Connecting device for prefabricated steel beam and prefabricated plate of prefabricated building

Through the design of prefabricated channel steel beams and beam plate connection clamps, and the use of mechanical choke force and sealant gaskets, the problem of cumbersome and high cost of connecting plates and beams in the existing technology is solved, and efficient assembly, disassembly and strength requirements are achieved.

CN119221649AActive Publication Date: 2024-12-31GUANGZHOU UNIVERSITY

Patent Information

Application Number
CN202411747410.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-02
Publication Date
2024-12-31
Estimated Expiration
2044-12-02

AI Technical Summary

Technical Problem

In existing prefabricated buildings, a large number of bolts and expansion agents are used to connect the plates and beams, which leads to high construction costs, high difficulty and inconvenient disassembly, making it impossible to achieve rapid assembly and disassembly.

Method used

The design of prefabricated channel steel beams and beam plate connection clamps is adopted, and the first bolt and the occlusal stripe block are used to achieve mechanical occlusal force, combined with sealant gaskets to replace expansion agents, simplify the connection structure and avoid the use of a large number of bolts and expansion agents.

Benefits of technology

The high strength, bending and shear resistance of the prefabricated channel steel beams and beam slabs are achieved, reducing construction costs and difficulty, and supporting rapid assembly and disassembly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119221649A_ABST
    Figure CN119221649A_ABST
Patent Text Reader

Abstract

The invention discloses a connecting device for a prefabricated steel beam and a prefabricated plate of a prefabricated building, and relates to the technical field of connection of building structures, the connecting device comprises a prefabricated steel channel beam, a beam plate connecting clamp and the prefabricated plate, and one side of the beam plate connecting clamp is provided with an upper mounting groove and a lower mounting groove corresponding to a top plate and a bottom plate of the prefabricated steel channel beam; the upper mounting groove and the lower mounting groove are connected with the top plate and the bottom plate through convenient connecting pieces correspondingly, each convenient connecting piece comprises two first bolts located at the end of the prefabricated channel steel beam and at least one meshing stripe, and a connecting groove corresponding to a prefabricated plate is formed in the other side of the beam plate connecting clamp. The connecting grooves are connected with the prefabricated slabs through a plurality of second bolts and nuts. According to the connecting device for the prefabricated steel beam and the prefabricated plate of the prefabricated building, the use of a large number of bolts and expanding agents is avoided, the construction cost and difficulty are reduced, the connecting strength between the prefabricated steel beam and the prefabricated plate is guaranteed through the beam plate connecting clamp, and rapid assembly and disassembly are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building structure connection, and in particular to a connection device for prefabricated steel beams and prefabricated panels used in assembled buildings. Background Art

[0002] Housing industrialization is the industrialized production of housing components, which are then assembled on site, and the integration of housing decoration. The long-term goal of housing industrialization is to mass-produce housing in an industrialized and socialized way, shorten the construction period, improve the labor productivity of housing production, and improve the economic benefits of the entire industry and enterprises on the basis of improving labor productivity.

[0003] Prefabricated frame structures have the advantages of high rigidity, high bearing capacity, good integrity, etc., and they are fast to construct, save materials and labor, and are one of the effective ways to achieve residential industrialization. The basic idea of ​​prefabricated frame structures is to divide the frame structure into columns, beams and floor slabs, prefabricate the columns, beams and floor slabs in the prefabricated component factory, and then transport them to the construction site for installation and connection to form a prefabricated frame structure.

[0004] In order to ensure the connection strength between the plate and the beam, the existing technology generally uses a large number of bolts and bolt expansion agents, which is not conducive to achieving efficient assembly and disassembly of prefabricated buildings. Among them, the bolts in each hole must be reinforced with expansion agents, and the number of bolts themselves is large, which makes the construction complicated; disassembly is also inconvenient. After the expansion agent is applied, it will become impossible to disassemble and can only be forced to be pushed down; a large amount of bolt expansion agents, the number of bolt holes and the amount of concrete used will result in high costs and increased construction difficulty.

[0005] In order to solve the above problems, it is necessary to propose a new type of connecting device between the plate and the beam. Summary of the invention

[0006] The purpose of the present invention is to provide a connection device for prefabricated steel beams and prefabricated panels for assembled buildings, which avoids the use of a large number of bolts and expansion agents, thereby reducing construction costs and construction difficulty, and utilizes beam-slab connection clamps to ensure the connection strength between the prefabricated steel beams and the prefabricated panels, while enabling rapid assembly and disassembly.

[0007] To achieve the above-mentioned objectives, the present invention provides a connection device for prefabricated steel beams and prefabricated panels for assembled buildings, comprising a prefabricated channel steel beam, a beam-to-panel connection clamp and a prefabricated panel, one side of the beam-to-panel connection clamp is provided with an upper mounting groove and a lower mounting groove corresponding to the top plate and the bottom plate of the prefabricated channel steel beam, the upper mounting groove and the lower mounting groove are respectively connected to the top plate and the bottom plate through a convenient connection piece, the convenient connection piece comprises two first bolts located at the ends of the prefabricated channel steel beam and at least one bite stripe, the other side of the beam-to-panel connection clamp is provided with a connection groove corresponding to the prefabricated panel, the connection groove is connected to the prefabricated panel through a plurality of second bolts and nuts.

[0008] Preferably, the engaging stripes include a first stripe block and a second stripe block that are relatively arranged, the first stripe block is located on the top plate and the bottom plate of the prefabricated channel steel beam, the first stripe block includes a plurality of grooves evenly distributed along the length direction of the prefabricated channel steel beam, and the bottom of the grooves is provided with evenly distributed engaging teeth, the second stripe block is located in the upper mounting groove and the lower mounting groove, the second stripe block includes a plurality of convex strips evenly distributed along the length direction of the beam-plate connecting clamp, and the convex strips are provided with engaging grooves that are compatible with the engaging tooth structure.

[0009] Preferably, two bite stripes are provided and are located between two of the first bolts.

[0010] Preferably, the upper mounting groove and the lower mounting groove are both provided with first sealing rubber pads arranged alternately with the first striped blocks, the first sealing rubber pad is provided with a first slot adapted to the top plate or the bottom plate structure, and the upper mounting groove, the lower mounting groove, the prefabricated channel steel beam and the first sealing rubber pad located at the end are all provided with first connecting holes arranged corresponding to the first bolts.

[0011] Preferably, a second sealing pad is provided in the connecting groove, a second slot adapted to the prefabricated plate structure is provided on the second sealing pad, and a second connecting hole corresponding to the second bolt is provided on the connecting groove, the second sealing pad and the prefabricated plate.

[0012] Preferably, five second bolts are provided and are evenly distributed along the length direction of the prefabricated plate.

[0013] Preferably, the prefabricated panels are made of concrete.

[0014] Therefore, the present invention adopts a connection device of prefabricated steel beams and prefabricated panels for assembled buildings with the above structure, which has the following beneficial effects: 1. The prefabricated channel steel beam and the beam-slab connecting clamp are easy to assemble and disassemble and have high connection strength: the present invention utilizes the first bolts at both ends of the prefabricated channel steel beam to achieve a stable connection between the prefabricated channel steel beam and the beam-slab connecting clamp, and utilizes the mechanical bite force generated between the first stripe block on the prefabricated channel steel beam and the second stripe block on the beam-slab connecting clamp to ensure that the prefabricated channel steel beam and the beam-slab connecting clamp have sufficient bending resistance and shear resistance, thereby further increasing the connection strength between the prefabricated channel steel beam and the beam-slab connecting clamp.

[0015] 2. The connection sealing between the prefabricated channel steel beam, the beam-slab connecting clamp and the prefabricated plate is good: the present invention utilizes the first sealing rubber pad and the second sealing rubber pad to replace the expansion agent to fill the gap between the prefabricated plate and the beam-slab connecting clamp, and the prefabricated channel steel beam and the beam-slab connecting clamp, thereby ensuring the sealing of the entire connection device.

[0016] 3. The application of the beam-slab connection clamp in the present invention avoids the use of a large number of bolts and expansion agents, thereby reducing construction costs and construction difficulty, while achieving rapid assembly and disassembly of prefabricated buildings.

[0017] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 An exploded view of an embodiment of a connection device for prefabricated steel beams and prefabricated panels for prefabricated buildings according to the present invention; Figure 2 It is a structural schematic diagram of an embodiment of bite stripes; Figure 3 The present invention is a schematic structural diagram of an embodiment of a connection state of a connection device for prefabricated steel beams and prefabricated panels used in prefabricated buildings.

[0019] Reference numerals 1. Prefabricated channel steel beam; 2. Beam-slab connecting clamp; 3. Prefabricated slab; 4. Upper mounting groove; 5. Lower mounting groove; 6. First connecting hole; 7. First stripe block; 71. Groove; 72. Engaging teeth; 8. Second stripe block; 81. Raised strip; 82. Engaging groove; 9. Connecting groove; 10. Second connecting hole; 11. First sealing pad; 12. First slot; 13. Second sealing pad; 14. Second slot. DETAILED DESCRIPTION

[0020] The technical solution of the present invention is further described below through the accompanying drawings and embodiments.

[0021] Example like Figure 1-3As shown, a connection device for prefabricated steel beams and prefabricated panels for assembled buildings includes a prefabricated channel steel beam 1, a beam-slab connection clamp 2 and a prefabricated panel 3, and the prefabricated panel 3 is made of concrete. An upper mounting groove 4 and a lower mounting groove 5 are arranged corresponding to the top plate and the bottom plate of the prefabricated channel steel beam 1 on one side of the beam-slab connection clamp 2, and the upper mounting groove 4 and the lower mounting groove 5 are respectively connected to the top plate and the bottom plate through a convenient connection piece. The convenient connection piece includes two first bolts located at the ends of the prefabricated channel steel beam 1 and at least one bite stripe. In this embodiment, two bite stripes are provided and located between the two first bolts.

[0022] The bite stripes include a first stripe block 7 and a second stripe block 8 that are arranged opposite to each other. The first stripe block 7 is located on the top plate and the bottom plate of the prefabricated channel steel beam 1. The first stripe block 7 includes a plurality of grooves 71 that are evenly distributed along the length direction of the prefabricated channel steel beam 1, and the groove bottom of the groove 71 is provided with evenly distributed bite teeth 72. The second stripe block 8 is located in the upper mounting groove 4 and the lower mounting groove 5, and the second stripe block 8 includes a plurality of convex strips 81 that are evenly distributed along the length direction of the beam-slab connecting clamp 2. The convex strip 81 is provided with a bite groove 82 that is compatible with the bite tooth 72 structure. The matching connection between the bite tooth 72 and the bite groove 82 can generate a mechanical bite force to ensure that the prefabricated channel steel beam 1 and the beam-slab connecting clamp 2 have sufficient bending resistance and shear resistance.

[0023] The upper mounting groove 4 and the lower mounting groove 5 are both provided with a first sealing rubber pad 11 arranged alternately with the first stripe block 7, and the first sealing rubber pad 11 is provided with a first slot 12 adapted to the top plate or bottom plate structure. The upper mounting groove 4, the lower mounting groove 5, the prefabricated channel steel beam 1 and the first sealing rubber pad 11 located at the end are all provided with a first connecting hole 6 arranged corresponding to the first bolt. In this embodiment, the first connecting hole 6 on the prefabricated channel steel beam 1 is a hole groove with an internal thread, and the first connecting hole 6 on the upper mounting groove 4, the lower mounting groove 5 and the first sealing rubber pad 11 is a through hole, so that the first bolt can be screwed into the hole groove to achieve the tightening and fixing of the first bolt. After the first bolt is installed in the first connecting hole 6 and tightened, the first sealing rubber pad 11 can be pressed between the upper mounting groove 4 and the top plate, or between the lower mounting groove 5 and the bottom plate, filling the gap between the prefabricated channel steel beam 1 and the beam-plate connecting clamp 2.

[0024] The other side of the beam-slab connection clamp 2 is provided with a connection groove 9 corresponding to the prefabricated plate 3, and the connection groove 9 is connected to the prefabricated plate 3 through a plurality of second bolts and nuts. In this embodiment, five second bolts are provided and are evenly distributed along the length direction of the prefabricated plate 3. A second sealing pad 13 is provided in the connection groove 9, and a second slot 14 adapted to the structure of the prefabricated plate 3 is provided on the second sealing pad 13. The connection groove 9, the second sealing pad 13 and the prefabricated plate 3 are all provided with a second connection hole 10 corresponding to the second bolt. In this embodiment, all the second connection holes 10 are through holes, and nuts are needed to fix them after the second bolts are installed. After the second bolt is installed in the second connection hole 10 and the nut is tightened, the second sealing pad 13 can be pressed between the connection groove 9 and the prefabricated plate 3 to fill the gap between the prefabricated plate 3 and the beam-slab connection clamp 2.

[0025] When in use, the prefabricated channel steel beam 1, the beam-slab connecting clamp 2 and the prefabricated plate 3 in the device can be processed in advance by the factory. When assembling, first install the first sealing rubber pad 11 into the upper installation groove 4 and the lower installation groove 5 of the beam-slab connecting clamp 2, and then insert the top plate and the bottom plate of the prefabricated channel steel beam 1 into the corresponding first slot 12 of the first sealing rubber pad 11, and then screw the first bolt into the first connecting hole 6 and tighten it. After tightening, the first sealing rubber pad 11 is compacted, and the bite teeth 72 on the first stripe block 7 and the bite grooves 82 on the second stripe block 8 are tightened. Mechanical bite is achieved to ensure the sealing between the prefabricated channel steel beam 1 and the beam-slab connecting clamp 2 while achieving a stable connection between the two. Then, the second sealing pad 13 is installed in the connecting groove 9 of the beam-slab connecting clamp 2, and then the prefabricated panel 3 is inserted into the second slot 14 of the second sealing pad 13 and the second bolt is installed. After tightening the second bolt with a nut, a sealed connection and a stable connection between the prefabricated panel 3 and the beam-slab connecting clamp 2 can be achieved; when disassembling, only the first bolt and the second bolt need to be pulled out. After pulling out, the mechanical bite force will automatically loosen and the panel can be directly disassembled.

[0026] Therefore, the present invention adopts a connection device of prefabricated steel beams and prefabricated panels for prefabricated buildings with the above-mentioned structure, avoiding the use of a large number of bolts and expansion agents, thereby reducing construction costs and construction difficulty, and utilizing beam-slab connection clamps to ensure the connection strength between the prefabricated steel beams and the prefabricated panels, while enabling rapid assembly and disassembly.

[0027] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.

Claims

1. A connection device for prefabricated steel beams and prefabricated panels for assembled buildings, characterized in that: It includes a prefabricated channel steel beam, a beam-slab connecting clamp and a prefabricated plate. One side of the beam-slab connecting clamp is provided with an upper mounting groove and a lower mounting groove corresponding to the top plate and the bottom plate of the prefabricated channel steel beam. The upper mounting groove and the lower mounting groove are respectively connected to the top plate and the bottom plate through a convenient connecting piece. The convenient connecting piece includes two first bolts located at the ends of the prefabricated channel steel beam and at least one bite stripe. The other side of the beam-slab connecting clamp is provided with a connecting groove corresponding to the prefabricated plate. The connecting groove is connected to the prefabricated plate through a plurality of second bolts and nuts.

2. The connection device for prefabricated steel beams and prefabricated panels for prefabricated buildings according to claim 1, characterized in that: The bite stripes include a first stripe block and a second stripe block that are relatively arranged, the first stripe block is located on the top plate and the bottom plate of the prefabricated channel steel beam, the first stripe block includes a plurality of grooves evenly distributed along the length direction of the prefabricated channel steel beam, and the groove bottoms of the grooves are provided with evenly distributed bite teeth, the second stripe block is located in the upper mounting groove and the lower mounting groove, the second stripe block includes a plurality of convex strips evenly distributed along the length direction of the beam-plate connecting clamp, and the convex strips are provided with bite grooves that are compatible with the bite tooth structure.

3. The connection device for prefabricated steel beams and prefabricated panels for prefabricated buildings according to claim 2, characterized in that: The bite stripes are provided with two and are located between the two first bolts.

4. The connection device for prefabricated steel beams and prefabricated panels for assembled buildings according to claim 3, characterized in that: The upper mounting groove and the lower mounting groove are both provided with first sealing rubber pads arranged alternately with the first stripe blocks, the first sealing rubber pad is provided with a first slot adapted to the top plate or the bottom plate structure, and the upper mounting groove, the lower mounting groove, the prefabricated channel steel beam and the first sealing rubber pad located at the end are all provided with first connecting holes arranged corresponding to the first bolts.

5. The connection device for prefabricated steel beams and prefabricated panels for assembled buildings according to claim 4, characterized in that: A second sealing pad is provided in the connecting groove, a second slot adapted to the prefabricated plate structure is provided on the second sealing pad, and a second connecting hole corresponding to the second bolt is provided on the connecting groove, the second sealing pad and the prefabricated plate.

6. The connection device for prefabricated steel beams and prefabricated panels for assembled buildings according to claim 5, characterized in that: There are five second bolts which are evenly distributed along the length direction of the prefabricated plate.

7. The connection device for prefabricated steel beams and prefabricated panels for prefabricated buildings according to claim 6, characterized in that: The prefabricated panel is made of concrete.

Citation Information

Patent Citations

  • Fabricated GFRP pultruded-section-core-wood composite floor slab structure system

    CN106245837A

  • Connecting joint of steel beam and prefabricated floor slab

    CN115538675A

  • City utility tunnel pedestrian protection device

    CN206090609U

  • C-shaped hollow steel floor slab for constructional engineering

    CN215106411U

  • Composite beam using C-type built-up beam

    KR1020120028763A

Cited By

  • Bolt-free interlocking type beam and slab connecting device

    CN121110832A

  • A boltless interlocking beam-plate connection device

    CN121110832B

  • Beam-slab connecting structure and method for fabricated building

    CN121363276A

  • Beam-slab connecting structure and method for fabricated building

    CN121363276B