Intelligent transportation scheduling system and method for rail transit equipment industry
Through the intelligent transportation scheduling system, the batch and loading and unloading order of goods in railway transportation is analyzed and optimized, and the problems of cargo detention and resource waste are solved, and transportation efficiency and resource utilization are improved.
Patent Information
- Application Number
- CN202411032910.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2025-01-03
AI Technical Summary
In railway transportation, cargo retention and resource waste at loading and unloading sites caused by instability in cargo volume and uneven distribution of human resources lead to low transportation efficiency and low resource utilization.
An intelligent transportation scheduling system was designed, including data acquisition module, transportation module, scheduling module and output module. By analyzing unloading information, detecting batches, predicting stacking, and adjusting plans, the batches and loading and unloading order of goods is optimized to ensure that the goods are timely. Arrive and reduce buildup.
It improves transportation efficiency and resource utilization. By optimizing the batch and loading and unloading order of goods, it reduces unloading pressure and human resource waste, and takes into account the cargo problems at the delivery and unloading locations.
Smart Images

Figure CN119250387A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of transportation management technology, and in particular to an intelligent transportation dispatching system and method for the rail transportation equipment industry. Background Art
[0002] The organization and command of daily subway transportation production is generally implemented by the dispatching organization established by the railway transportation department. Although the national railway transportation dispatching work has its own characteristics, its main contents include train operation and car allocation. Train operation refers to the command of train operation, and car allocation refers to the planning and organization of cargo loading and unloading, train operation, and traffic adjustment.
[0003] Since the development of railway transportation, train dispatchers will use dispatching telephones, train wireless dispatching telephones, etc. to continuously collect train operation information from the dispatching section under his command, and take corresponding operation adjustment measures according to the actual situation of train operation to ensure the reasonable operation of the train. However, due to the instability of the amount of cargo transported each time and the uneven distribution of human resources at different loading and unloading locations, a series of cargo transportation problems will still occur. Therefore, some railway dispatching systems have improved the dispatching system of cargo transportation, so that the manpower at each loading and unloading location and the cargo transportation volume between loading and unloading points are reasonably allocated. However, during railway transportation, there will still be a situation where there is too much cargo at one loading and unloading location, resulting in cargo detention, but there is no cargo loading and unloading at another loading and unloading location, resulting in a waste of human resources. Therefore, it is very necessary to design an intelligent transportation dispatching system and method for the rail transportation equipment industry with high transportation efficiency and high transportation resource utilization. Summary of the invention
[0004] The purpose of the present invention is to provide an intelligent transportation dispatching system and method for the rail transportation equipment industry to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: an intelligent transportation scheduling system and method for the rail transit equipment industry, including a data acquisition module, a transportation module, a scheduling module and an output module, the data acquisition module is used to collect relevant information of railway transportation; the transportation module is used to detect parameter indicators of railway transportation; the scheduling module analyzes the problems caused by the arrival of goods at different unloading locations; the output module is used to transmit the planning information to the mobilization personnel at the loading location.
[0006] According to the above technical solution, the transportation module includes a unloading information analysis module and a transportation batch detection module. The unloading information analysis module is used to obtain information about the target unloading location; the transportation batch detection module is used to detect cargo batches between the loading location and different unloading locations.
[0007] According to the above technical solution, the scheduling module includes a cargo batching module, a transportation planning module and a loading assessment module. The cargo batching module is used to analyze the cargo batches arriving at the same unloading location; the transportation planning module is used to predict the accumulation of cargo arriving at the unloading location and provide an adjustment plan; the loading assessment module is used to confirm the cargo storage situation at the shipping location and determine whether to implement the adjustment plan. The transportation planning module includes a cargo accumulation analysis submodule and a scheduling analysis submodule. The cargo accumulation analysis submodule is used to classify the accumulation of cargo at the unloading location; the scheduling analysis submodule is used to make adjustments to the detention of cargo at different loading and unloading locations.
[0008] According to the above technical solution, the output module includes a dispatching information adjustment module and a dispatching communication module. The dispatching information adjustment module is used to output cargo adjustment information for railway transportation; the dispatching communication module is used to transmit abnormal transportation and loading and unloading information to the dispatching personnel at the loading location.
[0009] According to the above technical solution, the intelligent transportation scheduling system mainly includes the following steps:
[0010] Step S1: The data acquisition module obtains the cargo information required to be transported at the loading location on the day, the human resource information at the unloading location, and the time information required from different loading locations to different unloading locations through the loading information collection module;
[0011] Step S2: The personnel at the loading location upload the transport volume and unloading location of the transported goods through the transport module. The unloading information analysis module analyzes the unloading time required for each unloading location and transmits the unloading information to the staff at the unloading location. The staff uploads the human resource information of the unloading location on that day. If the unloading information analysis module determines that the human resources are sufficient, the transport batch detection module detects the batches of goods between the current loading location and the target unloading location and returns the information to the staff at the loading location. Otherwise, the information on the shortage of personnel at the unloading location is transmitted to the dispatching communication module.
[0012] Step S3: The transportation planning module obtains the unloading status of the goods at the target unloading location within each cargo batch time period, obtains the time from different loading locations to the target unloading location through the cargo batching module, and controls the goods from different loading locations to arrive at the target unloading location at intervals;
[0013] Step S4: the cargo accumulation analysis submodule obtains the accumulation degree of X batches of cargo between the loading location and the unloading location at the unloading location, and predicts the cargo accumulation situation at the unloading location when the cargo at the current loading location arrives at the unloading location, and transmits the prediction information to the scheduling analysis submodule;
[0014] Step S5: the scheduling analysis submodule receives the forecast information of the cargo accumulation analysis submodule, analyzes the forecast situation and proposes different solutions to adjust the unloading situation at the unloading location according to different situations, and sends an adjustment request to the loading assessment module;
[0015] Step S6: The loading assessment module receives the adjustment request from the scheduling analysis submodule, obtains the accumulation of goods at each unloading location, and determines whether to adjust the shipment by detecting the storage volume of goods in the warehouse at the shipment location;
[0016] Step S7: The output module adjusts the loading information through the dispatch information adjustment module, and outputs it to the dispatch personnel at the loading location through the dispatch communication module.
[0017] According to the above technical solution, in step S2, when planning the loading of goods, the goods are arranged from near to far according to the location of the goods to be transported, and the unloading time t1, t2, ..., t of each batch of goods is calculated. n , total loading time The transportation information collection module is used to obtain the transportation time required for the goods from a loading location to different unloading locations, which is T1, T2, ..., T n , the time for the goods to travel from the point of shipment to the i-th loading and unloading location is T = T i +t; the next batch of goods is loaded immediately after loading at the loading location, and the inspection time of the same batch of goods The batch of goods between the loading location and the i-th unloading location Where X ≥ 2, and all times are in minutes.
[0018] According to the above technical solution, in step S3, the cargo batching module obtains the time required for the cargo to arrive at the same unloading location from a total of L loading locations within each cargo batch time period from the shortest to the longest, A1, A2, ..., A L , and calculate the arrival time difference of two adjacent batches of goods in total (L-1) ΔA1=A2-A1、ΔA2=A3-A2……ΔA L-1 =A L -A L-1 If the arrival time difference of the cth batch is less than 10 minutes and the arrival time difference of the (c+1)th batch is greater than 10 minutes, the delivery time of the (c+1)th batch of goods is delayed. minutes, where 1≤c≤L-2.
[0019] According to the above technical solution, in step S4, the unloading time of the cargo at the i-th unloading location is S1, S2, ... S from short to long. kThe transportation planning module sets the inspection time S of the same batch of goods as a batch time period, obtains the next batch time period, and it is expected that n1 vehicles of goods will arrive at the unloading location. The time for the next batch of n1 vehicles to arrive is D1, D2, ... D respectively from short to long. n1 , the cargo accumulation analysis submodule determines the accumulation degree M generated when subsequent cargo arrives. If S k ≥D1, it is determined that the subsequent unloading will not be affected, and the accumulation degree of the unloading location is set to 0; if D n1 <S1, it is judged that the subsequent unloading will result in complete accumulation, and the accumulation degree M of this point is set to 2; otherwise, it is judged that the subsequent unloading will result in partial accumulation, and the accumulation degree M of this point is set to 1.
[0020] According to the above technical solution, in step S5, the cargo accumulation analysis submodule sequentially obtains the accumulation degree generated when X batches of cargo arrive at the i-th unloading location, and the scheduling analysis submodule counts the total accumulation degree M of the unloading location when the current loading location arrives at the unloading location. 总 is the algebraic sum of the accumulation of X batches of cargo between the loading location and the i-th unloading location, where M 总 is an integer, if The normal amount of cargo to be loaded at the unloading location; if If the cargo at the unloading location is normally loaded, the unloading location is allowed to load more cargo at the unloading location. The limit of the amount of cargo loaded is the space generated by the cancellation of transportation at other unloading locations. 总 >X, it is determined that the accumulation degree of the place needs to be reduced, and the cargo loaded at the place is cancelled. The transportation planning module calculates the total accumulation degree M of the unloading place when the next cargo batch time period passes. 总 Is it lower than X? If it is lower than X, the cargo volume of the unloading location is loaded normally. Otherwise, the cargo loading of the location is cancelled and the total accumulation degree of the unloading location is M when the next cargo batch time period passes. 总 .
[0021] According to the above technical solution, in step S6, the loading assessment module prioritizes the loading of the stacking degree. and If there is still room for loading after unloading, the loading assessment module will assess the real-time storage volume Q of the cargo in the loading warehouse. If Q>(1+λ)Q1, then continue to load M. 总 > For cargo at unloading location X, the loading and unloading sequence is M 总Loading is done in order from small to large until the train reaches the load or stops when Q≤(1+λ)Q1, where λ is the maximum stacking rate of warehouse storage and Q1 is the normal storage capacity of the shipping location; if Q≤(1+λ)Q1, loading of goods is stopped and the goods are output through the output module according to the adjustment plan of the scheduling analysis submodule.
[0022] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention calculates the batches between the loading location and the unloading location through the transportation module, and the cargo batching module makes the cargo from different shipping locations arrive at the unloading location at different times as much as possible; the cargo accumulation analysis submodule analyzes the accumulation degree of the cargo at the unloading location, and the scheduling analysis submodule obtains an adjustment plan that is beneficial to reducing the unloading pressure at the unloading location through the accumulation degree of different unloading locations; the loading assessment module enables the maximum number of unloading locations to implement the adjustment plan while ensuring the normal storage capacity of the warehouse at the shipping location, taking into account the cargo problems at the shipping location and the unloading location. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0024] Figure 1 It is a schematic diagram of the system module composition of the present invention. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] Please refer to Figure 1 The present invention provides a technical solution: an intelligent transportation dispatching system and method for the rail transportation equipment industry, including:
[0027] Data acquisition module, transportation module, scheduling module and output module. The data acquisition module is used to collect relevant information of railway transportation; the transportation module is used to detect parameter indicators of railway transportation; the scheduling module analyzes the problems caused by the arrival of goods at different unloading locations; the output module is used to transmit planning information to the mobilization personnel at the loading location.
[0028] The present invention calculates the batches between the loading location and the unloading location through the transportation module, and the cargo batching module makes the cargo from different shipping locations arrive at the unloading location at different times as much as possible; the cargo accumulation analysis submodule analyzes the accumulation degree of the cargo at the unloading location, and the scheduling analysis submodule obtains an adjustment plan that is beneficial to reducing the unloading pressure at the unloading location through the accumulation degree of different unloading locations; the loading assessment module enables the maximum number of unloading locations to implement the adjustment plan while ensuring the normal storage capacity of the warehouse at the shipping location, thus taking into account the cargo problems at the shipping location and the unloading location.
[0029] The transportation module includes a unloading information analysis module and a transportation batch detection module. The unloading information analysis module is used to obtain information about the target unloading location; the transportation batch detection module is used to detect batches of goods between the loading location and different unloading locations.
[0030] The scheduling module includes a cargo batching module, a transportation planning module and a loading assessment module. The cargo batching module is used to analyze the cargo batches arriving at the same unloading location; the transportation planning module is used to predict the accumulation of cargo arriving at the unloading location and provide an adjustment plan; the loading assessment module is used to confirm the cargo storage situation at the shipping location and determine whether to implement the adjustment plan. The transportation planning module includes a cargo accumulation analysis submodule and a scheduling analysis submodule. The cargo accumulation analysis submodule is used to classify the accumulation of cargo at the unloading location; the scheduling analysis submodule is used to make adjustments to the detention of cargo at different loading and unloading locations.
[0031] The output module includes a dispatch information adjustment module and a dispatch communication module. The dispatch information adjustment module is used to output the cargo adjustment information of railway transportation; the dispatch communication module is used to transmit abnormal transportation and loading and unloading information to the dispatch personnel at the loading location.
[0032] In a preferred embodiment, the intelligent transportation scheduling system mainly includes the following steps:
[0033] Step S1: The data acquisition module obtains the cargo information required to be transported at the loading location on the day, the human resource information at the unloading location, and the time information required from different loading locations to different unloading locations through the loading information collection module;
[0034] Step S2: The personnel at the loading location upload the transport volume and unloading location of the transported goods through the transport module. The unloading information analysis module analyzes the unloading time required for each unloading location and transmits the unloading information to the staff at the unloading location. The staff uploads the human resource information of the unloading location on that day. If the unloading information analysis module determines that the human resources are sufficient, the transport batch detection module detects the batches of goods between the current loading location and the target unloading location and returns the information to the staff at the loading location. Otherwise, the information on the shortage of personnel at the unloading location is transmitted to the dispatching communication module.
[0035] Step S3: The transportation planning module obtains the unloading status of the goods at the target unloading location within each cargo batch time period, obtains the time from different loading locations to the target unloading location through the cargo batching module, and controls the goods from different loading locations to arrive at the target unloading location at intervals;
[0036] Step S4: the cargo accumulation analysis submodule obtains the accumulation degree of X batches of cargo between the loading location and the unloading location at the unloading location, and predicts the cargo accumulation situation at the unloading location when the cargo at the current loading location arrives at the unloading location, and transmits the prediction information to the scheduling analysis submodule;
[0037] Step S5: the scheduling analysis submodule receives the forecast information of the cargo accumulation analysis submodule, analyzes the forecast situation and proposes different solutions to adjust the unloading situation at the unloading location according to different situations, and sends an adjustment request to the loading assessment module;
[0038] Step S6: The loading assessment module receives the adjustment request from the scheduling analysis submodule, obtains the accumulation of goods at each unloading location, and determines whether to adjust the shipment by detecting the storage volume of goods in the warehouse at the shipment location;
[0039] Step S7: The output module adjusts the loading information through the dispatch information adjustment module, and outputs it to the dispatch personnel at the loading location through the dispatch communication module.
[0040] In step S2 of this embodiment, when planning the loading of goods, the goods are arranged from near to far according to the location of the goods to be transported, and the unloading time t1, t2, ..., t n , total loading time The transportation information collection module is used to obtain the transportation time required for the goods from a loading location to different unloading locations, which is T1, T2, ..., T n Without considering the waiting time for cargo to be loaded and unloaded at the unloading location, the time T = T i +t; If the loading location is adequately staffed, the next batch of goods will be loaded immediately after the loading is completed. The inspection time for the same batch of goods The batch of goods between the loading location and the i-th unloading location Where X ≥ 2, all times are in minutes. The loading time required at the loading point and the unloading time at the unloading point are approximately the same.
[0041] In step S3 of this embodiment, the cargo batching module obtains the time required for the cargo to arrive at the same unloading location from a total of L loading locations within each cargo batch time period from the shortest to the longest, A1, A2, ..., A L , and calculate the arrival time difference of two adjacent batches of goods in total (L-1) ΔA1=A2-A1、ΔA2=A3-A2……ΔA L-1 =A L -A L-1 If the arrival time difference of the cth batch is less than 10 minutes and the arrival time difference of the (c+1)th batch is greater than 10 minutes, the delivery time of the (c+1)th batch of goods is delayed. minutes, where 1≤c≤L-2.
[0042] The advantage of goods from different routes entering the loading and unloading site at different times during the same period of time is that it can reduce the maximum detention time of the same batch of goods. If a batch of goods that exceeds the current loading and unloading capacity enters the loading and unloading site at the same time, the goods that exceed the loading and unloading capacity need to wait for the loading and unloading of other goods to be completed before loading and unloading can begin. Entering the loading and unloading site in batches can complete the loading and unloading, and the later ones can start loading and unloading earlier. At the same time, it increases the ability to receive subsequent goods, and ensures to the greatest extent that the goods will not enter the same loading and unloading site in a short time.
[0043] In step S4 of this embodiment, when the cargo transportation is at a peak period, the cargo unloading time at the i-th unloading location is S1, S2, ..., S3 respectively from the shortest to the longest. k The transportation planning module sets the inspection time S of the same batch of goods as a batch time period, obtains the next batch time period, and it is expected that n1 vehicles of goods will arrive at the unloading location. The time for the next batch of n1 vehicles to arrive is D1, D2, ... D respectively from short to long. n1 , the cargo accumulation analysis submodule determines the accumulation degree M generated when subsequent cargo arrives. If S k ≥D1, it is determined that the subsequent unloading will not be affected, and the accumulation degree of the unloading location is set to 0; if D n1 <S1, it is judged that the subsequent unloading will result in complete accumulation, and the accumulation degree M of this point is set to 2; otherwise, it is judged that the subsequent unloading will result in partial accumulation, and the accumulation degree M of this point is set to 1.
[0044] When S k ≥D1, when the next batch of trucks arrives, the previous batch of goods has been unloaded, and the next batch of trucks can start unloading directly; when D n1 When <S1, after the next batch of trucks arrives, the previous batch of goods is still being unloaded. After the next batch of trucks arrives, all the trucks must wait, which will cause unloading backlog; in other cases, after a batch of trucks arrives, some trucks start unloading and some trucks need to wait.
[0045] Through the cargo accumulation analysis submodule, an unloading accumulation model for a single cargo batch time period is established, and the unloading conditions of cargo under different circumstances are classified to provide a basis for the subsequent shipment accumulation prediction at the loading location.
[0046] In step S5 of this embodiment, the cargo accumulation analysis submodule sequentially obtains the accumulation degree generated when X batches of cargo arrive at the i-th unloading location, and the scheduling analysis submodule counts the total accumulation degree M of the unloading location when the current loading location arrives at the unloading location. 总 is the algebraic sum of the accumulation of X batches of cargo between the loading location and the i-th unloading location, where M 总 is an integer, if The normal amount of cargo to be loaded at the unloading location; if If the cargo at the unloading location is normally loaded, the unloading location is allowed to load more cargo at the unloading location. The limit of the amount of cargo loaded is the space generated by the cancellation of transportation at other unloading locations. 总 >X, it is determined that the accumulation degree of the place needs to be reduced, and the cargo loaded at the place is cancelled. The transportation planning module calculates the total accumulation degree M of the unloading place when the next cargo batch time period passes. 总 Is it lower than X? If it is lower than X, the cargo volume of the unloading location is loaded normally. Otherwise, the cargo loading of the location is cancelled and the total accumulation degree of the unloading location is M when the next cargo batch time period passes. 总 .
[0047] With X, There are two measurement standards. X is the ideal situation that each unloading location has some accumulation as a reference. In this scenario, most unloading locations will have unloading accumulation, but under the guarantee of manpower at the unloading location, the task can be completed just in time without squeezing the unloading task. This is an ideal situation where most unloading locations have some accumulation and a few have no accumulation. In this scenario, the staff at the unloading location will not have a lot of idle time.
[0048] exist In the scope, the unloading location is transported at normal unloading intervals, and there will be no unloading accumulation or a lot of idle time; In the category, the unloading location lacks unloading tasks, which will generate a lot of idle time, which is abnormal during the peak period of cargo transportation. The cargo may be concentrated in a certain period of time in the future, and it is necessary to speed up the delivery to share the subsequent unloading pressure; in M 总>In the category of X, the unloading task at the unloading location is heavy, and the personnel at the unloading location cannot support long-term high-intensity unloading work. It is necessary to appropriately slow down the delivery frequency in subsequent deliveries to reduce the unloading pressure on the unloading personnel at the location.
[0049] In step S6 of this embodiment, the loading assessment module prioritizes the loading of the stacking degree. and If there is still room for loading after unloading, the loading assessment module will assess the real-time storage volume Q of the cargo in the loading warehouse. If Q>(1+λ)Q1, then continue to load M. 总 > For cargo at unloading location X, the loading and unloading sequence is M 总 Loading is done in order from small to large until the train reaches the load or stops when Q≤(1+λ)Q1, where λ is the maximum stacking rate of warehouse storage and Q1 is the normal storage capacity of the shipping location; if Q≤(1+λ)Q1, loading of goods is stopped and the goods are output through the output module according to the adjustment plan of the scheduling analysis submodule.
[0050] By analyzing the warehouse storage capacity at the loading location, the adjustment plan of the scheduling analysis submodule can be executed without affecting the maximum warehouse storage limit, helping the unloading locations with high loading and unloading pressure to reduce the unloading pressure. However, when the warehouse storage capacity exceeds the maximum value, the goods are sorted and loaded to ensure that as many unloading locations as possible reduce the unloading pressure.
[0051] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0052] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. Intelligent transportation dispatching system and method for rail transportation equipment industry, characterized by: It includes a data acquisition module, a transportation module, a scheduling module and an output module. The data acquisition module is used to collect relevant information of railway transportation; the transportation module is used to detect parameter indicators of railway transportation; the scheduling module analyzes the problems caused by the arrival of goods at different unloading locations; and the output module is used to transmit the planning information to the mobilization personnel at the loading location.
2. The intelligent transportation dispatching system and method for the rail transportation equipment industry according to claim 1 is characterized by: The transport module includes a cargo unloading information analysis module and a transport batch detection module. The cargo unloading information analysis module is used to obtain information about a target unloading location; the transport batch detection module is used to detect cargo batches from a loading location to different unloading locations.
3. The intelligent transportation dispatching system and method for the rail transportation equipment industry according to claim 2 is characterized by: The scheduling module includes a cargo batching module, a transportation planning module and a loading assessment module. The cargo batching module is used to analyze the cargo batches arriving at the same unloading location; the transportation planning module is used to predict the accumulation of cargo arriving at the unloading location and provide an adjustment plan; the loading assessment module is used to confirm the cargo storage situation at the shipping location and determine whether to implement the adjustment plan. The transportation planning module includes a cargo accumulation analysis submodule and a scheduling analysis submodule. The cargo accumulation analysis submodule is used to classify the accumulation of cargo at the unloading location; the scheduling analysis submodule is used to make adjustments to the detention of cargo at different loading and unloading locations.
4. The intelligent transportation dispatching system and method for the rail transportation equipment industry according to claim 3 is characterized by: The output module includes a dispatch information adjustment module and a dispatch communication module. The dispatch information adjustment module is used to output the cargo adjustment information of railway transportation; the dispatch communication module is used to transmit the transportation and loading and unloading information of abnormal conditions to the dispatch personnel at the loading location.
5. The intelligent transportation dispatching system and method for the rail transportation equipment industry according to claim 4 is characterized in that: The intelligent transportation scheduling system mainly includes the following steps: Step S1: The data acquisition module obtains the cargo information required to be transported at the loading location on the day, the human resource information at the unloading location, and the time information required from different loading locations to different unloading locations through the loading information collection module; Step S2: The personnel at the loading location upload the transport volume and unloading location of the transported goods through the transport module. The unloading information analysis module analyzes the unloading time required for each unloading location and transmits the unloading information to the staff at the unloading location. The staff uploads the human resource information of the unloading location on that day. If the unloading information analysis module determines that the human resources are sufficient, the transport batch detection module detects the batches of goods between the current loading location and the target unloading location and returns the information to the staff at the loading location. Otherwise, the information on the shortage of personnel at the unloading location is transmitted to the dispatching communication module. Step S3: The transportation planning module obtains the unloading status of the goods at the target unloading location within each cargo batch time period, obtains the time from different loading locations to the target unloading location through the cargo batching module, and controls the goods from different loading locations to arrive at the target unloading location at intervals; Step S4: the cargo accumulation analysis submodule obtains the accumulation degree of X batches of cargo between the loading location and the unloading location at the unloading location, and predicts the cargo accumulation situation at the unloading location when the cargo at the current loading location arrives at the unloading location, and transmits the prediction information to the scheduling analysis submodule; Step S5: the scheduling analysis submodule receives the forecast information of the cargo accumulation analysis submodule, analyzes the forecast situation and proposes different solutions to adjust the unloading situation at the unloading location according to different situations, and sends an adjustment request to the loading assessment module; Step S6: The loading assessment module receives the adjustment request from the scheduling analysis submodule, obtains the accumulation of goods at each unloading location, and determines whether to adjust the shipment by detecting the storage volume of goods in the warehouse at the shipment location; Step S7: The output module adjusts the loading information through the dispatch information adjustment module, and outputs it to the dispatch personnel at the loading location through the dispatch communication module.
6. The intelligent transportation dispatching system and method for the rail transportation equipment industry according to claim 5, characterized in that: In step S2, when planning the loading of goods, the goods are arranged from near to far according to the location of the goods to be transported, and the unloading time t1, t2, ..., t n , total loading time The transportation information collection module is used to obtain the transportation time required for the goods from a loading location to different unloading locations, which is T1, T2, ..., T n , the time for the goods to travel from the point of shipment to the i-th loading and unloading location is T = T i +t; the next batch of goods is loaded immediately after loading at the loading location, and the inspection time of the same batch of goods The batch of goods between the loading location and the i-th unloading location Where X ≥ 2, and all times are in minutes.
7. The intelligent transportation dispatching system and method for the rail transportation equipment industry according to claim 6 is characterized by: In step S3, the cargo batching module obtains the time required for cargo to arrive at the same unloading location from a total of L loading locations within each cargo batch time period through the transportation information collection module, from the shortest to the longest, A1, A2, ..., A L , and calculate the arrival time difference of two adjacent batches of goods in total (L-1) ΔA1=A2-A1、ΔA2=A3-A2……ΔA L-1 =A L -A L-1 If the arrival time difference of the cth batch is less than 10 minutes and the arrival time difference of the (c+1)th batch is greater than 10 minutes, the delivery time of the (c+1)th batch of goods is delayed. minutes, where 1≤c≤L-2.
8. The intelligent transportation dispatching system and method for the rail transportation equipment industry according to claim 7 is characterized by: In step S4, the unloading time of the cargo at the i-th unloading location is S1, S2, ... S from shortest to longest. k The transportation planning module sets the inspection time S of the same batch of goods as a batch time period, obtains the next batch time period, and it is expected that n1 vehicles of goods will arrive at the unloading location. The time for the next batch of n1 vehicles to arrive is D1, D2, ... D respectively from short to long. n1 , the cargo accumulation analysis submodule determines the accumulation degree M generated when subsequent cargo arrives. If S k ≥D1, it is determined that the subsequent unloading will not be affected, and the accumulation degree of the unloading location is set to 0; if D n1 <S1, it is judged that the subsequent unloading will result in complete accumulation, and the accumulation degree M of this point is set to 2; otherwise, it is judged that the subsequent unloading will result in partial accumulation, and the accumulation degree M of this point is set to 1.
9. The intelligent transportation dispatching system and method for the rail transportation equipment industry according to claim 8, characterized in that: In step S5, the cargo accumulation analysis submodule sequentially obtains the accumulation degree generated when X batches of cargo arrive at the i-th unloading location, and the scheduling analysis submodule counts the total accumulation degree M of the unloading location when the current loading location arrives at the unloading location. 总 is the algebraic sum of the accumulation of X batches of cargo between the loading location and the i-th unloading location, where M 总 is an integer, if The normal amount of cargo to be loaded at the unloading location; if If the cargo at the unloading location is normally loaded, the unloading location is allowed to load more cargo at the unloading location. The limit of the amount of cargo loaded is the space generated by the cancellation of transportation at other unloading locations. 总 >X, it is determined that the accumulation degree of the place needs to be reduced, and the cargo loaded at the place is cancelled. The transportation planning module calculates the total accumulation degree M of the unloading place when the next cargo batch time period passes. 总 Is it lower than X? If it is lower than X, the cargo volume of the unloading location is loaded normally. Otherwise, the cargo loading of the location is cancelled and the total accumulation degree of the unloading location is M when the next cargo batch time period passes. 总 .
10. The intelligent transportation dispatching system and method for the rail transportation equipment industry according to claim 9, characterized in that: In step S6, the loading assessment module prioritizes the loading of the stacking degree. and If there is still room for loading after unloading, the loading assessment module will assess the real-time storage volume Q of the cargo in the loading warehouse. If Q>(1+λ)Q1, then continue to load M. 总 > For cargo at unloading location X, the loading and unloading sequence is M 总 Loading is carried out in order from small to large until the train reaches the load or stops when Q≤(1+λ)Q1, where λ is the maximum stacking rate of warehouse storage and Q1 is the normal storage capacity of the shipping location; if Q≤(1+λ)Q1, loading of goods is stopped and output is made through the output module according to the adjustment plan of the scheduling analysis submodule.
Citation Information
Patent Citations
Intelligent logistics management method for allocation center
CN110348613A
Factory logistics scheduling system and method
CN114386917A
Automatic cargo transfer system and method
CN115526567A
Loading and unloading process vehicle scheduling method, system and device
CN116187649A
Intelligent logistics Internet of Things system
CN116739447A
Cited By
Intelligent transportation scheduling system of rail transit equipment industry
CN120494383A
Intelligent transportation scheduling system for rail transit equipment industry
CN120494383B