A junction box and photovoltaic panel automatic assembly machine and working method
By designing an automatic assembly machine for junction boxes and photovoltaic panels containing multiple processing devices, the problem of low efficiency and inability to deal with different types of junction boxes in the prior art is solved, and efficient and flexible junction boxes installation is achieved.
Patent Information
- Application Number
- CN202411740074.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-29
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2044-11-29
AI Technical Summary
The existing junction box automatic mounting machines can only handle one junction box at each station, which is inefficient and cannot install wired and wireless junction boxes at the same time.
An automatic assembly machine for junction boxes and photovoltaic panels is designed, including bus bar straightening glue shaping device, photovoltaic panel glue shaping device, junction box preparation and loading device, bus bar bending device and bus bar compression and welding device, which can handle multiple junction boxes and different types of junction boxes at the same time.
It improves the installation efficiency of the junction box, can handle multiple junction boxes and different types of junction boxes at the same time, adapts to the production of photovoltaic panels with different requirements, and improves the adaptability and production efficiency of the machine.
Smart Images

Figure CN119208460B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of solar photovoltaic equipment, and in particular to an automatic assembly machine for a junction box and a photovoltaic panel and a working method. Background Art
[0002] When producing solar photovoltaic panels, after the silicon wafer array is arranged on the glass plate, multiple arrayed silicon wafers need to be connected through bus bars, and then the junction box needs to be fixed on the photovoltaic panel. At the same time, the lead end of the bus bar needs to be reliably connected to the junction box in order to achieve electrical connection with the control equipment, etc.
[0003] The lead end of the busbar needs to stand upright when connected to the junction box, but it is inconvenient to transport and store the lead end upright. Therefore, in order to save space and facilitate transportation, the lead end is usually bent into a lying posture before the busbar enters the machine where the busbar is connected to the junction box. In order to prevent the lead end from being pressed too tightly against the busbar when bending and to protect the surface that needs to be welded in the subsequent process, a layer of high-temperature tape or transparent tape (hereinafter referred to as tape) is attached to the busbar before bending. The installation process of the junction box is as follows: first, you need to tear off the tape and shape the bent lead end to make it upright. Next, fix the junction box through the lead end on the glass plate, and finally weld the lead to the junction box to complete the installation of the junction box. Connect the connector of the junction box to the external circuit, and the junction box will be able to conduct the current generated by the solar cell. The original installation of junction boxes on solar photovoltaic panels mainly relies on manual work. The efficiency of manual installation is low and it is difficult to meet the requirements of mass and efficient production. Therefore, someone invented an automatic junction box installation machine. The patent document with the authorization announcement number CN218123931U discloses an automatic junction box installation machine, including a conveying part and an operating part, wherein: the conveying path of the conveying part is provided with a positioning station, a lead shaping station, a junction box installation station and a welding station, the conveying part conveys the battery string components step by step, and each step conveys a junction box installation position from the current operating station to the next operating station; the operating part includes a positioning mechanism, a lead shaping mechanism, a junction box installation mechanism and a welding mechanism, wherein: the positioning mechanism is located above the positioning station, and is used to position the junction box installation position; the lead shaping mechanism is located above the lead shaping station, and is used to tear off the tape on the junction box installation position and shape the lead; the junction box installation mechanism is located above the junction box installation position, and is used to install the junction box on the junction box installation position; the welding mechanism is located above the welding station, and is used to perform welding on the junction box installation position. The automatic installation of the junction box is realized, and the installation efficiency of the junction box is improved.
[0004] However, this scheme is for a structure in which the first junction box installation position, the second junction box installation position and the third junction box installation position are arranged along the conveying direction. Then, at each workstation, only one junction box can be processed at a time, and the efficiency is still low. Moreover, this scheme can only process junction boxes of the same specification. Usually, the structure of the junction box in the middle position is inconsistent with that of the junction boxes at both ends. The junction boxes at both ends have connecting wires, while the junction box in the middle does not have connecting wires. Therefore, it is necessary to design an automatic installation machine for solar photovoltaic panels that can be suitable for installing different junction boxes and can process the first junction box installation position, the second junction box installation position and the third junction box installation position that are perpendicular to the conveying direction at the same time, so as to further improve the installation efficiency. Summary of the invention
[0005] The present invention provides a junction box and photovoltaic panel automatic assembly machine and a working method, and aims to solve the technical problems that the junction box automatic installation machine in the prior art can only process one junction box at a time at each workstation during production, resulting in low efficiency, and cannot install wired junction boxes and wireless junction boxes at the same time.
[0006] In order to solve the above technical problems, the present invention provides an automatic assembly machine for junction boxes and photovoltaic panels, comprising a frame, on which a busbar straightening, glue tearing and shaping device, a photovoltaic panel glue applying device, a junction box preparation and feeding device, a busbar bending device and a busbar pressing and welding device are arranged along the assembly line for conveying photovoltaic panels;
[0007] The busbar straightening and peeling shaping device comprises a straightening and peeling shaping main bracket that reciprocates along the X-axis direction of the frame, and one or more straightening and peeling shaping components that can reciprocate along the Y-axis direction of the straightening and peeling shaping main bracket are provided on the straightening and peeling shaping main bracket; and at the same time, the connection between one or more junction boxes and the busbar in the Y-axis direction is processed;
[0008] The photovoltaic panel glue application device comprises a glue application main support that reciprocates along the X-axis direction of the frame, and one or more glue application components that can reciprocate along the Y-axis direction of the glue application main support are arranged on the glue application main support;
[0009] The junction box preparation and loading device includes a junction box preparation device for placing the wired junction box and the wireless junction box at a predetermined position and a junction box loading device for placing the wired junction box and / or the wireless junction box on the photovoltaic panel;
[0010] The busbar bending device comprises a bending main bracket that reciprocates along the X-axis direction of the frame, and one or more bending assemblies are arranged on the bending main bracket along the Y-axis direction of the bending main bracket, and the bending assemblies bend the busbars extending into the junction box;
[0011] The busbar pressing and welding device includes a pressing and welding main bracket that reciprocates along the X-axis direction of the frame, a pressing and welding sub-bracket that can be set along the Y-axis direction of the pressing and welding main bracket is provided on the pressing and welding main bracket, a busbar pressing device that presses the bent busbar and the electrode in the junction box is provided on one side of the pressing and welding sub-bracket; and a welding device that welds the busbar and the electrode in the junction box together is provided on the other side of the pressing and welding sub-bracket.
[0012] The present invention also provides a working method of a junction box and a photovoltaic panel automatic assembly machine, comprising the following steps:
[0013] S1, straightening and shaping the busbar, specifically: straightening the lead end of the busbar on the photovoltaic panel by straightening and peeling the glue assembly, then removing the tape on the busbar by the glue suction assembly and the clamping claw assembly; finally shaping the lead end of the busbar by the shaping assembly;
[0014] S2, applying glue to the photovoltaic panel, specifically: positioning the part to be glued by using the second position detection device of the photovoltaic panel glue applying device, and then applying glue on the bus bar below the lead end by using the automatic glue applying machine;
[0015] S3, junction box preparation and loading, specifically: prepare the wired junction box and the wireless junction box first by using the junction box preparation and loading device, and position the wired junction box and the wireless junction box at a predetermined position by using the first manipulator; transport the wired junction box and the wireless junction box to the photovoltaic panel as needed by using the second manipulator, so that the lead end of the bus bar passes through the bottom of the wired junction box and the wireless junction box and penetrates into the wired junction box and the wireless junction box;
[0016] S4, busbar bending, specifically: bending the lead end of the busbar by a bending block of the busbar bending device, so that the lead end contacts the electrodes in the wired junction box and the wireless junction box;
[0017] S5. Busbar pressing and welding, specifically: first, the lead end of the busbar is pressed onto the electrodes in the wired junction box and the wireless junction box by the busbar pressing device, and then the welding wire provided by the welding wire segment supply assembly is transported to the transfer table by the welding wire segment transport assembly, and the welding wire on the transfer table is transported to the junction box by the clamping welding assembly and energized, and the lead end of the busbar is welded together with the electrodes in the wired junction box and the wireless junction box.
[0018] The beneficial effects of the present invention are as follows: the busbar straightening, glue tearing and shaping device first straightens the lead end of the busbar, then tears off the tape covering the lead end, and finally shapes the lead end so that the junction box can be smoothly placed on the lead end; the photovoltaic panel gluing device pre-glueizes the lead end of the busbar to facilitate better connection of the junction box; the junction box preparation and loading device prepares the wired junction box and / or wireless junction box to be installed, so that the robot can accurately grasp the wired junction box and / or wireless junction box and transport it to the straightened lead end; the busbar bending device bends the busbar extended into the junction box; the busbar pressing and welding device first presses the busbar onto the electrode on the junction box, and then welds the busbar and the electrode on the junction box together.
[0019] The busbar straightening and glue tearing shaping device, photovoltaic panel glue applying device, junction box preparation and feeding device, busbar bending device and busbar pressing and welding device are arranged along the conveying direction of the photovoltaic panel; the busbar straightening and glue tearing shaping device includes a plurality of straightening and glue tearing shaping components arranged on a straightening and glue tearing shaping main bracket. This arrangement can process the connections between a plurality of junction boxes and busbars on the photovoltaic panel along the Y-axis direction at the same time according to actual needs, and has high efficiency; because large photovoltaic panels need to connect the busbars through a wireless junction box in the middle position, and the two sides need to be connected to the external circuit through a wired junction box, the junction box preparation and feeding device in this scheme can place the wired junction box or the wireless junction box on the photovoltaic panel at the same time, and the machine can adapt to the production of photovoltaic panels with different requirements, and this scheme is produced in an assembly line manner, and has high efficiency. By arranging a busbar straightening, glue tearing and shaping device, a photovoltaic panel gluing device, a junction box preparation and loading device, a busbar bending device and a busbar pressing and welding device along the conveying direction of the photovoltaic panel, the photovoltaic panels can be processed continuously, and multiple junction boxes can be assembled at the same workstation at the same time, thereby improving the installation efficiency; wired junction boxes and wireless junction boxes can also be installed at the same time, thereby improving the adaptability of the machine. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present invention;
[0021] Figure 2 This is a schematic diagram of the structure of a photovoltaic panel to be processed in an embodiment of the present invention;
[0022] Figure 3 for Figure 2 Enlarged view of point A in the middle;
[0023] Figure 4 Schematic diagram of the arrangement of the busbar straightening, glue peeling and shaping assembly in an embodiment of the present invention;
[0024] Figure 5 Schematic diagram of the overall structure of the busbar straightening, glue peeling and shaping assembly in an embodiment of the present invention;
[0025] Figure 6 It is a schematic diagram of the overall structure of the busbar straightening, glue peeling and shaping assembly from another perspective in an embodiment of the present invention;
[0026] Figure 7 for Figure 6 Enlarged view of point B in the middle;
[0027] Figure 8 This is a schematic diagram of the overall structure of a glue application device according to an embodiment of the present invention;
[0028] Fig. 9 It is a schematic diagram of the arrangement of the gluing assembly according to an embodiment of the present invention;
[0029] Fig.10 A structural schematic diagram of a glue application assembly from another perspective of an embodiment of the present invention;
[0030] Fig.11 for Fig.10 Enlarged view of point C in the middle;
[0031] Fig.12 It is a structural schematic diagram of a junction box preparation and loading device according to an embodiment of the present invention;
[0032] Fig.13 for Fig.12 Enlarged view of point D in the middle;
[0033] Fig.14 for Fig.12 Enlarged view of point E in the middle;
[0034] Fig.15 A schematic structural diagram of a junction box preparation and loading device from another perspective according to an embodiment of the present invention;
[0035] Fig.16 for Fig.15 Enlarged view of point F in the middle;
[0036] Fig.17 A schematic diagram of a portion of the structure of a busbar bending device according to an embodiment of the present invention;
[0037] Fig.18 Schematic diagram of the structure of the busbar pressing device in the embodiment of the present invention;
[0038] Fig.19 for Fig.18 Enlarged view of point G in the middle;
[0039] Fig. 20 Schematic diagram of the structure of a busbar pressing and welding device in an embodiment of the present invention;
[0040] Fig.21 for Fig. 20 Enlarged view of H in the middle;
[0041] Fig. 22 for Fig. 20 Enlarged view of point I in the middle.
[0042] Figure Number:
[0043] 100, bus bar; 101, lead terminal; 102, tape;
[0044] 1. Busbar straightening and tearing plastic shaping device; 10. Straightening and tearing plastic shaping general bracket; 11. Straightening and tearing plastic shaping assembly; 110. Lifting drive assembly; 111. Mounting seat; 112. Straightening and tearing plastic assembly; 1121. Straightening and tearing plastic lifting cylinder; 1122. Straightening and tearing plastic clamping cylinder; 113. Clamping claw assembly; 1130. Clamping claw seat; 1131. First mounting part; 1132. Second mounting part; 1133. Straightening claw; 1134. Glue clamping claw; 114. Glue suction assembly; 115. Straightening retainer; 1140. Mounting plate; 1141. Lifting cylinder; 1142. Suction cup fixing block; 1143. Suction cup; 1144. Guide column; 1145. Guide sleeve; 1150. Retainer support block; 1 151, holding block; 15, straightening and tearing plastic shaping sub-bracket; 16, plastic disc; 116, plastic shaping assembly; 1161, plastic shaping lifting cylinder; 1162, plastic shaping clamping cylinder; 1163, plastic shaping claw mounting seat; 1164, plastic shaping claw; 1165, vertical holding block; 1166, horizontal holding block; 17, first position detection device; 170, camera support frame; 171, first visual camera;
[0045] 2. Photovoltaic panel glue device; 20. Glueing main bracket; 21. Glueing assembly; 210. Glueing sub-bracket; 27. Second position detection device; 22. Second lifting drive assembly; 23. Automatic glueing machine; 271. Second visual camera;
[0046] 3. Junction box preparation and feeding device; 31. Junction box preparation device; 32. Junction box feeding device; 311. First manipulator; 312. Wired junction box bin; 313. Conveyor belt device; 314. Wired junction box positioning seat; 315. Wireless junction box supply device; 316. Recovery frame; 3140. Positioning bracket; 3141. Top mounting plate; 3142. Fixed card block; 3143. Avoidance groove; 3144. Junction box positioning slide rail; 3145. Junction box positioning slider; 3146. Movable card block; 31421. First opening; 31461. Second opening; 31422, first straight guide slope; 31462, second straight guide slope; 321, second manipulator; 322, junction box handling assembly; 323, second clamping bracket; 324, second clamping assembly; 3240, gear; 3241, first rack; 3242, second rack; 3243, cylinder; 3244, second clamping plate; 3245, second clamping block;
[0047] 4. Busbar bending device; 40. Cylinder fixing bracket; 41. Bidirectional cylinder; 42. Bending block;
[0048] 5. Busbar clamping and welding device; 50. Clamping and welding main bracket; 51. Clamping and welding sub-bracket; 52. Busbar clamping device; 520. Clamping device mounting plate; 521. Clamping assembly; 5210. Double-rod cylinder; 5211. Upper mounting block; 5212. Sliding rod; 5213. Upper stopper; 5214. Lower mounting block; 5215. Lower stopper; 5216. Spring; 5217. Clamping block; 53. Welding assembly; 530. Transfer table; 531. Wire segment supply assembly; 532. Wire segment transport assembly; 533. Clamping welding Connecting assembly; 5311, welding wire reel support; 5312, welding wire extraction assembly; 53120, welding wire extraction motor; 53121, driving wheel; 53122, driven wheel; 53123, wire outlet nozzle; 5313, welding wire cutting machine; 5321, welding wire segment translation device; 5322, welding wire segment lifting device; 5323, welding wire segment transport rack; 5324, welding wire segment clamping cylinder; 5325, welding wire segment clamping claw; 5330, clamping welding lifting device; 5331, clamping welding head; 5332, clamping welding part; 5333, welding wire accommodating groove. DETAILED DESCRIPTION
[0049] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0050] like Figure 1 As shown, a junction box and photovoltaic panel automatic assembly machine includes a frame, on which a busbar straightening, glue tearing and shaping device 1, a photovoltaic panel gluing device 2, a junction box preparation and loading device 3, a busbar bending device 4 and a busbar pressing and welding device 5 are arranged along the assembly line for conveying photovoltaic panels. The function of the machine is to install the junction box at the lead end of the busbar so as to achieve electrical connection with the control equipment, etc. Of course, the busbar straightening, glue tearing and shaping device 1, the photovoltaic panel gluing device 2, the junction box preparation and loading device 3, the busbar bending device 4 and the busbar pressing and welding device 5 are not necessarily all arranged on one frame, and the above devices can be separate and assembled into an assembly line according to the production process.
[0051] Figure 2 1 shows a bus bar 100 and two different types of junction boxes arranged on a photovoltaic panel. The figure also shows the state of the lead end 101 of the bus bar 100 before entering the machine processing of the present invention. Considering that the photovoltaic panel needs to save space and protect the lead end 101 of the bus bar 100 during transportation, the lead end 101 is usually bent. In order to prevent the lead end 101 from being pressed too tightly during bending, a piece of tape 102 is attached to the bend before bending, as shown in FIG. Figure 3 shown.
[0052] Then, when the photovoltaic panel enters the junction box and the photovoltaic panel automatic assembly machine of the present invention, the lead end 101 of the bus bar 100 needs to be straightened first, then the tape 102 is torn off, and then the lead end 101 of the bus bar 100 is shaped to a suitable angle for easy installation of the junction box.
[0053] like Figure 4 As shown, the busbar straightening and tearing shaping device 1 includes a straightening and tearing shaping main bracket 10 that reciprocates along the X-axis direction of the frame, and one or more straightening and tearing shaping components that can reciprocate along the Y-axis direction of the straightening and tearing shaping main bracket 10 are provided on the straightening and tearing shaping main bracket 10. In this embodiment, the number of the straightening and tearing shaping components is three, and the straightening and tearing shaping components are all driven by the first Y-axis driving device.
[0054] The total bracket 10 for straightening, tearing and shaping can be set on the frame of the assembly machine or independently set on the frame of the busbar straightening, tearing and shaping device 1. The total bracket 10 for straightening, tearing and shaping is usually driven by a synchronous wheel and synchronous belt mechanism driven by a servo motor, which is called the first X-axis drive device here. Since the first X-axis drive device is a mature existing technology, its specific structure is not described here.
[0055] The glue straightening and tearing shaping component comprises a glue straightening and tearing shaping sub-bracket 15 .
[0056] In this embodiment, the straightening and glue-tearing shaping sub-bracket 15 is a rectangular frame structure.
[0057] The glue straightening, peeling and shaping sub-brackets 15 can be driven by the first Y-axis driving device to perform reciprocating motion along the glue straightening, peeling and shaping main bracket 10.
[0058] A straightening and peeling glue shaping component 11 is provided on one side of the straightening and peeling glue shaping sub-bracket 15 .
[0059] like Figure 5 and Figure 6 As shown, the straightening and peeling glue shaping component 11 includes a lifting drive component 110 arranged on the straightening and peeling glue shaping sub-bracket 15. The lifting drive component 110 is a commonly used servo motor plus ball screw mechanism. Since the above drive mechanism is a mature existing technology, its specific structure is not repeated here.
[0060] A mounting seat 111 is provided at the movable end of the lifting drive assembly 110 , and a straightening and peeling assembly 112 and a shaping assembly 116 are provided at the bottom of the mounting seat 111 .
[0061] The glue straightening and tearing assembly 112 comprises a glue straightening and tearing lifting cylinder 1121 , on the end plate of which a glue straightening and tearing clamping cylinder 1122 is provided, and on the two clamping blocks of the glue straightening and tearing clamping cylinder 1122 , clamping claw assemblies 113 are provided oppositely.
[0062] In this embodiment, Figure 7 As shown in , the clamping jaw assembly 113 includes a clamping jaw seat 1130 , at the bottom end of which a first mounting portion 1131 and a second mounting portion 1132 are provided, a straightening jaw 1133 is detachably provided on the first mounting portion 1131 , and a glue clamping jaw 1134 is detachably provided on the second mounting portion 1132 .
[0063] A glue suction component 114 with an adsorption function and a straightening retaining frame 115 are provided on the cylinder body of the straightening and peeling glue clamping cylinder 1122.
[0064] The glue suction assembly 114 includes a mounting plate 1140 , on which a lifting cylinder 1141 is disposed, on the piston rod of the lifting cylinder 1141 a suction cup fixing block 1142 is disposed, on the suction cup fixing block 1142 a suction cup 1143 is disposed, and the suction cup 1143 is disposed between two opposite glue clamping claws 1134 .
[0065] In this embodiment, in order to improve the stability of the lifting and lowering of the suction cup 1143, a guide column 1144 is provided on the mounting plate 1140, and a guide sleeve 1145 is provided on the suction cup fixing block 1142, and the guide column 1144 and the guide sleeve 1145 are slidably matched.
[0066] A clamping plane is provided at the end of the clamping claw 1134 , and two opposite clamping claws 1134 are in contact through the clamping plane.
[0067] The straightening retainer 115 includes a retainer support block 1150 arranged on the cylinder body of the straightening and tearing rubber clamping cylinder 1122, and a retaining block 1151 is arranged at the bottom of the retainer support block 1150, and the retaining block 1151 is arranged between two oppositely arranged straightening claws 1133.
[0068] During operation, the straightening and peeling glue clamping cylinder 1122 is started to open the two straightening claws 1133 and the glue clamping claws 1134. Then, the straightening and peeling glue lifting cylinder 1121 drives the straightening claws 1133 and the glue clamping claws 1134 to reach above the lead end 101 of the bus bar 100, and the straightening and peeling glue clamping cylinder 1122 is started again to make the straightening claws 1133 move toward each other and scoop up the lead end 101; then, the straightening and peeling glue clamping cylinder 1122 is started to open the two straightening claws 1133 and the glue clamping claws 1134. The straight claw 1133 and the glue clamping claw 1134 are opened, and the first X-axis drive device and the first Y-axis drive device cooperate to move the suction cup 1143 to the top of the tape 102, and the lifting cylinder 1141 drives the suction cup 1143 to descend. After the suction cup 1143 sucks up the tape 102, the glue clamping claw 1134 clamps the tape 102, and the lifting cylinder 1121 drives the glue clamping claw 1134 to rise, and the tape 102 is torn off the lead end 101 of the bus bar 100.
[0069] like Figure 4 As shown, a glue tray 16 is also provided on the frame, and the adhesive tape 102 torn off by the glue clamping claw 1134 is placed in the glue tray 16 .
[0070] like Figure 6 and Figure 7 As shown, the shaping assembly 116 includes a shaping lifting cylinder 1161, a shaping clamping cylinder 1162 is provided on the end plate of the shaping lifting cylinder 1161, a shaping claw mounting seat 1163 is relatively provided on the two clamping blocks of the shaping clamping cylinder 1162, and a shaping claw 1164 is detachably provided at the bottom end of the shaping claw mounting seat 1163.
[0071] A shaping retaining frame is also provided on the cylinder body of the shaping clamping cylinder 1162; the shaping retaining frame includes vertical retaining blocks 1165 relatively arranged on both sides of the shaping clamping cylinder 1162, and a transverse retaining block 1166 is provided between the two vertical retaining blocks 1165, and the transverse retaining block 1166 is arranged between the two relatively arranged shaping claws 1164.
[0072] In the above structure, since the straightened lead end 101 may have an inconsistent standing angle problem, for the sake of safety, in order to facilitate the smooth insertion of the lead end 101 into the junction box, the straightened lead end 101 is shaped, and the shaping lifting cylinder 1161 can drive the transverse holding block 1166 and the shaping claw 1164 to achieve lifting. After the shaping clamping cylinder 1162 is opened, the transverse holding block 1166 is moved to the top of the lead end 101, and then the shaping clamping cylinder 1162 is started to make the shaping claw 1164 impact the transverse holding block 1166 from the opposite direction, so that the lead ends 101 on both sides of the transverse holding block 1166 are fitted to the transverse holding block 1166, so that the shape of the lead end 101 is regular, thereby achieving the purpose of shaping.
[0073] like Figure 6As shown, in order to achieve accurate operation of the lead end 101, a first position detection device 17 is provided on the other side of the straightening and peeling glue shaping sub-bracket 15, and the first position detection device 17 includes a camera support frame 170 connected to the straightening and peeling glue shaping sub-bracket 15 through a lifting drive assembly, and a first visual camera 171 is provided on the camera support frame 170.
[0074] Before operating the lead end 101, it is first precisely positioned by the first position detection device 17 to improve the processing accuracy.
[0075] like Figures 8 to 11 As shown, the photovoltaic panel gluing device 2 includes a main gluing bracket 20 that reciprocates along the X-axis direction of the frame, and one or more gluing components 21 that can reciprocate along the Y-axis direction of the main gluing bracket 20 are provided on the main gluing bracket 20. In this embodiment, the number of the gluing components 21 is three, and the three gluing components 21 are all driven by the second Y-axis driving device.
[0076] The main glue bracket 20 can be set on the frame of the assembly machine or independently set on the frame of the photovoltaic panel glue device 2. The main glue bracket 20 is usually driven by a synchronous wheel and synchronous belt mechanism driven by a servo motor, which is called the second X-axis drive device here. Since the second X-axis drive device is a mature existing technology, its specific structure is not described here.
[0077] The gluing component 21 includes a gluing sub-bracket 210, on which a second position detection device 27 is provided at the side of the gluing sub-bracket 210 away from the straightening and glue tearing shaping component 11; a second lifting drive component 22 is provided at the side of the gluing sub-bracket 210 opposite to the second position detection device 27, and an automatic gluing machine 23 is provided at the movable end of the second lifting drive component 22.
[0078] In this embodiment, the second position detection device 27 includes a second visual camera 271 driven by a lifting drive device; the second lifting drive component 22 is a servo motor plus a ball screw mechanism, and a slide rail slider structure is added to maintain the stability of the lifting; the second lifting drive component 22 and the automatic glue machine 23 are both mature existing technologies, and their specific structures are not repeated here.
[0079] Before gluing, accurate positioning is first performed by the second position detection device 27 to ensure the accuracy of gluing.
[0080] The junction box preparation and loading device 3 comprises a junction box preparation device 31 and a junction box loading device 32 .
[0081] like Fig.12 and Fig.14As shown, the junction box preparation device 31 includes a first manipulator 311, and a wired junction box warehouse 312 is respectively provided on both sides along the Y-axis direction of the first manipulator 311, a conveyor belt device 313 is provided on one side of the wired junction box warehouse 312 along the moving direction of the photovoltaic panel, a wired junction box positioning seat 314 is provided at the output end of the conveyor belt device 313, and a wireless junction box supply device 315 is also provided on the outer side of the conveyor belt device 313.
[0082] A recovery frame 316 is provided on a side of the first robot 311 away from the conveyor belt device 313 .
[0083] The wired junction box warehouse 312 can be used to hold wired junction boxes. Usually, the wired junction boxes in the wired junction box warehouse 312 are neatly arranged in multiple layers. The first manipulator 311 can sequentially grab the wired junction boxes and place them on the conveyor belt device 313, which will continuously convey them. If the wired junction boxes in the wired junction box warehouse 312 become messy, the first manipulator 311 will place the messy wired junction boxes into the recycling box 316.
[0084] The wired junction box positioning seat 314 includes a positioning bracket 3140, which has a top mounting plate 3141, a fixed block 3142 is provided on the top mounting plate 3141, a avoidance groove 3143 is opened on the top mounting plate 3141, a junction box positioning slide rail 3144 is provided on the top mounting plate 3141, a junction box positioning slider 3145 is provided on the junction box positioning slide rail 3144, the junction box positioning slider 3145 is placed in the avoidance groove 3143, a movable block 3146 is provided on the junction box positioning slider 3145, and a slider driving cylinder (not shown) for driving the junction box positioning slider 3145 is provided at the bottom of the top mounting plate 3141, and the movable block 3146 cooperates with the fixed block 3142 to realize the positioning of the junction box.
[0085] Furthermore, a first opening 31421 matching the shape of one end of the wired junction box is provided on the fixed block 3142, a second opening 31461 matching the shape of the other end of the junction box is provided on the movable block 3146, a first straight guide bevel 31422 is provided at the entrance of the first opening 31421, and a second straight guide bevel 31462 is provided at the entrance of the second opening 31461. The provision of the first straight guide bevel 31422 and the second straight guide bevel 31462 enables the wired junction box to be positioned smoothly.
[0086] like Figure 15 to Figure 16 As shown, the junction box loading device 32 includes two second manipulators 321 arranged opposite to each other. The first manipulator 311 and the second manipulator 321 are both mature existing technologies, and their specific structures are not repeated here. A junction box handling component 322 is provided at the execution end of the second manipulator 321.
[0087] The junction box carrying assembly 322 includes a second clamping bracket 323 , and a set of second clamping assemblies 324 capable of clamping the junction box are respectively provided at both ends of the second clamping bracket 323 .
[0088] In this embodiment, the second clamping assembly 324 includes a gear 3240 rotatably provided on the second clamping bracket 323, and a first rack 3241 and a second rack 3242 are slidably provided on the second clamping bracket 323. The first rack 3241 and the second rack 3242 are slidably provided on the second clamping bracket 323 through a slide rail and a slider. The first rack 3241 and the second rack 3242 are arranged relatively parallel to each other, and the first rack 3241 and the second rack 3242 are both engaged with the gear 3240. A rack driving device is provided on the second clamping bracket 323, which can drive the first rack 3241 or the second rack 3242 to translate.
[0089] In this embodiment, the rack drive device is a cylinder 3243 , the cylinder body of the cylinder 3243 is disposed on the second clamping bracket 323 , and the piston rod of the cylinder 3243 is connected to the first rack 3241 or the second rack 3242 .
[0090] A second clamping plate 3244 is disposed on each of the first rack 3241 and the second rack 3242 . A second clamping block 3245 is disposed at the end of each of the two second clamping plates 3244 . The two second clamping blocks 3245 are arranged opposite to each other.
[0091] In this embodiment, the second clamping blocks 3245 are made of PU, and anti-slip grooves are provided on two opposite surfaces of the two second clamping blocks 3245 .
[0092] In the above structure, the first manipulator 311 can arrange the wired junction boxes in the wired junction box warehouse 312 neatly on the conveyor belt device 313, which is convenient for transportation and positioning in the next step. Then the first manipulator 311 places the wired junction boxes on the conveyor belt device 313 on the wired junction box positioning seat 314, which is convenient for the second manipulator 321 to grab. The wireless junction box supply device 315 can automatically and continuously convey the wireless junction boxes to a position convenient for the second manipulator 321 to grab. The two second manipulators 321 arranged relatively to each other can grab the wired junction boxes and / or wireless junction boxes according to the actual needs of the processed solar panels. In this solution, the two second manipulators 321 can be started at the same time, and multiple wired junction boxes and / or wireless junction boxes can be grabbed at the same time and placed on the photovoltaic panels, so that the processing efficiency is high.
[0093] After the junction box is placed on the photovoltaic panel by the junction box loading device 32, the lead end 101 of the busbar 100 passes through the junction box. The next step is to bend the lead end 101 again so that the lead end 101 contacts the electrode in the junction box. Therefore, a busbar bending device needs to be set up.
[0094] The busbar bending device 4 includes a bending sub-bracket, and the structure and driving mode of the bending sub-bracket are consistent with the structure and driving mode of the gluing main bracket 20. Its specific structure is not repeated here. A third position detection device is provided on one side of the bending sub-bracket, and a bending lifting device is provided on the side of the bending sub-bracket opposite to the third position detection device, and a cylinder fixed bracket 40 is provided at the movable end of the bending lifting device.
[0095] like Fig.17 As shown, a bidirectional cylinder 41 is provided at the bottom of the cylinder fixing bracket 40 , and bending blocks 42 are provided on the push plates at both ends of the bidirectional cylinder 41 .
[0096] In this embodiment, the bending block 42 is an L-shaped structure. When the bidirectional cylinder 41 is activated, the bending block 42 moves sideways to bend the lead end 101 .
[0097] The lead end 101 of the busbar 100 cannot be tightly connected to the electrode in the junction box only by the busbar bending device 4, so the lead end 101 needs to be tightly connected to the junction box by a busbar pressing device before welding.
[0098] like Figures 18 to 21 As shown, the busbar pressing and welding device 5 includes a pressing and welding main bracket 50 that reciprocates along the X-axis direction of the frame. The pressing and welding main bracket 50 is driven by an existing servo motor plus a screw nut, and then guided by a slide rail and slider structure to achieve reciprocating motion of the pressing and welding main bracket 50 along the X-axis direction of the frame.
[0099] The clamping and welding main bracket 50 is provided with one or more clamping and welding sub-brackets 51 which can be arranged along the Y-axis direction of the clamping and welding main bracket 50; in this embodiment, the number of the clamping and welding sub-brackets 51 is three, and the clamping and welding sub-brackets 51 are driven by a gear rack structure, that is: a rack is arranged on the clamping and welding main bracket 50, a driving motor is arranged on the clamping and welding sub-bracket 51, and a gear is arranged on the output shaft of the driving motor, and the gear and the rack are engaged to realize the drive.
[0100] A busbar pressing device 52 is provided on one side of the pressing and welding sub-bracket 51 close to the junction box preparation and loading device 3 .
[0101] In this embodiment, the busbar pressing device 52 includes a pressing device mounting plate 520 that can be lifted and lowered on one side of the pressing and welding sub-bracket 51 , and one or more pressing assemblies 521 are provided on the pressing device mounting plate 520 .
[0102] like Fig.19As shown, the clamping assembly 521 includes a clamping drive device. In this embodiment, the clamping drive device is a double-rod cylinder 5210. An upper mounting block 5211 is provided at the driving end of the double-rod cylinder 5210. One or more sliding rods 5212 are provided on the upper mounting block 5211. The sliding rod 5212 includes a fixed end and a sliding end. The fixed end is fixedly connected to the upper mounting block 5211. An upper stopper 5213 is provided at the top of the sliding end. A lower mounting block 5214 is slidably provided on the sliding end. A lower stopper 5215 is provided at the bottom end of the sliding end to prevent the lower mounting block 5214 from escaping from the sliding end. An elastic member is provided between the upper stopper 5213 and the lower mounting block 5214. In this embodiment, the elastic member is a spring 5216. A clamping block 5217 is provided at the bottom of the lower mounting block 5214 so that the lower mounting block 5214 can contact the wiring terminal of the bus bar when it moves downward to a certain position.
[0103] The double-rod cylinder 5210 starts to drive the clamping block 5217 downward, and the bottom surface of the clamping block 5217 contacts the lead end 101 of the busbar 100. Due to the provision of the spring 5216, the lower mounting block 5214 and the clamping block 5217 have a certain elastic stroke, which will not deform the lead end 101 and the electrode in the junction box, and can ensure that sufficient clamping force is applied to the lead end 101, so that the lead end 101 is tightly connected to the electrode in the junction box.
[0104] like Figure 20 to Figure 21 As shown, a welding assembly 53 for welding the lead end 101 of the bus bar and the electrode in the junction box is provided on the other side of the pressing and welding sub-bracket 51 .
[0105] The welding assembly 53 includes a transfer table 530, a welding wire segment supply assembly 531, a welding wire segment transport assembly 532 and a clamping welding assembly 533. The welding wire segment transport assembly 532 transports the welding wire segment provided by the welding wire segment supply assembly 531 to the transfer table 530. The clamping welding assembly 533 transports the welding wire on the transfer table 530 into the junction box and energizes it to weld the lead end 101 of the bus bar 100 to the electrode in the junction box.
[0106] The welding wire segment supply assembly 531 includes a welding wire reel support 5311, which can be used to support the rolled welding wire, and the rolled welding wire can be rotated on the welding wire reel support 5311. Usually, the welding wire is tin wire.
[0107] A welding wire extraction assembly 5312 is provided on one side of the welding wire reel support 5311, and the welding wire extraction assembly 5312 includes a welding wire extraction motor 53120, and a driving wheel 53121 is provided on the output shaft of the welding wire extraction motor 53120. The welding wire extraction assembly 5312 also includes a driven wheel 53122 arranged below the driving wheel 53121, and there is a gap between the driving wheel 53121 and the driven wheel 53122 for the welding wire to pass through. An elastic ring is provided on the driving wheel 53121, and the driving wheel 53121 and the driven wheel 53122 can clamp the welding wire. When the welding wire extraction motor 53120 is started, the welding wire extraction assembly 5312 can pull out the welding wire from the welding wire roll on the welding wire reel support 5311.
[0108] The welding wire extraction assembly 5312 also includes a wire outlet nozzle 53123, through which the welding wire can be continuously output.
[0109] A welding wire cutter 5313 is provided at the output end of the welding wire extraction component 5312. The welding wire cutter 5313 can intermittently cut the welding wire. The welding wire cutter 5313 is a mature existing technology, and its specific structure is not described here.
[0110] like Fig. 20 and Fig. 22 As shown, the welding wire segment transport assembly 532 includes a welding wire segment translation device 5321, on which a welding wire segment lifting device 5322 is provided, at the output end of the welding wire segment lifting device 5322 a welding wire segment transport frame 5323 is provided, at the bottom end of the welding wire segment transport frame 5323 a welding wire segment clamping cylinder 5324 is provided, and on the welding wire segment clamping cylinder 5324 a welding wire segment clamping claw 5325 is provided.
[0111] In this embodiment, the welding wire segment translation device 5321 is a driving structure of a servo motor with a synchronous wheel and a synchronous belt; the welding wire segment lifting device 5322 is a driving structure of a servo motor with a ball screw. The welding wire segment translation device 5321 and the welding wire segment lifting device 5322 are both mature existing technologies, and their specific structures are not described here; the welding wire segment clamping cylinder 5324 adopts a clamping cylinder, and two welding wire segment clamping claws 5325 are respectively installed on the welding wire segment clamping cylinder 5324. The opening and closing of the welding wire segment clamping cylinder 5324 can achieve the clamping of the tin wire segment, and then through the cooperation of the welding wire segment lifting device 5322 and the welding wire segment translation device 5321, the tin wire segment cut by the welding wire cutting machine 5313 can be transported to the transfer platform 530 by the welding wire segment supply assembly 531.
[0112] The clamping welding assembly 533 includes a clamping welding lifting device 5330 disposed on the pressing and welding sub-bracket 51. In this embodiment, the clamping welding lifting device 5330 is a driving structure of a servo motor and a ball screw. The clamping welding lifting device 5330 is a mature prior art, and its specific structure is not repeated here.
[0113] A clamping welding head 5331 is provided at the output end of the clamping welding lifting device 5330. The clamping welding head 5331 includes a clamping welding portion 5332. A welding wire receiving groove 5333 with an inverted trapezoidal cross section is provided at the bottom of the clamping welding portion 5332. Since the tin wire is soft, when the clamping welding portion 5332 is pressed down, the tin wire can be inserted into the welding wire receiving groove 5333. The clamping welding portion 5332 is used as a welding head. When the clamping welding portion 5332 clamps the welding wire and moves it to the junction box to contact the lead terminal 101 and the electrode in the junction box, the clamping welding portion 5332 is energized to melt the tin wire and weld the lead terminal 101 and the electrode together.
[0114] A working method of a junction box and photovoltaic panel automatic assembly machine, comprising the following steps:
[0115] S1. Straighten, peel and reshape the busbar. The specific steps are as follows: first straighten the lead end 101 of the busbar 100 on the photovoltaic panel through the straightening and peeling assembly 112, then remove the tape on the busbar 100 through the glue suction assembly 114 and the clamping jaw assembly 113; finally, reshape the lead end 101 of the busbar 100 through the shaping assembly 116.
[0116] The specific process is as follows: the straightening and peeling glue clamping cylinder 1122 is started to open the two straightening claws 1133 and the glue clamping claws 1134, then the straightening and peeling glue lifting cylinder 1121 drives the straightening claws 1133 and the glue clamping claws 1134 to reach above the lead end 101 of the bus bar 100, and the straightening and peeling glue clamping cylinder 1122 is started again to make the straightening claws 1133 move towards each other and scoop up the lead end 101; then, the straightening and peeling glue clamping cylinder 1122 is started to open the two straightening claws 1133 and the glue clamping claws 1134. The straightening claw 1133 and the glue clamping claw 1134 are opened, and the first X-axis drive device and the first Y-axis drive device cooperate to move the suction cup 1143 to the top of the tape 102, and the lifting cylinder 1141 drives the suction cup 1143 to descend. After the suction cup 1143 sucks up the tape 102, the glue clamping claw 1134 clamps the tape 102, and the straightening and tearing lifting cylinder 1121 drives the glue clamping claw 1134 to rise, and the tape 102 is torn off the lead end 101 of the busbar 100.
[0117] S2, gluing the photovoltaic panel, the specific steps are: positioning the part to be glued by the second position detection device 27 of the photovoltaic panel gluing device 2, and then gluing the bus bar 100 below the lead end 101 by the automatic glue machine.
[0118] S3, junction box preparation and loading, the specific steps are: prepare the wired junction box and the wireless junction box first by the junction box preparation device 31 and the junction box loading device 32, and position the wired junction box and the wireless junction box at a predetermined position by the first manipulator 311; transport the wired junction box and the wireless junction box to the photovoltaic panel as needed by the second manipulator 321, so that the lead end 101 of the bus bar 100 passes through the bottom of the wired junction box and the wireless junction box and penetrates into the wired junction box and the wireless junction box.
[0119] The specific process is as follows: the first manipulator 311 can neatly arrange the wired junction boxes in the wired junction box warehouse 312 onto the conveyor belt device 313 to facilitate transportation and positioning in the next step, and then the first manipulator 311 places the wired junction boxes on the conveyor belt device 313 on the wired junction box positioning seat 314 to facilitate the grabbing of the second manipulator 321, and the wireless junction box supply device 315 can automatically and continuously convey the wireless junction boxes to a position convenient for the second manipulator 321 to grab; the two second manipulators 321 arranged opposite to each other can grab the wired junction boxes and / or wireless junction boxes according to the actual needs of the processed solar panels.
[0120] S4, busbar bending, specifically: bending the lead end 101 of the busbar 100 by the bending block 42 of the busbar bending device, so that the lead end 101 contacts the electrodes in the wired junction box and the wireless junction box.
[0121] S5. Busbar pressing and welding, specifically: first, the lead end 101 of the busbar 100 is pressed onto the electrodes in the wired junction box and the wireless junction box by the busbar pressing device, and then the welding wire provided by the welding wire segment supply component 531 is transported to the transfer table 530 by the welding wire segment transport component 532, and the clamping welding component 533 transports the welding wire on the transfer table 530 into the junction box and energizes to melt the welding wire, and the lead end 101 of the busbar 100 is welded together with the electrodes in the wired junction box and the wireless junction box.
[0122] In this step, the welding wire needs to be extracted from the coil placed on the welding wire reel support 5311 by the welding wire extraction component 5312, and cut by the welding wire cutting machine 5313 after the welding wire is clamped by the welding wire segment transport component 532.
[0123] The above scheme, by arranging a busbar straightening, glue tearing and shaping device 1, a photovoltaic panel gluing device 2, a junction box preparation and loading device 3, a busbar bending device 4 and a busbar pressing and welding device 5 along the conveying direction of the photovoltaic panel, can continuously process the photovoltaic panel, and multiple junction boxes can be assembled at the same workstation at the same time, thereby improving the installation efficiency; the scheme can also install wired junction boxes and wireless junction boxes at the same time, thereby improving the adaptability of the machine.
Claims
1. A junction box and photovoltaic panel automatic assembly machine, comprising a frame, characterized in that: On the frame, along the production line for conveying photovoltaic panels, there are arranged a busbar straightening, glue tearing and shaping device, a photovoltaic panel glue applying device, a junction box preparation and feeding device, a busbar bending device and a busbar pressing and welding device; The busbar straightening and peeling shaping device comprises a straightening and peeling shaping main bracket that reciprocates along the X-axis direction of the frame, and one or more straightening and peeling shaping components that can reciprocate along the Y-axis direction of the straightening and peeling shaping main bracket are provided on the straightening and peeling shaping main bracket; and at the same time, the connection between one or more junction boxes and the busbar in the Y-axis direction is processed; The photovoltaic panel glue application device comprises a glue application main support that reciprocates along the X-axis direction of the frame, and one or more glue application components that can reciprocate along the Y-axis direction of the glue application main support are arranged on the glue application main support; The junction box preparation and loading device includes a junction box preparation device for placing the wired junction box and the wireless junction box at a predetermined position and a junction box loading device for placing the wired junction box and / or the wireless junction box on the photovoltaic panel; The busbar bending device comprises a bending main bracket that reciprocates along the X-axis direction of the frame, and one or more bending assemblies are arranged on the bending main bracket along the Y-axis direction of the bending main bracket, and the bending assemblies bend the busbars extending into the junction box; The busbar pressing and welding device comprises a pressing and welding main bracket that reciprocates along the X-axis direction of the frame, a pressing and welding sub-bracket that can be set along the Y-axis direction of the pressing and welding main bracket is provided on the pressing and welding main bracket, a busbar pressing device that presses the bent busbar and the electrode in the junction box is provided on one side of the pressing and welding sub-bracket; and a welding assembly that welds the busbar and the electrode in the junction box together is provided on the other side of the pressing and welding sub-bracket; The glue straightening and tearing shaping component comprises a glue straightening and tearing shaping sub-bracket, and a glue straightening and tearing shaping component is arranged on one side of the glue straightening and tearing shaping sub-bracket; A first position detection device is provided on the other side of the straightening and peeling plastic shaping sub-bracket; The glue straightening and tearing shaping assembly comprises a first lifting and driving assembly arranged on the glue straightening and tearing shaping sub-bracket, a mounting seat is arranged at the movable end of the first lifting and driving assembly, and a glue straightening and tearing assembly and a shaping assembly are arranged at the bottom of the mounting seat; The glue straightening and tearing assembly comprises a glue straightening and tearing lifting cylinder, a glue straightening and tearing clamping cylinder is arranged on the end plate of the glue straightening and tearing lifting cylinder, and a clamping claw assembly is arranged on two clamping blocks of the glue straightening and tearing clamping cylinder in opposite directions; A glue suction component with adsorption function and a straightening retainer are provided on the cylinder body of the straightening and tearing glue shaping clamping cylinder; The clamping jaw assembly comprises a clamping jaw seat, a first mounting portion and a second mounting portion are arranged at the bottom end of the clamping jaw seat, a straightening jaw is detachably arranged on the first mounting portion, and a rubber clamping jaw is detachably arranged on the second mounting portion.
2. The automatic assembly machine for junction boxes and photovoltaic panels according to claim 1, characterized in that: The glue suction assembly comprises a mounting plate, a lifting cylinder is arranged on the mounting plate, a suction cup fixing block is arranged on the piston rod of the lifting cylinder, a suction cup is arranged on the suction cup fixing block, and the suction cup is arranged between two opposite glue clamping claws; The shaping assembly comprises a shaping lifting cylinder, a shaping clamping cylinder is arranged on the end plate of the shaping lifting cylinder, shaping claw mounting seats are arranged oppositely on two clamping blocks of the shaping clamping cylinder, and a shaping claw is detachably arranged at the bottom end of the shaping claw mounting seat; The first position detection device comprises a camera support frame fixedly connected to the straightening and glue-tearing shaping sub-bracket, and a visual camera is arranged on the camera support frame.
3. The automatic assembly machine for junction boxes and photovoltaic panels according to claim 1, characterized in that: The gluing assembly includes a gluing sub-bracket, on which a second position detection device is provided on the side of the gluing sub-bracket away from the straightening and glue tearing and shaping assembly; a second lifting drive assembly is provided on the side of the gluing sub-bracket opposite to the second position detection device, and an automatic gluing machine is provided at the movable end of the second lifting drive assembly.
4. The automatic assembly machine for junction boxes and photovoltaic panels according to claim 1, characterized in that: The junction box preparation device includes a first manipulator, and a wired junction box bin is provided on each side along the Y-axis direction of the first manipulator, a conveyor belt device is provided on one side of the wired junction box bin along the traveling direction of the photovoltaic panel, a wired junction box positioning seat is provided at the output end of the conveyor belt device, and a wireless junction box supply device is also provided on the outer side of the conveyor belt device; The junction box loading device comprises a second manipulator, and a junction box handling assembly is provided at the execution end of the second manipulator; The first manipulator arranges the wired junction boxes in the wired junction box neatly on the conveyor belt device, and also places the wired junction boxes on the conveyor belt device on the wired junction box positioning seat; the second manipulator places the wired junction box on the wired junction box positioning seat and / or the wireless junction box on the wireless junction box supply device onto the solar panel, so that the lead end of the bus bar passes into the junction box.
5. The automatic assembly machine for junction boxes and photovoltaic panels according to claim 4, characterized in that: The wired junction box positioning seat comprises a positioning bracket, the positioning bracket has a top mounting plate, a fixed card block is arranged on the top mounting plate, a position avoidance groove is opened on the top mounting plate, a junction box positioning slide rail is arranged on the top mounting plate, a junction box positioning slider is arranged on the junction box positioning slide rail, the junction box positioning slider is placed in the position avoidance groove, a movable card block is arranged on the junction box positioning slider, a slider driving cylinder for driving the junction box positioning slider is arranged at the bottom of the top mounting plate, and the movable card block cooperates with the fixed card block to realize the positioning of the junction box; The junction box handling assembly comprises a second clamping bracket, and a set of second clamping assemblies capable of clamping the junction box are respectively provided at both ends of the second clamping bracket; The second clamping assembly includes a gear rotatably arranged on the second clamping bracket, a first rack and a second rack are slidably arranged on the second clamping bracket, the first rack and the second rack are arranged relatively parallel, the first rack and the second rack are both meshed with the gear, and a rack driving device that can drive the first rack or the second rack to translate is provided on the second clamping bracket; second clamping plates are provided on the first rack and the second rack, second clamping blocks are provided at the ends of the two second clamping plates, and the two second clamping blocks are arranged opposite to each other.
6. The automatic assembly machine for junction boxes and photovoltaic panels according to claim 1, characterized in that: The busbar bending device includes a bending sub-bracket, a third position detection device is provided on one side of the bending sub-bracket, a bending lifting device is provided on the side of the bending sub-bracket opposite to the third position detection device, a cylinder fixing bracket is provided at the movable end of the bending lifting device, a bidirectional cylinder is provided at the bottom of the cylinder fixing bracket, and a bending block is provided on the push plate of the bidirectional cylinder.
7. The automatic assembly machine for junction boxes and photovoltaic panels according to claim 1, characterized in that: The busbar pressing and welding device comprises a pressing and welding main bracket that reciprocates along the X-axis direction of the frame, and a pressing and welding sub-bracket that can be set along the Y-axis direction of the pressing and welding main bracket is provided on the pressing and welding main bracket; A busbar pressing device for pressing the bent busbar and the electrode in the junction box is provided on one side of the pressing and welding sub-bracket; a welding assembly for welding the busbar and the electrode in the junction box is provided on the other side of the pressing and welding sub-bracket; The busbar clamping device comprises a clamping device mounting plate capable of lifting and lowering on one side of the clamping and welding sub-bracket, and one or more clamping assemblies are arranged on the clamping device mounting plate; The clamping assembly includes a clamping drive device, an upper mounting block is provided at the driving end of the clamping drive device, and one or more sliding rods are provided on the upper mounting block, the sliding rod includes a fixed end and a sliding end, the fixed end is fixedly connected to the upper mounting block, an upper stopper is provided at the top of the sliding end, a lower mounting block is slidably provided on the sliding end, a lower stopper is provided at the bottom end of the sliding end to prevent the lower mounting block from escaping from the sliding end, an elastic member is provided between the upper stopper and the lower mounting block, and a clamping block is provided at the bottom of the lower mounting block so that the lower mounting block can contact the wiring terminal of the bus bar when it descends to a certain position.
8. The automatic assembly machine for junction boxes and photovoltaic panels according to claim 7, characterized in that: The welding assembly includes a transfer table, a welding wire segment supply assembly, a welding wire segment transport assembly and a clamping welding assembly. The welding wire segment transport assembly transports the welding wire segment provided by the welding wire segment supply assembly to the transfer table, and the clamping welding assembly transports the welding wire on the transfer table to the junction box and energizes the welding.
9. A working method of the junction box and photovoltaic panel automatic assembly machine as claimed in any one of claims 1 to 8, characterized in that: The following steps are involved: S1, straightening and shaping the busbar, specifically: straightening the lead end of the busbar on the photovoltaic panel by straightening and peeling the glue assembly, then removing the tape on the busbar by the glue suction assembly and the clamping claw assembly; finally shaping the lead end of the busbar by the shaping assembly; S2, applying glue to the photovoltaic panel, specifically: positioning the part to be glued by using the second position detection device of the photovoltaic panel glue applying device, and then applying glue on the bus bar below the lead end by using the automatic glue applying machine; S3, junction box preparation and loading, specifically: prepare the wired junction box and the wireless junction box first by using the junction box preparation and loading device, and position the wired junction box and the wireless junction box at a predetermined position by using the first manipulator; transport the wired junction box and the wireless junction box to the photovoltaic panel as needed by using the second manipulator, so that the lead end of the bus bar passes through the bottom of the wired junction box and the wireless junction box and penetrates into the wired junction box and the wireless junction box; S4, busbar bending, specifically: bending the lead end of the busbar by a bending block of the busbar bending device, so that the lead end contacts the electrodes in the wired junction box and the wireless junction box; S5. Busbar pressing and welding, specifically: first, the lead end of the busbar is pressed onto the electrodes in the wired junction box and the wireless junction box by the busbar pressing device, and then the welding wire provided by the welding wire segment supply assembly is transported to the transfer table by the welding wire segment transport assembly, and the welding wire on the transfer table is transported to the junction box by the clamping welding assembly and energized, and the lead end of the busbar is welded together with the electrodes in the wired junction box and the wireless junction box.
Citation Information
Patent Citations
Automatic installing machine for junction box
CN218123931U
Photovoltaic junction box lead processing junction box mounting and welding method and all-in-one machine
CN117047271A