Techniques for performing scheduling in wireless communications

Through adaptive parameter adjustment SPS and CG configurations, the problem of the quasi-periodicity and large data volume of XR services in 5G and 6G communications is solved, and effective support for XR services and resource efficiency improvement is achieved.

CN119278659AActive Publication Date: 2025-01-07ZTE CORP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202280096512.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2022-07-28
Publication Date
2025-01-07
Estimated Expiration
2042-07-28

AI Technical Summary

Technical Problem

Existing semi-persistent scheduling (SPS) and configuration authorization (CG) cannot meet the needs of quasi-periodic and large and diverse data volumes when supporting extended reality (XR) services, especially in 5G and 6G communications. The transmission delay requirements are strict and the data volume is large, so the prior art is difficult to support.

Method used

Multiple SPS configurations and CG configurations that use adaptive parameter adjustments, activation, deactivation, parameter updates and rapid resource authorization and release are carried out through control signaling, and dynamic adjustment of SPS/CG configurations on time and frequency resources is supported.

Benefits of technology

It realizes support for extended reality services in 5G and 6G communications, improves resource utilization efficiency, meets strict latency requirements, and reduces power consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119278659A_ABST
    Figure CN119278659A_ABST
Patent Text Reader

Abstract

Techniques for performing scheduling in wireless communications are described. An example wireless communication method includes receiving, by a communication device, control signaling from a network device, the control signaling including one or more parameters of a semi-persistent scheduling (SPS) configuration for scheduling of one or more time and frequency resources; and performing, by the communication device, an operation based on the SPS configuration, wherein the operation is performed according to the application delay.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This document is generally directed to digital wireless communications. Background Art

[0002] Mobile telecommunication technologies are driving the world towards an increasingly connected and networked society. Compared to existing wireless networks, next generation systems and wireless communication technologies will need to support a wider range of use case characteristics and provide a more complex and sophisticated range of access requirements and flexibility.

[0003] Long-Term Evolution (LTE) is a standard for wireless communications for mobile devices and data terminals developed by the 3rd Generation Partnership Project (3GPP). LTE Advanced (LTE-A) is a wireless communications standard that enhances the LTE standard. The fifth-generation wireless system, known as 5G, advances the LTE and LTE-A wireless standards and is committed to supporting higher data rates, a large number of connections, ultra-low latency, high reliability, and other emerging business needs. Summary of the invention

[0004] Techniques for performing scheduling in wireless communications are disclosed. For example, techniques for controlling timing associated with control signals for scheduling techniques (e.g., semi-persistent scheduling (SPS) techniques) and resources (e.g., SPS resources) are described. The patent document also describes configurations associated with one or more time and frequency resources (also referred to as one or more SPS resources) or a set of multiple time and frequency resources (also referred to as an SPS set) for scheduling techniques.

[0005] A first example wireless communication method includes receiving, by a communication device, control signaling from a network device, the control signaling including one or more parameters of a semi-persistent scheduling (SPS) configuration for scheduling one or more time and frequency resources; and performing, by the communication device, an operation based on the SPS configuration, wherein the operation is performed according to an application delay.

[0006] A second example wireless communication method includes transmitting, by a communication device, control signaling to a network device, the control signaling including one or more parameters of a semi-persistent scheduling (SPS) configuration for scheduling one or more time and frequency resources; and performing, by the communication device, an operation based on the SPS configuration, wherein the operation is performed according to an application delay.

[0007] A third example wireless communication method includes transmitting, by a network device to a communication device, control signaling including one or more parameters of a semi-persistent scheduling (SPS) configuration for scheduling one or more time and frequency resources; and transmitting or receiving, by the network device, on the one or more time and frequency resources based on the SPS configuration and in accordance with an application delay.

[0008] A fourth example wireless communication method includes receiving, by a network device, control signaling from a communication device, the control signaling including one or more parameters of a semi-persistent scheduling (SPS) configuration for scheduling one or more time and frequency resources; and transmitting or receiving, by the network device, on the one or more time and frequency resources based on the SPS configuration and according to an application delay.

[0009] In some embodiments, the SPS configuration includes any one or more of the following: periodicity information, one or more SPS configuration indexes, one or more time and frequency resources, one or more time and frequency resource groups, length information of duration, valid or invalid indication and / or offset information. In some embodiments, each of the one or more time and frequency resource groups includes a set of time and frequency resources, and the set of one or more time and frequency resources is associated with the length information of duration and a valid or invalid indication, the length information of duration indicates the time range of the set of one or more time and frequency resources, and the valid or invalid indication indicates the time domain position of the set of one or more time and frequency resources. In some embodiments, each of the one or more time and frequency resource groups is associated with multiple SPS configuration indexes and offset information, and the offset information indicates the offset between the sets of one or more time and frequency resources with different SPS configuration indexes.

[0010] In some embodiments, the control signaling includes any one or more of the following: radio resource control (RRC) signaling, medium access control element (MAC CE) signaling, downlink control information (DCI) signaling, or uplink control information (UCI) signaling. In some embodiments, one or more parameters of the SPS configuration in the DCI signaling include one or more types of indications, which include: activation indications of one or more time and frequency resources, release indications of one or more time and frequency resources, and / or update indications and update parameters of one or more time and frequency resources. In some embodiments, one or more parameters of the SPS configuration in the DCI signaling include an activation indication, which indicates that at least one time and frequency resource is used to transmit or receive data. In some embodiments, one or more parameters of the SPS configuration in the DCI signaling include a release indication, which indicates that at least one time and frequency resource is not used to transmit or receive data.

[0011] In some embodiments, one or more parameters of the SPS configuration in the DCI signaling include an update indication, which indicates that at least one parameter of the SPS configuration is updated by the information included in the control signaling. In some embodiments, the update parameters of the SPS configuration include any one or more of the following: modulation and coding scheme (MCS) level, information of the MCS table, time domain resource allocation (TDRA), frequency domain resource allocation (FDRA), number of layers, periodicity information, valid or invalid indication and / or offset information. In some embodiments, one or more types of indications are determined or indicated by any one or more of the following: high-level parameters, DCI format, DCI field, which includes HARQ process number, redundancy version, time domain resource allocation, frequency domain resource allocation, MCS, downlink allocation index, TPC command for scheduled PUCCH and / or VRB to PRB mapping.

[0012] In some embodiments, one or more parameters of the SPS configuration in the UCI signaling include any one or more of the following: an activation indication of one or more time and frequency resources, and / or a release indication of one or more time and frequency resources. In some embodiments, one or more parameters of the SPS configuration in the UCI signaling include an activation indication indicating that at least one time and frequency resource is used to transmit or receive data. In some embodiments, one or more parameters of the SPS configuration in the UCI signaling include a release indication indicating that at least one time and frequency resource is not used to transmit or receive data. In some embodiments, the operation based on the SPS configuration includes any one of the following: transmitting in one or more time and frequency resources, receiving in one or more time domain and frequency domain resources, determining not to transmit in one or more time domain and frequency resources, or determining not to receive in one or more time domain and frequency domain resources. In some embodiments, the application delay is determined by any one or more of the following: a start time point; an end time point; a distance between the start time point and the end time point.

[0013] In some embodiments, the start time point includes at least one of the following: a time slot for physical downlink control channel (PDCCH) monitoring; the last symbol of PDCCH monitoring; a time slot for UCI transmission; the last symbol of physical uplink control channel (PUCCH) for transmitting UCI; the last symbol of physical uplink shared channel (PUSCH) for transmitting UCI; a time slot of the first resource in one or more time and frequency resources; the first symbol of one or more time and frequency resources; the last symbol of one or more time and frequency resources. In some embodiments, the end time point includes at least one of the following: a time slot of one or more time and frequency resources; the last symbol of one or more time and frequency resources; a time slot for UCI transmission; the first symbol of PUCCH for transmitting UCI; the first symbol of PUSCH for transmitting UCI, a time slot for PDCCH monitoring; the first symbol of PDCCH monitoring. In some embodiments, the time slot of one or more time and frequency resources includes a time slot of the first resource within one or more time and frequency resources, a time slot of the first resource within a time and frequency resource group, a time slot of the last resource within one or more time and frequency resources, or a time slot of the last resource within a time and frequency resource group.

[0014] In some embodiments, the first or last symbol of one or more time and frequency resources includes the first or last symbol of the first resource within the one or more time and frequency resources, the first and last symbols of the first resource within the time and frequency resource group, the first or last symbol of the last resource within the one or more time and frequency resources, and the first or last symbol of the last resource within the time and frequency resource group. In some embodiments, the distance K between the start time point and the end time point is determined or indicated by at least one of the following: a high-layer parameter; a subcarrier spacing; a user equipment (UE) capability, wherein the distance K is a positive integer in symbols, time slots, or milliseconds. In some embodiments, in the distance K, any one or more of the following operations are performed: another control signaling is not transmitted in the distance K; another control signaling is not transmitted in the same time slot of the control signaling; when another control signaling is transmitted in the distance K, the other control signaling expires; or when another control signaling is transmitted in the distance K, the other control signaling replaces the control signaling. In some embodiments, the application delay includes the time slot or last symbol monitored by the PDCCH as the starting time point, the time slot or first symbol of the first resource in the time and frequency resource group as the ending time point, and the distance between the time slot or last symbol monitored by the PDCCH and the time slot or first symbol of the first resource is K time slots or symbols. When the control signaling is received in the nth time slot or symbol, the operation is performed at the time slot of the first resource in the time and frequency resource group located in the (n+K)th time slot or symbol, and wherein n and K are integers greater than or equal to 1.

[0015] In some embodiments, the application delay includes the time slot or last symbol of PDCCH monitoring as the starting time point, the time slot or first symbol of PDCCH monitoring or UCI transmission as the ending time point, and the distance between the time slot or last symbol of PDCCH monitoring and the time slot or first symbol of PDCCH monitoring or UCI transmission is K time slots or symbols, when the control signaling is received in the nth time slot or symbol, the communication device is responded to by DCI or UCI, and the operation is performed at the time and frequency resources located at the (n+K)th time slot or symbol, and wherein n and K are integers greater than or equal to 1. In some embodiments, the application delay includes the time slot or first symbol of PDCCH monitoring or UCI transmission as the starting time point, the time slot or last symbol of PDCCH monitoring as the starting time point, and the distance between the time slot or first symbol of PDCCH monitoring or UCI transmission and the time slot or last symbol of PDCCH monitoring is K time slots or symbols. When responding to the communication device via DCI or UCI, the operation is performed at the time and frequency resources located at the nth time slot or symbol, and the control signaling is received in the (nK)th time slot or symbol or before the (nK)th time slot or symbol, where n and K are integers greater than or equal to 1, and where K is less than n.

[0016] In some embodiments, the application delay includes the time slot or first symbol of the first resource within the time and frequency domain resource group as the starting time point, the time slot or last symbol monitored by the PDCCH as the ending time point, and a distance of K time slots or symbols between the time slot or first symbol of the first resource and the time slot or last symbol monitored by the PDCCH, when the operation is performed at the first resource within the time and frequency resource group located at the nth time slot or symbol, the control signaling is received in the (nK)th time slot or symbol or before the (nK)th time slot or symbol, and wherein n and K are integers greater than or equal to 1. In some embodiments, the application delay includes a time slot or first symbol of UCI transmission as a start time point, a time slot or first symbol of a first resource within a time and frequency resource group as an end time point, and a distance of K time slots or symbols between the time slot or first symbol of UCI transmission and the time slot or last symbol of the first resource, and when the control signaling is transmitted in an nth time slot or symbol, the operation is performed at a time and frequency resource located in a time range from an (nK)th time slot or symbol to an (n)th time slot or symbol, and wherein n and K are integers greater than or equal to 1. In some embodiments, the SPS includes a configured grant (CG).

[0017] In another exemplary aspect, the above method is embodied in the form of processor executable code and stored in a non-transitory computer readable storage medium. When executed by a processor, the code included in the computer readable storage medium causes the processor to implement the method described in this patent document.

[0018] In another exemplary embodiment, a device configured or operable to perform the above method is disclosed.

[0019] The above aspects and other aspects and embodiments thereof are described in more detail in the drawings, the description and the claims. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1A-1B A timeline for current semi-persistent scheduling (SPS) and currently configured grant (CG) transmissions is shown.

[0021] Figure 2 The configuration for the current SPS or the current CG is shown.

[0022] Figure 3 Multiple SPS physical downlink shared channel (PDSCH) configurations or multiple CG physical uplink shared channel (PUSCH) configurations with adaptive parameter adjustment are shown.

[0023] Figure 4 A timeline from control signaling to SPS resources is shown.

[0024] Figure 5 A timeline from control signaling to control signaling is shown.

[0025] Figure 6 A timeline from resources to control signaling is shown.

[0026] Figure 7 It is shown that when the control signaling is used for one SPS configuration activation, the application delay may include a start time point, an end time point and / or a distance N1.

[0027] Figure 8 It is shown that when the control signaling is used to deactivate one or more SPS configurations simultaneously, the application delay may include a start time point, an end time point and / or a distance N1.

[0028] Fig. 9 It is shown that when control signaling is used for SPS parameter update, the application delay may include a start time point, an end time point and / or a distance N1.

[0029] Fig.10 It is shown that when control signaling is used for resource activation and release of one or more SPSs, the application delay may include a start time point, an end time point and / or a distance N1.

[0030] Fig.11 It is shown that when the control signaling is uplink control information (UCI) for activation or release of a CG physical uplink shared channel (PUSCH) in a CG PUSCH group, the application delay for deactivating UCI may include a start time point, an end time point and / or a distance N1, while the application delay for activating UCI may include a start time point, an end time point and / or a distance N1'.

[0031] Fig.12 The current SPS or CG configuration is shown, which means that according to the periodicity information, the first time and frequency resources can transmit or receive data in the Mth time slot, and the second time and frequency resources can transmit or receive data in the (M+10)th time slot.

[0032] Fig.13 It is shown how to configure multiple SPS PDSCH / CG PUSCH configurations using length information of duration and valid or invalid indication, and what are time and frequency resource groups (e.g., SPS PDSCH / CG PUSCH groups).

[0033] Fig.14 It shows how to configure multiple SPS PDSCH / CGPUSCH configurations using multiple SPS configuration indexes and offset information and what are the time and frequency resource groups (eg, SPS PDSCH / CG PUSCH groups).

[0034] Fig.15 It is shown that the parameters of the updated DCI update time and frequency resource group (eg, SPS PDSCH / CG PUSCH group).

[0035] Fig.16 It shows how time and frequency resource group (eg, SPS PDSCH group) feedback confirms UCI (eg, HARQ-ACK information).

[0036] Fig.17 It is shown how activating UCI and / or releasing UCI works in time and frequency resource groups (eg, CG PUSCH groups).

[0037] Fig.18 An exemplary block diagram of a hardware platform that may be part of a network device or a communication device is shown.

[0038] Fig.19 An example of wireless communication including a base station (BS) and a user equipment (UE) based on some embodiments of the disclosed technology is shown.

[0039] Fig. 20AAn exemplary flow chart for receiving control signaling and performing operations is shown.

[0040] Fig. 20B An exemplary flow chart for transmitting control signaling and performing operations is shown.

[0041] Figure 21A-21B An exemplary flow diagram for transmitting or receiving on one or more time and frequency resources is shown.

[0042] Fig. 22 It is shown that other control signaling is not transmitted or received in the distance K.

[0043] Fig.23 It is shown that other control signaling expires in a distance K. DETAILED DESCRIPTION

[0044] In beyond 5G and 6G communications, a promising service has the characteristics of quasi-periodicity (affected by jitter), large and diverse data volumes, and strict latency requirements, including, for example, extended reality (XR) services. In the prior art, authorized transmissions, including configured grants (CG) and semi-persistent scheduling (SPS), are able to transmit periodic data through pre-configured resources without the need for authorization requests and excessive power consumption. However, due to the quasi-periodicity and the service characteristics of large and diverse data volumes, current SPS and CG do not support the transmission of such services. To this end, multiple SPS configurations and multiple CG configurations with adaptive parameter adjustment should be considered to support SPS / CG configurations for the transmission of XR services, wherein the adaptive parameter adjustment (such as activation, deactivation, parameter update, and resource fast authorization and release) is determined by control signaling. The present disclosure aims to propose a method for how the control signaling of adaptive parameter adjustment works.

[0045] The example titles of the following sections are used to facilitate understanding of the disclosed subject matter and do not limit the scope of the claimed subject matter in any way. Therefore, one or more features of one example section can be combined with one or more features of another example section. In addition, for the sake of clarity of explanation, 5G terminology is used, but the technology disclosed in this document is not limited to 5G technology, but can also be used in wireless systems implementing other protocols.

[0046] I. Introduction

[0047] Figure 1A-1BThe timeline of the current semi-persistent scheduling (SPS) and currently configured grant (CG) transmission is shown. For SPS transmission or CG transmission, the gNB first transmits RRC signaling SPS-config or ConfiguredGrantConfig, respectively. Then, DCI is used to activate SPS transmission or CG transmission. Finally, SPS transmission or CG transmission is activated, and data will be transmitted periodically in preconfigured resources. For SPS or CG transmission, the first SPS physical downlink shared channel (PDSCH) is received or the CG physical uplink shared channel (PUSCH) is transmitted in K time slots after the UE receives the DCI with the SPS or CG activation indication. At the same time, the gNB needs to receive HARQ-ACK information to confirm whether the UE has received the deactivation indication. Considering the processing capability of the UE, the HARQ-ACK information for the deactivation indication is transmitted in N symbols after the deactivation indication is received.

[0048] Figure 2 Shows the configuration of the current SPS or the current CG. Figure 3 Multiple SPS PDSCH configurations and multiple CG PUSCH configurations with adaptive parameter adjustment are shown. Figure 2-Figure 3 The one or more control signals may include configuration-related parameters, where the parameters may be related to activation, deactivation, parameter update, etc., and may have their own timelines. The control signaling may include radio resource control (RRC) signaling, downlink control information (DCI) signaling, and / or UCI signaling. The timeline of one or more control signaling may include the following: (1) Figure 4 As shown, from control signaling to resources; (2) as Figure 5 As shown, from control signaling to another control signaling; (3) as Figure 6 As shown, from resources to control signaling.

[0049] exist Figure 4 In the case (1) shown, when control signaling is transmitted or received in the nth time slot / symbol, the control signaling is valid for the SPS resource in the (n+K)th time slot / symbol, or the UE performs transmission or reception in the SPS resource in the (n+K)th time slot / symbol, or the UE performs an action in the (n+K)th time slot / symbol, such as activation, deactivation, or parameter update of the SPS resource. In the patent document, n and K are integers greater than or equal to 1.

[0050] exist Figure 5 In the case (2) shown, when the first control signaling is transmitted in the nth time slot / symbol, the control signaling is valid for the SPS resource when the second control signaling (e.g., DCI or an acknowledgment indication such as HARQ-ACK) is received or transmitted in the (n+K)th time slot / symbol, and then the UE performs transmission or reception in the SPS resource after the (n+K)th time slot / symbol, or the UE performs an action after the (n+K)th time slot / symbol, such as activation, deactivation, or updating of the SPS resource.

[0051] Alternatively, in Figure 5 In the case (2) shown, when the second control signaling (e.g., DCI or an acknowledgment indication such as HARQ-ACK) is transmitted or received in the nth time slot / symbol, the first control signaling should be transmitted or received in the (nK)th time slot / symbol or before the (nK)th time slot / symbol.

[0052] In the patent document, operations associated with one or more time slots / symbols may refer to operations of transmission or reception of an uplink channel (e.g., PUSCH) or a downlink channel (e.g., PDSCH), respectively, or do not include operations performed by the UE such as activation / deactivation of SPS resources. Figure 6 In the case (3) shown, when the transmission configuration of the SPS is associated with the nth, ... (n+delta)th, ... (n+K-1)th time slots / symbols, respectively, the control signaling is valid for the SPS resource in the (n+K)th time slot / symbol, or the UE performs transmission or reception in the SPS resource in the (n+K)th time slot / symbol, or the UE performs an action in the (n+K)th time slot / symbol, such as activation, deactivation, and confirmation of multiple SPS resources. In the example of case (3), the control signaling transmitted in the (n+K)th time slot / symbol can be an acknowledgment indication such as HARQ-ACK, which can be associated with data received in the SPS resources in the nth, ... (n+delta)th, ... (n+K-1)th time slots / symbols, or can be used to indicate the data.

[0053] In addition, Figure 4 In the case shown, when the operation is associated with the nth time slot / symbol, the control signaling should be transmitted or received in the (nK)th time slot. For example, when the UE performs transmission / reception / operation in the SPS resource in the nth time slot / symbol, uplink control information (UCI) for activating / deactivating the SPS resource can be transmitted or received in the (nK)th time slot.

[0054] In the patent document, the term SPS may refer to an SPS configuration for a downlink or a CG configuration for an uplink. In the patent document, the term SPS resource may refer to an SPS PDSCH for a downlink or a CG PUSCH for an uplink, and the term time and frequency resources are similar to the term SPS resources. In the patent document, the term operation may refer to transmission, reception, etc.

[0055] The patent document describes technologies related to at least the following technical solutions:

[0056] Explanation of SPS configuration

[0057] Interpretation of control signaling

[0058] Explanation for delay in filing application.

[0059] II. Explanation of SPS Configuration

[0060] In some embodiments, the SPS configuration includes an SPS configuration index, wherein the SPS configuration includes an index corresponding to any one or more of the following:

[0061] 1. An information set for SPS configuration indexing, comprising any one or more of the following:

[0062] a. Periodicity information, which indicates the time length between a time and frequency domain resource and its previous and / or next time and frequency domain resource, or the time length between a time and frequency domain resource group and its previous and / or next time and frequency domain resource group, wherein the time and frequency resource group includes one or more time and frequency resources.

[0063] b. Duration length information, wherein the length information indicates the time length associated with the time and frequency resource group allocated to the UE, wherein the time length may be less than or equal to Figure 2 and Figure 3 Periodic information shown.

[0064] c. A valid or invalid indication that identifies one or more time slots that can be used for one or more time and frequency resources within a duration. In one example, a bitmap may be used to indicate the valid or invalid indication of a time slot.

[0065] d. Offset information, which indicates the time offset between two adjacent time and frequency resources within a time and frequency resource group.

[0066] 2. Some SPS resources

[0067] In one example, the SPS configuration includes an SPS configuration index corresponding to periodicity information, that is, the periodicity in SPS-config or the periodicity in ConfiguredGrantConfig, such as "10ms" or "10ms x 14 symbols", and the SPS configuration is as follows: Fig.12 shown.

[0068] exist Fig.12 , the first time and frequency resources are transmitted or received in the Mth time slot, the second time and frequency resources are transmitted or received in the (M+10)th time slot, and so on.

[0069] In another example, the SPS configuration includes an SPS configuration index, which corresponds to the periodicity information, that is, the periodicity in SPS-config or the periodicity in ConfiguredGrantConfig, such as "10ms" or "10ms x 14 symbols", the length information of the duration is "5 time slots", the valid or invalid indication is a bitmap "10101", and the SPS configuration is as follows Fig.13 shown.

[0070] exist Fig.13 In the example, the first time and frequency resource group represented as resource group 1 includes the first time and frequency resources to the third time and frequency resources. If the offset information is set to "1 time slot", this pattern can also be realized, which is similar to the valid or invalid indication being set to "10101".

[0071] According to the above example, the time and frequency resource group is associated with the length information of the duration, the valid or invalid indication, or the offset information.

[0072] In some embodiments, the SPS configuration includes an SPS set, wherein the SPS set includes any one or more of the following:

[0073] 1. One or more SPS configuration indexes

[0074] 2. An information set for an SPS set, comprising any one or more of the following:

[0075] a. Periodic information for different SPS configuration indexes in the SPS set

[0076] b. Offset information for different SPS configuration indexes in the SPS set

[0077] c. Information about the number of SPS configuration indexes.

[0078] In one example, if you configure Fig.13The SPS set in the SPS configuration includes three SPS configuration indexes, such as {4, 5, 6}. As a result, the quantity information or number of SPS configuration indexes (such as Fig.13 The periodicity information of the three SPS configuration indexes is set to "10ms", and the offset information of the SPS configuration indexes from 4 to 6 is set to "0", "2" and "4", respectively. Fig.14 shown.

[0079] exist Fig.14 In Fig.13 The patterns are similar, but the SPS set configurations are different. There are multiple SPS sets, and the gNB indicates one of the SPS sets for configuring the corresponding pattern based on the number information of the SPS configuration index.

[0080] According to the above example, the time and frequency resource groups are associated with the number information of the SPS configuration indexes, the multiple SPS configuration indexes, and the offset information.

[0081] III. Interpretation of Control Signaling

[0082] 1. In some embodiments, the control signaling is high-layer signaling, including:

[0083] a. Radio Resource Control (RRC) signaling

[0084] b. Medium Access Control Unit (MAC CE) signaling

[0085] In some cases, the high-layer signaling is RRC signaling SPS-config or ConfiguredGrantConfig. In this case, SPS-config or ConfiguredGrantConfig is used for SPS configuration activation.

[0086] In some cases, the higher layer signaling is an authorization confirmation of a MAC CE signaling configuration, or an authorization confirmation of multiple configurations.

[0087] 2. In some embodiments, the control signaling is downlink control information (DCI) signaling

[0088] • In some cases, the DCI signaling is UE-specific DCI or group-common DCI.

[0089] o For UE-specific DCI, such as DCI format 0_0, DCI format 0_1, and DCI format 0_2 for uplink, or DCI format 1_0, DCI format 1_1,

[0090] DCI format 1_2, the SPS configuration parameters in the DCI signaling include different types of indications, where the type of indication is determined by different states of high-level parameters, DCI format, and DCI fields.

[0091] o For DCI containing different types of indications, the status of the mentioned DCI fields is different.

[0092] A. In some cases, DCI signaling is used for SPS activation

[0093] • The SPS configuration parameters in the DCI signaling include a DCI field to indicate that the DCI signaling is for SPS activation.

[0094] In some cases, the DCI fields "HARQ process number" and "redundancy version" are set to all "1",

[0095] To indicate that the DCI is used for SPS activation.

[0096] In some cases, the DCI fields "HARQ process number" and "redundancy version" are set to all "1",

[0097] At least one field in the DCI field, such as "time domain resource allocation"; "frequency domain resource allocation";

[0098] "MCS"; "Downlink Allocation Index"; "TPC command for scheduled PUCCH"; or "VRB to PRB mapping" are reinterpreted as all 1s or all 0s to indicate Fig.13 The SPS configuration in is activated.

[0099] In some cases, the DCI field "Redundancy Version" is set to all "1s" and the DCI field

[0100] The "HARQ process number" is reinterpreted to indicate the SPS set index to indicate that the DCI is used for Fig.14 The SPS configurations of multiple SPS configuration indexes in are activated simultaneously.

[0101] In some cases, one or more DCI fields, such as "HARQ process number", "redundancy version", "time domain resource allocation", "frequency domain resource allocation", "MCS", "downlink allocation index";

[0102] "TPC command for scheduled PUCCH" or "VRB to PRB mapping" is reinterpreted as all 0s or all 1s to indicate that the time and frequency resources in the time and frequency resource group are activated. B. In some cases, DCI signaling is used for SPS release

[0103] · The parameters of the DCI signaling include DCI fields to indicate that the DCI signaling is for SPS release / deactivation. · In some cases, DCI fields such as "HARQ process number", "redundancy version" and "frequency domain allocation" are set to all 1 or all 0 to indicate that the DCI signaling is for SPS configuration release.

[0104] In some cases, DCI fields such as "Redundancy Version" and "Frequency Domain Allocation" are set to all 1s or all 0s, while "HARQ Process Number" indicates the SPS configuration index list to indicate the DCI

[0105] Signaling is used to release multiple SPS configuration indexes.

[0106] In some cases, DCI fields such as "Redundancy Version" and "Frequency Domain Allocation" are set to all 1s or all 0s, while "HARQ Process Number" indicates an SPS set including multiple SPS configuration indices to indicate that the DCI signaling is used for Fig.14 The SPS configuration in is released.

[0107] In some cases, DCI fields such as "HARQ process number", "redundancy version" and "frequency domain allocation" are set to all 1s or all 0s, while one or more DCI fields such as "time domain allocation", "time domain resource allocation"; "frequency domain resource allocation"; "MCS"; "downlink allocation index" are set to all 1s or all 0s;

[0108] "TPC command for scheduled PUCCH" or "VRB to PRB mapping" is reinterpreted as all 1s or all 0s to indicate that DCI signaling is used for Fig.10 The time and frequency resources in the time-frequency domain resource group are released.

[0109] C. In some cases, DCI signaling is used for SPS parameter updates

[0110] · The parameters of the DCI signaling include a DCI field to indicate that the DCI signaling is for SPS parameter update. · In some cases, the DCI field for update indication includes at least one of the following: "HARQ process number", "redundancy version"; "downlink allocation index"; "TPC command for scheduled PUCCH"; or "VRB to PRB mapping". One or more of these fields are reinterpreted as an update indication with P bits, where P is a positive integer. For example, when "redundancy version"

[0111] When set to all 1s and configured with duration length information, valid or invalid indication, or offset information, the LSB of the "HARQ process number" is an update indication. The update indication is set to "1", which means that the DCI is used for SPS parameter update, and the update indication is set to "0", which means that the DCI is not used for SPS parameter update. The state of the DCI field for SPS parameter update is different from the state of the DCI field for SPS activation.

[0112] In this case, the SPS parameters include any one or more of the following:

[0113] 1. Modulation and coding scheme (MCS) level

[0114] 2. Information of MCS table

[0115] 3. Time domain resource assignment (TDRA)

[0116] 4. Frequency domain resource assignment (FDRA)

[0117] 5. Number of layers

[0118] 6. Periodic Information

[0119] 7. Valid or invalid instructions

[0120] 8. Offset information

[0121] • The update parameters are valid in one or more time and frequency resource groups.

[0122] For example, Fig.15 As shown, the update DCI signaling updates the above parameters of the time and frequency resources in a time-frequency resource group.

[0123] For group common DCI, such as DCI format 2_6 or the newly defined DCI format 2, the parameters of the SPS configuration in the DCI signaling determine different types of indications through specially defined fields.

[0124] A. In some cases, DCI signaling is used for SPS activation or SPS deactivation / release

[0125] The parameters of the DCI signaling include a newly defined DCI field to indicate that the DCI signaling is for SPS activation. The newly defined field for indicating that the time and frequency resources in the time and frequency resource group are activated or deactivated is an "activation / release indication" with a length of one bit. When the field is indicated by "1", it means that the time and frequency resources in the time and frequency resource group are activated, and when the field is indicated by "0", it means that the time and frequency resources in the time and frequency resource group are activated.

[0126] When indicated, it means that the time and frequency resources in the time and frequency source group are released / deactivated.

[0127] B. In some cases, DCI signaling is used for SPS parameter updates

[0128] The parameters of the DCI signaling include a newly defined DCI field to indicate that the DCI signaling is for SPS parameter update. The newly defined field for indicating that the DCI signaling is for SPS parameter update. Other defined fields indicate update parameters such as MCS level; information of the MCS table; time domain resource allocation (TDRA); frequency domain resource allocation (FDRA); number of layers; periodicity information; valid or invalid indication; offset information.

[0129] o In some embodiments, the control signaling is uplink control information (UCI) signaling, including at least one (or any one or more) of an acknowledgement indication, an activation indication, or a deactivation indication.

[0130] The following example is based on Fig.16 .

[0131] In the example of confirmation indication, the UCI signaling is HARQ-ACK information of one or more time and frequency resources in the time and frequency resource group. Fig.16 , the first HARQ-ACK information is associated with the first two CG PUSCHs in resource group 1, and the second HARQ-ACK information is associated with all CG PUSCHs in resource group 2, where the time and frequency resource groups are represented by resource groups and the time and frequency resources are represented by CG PUSCHs.

[0132] The following example is based on Fig.17 .exist Fig.17 In the example, for activation or deactivation / release indication, the first activation UCI activates the first two CG PUSCHs in resource group 1, and when the UE receives the first release UCI, the third CG PUSCH is released. When the second activation UCI activates the second CG PUSCH, and when the UE does not receive the second activation UCI and the UE receives the second release UCI, the first CG PUSCH and the third CG PUSCH are released in resource group 2, respectively, where the time and frequency resource groups are represented by resource groups, and the time and frequency resources are represented by CG PUSCHs.

[0133] For example, the UCI signaling is a scheduling request (SR) for indicating activation, which means that one or more time and frequency resources in the time and frequency resource group are used for data transmission.

[0134] For example, the UCI signaling is a scheduling request (SR) for indicating deactivation / release, which means that one or more time and frequency resources in the time and frequency resource group are not used for data transmission.

[0135] For example, UCI signaling is a newly defined signaling, instead of HARQ-ACK information, scheduling request, CSI report, and carries activation indication and deactivation / release indication information. In some cases, there is one-bit length information in the newly defined signaling, where bit "1" indicates activation, meaning that one or more time and frequency resources in the time and frequency resource group are used for data transmission, and bit "0" indicates deactivation, meaning that another one or more time and frequency resources in the time and frequency group are not used for data transmission.

[0136] IV. Explanation of application delays

[0137] In some embodiments, application delay is determined by at least one (or any one or more) of the following:

[0138] 1. Start time

[0139] a. In some cases, the starting time point includes any one or more of the following:

[0140] i. Timeslot for PDCCH monitoring.

[0141] ii. The last symbol monitored by PDCCH.

[0142] iii. Time slot for UCI transmission.

[0143] iv. The last symbol of UCI transmission in PUCCH.

[0144] v. The last symbol of UCI transmission in PUSCH.

[0145] vi. Time slots of SPS resources

[0146] vii.The last symbol of the SPS resource.

[0147] 2. End time

[0148] i. The time slot of the time and frequency resources determined by control signaling

[0149] 1. In some cases, the time and frequency resource is the first time and frequency resource in a group of time and frequency resources.

[0150] 2. In some cases, the time and frequency resource is the last time and frequency resource in a group of time and frequency resources.

[0151] 3. In some cases, the time and frequency resource is the first time and frequency resource corresponding to the first SPS configuration index in the SPS set.

[0152] 4. In some cases, the time and frequency resources are the time and frequency resources of the last SPS configuration index in the SPS set.

[0153] ii. The last symbol of the time and frequency resource determined by control signaling

[0154] 5. In some cases, the time and frequency resource is the first time and frequency resource in a group of time and frequency resources.

[0155] 6. In some cases, the time and frequency resource is the last time and frequency resource in a group of time and frequency resources.

[0156] 7. In some cases, the time and frequency resource is the first time and frequency resource indexed by the first SPS configuration in the SPS set.

[0157] 8. In some cases, the time and frequency resources are the time and frequency resources of the last SPS configuration index in the SPS set.

[0158] iii. UCI transmission time slot

[0159] iv. The first symbol of UCI transmission in PUCCH

[0160] v. The first symbol of UCI transmission in PUSCH

[0161] vi. PDCCH monitoring time slot

[0162] vii. The first symbol of PDCCH monitoring.

[0163] 3. The distance K between the start time point and the end time point, where K is an integer not less than 0, and the characteristics of K include any one or more of the following:

[0164] i. In some cases, the distance is determined through higher layer signaling.

[0165] ii. In some cases, the distance is associated with the subcarrier spacing.

[0166] iii. In some cases, K is in units of slots or symbols.

[0167] iv. In some cases, K is determined by UE capabilities.

[0168] v. In some cases, K is not less than K0min or K2min, where K0min and K2min are determined by high-layer signaling.

[0169] a. In some cases, K0min is the minimumSchedulingOffsetK0 in the RRC signaling PDSCH-Config.

[0170] b. In some cases, K2min is the minimumSchedulingOffsetK2 in the RRC signaling PUSCH-Config.

[0171] The control signaling is valid for the time and frequency resources according to or based on the application delay, or the UE performs transmission or reception in the time and frequency resources according to or based on the application delay, or the UE performs an action in the time and frequency resources according to or based on the application delay.

[0172] In some embodiments, Fig. 22 As shown, no other control signaling is transmitted or received (or determined not to be transmitted or received) within the distance K.

[0173] In some embodiments, Fig.23 As shown, other control signaling expires within distance K.

[0174] In some embodiments, the control signaling is replaced by other control signaling of the same type transmitted within the distance K.

[0175] In some embodiments, other control signaling is not transmitted (or determined not to be transmitted) in the same time slot as the control signaling.

[0176] In the following examples, different application delays are shown.

[0177] Example 1: Figure 7 It is shown that when the control signaling is DCI signaling for SPS configuration activation, in one example, the application delay includes:

[0178] Start time: PDCCH monitoring time slot

[0179] End time point: the time slot of the first SPS PDSCH in the SPS PDSCH group (or the start time point is the time slot of the first SPS PDSCH, and the end time point is the time slot of PDCCH monitoring)

[0180] Distance: N1 time slots

[0181] Assuming that the DCI signaling for downlink SPS configuration activation is received in the nth time slot, the time slot of the first SPS PDSCH transmission is located at

[0182]

[0183] Wherein n represents the time slot used for PDCCH monitoring, and u represents the subcarrier spacing (SCS).

[0184] In one example, application delays include:

[0185] Start time: the last symbol of PDCCH monitoring

[0186] End time point: the first symbol of the first SPS PDSCH in the SPS PDSCH group. (or the start time point is the first symbol of the first SPS PDSCH in the SPS PDSCH group, and the end time point is the last symbol monitored by PDCCH)

[0187] Distance: N1 time slots

[0188] Assuming that DCI signaling for downlink SPS configuration activation is received at the nth symbol, the first symbol of the first SPS PDSCH transmission is located at

[0189]

[0190] where n slot Indicates the time slot for PDCCH monitoring, Indicates the number of symbols in a time slot.

[0191] In one example, application delays include:

[0192] Start time: PDCCH monitoring time slot

[0193] End time point: the time slot of the first CG PUSCH in the CG PUSCH group (or the start time point is the time slot of the first CGPUSCH, and the end time point is the time slot of PDCCH monitoring)

[0194] Distance: N1 time slots

[0195] Assuming that the DCI signaling for uplink SPS configuration activation is received in the nth time slot, the time slot of the first CG PUSCH transmission is located at

[0196]

[0197] Where n represents the time slot used for PDCCH monitoring, and u represents the subcarrier spacing (SCS).

[0198] In another example, applying delays includes:

[0199] Start time: the last symbol of PDCCH monitoring

[0200] End time point: the first symbol of the first CG PUSCH in the CG PUSCH group. (or the start time point is the first symbol of the first CG PUSCH in the CG PUSCH group, and the end time point is the last symbol monitored by PDCCH)

[0201] Distance: N1 symbols

[0202] Assuming that DCI signaling for uplink SPS configuration activation is received at the nth symbol, the first symbol of the first SPS PDSCH transmission is located at

[0203]

[0204] where n slot Indicates the time slot for PDCCH monitoring, Indicates the number of symbols in a time slot.

[0205] Example 2: Figure 8 It is shown that when the control signaling is for SPS configuration deactivation, in one example, the application delay includes:

[0206] Start time: the time slot of HARQ-ACK information

[0207] End time point: the time slot of PDCCH monitoring (or, the start time point is the time slot of PDCCH monitoring, and the end time point is the time slot of HARQ-ACK information)

[0208] Distance: N1 time slots

[0209] Assuming that the HARQ-ACK information is transmitted in the nth time slot, the time slot monitored by PDCCH is located at or before the position of

[0210] or Where n represents the time slot used for PDCCH monitoring, and u represents the subcarrier spacing (SCS).

[0211] In another example, applying delays includes:

[0212] Start time: the first symbol of HARQ-ACK information

[0213] End time point: the last symbol of PDCCH monitoring (or, the start time point is the last symbol of PDCCH monitoring, and the end time point is the first symbol of HARQ-ACK information)

[0214] ● Distance: N1 symbols

[0215] Assuming that HARQ-ACK information is transmitted in the nth symbol, the time slot monitored by PDCCH is located at or before the position of

[0216] or

[0217] Example 3: Fig. 9 It is shown that when the control signaling is DCI signaling for SPS parameter update, in one example, applying the delay includes:

[0218] Start time: the time slot of the first SPS PDSCH in the SPS PDSCH group

[0219] End time point: the time slot of PDCCH monitoring (or, the start time point is the time slot of PDCCH monitoring, and the end time point is the time slot of the first SPS PDSCH in the SPS PDSCH group)

[0220] Distance: N1 time slots

[0221] Assuming that the time slot of the first SPS PDSCH in the SPS PDSCH group for update is located at the nth time slot, the time slot of the DCI signaling for SPS parameter update is located at or before the position of

[0222]

[0223] In one example, application delays include:

[0224] Start time: The first symbol of the first SPS PDSCH in the SPS PDSCH group

[0225] End time point: the last symbol monitored by the PDCCH (or the start time point is the last symbol monitored by the PDCCH, and the end time point is the first symbol of the first SPS PDSCH in the SPS PDSCH group)

[0226] Distance: N1 symbols

[0227] Assuming that the symbol of the first SPS PDSCH in the SPS PDSCH group for update is located at the nth symbol, the last symbol of the DCI signaling for SPS parameter update is located at or before the position of

[0228]

[0229] In one example, application delays include:

[0230] Start time: the time slot of the first CG PUSCH in the CG PUSCH group

[0231] End time point: the time slot of PDCCH monitoring (or, the start time point is the time slot of PDCCH monitoring, and the end time point is the time slot of the first CG PUSCH in the CG PUSCH group)

[0232] Distance: N1 time slots

[0233] Assuming that the time slot of the first CG PUSCH in the CG PUSCH group for update is located at the nth time slot, the time slot of the DCI signaling for SPS parameter update is located at or before the position of

[0234]

[0235] In another example, applying delays includes:

[0236] Start time: The first symbol of the first CG PUSCH in the CG PUSCH group

[0237] End time point: the last symbol monitored by the PDCCH (or the start time point is the last symbol monitored by the PDCCH, and the end time point is the first symbol of the first CG PUSCH in the CG PUSCH group)

[0238] Distance: N1 symbols

[0239] Assuming that the symbol of the first CG PUSCH in the CG PUSCH group for update is located at the nth symbol, the last symbol of the DCI signaling for SPS parameter update is located at or before the position of

[0240]

[0241] Example 4: Fig.10 It is shown that when the control signaling is DCI signaling for activation or release of an SPS PDSCH in an SPS PDSCH group, in one example, applying the delay includes:

[0242] Start time: The time slot of the first activated / released SPS PDSCH in the SPS PDSCH group

[0243] End time point: the time slot of PDCCH monitoring (or, the start time point is the time slot of PDCCH monitoring, and the end time point is the time slot of the first released SPS PDSCH in the SPS PDSCH group)

[0244] Distance: N1 time slots

[0245] Assuming that the time slot of the first activated / released SPS PDSCH in the SPS PDSCH group is located at the nth time slot, the time slot of the DCI signaling for activating or releasing the SPS PDSCH in the SPS PDSCH group is located at or before the position of the following formula,

[0246]

[0247] Where n represents the time slot used for control signaling transmission, and u represents SCS.

[0248] In another example, applying delays includes:

[0249] Start time: The first symbol of the first activated / released SPS PDSCH in the SPS PDSCH group

[0250] End time point: the last symbol monitored by PDCCH (or, the start time point is the last symbol monitored by PDCCH, and the end time point is the first time slot of the first released SPS PDSCH in the SPS PDSCH group)

[0251] Distance: N1 symbols

[0252] Assuming that the symbol of the first activated / released SPS PDSCH in the SPS PDSCH group is located at the nth symbol, the time slot of the DCI signaling for activating or releasing the SPS PDSCH in the SPS PDSCH group is located at or before the position of the following formula,

[0253]

[0254] Fig.11 It is shown that when the control signaling is UCI for activation or release of a CG PUSCH in a CG PUSCH group, in one example, the application delay includes:

[0255] ●Start time point: the time slot of the first activated / released CG PUSCH in the CG PUSCH group.

[0256] End time point: the time slot of UCI transmission (or, the start time point is the time slot of UCI transmission, and the end time point is the time slot of the first activated / released CG PUSCH in the CG PUSCH group)

[0257] ●Distance: N1 time slots

[0258] Assuming that the time slot of the first activated / released CG PUSCH in the CG PUSCH group is located at the nth time slot, the time slot of the UCI signaling for activating or releasing the CG PUSCH in the CGPUSCH group is located at or before the position of the following formula,

[0259] or n-N1

[0260] Where n represents the time slot used for PDCCH monitoring, and u represents the subcarrier spacing (SCS).

[0261] In another example, applying delays includes:

[0262] Start time point: the first symbol of the first activated / released CG PUSCH in the CG PUSCH group.

[0263] End time point: the last symbol of UCI transmission (or the start time point is the last symbol of UCI transmission, and the end time point is the first symbol of the first activated / released CGPUSCH in the CG PUSCH group)

[0264] Distance: N1 symbols

[0265] Assuming that the symbol of the first activated / released CG PUSCH in the CG PUSCH group is located at the nth symbol, the last symbol of the UCI signaling for activating or releasing the CG PUSCH in the CG PUSCH group is located at or before the position of the following formula,

[0266] or

[0267] Fig.18 1 to 18. An exemplary block diagram of a hardware platform 1800 is shown, which may be part of a network device (e.g., a base station) or a communication device (e.g., a user equipment (UE)). The hardware platform 1800 includes at least one processor 1810 and a memory 1805 having instructions stored thereon. The instructions executed by the processor 1810 configure the hardware platform 1800 to perform the operations of FIG. 1 to 18. Fig.17 and Figures 19 to 23 18 and the operations described in the various embodiments described in this patent document. Transmitter 1815 transmits or sends information or data to another device. For example, a network device transmitter can send a message to a user device. Receiver 1820 receives information or data transmitted or sent by another device. For example, a user device can receive a message from a network device.

[0268] The above-described embodiments may be applied to wireless communications. Fig.19 An example of a wireless communication system (e.g., a 5G or NR cellular network) is shown that includes a base station 1920 and one or more user equipment (UE) 1911, 1912, and 1913. In some embodiments, the UE accesses the BS (e.g., the network) using a communication link to the network (sometimes referred to as an uplink direction, as depicted by dashed arrows 1931, 1932, 1933), which then enables subsequent communication from the BS to the UE (e.g., shown in the direction from the network to the UE, sometimes referred to as a downlink direction, as depicted by arrows 1941, 1942, 1943). In some embodiments, the BS sends information to the UE (sometimes referred to as a downlink direction, as depicted by arrows 1941, 1942, 1943), which then enables subsequent communication from the UE to the BS (e.g., shown in the direction from the UE to the BS, sometimes referred to as an uplink direction, as depicted by dashed arrows 1931, 1932, 1933). The UE may be, for example, a smart phone, a tablet computer, a mobile computer, a machine to machine (M2M) device, an Internet of Things (IoT) device, etc.

[0269] Fig. 20A An exemplary flow chart for receiving control signaling and performing operations is shown. Operation 2002 includes receiving, by a communication device, control signaling from a network device, the control signaling including one or more parameters of a semi-persistent scheduling (SPS) configuration for scheduling of one or more time and frequency resources. Operation 2004 includes performing, by the communication device, operations based on the SPS configuration, wherein the operations are performed according to an application delay.

[0270] Fig. 20A An exemplary flow chart for transmitting control signaling and performing operations is shown. Operation 2052 includes transmitting, by a communication device, control signaling to a network device, the control signaling including one or more parameters of a semi-persistent scheduling (SPS) configuration for scheduling of one or more time and frequency resources. Operation 2054 includes performing, by the communication device, operations based on the SPS configuration, wherein the operations are performed according to an application delay.

[0271] Fig.21A An exemplary flow chart for transmitting or receiving on one or more time and frequency resources is shown. Operation 2102 includes transmitting, by a network device, control signaling to a communication device, the control signaling including one or more parameters of a semi-persistent scheduling (SPS) configuration for scheduling of one or more time and frequency resources. Operation 2104 includes transmitting or receiving, by the network device, on one or more time and frequency resources based on the SPS configuration and according to an application delay.

[0272] Fig. 21B Another exemplary flow chart for transmitting or receiving on one or more time and frequency resources is shown. Operation 2152 includes receiving, by a network device, control signaling from a communication device, the control signaling including one or more parameters of a semi-persistent scheduling (SPS) configuration for scheduling of the one or more time and frequency resources. Operation 2154 includes transmitting or receiving, by the network device, on the one or more time and frequency resources based on the SPS configuration and according to an application delay.

[0273] The following exemplary operations and features apply to Fig. 20A , Fig. 20B , Fig.21A and Fig. 21B The method in .

[0274] In some embodiments, the SPS configuration includes any one or more of the following: periodicity information, one or more SPS configuration indexes, one or more time and frequency resources, one or more time and frequency resource groups, length information of the duration, a valid or invalid indication, and / or offset information. In some embodiments, each of the one or more time and frequency resource groups includes a set of time and frequency resources, and the set of one or more time and frequency resources is associated with the length information of the duration and a valid or invalid indication, the length information of the duration indicates the time range of the set of one or more time and frequency resources, and the valid or invalid indication indicates the time domain position of the set of one or more time and frequency resources. In some embodiments, each of the one or more time and frequency resource groups is associated with multiple SPS configuration indexes and offset information, and the offset information indicates the offset between the sets of one or more time and frequency resources with different SPS configuration indexes.

[0275] In some embodiments, the control signaling includes any one or more of the following: radio resource control (RRC) signaling, medium access control element (MAC CE) signaling, downlink control information (DCI) signaling, or uplink control information (UCI) signaling. In some embodiments, one or more parameters of the SPS configuration in the DCI signaling include one or more types of indications, which include: activation indications of one or more time and frequency resources, release indications of one or more time and frequency resources, and / or update indications and update parameters of one or more time and frequency resources. In some embodiments, one or more parameters of the SPS configuration in the DCI signaling include an activation indication, which indicates that at least one time and frequency resource is used to transmit or receive data. In some embodiments, one or more parameters of the SPS configuration in the DCI signaling include a release indication, which indicates that at least one time and frequency resource is not used to transmit or receive data.

[0276] In some embodiments, one or more parameters of the SPS configuration in the DCI signaling include an update indication indicating that at least one parameter of the SPS configuration is updated by the information included in the control signaling. In some embodiments, the update parameters of the SPS configuration include any one or more of the following: modulation and coding scheme (MCS) level, information of the MCS table, time domain resource allocation (TDRA), frequency domain resource allocation (FDRA), number of layers, periodicity information, valid or invalid indication and / or offset information. In some embodiments, one or more types of indications are determined or indicated by any one or more of the following: high-level parameters, DCI format, DCI field, which includes HARQ process number, redundancy version, time domain resource allocation, frequency domain resource allocation, MCS, downlink allocation index, TPC command for scheduled PUCCH and / or VRB to PRB mapping.

[0277] In some embodiments, one or more parameters of the SPS configuration in the UCI signaling include any one or more of the following: an activation indication of one or more time and frequency resources, and / or a release indication of one or more time and frequency resources. In some embodiments, one or more parameters of the SPS configuration in the UCI signaling include an activation indication indicating that at least one time and frequency resource is used to transmit or receive data. In some embodiments, one or more parameters of the SPS configuration in the UCI signaling include a release indication indicating that at least one time and frequency resource is not used to transmit or receive data. In some embodiments, operations based on the SPS configuration include any one of the following: transmitting in one or more time and frequency resources, receiving in one or more time domain and frequency domain resources, determining not to transmit in one or more time and frequency resources, or determining not to receive in one or more time domain or frequency domain resources. In some embodiments, the application delay is determined by any one or more of the following: a start time point; an end time point; a distance between a start time point and an end time point.

[0278] In some embodiments, the start time point includes at least one of the following: a time slot for monitoring of the Physical Downlink Control Channel (PDCCH); the last symbol of PDCCH monitoring; a time slot for UCI transmission; the last symbol of the Physical Uplink Control Channel (PUCCH) for transmitting UCI; the last symbol of the Physical Uplink Shared Channel (PUSCH) for transmitting UCI; a time slot of the first resource of one or more time and frequency resources; the first symbol of one or more time and frequency resources; the last symbol of one or more time and frequency resources. In some embodiments, the end time point includes at least one of the following: a time slot of one or more time and frequency resources; the last symbol of one or more time and frequency resources; a time slot for UCI transmission; the first symbol of UCI transmitted by PUCCH; the first symbol of UCI transmitted by PUSCH and a time slot for PDCCH monitoring; the first symbol of PDCCH monitoring. In some embodiments, the time slots of one or more time and frequency resources include the time slot of the first resource within the one or more time and frequency resources, the time slot of the first resource within the time and frequency resource group, the time slot of the last resource within the one or more time and frequency resources, or the time slot of the last resource within the time and frequency resource group.

[0279] In some embodiments, the first or last symbol of one or more time and frequency resources includes the first or last symbol of the first resource within one or more time and frequency resources, the first or last symbol of the first resource within the time and frequency resource group, the first and last symbols of the last resource within one or more time and frequency resources, and the first or last symbol of the last resource within the time and frequency resource group. In some embodiments, the distance K between the start time point and the end time point is determined or indicated by at least one of the following: a high-layer parameter; a subcarrier spacing; a user equipment (UE) capability, wherein the distance K is a positive integer in symbols, time slots, or milliseconds. In some embodiments, in the distance K, any one or more of the following operations are performed: another control signaling is not transmitted in the distance K; another control signaling is not transmitted in the same time slot of the control signaling; when another control signaling is transmitted in the distance K, the other control signaling expires; or when another control signaling is transmitted in the distance K, the other control signaling replaces the control signaling. In some embodiments, applying the delay includes taking the time slot or last symbol monitored by the PDCCH as the starting time point, the time slot or first symbol of the first resource in the time and frequency resource group as the ending time point, and the distance between the time slot or last symbol monitored by the PDCCH and the time slot or first symbol of the first resource is K time slots or symbols, and when the control signaling is received in the nth time slot or symbol, the operation is performed in the time slot of the first resource in the time and frequency resource group located in the (n+K)th time slot or symbol, and wherein n and K are integers greater than or equal to 1.

[0280] In some embodiments, applying the delay includes taking the time slot or last symbol of PDCCH monitoring as the starting time point, the time slot or first symbol of PDCCH monitoring or UCI transmission as the ending time point, and the distance between the time slot or last symbol of PDCCH monitoring and the time slot or first symbol of PDCCH monitoring or UCI transmission is K time slots or symbols, when the control signaling is received in the nth time slot or symbol, responding to the communication device through DCI or UCI, the operation is performed at the time and frequency resources located at the (n+K)th time slot or symbol, and where n and K are integers greater than or equal to 1. In some embodiments, the application delay includes the time slot or first symbol of PDCCH monitoring or UCI transmission as the starting time point, the time slot or last symbol of PDCCH monitoring as the starting time point, and the distance between the time slot or first symbol of PDCCH monitoring or UCI transmission and the time slot or last symbol of PDCCH monitoring is K time slots or symbols. When responding to the communication device via DCI or UCI, the operation is performed at the time and frequency resources located at the nth time slot or symbol, and the control signaling is received in the (nK)th time slot or symbol or before the (nK)th time slot or symbol, where n and K are integers greater than or equal to 1, and where K is less than n.

[0281] In some embodiments, the application delay includes the time slot or first symbol of the first resource within the time and frequency domain resource group as the starting time point, the time slot or last symbol monitored by the PDCCH as the ending time point, and a distance of K time slots or symbols between the time slot or first symbol of the first resource and the time slot or last symbol monitored by the PDCCH, when the operation is performed at the first resource within the time and frequency resource group located at the nth time slot or symbol, the control signaling is received in the (nK)th time slot or symbol or before the (nK)th time slot or symbol, where n and K are integers greater than or equal to 1. In some embodiments, the application delay includes a time slot or first symbol of UCI transmission as a start time point, a time slot or first symbol of a first resource within a time and frequency resource group as an end time point, and a distance of K time slots or symbols between the time slot or first symbol of UCI transmission and the time slot or last symbol of the first resource, and when control signaling is transmitted in an nth time slot or symbol, the operation is performed at a time and frequency resource located in a time range from an (nK)th time slot or symbol to an (n)th time slot or symbol, where n and K are integers greater than or equal to 1. In some embodiments, the SPS includes a configured grant (CG).

[0282] In this document, the term "exemplary" is used to mean an "example of," and does not imply an ideal or preferred embodiment unless otherwise specified.

[0283] Some embodiments described herein are described in the general context of methods or processes, which can be implemented in one embodiment by a computer program product, which is embodied in a computer-readable medium, including computer executable instructions, such as program codes, executed by a computer in a networked environment. Computer-readable media may include removable and non-removable storage devices, including but not limited to read-only memory (ROM), random access memory (RAM), compact discs (CD), digital versatile discs (DVD), etc. Therefore, computer-readable media may include non-transitory storage media. Generally, program modules may include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. Computer or processor executable instructions, related data structures, and program modules represent examples of program codes for executing the steps of the methods disclosed herein. A specific sequence of such executable instructions or related data structures represents an example of corresponding actions for implementing the functions described in such steps or processes.

[0284] Some disclosed embodiments can be implemented as devices or modules using hardware circuits, software or a combination thereof. For example, a hardware circuit implementation may include discrete analog and / or digital components, which are, for example, integrated as a part of a printed circuit board. Alternatively or additionally, the disclosed components or modules may be implemented as application specific integrated circuits (Application Specific Integrated Circuit, ASIC) and / or field programmable gate arrays (Field Programmable Gate Array, FPGA) devices. Some embodiments may additionally or alternatively include a digital signal processor (digital signal processor, DSP), which is a dedicated microprocessor with an architecture optimized for the operational requirements of digital signal processing related to the disclosed functions of the present application. Similarly, various components or subcomponents within each module may be implemented with software, hardware or firmware. The connection between modules and / or components within the modules may be provided using any of the connection methods and media known in the art, including but not limited to communications on the Internet, wired or wireless networks using appropriate protocols.

[0285] Although this document contains many details, these details should not be interpreted as limitations on the scope of the claimed invention or what may be claimed, but rather as descriptions of features for specific embodiments. Certain features described in this document in the context of separate embodiments may also be implemented in combination in a single embodiment. Conversely, various features described in the context of a single embodiment may also be implemented separately in multiple embodiments or in any suitable sub-combination. In addition, although the above-mentioned features may be described as working in certain combinations and even initially claimed as such, in some cases, one or more features from the combination may be deleted from the combination, and the combination may involve sub-combinations or variations of sub-combinations. Similarly, although operations are depicted in a particular order in the accompanying drawings, this should not be understood as requiring that the operations be performed in the particular order or sequence shown, or requiring that all illustrated operations be performed to obtain the desired results.

[0286] Only a few implementations and examples are described, and other implementations, enhancements, and variations may be made based on what is described and illustrated in this disclosure.

Claims

1. A wireless communication method, comprising: receiving, by a communication device from a network device, control signaling including one or more parameters of a semi-persistent scheduling (SPS) configuration for scheduling of one or more time and frequency resources; as well as An operation based on the SPS configuration is performed by the communication device, wherein the operation is performed according to an application delay.

2. A wireless communication method, comprising: transmitting, by a communication device to a network device, control signaling including one or more parameters of a semi-persistent scheduling (SPS) configuration for scheduling of one or more time and frequency resources; as well as An operation based on the SPS configuration is performed by the communication device, wherein the operation is performed according to an application delay.

3. The method according to any one of claims 1 or 2, wherein: The SPS configuration includes any one or more of the following: Periodic information, One or more SPS configuration indexes, one or more time and frequency resources, one or more time and frequency resource groups, Duration length information, Valid or invalid indication, and / or Offset information.

4. The method according to claim 3, in, Each of the one or more time and frequency resource groups comprises a set of time and frequency resources, The set of one or more time and frequency resources is associated with the length information of the duration and a valid or invalid indication, The length information of the duration indicates a time range of the set of one or more time and frequency resources, and The valid or invalid indication indicates the time domain position of the set of one or more time and frequency resources.

5. The method according to claim 3, in, Each of the one or more time and frequency resource groups is associated with a plurality of SPS configuration indexes and offset information, and The offset information indicates an offset between a set of one or more time and frequency resources with different SPS configuration indexes.

6. The method according to any one of claims 1 or 2, wherein: The control signaling includes any one or more of the following: radio resource control (RRC) signaling, medium access control element (MAC CE) signaling, downlink control information (DCI) signaling, or uplink control information (UCI) signaling.

7. The method according to claim 6, wherein: The one or more parameters of the SPS configuration in the DCI signaling include one or more types of indications, and the indications include: an activation indication for said one or more time and frequency resources, a release indication for the one or more time and frequency resources, and / or An update indication and update parameters for the one or more time and frequency resources.

8. The method according to claim 7, wherein: The one or more parameters of the SPS configuration in the DCI signaling include an activation indication indicating that at least one time and frequency resource is used for transmitting or receiving data.

9. The method according to claim 7, wherein: The one or more parameters of the SPS configuration in the DCI signaling include a release indication indicating that at least one time and frequency resource is not used for transmitting or receiving data.

10. The method according to claim 7, wherein: The one or more parameters of the SPS configuration in the DCI signaling include an update indication indicating that at least one parameter of the SPS configuration is updated by information included in the control signaling.

11. The method according to claim 10, wherein: The updated parameters of the SPS configuration include any one or more of the following: modulation and coding scheme (MCS) level, MCS table information, time domain resource allocation (TDRA), frequency domain resource allocation (FDRA), number of layers, periodicity information, valid or invalid indication and / or offset information.

12. The method according to claim 7, wherein: The one or more types of indications are determined or indicated by any one or more of the following: higher layer parameters, DCI format, DCI field, which includes HARQ process number, redundancy version, time domain resource allocation, frequency domain resource allocation, MCS, downlink allocation index, TPC command for scheduled PUCCH and / or VRB to PRB mapping.

13. The method according to claim 6, wherein: The one or more parameters of the SPS configuration in the UCI signaling include any one or more of the following: an activation indication of the one or more time and frequency resources, and / or a release indication of the one or more time and frequency resources.

14. The method according to claim 13, wherein: The one or more parameters of the SPS configuration in the UCI signaling include an activation indication indicating that at least one time and frequency resource is used to transmit or receive data.

15. The method according to claim 13, wherein: The one or more parameters of the SPS configuration in the UCI signaling include a release indication indicating that at least one time and frequency resource is not used for transmitting or receiving data.

16. The method according to any one of claims 1 or 2, wherein: The operation based on the SPS configuration includes any one of the following: transmitting in said one or more time and frequency resources, receiving in said one or more time domain and frequency domain resources, determining not to transmit in the one or more time and frequency resources, or A determination is made not to receive in one or more time domain and frequency domain resources.

17. The method according to claim 1, wherein: The application delay is determined by any one or more of the following: a start time point; an end time point; a distance between the start time point and the end time point.

18. The method according to claim 17, wherein: The starting time point includes at least one of the following: a time slot for physical downlink control channel (PDCCH) monitoring; a last symbol for PDCCH monitoring; a time slot for UCI transmission; a last symbol for physical uplink control channel (PUCCH) for transmitting UCI; a last symbol for physical uplink shared channel (PUSCH) for transmitting UCI; a time slot for a first resource among the one or more time and frequency resources; a first symbol for the one or more time and frequency resources; a last symbol for one or more time and frequency resources.

19. The method according to claim 17, wherein: The end time point includes at least one of the following: the time slot of the one or more time and frequency resources; the last symbol of the one or more time and frequency resources; the time slot for UCI transmission; the first symbol of PUCCH for transmitting UCI; the first symbol of PUSCH for transmitting UCI and the time slot for PDCCH monitoring; the first symbol of PDCCH monitoring.

20. The method according to any one of claims 18 or 19, wherein: The time slots of the one or more time and frequency resources include the time slot of the first resource within the one or more time and frequency resources, the time slot of the first resource within the time and frequency source group, the time slot of the last resource within the one or more time and frequency resources, or the time slot of the last resource within the time and frequency resource group.

21. The method according to any one of claims 18 or 19, wherein: The first or last symbol of the one or more time and frequency resources includes the first or last symbol of the first resource within the one or more time and frequency resources, the first or last symbol of the first resource within the time and frequency resource group, the first or last symbol of the last resource within the one or more time and frequency resources, and the first or last symbol of the last resource within the time and frequency resource group.

22. The method according to claim 17, wherein: The distance K between the start time point and the end time point is determined or indicated by at least one of the following: high-level parameters; subcarrier spacing; user equipment (UE) capabilities, wherein the distance K is a positive integer in symbols, time slots or milliseconds.

23. The method according to claim 22, wherein: In the distance K, any one or more of the following operations are performed: another control signaling is not transmitted in the distance K; another control signaling is not transmitted in the same time slot of the control signaling; when another control signaling is transmitted in the distance K, the other control signaling expires; or when another control signaling is transmitted in the distance K, the other control signaling replaces the control signaling.

24. The method according to any one of claims 18 to 23, in, The application delay includes the time slot or the last symbol monitored by the PDCCH as the starting time point, the time slot or the first symbol of the first resource in the time and frequency resource group as the ending time point, and the distance between the time slot or the last symbol monitored by the PDCCH and the time slot or the first symbol of the first resource is K time slots or symbols, When the control signaling is received in an nth time slot or symbol, the operation is performed at a time slot of a first resource within the time and frequency resource group located in an (n+K)th time slot or symbol, and Wherein n and K are integers greater than or equal to 1.

25. The method according to any one of claims 18 to 23, in, The application delay includes the time slot or the last symbol of PDCCH monitoring as the starting time point, the time slot or the first symbol of PDCCH monitoring or UCI transmission as the ending time point, and the distance between the time slot or the last symbol of PDCCH monitoring and the time slot or the first symbol of PDCCH monitoring or UCI transmission is K time slots or symbols, When the control signaling is received in the nth time slot or symbol, the operation is performed at the time and frequency resource located in the (n+K)th time slot or symbol in response to the communication device via DCI or UCI, and Wherein, n and K are integers greater than or equal to 1.

26. The method according to any one of claims 18 to 23, in, The application delay includes the time slot or the first symbol of the PDCCH monitoring or UCI transmission as the starting time point, the time slot or the last symbol of the PDCCH monitoring as the starting time point, and the distance between the time slot or the first symbol of the PDCCH monitoring or UCI transmission and the time slot or the last symbol of the PDCCH monitoring is K time slots or symbols, When the operation is performed at a time and frequency resource located at an nth time slot or symbol in response to the communication device via a DCI or UCI, the control signaling is received in or before an (nK)th time slot or symbol, Where n and K are integers greater than or equal to 1, and Where K is less than n.

27. The method according to any one of claims 18 to 23, in, The application delay includes the time slot or the first symbol of the first resource in the time-frequency domain resource group as the starting time point, the time slot or the last symbol monitored by the PDCCH as the ending time point, and the distance between the time slot or the first symbol of the first resource and the time slot or the last symbol monitored by the PDCCH is K time slots or symbols, When the operation is performed at a first resource within the time and frequency resource group located at an nth time slot or symbol, the control signaling is received in or before an (nK)th time slot or symbol, and Wherein, n and K are integers greater than or equal to 1.

28. The method according to any one of claims 18 to 23, wherein: The application delay includes the time slot or first symbol of UCI transmission as the starting time point, the time slot or first symbol of the first resource in the time and frequency resource group as the ending time point, and the distance between the time slot or first symbol of UCI transmission and the time slot or last symbol of the first resource is K time slots or symbols. When the control signaling is transmitted in the nth time slot or symbol, the operation is performed at the time and frequency resource located in the time range from the (nK)th time slot or symbol to the (n)th time slot or symbol, and wherein n and K are integers greater than or equal to 1.

29. The method according to claim 2, wherein: The SPS includes a configured grant (CG).

30. A wireless communication method, comprising: transmitting, by a network device to a communication device, control signaling including one or more parameters of a semi-persistent scheduling (SPS) configuration for scheduling of one or more time and frequency resources; as well as The network device transmits or receives on the one or more time and frequency resources based on the SPS configuration and according to application delay.

31. A wireless communication method, comprising: receiving, by a network device, control signaling from a communication device, the control signaling comprising one or more parameters of a semi-persistent scheduling (SPS) configuration for scheduling of one or more time and frequency resources; as well as The network device transmits or receives on the one or more time and frequency resources based on the SPS configuration and according to application delay.

32. The method according to any one of claims 30 or 31, wherein: The SPS configuration includes any one or more of the following: Periodic information, One or more SPS configuration indexes, one or more time and frequency resources, one or more time and frequency resource groups, Duration length information, Valid or invalid indication, and / or Offset information.

33. The method according to claim 32, in, Each of the one or more time and frequency resource groups comprises a set of time and frequency resources, The set of one or more time and frequency resources is associated with the length information of the duration and a valid or invalid indication, The length information of the duration indicates a time range of the set of one or more time and frequency resources, and The valid or invalid indication indicates the time domain position of the set of one or more time and frequency resources.

34. The method according to claim 32, in, Each of the one or more time and frequency resource groups is associated with a plurality of SPS configuration indexes and offset information, and The offset information indicates an offset between a set of one or more time and frequency resources with different SPS configuration indexes.

35. An apparatus for wireless communication, comprising a processor configured to implement the method according to one or more of claims 1 to 34.

36. A non-transitory computer-readable program storage medium having stored thereon codes which, when executed by a processor, cause the processor to implement the method according to one or more of claims 1 to 34.

Citation Information

Patent Citations

  • Semi-persistent scheduling method, base station equipment and user equipment

    CN111757521A

  • Apparatus and method for semi-persistent scheduling and power control in wireless communication system

    US20180279274A1

  • Data transmission method and corresponding terminal

    US20210337583A1

  • Apparatuses and methods to reduce application latency for periodic data transmission in radio access networks

    WO2019149371A1