Oil and gas project planning system, method, device, equipment and medium

Through the project plan introduction, planning indicator revision and plan comparison components of the oil and gas project planning system, the problems of low planning efficiency and unreasonable plans before the development of oil and gas project are solved, and more efficient and reasonable planning plans are achieved.

CN119648119APending Publication Date: 2025-03-18CHINA NAT PETROLEUM CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311204978.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-09-18
Publication Date
2025-03-18

AI Technical Summary

Technical Problem

Before the development of existing oil and gas projects, users need to manually plan investment and output, resulting in low planning efficiency and unreasonable plans.

Method used

It provides an oil and gas project planning system, including project plan introduction components, planning indicator revision components and project plan comparison components, to realize simultaneous revision, comparison and adjustment of multiple planning solutions.

Benefits of technology

It effectively reduces the workload of oil and gas project planning and improves the rationality and efficiency of the planning plan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119648119A_ABST
    Figure CN119648119A_ABST
Patent Text Reader

Abstract

The invention discloses an oil and gas project planning system, method, device and equipment and a medium. The system comprises a project scheme import assembly which responds to an import operation of a user on a to-be-developed oil and gas project scheme to obtain oil and gas project information corresponding to a plurality of planning schemes of an oil and gas project; the planning index revision assembly responds to revision operation of a user on planning indexes in the oil and gas project information corresponding to the multiple planning schemes of the oil and gas project, and oil and gas project information corresponding to the revised planning schemes is obtained; and the project scheme comparison component compares the planning indexes in the oil and gas project information corresponding to the revised planning schemes, and adjusts the planning indexes in the oil and gas project information corresponding to the revised planning schemes based on a comparison result to obtain a target oil and gas project scheme. Through the above technical scheme, simultaneous revision, comparison and adjustment of a plurality of planning schemes are realized, the workload of oil and gas project planning is reduced, and the rationality and planning efficiency of the planning schemes are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of oil and gas reservoir engineering, and in particular to an oil and gas project planning system, method, device, equipment and medium. Background Art

[0002] As people's demand for oil and gas increases, the number of oil and gas projects being developed is also increasing.

[0003] At present, before the development of multiple oil and gas projects, users are required to manually plan the investment, output, etc. of each oil and gas project one by one, which leads to low efficiency in oil and gas project planning and unreasonable project plan planning. Summary of the invention

[0004] The present invention provides an oil and gas project planning system, method, device, equipment and medium to achieve simultaneous revision, comparison and adjustment of multiple planning schemes, effectively reducing the workload of oil and gas project planning and improving the rationality and planning efficiency of planning schemes.

[0005] According to one aspect of the present invention, there is provided an oil and gas project planning system, comprising:

[0006] A project plan import component is used to respond to the user's import operation of the oil and gas project plan to be developed, and obtain the oil and gas project information corresponding to multiple planning plans of the oil and gas project;

[0007] A planning indicator revision component, for responding to a user's revision operation on planning indicators in the oil and gas project information corresponding to a plurality of planning schemes of the oil and gas project, and obtaining revised oil and gas project information corresponding to each planning scheme;

[0008] The project plan comparison component is used to compare the planning indicators in the oil and gas project information corresponding to the revised planning plans, and adjust the planning indicators in the oil and gas project information corresponding to the revised planning plans based on the comparison results to obtain the target oil and gas project plan.

[0009] According to another aspect of the present invention, there is provided an oil and gas project planning method, comprising:

[0010] In response to the user's import operation of the oil and gas project plan to be developed, the project plan import component obtains oil and gas project information corresponding to multiple planning plans of the oil and gas project;

[0011] In response to a user's revision operation of the planning indicators in the oil and gas project information corresponding to the multiple planning schemes of the oil and gas project by the planning indicator revision component, the revised oil and gas project information corresponding to each planning scheme is obtained;

[0012] The planning indicators in the oil and gas project information corresponding to the revised planning schemes are compared through the project plan comparison component, and the planning indicators in the oil and gas project information corresponding to the revised planning schemes are adjusted based on the comparison results to obtain the target oil and gas project plan.

[0013] According to another aspect of the present invention, there is provided an oil and gas project planning device, comprising:

[0014] The oil and gas project information import module is used to obtain the oil and gas project information corresponding to multiple planning schemes of the oil and gas project in response to the user's import operation of the oil and gas project scheme to be developed through the project scheme import component;

[0015] An oil and gas project information revision module, used to respond to a user's revision operation of a planning indicator in the oil and gas project information corresponding to a plurality of planning schemes of the oil and gas project through a planning indicator revision component, and obtain revised oil and gas project information corresponding to each planning scheme;

[0016] The target oil and gas project plan determination module is used to compare the planning indicators in the oil and gas project information corresponding to the revised planning plans through the project plan comparison component, and adjust the planning indicators in the oil and gas project information corresponding to the revised planning plans based on the comparison results to obtain the target oil and gas project plan.

[0017] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:

[0018] at least one processor;

[0019] and a memory communicatively coupled to the at least one processor;

[0020] The memory stores a computer program that can be executed by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the oil and gas project planning method described in any embodiment of the present invention.

[0021] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the oil and gas project planning method described in any embodiment of the present invention when executed.

[0022] The technical solution of the embodiment of the present invention realizes the simultaneous revision, comparison and adjustment of multiple planning schemes through the project scheme import component, the planning indicator revision component and the project scheme comparison component, which effectively reduces the workload of oil and gas project planning and improves the rationality and planning efficiency of the planning scheme.

[0023] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0025] Figure 1 This is a structural diagram of an oil and gas project planning system provided according to Embodiment 1 of the present invention;

[0026] Figure 2 This is a structural diagram of an oil and gas project planning system provided according to Embodiment 2 of the present invention;

[0027] Figure 3 This is a schematic diagram of the structure of an oil and gas project planning system provided according to Embodiment 3 of the present invention;

[0028] Figure 4 is a structural diagram of an oil and gas project planning system provided according to a fourth embodiment of the present invention;

[0029] Figure 5 is a flow chart of an oil and gas project planning method provided according to Embodiment 5 of the present invention;

[0030] Figure 6 This is a structural schematic diagram of an oil and gas project planning device provided according to Embodiment 6 of the present invention;

[0031] Figure 7 It is a structural schematic diagram of an electronic device for implementing the oil and gas project planning method according to an embodiment of the present invention. DETAILED DESCRIPTION

[0032] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0033] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0034] Embodiment 1

[0035] Figure 1 The structure diagram of an oil and gas project planning system provided in the first embodiment of the present invention is shown below. The oil and gas project planning system 100 can be implemented in the form of hardware and / or software. The oil and gas project planning system 100 includes:

[0036] The project plan import component 110 is used to respond to the user's import operation of the oil and gas project plan to be developed, and obtain the oil and gas project information corresponding to multiple planning plans of the oil and gas project; the planning indicator revision component 120 is used to respond to the user's revision operation of the planning indicators in the oil and gas project information corresponding to the multiple planning plans of the oil and gas project, and obtain the revised oil and gas project information corresponding to each planning plan; the project plan comparison component 130 is used to compare the planning indicators in the oil and gas project information corresponding to each revised planning plan, and adjust the planning indicators in the oil and gas project information corresponding to each revised planning plan based on the comparison results to obtain the target oil and gas project plan.

[0037] In the disclosed embodiment, the oil and gas project plan refers to a pre-designed oil and gas project planning plan document, which may include but is not limited to annual investment, annual new production capacity, annual production decline, annual oil and gas production, ground engineering construction and other oil and gas project information.

[0038] Exemplarily, the oil and gas project plan may be multiple planning plans for one or more oil and gas projects. The electronic device may import the oil and gas project plan to be developed through the project plan importing component 110, thereby obtaining the oil and gas project information corresponding to the multiple planning plans.

[0039] Optionally, the project plan import component 110 is specifically used to: obtain oil and gas project information corresponding to multiple planning plans for oil and gas projects in response to the user's batch import operation on the oil and gas project plans to be developed; convert the oil and gas project information corresponding to the multiple planning plans for the oil and gas projects into a database format, and store the oil and gas project information after the database format conversion into a target database for subsequent analysis and call.

[0040] Exemplarily, each oil and gas project plan to be developed may be an Excel format file, and the batch-imported Excel format oil and gas project plans may be converted into a database format oil and gas project plan, wherein any planning plan for each oil and gas project may be stored separately in the database.

[0041] In the disclosed embodiment, after obtaining the oil and gas project information, the electronic device can revise the planning indicators in the oil and gas project information through the planning indicator revision component 120, thereby obtaining the revised oil and gas project information corresponding to each planning scheme.

[0042] Exemplarily, the user may modify the planning indicators in the planning indicator table, thereby obtaining the revised oil and gas project information corresponding to each planning scheme, wherein the planning indicator table may be selected or set according to user needs.

[0043] Optionally, the planning indicator revision component 120 is further used to: modify the planning indicators associated with the modified planning indicators in a linked manner to obtain the oil and gas project information after the linked modification.

[0044] It should be noted that by modifying the planning indicators associated with the modified planning indicators in a linked manner, the modification workload of the user is reduced, and the rationality and accuracy of the planning indicators of the oil and gas project are ensured.

[0045] In the disclosed embodiment, the electronic device can perform a horizontal comparison of the planning indicators in the oil and gas project information corresponding to each revised planning scheme through the project scheme comparison component 130, thereby determining the difference information of the planning indicators between the planning schemes based on the comparison results, so that the user can judge the rationality of the planning indicators according to the difference information, and adjust the planning indicators in the oil and gas project information corresponding to each revised planning scheme, so as to obtain a target oil and gas project scheme with reasonable planning indicators. Among them, the target oil and gas project scheme can be an overall planning scheme for multiple target oil and gas projects, which can be used as a scheme recommended to the user.

[0046] The technical solution of the embodiment of the present invention realizes the simultaneous revision, comparison and adjustment of multiple planning schemes through the project scheme import component, the planning indicator revision component and the project scheme comparison component, which effectively reduces the workload of oil and gas project planning and improves the rationality and planning efficiency of the planning scheme.

[0047] Embodiment 2

[0048] Figure 2 This is a schematic diagram of the structure of an oil and gas project planning system provided in the second embodiment of the present invention. The system of this embodiment can be combined with various optional solutions of the oil and gas project planning system provided in the above embodiments. The oil and gas project planning system provided in this embodiment is further optimized.

[0049] Optionally, the oil and gas project planning system 100 further includes: a project query and revision component 140, which is used to obtain a project query and revision result in response to a user's query and revision operation on oil and gas project information corresponding to multiple planning schemes of the oil and gas project.

[0050] Among them, the project query and revision results refer to the results of overall query and revision of planning indicators of multiple planning schemes.

[0051] Optionally, the project query revision component 140 is specifically used to: query the oil and gas project information corresponding to multiple planning schemes of the oil and gas project based on preset query conditions to obtain project query results; modify the oil and gas project information based on the project query results to obtain project query revision results.

[0052] The query condition may be composed of one or more planning indicators, which are not limited here.

[0053] For example, taking the development of overseas oil and gas projects as an example, after all the planning schemes of overseas oil and gas projects are imported or set up, the planning schemes of each overseas oil and gas project will constitute the overall plan for the development of overseas oil and gas projects. Furthermore, users can select a single planning indicator or a single year to query the oil and gas project information of the overall plan for the development of overseas oil and gas projects, and then the user can analyze the project query results according to the overall overseas investment constraints, production plans and construction progress, determine unreasonable planning indicators, and locate the oil and gas projects affected by the unreasonable planning indicators according to the unreasonable planning indicators, and then modify or adjust the oil and gas project information of the oil and gas projects affected by the planning indicators, so that the planning scheme conforms to the overall plan and obtains a reasonable recommended planning scheme.

[0054] The technical solution of the embodiment of the present invention, through the project query and revision component 140, responds to the user's query and revision operations on the oil and gas project information corresponding to multiple planning schemes of the oil and gas project, obtains the project query and revision results, realizes the overall query and revision of each planning scheme, and thus improves the efficiency of oil and gas project planning.

[0055] Embodiment 3

[0056] Figure 3This is a schematic diagram of the structure of an oil and gas project planning system provided in the third embodiment of the present invention. The system of this embodiment can be combined with various optional solutions of the oil and gas project planning system provided in the above embodiments. The oil and gas project planning system provided in this embodiment is further optimized.

[0057] Optionally, the oil and gas project planning system 100 further includes: a project statistical analysis component 150, which is used to obtain planning indicators of the oil and gas project scheme to be developed, and generate a planning scheme chart corresponding to the planning indicators of the oil and gas project scheme to be developed.

[0058] In the embodiment of the present disclosure, the project statistical analysis component 150 can be specifically used to: obtain the planning indicators of the oil and gas project plan to be developed in response to the user's selection operation on the planning indicators of the oil and gas project plan to be developed; and generate a planning scheme chart corresponding to the planning indicators of the oil and gas project plan to be developed based on a preset chart format and chart function.

[0059] The planning scheme chart may be a pie chart, a line chart or a statistical table, etc., which is not specifically limited here.

[0060] It should be noted that, according to the preset chart format and chart function, the planning scheme chart corresponding to the planning indicators of the oil and gas project to be developed is automatically generated, which reduces the workload of oil and gas analysis and thus improves the efficiency of oil and gas scheme planning.

[0061] Embodiment 4

[0062] Figure 4 This is a schematic diagram of the structure of an oil and gas project planning system provided in the fourth embodiment of the present invention. The system of this embodiment can be combined with various optional solutions of the oil and gas project planning system provided in the above embodiments. The oil and gas project planning system provided in this embodiment is further optimized.

[0063] Optionally, the oil and gas project planning system 100 further includes: an original solution management component 160, which is used to obtain the repaired oil and gas project information in response to the user's repair operation on the oil and gas project information;

[0064] Among them, the original plan management component 160 is specifically used for: when the oil and gas project plan to be developed is imported into the database, the oil and gas project plan to be developed is saved in the backup library; when the oil and gas project information is damaged, the damaged oil and gas project information is repaired based on the oil and gas project plan to be developed in the backup library to obtain the repaired oil and gas project information.

[0065] The technical solution of the embodiment of the present invention improves the security and stability of the database by repairing the oil and gas project information.

[0066] Embodiment 5

[0067] Figure 5 This is a flow chart of an oil and gas project planning method provided by an embodiment of the present invention. This embodiment is applicable to the situation of overall planning of oil and gas projects. The method can be executed by an oil and gas project planning device. The oil and gas project planning device can be implemented in the form of hardware and / or software. The oil and gas project planning device can be configured in electronic devices such as computer terminals. Figure 5 As shown, the method includes:

[0068] S510. In response to the user's import operation of the oil and gas project plan to be developed, the project plan import component obtains oil and gas project information corresponding to multiple planning plans of the oil and gas project.

[0069] S520. Responding to the user's revision operation on the planning indicators in the oil and gas project information corresponding to the multiple planning schemes of the oil and gas project through the planning indicator revision component, the revised oil and gas project information corresponding to each planning scheme is obtained.

[0070] S530. Compare the planning indicators in the oil and gas project information corresponding to the revised planning schemes through the project scheme comparison component, and adjust the planning indicators in the oil and gas project information corresponding to the revised planning schemes based on the comparison results to obtain the target oil and gas project scheme.

[0071] The technical solution of the embodiment of the present invention realizes the simultaneous revision, comparison and adjustment of multiple planning schemes, effectively reduces the workload of oil and gas project planning, and improves the rationality and planning efficiency of planning schemes.

[0072] In some optional implementations, in response to a user's import operation of an oil and gas project plan to be developed, the project plan import component obtains oil and gas project information corresponding to multiple planning plans of the oil and gas project, including:

[0073] In response to a user's batch import operation of oil and gas project plans to be developed, oil and gas project information corresponding to multiple planning plans of the oil and gas projects is obtained;

[0074] The oil and gas project information corresponding to the multiple planning schemes of the oil and gas project is converted into a database format, and the oil and gas project information after the database format conversion is stored in a target database.

[0075] In some optional implementations, the oil and gas project planning method further includes:

[0076] The planning indicator revision component is used to modify the planning indicators associated with the modified planning indicators in a linked manner, thereby obtaining the oil and gas project information after the linked modification.

[0077] In some optional implementations, the oil and gas project planning method further includes:

[0078] The project query revision component responds to the user's query and revision operation on the oil and gas project information corresponding to the multiple planning schemes of the oil and gas project to obtain a project query revision result.

[0079] In some optional implementations, the project query revision component responds to the user's query revision operation on the oil and gas project information corresponding to the multiple planning schemes of the oil and gas project to obtain a project query revision result, including:

[0080] Based on the preset query conditions, query the oil and gas project information corresponding to the multiple planning schemes of the oil and gas project to obtain the project query results;

[0081] The oil and gas project information is modified based on the project query result to obtain a project query revision result.

[0082] In some optional implementations, the oil and gas project planning method further includes:

[0083] The planning indicators of the oil and gas project to be developed are obtained through the project statistical analysis component, and a planning scheme chart corresponding to the planning indicators of the oil and gas project to be developed is generated.

[0084] In some optional implementations, the planning indicators of the oil and gas project to be developed are obtained through the project statistical analysis component, and a planning scheme chart corresponding to the planning indicators of the oil and gas project to be developed is generated, including:

[0085] In response to a user's selection operation of a planning indicator of an oil and gas project to be developed, obtaining the planning indicator of the oil and gas project to be developed;

[0086] Based on the preset chart format and chart function, a planning scheme chart corresponding to the planning indicators of the oil and gas project to be developed is generated.

[0087] In some optional implementations, the oil and gas project planning method further includes:

[0088] The original solution management component responds to the user's repair operation on the oil and gas project information to obtain the repaired oil and gas project information.

[0089] In some optional implementations, the original solution management component responds to the user's repair operation on the oil and gas project information to obtain the repaired oil and gas project information, including:

[0090] When the oil and gas project plan to be developed is imported into the database, the oil and gas project plan to be developed is saved in the backup library;

[0091] In the case that the oil and gas project information is damaged, the damaged oil and gas project information is repaired based on the oil and gas project plan to be developed in the backup library to obtain the repaired oil and gas project information.

[0092] The oil and gas project planning system provided in the embodiment of the present invention can execute the oil and gas project planning method provided in any embodiment of the present invention, and the oil and gas project planning method has the corresponding method and beneficial effects of the oil and gas project planning system.

[0093] Embodiment 6

[0094] Figure 6 This is a schematic diagram of the structure of an oil and gas project planning device provided in Example 6 of the present invention. Figure 6 As shown, the device comprises:

[0095] The oil and gas project information import module 610 is used to obtain oil and gas project information corresponding to multiple planning schemes of the oil and gas project in response to the user's import operation of the oil and gas project scheme to be developed through the project scheme import component;

[0096] The oil and gas project information revision module 620 is used to respond to the user's revision operation of the planning indicators in the oil and gas project information corresponding to the multiple planning schemes of the oil and gas project through the planning indicator revision component, and obtain the revised oil and gas project information corresponding to each planning scheme;

[0097] The target oil and gas project plan determination module 630 is used to compare the planning indicators in the oil and gas project information corresponding to the revised planning plans through the project plan comparison component, and adjust the planning indicators in the oil and gas project information corresponding to the revised planning plans based on the comparison results to obtain the target oil and gas project plan.

[0098] The technical solution of the embodiment of the present invention realizes the simultaneous revision, comparison and adjustment of multiple planning schemes, effectively reduces the workload of oil and gas project planning, and improves the rationality and planning efficiency of planning schemes.

[0099] In some optional implementations, the oil and gas project information import module 610 is specifically used to:

[0100] In response to a user's batch import operation of oil and gas project plans to be developed, oil and gas project information corresponding to multiple planning plans of the oil and gas projects is obtained;

[0101] The oil and gas project information corresponding to multiple planning schemes of the oil and gas project is converted into a database format, and the oil and gas project information after the database format conversion is stored in a target database.

[0102] In some optional implementations, the oil and gas project information revision module 620 is further used to:

[0103] The planning indicator revision component is used to modify the planning indicators associated with the modified planning indicators in a linked manner, thereby obtaining the oil and gas project information after the linked modification.

[0104] In some optional implementations, the oil and gas project planning device further includes:

[0105] The project query revision result determination module is used to obtain the project query revision result in response to the user's query revision operation on the oil and gas project information corresponding to multiple planning schemes of the oil and gas project through the project query revision component.

[0106] In some optional implementations, the project query revision result determination module is specifically used to:

[0107] Based on the preset query conditions, query the oil and gas project information corresponding to the multiple planning schemes of the oil and gas project to obtain the project query results;

[0108] The oil and gas project information is modified based on the project query result to obtain a project query revision result.

[0109] In some optional implementations, the oil and gas project planning device further includes:

[0110] The planning scheme chart generation module is used to obtain the planning indicators of the oil and gas project to be developed through the project statistical analysis component, and generate a planning scheme chart corresponding to the planning indicators of the oil and gas project to be developed.

[0111] In some optional implementations, the planning scheme chart generation module is specifically used to:

[0112] In response to a user's selection operation of a planning indicator of an oil and gas project to be developed, obtaining the planning indicator of the oil and gas project to be developed;

[0113] Based on the preset chart format and chart function, a planning scheme chart corresponding to the planning indicators of the oil and gas project to be developed is generated.

[0114] In some optional implementations, the oil and gas project planning device further includes:

[0115] The oil and gas project information repair module is used to respond to the user's repair operation on the oil and gas project information through the original solution management component to obtain the repaired oil and gas project information.

[0116] In some optional implementations, the oil and gas project information repair module is specifically used to:

[0117] When the oil and gas project plan to be developed is imported into the database, the oil and gas project plan to be developed is saved in the backup library;

[0118] In the case that the oil and gas project information is damaged, the damaged oil and gas project information is repaired based on the oil and gas project plan to be developed in the backup library to obtain the repaired oil and gas project information.

[0119] The oil and gas project planning device provided in the embodiment of the present invention can execute the oil and gas project planning method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.

[0120] Embodiment 7

[0121] Figure 7 A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital assistants, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.

[0122] like Figure 7 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. The I / O interface 15 is also connected to the bus 14.

[0123] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0124] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The processor 11 executes the various methods and processes described above, such as an oil and gas project planning method, which includes:

[0125] In response to the user's import operation of the oil and gas project plan to be developed, the project plan import component obtains oil and gas project information corresponding to multiple planning plans of the oil and gas project;

[0126] In response to a user's revision operation of the planning indicators in the oil and gas project information corresponding to the multiple planning schemes of the oil and gas project by the planning indicator revision component, the revised oil and gas project information corresponding to each planning scheme is obtained;

[0127] The planning indicators in the oil and gas project information corresponding to the revised planning schemes are compared through the project plan comparison component, and the planning indicators in the oil and gas project information corresponding to the revised planning schemes are adjusted based on the comparison results to obtain the target oil and gas project plan.

[0128] In some embodiments, the oil and gas project planning method may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the oil and gas project planning method described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to execute the oil and gas project planning method in any other appropriate manner (e.g., by means of firmware).

[0129] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0130] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0131] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0132] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).

[0133] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.

[0134] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.

[0135] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.

[0136] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. An oil and gas project planning system, characterized in that: include: A project plan import component is used to respond to the user's import operation of the oil and gas project plan to be developed, and obtain the oil and gas project information corresponding to multiple planning plans of the oil and gas project; A planning indicator revision component, for responding to a user's revision operation on planning indicators in the oil and gas project information corresponding to a plurality of planning schemes of the oil and gas project, and obtaining revised oil and gas project information corresponding to each planning scheme; The project plan comparison component is used to compare the planning indicators in the oil and gas project information corresponding to the revised planning plans, and adjust the planning indicators in the oil and gas project information corresponding to the revised planning plans based on the comparison results to obtain the target oil and gas project plan.

2. The system according to claim 1, characterized in that The project solution import component is specifically used for: In response to a user's batch import operation of oil and gas project plans to be developed, oil and gas project information corresponding to multiple planning plans of the oil and gas projects is obtained; The oil and gas project information corresponding to the multiple planning schemes of the oil and gas project is converted into a database format, and the oil and gas project information after the database format conversion is stored in a target database.

3. The system according to claim 1, characterized in that The planning indicator revision component is also used to: The planning indicators associated with the modified planning indicators are modified in linkage to obtain the oil and gas project information after linkage modification.

4. The system according to claim 1, characterized in that The oil and gas project planning system further includes: The project query and revision component is used to obtain a project query and revision result in response to a user's query and revision operation on the oil and gas project information corresponding to multiple planning schemes of the oil and gas project.

5. The system according to claim 4, characterized in that The project query revision component is specifically used for: Based on the preset query conditions, query the oil and gas project information corresponding to the multiple planning schemes of the oil and gas project to obtain the project query results; The oil and gas project information is modified based on the project query result to obtain a project query revision result.

6. The system according to claim 1, characterized in that The oil and gas project planning system further includes: The project statistical analysis component is used to obtain the planning indicators of the oil and gas project to be developed and generate a planning scheme chart corresponding to the planning indicators of the oil and gas project to be developed.

7. The system according to claim 6, characterized in that The project statistics analysis component is specifically used for: In response to a user's selection operation of a planning indicator of an oil and gas project to be developed, obtaining the planning indicator of the oil and gas project to be developed; Based on the preset chart format and chart function, a planning scheme chart corresponding to the planning indicators of the oil and gas project to be developed is generated.

8. The system according to claim 1, characterized in that The oil and gas project planning system further includes: The original solution management component is used to obtain the repaired oil and gas project information in response to the user's repair operation on the oil and gas project information.

9. The system according to claim 8, characterized in that The original solution management component is specifically used for: When the oil and gas project plan to be developed is imported into the database, the oil and gas project plan to be developed is saved in the backup library; In the case that the oil and gas project information is damaged, the damaged oil and gas project information is repaired based on the oil and gas project plan to be developed in the backup library to obtain the repaired oil and gas project information.

10. A method for oil and gas project planning, characterized in that: include: In response to the user's import operation of the oil and gas project plan to be developed, the project plan import component obtains oil and gas project information corresponding to multiple planning plans of the oil and gas project; In response to the user's revision operation of the planning indicators in the oil and gas project information corresponding to the multiple planning schemes of the oil and gas project through the planning indicator revision component, the revised oil and gas project information corresponding to each planning scheme is obtained; The planning indicators in the oil and gas project information corresponding to the revised planning schemes are compared through the project plan comparison component, and the planning indicators in the oil and gas project information corresponding to the revised planning schemes are adjusted based on the comparison results to obtain the target oil and gas project plan.

11. An oil and gas project planning device, characterized in that: include: The oil and gas project information import module is used to obtain the oil and gas project information corresponding to multiple planning schemes of the oil and gas project in response to the user's import operation of the oil and gas project scheme to be developed through the project scheme import component; An oil and gas project information revision module, used to respond to a user's revision operation of a planning indicator in the oil and gas project information corresponding to a plurality of planning schemes of the oil and gas project through a planning indicator revision component, and obtain revised oil and gas project information corresponding to each planning scheme; The target oil and gas project plan determination module is used to compare the planning indicators in the oil and gas project information corresponding to the revised planning plans through the project plan comparison component, and adjust the planning indicators in the oil and gas project information corresponding to the revised planning plans based on the comparison results to obtain the target oil and gas project plan.

12. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively coupled to the at least one processor; Wherein, the memory stores a computer program that can be executed by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the oil and gas project planning method described in claim 10.

13. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to implement the oil and gas project planning method described in claim 10 when executed by a processor.