Fabricated wallboard mounting structure and mounting method thereof
Through the combination of mounting frame, winding assembly and oblique support assembly, the winding roll and long support rods are used to achieve slow lifting and positioning installation of prefabricated wall panels, solving the problem of prefabricated wall panel installation in narrow construction environments, and achieving high efficiency. Stable installation effect.
Patent Information
- Application Number
- CN202411651374.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-19
- Publication Date
- 2025-01-10
AI Technical Summary
In a narrow construction environment, heavy handling equipment such as cranes are difficult to enter, resulting in difficulty in installing prefabricated wall panels.
Using a structure including a mounting frame, a winding assembly and an oblique support assembly, the prefabricated wall panels are slowly lifted and positioned and installed through winding rolls and long support rods, and each component is detachable for easy transportation and adapted to narrow spaces.
The installation of prefabricated wall panels can be completed without a large application space, which improves installation efficiency and stability and is suitable for narrow construction environments.
Smart Images

Figure CN119288222A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of prefabricated wall panel installation, and in particular to an assembled wall panel installation structure and an installation method thereof. Background Art
[0002] Prefabricated wall panels, also known as prefabricated wall panels or modular wall panels, are a type of building material, usually made of concrete, wood or other composite materials, that can be produced in a factory and then transported to the construction site for assembly. The design of this type of wall panel makes building construction faster and more efficient, while also helping to reduce the complexity and reliance on labor on site.
[0003] At present, when installing prefabricated wall panels, heavy handling equipment such as cranes are usually used to lift the prefabricated wall panels to the top of the installation position, and then slowly lower them. When the prefabricated wall panels are lowered to a height of about 1M, workers are required to hold the prefabricated wall panels by hand and continue to slowly lower them, and observe through reflectors whether the reserved steel bars of the wall are aligned with the installation holes of the prefabricated wall panels, so that the reserved steel bars are inserted into the installation holes of the prefabricated wall panels, and then install oblique supports to correct the positioning and verticality of the wall, thereby completing the installation of the prefabricated wall panels.
[0004] Regarding the above-mentioned related technologies, heavy-duty handling equipment such as cranes usually requires a larger layout space. When the surrounding buildings are densely distributed, it is difficult for heavy-duty handling equipment such as cranes to enter the construction site. Therefore, it is difficult to use heavy-duty handling equipment such as cranes in a narrow construction environment. Summary of the invention
[0005] In order to adapt to the narrow construction environment for installing prefabricated wall panels, the present application provides an assembled wall panel installation structure and an installation method thereof.
[0006] The present application provides an assembled wall panel installation structure and an installation method thereof using the following technical solutions: An assembled wall panel installation structure, comprising: A mounting frame, used for mounting on a mounting platform of a prefabricated wall panel and located above a location to be mounted; The winding assembly comprises a winding frame and a winding roller, wherein the winding frame is mounted on the mounting frame located above, the winding roller is rotatably connected to the winding frame, a winding rope is wound around the winding roller, a hook is arranged at the end of the winding rope, and the hook is used to be fixed to the prefabricated wall panel; the winding frame is also fixedly connected to a support wheel, and the support wheel is located directly above the location to be installed; The inclined support assembly includes a long support rod, which is a telescopic rod. One end of the long support rod is hinged on the mounting platform, and the other end is equipped with a guide wheel, and the end with the guide wheel passes through the mounting frame. The winding rope is wound around the guide wheel, and the long support rod can be overlapped on the support wheel.
[0007] By adopting the above technical solution, the winding roller is unwound so that the hook is connected to the prefabricated wall panel below, and then the winding roller is driven to rewind, and the prefabricated wall panel is slowly lifted by the winding of the winding roller. After the height of the bottom of the prefabricated wall panel is higher than the installation site, the long support rod is slowly retracted so that the winding rope is located on the support wheel, and the prefabricated wall panel is located directly above the installation site. Then, the reserved steel bar is aligned with the installation hole of the prefabricated wall panel, and the winding roller is controlled to slowly unwind, so that the prefabricated wall panel is placed at the installation site, thereby completing the installation of the assembled wall panel.
[0008] During the installation of prefabricated wall panels, the installation frame, winding assembly and diagonal support assembly can all be disassembled for transportation and then installed on the installation platform. At the same time, the long support rod is extended to guide the rising route of the prefabricated wall panels so that the prefabricated wall panels can rise smoothly. The long support rod is then retracted so that the prefabricated wall panels can be moved above the installation site for easy installation. Therefore, the transportation and installation of the installation structure do not require a large space, so it is more suitable for the installation of prefabricated wall panels in narrow construction environments.
[0009] Optionally, an abutment seat is hingedly connected to one end of the long support rod away from the mounting platform, and the guide wheel is fixedly connected to the abutment seat. When the abutment seat rotates on the side away from the guide wheel, it abuts against the long support rod to limit the rotation of the abutment seat.
[0010] By adopting the above technical solution, when the guide wheel is used to guide the winding rope, the end of the abutment seat away from the guide wheel abuts against the long support rod, thereby limiting the abutment seat, so that the guide wheel can smoothly guide the winding rope.
[0011] When the long support rod is retracted, the abutment seat can be rotated to abut the abutment seat against the prefabricated wall panel, so that the long support rod can support the prefabricated wall panel, which is convenient for the installation of the prefabricated wall panel.
[0012] Optionally, connecting ears are fixedly connected to both sides of the abutment seat, and the connecting ears are used to be fixedly connected to the prefabricated wall panels.
[0013] By adopting the above technical solution, the setting of the connecting ears facilitates fixed connection with the prefabricated wall panels.
[0014] Optionally, a plurality of winding rollers are provided, and the plurality of winding rollers are coaxially fixedly connected. A driving motor is also fixedly connected to the winding frame, and an output shaft of the driving motor is coaxially fixedly connected to one of the winding rollers.
[0015] By adopting the above technical solution, multiple winding rollers wind up the winding ropes at the same time, so that the movement of the prefabricated wall panels is more stable when the winding rollers are winding up.
[0016] Optionally, the hook includes a connecting beam, a plurality of connecting holes are provided on both sides of the connecting beam, the winding rope is connected to the connecting holes on one side one by one, and a connecting hook is provided on the connecting hole at the other end, and the connecting hook is connected to the prefabricated wall panel.
[0017] By adopting the above technical solution, multiple winding ropes can be used to pull up the prefabricated wall panels at the same time using the connection holes, and different numbers and intervals of connecting hooks can be selected to connect with the connecting beams, so that the hooks can adapt to prefabricated wall panels of different sizes.
[0018] Optionally, a slide rail is provided on the mounting frame in the length direction, a slider is connected to the winding frame, and the slider is slidably connected to the slide rail.
[0019] By adopting the above technical solution and setting the slide rail, multiple prefabricated wall panels can be installed on the same installation frame, thereby improving the installation efficiency.
[0020] Optionally, a driving screw is installed on the mounting frame, the length direction of the driving screw is arranged parallel to the length direction of the slide rail, a movable motor is installed at one end of the driving screw, the movable motor is coaxially fixedly connected to the driving screw, and the driving screw is threadedly connected to the winding frame.
[0021] By adopting the above technical solution, the mobile motor and the driving screw are used to drive the winding frame to move and position at any position of the installation frame, so that the winding assembly can be used to install multiple prefabricated wall panels.
[0022] Optionally, the long support rod includes a telescopic tube and an extension rod, the telescopic tube is rotatably connected to a control tube, the extension rod is inserted into the telescopic tube, and the control tube is threadedly connected to the extension rod, a limiting groove is provided on the extension rod, a limiting block is fixedly connected to the telescopic tube, and the limiting block is inserted in the limiting groove.
[0023] By adopting the above technical solution, the extension rod can be freely extended and retracted in the telescopic cylinder by utilizing the rotation of the control cylinder and the cooperation of the limit block and the limit groove.
[0024] Optionally, the inclined support assembly also includes a short support rod, one end of which is hinged on the mounting platform, and the other end is hinged with a connecting seat, and the connecting seat can be rotated to be fixedly connected to the telescopic cylinder, and can also be rotated to be fixedly connected to the prefabricated wall panel.
[0025] By adopting the above technical solution, when the short support rod is rotated to be fixedly connected with the telescopic cylinder, the stability of the long support rod can be increased, so that the long support rod can bear heavier prefabricated wall panels.
[0026] At the same time, after the long support rods are used, the short support rods are used to support the prefabricated wall panels, making the prefabricated wall panels more stable during the installation process.
[0027] The present application also discloses a method for installing an assembled wall panel, comprising: Assemble the installation structure, install the installation frame on the installation platform, then install the winding assembly on the installation frame, then install the oblique support assembly, and control one end of the oblique support assembly to pass through the installation frame, and the oblique support assembly is overlapped on the support wheel; Connect the prefabricated wall panels, wind the reel rope around the guide wheel, unwind it downward, and connect the hook on the reel rope to the prefabricated wall panels; Lift the prefabricated wall panel, control the winding roller to wind up the winding rope, slowly pull up the prefabricated wall panel, and after the bottom of the prefabricated wall panel is higher than the reserved steel bars on the installation platform, control the long support rod to slowly retract, and at the same time, slowly wind up the winding roller until the prefabricated wall panel is directly above the reserved steel bars; Install the prefabricated wall panels, control the winding roller to unwind slowly, and align the reserved steel bars with the installation holes of the prefabricated wall panels; Remove the hooks and remove the hooks connected to the prefabricated wall panels.
[0028] By adopting the above technical solution, the installation of the prefabricated wall panels at the installation location is completed by assembling the installation structure → connecting the prefabricated wall panels → lifting the prefabricated wall panels → installing the prefabricated wall panels → removing the hooks.
[0029] Install the mounting frame on the mounting platform, then install the winding assembly on the mounting frame, then install the diagonal support assembly, and control one end of the diagonal support assembly to pass through the mounting frame, and the diagonal support assembly is overlapped on the support wheel. Then wind the winding rope around the guide wheel and unwind it downward, connect the hook on the winding rope to the prefabricated wall panel, then control the winding roller to wind the winding rope, slowly pull up the prefabricated wall panel, and when the bottom of the prefabricated wall panel is higher than the reserved steel bars on the mounting platform, control the long support rod to slowly shrink, and at the same time, slowly wind the winding roller until the prefabricated wall panel is directly above the reserved steel bars.
[0030] Then control the winding roller to unwind slowly, and align the reserved steel bars with the installation holes of the prefabricated wall panels. Finally, remove the hooks connected to the prefabricated wall panels, and then install the prefabricated wall panels at the location to be installed.
[0031] In summary, the present application includes at least one of the following beneficial technical effects: 1. Through the coordination of the mounting frame, the winding frame, the winding roller, the winding rope, the hook, the supporting wheel and the long supporting rod, the long supporting rod is extended to guide the rising route of the prefabricated wall panel, so that the prefabricated wall panel can be smoothly raised, and then the long supporting rod is retracted, so that the prefabricated wall panel can be moved above the installation location, which is convenient for the installation of the prefabricated wall panel installation structure, so that the installation of the prefabricated wall panel installation structure does not require a large space, thereby achieving the effect of adapting to the narrow construction environment to install the prefabricated wall panel; 2. Through the cooperation of the long support rod, the guide wheel, the abutment seat and the connecting ear, the long support rod can not only guide the rising route of the prefabricated wall panel, but also support the prefabricated wall panel; 3. Through the coordination of the mounting frame, the slide rail, the winding frame, the slider, the driving screw and the mobile motor, multiple prefabricated wall panels can be installed on the mounting frame, thereby achieving the effect of improving the installation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a structural schematic diagram of an assembled wall panel installation structure in an embodiment of the present application.
[0033] Figure 2 It is a schematic diagram of the structure of the winding assembly in the embodiment of the present application.
[0034] Figure 3 It is a structural schematic diagram of the oblique support assembly in an embodiment of the present application.
[0035] Figure 4 It is a schematic diagram of the structure of the long support rod in an embodiment of the present application.
[0036] Figure 5 yes Figure 4 Enlarged view of point A in the middle.
[0037] Figure 6 It is a flow chart of the method for installing assembled wall panels in an embodiment of the present application.
[0038] Description of reference numerals: 10. Installation platform; 1. Installation frame; 11. Slide rail; 12. Auxiliary rod; 13. Driving screw rod; 14. Moving motor; 2. Winding assembly; 21. Winding frame; 211. Sliding block; 22. Winding roller; 23. Winding rope; 24. Hook; 241. Connecting beam; 242. Connecting hole; 243. Connecting hook; 25. Support wheel; 26. Driving motor; 3. Oblique support assembly; 31. Long support rod; 311. Telescopic cylinder; 312. Extension rod; 313. Control cylinder; 314. Limiting groove; 315. Limiting block; 32. Guide wheel; 33. Abutment seat; 34. Connecting ear; 35. Short support rod; 36. Connecting seat. DETAILED DESCRIPTION
[0039] The following is combined with Figure 1-6 This application is described in further detail.
[0040] An embodiment of the present application discloses an assembled wall panel installation structure.
[0041] Reference Figure 1 A prefabricated wall panel installation structure includes a mounting frame 1, a winding assembly 2 and an inclined support assembly 3. The mounting frame 1 is installed on the mounting platform 10 of the prefabricated wall panel and is located above the location to be installed. The winding assembly 2 includes a winding frame 21 and a winding roller 22. The winding frame 21 is installed on the mounting frame 1 located above. The winding roller 22 is rotatably connected to the winding frame 21. A winding rope 23 is wound around the winding roller 22. A hook 24 is provided at the end of the winding rope 23. The hook 24 is used to be fixed to the prefabricated wall panel. A support wheel 25 is also fixedly connected to the winding frame 21. The support wheel 25 is located directly above the location to be installed. The inclined support assembly 3 includes a long support rod 31, which is a telescopic rod. One end of the long support rod 31 is hinged on the mounting platform 10, and a guide wheel 32 is installed on the other end. One end of the guide wheel 32 passes through the mounting frame 1, and the winding rope 23 is wound around the guide wheel 32, and the long support rod 31 can be overlapped on the support wheel 25.
[0042] During the installation of the prefabricated wall panels, the installation frame 1, the winding assembly 2 and the inclined support assembly 3 can all be disassembled for transportation, and then installed after arriving at the installation platform 10. At the same time, the long support rod 31 is extended to guide the rising route of the prefabricated wall panels so that the prefabricated wall panels can rise smoothly. The long support rod 31 is then retracted so that the prefabricated wall panels can be moved above the installation site for easy installation. Therefore, the transportation and installation of the installation structure do not require a large space, so it is more suitable for installing prefabricated wall panels in narrow construction environments.
[0043] There are multiple winding rollers 22. In this embodiment, there are two winding rollers 22. In other embodiments, the number of winding rollers 22 can be adaptively adjusted according to the length and weight of the prefabricated wall panels, for example, 3 or 4.
[0044] Reference Figure 2 The two winding rollers 22 are coaxially fixedly connected, and a driving motor 26 is also fixedly connected to the winding frame 21, and the output shaft of the driving motor 26 is coaxially fixedly connected to one of the winding rollers 22. The two winding rollers 22 are used to simultaneously wind up the winding rope 23, so that when the winding rollers 22 are winding up, the prefabricated wallboard is not easy to rotate around itself, so that the lifting movement of the prefabricated wallboard is more stable.
[0045] In this embodiment, the hook 24 includes a connecting beam 241, and a plurality of connecting holes 242 are provided on both sides of the connecting beam 241. The winding rope 23 is connected to the connecting holes 242 on one side in a one-to-one correspondence, and a connecting hook 243 is provided on the connecting hole 242 at the other end, and the connecting hook 243 is connected to the prefabricated wall panel. The setting of the plurality of connecting holes 242 enables the winding roller 22 to be adapted whether it is set to 2, 3 or 4, and different numbers of connecting hooks 243 can also be adapted according to the length and weight of the prefabricated wall panel. The number of connecting hooks 243 can be set to be consistent with the number of winding rollers 22, so as to facilitate the determination of the position of the prefabricated wall panel after lifting. Of course, the number of connecting hooks 243 and the number of winding rollers 22 can also be set to be inconsistent, and the installation can be completed by adjusting after the prefabricated wall panel is lifted.
[0046] The connection holes 242 can be used to pull up the prefabricated wall panels simultaneously with multiple winding ropes 23. At the same time, different numbers and spacings of connecting hooks 243 can be selected to connect with the connecting beam 241, so that the hooks 24 can adapt to prefabricated wall panels of different sizes.
[0047] In order to facilitate the installation of the prefabricated wall panels on the same side wall, the two sides of the mounting frame 1 are installed at the two corners on the same side of the prefabricated platform, and at the same time, a slide rail 11 is provided on the mounting frame 1 in the length direction, and a slider 211 is connected to the winding frame 21, and the slider 211 is slidably connected to the slide rail 11. The winding frame 21 can slide freely along the length direction of the mounting frame 1, so that the position of the winding wheel can be adjusted, which is not only convenient for adjusting the position of the prefabricated wall panels during installation, but also can be installed on multiple installation positions in the same length direction, so that multiple prefabricated wall panels can be installed on the same mounting frame 1, thereby improving the efficiency of installation.
[0048] Reference Figure 1 In an optional embodiment, in order to make the mounting frame 1 installed on the mounting platform 10 more stably, an auxiliary rod 12 is also installed on the mounting frame 1, one end of the auxiliary rod 12 is fixedly connected to the top of the mounting frame 1, and the other end is fixedly connected to the mounting platform 10. The mounting frame 1 is fixed by the auxiliary rod 12, so that the mounting frame 1 is more stable when lifting prefabricated wall panels.
[0049] Reference Figure 2 A driving screw rod 13 is installed on the mounting frame 1, and the length direction of the driving screw rod 13 is arranged parallel to the length direction of the slide rail 11. A moving motor 14 is installed at one end of the driving screw rod 13, and the moving motor 14 is coaxially fixedly connected with the driving screw rod 13, and the driving screw rod 13 is threadedly connected with the winding frame 21. By using the cooperation of the moving motor 14 and the driving screw rod 13, the winding frame 21 is driven to move and position at any position of the mounting frame 1, so that the winding assembly 2 can accurately install the prefabricated wall panel, and it is also convenient to install multiple prefabricated wall panels.
[0050] Reference Figure 3 The end of the long support rod 31 away from the installation platform 10 is hinged with an abutment seat 33, and the guide wheel 32 is fixedly connected to the abutment seat 33. When the side of the abutment seat 33 away from the guide wheel 32 rotates, it abuts against the long support rod 31 to limit the rotation of the abutment seat 33. The long support rod 31 can not only use the guide wheel 32 to guide the winding rope 23, but also use the abutment seat 33 to fix and support the installed prefabricated wall panel.
[0051] When the guide wheel 32 is used to guide the winding rope 23, the end of the abutment seat 33 away from the guide wheel 32 abuts against the long support rod 31, thereby limiting the abutment seat 33 so that the guide wheel 32 can smoothly guide the winding rope 23. When the long support rod 31 is retracted, the abutment seat 33 can be rotated to abut against the prefabricated wall panel, so that the long support rod 31 can support the prefabricated wall panel, which is convenient for the installation of the prefabricated wall panel.
[0052] Connecting ears 34 are also fixedly connected to both sides of the abutting seat 33. The connection ears 34 are arranged to facilitate fixed connection with the prefabricated wall panel, so that the long support rod 31 can support the prefabricated wall panel.
[0053] Reference Figure 4 and Figure 5 The long support rod 31 includes a telescopic cylinder 311 and an extension rod 312. The telescopic cylinder 311 is rotatably connected with a control cylinder 313. The extension rod 312 is inserted into the telescopic cylinder 311, and the control cylinder 313 is threadedly connected with the extension rod 312. A limiting groove 314 is provided on the extension rod 312. The telescopic cylinder 311 is fixedly connected with a limiting block 315, and the limiting block 315 is inserted into the limiting groove 314. By rotating the control cylinder 313 and cooperating with the limiting block 315 and the limiting groove 314, the extension rod 312 can be freely extended and retracted in the telescopic cylinder 311.
[0054] Reference Figure 3The oblique support assembly 3 also includes a short support rod 35, one end of which is hinged on the installation platform 10, and the other end is hinged with a connection seat 36, which can be rotated to be fixedly connected with the telescopic cylinder 311. When the short support rod 35 is fixedly connected with the telescopic cylinder 311, the stability of the long support rod 31 can be increased, so that the long support rod 31 can bear heavier prefabricated wall panels. At the same time, after the long support rod 31 is used, the connection seat 36 can also be rotated to be fixedly connected with the prefabricated wall panel, and the short support rod 35 is used to support the prefabricated wall panel, so that the prefabricated wall panel is more stable during the installation process.
[0055] The implementation principle of an assembled wall panel installation structure of an embodiment of the present application is: the installation frame 1, the winding assembly 2 and the inclined support assembly 3 are respectively transported to the installation platform 10, and then the installation frame 1 is assembled at the edge of the installation platform 10 so that the installation frame 1 is located above the installation location, and then the winding assembly 2 is installed on the installation frame 1, and then one end of the long support rod 31 is hinged to the installation platform 10, and the other end passes through the edge of the installation platform 10 from the upper side of the support wheel 25, and then the long support rod 31 is overlapped on the support wheel 25, and the winding rope 23 is overlapped on the guide wheel 32.
[0056] The winding roller 22 is unwound so that the hook 24 is connected to the prefabricated wall panel below, and then the winding roller 22 is driven to rewind, and the prefabricated wall panel is slowly lifted by the winding of the winding roller 22. After the height of the bottom of the prefabricated wall panel is higher than the installation location, the long support rod 31 is slowly retracted so that the winding rope 23 is located on the support wheel 25, and the prefabricated wall panel is located directly above the installation location. Then, the reserved steel bar is aligned with the installation hole of the prefabricated wall panel, and the winding roller 22 is controlled to slowly unwind, so that the prefabricated wall panel is placed at the installation location, thereby completing the installation of the assembled wall panel.
[0057] During the installation of the prefabricated wall panels, the installation frame 1, the winding assembly 2 and the inclined support assembly 3 can all be disassembled for transportation, and then installed after arriving at the installation platform 10. At the same time, the long support rod 31 is extended to guide the rising route of the prefabricated wall panels so that the prefabricated wall panels can rise smoothly. The long support rod 31 is then retracted so that the prefabricated wall panels can be moved above the installation site for easy installation. Therefore, the transportation and installation of the installation structure do not require a large space, so it is more suitable for installing prefabricated wall panels in narrow construction environments.
[0058] An embodiment of the present application discloses a method for installing an assembled wall panel.
[0059] Reference Figure 6 The method for installing the prefabricated wall panel includes assembling the installation structure → connecting the prefabricated wall panel → lifting the prefabricated wall panel → installing the prefabricated wall panel → removing the hook 24 to complete the installation of the prefabricated wall panel at the installation location.
[0060] Assembling the installation structure, specifically: Install the mounting frame 1 on the edge of the mounting platform 10, then install the winding assembly 2 on the mounting frame 1, and then install the oblique support assembly 3, and control one end of the oblique support assembly 3 to pass through the mounting frame 1 and extend to the outside of the mounting platform 10, and the oblique support assembly 3 is overlapped on the support wheel 25; Connecting prefabricated wall panels, specifically; The winding rope 23 is wound around the guide wheel 32 and unwound downward, and the hook 24 on the winding rope 23 is connected to the prefabricated wall panel; To enhance prefabricated wall panels, specifically; The winding roller 22 is controlled to wind up the winding rope 23, and the prefabricated wall panel is slowly pulled up. After the bottom of the prefabricated wall panel is higher than the reserved steel bars on the installation platform 10, the long support rod 31 is controlled to slowly shrink, and the winding roller 22 is slowly wound up until the winding rope 23 is overlapped on the support wheel 25, so that the prefabricated wall panel is located directly above the reserved steel bars; Install prefabricated wall panels, specifically; Control the winding roller 22 to unwind slowly, and align the reserved steel bars with the installation holes of the prefabricated wall panels; Removing the hook 24, specifically: The hook 24 connected to the prefabricated wall panel is removed.
[0061] The mounting frame 1 is mounted on the edge of the mounting platform 10, and the winding assembly 2 is mounted on the mounting frame 1, and then the oblique support assembly 3 is installed, and one end of the oblique support assembly 3 is controlled to pass through the mounting frame 1 and extend to the outside of the mounting platform 10, and the oblique support assembly 3 is overlapped on the support wheel 25. Then the winding rope 23 is wound around the guide wheel 32 and unwound downward until the hook 24 on the winding rope 23 is connected to the prefabricated wall panel, and then the winding roller 22 is controlled to wind up the winding rope 23, and the prefabricated wall panel is slowly pulled up. After the bottom of the prefabricated wall panel is higher than the reserved steel bars on the mounting platform 10, the long support rod 31 is controlled to slowly shrink, and the winding roller 22 is slowly wound until the prefabricated wall panel is located directly above the reserved steel bars.
[0062] Then, the winding roller 22 is controlled to unwind slowly, and the reserved steel bars are aligned with the installation holes of the prefabricated wall panels. Finally, the hooks 24 connected to the prefabricated wall panels are removed, and the prefabricated wall panels can be installed at the location to be installed.
[0063] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. An assembled wall panel installation structure, characterized in that: include: A mounting frame (1) is used for mounting on a mounting platform (10) of a prefabricated wall panel and is located above a location to be mounted; The winding assembly (2) comprises a winding frame (21) and a winding roller (22), wherein the winding frame (21) is mounted on the mounting frame (1) located above, and the winding roller (22) is rotatably connected to the winding frame (21), and a winding rope (23) is wound around the winding roller (22), and a hook (24) is provided at the end of the winding rope (23), and the hook (24) is used to be fixed to the prefabricated wall panel; the winding frame (21) is also fixedly connected to a support wheel (25), and the support wheel (25) is located directly above the location to be installed; The oblique support assembly (3) comprises a long support rod (31), wherein the long support rod (31) is a telescopic rod, one end of the long support rod (31) is hinged on the mounting platform (10), and the other end is provided with a guide wheel (32), and one end of the guide wheel (32) passes through the mounting frame (1), the winding rope (23) is wound around the guide wheel (32), and the long support rod (31) can be overlapped on the support wheel (25).
2. The assembled wall panel installation structure according to claim 1, characterized in that: An end of the long support rod (31) away from the mounting platform (10) is hingedly connected to an abutment seat (33), and the guide wheel (32) is fixedly connected to the abutment seat (33). When the abutment seat (33) is rotated away from the guide wheel (32), it abuts against the long support rod (31) to limit the rotation of the abutment seat (33).
3. The assembled wall panel installation structure according to claim 2, characterized in that: The two sides of the abutment seat (33) are also fixedly connected with connection ears (34), and the connection ears (34) are used for fixed connection with the prefabricated wall panels.
4. The assembled wall panel installation structure according to claim 1, characterized in that: A plurality of winding rollers (22) are provided, and the plurality of winding rollers (22) are coaxially fixedly connected. A drive motor (26) is also fixedly connected to the winding frame (21), and an output shaft of the drive motor (26) is coaxially fixedly connected to one of the winding rollers (22).
5. The assembled wall panel installation structure according to claim 4 is characterized in that: The hook (24) comprises a connecting beam (241), a plurality of connecting holes (242) are provided on both sides of the connecting beam (241), the winding rope (23) is connected to the connecting holes (242) on one side in a one-to-one correspondence, and a connecting hook (243) is provided on the connecting hole (242) at the other end, and the connecting hook (243) is connected to the prefabricated wall panel.
6. The assembled wall panel installation structure according to claim 1, characterized in that: The mounting frame (1) is provided with a slide rail (11) in the length direction, the winding frame (21) is connected with a slide block (211), and the slide block (211) is slidably connected to the slide rail (11).
7. The assembled wall panel installation structure according to claim 6, characterized in that: A driving screw (13) is mounted on the mounting frame (1), the length direction of the driving screw (13) being arranged parallel to the length direction of the slide rail (11), a moving motor (14) being mounted on one end of the driving screw (13), the moving motor (14) being coaxially fixedly connected to the driving screw (13), and the driving screw (13) being threadedly connected to the winding frame (21).
8. The assembled wall panel installation structure according to claim 1, characterized in that: The long support rod (31) comprises a telescopic cylinder (311) and an extension rod (312); the telescopic cylinder (311) is rotatably connected to a control cylinder (313); the extension rod (312) is inserted into the telescopic cylinder (311); the control cylinder (313) is threadedly connected to the extension rod (312); a limiting groove (314) is provided on the extension rod (312); a limiting block (315) is fixedly connected to the telescopic cylinder (311); and the limiting block (315) is inserted into the limiting groove (314).
9. The assembled wall panel installation structure according to claim 8, characterized in that: The oblique support assembly (3) further comprises a short support rod (35), one end of the short support rod (35) being hinged on the mounting platform (10), and the other end of the short support rod (35) being hinged with a connecting seat (36), the connecting seat (36) being rotatable to be fixedly connected to the telescopic cylinder (311), and also being rotatable to be fixedly connected to the prefabricated wall panel.
10. A method for installing an assembled wall panel, characterized in that: Including, applied to the assembled wall panel installation structure according to any one of claims 1 to 9: Assemble the installation structure, install the installation frame (1) on the installation platform (10), then install the winding assembly (2) on the installation frame (1), and then install the inclined support assembly (3), and control one end of the inclined support assembly (3) to pass through the installation frame (1), and the inclined support assembly (3) is overlapped on the support wheel (25); Connect the prefabricated wall panels, wind the reeling rope (23) around the guide wheel (32), unwind it downward, and connect the hook (24) on the reeling rope (23) to the prefabricated wall panels; The prefabricated wall panel is lifted, and the winding roller (22) is controlled to wind up the winding rope (23), and the prefabricated wall panel is slowly pulled up. After the bottom of the prefabricated wall panel is higher than the reserved steel bars on the installation platform (10), the long support rod (31) is controlled to slowly retract, and the winding roller (22) is slowly wound up at the same time, until the prefabricated wall panel is located directly above the reserved steel bars; Install the prefabricated wall panel, control the winding roller (22) to slowly unwind, and align the reserved steel bars with the installation holes of the prefabricated wall panel; The hook (24) is removed, and the hook (24) connected to the prefabricated wall panel is removed.