Construction hanging basket device
By designing a construction hanging basket device for high-rise steel structure construction, the hanging basket can move freely in the horizontal and vertical directions by using the climbing frame steel structure, H-shaped steel slide rails, hand-operated hoists and hand-chain hoists. It solves the cumbersome and dangerous problems of traditional connection methods and improves construction efficiency and safety.
Patent Information
- Application Number
- CN202411454801.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-17
- Publication Date
- 2025-01-21
AI Technical Summary
In the construction of high-rise steel structures, the connection between the traditional floor steel beams and the core cylinder embedded parts is cumbersome, with high risk and low construction efficiency.
Design a construction hanging basket device, including the core tube wall, the steel climbing steel structure, the H -shaped steel slide rail, the hand pulling the cape, and the hand -stretched gourd. Move freely.
This device simplifies the construction process, improves construction efficiency and security, reduces human and material investment, and reduces construction costs.
Smart Images

Figure CN119332915A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of structural engineering, and in particular to a construction hanging basket device. Background Art
[0002] At present, in the construction of high-rise steel structures, the connection between floor steel beams and embedded parts of the core tube is the main work of hoisting. The common construction method is to first use a tower crane to lift the steel beam to the embedded part position, then set up a floor frame for workers to climb to the embedded part position, cooperate with the tower crane to adjust the steel beam to a suitable position, and use a traction rope to push the steel beam against the positioning plate, and then install the fixing bolts and weld the wing web. Repeat this process until all floor steel beams are installed. This traditional installation method is cumbersome, dangerous, and has low construction efficiency. There are many high-rise structural steel beams and a large installation workload. Therefore, we have introduced a new construction hanging basket device. Summary of the invention
[0003] The main purpose of the present invention is to provide a construction hanging basket device, which can effectively solve the problems in the background technology.
[0004] To achieve the above object, the technical solution adopted by the present invention is:
[0005] A construction hanging basket device comprises a core tube wall, wherein a climbing frame steel structure is arranged at the upper front end of the core tube wall, an H-shaped steel slide rail is fixedly installed at the lower end of the climbing frame steel structure, two hand-pulled hoists are slidably connected to the lower end of the H-shaped steel slide rail, a hand-pulled hoist is arranged below each of the two hand-pulled hoists, two lifting rings are arranged below each of the two hand-pulled hoists, four lifting rings are buckled and connected with lifting ear plates, and the lower ends of the four lifting ear plates are commonly fixedly connected with a hanging basket steel frame, and embedded parts and steel beams are arranged at the lower front end of the core tube wall.
[0006] Preferably, the climbing frame steel structure is fixedly connected to the core tube wall by high-strength bolts.
[0007] Preferably, the cross-section of the H-shaped steel slide rail is H250x200x8x10.
[0008] Preferably, the horizontal positions of the two hand-pulled hoists are consistent.
[0009] Preferably, the two hand-pulled hoists control the hanging basket steel frame to run horizontally along the H-shaped steel slide rail through a hand-pulled chain.
[0010] Preferably, the two hand hoists control the vertical movement of the hanging basket steel frame through a hand chain.
[0011] Preferably, the hanging basket steel frame is 1.2 meters long x 0.6 meters wide x 1.1 meters high, and the hanging basket steel frame is made of L50X4 angle steel.
[0012] Preferably, the hanging basket steel frame and the four lifting ear plates are an integrated structure.
[0013] Compared with the prior art, the present invention has the following beneficial effects:
[0014] 1. By setting an H-shaped steel slide rail under the climbing frame steel structure, setting a hand-pulled hoist on the H-shaped steel slide rail, controlling the hanging basket steel frame to move horizontally along the H-shaped steel slide rail through a hand-pulled chain, setting a hand-pulled hoist, manually controlling the hanging basket steel frame to move vertically through a hand-pulled chain, and operating the hand-pulled hoist and hand-pulled hoist to enable the construction hanging basket to move freely in the horizontal and vertical directions;
[0015] 2. By directly setting up a construction hanging basket that can move horizontally and vertically under the climbing frame steel structure, compared with the traditional installation method, there is no need for cumbersome installation procedures, and it is simple to make, easy to use, and has significant effects. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is an installation cross-sectional view of a construction hanging basket device of the present invention;
[0017] Figure 2 This is an installation elevation view of a construction hanging basket device of the present invention;
[0018] Figure 3 A side view of a steel frame of a hanging basket of a construction hanging basket device of the present invention;
[0019] Figure 4 The present invention provides a vertical view of a steel frame of a hanging basket of a construction hanging basket device.
[0020] In the figure: 1. Core tube wall; 2. Climbing frame steel structure; 3. H-shaped steel slide rail; 4. Hand-pulled hoist; 5. Hand-pulled winch; 6. Lifting ring; 7. Lifting ear plate; 8. Hanging basket steel frame; 9. Embedded parts and steel beams. DETAILED DESCRIPTION
[0021] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0022] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0023] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0024] See also Figure 1-4 , the present invention provides a technical solution:
[0025] A construction hanging basket device comprises a core tube wall 1, a climbing frame steel structure 2 is arranged at the upper front end of the core tube wall 1, an H-shaped steel slide rail 3 is fixedly installed at the lower end of the climbing frame steel structure 2, two hand-pulled hoists 4 are slidably connected to the lower end of the H-shaped steel slide rail 3, a hand-pulled hoist 5 is arranged below the two hand-pulled hoists 4, two lifting rings 6 are arranged below the two hand-pulled hoists 5, four lifting rings 6 are buckled and connected with lifting ear plates 7, and the lower ends of the four lifting ear plates 7 are commonly fixedly connected with a hanging basket steel frame 8, and an embedded part and a steel beam 9 are arranged at the lower front end of the core tube wall 1.
[0026] In this embodiment, the climbing frame steel structure 2 is fixedly connected to the core tube wall 1 by high-strength bolts, the cross-section of the H-shaped steel slide rail 3 is H250x200x8x10, the horizontal positions of the two hand-pulled hoists 4 are consistent, the two hand-pulled hoists 4 control the hanging basket steel frame 8 to run horizontally along the H-shaped steel slide rail 3 through the hand chain, and the two hand hoists 5 control the hanging basket steel frame 8 to run vertically through the hand chain.
[0027] Through the above scheme: by operating the hand-pulled hoist 4 and the hand-pulled winch 5, the construction hanging basket can be freely moved in the horizontal direction and the vertical direction.
[0028] In this embodiment, the hanging basket steel frame 8 is 1.2 meters long x 0.6 meters wide x 1.1 meters high, and the hanging basket steel frame 8 is made of L50X4 angle steel. The hanging basket steel frame 8 and the four lifting ear plates 7 are an integrated structure.
[0029] Through the above scheme: the hanging basket steel frame 8 is made of angle steel and is used to protect workers and place construction equipment.
[0030] It should be noted that the present invention is a construction hanging basket device. During use, a high-precision measuring instrument is used to accurately measure the climbing frame steel structure 2 to determine the installation position of the H-shaped steel slide rail 3 to ensure its stability and horizontality during the entire construction process. The installation horizontality of the H-shaped steel slide rail 3 is strictly controlled, and the H-shaped steel slide rail 3 is firmly fixed to the bottom of the climbing frame steel structure 2 by high-strength bolts or welding to ensure that it will not be displaced or deformed when bearing the construction hanging basket and load. A suitable position is selected on the H-shaped steel slide rail 3 to install the hand-pulled hoist 4. The operator can control the hanging basket steel frame 8 to move horizontally along the H-shaped steel slide rail 3 through a hand-pulled chain to achieve rapid switching of the construction position. A hand-pulled winch 5 is installed below the hand-pulled hoist 4. Ensure that the lifting ring 6 on the hand winch 5 can be stably connected to the hanging basket steel frame 8 to achieve vertical lifting control. The operator can accurately control the lifting height of the hanging basket steel frame 8 through the hand chain of the hand winch 5 to meet the needs of different construction heights. The hand winch 5 should be equipped with safety mechanisms such as overload protection and automatic braking to ensure that it can quickly stop running in an emergency to ensure construction safety. By operating the hand hoist 4 and the hand winch 5, the construction hanging basket can be freely moved in the horizontal and vertical directions, which greatly improves the construction efficiency and flexibility. Compared with the traditional installation method, it does not require complicated installation processes and a large amount of manpower and material resources. It is simple to make, easy to install and maintain, which improves construction efficiency, shortens construction period, and reduces construction costs.
[0031] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A construction hanging basket device, comprising a core tube wall (1), characterized in that: A climbing frame steel structure (2) is arranged at the upper front end of the core tube wall (1), an H-shaped steel slide rail (3) is fixedly installed at the lower end of the climbing frame steel structure (2), two hand-pulled hoists (4) are slidably connected to the lower end of the H-shaped steel slide rail (3), a hand-pulled hoist (5) is arranged below the two hand-pulled hoists (4), two lifting rings (6) are arranged below the two hand-pulled hoists (5), four lifting rings (6) are buckled and connected with lifting ear plates (7), and the lower ends of the four lifting ear plates (7) are fixedly connected with a hanging basket steel frame (8), and an embedded part and a steel beam (9) are arranged at the lower front end of the core tube wall (1).
2. A construction hanging basket device according to claim 1, characterized in that: The climbing frame steel structure (2) is fixedly connected to the core tube wall (1) via high-strength bolts.
3. A construction hanging basket device according to claim 1, characterized in that: The cross section of the H-shaped steel slide rail (3) is H250x200x8x10.
4. A construction hanging basket device according to claim 1, characterized in that: The horizontal positions of the two hand-pulled hoists (4) are consistent.
5. A construction hanging basket device according to claim 1, characterized in that: The two hand-pulled hoists (4) control the hanging basket steel frame (8) to run horizontally along the H-shaped steel slide rail (3) through a hand-pulled chain.
6. A construction hanging basket device according to claim 1, characterized in that: The two hand chain hoists (5) control the vertical movement of the hanging basket steel frame (8) through a hand chain.
7. A construction hanging basket device according to claim 1, characterized in that: The hanging basket steel frame (8) is 1.2 meters long x 0.6 meters wide x 1.1 meters high, and the hanging basket steel frame (8) is made of L50X4 angle steel.
8. A construction hanging basket device according to claim 1, characterized in that: The hanging basket steel frame (8) and the four hanging ear plates (7) are an integrated structure.