[0113]
[0114] wherein these terms are as defined above and Indicates the power consumed by the pump 224 .
[0115] At step 508, a weather forecast is obtained (e.g., from a weather service) and the cooling load is predicted. The cooling load may be predicted using the load prediction model trained in step 506. For example, step 508 may provide the outside air temperature T OA and computing equipment heating The value of .
[0116] At step 510, a penalty function is generated for exceeding the desired temperature, that is, penalizing the temperature at the server rack 102 that is higher than the desired maximum temperature of the server rack 102. For example, the penalty function may be composed of c 惩罚 =r 惩罚 (T 排气 -T sp ) 2 Given.
[0117] At step 512, the cost is optimized plus a penalty, but tank 222 is emptied at least every N days. Step 512 may include taking into account water usage as follows, where water used to dilute the salt is labeled separately from water used for evaporation using an additional subscript d:
[0118]
[0119] has been used after the initial purchase;
[0120] The box should not be used for more than N days without flushing;
[0121]
[0122] These equations, together with the model obtained in the first part 501 of the process 500, can be used as a method to minimize an objective function such as Step 512 can obtain the optimization constraint that minimizes the objective function. and / or T 排气 The value of re is the utility rate (i.e., the cost per unit of electricity) and r w is the water price (i.e., the cost per unit of water). Step 512 may also include determining and / or T 排气 The determined value is whether evaporative cooling is required to be enabled.
[0123] At step 514, the DEC unit 108 is controlled using the supply temperature set point and the evaporative cooling enablement decision to achieve the DEC operation determined to minimize the objective function. The DEC unit 108 is thereby operated as the culmination of the previous steps of the process 500. At step 516, the second portion 502 of the process 500 may be repeated, such as periodically (e.g., every 15 minutes), so that the process 500 can take into account changes in load or weather forecasts.
[0124] In some embodiments, step 514 includes controlling the computing device to affect the heat generated thereby, i.e. For example, the controller 230 may be adapted to cause computer tasks to be relocated to other computing devices, other data centers, other parts of the facility, other times, etc. Doing so will affect the value of the objective function and, for example, may help minimize the overall cost of operation. Moving the computation itself may incur costs, which may be compared to the savings achieved by such movement through the cost function to determine whether mobile computing should be implemented in a particular scenario. The process 500 may thus provide for optimal operation of the DEC unit 102.
[0125] Reference now Figure 6 , a flow chart of a process 600 for controlling a DEC according to some embodiments is shown. In some embodiments, the process 600 may be performed by the controller 230. In some embodiments, the process 600 may be used in combination with the process 500. In various embodiments, the process 600 may result in the following: Figure 2 DEC Unit 102 and / or Figure 1 Advantageous operation of multiple DEC units 102a-102f.
[0126] Process 600 may be based on (eg, using, including algorithmic steps derived from, etc., such as these expressions, etc.) the following expressions related to the efficiency of a DEC unit (eg, DEC unit 108):
[0127]
[0128] DEC cooling T = dry bulb T-efficiency (dry bulb T-wet bulb)
[0129] T 供应 =Bypass*T oa +(1-Bypass)*DEC Cooling T
[0130] Where bypass indicates the position of the bypass / surface baffle (bypass=1 indicates that all air flows through the bypass channel 212, bypass=0 indicates that all air flows through the surface channel 208 and the evaporative medium 210. In some embodiments, the efficiency value (expressed as efficiency) is taken as a known value of the design value of the DEC unit (e.g., provided in product literature, indicated by the manufacturer), and in some embodiments can be about 92% (e.g., between 90% and 95%).
[0131] At step 602, the heat generated from the CPU (e.g., the server of the server rack 102, etc.) is estimated based on historical temperature data. The historical temperature data may include hot aisle temperature (exhaust temperature), cold aisle temperature, and supply temperature. Bypass values (damper positions) may also be used. As an example of a data center including multiple aisles and DEC units (e.g., similar to Figure 1 ), Fig. 7A A first graph 700 of supply temperatures from multiple DEC units over a period of time (e.g., several days), a second graph 702 of hot aisle temperatures over the same period of time or a portion thereof, a third graph 704 of cold space (cold aisle) temperatures over the same period of time or a portion thereof, and a fourth graph 706 showing bypass locations over the same period of time or a portion thereof are shown based on a set of experimental data. In some embodiments, step 602 is performed by averaging multiple DEC units, multiple aisles, etc. In other embodiments, different estimates are performed for multiple models.
[0132] Based on the temperature measurement and the bypass location, step 602 may include estimating the heat generated by the CPU as in is the airflow rate across the CPU, which may be substantially equal to the airflow rate provided by one or more supply fans. For example, It can be calculated as the sum of the fan flow rates of multiple fans serving a data center, for example, where the flow rate is obtained by multiplying the maximum flow of the fan by the percentage of operating capacity (eg, fan speed percentage) at which the fan is operating. 热 can be the average temperature of the hot channel, and T 冷 is the average cold aisle temperature or the average supply air temperature. Figure 7B A graph 710 is shown which illustrates the Fig. 7A The temperature data in the curve of , the heat generated over time from computing equipment in the data center. In one example, the estimated Q can have a maximum value of 1300kW and an average value of 672kW, for example, for a data room with a design maximum of fifteen racks, ten rows, and 10kW per row.
[0133] At step 604, the cold aisle temperature is predicted based on the DEC bypass curve (bypass position change over time), outdoor air temperature, and DEC design value. In some embodiments, step 604 can be viewed as validating the DEC model used by process 600 and involves the use of such a model, namely:
[0134]
[0135] DEC cooling T = dry bulb T-efficiency (dry bulb T-wet bulb)
[0136] T 供应 =Bypass*T oa +(1-Bypass)*DEC Cooling T
[0137] By setting the value of efficiency from the design situation (e.g., 92%) and using the average bypass curve from historical data (e.g., Fig. 7A The cold side (channel) temperature may be predicted in step 604 based on the data shown in graph 706 in FIG. 7A , and the average position of each bypass baffle at each time step. Figure 8 An example first graph 800 and a second graph 802 of bypass positions as used in an example implementation of step 604 are shown, the second graph including a line plotting predicted / estimated cold aisle temperature versus time as derived in step 604 . Figure 8 Further included is a third graph 804 that demonstrates that such calculated cold aisle values track actual cold aisle values, thereby validating the methodology used by process 600 .
[0138] At step 606, the hot aisle temperature is predicted. For example, the hot aisle temperature may be predicted by using the cold aisle temperature prediction from step 604 and the CPU heating estimate / prediction from step 602. Step 606 may be based on the Figure 8 The second graph 802 includes a line plotting the predicted / estimated hot side temperature as derived in step 606 versus time. Figure 8 Further included is a fourth graph 804 that illustrates that such hot aisle values track actual cold aisle values, thereby validating the methodology used by process 600 .
[0139] At step 608, the amount of water mass that evaporates is predicted. Step 608 may assume that the same efficiency value (i.e., efficiency) (e.g., 92%) applies to humidity, such that the humidity of the portion of air that passes through the evaporative medium 210 increases by 92% (or other selected efficiency percentage) between the outdoor air humidity and 100% humidity. Step 608 may use this information to perform a water mass balance to calculate the total amount of water evaporated as a function of the outdoor air humidity and 100% humidity, since the amount of water evaporated is equal to the amount of water required to increase the air humidity by a known amount.
[0140] At step 610, one or more DEC units are controlled using the predictions, for example, using temperature predictions and / or water mass evaporation predictions. Figure 3 to Figure 4 Water quality prediction is used in a manner similar to that described above. For example, step 610 may calculate the salt concentration over time using: and So that when The time box will reach the concentration limit, where The prediction is made in step 608. Step 610 can further use the understanding that the purchased water must make up for the evaporated and drained water, i.e. Make Step 610 may use these operations to determine when and how much water to drain and / or purchase from the utility based on the evaporation predicted from step 608, e.g., to minimize water consumption over time, and e.g., subject to a predicted temperature defined using the temperatures predicted from steps 604 and 606.
[0141] In addition to or as an alternative to optimally controlling water-related components, step 610 may also include optimally controlling fan speed and / or optimally controlling bypass position. In some embodiments, various such features are described elsewhere herein and may be used in step 610.
[0142] Reference now Fig. 9 , shows a flow chart of a process 900 for model-based fault detection of a direct evaporative cooling unit according to some embodiments. In some embodiments, the controller 230 is programmed to perform the process 900. In various embodiments, the process 900 may use modeling, equations, etc. of other processes described herein.
[0143] At step 902, the supply air temperature and supply air humidity of the DEC unit are estimated (or predicted) based on the bypass curve and the outdoor air temperature. Estimating the supply air temperature and supply air humidity can include determining expected values of these variables based on the actual bypass position and the actual outdoor air temperature, for example, for each time step within a time period. Estimating the supply air temperature and supply air humidity can be performed using a model described elsewhere herein (e.g., with respect to process 600). As in the model used in process 600, the estimation (or prediction) can be based on an ideal design efficiency or other design values from a manufacturer.
[0144] The estimate determined in step 902 is shown in FIG. 10A to FIG. 10B middle. Fig. 10A A first DEC unit (shown as DEC A, e.g. Figure 1 DEC 102a) includes a set of graphs including a first graph 1000 comparing a measured humidity ratio and a predicted (or estimated) humidity ratio, a second graph 1002 showing a measured supply relative humidity and a predicted (or estimated) supply relative humidity, a third graph 1004 showing a measured supply air temperature and a predicted (or estimated) supply air temperature, and a fourth graph 1006 showing a bypass position. Fig. 10B A second DEC unit (shown as DEC B, e.g. Figure 1 DEC 102b) includes a set of curve graphs 1050 comparing the measured humidity ratio and the predicted (or estimated) humidity ratio, a second curve graph 1052 showing the measured supply relative humidity and the predicted (or estimated) supply relative humidity, a third curve graph 1054 showing the measured supply air temperature and the predicted (or estimated) supply air temperature, and a fourth curve graph 1056 showing the bypass position.
[0145] At step 904, the predicted supply air temperature is compared to the measured supply air temperature. Comparing the predicted supply air temperature to the measured supply air temperature may include determining a difference (e.g., a gap) between the predicted supply air temperature and the measured supply air temperature (e.g., summed or integrated at a given point in time, over a period of time, etc.). In some embodiments, a statistical measure of the difference between the predicted and measured supply air temperatures is evaluated (e.g., a variance of the difference, a mean of the difference, a standard deviation of the variance, etc.). Comparing the predicted supply air temperature to the measured supply air temperature may include determining whether such difference, sum of the differences, statistical measure, etc. exceeds a corresponding threshold. If the threshold is exceeded, the comparison may be considered to indicate a difference between the predicted and measured supply air temperatures.
[0146] At step 906, the predicted supply air humidity is compared to the measured supply air humidity. Comparing the predicted supply air humidity to the measured supply air humidity may include determining a difference (e.g., a gap) between the predicted supply air humidity and the measured supply air humidity (e.g., summed or integrated over a time period, etc., at a given point in time). In some embodiments, a statistical measure of the difference between the predicted and measured supply air humidity is evaluated (e.g., a variance of the difference, a mean of the difference, a standard deviation of the variance, etc.). Comparing the predicted supply air humidity to the measured supply air humidity may include determining whether such a difference, a sum of the differences, a statistical measure, etc. exceeds a corresponding threshold. If the threshold is exceeded, the comparison may be considered to indicate a difference between the predicted and measured supply air humidity.
[0147] In some embodiments, process 900 is performed for a group of DEC units. In such embodiments, process 900 (e.g., comparison of steps 904 and 906) may include performing a peer analysis to compare the performance of the DEC units and detect outliers. For example, comparing the predicted supply air temperature and the measured supply air temperature in step 904 may include using a peer analysis to detect abnormal supply air temperatures (predicted or measured) across the group of DEC units. As another example, comparing the predicted supply air humidity and the measured supply air humidity in step 906 may include using a peer analysis to detect abnormal supply air humidity (predicted or measured) for the group of DEC units. As another example, supply air temperature and humidity may be used to quantify the efficiency of the DEC units, which efficiencies may be compared to each other to detect outliers. Outlier detection may be performed using generalized extreme studentized deviation analysis.
[0148] At step 908, a fault is determined to be occurring in response to a difference determined in step 904 or step 906. Various faults are possible. For example, if step 904 determines that no difference has occurred in supply air temperature, but step 906 determines that a difference has occurred in supply air humidity, step 908 may include determining that a fault has occurred in a humidity sensor (e.g., humidity sensor 206) that measures the humidity of the supply air. Fig. 10B An example of such a scenario is shown where the third graph 1054 shows that the actual and predicted supply temperatures follow each other closely, while gaps consistently occur between the predicted and measured supply relative humidity in the second graph 1052 and between the predicted and measured humidity ratios in the first graph 1050. Since the desired supply air temperature is still being met, step 908 can infer that the error causing the difference between the humidity is a fault in the humidity sensor.
[0149] As another example, if step 906 determines that no difference occurs in supply air humidity, but step 904 determines that a difference occurs in supply air temperature, step 908 may include determining that a fault occurs in a temperature sensor (eg, humidity sensor 206 ) measuring the supply air temperature.
[0150] As another example, if step 904 determines that the measured supply air temperature is consistently higher than desired (predicted, estimated), and step 906 determines that the supply air humidity is consistently lower than desired (but the supply air humidity and supply air temperature maintain a desired relationship), then step 908 may include determining that the DEC unit is operating at a lower than desired efficiency or that some other control or equipment failure is occurring. DEC unit efficiency may be lost due to degradation of the evaporative media 210, mechanical problems with the baffles 218 / 220, problems with the supply fan 214, etc. Thus, in such a scenario, a failure may be determined in step 908, indicating that a loss of efficiency has occurred and that the DEC unit may benefit from maintenance.
[0151] As another example, if an outlier (difference) is found for one of a group of DEC units (relative to the other DEC units in the group) at steps 904 and / or 906, a fault may be detected. Process 900 may include performing analytical methods and / or model-based calculations to examine the outlier to determine the source of the fault and / or determine recommendations for resolving the fault (e.g., maintenance steps, automated control actions, etc.).
[0152] At step 910, in response to detecting a fault at step 908, the operation of the DEC unit can be affected to resolve or compensate for the fault. For example, in an instance where the fault indicates that the sensor is faulty and the measurement provided deviates from the actual value or expected value by a specific amount, the control logic of the DEC unit can be updated to add the offset of the specific amount to the measurement from the corresponding sensor before being used for control, thereby compensating for the detected fault. As another example, step 908 can include running the DEC unit through a diagnostic or self-repair program (e.g., flushing the evaporative medium 210 with additional water to remove salt accumulation that may provide degradation). As another example, step 908 can include commanding and performing maintenance tasks for the DEC unit, such as mechanical maintenance, cleaning, sensor replacement, evaporative medium replacement, and / or air filter replacement. For example, one or more sensors (e.g., temperature sensors, humidity sensors) can be cleaned, moved (e.g., to a location where it is expected to provide more reliable or more useful measurements), replaced (e.g., discarding an existing sensor and installing a new replacement sensor), or otherwise maintained or adjusted to resolve a sensor fault. Triggering a fault (eg, triggering a sensor fault) as in steps 908 to 910 may thereby result in resolution of the fault.
[0153] Reference now Fig.11A , shows a flow chart of a process 1100 for creating a model that can be used to control one or more DEC units according to some embodiments. In some embodiments, the controller 230 is programmed to perform the process 1100. The model generated in the process 1100 can be used in various control processes described herein, such as the following Fig.12 Process 1200.
[0154] At step 1102, a fan model is fitted that relates fan speed and volumetric flow to pressure differential. Step 1102 may use a fan pressure rise formula, where the fan pressure rise is a function of the ratio of volumetric flow rate to fan speed, for example:
[0155]
[0156] Step 1102 may include fitting the coefficients (coefficient 1, coefficient 2, coefficient 3) using, for example, a nonlinear least squares method based on actual fan data (e.g., measured values). Speed refers to fan speed (e.g., revolutions per minute) and flow refers to volume flow rate (e.g., cubic meters per hour). The value is designed P is the equipment design pressure differential (measured in inches of water column, for example, from product literature). 流量 ) is also the equipment design value (e.g. from product literature, measured in cubic meters per hour). Fig. 11B A graph 1150 is shown showing a flow chart having volume flow rate (ie, flow rate) on the horizontal axis and flow rate on the vertical axis. The curves fitted for different fan speed values (different RPM) in the curve graph.
[0157] At step 1104, the flow coefficient is fitted for a plurality of bypass damper positions. Step 1104 may be performed using And the value of the flow coefficient Cv for different bypass positions can be determined. The bypass position can range from a first extreme value, where the baffle is arranged to direct all air through the bypass channel 212 (bypass value=1), to an opposite extreme value, where the baffle is arranged to direct all air through the surface channel 208 and the evaporative medium 210 (bypass value=0). The bypass value can take any value therebetween, for example, such that a bypass value of 0.3 indicates that 30% of the airflow is directed through the bypass channel 212 and 70% of the airflow is directed through the surface channel 208.
[0158] Step 1104 may include fitting a curve for each of a set of shunt positions (e.g., ten or eleven shunt positions ranging from shunt=0 to shunt=1 (e.g., in increments of 0.1), for example, based on real data (e.g., measured values). Examples of such curves are shown in FIG. Fig. 11C 1160, which is used to find the value of the flow coefficient Cv at each bypass position evaluated.
[0159] At step 1106, a mapping between bypass damper positions and flow coefficients is created. For example, the discrete values of the flow coefficient Cv at multiple damper positions from step 1104 can then be used in an interpolation to obtain a continuous function that determines the flow coefficient Cv for any bypass value, such as Fig.11D Step 1106 thus provides a mapping between the bypass damper position and the flow coefficient.
[0160] At step 1108, a model is created that relates volume flow rate, CPU heat generation, and supply air temperature. The model used in step 1108 may be a regression model based on site data that maps the required volume flow rate (flow) to CPU heat generation (Q CPU ) and supply air temperature (T 供应 ) For example, based on the function Q CPU =Flow rate*C p (T 热 -T 供应 ), where C p is the heat transfer coefficient. The relationship in step 1108 can be based on T 热 (hot aisle temperature) constraints, limits, targets, etc., such as by increasing or decreasing flow and / or T 供应 To adjust for different levels of Q CPU. To keep T 热 Basically a constant goal.
[0161] At step 1110, a model is created that relates supply air temperature and water consumption. The model created in step 1110 may be, for example, a water mass balance based on the design efficiency values of the DEC units. The model created at step 1110 may be similar to the water evaporation modeling discussed above, for example, based on the following set of rules: has been used after initial purchase; the box must not be used for more than N days without being flushed; and The model created in step 1110 can determine the outdoor air temperature, outdoor air humidity, air volume flow rate (flow rate, w s) and / or the amount of water evaporated as a function of the supply air temperature. The model of step 1110 can be used to determine the total water consumption over a time period based on the value of one or more of such variables over the time period. Process 1100 thus provides a set of interrelated models and equations that can be used in a control process, for example, as constraints to optimization. Process 1200 provides an example process in which a device is controlled using the model created in process 1100. Other control processes based on one or more of the models from process 1100 can be implemented in various embodiments.
[0162] Reference now Fig.12 , shows a process 1200 for optimizing control of a DEC unit according to some embodiments. In some embodiments, controller 230 is programmed to perform process 1200. In some embodiments, process 1200 can use the model created in process 1100.
[0163] At step 1202, a value for the supply air temperature is selected. In a first instance of step 1202, the selected value for the supply air temperature initiates the optimization. In some embodiments, the selected value may be the value used for control in a previous time step.
[0164] At step 1204, the volumetric flow rate and bypass damper position are determined based on the supply air temperature. The DEC efficiency model described above may be used, for example, based on T 供应 =Bypass*T oa + (1-Bypass) * T of DEC Cooling to determine the bypass position, where T of DEC Cooling = Dry Bulb T - Efficiency * (Dry Bulb T - Wet Bulb T) and Efficiency is a given value from the DEC unit product documentation (e.g., 92%). Such an equation can be used with the selected supply air temperature and outdoor air temperature (e.g., from a weather service, from a sensor) from step 1202 to determine the bypass position (i.e., the value of Bypass).
[0165] The volumetric flow rate may be determined in step 1204 using a model relating volumetric flow rate, CPU heating, and supply air temperature (e.g., the model output from and described with reference to step 1108 of process 1100). For example, the volumetric flow rate may be based on predicted CPU heating (e.g., load prediction). Step 1204 thus outputs the volumetric flow rate and the bypass damper position.
[0166] At step 1206, the flow coefficient Cv is selected based on the bypass damper position. The function output from step 1106 of process 1100 (e.g., Fig.11D The function shown in the graph 1170 of FIG. 1170 is used to perform step 1206. The value of Cv is thus determined.
[0167] At step 1208, the pressure difference is obtained based on the flow coefficient (Cv) from step 1206 and the volume flow rate (flow) from step 1204. The pressure difference can be obtained according to the discussion with reference to step 1104 of process 1100. That is, step 1208 can calculate the pressure difference as
[0168] At step 1210, the fan speed is obtained based on the pressure difference ΔP from step 1208 and the volumetric flow rate flow from step 1204. Step 1210 may use the fan model from step 1102, for example: When ΔP and flow rate (e.g., other values are suitable for process 1100), fan speed (i.e., speed) is the remaining unknown variable. Step 1210 can include running a solver (e.g., quadratic solver logic, numerical methods, etc.) to obtain a positive value of speed that satisfies the equation. The fan speed required to provide the supply air temperature selected in step 1202 is thereby determined.
[0169] In step 1214, the amount of water evaporated and / or drained is calculated based in part on the supply air temperature using a water mass balance. Step 1214 can take into account all water that will be consumed by the DEC over the time frame. For example, step 1214 can use the model created in step 1110 of process 1100.
[0170] At step 1216, the value of an objective function that considers both energy consumption and water consumption is calculated based on the outputs of steps 1212 and 1214. The objective function may have the following form:
[0171]
[0172] The function considers the cost of water consumption of the DEC unit and the cost of power consumption (e.g., electricity consumption) of the fan of the DEC unit. The objective function solves the trade-off between water and fan power consumption, that is, because water consumption and fan speed may be competing goals, because increasing water consumption can provide cooler supply air, which requires a lower fan speed to provide the same amount of cooling. The water cost and electricity cost items can be rates set by utility companies and / or can be adjustable weights set by users' water use preferences relative to electricity use (e.g., based on competing sustainability goals). In some embodiments, the electricity cost is associated with the marginal carbon emissions associated with the marginal increase in fan power consumption (e.g., internalizing marginal carbon emissions), so that the objective function takes carbon emission considerations into account. As another example, a penalty term can be applied to punish water consumption that exceeds an upper limit (e.g., set by sustainable development goals, set by government regulators, etc.). In various embodiments, various other costs and penalties can be represented in the objective function.
[0173] Step 1216 provides the value of the cost function given the supply air temperature selected in step 1202. At step 1218, the supply air temperature is adjusted in an effort to reduce (or otherwise improve, depending on the objective / preference) the value of the objective function, and the process returns to step 1202, where the adjusted value is used as the supply air temperature input to initialize steps 1204 through 1216 of process 1200. Steps 1202 through 1218 may be repeated such that the value of the objective function is calculated for different supply air temperatures, such as using gradient descent or other optimization methods to select the supply air temperature in 1218 that is desired to drive the objective function to an optimal value. Thus, after iterating steps 1202 through 1218, a supply air temperature is determined that improves (e.g., minimizes, or, if formulated differently, maximizes or approaches the objective) the value of the objective function.
[0174] At step 1220, the DEC unit is controlled based on the supply air temperature that best improves (e.g., minimizes) the value of the objective function. Step 1220 may include, for example, controlling the supply fan 214 and the actuator 216. Process 1200 may be repeated periodically, such as every minute, every fifteen minutes, etc., to provide optimal control of the DEC unit over time. Thus, the DEC unit is controlled in a manner that takes into account the tradeoff between consuming more water to reduce fan power consumption and consuming more fan power to reduce water consumption. Such an approach is beneficial in that Figures 13 to 16 This is demonstrated in the experimental results shown in and discussed below.
[0175] In some embodiments, process 1200 is performed for a group of DEC units. The supply air temperature output from the optimization can be used as an overall control target for the group of DEC units. Controlling the group of DEC units can further include distributing loads across the group of DEC units, such as by running a second optimization constrained to provide the same total supply air temperature output from process 1200, distributing water consumption and fan power consumption among the various DEC units. For example, it may be more efficient to provide a larger amount of evaporative cooling with one DEC unit while other DEC units completely bypass evaporative cooling, compared to providing a small amount of evaporative cooling equally from all DEC units, while both scenarios achieve the same overall supply air temperature. Therefore, controlling a group of DEC units can include running process 1200 to determine a target overall supply air temperature, and then using the target overall supply air temperature as a constraint to a second optimization that determines the distribution of loads across the group of DEC units that will best achieve the target overall supply air temperature.
[0176] Reference now Fig.13, a graph 1300 is shown according to some embodiments and experimental results. Graph 1300 compares supply air temperature values determined over a time period by optimizing fan power usage only, optimizing water usage only, or optimizing fan power and water consumption together (as in process 1200). As shown, optimizing fans only provides lower supply air temperatures because fan optimization relies on increasing the use of direct evaporative cooling (thereby consuming more water) to reduce the fan speed required to provide adequate cooling. Alternatively, optimizing water usage only provides higher supply air temperatures, thereby requiring higher fan speeds to provide higher flow rates while reducing the use of evaporative cooling (and corresponding water consumption). Graph 1300 further shows that optimizing fans and water consumption together provides a supply air temperature between the temperatures provided by the other two methods, representing an intermediate method that provides a balance between water consumption savings and fan power savings.
[0177] Reference now Figures 14 to 16 , shows multiple sets of graphs according to some embodiments and experimental results, which further demonstrate the advantages of comprehensive optimization of water consumption and fan power as in process 1200. Fig.14 A set of graphs 1400 are shown illustrating fan and water costs for a scenario where only fan power is optimized (ie, water consumption is not considered in the control). Fig.15 A set of graphs 1500 are shown that illustrate fan and water costs for a scenario where only water power is optimized (i.e., fan power is not considered in the control). Graphs 1500 show that relative to the fan-centric approach of graph 1400, water costs are greatly reduced (e.g., reduced by 87% in one cycle), but fan power consumption is increased (such that overall costs may increase). Fig.16 A set of graphs 1600 are shown that illustrate fan and water costs for a scenario where both water and fan power costs are considered in control optimization (e.g., according to process 1200). Graphs 1600 show that total costs are reduced relative to other examples (e.g., reduced by more than 20% during the evaporation period), and water consumption is reduced relative to Fig.14 The example maintained a significant decrease (eg, a 47% decrease during the evaporation period). Figures 14 to 16 The results thus demonstrate the effectiveness of the various features described in this article.
[0178] Various other control strategies may be implemented in various embodiments. For example, in some embodiments, the optimization (e.g., as in process 1200) is formulated as a multi-objective optimization, where water and electricity costs are adjusted to construct a Pareto front. Then, the operating point can be selected based on the Pareto front, for example, by examining how much water savings are achieved for various electricity savings levels. As another example, for example, Figure 1The data center shown being served by multiple DEC units can save fan energy by running half of the DEC units dry with all dampers fully open any time less than half cooling is needed. If more than half cooling is needed which is optimal, then an additional comparison is made if shutting down half of the units will run at a lower cost and keep the temperature below acceptable limits, which becomes the new optimal. As another example, a high-level / low-level optimization architecture can be provided where load can be distributed across multiple DEC units, e.g., the best way to serve any combination of flow and temperature from the NDEC units is obtained in a high-level optimization, and then low-level optimization is used during run time to obtain the optimal operating point for each DEC unit based on the decisions / allocations made under the high-level optimization.
[0179] The hardware and data processing components for implementing various processes, operations, illustrative logic, logic blocks, modules and circuits described in conjunction with the embodiments disclosed herein may be implemented or executed using a general purpose single-chip or multi-chip processor, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic device, discrete gate or transistor logic, discrete hardware components, or any combination thereof designed to perform the functions described herein. A general purpose processor may be a microprocessor or any conventional processor, controller, microcontroller or state machine. The processor may also be implemented as a combination of computing devices, such as a combination of a DSP and a microprocessor, a combination of multiple microprocessors, one or more microprocessors in combination with a DSP core, or any other such configuration. In some embodiments, specific processes and methods may be performed by circuit systems specific to a given function. A memory (e.g., a memory, a memory unit, a storage device) may include one or more devices (e.g., RAM, ROM, flash memory, hard disk storage) for storing data and / or computer code to complete or facilitate the various processes, layers and modules described in this disclosure. The memory may be or include volatile memory or non-volatile memory, and may include database components, object code components, script components, or any other type of information structure for supporting the various activities and information structures described in the present disclosure. According to an exemplary embodiment, the memory is communicatively connected to the processor via a processing circuit and includes computer code for executing (e.g., executed by a processing circuit or processor) the one or more processes described herein.
[0180] The present disclosure contemplates methods, systems, and program products on any machine-readable medium for completing various operations. Embodiments of the present disclosure may be implemented using existing computer processors, or by special-purpose computer processors for appropriate systems, combined for this or another purpose, or implemented by hard-wired systems. Embodiments within the scope of the present disclosure include program products, which include machine-readable media for carrying or storing machine-executable instructions or data structures. Such machine-readable media may be any available medium accessible by a general or special-purpose computer or other machine with a processor. For example, such machine-readable media may include RAM, ROM, EPROM, EEPROM, or other optical disk storage bodies, disk storage bodies, or other magnetic storage devices, or any other medium that may be used to carry or store desired program codes in the form of machine-executable instructions or data structures and may be accessed by a general or special-purpose computer or other machine with a processor. The above combinations are also included within the scope of machine-readable media. Machine-executable instructions include, for example, instructions and data that cause a general-purpose computer, a special-purpose computer, or a special-purpose processing machine to perform a specific function or a set of functions.
[0181] Although the drawings and description may show a specific order of method steps, the order of such steps may be different from that depicted and described, unless otherwise specified above. In addition, two or more steps may be performed simultaneously or partially simultaneously, unless otherwise specified above. Such variations may depend on, for example, the software and hardware systems selected and the designer's choice. All such variations are within the scope of the present disclosure. Similarly, the software implementation of the described method can be accomplished with standard programming techniques having rule-based logic and other logic to accomplish various connection steps, processing steps, comparison steps, and decision steps.
Claims
1. A method of controlling a direct evaporative cooling unit, comprising: predicting water consumption and energy consumption of the direct evaporative cooling unit based on control variables of the direct evaporative cooling unit; selecting a target for the controlled variable based on optimization of an objective function, the objective function comprising the water consumption and the energy consumption; as well as The direct evaporative cooling unit is controlled according to the target for the control variable.
2. The method of claim 1, wherein the water consumption comprises at least one of water evaporated during operation of the direct evaporative cooling unit or water drained from a water tank of the direct evaporative cooling unit.
3. The method of claim 1 , wherein predicting the water consumption is based on an amount of airflow over an evaporative medium of the direct evaporative cooling unit and an expected change in humidity of the airflow across the evaporative medium, and wherein the controlled variable is supply air temperature, supply air humidity, or bypass damper position.
4. The method of claim 1, wherein the energy consumption comprises energy consumption of a fan of the direct evaporative cooling unit.
5. The method of claim 1 , wherein the control variable of the direct evaporative cooling unit is associated with a bypass damper position that varies depending on the outside air temperature, and wherein the energy consumption is predicted based on the bypass damper position.
6. The method of claim 1 , wherein the controlled variable is supply air temperature and the target is a target supply air temperature, and wherein controlling the direct evaporative cooling unit comprises controlling a bypass damper to a position determined based on the target supply air temperature and an outdoor air temperature.
7. The method of claim 1 , wherein predicting the water consumption and the energy consumption of the direct evaporative cooling unit based on the control variables of the direct evaporative cooling unit comprises utilizing a plurality of curves representing the relationship between pressure difference and flow rate for a plurality of bypass damper positions.
8. A method of controlling a group of direct evaporative cooling units serving a data center, comprising: selecting a target supply air temperature for the set of direct evaporative cooling units by performing a first optimization of a target based on predicted water and energy consumption of the set of direct evaporative cooling units; allocating the predicted water and energy consumption among the set of direct evaporative cooling units by performing a second optimization constrained by the target supply air temperature; as well as The group of direct evaporative cooling units is controlled according to a result of the allocation. 9 . The method of claim 8 , wherein selecting the target supply air temperature by performing the first optimization comprises predicting the predicted water and energy consumption for a plurality of possible supply air temperatures.
10. The method of claim 8, wherein the water consumption comprises an amount of water evaporated during operation of the set of direct evaporative cooling units.
11. The method of claim 8, comprising predicting predicted water consumption based on an amount of airflow over an evaporative medium of the set of direct evaporative cooling units and an expected change in humidity of the airflow across the evaporative medium.
12. The method of claim 8, comprising predicting predicted energy consumption by deriving a fan speed based on a pressure differential and a volumetric flow rate associated with the target supply air temperature.
13. The method of claim 8, wherein allocating the predicted water and energy consumption among the group of direct evaporative cooling units comprises determining different control actions for different units of the group of direct evaporative cooling units, and controlling the group of direct evaporative cooling units according to a result of the allocation comprises causing the different units to operate according to different control decisions.
14. The method of claim 8, comprising predicting water and energy consumption of the group of direct evaporative cooling units based on likely supply air temperatures by utilizing a plurality of curves representing the relationship between pressure differential and flow rate for a plurality of bypass damper positions.
15. A direct evaporative cooling system comprising a controller programmed to: predicting water consumption and energy consumption of the direct evaporative cooling system based on a selected supply air temperature; by adjusting the selected supply air temperature to achieve a target supply air temperature such that a value of an objective function is improved, the objective function including predicted water and energy consumption of the direct evaporative cooling system; and The direct evaporative cooling system is controlled according to the target supply air temperature.
16. The direct evaporative cooling system of claim 15, wherein the water consumption comprises an amount of water evaporated during operation of the direct evaporative cooling system.
17. The direct evaporative cooling system of claim 15, wherein a controller is programmed to predict the water consumption based on an amount of airflow over an evaporative medium of the direct evaporative cooling unit and an expected change in humidity of the airflow across the evaporative medium.
18. The direct evaporative cooling system of claim 15, wherein the controller is programmed to predict the water consumption and the energy consumption using a plurality of curves representing the relationship between pressure differential and flow rate for a plurality of bypass damper positions.
19. The direct evaporative cooling system of claim 15, wherein: The direct evaporative cooling unit includes a bypass baffle; and The controller is configured to control the direct evaporative cooling system according to the target supply air temperature by causing a change in a position of the bypass damper.
20. The direct evaporative cooling system of claim 15, wherein the controller is programmed to predict the energy consumption by deriving a fan speed based on a pressure differential and a volumetric flow rate associated with the selected supply air temperature.
21. A method for fault detection of direct evaporative cooling of a data center, wherein the direct evaporative cooling affects humidity and temperature of the data center, the method comprising: generating, using a model, an expected value for the humidity of the data center and an expected value for the temperature of the data center; as well as A sensor fault is triggered in response to: the measured value for the humidity deviates from the expected value for the humidity while the measured value for the temperature follows the expected value for the temperature; or The measured value for the temperature deviates from the expected value for the temperature while the measured value for the humidity follows the expected value for the humidity.
22. The method of claim 21, comprising performing an action to resolve the sensor fault in response to triggering the sensor fault.
23. The method of claim 22, wherein performing the action to resolve the sensor failure comprises moving the sensor, cleaning the sensor, or replacing the sensor.
24. The method of claim 21, comprising changing control of the direct evaporative cooling of the data center to accommodate a fault condition.
25. The method of claim 21, wherein the model uses inputs including a bypass curve and at least one of an outdoor air temperature or an outdoor air humidity value.
26. The method of claim 21, wherein the model is further based on a design efficiency of a direct evaporative cooling unit.
27. The method of claim 26, further comprising determining a degradation in the design efficiency based on a comparison of the expected value with an actual value.
28. A method for sensor fault detection for a first sensor measuring a first condition and a second sensor measuring a second condition, wherein a device is operable to affect the first condition and the second condition, the method comprising: generating an expected value for the first condition and a corresponding expected value for the second condition using a physics-based model that defines a physics-based relationship between the first condition and the second condition; as well as triggering a sensor fault in response to determining that a measured value for the first condition deviates from the expected value for the first condition and a measured value for the second condition follows the expected value for the second condition; as well as Triggering of the sensor fault is avoided in response to determining that the measured value for the first condition deviates from the expected value for the first condition and the measured value for the second condition deviates from the expected value for the second condition.
29. The method of claim 28, comprising performing an action to address the sensor failure in response to indicating the sensor failure.
30. The method of claim 29, wherein performing the action to resolve the sensor failure comprises moving the first sensor or the second sensor, cleaning the first sensor or the second sensor, or replacing the first sensor or the second sensor.
31. The method of claim 28, comprising changing control of direct evaporative cooling of a data center to accommodate a fault condition.
32. The method of claim 28, wherein the physics-based model uses a bypass position of a direct evaporative cooling unit, outdoor air temperature, or outdoor air humidity as input.
33. The method of claim 28, wherein the physics-based model is based on the efficiency of a direct evaporative cooling unit.
34. The method of claim 28, wherein the first sensor measures supply air humidity to a direct evaporative cooling unit and the second sensor measures supply air temperature to the direct evaporative cooling unit.
35. The method of claim 28, further comprising triggering a control and / or device fault when triggering the sensor fault is avoided.
36. A method for performing sensor failure detection on a first sensor for measuring a first indoor air condition and a second sensor for measuring a second indoor air condition, the method comprising: Determine a desired relationship between the first indoor air condition and the second indoor air condition based on thermodynamic principles ; evaluating a first measurement of the first indoor air condition from the first sensor and a second measurement of the second indoor air condition from the second sensor to determine whether the first measurement and the second measurement satisfy the desired relationship between the first indoor air condition and the second indoor air condition; as well as A fault in the first sensor or the second sensor is triggered in response to determining that the first measurement from the first sensor and the second measurement from the second sensor do not satisfy the expected relationship between the first indoor air condition and the second indoor air condition.
37. The method of claim 36, wherein the first sensor and the second sensor are associated with a first unit of a plurality of equipment units, the method further comprising attributing the fault to the first sensor or the second sensor by performing a peer analysis of the plurality of equipment units.
38. The method of claim 36, wherein performing the peer analysis comprises determining whether the measurement result from the first sensor or the measurement result from the second sensor is an outlier 39. The method of claim 36, wherein performing the peer analysis comprises using generalized extreme studentized deviation.