Remote sensing image-based flood storage and detention area supervision system and method
By integrating remote sensing imaging technology in the regulatory system of the flood stagnation area, the problem of cumbersome approval process in existing technologies and lagging water conditions monitoring in existing technologies, realized intelligent management and real -time monitoring, significantly improved supervision efficiency and response capabilities.
Patent Information
- Application Number
- CN202411475359.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2025-01-28
AI Technical Summary
The existing regulatory technology in flood storage and detention areas has problems such as cumbersome approval process, lagging information feedback, and difficulty in achieving effective monitoring of project implementation. Especially during flood season, water condition monitoring is difficult to reflect dynamic changes in real time.
Adopting a remote sensing image -based flood -storage regulatory regulatory system, integrated data management, daily approval of the flood review project, supervision of non -flood prevention construction projects, and water situation monitoring during the flood season to improve information sharing and regulatory efficiency through intelligent management and emergency response.
It has significantly improved the supervision efficiency and response capabilities of the flood stagnation area, realized the intelligence of project approval and the real -time nature of water conditions monitoring, and enhanced the protection of ecology and security of the flood stagnation area.
Smart Images

Figure CN119378885A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of flood storage and detention area supervision, and in particular to a flood storage and detention area supervision system and method based on remote sensing images. Background Art
[0002] Flood storage and detention areas have the dual functions of regional flood control and the survival and development of residents in the area. They have played an important role in the prevention of flood disasters in the basin and ensured the safety of important cities and important flood control areas in the middle and lower reaches of the river. In the early days of the establishment of flood storage and detention areas, most of the areas were sparsely populated, and the losses caused by flood storage were relatively small, so the flood storage and detention areas were put into use relatively smoothly. However, with the development of the economy and society, the population has continued to increase, natural lakes and depressions have gradually been occupied, and the degree of land development and utilization in flood storage and detention areas has continued to increase, resulting in the contradiction between flood storage in flood storage and detention areas and ensuring the safety of life and property of residents in the area and developing the economy. It has become increasingly difficult to make decisions on the use of flood storage and detention areas. Therefore, it is particularly important to strengthen the supervision capacity of flood storage and detention areas.
[0003] At present, the supervision of flood storage and detention areas mainly includes: approval and supervision of non-flood control construction projects, water situation monitoring during flood season, and post-disaster compensation. In flood storage and detention areas, the approval process of non-flood control construction projects usually involves multiple departments and links, including the construction unit submitting a flood assessment application, the water administration department conducting a project review, the local government's approval, and the final approval of the river basin committee. Although this process ensures that the opinions and standards of all parties are taken into consideration, its cumbersomeness and manual operation often lead to a long approval time, delayed information feedback, and difficulty in achieving effective monitoring of the project implementation process. During the flood season, water situation monitoring mainly relies on the monitoring data of hydrological stations. Although hydrological stations provide basic water level and flow data, their monitoring frequency and spatial coverage are limited, making it difficult to reflect the dynamic changes of water conditions in flood storage and detention areas in real time. In addition, the data update of hydrological stations usually relies on regular manual inspections, which cannot meet the needs of rapid response under sudden weather events.
[0004] Therefore, there is an urgent need for a flood storage and detention area supervision system and method based on remote sensing images to build an integrated supervision platform, realize intelligent management and emergency response, significantly improve the supervision efficiency and response capacity of flood storage and detention areas, and provide strong support for flood prevention and regional sustainable development. Summary of the invention
[0005] In order to solve the above technical problems, the present invention provides a flood storage and detention area supervision system and method based on remote sensing images, which can realize intelligent management and emergency response, improve information sharing, and significantly enhance the supervision efficiency and response capability of flood storage and detention areas.
[0006] The present invention provides a flood storage and detention area supervision system based on remote sensing images, including: a data management module, a daily approval module for flood assessment projects, a non-flood control construction project supervision module, a flood season water situation monitoring module, a data cockpit module, and a task issuing and pushing module; The data management module is used for data management, data upload and download, and service publishing of various types of data; The flood assessment project daily approval module is connected to the data management module and is used to monitor the information of the application, approval and verification stages of the flood assessment project in real time, and upload the data and progress information of the flood assessment project to the data management module; The non-flood control construction project supervision module is connected to the data management module and the flood assessment project daily approval module, and is used to intelligently identify new non-flood control construction projects based on the various types of data, automatically assign new non-flood control construction project map attributes, and determine the supervision type of new non-flood control construction projects; according to the supervision type, daily flood assessment project approval is carried out for new non-flood control construction projects that violate regulations; The flood season water regime monitoring module is connected to the data management module and is used to automatically extract the water distribution range of the flood storage area in different periods, assign water body attributes and intelligently extract flooding information based on the various types of data; The data cockpit module is connected to the data management module and includes a chart information column and a map column for visually displaying various data of different flood storage areas in the basin; The task issuance and push module is connected to the daily approval module of the flood assessment project, and is used to push the approval tasks, verification tasks and approval results in the approval process to the water administration department, the river basin committee and the applicant unit, to ensure that all participants obtain information and respond in a timely manner; it is connected to the non-flood control construction project supervision module, and is used to push the intelligent identification results of new non-flood control construction projects to the water administration department and the river basin committee; it is connected to the flood season water situation monitoring module, and is used to push the water body distribution range, water body attribute assignment and inundation information to the water administration department and the river basin committee.
[0007] Furthermore, the various types of data include basic geographic spatial data, remote sensing monitoring data, business management data, thematic data and socio-economic data.
[0008] Furthermore, the daily approval module of the Hongping project includes: There are three sub-modules: application module, approval module and verification module; Among them, the application module is used to support the applicant unit to submit relevant materials and information of the flood assessment project; the approval module is used to support the water administration department to conduct step-by-step approval of the flood assessment projects that have been applied for and are awaiting approval; the verification module is used to support the administrative approval department of the river basin committee to issue flood assessment project verification tasks, and the local water administration department shall conduct on-site verification.
[0009] The present invention also provides a method for monitoring a flood storage and detention area based on remote sensing images, which is implemented based on the aforementioned flood storage and detention area monitoring system based on remote sensing images, and is characterized in that it specifically includes the following steps: S1. Collect remote sensing images covering the flood storage area to be monitored, and select two sets of remote sensing images before and during the monitoring period respectively; S2. Preprocess the two sets of remote sensing images to produce digital orthophotos of the flood storage and detention area to be monitored before and during the monitoring period; S3. Using intelligent interpretation combined with manual correction, the digital orthophotos of the monitored flood storage and detention area before and during the monitoring period are used to detect changes in non-flood control construction projects, and obtain a distribution map of newly added non-flood control construction projects; S4. Arrange and edit the attributes of the newly added non-flood control construction project map distribution map; the attributes of the newly added non-flood control construction project map distribution map include map number, flood storage area, administrative district, longitude and latitude coordinates, monitoring period, map area, supervision type, whether to deal with it, construction status description, and feedback; S5. Determine the supervision type of the newly added non-flood control construction project spots according to the attributes of the newly added non-flood control construction project spot distribution map; the supervision types include: compliance, construction without approval, and approval and construction not in compliance; S6. Send the maps of newly added non-flood control construction projects with supervision types of construction without approval and construction inconsistent with approval to local water administration departments for on-site verification; S7. Based on the verification results, the daily approval process for flood assessment projects will be carried out for the newly added non-flood control construction project areas whose supervision types are construction without approval and construction inconsistent with approval.
[0010] Furthermore, a method for monitoring flood storage areas based on remote sensing images also includes: Based on the remote sensing images of the flood storage and detention areas, the water distribution range of the flood storage and detention areas in different periods can be automatically extracted, the water body attributes can be assigned, and the inundation information can be intelligently extracted.
[0011] Furthermore, the image phase of the remote sensing images is a quarterly frequency, and the same group of remote sensing images is in the same quarter.
[0012] Furthermore, the supervision type of the newly added non-flood control construction project spots is determined according to the attributes of the newly added non-flood control construction project spot distribution map, specifically including: Automatically search for flood assessment projects that are consistent with the location information based on the location information, and determine the type of supervision by comparing the monitoring period of the newly added non-flood control construction project spots with the project construction time in the approved flood assessment projects, and the area of the newly added non-flood control construction project spots with the approved construction area in the approved flood assessment projects; When the monitoring period of the newly added non-flood control construction project is shorter than the project construction time of the approved flood assessment project, the supervision type of the newly added non-flood control construction project is determined to be "construction before approval"; When the area of the newly added non-flood control construction project is larger than the approved construction area in the approved flood assessment project, the supervision type of the newly added non-flood control construction project is determined to be "inconsistent with approval and construction".
[0013] Furthermore, the automatic extraction of water distribution range, water attribute assignment and inundation information intelligent extraction of flood storage and detention areas at different periods based on remote sensing images of the flood storage and detention areas specifically include: Collect remote sensing images covering the flood storage area and perform preprocessing; Extracting water bodies from the remote sensing image of the flood storage area by using a threshold method to obtain a water body distribution map, and organizing and editing the attributes of the water body distribution map, wherein the attributes of the water body distribution map include type, name, and time; Performing spatial intersection analysis on the water body distribution map and the flood storage and detention area water system distribution map, performing an inversion operation on the obtained intersection area, and obtaining a flood range distribution map; The flood range distribution map is sorted and its attributes are edited, and the attributes of the flood range distribution map include flooded area and flooding duration.
[0014] The embodiments of the present invention have the following technical effects: 1. In the supervision of non-flood control construction projects, high-resolution remote sensing images of flood storage and detention areas are periodically obtained on a quarterly basis, and change detection of two phases of remote sensing images is performed with the help of artificial intelligence technology to obtain the distribution of new non-flood control construction projects. The information of the detected new non-flood control construction projects is integrated into the supervision database, and the approval and supervision status of the projects is updated in real time, which improves the efficiency and accuracy of supervision, promotes information transparency and public participation, and thus more effectively protects the ecology and safety of flood storage and detention areas.
[0015] 2. In the approval of flood assessment projects, we connect all relevant business departments in accordance with the business flow of "application-approval-verification", establish an online application platform, and significantly reduce project approval time and improve work efficiency through information sharing and intelligent approval. We have broken through information barriers, increased the transparency of business processes, and enhanced the public's trust in government work. Through real-time recording and feedback in the verification process, we can ensure the compliance of flood assessment project implementation and reduce environmental risks.
[0016] 3. By coordinating multi-source remote sensing data during the flood season, acquiring remote sensing images at the maximum frequency, and using the threshold method to extract the distribution of water bodies in and around the flood storage area, and timely tracking water information, the timeliness and accuracy of water monitoring can be improved, and strong support can be provided for decision-making.
[0017] 4. By building a flood storage and detention area supervision platform that brings together a variety of data resources and has comprehensive functions, a business application model of "daily supervision and emergency response in times of disaster" is formed, which can not only improve the management efficiency and decision-making ability of the flood area, but also enhance the public's sense of participation and trust, and provide a solid foundation for achieving sustainable flood management. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 It is a structural schematic diagram of a flood storage and detention area supervision system based on remote sensing images provided by an embodiment of the present invention; Figure 2 It is a structural schematic diagram of a flood storage and detention area platform based on remote sensing images provided by an embodiment of the present invention; Figure 3 The present invention provides a flowchart of a method for monitoring flood storage areas based on remote sensing images. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.
[0021] Figure 1 Schematic diagram of a flood storage and detention area monitoring system based on remote sensing images provided by an embodiment of the present invention. Figure 1 , specifically including: data management module, daily approval module for flood assessment projects, supervision module for non-flood control construction projects, flood season water situation monitoring module, data cockpit module, task issuance and push module; The data management module is used for data management, data upload and download, and service publishing of various types of data.
[0022] Furthermore, the data management, data upload and download, and service release of the various types of data specifically include: Data management, supporting the organization, storage and maintenance of various types of data, including basic geospatial data, remote sensing monitoring data, business management data, thematic data and socio-economic data; Data upload and download allows users to easily upload the latest monitoring data and files, and also supports data download function so that users can obtain the required information; Service publishing supports the publishing of vector data and raster images. Vector data publishing supports multiple coordinate systems.
[0023] The daily approval module for flood assessment projects is connected to the data management module, and is used to monitor the information of the application, approval and verification stages of flood assessment projects in real time, and upload the data and progress information of flood assessment projects to the data management module.
[0024] The non-flood control construction project supervision module is connected to the data management module and the flood assessment project daily approval module, and is used to intelligently identify new non-flood control construction projects based on the various types of data, automatically assign new non-flood control construction project map attributes, and determine the supervision type of new non-flood control construction projects; according to the supervision type, daily flood assessment project approval is carried out for new non-flood control construction projects that violate regulations; Furthermore, the daily approval module of the Hongping project includes: There are three sub-modules: application module, approval module and verification module; Among them, the application module is used to support applicants in submitting relevant materials and information of flood assessment projects; specifically, it supports applicants in uploading vector files of the project's geographical location range and flood assessment reports, agreements or relevant instructions reached with third parties, documents on which project construction is based, and other document materials; and it supports map visualization and query of applied flood assessment projects.
[0025] The approval module is used to support the water administration department in conducting step-by-step approval for flood assessment projects that have been applied for and are awaiting approval; specifically, it supports the water administration department in conducting step-by-step approval for flood assessment projects that have been applied for and are awaiting approval. The approval process is that the application project and related documents are transferred to the local water administration department, which reviews them and forms a review opinion of the local water administration department; then the project is transferred to the administrative approval department of the river basin committee, which reviews them and forms a licensing document for the approved projects; and it supports map visualization and query of approved flood assessment projects.
[0026] The verification module is used to support the administrative approval department of the river basin committee to issue flood assessment project verification tasks, and the local water administration department will conduct on-site verification; specifically, it supports the administrative approval department of the river basin committee to issue flood assessment project verification tasks, and the local water administration department will conduct on-site verification and upload the verification results. The uploaded verification files include the actual geographical location information of the project, project status information, verification results information, etc.; and supports the visualization and query of the verified flood assessment project map.
[0027] The flood season water regime monitoring module is connected to the data management module and is used to automatically extract the water distribution range of the flood storage area in different periods, assign water body attributes and intelligently extract flooding information based on the various types of data; The data cockpit module is connected to the data management module and includes a chart information column and a map column for visually displaying various data of different flood storage areas in the basin; Specifically, the chart information column displays the basic information of different flood storage and detention areas in the basin in the form of data lists, including the name, area, designed flood storage and detention water level, retreat route, flood inlet gates, flood discharge gates, buildings, safety buildings, flood inlet gates, flood discharge gates, embankments, flood discharge rivers and other water conservancy engineering facilities; the distribution of new non-flood control construction categories in the latest monitoring period of different flood storage and detention areas is displayed in the form of statistical charts; the map column displays the map overview of the flood storage and detention areas, mainly including: vector layers such as the management scope line of the flood storage and detention area, multi-level river network base map, basin distribution map, and water conservancy project layout; thematic element base maps such as the latest satellite image base map of the supervision scope of the flood storage and detention area, DOM data base map, land use coverage, and the latest non-flood control building spots interpreted by remote sensing images.
[0028] The task issuance and push module is connected to the daily approval module of the flood assessment project, and is used to push the approval tasks, verification tasks and approval results in the approval process to the water administration department, the river basin committee and the applicant unit, to ensure that all participants obtain information and respond in a timely manner; it is connected to the non-flood control construction project supervision module, and is used to push the intelligent identification results of new non-flood control construction projects to the water administration department and the river basin committee; it is connected to the flood season water situation monitoring module, and is used to push the water body distribution range, water body attribute assignment and inundation information to the water administration department and the river basin committee.
[0029] The above-mentioned remote sensing image-based flood storage and detention area supervision system is based on a remote sensing image-based flood storage and detention area supervision platform, see Figure 2 A flood storage and detention area supervision platform based on remote sensing images includes: basic layer, data layer, support layer, service layer, application layer, standard and specification system and network security system.
[0030] The basic layer is the core of the entire system and is responsible for providing the necessary hardware and software resources to support the operation requirements of the platform system. Specifically: Resource utilization: Add new equipment and technologies based on the full use of existing server, network, storage and computing resources. Equipment configuration: Ensure that the server has sufficient processing power and storage space to handle large-scale data; network equipment must have high bandwidth and low latency to meet the needs of real-time data transmission. Platform optimization: Optimize resource configuration and improve system flexibility and scalability through virtualization technology or cloud computing solutions.
[0031] The data layer is the information foundation of the system, covering various types of data, and providing support for the analysis and application of subsequent layers. It mainly includes: Basic geospatial data: providing basic information on geographic location and environmental characteristics, including topography, land use, climate conditions, etc. Remote sensing monitoring data: remote sensing data obtained through satellites or drones, monitoring and analyzing dynamic information such as surface changes and water conditions. Business management data: covering data related to project management, operational efficiency, etc., to support decision-making. Thematic data: data sets for specific projects or fields, such as flood disasters, ecological protection, etc., to support in-depth analysis. Socioeconomic data: including data on demographics, economic activities, social infrastructure, etc., to provide background information for comprehensive assessments.
[0032] The support layer provides underlying technical support for the upper application modules to ensure the stable operation of various functions. Its features include: Service interface: Provide API and service interface to ensure seamless connection of data and functions between different modules. System monitoring: Monitor system performance to ensure efficient use of resources and timely troubleshooting. Security management: Implement data security strategies, protect sensitive information, and ensure system security and stability.
[0033] The service layer is a bridge between the system and users, and meets the needs of the application layer in the form of various business services. Specific services include: Flood storage and detention area one-picture service: provides a comprehensive view to show the real-time data and dynamic changes of the flood storage and detention area. Data management service: supports data storage, retrieval and maintenance to ensure data integrity and availability. Data acquisition service: collects data from various sensors and monitoring equipment, and updates system information in real time. Data transmission service: ensures efficient transmission of data between different modules and users, and ensures the timeliness of data. Non-flood control project management service: provides support for the management needs of non-flood control projects, such as construction progress monitoring, resource allocation, etc.
[0034] The application layer is the level where end users interact directly, and provides various application functions, mainly including: Data cockpit: provides an integrated visual interface where users can monitor various data indicators in real time through charts and maps. Supervision of non-flood control construction projects: real-time supervision and approval of non-flood control projects to ensure that the projects comply with management regulations. Daily approval of flood assessment projects: provide approval process support for flood risk assessment projects to ensure the efficiency and transparency of approval. Emergency monitoring of water conditions during flood season: provide real-time water condition monitoring and early warning services during flood season to support decision-making and emergency response. Data management: provide users with multiple functions such as data entry, query, and analysis to improve data utilization.
[0035] The user groups targeted by the application layer are: River Basin Committees, government agencies responsible for water resource management and dispatch, focusing on the overall water resource status and management efficiency. Water Administration Departments: responsible for the implementation and management of water conservancy projects in specific regions, focusing on project compliance and resource allocation. Construction Units (and Application Units): Enterprises involved in the construction of water conservancy and related projects, focusing on construction progress and project quality.
[0036] The present invention also provides a method for monitoring flood storage and detention areas based on remote sensing images, which is implemented based on the aforementioned system for monitoring flood storage and detention areas based on remote sensing images. Figure 3 , specifically including the following steps: S1. Collect remote sensing images covering the flood storage area to be monitored, and select two sets of remote sensing images before and during the monitoring period respectively; Furthermore, the image phase of the remote sensing images is a quarterly frequency. For the same group of remote sensing images in the same quarter, two sets of remote sensing images before and during the monitoring period are selected, that is, two sets of remote sensing images in this quarter and the previous quarter are selected.
[0037] S2. Preprocess the two sets of remote sensing images to produce digital orthophotos of the flood storage and detention area before and during the monitoring period. The preprocessing includes geometric correction, image fusion, and image cropping of the two sets of remote sensing images to ensure data consistency and accuracy.
[0038] S3. Using intelligent interpretation combined with manual correction, the digital orthophotos of the monitored flood storage and detention area before and during the monitoring period are used to detect changes in non-flood control construction projects, and obtain a distribution map of newly added non-flood control construction projects; Specifically, digital orthophotos before and after the monitoring period are obtained, and the images are analyzed using intelligent interpretation algorithms to automatically identify and extract changes in new non-flood control construction projects. Professionals review the results of intelligent interpretation and correct any errors to ensure the accuracy of the map distribution map. The final map distribution map of new non-flood control construction projects is generated for subsequent decision-making and management. Intelligent interpretation can quickly process large amounts of data, greatly reducing the workload required for manual inspection. In different monitoring environments and targets, the intelligent interpretation algorithm can continuously learn and optimize based on historical data.
[0039] S4. Arrange and edit the attributes of the newly added non-flood control construction project map distribution map; the attributes of the newly added non-flood control construction project map distribution map include map number, flood storage area, administrative district, longitude and latitude coordinates, monitoring period, map area, supervision type, whether to deal with it, construction status description, and feedback; S5. Determine the supervision type of the newly added non-flood control construction project spots according to the attributes of the newly added non-flood control construction project spot distribution map; the supervision types include: compliance, construction without approval, and approval and construction not in compliance; Furthermore, the supervision type of the newly added non-flood control construction project spots is determined according to the attributes of the newly added non-flood control construction project spot distribution map, specifically including: Automatically search for flood assessment projects that are consistent with the location information based on the location information, and determine the type of supervision by comparing the monitoring period of the newly added non-flood control construction project spots with the project construction time in the approved flood assessment projects, and the area of the newly added non-flood control construction project spots with the approved construction area in the approved flood assessment projects; When the monitoring period of the newly added non-flood control construction project is shorter than the project construction time of the approved flood assessment project, the supervision type of the newly added non-flood control construction project is determined to be "construction before approval"; When the area of the newly added non-flood control construction project is larger than the approved construction area in the approved flood assessment project, the supervision type of the newly added non-flood control construction project is determined to be "inconsistent with approval and construction".
[0040] It is worth noting that the Hongping projects associated and compared here are the Hongping projects that have been approved. If the Hongping project is in the application stage or the applied but not approved stage, it cannot be associated.
[0041] S6. Maps of new non-flood control construction projects with supervision types of "construction without approval" and "construction inconsistent with approval" shall be sent to local water administration departments for on-site verification.
[0042] S7. Based on the verification results, the daily approval process for flood assessment projects will be carried out for new non-flood control construction project areas whose supervision types are construction without approval and construction inconsistent with approval, that is, the application process of "flood assessment project application-flood assessment project approval-flood assessment project verification".
[0043] Flood assessment project application supports applicants to upload project geographic location range vector files and flood assessment reports, agreements or related instructions reached with third parties, documents based on which project construction is based, and other documents; and supports visualization and query of applied flood assessment project maps. Flood assessment project approval supports water administration departments to approve flood assessment projects that have been applied for approval step by step. The approval process is that the application project and related documents are transferred to the local water administration department, which reviews and forms the review opinions of the local water administration department; then the project is transferred to the administrative approval department of the basin committee, which reviews and forms the license documents for the approved projects; and supports visualization and query of approved flood assessment project maps. Flood assessment project verification supports the administrative approval department of the basin committee to issue flood assessment project verification tasks, and the local water administration department conducts on-site verification and uploads the verification results. The uploaded verification documents include the actual geographic location information of the project, the current status of the project, and the verification results. And supports visualization and query of verified flood assessment project maps.
[0044] Furthermore, a method for monitoring flood storage areas based on remote sensing images also includes: Based on the remote sensing images of the flood storage and detention areas, the water distribution range of the flood storage and detention areas in different periods can be automatically extracted, the water body attributes can be assigned, and the inundation information can be intelligently extracted.
[0045] Furthermore, the automatic extraction of water distribution range, water attribute assignment and inundation information intelligent extraction of flood storage and detention areas at different periods based on remote sensing images of the flood storage and detention areas specifically include: Collect remote sensing images covering the flood storage area, with the latest phase as the standard, and perform pre-processing, that is, multi-view processing, filtering, geocoding and other operations on the remote sensing images; Extracting water bodies from the remote sensing image of the flood storage area by a threshold method to obtain a water body distribution map, sorting and editing the attributes of the water body distribution map, wherein the attributes of the water body distribution map include type (for example, river, lake, pond, reservoir, other), name, and time; Performing spatial intersection analysis on the water body distribution map and the flood storage and detention area water system distribution map, performing an inversion operation on the obtained intersection area, and obtaining a flood range distribution map; The flood range distribution map is sorted and its attributes are edited, and the attributes of the flood range distribution map include flooded area and flooding duration.
[0046] The present invention establishes a working mechanism for clue transfer, problem investigation and result feedback between daily supervision of flood storage and detention areas and water administrative law enforcement through platform problem supervision, ledger update and push, promotes the approval of flood impact assessment projects and daily supervision of non-flood control construction projects in flood storage and detention areas, and provides a coordinated management mechanism for the supervision of non-flood control construction projects, approval of flood assessment projects, supervision and punishment. And through multi-period remote sensing image comparison and artificial intelligence remote sensing interpretation technology, it can periodically and dynamically monitor the stock, increase and decrease of construction projects in flood storage and detention areas, and visualize them on the supervision platform, supporting daily comprehensive investigation of non-flood control construction projects, flood assessment approval management and rectification of illegal construction projects.
[0047] It should be noted that the terms used in the present invention are only for describing specific embodiments, rather than limiting the scope of the present application. As shown in the present specification, unless the context clearly indicates an exception, the words "one", "a", "a kind of" and / or "the" do not specifically refer to the singular, but may also include the plural. The terms "include", "comprise" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method or device. In the absence of more restrictions, the elements defined by the sentence "include one..." do not exclude the presence of other identical elements in the process, method or device including the elements.
[0048] It should also be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. Unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0049] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the technical solutions of the embodiments of the present invention.
Claims
1. A flood storage and detention area supervision system based on remote sensing images, characterized in that: include: Data management module, daily approval module for flood assessment projects, supervision module for non-flood control construction projects, flood season water regime monitoring module, data cockpit module, task issuance and push module; The data management module is used for data management, data upload and download, and service publishing of various types of data; The flood assessment project daily approval module is connected to the data management module and is used to monitor the information of the application, approval and verification stages of the flood assessment project in real time, and upload the data and progress information of the flood assessment project to the data management module; The non-flood control construction project supervision module is connected to the data management module and the flood assessment project daily approval module, and is used to intelligently identify new non-flood control construction projects based on the various types of data, automatically assign new non-flood control construction project map attributes, and determine the supervision type of new non-flood control construction projects; according to the supervision type, daily flood assessment project approval is carried out for new non-flood control construction projects that violate regulations; The flood season water regime monitoring module is connected to the data management module and is used to automatically extract the water distribution range of the flood storage area in different periods, assign water body attributes and intelligently extract flooding information based on the various types of data; The data cockpit module is connected to the data management module and includes a chart information column and a map column for visually displaying various data of different flood storage areas in the basin; The task issuance and push module is connected to the daily approval module of the flood assessment project, and is used to push the approval tasks, verification tasks and approval results in the approval process to the water administration department, the river basin committee and the applicant unit, to ensure that all participants obtain information and respond in a timely manner; it is connected to the non-flood control construction project supervision module, and is used to push the intelligent identification results of new non-flood control construction projects to the water administration department and the river basin committee; it is connected to the flood season water situation monitoring module, and is used to push the water body distribution range, water body attribute assignment and inundation information to the water administration department and the river basin committee.
2. The remote sensing image-based flood storage and detention area monitoring system according to claim 1 is characterized in that: The various types of data include basic geographic spatial data, remote sensing monitoring data, business management data, thematic data and socio-economic data.
3. The remote sensing image-based flood storage and detention area monitoring system according to claim 1 is characterized in that: The daily approval module of the Hongping project includes: There are three sub-modules: application module, approval module and verification module; Among them, the application module is used to support the applicant unit to submit relevant materials and information of the flood assessment project; the approval module is used to support the water administration department to conduct step-by-step approval of the flood assessment projects that have been applied for and are awaiting approval; the verification module is used to support the administrative approval department of the river basin committee to issue flood assessment project verification tasks, and the local water administration department shall conduct on-site verification.
4. A method for monitoring a flood storage and detention area based on remote sensing images, implemented based on a system for monitoring a flood storage and detention area based on remote sensing images as described in any one of claims 1 to 3, characterized in that: The specific steps include: S1. Collect remote sensing images covering the flood storage area to be monitored, and select two sets of remote sensing images before and during the monitoring period respectively; S2. Preprocess the two sets of remote sensing images to produce digital orthophotos of the flood storage and detention area to be monitored before and during the monitoring period; S3. Using intelligent interpretation combined with manual correction, the digital orthophotos of the monitored flood storage and detention area before and during the monitoring period are used to detect changes in non-flood control construction projects, and obtain a distribution map of newly added non-flood control construction projects; S4. Arrange and edit the attributes of the newly added non-flood control construction project map distribution map; the attributes of the newly added non-flood control construction project map distribution map include map number, flood storage area, administrative district, longitude and latitude coordinates, monitoring period, map area, supervision type, whether to deal with it, construction status description, and feedback; S5. Determine the supervision type of the newly added non-flood control construction project spots according to the attributes of the newly added non-flood control construction project spot distribution map; the supervision types include: compliance, construction without approval, and approval and construction not in compliance; S6. Send the maps of newly added non-flood control construction projects with supervision types of construction without approval and construction inconsistent with approval to local water administration departments for on-site verification; S7. Based on the verification results, the daily approval process for flood assessment projects will be carried out for the newly added non-flood control construction project areas whose supervision types are construction without approval and construction inconsistent with approval.
5. A method for monitoring flood storage areas based on remote sensing images according to claim 4, characterized in that: Also includes: Based on the remote sensing images of the flood storage and detention areas, the water distribution range of the flood storage and detention areas in different periods can be automatically extracted, the water body attributes can be assigned, and the inundation information can be intelligently extracted.
6. A method for monitoring flood storage areas based on remote sensing images according to claim 4, characterized in that: The image phase of the remote sensing images is a quarterly frequency, and the same group of remote sensing images is in the same quarter.
7. The method for monitoring flood storage areas based on remote sensing images according to claim 4 is characterized in that: The above-mentioned method of determining the supervision type of the newly added non-flood control construction project spots according to the attributes of the newly added non-flood control construction project spot distribution map specifically includes: Automatically search for flood assessment projects that are consistent with the location information based on the location information, and determine the type of supervision by comparing the monitoring period of the newly added non-flood control construction project spots with the project construction time in the approved flood assessment projects, and the area of the newly added non-flood control construction project spots with the approved construction area in the approved flood assessment projects; When the monitoring period of the newly added non-flood control construction project is shorter than the project construction time of the approved flood assessment project, the supervision type of the newly added non-flood control construction project is determined to be "construction before approval"; When the area of the newly added non-flood control construction project is larger than the approved construction area in the approved flood assessment project, the supervision type of the newly added non-flood control construction project is determined to be "approval and construction inconsistent".
8. The method for monitoring flood storage areas based on remote sensing images according to claim 5 is characterized by: The automatic extraction of the water distribution range of the flood storage and detention area at different periods, the attribute assignment of the water distribution map and the intelligent extraction of the flooding information based on the remote sensing image of the flood storage and detention area specifically include: Collect remote sensing images covering the flood storage area and perform preprocessing; Extracting water bodies from the remote sensing image of the flood storage area by using a threshold method to obtain a water body distribution map, and organizing and editing the attributes of the water body distribution map, wherein the attributes of the water body distribution map include type, name, and time; Performing spatial intersection analysis on the water body distribution map and the flood storage and detention area water system distribution map, performing an inversion operation on the obtained intersection area, and obtaining a flood range distribution map; The flood range distribution map is sorted and its attributes are edited, and the attributes of the flood range distribution map include flooded area and flooding duration.