Water meter shell forging and pressing die
By introducing water-cooling circulation and air-cooling mechanisms into the forging mold of the water meter case, the problem of loss of size and shape accuracy of the mold in high temperature environment is solved, and the effective reduction of mold temperature and the extension of service life is achieved.
Patent Information
- Application Number
- CN202411615471.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-13
- Publication Date
- 2025-03-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the forging operation of existing water meter shell forging molds, due to the high temperature environment, the material hardness and strength are reduced, which can easily cause mold damage and shorten service life.
A water meter housing forging mold including a water-cooled circulation mechanism and an air-cooled mechanism is designed. The upper and lower molds of forging molds are water-cooled and cooled by a water-cooled circulation system driven by a circulation pump, and the molds are ventilated and heated through the air-cooled mechanism to reduce the mold temperature and extend the service life.
It effectively avoids the problem of excessive mold temperature, reduces changes in thermal stress, reduces the probability of thermal fatigue damage, extends the service life of the mold, and improves the accuracy of forging.
Smart Images

Figure CN119634643A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of forging dies, in particular to a forging die for a water meter shell. Background Art
[0002] The water meter shell is an important component of the water meter. It is often forged and processed by forging dies during production. The water meter shell forging die is installed on the forging machine, and the red-hot copper rod and other materials are punched into the mold of the water meter shell at one time. Using the water meter shell forging die to forge the material can improve production efficiency and product quality.
[0003] For example, publication number: CN109201999A discloses "a forging die for a water meter shell", which adopts a water meter shell cavity formed by merging a pair of half mold cores, the mold core is installed in a mold base with an inclined outer wall formed by merging a pair of half mold bases, a core pulling slider is arranged at the open part of the half mold base, the half mold base is installed in a through cavity with an inclined wall on the side wall of the mold frame, and a push rod is installed under the mold base, and the push rod is lifted to make the core pulling slider of the half mold base and the half mold core move up along the inclined wall of the mold frame side wall and open.
[0004] However, in the prior art, because hot forging can cause the blank to produce larger deformation under lower pressure, which is conducive to the forming of complex shapes, the forging of water meter shells usually adopts hot forging technology. During the hot forging process, the blank needs to be heated to a higher temperature, generally above the recrystallization temperature. The heating temperature of the common copper water meter shell blank is between 600-900°C. When the high-temperature blank is placed in the mold cavity, according to the basic principle of heat transfer, heat will be transferred from the high-temperature blank to the low-temperature mold. Since the blank is in close contact with the surface of the mold cavity and the contact time between the blank and the mold is relatively long during the forging process, the heat will continue to be conducted to the mold. During the long-term and repeated forging process, the temperature of the mold will gradually increase. In a high-temperature environment, the thermal expansion coefficient of the mold material will cause the mold size to change, thereby destroying the original dimensional accuracy and shape accuracy of the mold. At the same time, high temperature will reduce the hardness and strength of the mold material, weaken its ability to resist deformation and wear, easily cause mold damage, and reduce the service life of the mold. Summary of the invention
[0005] The purpose of the present invention is to provide a water meter shell forging die to solve the problem that the temperature of the existing water meter shell forging die will gradually increase during the forging operation. In a high temperature environment, the thermal expansion coefficient of the die material will cause the die size to change, thereby destroying the original dimensional accuracy and shape accuracy of the die. At the same time, high temperature will reduce the hardness and strength of the die material, thereby weakening its ability to resist deformation and wear, easily causing damage to the die and reducing the service life of the die.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a water meter shell forging die, comprising a forging mechanism, the forging mechanism comprising a forging base, a forging cylinder is installed on the upper part of the forging base, a forging lower die is installed on the surface of the forging cylinder, a forging top plate is fixedly connected to the bottom of the forging cylinder, a forging upper die is installed at the bottom of the forging top plate, the forging upper die is located above the forging lower die, a water-cooling circulation mechanism is installed on the side of the forging base, a water-cooling heat dissipation mechanism is fixedly connected to the upper part of the water-cooling circulation mechanism, the water-cooling circulation mechanism is used to water-cool the inside of the forging upper die and the forging lower die, the water-cooling heat dissipation mechanism is used to dissipate the heat of the water-cooled circulating water of the water-cooling circulation mechanism, an air-cooling mechanism is fixedly connected to the side of the forging top plate, a No. 2 heat sink assembly is fixedly connected to the side of the forging lower die, and the air-cooling mechanism is used to ventilate and dissipate heat to the forging upper die, the forging lower die and the No. 2 heat sink assembly.
[0007] Preferably, a guide rod is fixedly connected to the upper portion of the forging base, and the forging top plate is slidably plugged into the guide rod.
[0008] Preferably, the water-cooling circulation mechanism includes a circulation pump, which is fixedly connected to the side of the forging base, one end of the circulation pump is fixedly connected to a No. 1 connecting pipe, and the other end of the circulation pump is fixedly connected to a No. 2 connecting pipe.
[0009] Preferably, the water-cooling circulation mechanism includes a No. 1 water-cooling pipe assembly, a No. 3 connecting pipe and a No. 2 water-cooling pipe assembly, the No. 1 water-cooling pipe assembly is fixedly connected to the inside of the forging upper die, the No. 2 water-cooling pipe assembly is fixedly connected to the inside of the forging lower die, one end of the No. 3 connecting pipe is fixedly connected to the water outlet end of the No. 1 water-cooling pipe assembly, and the other end of the No. 3 connecting pipe is fixedly connected to the water inlet end of the No. 2 water-cooling pipe assembly.
[0010] Preferably, the No. 1 connecting pipe is fixedly connected to the water inlet end of the No. 1 water-cooling pipe assembly, and the No. 1 water-cooling pipe assembly and the No. 2 water-cooling pipe assembly are both S-shaped water-cooling pipes.
[0011] Preferably, the water-cooling heat dissipation mechanism includes a No. 1 mounting frame, the No. 1 mounting frame is fixedly connected to the side of the forging cylinder, and the No. 1 mounting frame is fixedly connected to the inside of a heat sink assembly, the No. 1 heat sink assembly is fixedly connected to the inside of a No. 3 water-cooling pipe assembly, the water inlet end of the No. 3 water-cooling pipe assembly is fixedly connected to a No. 4 connecting pipe, the No. 4 connecting pipe is fixedly connected to the water outlet end of the No. 2 water-cooling pipe assembly, the water outlet end of the No. 3 water-cooling pipe assembly is fixedly connected to the No. 2 connecting pipe, the No. 3 water-cooling pipe assembly is an S-shaped water-cooling pipe, and the No. 1 ventilator is fixedly connected to the surface of the No. 1 mounting frame.
[0012] Preferably, a ventilation duct is fixedly connected to the side of the No. 1 mounting frame, and a No. 2 ventilator is fixedly connected to the bottom of the ventilation duct.
[0013] Preferably, the air cooling mechanism includes a No. 2 mounting frame, the No. 2 mounting frame is fixedly connected to the side of the forging top plate, and one end of the No. 2 mounting frame is fixedly connected to a servo motor, the output end of the servo motor is fixedly connected to a screw rod, the screw rod is rotatably connected to the No. 2 mounting frame, and a screw block is threadedly connected to the surface of the screw rod, the bottom of the screw block is fixedly connected to a connecting plate, and the bottom of the connecting plate is fixedly connected to a No. 3 fan.
[0014] Preferably, a slide rail is fixedly connected to the bottom of the second mounting frame, a sliding block is slidably connected to the surface of the slide rail, and the sliding block is fixedly connected to the connecting plate.
[0015] Preferably, a second heat sink assembly is fixedly connected to the side of the forging lower die.
[0016] Compared with the prior art, the present invention has the following beneficial effects: 1. In the present invention, the cooling water inside the No. 1 water-cooling pipe assembly in the forging upper die and the No. 2 water-cooling pipe assembly in the forging lower die is circulated by a circulating pump, and the forging upper die and the forging lower die are cooled and lowered by the cooling water to avoid the forging upper die and the forging lower die from being overheated during the forging operation. The heat brought out by the cooling water is dispersed to the surface of the No. 1 heat sink assembly by the No. 3 water-cooling pipe assembly, and then the surface of the No. 1 heat sink assembly and the No. 3 water-cooling pipe assembly are ventilated and dissipated by the No. 1 ventilator to ventilate and dissipate the heat, so that the temperature of the cooling water is reduced, so that the forging upper die and the forging lower die can be fully cooled. At the same time, the interior of the ventilation duct is ventilated by the No. 2 ventilator, and then the No. 1 heat sink assembly and the No. 3 water-cooling pipe assembly are fully ventilated and dissipated, and the temperature of the cooling water is further reduced. By reducing the temperature of the forging die, the variation amplitude of thermal stress can be reduced, and the probability of thermal fatigue damage can be reduced, thereby extending the service life of the die and improving the forging accuracy.
[0017] 2. In the present invention, since the contact time between the forging lower die and the forging material is relatively long, the heating speed of the forging lower die is relatively fast and the temperature is relatively high. The cooling plate assembly No. 2 is used to assist in cooling the forging lower die again. At the same time, the ventilation and heat dissipation of the forging upper die and the forging lower die are carried out by the ventilation fan No. 3 to ensure that the temperature of the forging upper die and the forging lower die is not too high. The lead screw is driven to rotate by the servo motor to adjust the position of the wire block, thereby driving the connecting plate and the No. 3 ventilation fan to adjust the position, so that the No. 3 ventilation fan can fully ventilate and dissipate the heat on the surface of the forging upper die and the forging lower die. In the process of the movement of the connecting plate, the slider slides along the slide rail to limit the movement of the connecting plate, thereby improving the stability of the movement of the No. 3 ventilation fan. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 A schematic diagram of the three-dimensional structure of a water meter housing forging die of the present invention Figure 1 ; Figure 2 A schematic diagram of the three-dimensional structure of a water meter housing forging die of the present invention Figure 2 ; Figure 3 It is a front view structural schematic diagram of a water meter housing forging die of the present invention; Figure 4 It is a three-dimensional structural schematic diagram of a water cooling circulation mechanism in a forging die for a water meter housing of the present invention; Figure 5 It is a three-dimensional structural schematic diagram of a water cooling and heat dissipation mechanism in a forging die for a water meter housing of the present invention; Figure 6 The present invention is a schematic diagram of the three-dimensional structure of an air cooling mechanism in a forging die for a water meter shell.
[0019] In the figure: 1. Forging mechanism; 11. Forging base; 12. Forging cylinder; 13. Forging top plate; 14. Guide rod; 2. Water cooling circulation mechanism; 21. Circulation pump; 22. No. 1 connecting pipe; 23. No. 2 connecting pipe; 24. No. 1 water cooling pipe assembly; 25. No. 3 connecting pipe; 26. No. 2 water cooling pipe assembly; 27. No. 4 connecting pipe; 3. Water cooling heat dissipation mechanism; 31. No. 1 mounting frame; 32. No. 1 heat sink assembly; 33. No. 3 water cooling pipe assembly; 34. No. 1 ventilator; 35. Ventilation duct; 36. No. 2 ventilator; 4. Forging upper die; 5. Forging lower die; 6. Air cooling mechanism; 61. No. 2 mounting frame; 62. Servomotor; 63. Screw rod; 64. Screw block; 65. Connecting plate; 66. No. 3 ventilator; 67. Slide rail; 68. Slider; 7. No. 2 heat sink assembly. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] Embodiment 1 Reference Figure 1-Figure 6As shown: a water meter shell forging die, including a forging mechanism 1, the forging mechanism 1 includes a forging base 11, a forging cylinder 12 is installed on the upper part of the forging base 11, a forging lower die 5 is installed on the surface of the forging cylinder 12, a forging top plate 13 is fixedly connected to the bottom of the forging cylinder 12, a forging upper die 4 is installed at the bottom of the forging top plate 13, the forging upper die 4 is located above the forging lower die 5, a water cooling circulation mechanism 2 is installed on the side of the forging base 11, a water cooling heat dissipation mechanism 3 is fixedly connected to the upper part of the water cooling circulation mechanism 2, and the water cooling circulation mechanism 2 is fixedly connected to the upper part of the water cooling circulation mechanism 2. The ring mechanism 2 is used for water cooling the inside of the forging upper die 4 and the forging lower die 5, the water cooling heat dissipation mechanism 3 is used for cooling the water-cooled circulating water of the water cooling circulation mechanism 2, the side of the forging top plate 13 is fixedly connected with an air cooling mechanism 6, the side of the forging lower die 5 is fixedly connected with a second heat sink assembly 7, the air cooling mechanism 6 is used for ventilation and heat dissipation of the forging upper die 4, the forging lower die 5 and the second heat sink assembly 7, the upper part of the forging base 11 is fixedly connected with a guide rod 14, and the forging top plate 13 is slidably plugged with the guide rod 14; The water-cooling circulation mechanism 2 includes a circulation pump 21, which is fixedly connected to the side of the forging base 11, one end of the circulation pump 21 is fixedly connected to a No. 1 connecting pipe 22, and the other end of the circulation pump 21 is fixedly connected to a No. 2 connecting pipe 23, the water-cooling circulation mechanism 2 includes a No. 1 water-cooling pipe assembly 24, a No. 3 connecting pipe 25 and a No. 2 water-cooling pipe assembly 26, the No. 1 water-cooling pipe assembly 24 is fixedly connected to the inside of the forging upper die 4, the No. 2 water-cooling pipe assembly 26 is fixedly connected to the inside of the forging lower die 5, one end of the No. 3 connecting pipe 25 is fixedly connected to the water outlet end of the No. 1 water-cooling pipe assembly 24, and the other end of the No. 3 connecting pipe 25 is fixedly connected to the water inlet end of the No. 2 water-cooling pipe assembly 26, the No. 1 connecting pipe 22 is fixedly connected to the water inlet end of the No. 1 water-cooling pipe assembly 24, and the No. 1 water-cooling pipe assembly 24 and the No. 2 water-cooling pipe assembly 26 are uniformly S shaped water-cooling pipe, the water-cooling heat dissipation mechanism 3 includes a No. 1 mounting frame 31, the No. 1 mounting frame 31 is fixedly connected to the side of the forging cylinder 12, and the No. 1 mounting frame 31 is fixedly connected to the inside of the No. 1 heat sink assembly 32, the No. 3 water-cooling pipe assembly 33 is fixedly connected to the inside of the No. 1 heat sink assembly 32, the water inlet end of the No. 3 water-cooling pipe assembly 33 is fixedly connected to the No. 4 connecting pipe 27, the No. 4 connecting pipe 27 is fixedly connected to the water outlet end of the No. 2 water-cooling pipe assembly 26, the water outlet end of the No. 3 water-cooling pipe assembly 33 is fixedly connected to the No. 2 connecting pipe 23, the No. 3 water-cooling pipe assembly 33 is an S-shaped water-cooling pipe, a No. 1 ventilator 34 is fixedly connected to the surface of the No. 1 mounting frame 31, a ventilation duct 35 is fixedly connected to the side of the No. 1 mounting frame 31, and a No. 2 ventilator 36 is fixedly connected to the bottom of the ventilation duct 35.
[0022] During use of the present invention, the forging cylinder 12 pushes the forging top plate 13 and the forging upper die 4 below the forging top plate 13 to close to the forging lower die 5 to complete the forging operation. During the forging process, the forging top plate 13 slides along the guide rod 14, and the forging top plate 13 is limited by the guide rod 14, so as to improve the stability of the forging top plate 13 and the forging upper die 4 moving up and down and the accuracy of the moving position; When the forging upper die 4 and the forging lower die 5 are performing forging work, the cooling water inside the No. 1 water-cooling pipe assembly 24 in the forging upper die 4 and the No. 2 water-cooling pipe assembly 26 in the forging lower die 5 is circulated through the circulating pump 21, and the forging upper die 4 and the forging lower die 5 are cooled and lowered by the cooling water to avoid the forging upper die 4 and the forging lower die 5 from being too high in temperature during the forging operation. The heat brought out by the cooling water is dispersed to the surface of the No. 1 heat sink assembly 32 through the No. 3 water-cooling pipe assembly 33, and then the surface of the No. 1 heat sink assembly 32 and the No. 3 water-cooling pipe assembly 33 is ventilated and dissipated through the No. 1 ventilator 34, so that the temperature of the cooling water is reduced, so that the forging upper die 4 and the forging lower die 5 can be fully cooled. At the same time, the interior of the ventilation duct 35 is ventilated through the No. 2 ventilator 36, and then the No. 1 heat sink assembly 32 and the No. 3 water-cooling pipe assembly 33 are fully ventilated and dissipated, and the temperature of the cooling water is further reduced. Since the contact time between the forging lower die 5 and the forging material is relatively long, the heating speed of the forging lower die 5 is relatively fast and the temperature is relatively high. The forging lower die 5 is assisted to be cooled again by the No. 2 heat sink assembly 7. At the same time, the forging upper die 4 and the forging lower die 5 are ventilated and cooled by the No. 3 ventilator 66 to ensure that the temperature of the forging upper die 4 and the forging lower die 5 is not too high.
[0023] Embodiment 2 according to Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown, the air cooling mechanism 6 includes a No. 2 mounting frame 61, the No. 2 mounting frame 61 is fixedly connected to the side of the forging top plate 13, and one end of the No. 2 mounting frame 61 is fixedly connected to a servo motor 62, the output end of the servo motor 62 is fixedly connected to a screw rod 63, the screw rod 63 is rotatably connected to the No. 2 mounting frame 61, and a screw block 64 is threadedly connected to the surface of the screw rod 63, the bottom of the screw block 64 is fixedly connected to a connecting plate 65, the bottom of the connecting plate 65 is fixedly connected to a No. 3 ventilator 66, the bottom of the No. 2 mounting frame 61 is fixedly connected to a slide rail 67, the surface of the slide rail 67 is slidably connected to a slider 68, the slider 68 is fixedly connected to the connecting plate 65, and the side of the forging lower die 5 is fixedly connected to a No. 2 heat sink assembly 7.
[0024] In the present invention, the servo motor 62 drives the screw rod 63 to rotate, thereby adjusting the position of the wire block 64, and then driving the connecting plate 65 and the No. 3 fan 66 to adjust the position, so that the No. 3 fan 66 can fully ventilate and dissipate heat on the surfaces of the forging upper die 4 and the forging lower die 5. During the movement of the connecting plate 65, the slider 68 slides along the slide rail 67 to limit the movement of the connecting plate 65, thereby improving the stability of the movement of the No. 3 fan 66.
[0025] The use method and working principle of the device are as follows: the forging cylinder 12 pushes the forging top plate 13 and the forging upper die 4 below the forging top plate 13 to close to the forging lower die 5 to complete the forging operation. When the forging upper die 4 and the forging lower die 5 are performing the forging operation, the circulating pump 21 circulates the cooling water inside the No. 1 water-cooling pipe assembly 24 in the forging upper die 4 and the No. 2 water-cooling pipe assembly 26 in the forging lower die 5, and the cooling water is used to cool the forging upper die 4 and the forging lower die 5 to avoid excessively high temperatures during the forging operation. The heat brought out by the cooling water is dispersed to the surface of the No. 1 heat sink assembly 32 by the No. 1 ventilator 34, and the surface of the No. 1 heat sink assembly 32 and the No. 3 water-cooling pipe assembly 33 are ventilated and dissipated to reduce the temperature of the cooling water, so that the forging upper die 4 and the forging lower die 5 can be fully cooled. At the same time, the No. 2 ventilator 36 is used to ventilate the inside of the ventilation duct 35, and then the No. 1 heat sink assembly 32 and the No. 3 water-cooling pipe assembly 33 are fully ventilated and dissipated, and the temperature of the cooling water is further reduced. The No. 2 heat sink assembly 7 is used to assist in cooling the forging lower die 5 again. The servo motor 62 drives the lead screw 63 to rotate, thereby adjusting the position of the lead screw block 64, and further driving the connecting plate 65 and the third ventilator 66 to adjust their positions.
[0026] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A water meter housing forging die, comprising a forging mechanism (1), the forging mechanism (1) comprising a forging base (11), a forging cylinder (12) being mounted on the upper portion of the forging base (11), a forging lower die (5) being mounted on the surface of the forging cylinder (12), a forging top plate (13) being fixedly connected to the bottom of the forging cylinder (12), a forging upper die (4) being mounted on the bottom of the forging top plate (13), the forging upper die (4) being located above the forging lower die (5), characterized in that: A water-cooling circulation mechanism (2) is installed on the side of the forging base (11); a water-cooling heat dissipation mechanism (3) is fixedly connected to the upper part of the water-cooling circulation mechanism (2); the water-cooling circulation mechanism (2) is used to cool the inside of the forging upper die (4) and the forging lower die (5) with water; the water-cooling heat dissipation mechanism (3) is used to dissipate the heat of the water-cooling circulation water of the water-cooling circulation mechanism (2); an air-cooling mechanism (6) is fixedly connected to the side of the forging top plate (13); a second heat dissipation plate assembly (7) is fixedly connected to the side of the forging lower die (5); the air-cooling mechanism (6) is used to ventilate and dissipate heat for the forging upper die (4), the forging lower die (5) and the second heat dissipation plate assembly (7).
2. The water meter housing forging die according to claim 1, characterized in that: A guide rod (14) is fixedly connected to the upper portion of the forging base (11), and the forging top plate (13) is slidably plugged into the guide rod (14).
3. The water meter housing forging die according to claim 1, characterized in that: The water-cooling circulation mechanism (2) comprises a circulation pump (21), the circulation pump (21) being fixedly connected to the side of the forging base (11), one end of the circulation pump (21) being fixedly connected to a first connecting pipe (22), and the other end of the circulation pump (21) being fixedly connected to a second connecting pipe (23).
4. The water meter housing forging die according to claim 1, characterized in that: The water cooling circulation mechanism (2) comprises a No. 1 water cooling pipe assembly (24), a No. 3 connecting pipe (25) and a No. 2 water cooling pipe assembly (26); the No. 1 water cooling pipe assembly (24) is fixedly connected to the inside of the forging upper die (4); the No. 2 water cooling pipe assembly (26) is fixedly connected to the inside of the forging lower die (5); one end of the No. 3 connecting pipe (25) is fixedly connected to the water outlet end of the No. 1 water cooling pipe assembly (24); and the other end of the No. 3 connecting pipe (25) is fixedly connected to the water inlet end of the No. 2 water cooling pipe assembly (26).
5. The water meter housing forging die according to claim 3, characterized in that: The No. 1 connecting pipe (22) is fixedly connected to the water inlet end of the No. 1 water cooling pipe assembly (24), and the No. 1 water cooling pipe assembly (24) and the No. 2 water cooling pipe assembly (26) are both S-shaped water cooling pipes.
6. The water meter housing forging die according to claim 1, characterized in that: The water-cooling heat dissipation mechanism (3) comprises a No. 1 mounting frame (31), the No. 1 mounting frame (31) is fixedly connected to the side of the forging cylinder (12), and the No. 1 mounting frame (31) is internally fixedly connected to a No. 1 heat sink assembly (32), the No. 1 heat sink assembly (32) is internally fixedly connected to a No. 3 water-cooling pipe assembly (33), the water inlet end of the No. 3 water-cooling pipe assembly (33) is fixedly connected to a No. 4 connecting pipe (27), the No. 4 connecting pipe (27) is fixedly connected to the water outlet end of the No. 2 water-cooling pipe assembly (26), the water outlet end of the No. 3 water-cooling pipe assembly (33) is fixedly connected to the No. 2 connecting pipe (23), the No. 3 water-cooling pipe assembly (33) is an S-shaped water-cooling pipe, and the No. 1 ventilator (34) is fixedly connected to the surface of the No. 1 mounting frame (31).
7. A water meter housing forging die according to claim 6, characterized in that: A ventilation duct (35) is fixedly connected to the side of the No. 1 mounting frame (31), and a No. 2 ventilator (36) is fixedly connected to the bottom of the ventilation duct (35).
8. The water meter housing forging die according to claim 1, characterized in that: The air cooling mechanism (6) comprises a No. 2 mounting frame (61), the No. 2 mounting frame (61) is fixedly connected to the side of the forging top plate (13), and one end of the No. 2 mounting frame (61) is fixedly connected to a servo motor (62), an output end of the servo motor (62) is fixedly connected to a screw rod (63), the screw rod (63) is rotatably connected to the No. 2 mounting frame (61), and a screw block (64) is threadedly connected to the surface of the screw rod (63), the bottom of the screw block (64) is fixedly connected to a connecting plate (65), and the bottom of the connecting plate (65) is fixedly connected to a No. 3 ventilator (66).
9. A water meter housing forging die according to claim 8, characterized in that: The bottom of the second mounting frame (61) is fixedly connected to a slide rail (67), the surface of the slide rail (67) is slidably connected to a slider (68), and the slider (68) is fixedly connected to the connecting plate (65).
10. The water meter housing forging die according to claim 1, characterized in that: A second heat sink assembly (7) is fixedly connected to the side surface of the forging lower die (5).
Citation Information
Patent Citations
Water meter shell body forging and pressing die
CN109201999A