An automatic positioning system for quality inspection batches based on BIM+CIM technology

By adopting BIM+CIM technology automatic positioning system during the construction process, the engineering quality problems caused by information lag are solved, information accuracy and real-time data management are achieved, and inspection efficiency and project quality are improved.

CN119249110BActive Publication Date: 2025-04-22ZHONGKE WEIYI (SUZHOU) INTELLIGENT TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411072407.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2025-04-22
Estimated Expiration
2044-08-06

AI Technical Summary

Technical Problem

The existing technology has lagged information during construction, resulting in project quality and management problems.

Method used

The automatic positioning system of quality inspection batches based on BIM+CIM technology is adopted, and the integrated module, model data matching module, construction inspection module and inspection positioning module are constructed through model to achieve accurate acquisition and matching of building structure data, and timely discover and correct quality problems during the construction process.

Benefits of technology

It improves the accuracy of information and real-time data management during the construction process, ensures the accuracy and standardization of project quality, reduces the number and time of inspections, and improves inspection efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119249110B_ABST
    Figure CN119249110B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of building inspection, and specifically discloses an automatic positioning system for quality inspection batches based on BIM+CIM technology, comprising: acquiring building structure data, constructing a BIM under-construction building model based on the building structure data, and importing the BIM under-construction building model into a CIM data platform; performing data matching on the BIM under-construction building model based on building size data of the BIM under-construction building model and positioning data of the BIM under-construction building model in the CIM platform; acquiring a construction building inspection batch, obtaining positioning under the slow construction progress signal or abnormal construction material signal in the inspection batch based on a slow construction progress signal or abnormal construction material signal obtained by a construction building inspection in the inspection batch, constructing a building model through a BIM model, and performing inspection batch detection, thereby ensuring the standardization and uniformity of the construction building, and facilitating unified management and control of engineering quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building inspection, and in particular to an automatic positioning system for quality inspection batches based on BIM+CIM technology. Background Art

[0002] At present, advanced projects usually use BIM digital twins to collect data, unify and report, and regularly connect to regional, city, and provincial CIM management platforms. This is a systematic activity involving many factors such as personnel exchanges, transportation, material allocation, garbage removal, and surrounding safety. Data transmission between various links is generally reported and updated on a daily, weekly, or even longer cycle, which usually leads to information lags, which in turn leads to misjudgments and ultimately to problems such as project quality and management.

[0003] In order to solve the above problems, improve the accuracy of information of construction projects, realize real-time data management, and ensure the accuracy and quality requirements of information during the construction process, this application proposes an automatic positioning system for quality inspection batches based on BIM+CIM technology. Summary of the invention

[0004] The purpose of the present invention is to provide an automatic positioning system for quality inspection batches based on BIM+CIM technology to solve the problems in the above background.

[0005] The purpose of the present invention can be achieved by the following technical solutions:

[0006] An automatic positioning system for quality inspection batches based on BIM+CIM technology, comprising:

[0007] Model building integration module: used to obtain building structure data, build a BIM building model based on the building structure data, and import the BIM building model into the CIM data platform;

[0008] Model data matching module: Based on the building size data of the BIM building model under construction and the positioning data of the BIM building model under construction in the CIM platform, the BIM building model under construction is matched with data;

[0009] Construction inspection module: obtains the construction inspection batch and BIM model data, and inspects the buildings under construction in the inspection batch;

[0010] Inspection and positioning module: Based on the slow construction progress signal or abnormal construction material signal obtained by the inspection of the construction building in the inspection batch, the BIM under-construction building model corresponding to the construction building is obtained, and then the coordinate point data of the BIM under-construction building model in the CIM data platform is obtained to obtain the positioning under the slow construction progress signal or abnormal construction material signal in the inspection batch.

[0011] As a further solution of the present invention: the building structure data includes: building material data under construction, building size data under construction, related data under construction and construction expected value;

[0012] The size data of the building under construction includes: the length value LZ and the width value KZ of the building under construction; and also includes the vertex angle value θ on the horizontal plane of the building under construction i ; Where i is 1, 2, 3, ...;

[0013] The expected construction value includes the expected building height value YQH within the construction period T t ; Wherein, t is a time point within the construction period T, which can be any day or week within the construction period, etc.;

[0014] Data on materials for buildings under construction include the actual progress rate of materials used in the building;

[0015] The under-construction related data includes: the adjacent completed building model of the building component model; specifically includes the coordinate point data of the completed building model on the CIM data platform;

[0016] Among them, the CIM data platform includes the currently completed building data, namely the built data, wherein the built data is the built building size data and the coordinate point data of the built building.

[0017] As a further solution of the present invention: the step of importing the BIM building model under construction into the CIM data platform includes:

[0018] In the CIM platform, a horizontal plane coordinate system is constructed with the center point of the first building model under construction as the coordinate origin; wherein the horizontal plane coordinate system is constructed based on the horizontal plane in the CIM data platform;

[0019] Randomly select n edge points of the BIM building model under construction, and obtain the distance values ​​from the n edge points to any two adjacent feature points of the completed building; where n≥2;

[0020] Based on the distance value between the edge point of the BIM building under construction and the characteristic point of the completed building, the edge point of the BIM building under construction model is located; and the relative position of the BIM building under construction model between other completed building models in the CIM platform is confirmed.

[0021] As a further solution of the present invention: the step of performing data matching on the BIM building model under construction includes:

[0022] Obtaining the corner coordinate point data of the BIM building under construction model, wherein the corner coordinate point data is the vertex coordinates on the horizontal plane of the building under construction where the BIM building under construction contacts the horizontal plane in the CIM data platform;

[0023] At the same time, based on the vertex coordinates, the model coordinate length value MLz and the model coordinate width value MKz of the BIM building under construction in the CIM data platform are calculated;

[0024] Then, the plane length deviation value lcp of the BIM building model under construction is calculated by lcp=|MLz-LZ|;

[0025] Then, the plane width deviation value kcp of the BIM building model under construction is calculated by kcp=|MKz-KZ|;

[0026] Then, based on the BIM building model under construction and the horizontal plane in the CIM data platform, the vertex angle value on the horizontal plane of the building under construction is marked as ω i ; Where i is 1, 2, 3, ...;

[0027] Then pass Calculate and obtain the plane qualified representation value Pass of the BIM building model under construction in the CIM data platform;

[0028] Compare the plane qualified characterization value Pass with the model deviation threshold Pmax;

[0029] If the plane qualified representation value Pass is less than or equal to the model deviation threshold Pmax; a BIM model positioning qualified signal is obtained;

[0030] If the plane qualified characterization value Pass is greater than the model deviation threshold Pmax, a BIM model positioning deviation signal is obtained.

[0031] As a further solution of the present invention: the steps of inspecting the buildings under construction in the inspection batch include:

[0032] Based on the model building integration module and the model data matching module, several BIM building models under construction are constructed, and the BIM building models under construction are marked as j, where j is 1, 2, 3, etc.;

[0033] Based on the height value HZ of the building under construction of the BIM building under construction model, obtain the construction data of any time t within the construction cycle time value T of the building under construction;

[0034] Among them, the construction data of the building at time t includes: the height value of the building HZ t At the same time, obtain the expected building height value YQH in the BIM building model under construction at time t within the construction cycle time value T t ; Calculate the construction height progress deviation rate Hcp at construction time t t ;

[0035] Determine the construction height progress deviation rate Hcp at construction time t tIs it greater than zero? And get a qualified construction progress signal;

[0036] Under the qualified construction progress signal, calculate the expected material progress rate CNL in the BIM building model under construction at time t t ;

[0037] Get the actual progress rate CL of materials used in the BIM building model under construction at time t within the construction cycle time value T t ; Calculate the construction material progress deviation rate Ccp when the construction time t is obtained t ;

[0038] Then based on the construction material progress deviation rate Ccp at construction time t t and construction building height progress deviation rate Hcp t ; by ylh t =|Ccp t -Hcpt|Calculate the construction progress material stability value ylh at construction time t t ;

[0039] Then the progress material stability value ylh t Compare with the progress material deviation value Jhy; obtain the qualified signal of construction materials.

[0040] As a further solution of the present invention: Calculate the construction height progress deviation rate Hcp at construction time t t .

[0041] As a further solution of the present invention: if the construction height progress deviation rate Hcp t If the construction height progress Hcp is greater than or equal to zero, a qualified construction progress signal is generated; t Less than zero, generating a slow construction progress signal.

[0042] As a further solution of the present invention: Calculate the construction material progress deviation rate Ccp at construction time t t .

[0043] As a further solution of the present invention: by CNL t =a×HZ t + b Calculate the expected progress rate CNL of materials used in the BIM building model at time t within the construction cycle time value T t ; Among them, a is the material coefficient of the construction building height, and b is the correction value for the impact of the construction building height.

[0044] As a further solution of the present invention: if the progress material stability value ylh tIf it is less than or equal to the progress material deviation value Jhy, a qualified signal for construction materials will be generated;

[0045] If the progress material is stable value ylh t If it is greater than or equal to the progress material deviation value Jhy, a construction material abnormality signal will be generated.

[0046] Beneficial effects of the present invention:

[0047] In the present invention, the BIM model is combined with the CIM platform, and the coordinate points of the BIM model are located in the CIM platform to ensure the accuracy of the coordinate points of the BIM model, which can better ensure the positioning accuracy of the inspection batch during inspection;

[0048] By inspecting the inspection batches, quality problems in the production process can be discovered and corrected in a timely manner to ensure that the project quality meets the standards. Random inspections of construction buildings within the inspection batch can reduce the number and time of inspections and improve inspection efficiency. The building model can be constructed through the BIM model, and inspection batches can be tested to ensure the standardization and uniformity of the construction buildings, which facilitates unified management and control of project quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The present invention will be further described below in conjunction with the accompanying drawings.

[0050] Figure 1 is a system block diagram of the present invention;

[0051] Figure 2 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION

[0052] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0053] Embodiment 1

[0054] See also Figure 1 As shown, the present invention is an automatic positioning system for quality inspection batches based on BIM+CIM technology, comprising:

[0055] Model building integration module: obtain building structure data, and build a BIM building model based on the building structure data, and then import the BIM building model into the CIM data platform;

[0056] Specific:

[0057] Building structure data includes: building material data under construction, building size data under construction, related data under construction, and expected construction value;

[0058] The size data of the building under construction includes: the length value LZ and the width value KZ of the building under construction; and also includes the vertex angle value θ on the horizontal plane of the building under construction i ; Where i is 1, 2, 3, ...;

[0059] The expected construction value includes the expected building height value YQH within the construction period T t ; Wherein, t is a time point within the construction period T, which can be any day or week within the construction period, etc.;

[0060] Data on materials for buildings under construction include the actual progress rate of materials used in the building;

[0061] The under-construction related data includes: the adjacent completed building model of the building component model; specifically includes the coordinate point data of the completed building model on the CIM data platform;

[0062] Among them, the CIM data platform includes the currently completed building data, namely the built data, wherein the built data is the built building size data and the coordinate point data of the built building;

[0063] First, a horizontal plane coordinate system is constructed in the CIM platform with the center point of the first building model under construction as the coordinate origin; wherein the horizontal plane coordinate system is constructed based on the horizontal plane in the CIM data platform;

[0064] Randomly select n edge points of the BIM building model under construction, and obtain the distance values ​​from the n edge points to any two adjacent feature points of the completed buildings; where n≥2, when determining the location of the BIM building model under construction, the location of the model can be determined by locating the two edge points; the more edge points there are, the more accurate the location of the BIM building model under construction;

[0065] It should be noted that the built building feature points are special points on the built building, such as the endpoints of the built building;

[0066] Therefore, the position of the BIM under-construction building model can be realized based on the distance between any two or more edge points and adjacent feature points of the built model;

[0067] Then, based on the distance value between the edge point of the BIM building under construction and the feature point of the completed building, the edge point of the BIM building under construction model is located; thus, the relative position of the BIM building under construction model between other completed building models in the CIM platform can be confirmed;

[0068] Model data matching module: Based on the building size data of the BIM building model under construction and the positioning data of the BIM building model under construction in the CIM platform, the BIM building model under construction is matched with data;

[0069] Specifically include:

[0070] Obtaining the corner coordinate point data of the BIM building under construction model, wherein the corner coordinate point data is the vertex coordinates on the horizontal plane of the building under construction where the BIM building under construction contacts the horizontal plane in the CIM data platform;

[0071] At the same time, based on the vertex coordinates, the model coordinate length value MLz and the model coordinate width value MKz of the BIM building under construction in the CIM data platform are calculated;

[0072] Then, the plane length deviation value lcp of the BIM building model under construction is calculated by lcp=|MLz-LZ|;

[0073] Then, the plane width deviation value kcp of the BIM building model under construction is calculated by kcp=|MKz-KZ|;

[0074] Then, based on the BIM building model under construction and the horizontal plane in the CIM data platform, the vertex angle value on the horizontal plane of the building under construction is marked as ω i ; Where i is 1, 2, 3, ...;

[0075] Then pass Calculate and obtain the plane qualified representation value Pass of the BIM building model under construction in the CIM data platform;

[0076] Compare the plane qualified characterization value Pass with the model deviation threshold Pmax;

[0077] If the plane qualified representation value Pass is less than or equal to the model deviation threshold Pmax; a BIM model positioning qualified signal is obtained;

[0078] If the plane qualified representation value Pass is greater than the model deviation threshold Pmax, a BIM model positioning deviation signal is obtained, and the BIM building model under construction needs to be repositioned;

[0079] By verifying and calculating the size data of the BIM building model under construction in the CIM platform, the data matching positioning deviation of the BIM building model under construction can be measured to ensure the accuracy of the BIM building model under construction in the CIM platform, so as to ensure the accuracy of data calculation during the inspection process of the inspection batch;

[0080] Construction inspection module: obtains the construction inspection batch and BIM model data, and inspects the buildings under construction in the inspection batch;

[0081] Specific:

[0082] Based on the model building integration module and the model data matching module, several BIM building models under construction are constructed, and the BIM building models under construction are marked as j, where j is 1, 2, 3, etc.;

[0083] Based on the height value HZ of the building under construction of the BIM building under construction model, obtain the construction data of any time t within the construction cycle time value T of the building under construction;

[0084] Among them, the construction data of the building at time t includes: the height value of the building HZ t At the same time, obtain the expected building height value YQH in the BIM building model under construction at time t within the construction cycle time value T t ;

[0085] pass Calculate the construction height progress deviation rate Hcp at construction time t t ;

[0086] Determine the construction height progress deviation rate Hcp at construction time t t Is it greater than zero?

[0087] If the construction height progress deviation rate Hcp t If it is greater than or equal to zero, a qualified construction progress signal is generated;

[0088] If the construction height progress Hcp t If it is less than zero, a slow construction progress signal is generated; at this time, the construction process should be reminded to ensure that the construction is completed on time;

[0089] With the construction progress qualified signal, through CNL t =a×HZ t + b Calculate the expected progress rate CNL of materials used in the BIM building model at time t within the construction cycle time value T t ; Among them, a is the material coefficient of the building height, and b is the correction value of the building height impact;

[0090] Get the actual progress rate CL of materials used in the BIM building model under construction at time t within the construction cycle time value T t ;

[0091] Then through Calculate the construction material progress deviation rate Ccp at construction time t t ;

[0092] Then based on the construction material progress deviation rate Ccp at construction time t tand construction building height progress deviation rate Hcp t ; by ylh t =|Ccp t -Hcp t |Calculate the stable value of the construction materials used in the construction progress at construction time t ylh t ;

[0093] Then the progress material stability value ylh t Compare with the progress material deviation value Jhy;

[0094] If the progress material is stable value ylh t If it is less than or equal to the progress material deviation value Jhy, a qualified signal for construction materials will be generated, and subsequent construction can continue;

[0095] If the progress material is stable value ylh t If the value is greater than or equal to the progress material deviation value Jhy, an abnormal signal of construction materials is generated, indicating that there are deviations in building height and construction materials during the construction process. At this time, it is necessary to measure and calculate the construction building or construction materials to ensure that the building reaches the safety and stability standards at the time t.

[0096] Inspection and positioning module: Based on the slow construction progress signal or abnormal construction material signal obtained by the construction building inspection in the inspection batch, the BIM under-construction building model corresponding to the construction building is obtained, and then the coordinate point data of the BIM under-construction building model in the CIM data platform is obtained, so as to obtain the positioning under the slow construction progress signal or abnormal construction material signal in the inspection batch.

[0097] Combining the BIM model with the CIM platform, locating the coordinate points of the BIM model in the CIM platform, ensuring the accuracy of the coordinate points of the BIM model, can better ensure the positioning accuracy of the inspection batch during inspection;

[0098] By inspecting the inspection batches, quality problems in the production process can be discovered and corrected in a timely manner to ensure that the project quality meets the standards. Random inspections of construction buildings within the inspection batch can reduce the number of inspections and inspection time, improve inspection efficiency, and build models of buildings through the BIM model and conduct inspections of inspection batches to ensure the standardization and uniformity of construction buildings, facilitating unified management and control of project quality.

[0099] Embodiment 2

[0100] Reference Figure 2 As shown in the figure, an automatic positioning method for quality inspection batches based on BIM+CIM technology:

[0101] include:

[0102] Step 01: Obtain building structure data, and build a BIM building model based on the building structure data. Then, import the BIM building model into the CIM data platform.

[0103] Step 02: Based on the building size data of the BIM building model under construction and the positioning data of the BIM building model under construction in the CIM platform, data matching is performed on the BIM building model under construction;

[0104] Verify and calculate the size data of the BIM building model under construction in the CIM platform, and measure the matching positioning deviation of the data of the BIM building model under construction to ensure the accuracy of the BIM building model under construction in the CIM platform, so as to ensure the accuracy of data calculation during the inspection process of the inspection batch;

[0105] Step 03: Obtain the construction inspection batch and BIM model data, inspect the buildings under construction in the inspection batch, measure and calculate the construction buildings or building materials, to ensure that the buildings reach the safety and stability standards at the time t;

[0106] Step 04: Based on the slow construction progress signal or abnormal construction material signal obtained from the construction building inspection in the inspection batch, the BIM under-construction building model corresponding to the construction building is obtained, and then the coordinate point data of the BIM under-construction building model in the CIM data platform is obtained to obtain the positioning of the slow construction progress signal or abnormal construction material signal in the inspection batch.

[0107] Random inspections of construction buildings within inspection batches can reduce the number of inspections and inspection time, improve inspection efficiency, construct building models through BIM models, and conduct inspections of inspection batches to ensure the standardization and uniformity of construction buildings, facilitating unified management and control of project quality.

[0108] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. An automatic positioning system for quality inspection batches based on BIM+CIM technology, characterized in that: include: Model building integration module: used to obtain building structure data, build a BIM building model based on the building structure data, and import the BIM building model into the CIM data platform; The building structure data includes: building material data under construction, building size data under construction, related data under construction and construction expected value; The size data of the building under construction includes: the length value LZ and the width value KZ of the building under construction; and also includes the vertex angle value θ on the horizontal plane of the building under construction i ; Where i is 1, 2, 3, ...; The expected construction value includes the expected building height value YQH within the construction period T t ; Wherein, t is a time point within the construction period T, which is any day or week within the construction period; Data on materials for buildings under construction include the actual progress rate of materials used in the building; The under-construction related data includes: the adjacent completed building model of the building component model; specifically includes the coordinate point data of the completed building model on the CIM data platform; Among them, the CIM data platform includes the currently completed building data, namely the built data, wherein the built data is the built building size data and the coordinate point data of the built building; Model data matching module: Based on the building size data of the BIM building model under construction and the positioning data of the BIM building model under construction in the CIM platform, the BIM building model under construction is matched with data; include: Obtain the corner coordinate point data of the BIM building model under construction, and calculate the model coordinate length value MLz and model coordinate width value MKz of the BIM building under construction in the CIM data platform; pass Calculate and obtain the plane length deviation value lcp of the BIM building model under construction; Then through Calculate and obtain the plane width deviation value kcp of the BIM building model under construction; Then, based on the BIM building model under construction and the horizontal plane in the CIM data platform, the vertex angle value on the horizontal plane of the building under construction is marked as ω i ; Where i is 1, 2, 3, ...; Then pass Calculate and obtain the plane qualified representation value Pass of the BIM building model under construction in the CIM data platform; Compare the plane qualified characterization value Pass with the model deviation threshold Pmax; obtain the BIM model positioning qualified signal; Construction inspection module: obtains the construction inspection batch and BIM model data, and inspects the buildings under construction in the inspection batch; The steps for inspecting the buildings under construction in the inspection lot include: Based on the model building integration module and the model data matching module, several BIM building models under construction are constructed, and the BIM building models under construction are marked as j, where j is 1, 2, 3, etc.; Based on the height value HZ of the building under construction of the BIM building under construction model, obtain the construction data of any time t within the construction cycle time value T of the building under construction; Among them, the construction data of the building at time t includes: the height value of the building HZ t At the same time, obtain the expected building height value YQH in the BIM building model under construction at time t within the construction cycle time value T t ; Calculate the construction height progress deviation rate Hcp at construction time t t ; Determine the construction height progress deviation rate Hcp at construction time t t Is it greater than zero? And get a qualified construction progress signal; Under the qualified construction progress signal, calculate the expected material progress rate CNL in the BIM building model under construction at time t t ; Get the actual progress rate CL of materials used in the BIM building model under construction at time t within the construction cycle time value T t ; Calculate the construction material progress deviation rate Ccp when the construction time t is obtained t ; Then based on the construction material progress deviation rate Ccp at construction time t t and construction building height progress deviation rate Hcp t ;pass Calculate the stable value of the construction material used for the construction of the building at construction time t t ; Then the progress material stability value ylh t Compare with the progress material deviation value Jhy; get the qualified signal of construction materials; Inspection and positioning module: Based on the slow construction progress signal or abnormal construction material signal obtained by the inspection of the construction building in the inspection batch, the BIM under-construction building model corresponding to the construction building is obtained, and then the coordinate point data of the BIM under-construction building model in the CIM data platform is obtained to obtain the positioning under the slow construction progress signal or abnormal construction material signal in the inspection batch.

2. According to the automatic positioning system of quality inspection batch based on BIM+CIM technology in claim 1, it is characterized in that: The steps to import the BIM building model into the CIM data platform include: In the CIM platform, a horizontal plane coordinate system is constructed with the center point of the first building model under construction as the coordinate origin; wherein the horizontal plane coordinate system is constructed based on the horizontal plane in the CIM data platform; Randomly select n edge points of the BIM building model under construction, and obtain the distance values ​​from the n edge points to any two adjacent feature points of the completed building; where n≥2; Based on the distance value between the edge point of the BIM building under construction and the characteristic point of the completed building, the edge point of the BIM building under construction model is located; and the relative position of the BIM building under construction model between other completed building models in the CIM platform is confirmed.

3. The automatic positioning system for quality inspection batches based on BIM+CIM technology according to claim 1 is characterized in that: Compare the plane qualified characterization value Pass with the model deviation threshold Pmax; If the plane qualified representation value Pass is less than or equal to the model deviation threshold Pmax; Obtain the BIM model positioning qualified signal; If the plane qualified characterization value Pass is greater than the model deviation threshold Pmax, a BIM model positioning deviation signal is obtained.

4. The automatic positioning system for quality inspection batches based on BIM+CIM technology according to claim 1 is characterized in that: pass Calculate the construction height progress deviation rate Hcp at construction time t t .

5. The automatic positioning system for quality inspection batches based on BIM+CIM technology according to claim 1 is characterized in that: If the construction height progress deviation rate Hcp t If the construction height progress Hcp is greater than or equal to zero, a qualified construction progress signal is generated; t Less than zero, generating a slow construction progress signal.

6. The automatic positioning system for quality inspection batches based on BIM+CIM technology according to claim 1 is characterized in that: pass Calculate the construction material progress deviation rate Ccp at construction time t t .

7. The automatic positioning system for quality inspection batches based on BIM+CIM technology according to claim 1 is characterized in that: pass Calculate the expected progress rate CNL of materials used in the BIM building model under construction at time t within the construction cycle time value T t ; Among them, a is the material coefficient of the construction building height, and b is the correction value for the impact of the construction building height.

8. The automatic positioning system for quality inspection batches based on BIM+CIM technology according to claim 1 is characterized in that: If the progress material is stable value ylh t If it is less than or equal to the progress material deviation value Jhy, a qualified signal for construction materials will be generated; If the progress material is stable value ylh t If it is greater than or equal to the progress material deviation value Jhy, a construction material abnormality signal will be generated.

Citation Information

Patent Citations

  • Rasterization technology-based similar building three-dimensional model simplification method and system

    CN110827402A

  • CIM technology-based construction project online multi-dimensional construction reporting cooperation system

    CN114417458A