Benchmarking analysis method and system for railway signal equipment maintenance operation
Through benchmarking analysis methods and systems, efficient and accurate analysis of railway signal equipment maintenance operations is solved, and the problems of low efficiency and difficulty in ensuring the accuracy of maintenance operations in the existing technology are improved, and driving safety of railway systems is improved.
Patent Information
- Application Number
- CN202411800263.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-09
- Publication Date
- 2025-03-21
AI Technical Summary
In the prior art, railway signal equipment maintenance operations mainly rely on manual confirmation, low efficiency and difficult to ensure accuracy, and there is a safety hazard of missing equipment maintenance or not returning to normal working conditions.
A benchmarking analysis method and system for railway signal equipment maintenance operations is provided. By setting up a maintenance plan in advance, an analysis model is established for each maintenance project of each signal equipment, detection data is obtained and benchmark analysis is carried out, and benchmark analysis reports and warning prompts are generated.
It improves the efficiency and accuracy of maintenance operations, reduces the workload of manual verification, and enhances driving safety guarantees for the railway system.
Smart Images

Figure CN119671544A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of rail transit equipment maintenance, and in particular to a benchmarking analysis method and system for railway signal equipment maintenance operations. Background Art
[0002] As the central nervous system of railway operation, the railway signal system is responsible for the transmission of various commands and information, and is a key infrastructure to ensure the safe operation of trains. Its stability and reliability are crucial. With the continuous advancement of railway technology and the continuous increase in train speed, higher requirements are placed on the maintenance quality and efficiency of railway signal systems.
[0003] Railway electrical engineering usually conducts signal equipment inspection and maintenance work within the skylight points to inspect, maintain and repair the equipment. The above-mentioned skylight refers to the time reserved for construction and maintenance work when the train operation line is not drawn or the train operation is adjusted or reduced in the train operation diagram. During this time period, no trains pass through the blocked section of the line, and railway staff can carry out line maintenance or equipment repair work, including line renovation, replacement of damaged equipment, and disease repair.
[0004] At present, whether the maintenance process meets the standards is mainly confirmed by manually checking the monitoring data after the maintenance is completed. However, since the maintenance process involves a variety of signal equipment and a variety of maintenance items, manual confirmation alone is not only inefficient, but also difficult to ensure accuracy. If there is a situation where the equipment is missed for maintenance or is not restored to normal working condition after maintenance, it is easy to cause safety hazards and affect the safe operation of the train. Summary of the invention
[0005] The purpose of the present invention is to provide a benchmarking analysis method and system for railway signal equipment maintenance operations, which is used to address the problem that the maintenance operation process is currently mainly confirmed manually to see whether it meets the standards, which not only has low work efficiency but also is difficult to ensure accuracy. By establishing an analysis model for each maintenance item of each signal equipment, and performing benchmarking analysis on the detection data according to the analysis model and based on a pre-set maintenance plan, the analysis efficiency is higher, the analysis results are more accurate and precise, and the safe operation of the train is effectively guaranteed.
[0006] In order to achieve the above objectives, the present invention is implemented by the following technical solutions:
[0007] A first aspect of the present invention provides a benchmarking analysis method for railway signal equipment maintenance operations, comprising:
[0008] Pre-set maintenance plan;
[0009] According to the maintenance plan, establishing an analysis model for each maintenance item of each signal device;
[0010] Acquiring detection data of the signal device;
[0011] According to the analysis model, performing benchmark analysis on the detection data;
[0012] Generate benchmark analysis reports and early warning prompts.
[0013] Optionally, the pre-setting of the maintenance plan includes pre-setting the following contents:
[0014] Maintenance start time, maintenance end time, the signal equipment to be maintained, the inspection items of the signal equipment, and the standard values of the inspection items.
[0015] Optionally, establishing an analysis model for each maintenance item of each signal device includes:
[0016] Taking one maintenance item of one signal device as an analysis unit, the maintenance operation is decomposed, and all the analysis units are sequentially stored in an analysis queue.
[0017] Optionally, performing benchmark analysis on the detection data according to the analysis model includes:
[0018] According to the analysis queue, benchmark analysis is performed on the detection data of the detection item corresponding to each analysis unit in turn.
[0019] Optionally, the benchmarking analysis of the detection data includes:
[0020] Based on the preset standard value, the test data of each test item is analyzed to determine whether the test item meets the standard.
[0021] Optionally, a warning prompt is generated for each of the detection items that do not meet the standards.
[0022] Optionally, the benchmarking analysis report includes the following contents:
[0023] Whether each of the test items meets the standard; and
[0024] The reason for each non-compliance of the test item.
[0025] Optionally, the signal device includes:
[0026] Turnout equipment, track equipment, and signal equipment.
[0027] Optionally, the maintenance items of the turnout equipment include:
[0028] Turnout gap, turnout friction current, turnout friction power, turnout operation times, turnout break indication, turnout action power, turnout action time, turnout action current and turnout indication voltage.
[0029] Optionally, the maintenance items of the track equipment include:
[0030] Track voltage, track phase angle, track red light band times, branch residual pressure test and ZPW-2000 master-slave switching test.
[0031] Optionally, the maintenance items of the signal equipment include:
[0032] DJ current and / or light position open experiment.
[0033] A second aspect of the present invention provides a benchmarking analysis system for railway signal equipment maintenance operations, comprising:
[0034] An interactive interface, wherein the interactive interface is used to pre-set a maintenance plan;
[0035] A detection module, the detection module is used to collect detection data of the signal device;
[0036] a storage module, the storage module being connected to the interactive interface and the detection module and being used to store the maintenance plan and the detection data; and
[0037] An analysis module is connected to the storage module, and is used to establish an analysis model for each maintenance item of each signal device according to the maintenance plan, and to perform a benchmark analysis on the detection data according to the analysis model, and to generate a benchmark analysis report and an early warning prompt.
[0038] Optionally, the interactive interface is used to pre-set the following contents to form the maintenance plan:
[0039] Maintenance start time, maintenance end time, the signal equipment to be maintained, the inspection items of the signal equipment, and the standard values of the inspection items.
[0040] Optionally, the analysis module is used to analyze the test data of each of the test items based on the pre-set standard value, and determine whether the test item meets the standard, so as to complete the benchmark analysis of the test data.
[0041] The present invention has at least the following technical effects:
[0042] By presetting the maintenance plan, operators can set appropriate parameters according to the actual situation to ensure that maintenance work and benchmark analysis are carried out in an orderly manner;
[0043] By establishing an analysis model for each maintenance item of each signal device and performing benchmark analysis on the test data according to the analysis model, it is convenient for operation management and function expansion, with higher analysis efficiency and more accurate and detailed analysis results. It is conducive to improving the management efficiency of the electrical workshop, greatly reducing the workload of manual verification during or after maintenance, and better assisting on-site safety production;
[0044] By generating a benchmarking analysis report after each maintenance operation, management personnel can intuitively understand the maintenance operation status; early warning prompts are generated to facilitate operators to discover and solve problems in a timely manner, thereby ensuring the safety of railway system operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 A schematic flow chart of a benchmarking analysis method for railway signal equipment maintenance operations provided by an embodiment of the present invention;
[0046] Figure 2 A schematic diagram of the classification of signal equipment provided in one embodiment of the present invention and the maintenance items included in each type of signal equipment. DETAILED DESCRIPTION
[0047] The following is a further detailed description of a benchmarking analysis method and system for railway signal equipment maintenance operations proposed by the present invention in combination with the accompanying drawings and specific embodiments. According to the following description, the advantages and features of the present invention will be clearer. It should be noted that the accompanying drawings are in a very simplified form and use non-precise proportions, which are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. In order to make the purposes, features and advantages of the present invention more obvious and easy to understand, please refer to the accompanying drawings. It should be noted that the structures, proportions, sizes, etc. illustrated in the accompanying drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no technical substantive significance. Any structural modification, change in proportional relationship or adjustment of size, without affecting the effects that the present invention can produce and the purposes that can be achieved, should still fall within the scope of the technical content disclosed by the present invention.
[0048] A first aspect of this embodiment provides a benchmarking analysis method for railway signal equipment maintenance operations, such as Figure 1 As shown, the benchmarking analysis method for railway signal equipment maintenance work includes: presetting a maintenance plan; establishing an analysis model for each maintenance item of each signal equipment according to the maintenance plan; acquiring the detection data of the signal equipment; performing a benchmarking analysis on the detection data according to the analysis model; and generating a benchmarking analysis report and an early warning prompt.
[0049] Specifically, Figure 1As shown, when presetting the maintenance plan, the staff can pre-set the following contents: maintenance start time, maintenance end time, the signal equipment to be repaired, the detection items of the signal equipment, and the standard value of the detection items. Furthermore, after the maintenance plan is pre-set, the maintenance plan can be distributed. Since the specific parameters used to analyze each maintenance item can be modified by the operator, it is convenient for the operator to set appropriate parameters according to the actual situation, fully meet the actual needs, and improve work efficiency.
[0050] Furthermore, in order to establish an analysis model for each maintenance item of each signal device, the maintenance operation can be decomposed by taking one maintenance item of one signal device as an analysis unit, and the entire maintenance operation can be decomposed into multiple analysis units. All the analysis units are stored in the analysis queue in sequence to facilitate further benchmarking analysis. By classifying maintenance operations by equipment type and maintenance content, the benchmarking analysis functions of each maintenance item are independent of each other, which is convenient for operation management and function expansion.
[0051] In order to obtain the detection data, the electrical characteristic data of the signal equipment can be collected in real time and stored through the signal centralized monitoring software during the maintenance operation. Figure 1 As shown, after acquiring the detection data, after the maintenance work is completed, multiple analysis units can be taken out according to the analysis queue, and the detection data of the detection items corresponding to each analysis unit can be subjected to benchmark analysis in turn.
[0052] More specifically, in order to achieve benchmark analysis, the test data collected during the maintenance operation can be compared and analyzed based on the standard value and other parameters set for each test item when the staff pre-sets the maintenance plan. This can determine whether the maintenance items of each signal device meet the standards, and generate the benchmark analysis report and the early warning prompt based on the analysis results, which are convenient for staff to view.
[0053] Specifically, Figure 2 As shown, the equipment that needs to be inspected and benchmarked includes three types of signal equipment, namely, turnout equipment, track equipment, and signal equipment. Each type of signal equipment includes a variety of inspection items that need to be inspected and benchmarked.
[0054] The above-mentioned turnout refers to a switch line laid at the divergence point where one track is divided into two tracks, and is used to allow locomotives and vehicles to switch from one track to another. Turnouts have two states, fixed and reverse, which are used in different situations. Generally speaking, fixed means that the turnout should remain in a position open to a certain track except for normal use, cleaning, inspection or repair, while the position open to another track is called reverse.
[0055] In order to switch the state of the turnout between the positioning and reverse positions, the turnout needs to be switched through a converter, which can be, for example, a mechanical switching device or a power switch machine. In order to check and supervise the state of the turnout and limit the turnout to a certain position (positioning or reverse position) so that it cannot be moved arbitrarily. This needs to be achieved through a lock, such as an interlock formed by buttons, relays and other electrical components. Combined with the converter and the lock, the turnout needs to go through the following process from positioning to reverse position: positioning lock → unlock → conversion (to reverse position) → reverse position lock. Similarly, the turnout needs to go through the following process from reverse position to positioning: reverse position lock → unlock → conversion (to reverse position) → positioning lock.
[0056] More specifically, if Figure 2 As shown, the maintenance of the switch equipment may include the following maintenance items: switch gap, switch friction current, switch friction power, switch operation times, switch break indication, switch action power, switch action time, switch action current and switch indication voltage. The analysis logic of each maintenance item will be specifically introduced below.
[0057] When benchmarking the turnout gap, the data of the last turnout positioning / reversal before the end of the skylight can be compared with the preset gap standard value. When the deviation between the two exceeds the preset initial value, it is judged as not meeting the standard. The above-mentioned turnout gap generally refers to the gap of the point rail on the turnout, which is mainly caused by track wear due to long-term use. The above-mentioned initial value is, for example, 0.5mm, which can be set and adjusted by the staff as needed.
[0058] When benchmarking the friction current of the turnout, the current curve of the last fixed / reversed position of the DC turnout before the end of the skylight can be compared with the pre-set standard value. When the current curve is not within the standard range, it is judged as not meeting the standard. The above-mentioned turnout friction current refers to the current generated by the converter's motor and friction connector during the turnout conversion process. If the friction current is too small, the turnout may not be converted in place; if the friction current is too large, it may cause the turnout to rebound after conversion.
[0059] When benchmarking the turnout friction power, the power curve of the last positioning / reversing of the AC turnout before the end of the skylight can be compared with the pre-set standard value. When the power curve is not within the standard range, it is judged as not meeting the standard. The above-mentioned turnout friction power refers to the power demand generated by friction between the wheelsets and the tracks on both sides of the AC turnout of the railway.
[0060] When benchmarking the number of turnout operations, the number of times the turnout set / reverse 1DQJ relay is pulled up within the skylight point can be counted. The above-mentioned 1DQJ relay, as a turnout start relay, plays the role of controlling the turnout conversion, and is usually configured with a JWJXC-H125 / 80 relay. When the number of pull-ups is less than the preset standard value, it is judged as not meeting the standard.
[0061] When performing a benchmark analysis on the switch break indication, the number of times the switch 1DQJ relay is not indicated in the positioning and reverse positions when it is energized for 30 seconds can be queried according to the start and end time set in the skylight. When the number of times no indication occurs at each traction point (from reverse position to positioning, from positioning to reverse position) is less than the preset initial value, it is judged as not meeting the standard. The above-mentioned switch break indication refers to the interruption of the switch indication circuit, which results in the inability to correctly display the status of the switch in the control room. The above-mentioned initial value is, for example, 1 time, which can be set and adjusted by the staff as needed.
[0062] When benchmarking the turnout action power, the maximum value of the last turnout fixed / reversed power curve before the end of the skylight can be taken. When the difference between the maximum value of the standard power curve set in the same direction exceeds the preset initial value, it is judged as not meeting the standard. The above-mentioned turnout action power refers to the power required by the turnout during the conversion process, which is usually analyzed and diagnosed by monitoring the power curve during the turnout action. The above-mentioned initial value is, for example, 10%, which can be set and adjusted by the staff as needed.
[0063] When benchmarking the turnout action time, the conversion time of the last turnout fixed / reverse action curve before the end of the skylight can be taken and compared with the conversion time of the standard curve set in the same direction. When the deviation between the two exceeds the preset initial value, it is judged as not meeting the standard. The above-mentioned turnout action time refers to the time required for the turnout in the conversion process, which usually depends on the specific turnout type, size and equipment used. The above-mentioned initial value is, for example, 1 second, which can be set and adjusted by the staff as needed.
[0064] When benchmarking the turnout action current, the maximum value of the last turnout fixed / reverse current curve before the end of the skylight can be taken and compared with the maximum value of the standard current curve set in the same direction. When the deviation between the two exceeds the preset initial value, it is judged as not meeting the standard. The above-mentioned turnout action power refers to the current required by the turnout during the conversion process. The above-mentioned initial value is, for example, 10%, which can be set and adjusted by the staff as needed.
[0065] When performing a benchmark analysis on the turnout indication voltage, the turnout indication voltage (AC / DC voltage of fixed / reverse position) curve of the section before the skylight ends can be taken, and the average value can be calculated and compared with the average value of the turnout standard indication voltage (AC / DC voltage of fixed / reverse position) curve. When the deviation between the two exceeds the preset initial value, it is judged as not meeting the standard. The above-mentioned turnout indication voltage refers to the voltage value used to indicate the position status of the turnout. The above-mentioned initial value is, for example, 5%, which can be set and adjusted by the staff as needed.
[0066] The above-mentioned track equipment mainly refers to track circuit equipment. Track circuit is an electrical circuit that uses two rails of the railway as conductors, rail insulation as a boundary, and uses conductors to connect signal sources and receiving devices. Track circuits can be used to reflect whether there are trains or whether the rails are intact in the line and turnout sections, which is convenient for train operation scheduling. Track circuits play an important role in railway signal automatic control systems. For example, the realization of automatic blocking is to use track circuits to transmit information about the operating status of the preceding train, and automatically command subsequent trains to run at the minimum interval, thereby improving traffic density and driving safety.
[0067] More specifically, if Figure 2 As shown, the maintenance of the track equipment may include the following maintenance items: track voltage, track phase angle, track red light band times, branch residual voltage test, ZPW-2000 main and standby switching test. The following will specifically introduce the analysis logic of each maintenance item.
[0068] When benchmarking the track voltage, the voltage curve of a section of the track circuit before the skylight ends can be taken, the average value of the voltage curve can be calculated, and compared with the standard voltage curve of the track circuit. When the deviation between the two exceeds the preset initial value, it is judged as not meeting the standard. The above track voltage is the working voltage of the track circuit. The above initial value is, for example, 10%, which can be set and adjusted by the staff as needed.
[0069] When performing benchmark analysis on the track phase angle, the phase angle curve of a section of the track circuit before the skylight ends can be taken, and the average value of the phase angle curve can be calculated. When the deviation between the two exceeds the preset initial value, it is judged as not meeting the standard. The above-mentioned track phase angle generally refers to the difference between the phase of the AC signal in the track circuit and the phase of the modulation signal. The above-mentioned initial value is, for example, 5%, which can be set and adjusted by the staff as needed.
[0070] When the number of track red light bands is analyzed, the number of track occupancy within the skylight time range can be taken and compared with the preset initial value. When the requirements are not met, it is judged as not meeting the standards. The above-mentioned track red light band is when a train passes by, the track circuit will be short-circuited, so that it will be displayed in red in the control system, indicating the location of the vehicle.
[0071] When conducting benchmark analysis on the branch residual pressure test, the lowest value of the track residual pressure test within the skylight point can be taken and compared with the preset initial value. When the lowest value of the residual pressure test is greater than the preset initial value, it is judged as not meeting the standard. The "standard branch line" is connected across the two rails that make up the track circuit, and the measured relay terminal voltage is the residual pressure of the track circuit.
[0072] When benchmarking the ZPW-2000 master-slave switch test, you can check the pickup and output voltage of the FBJ relay after the FBJ relay of the ZPW-2000 series falls within the skylight point and before the skylight point ends. When the voltage is normal, it is determined to be up to standard; otherwise, it is determined to be not up to standard. The above ZPW-2000 is the industry standard.
[0073] More specifically, if Figure 2 As shown, the maintenance of the signal equipment may include the following maintenance items: DJ current, light position opening test. The following will specifically introduce the analysis logic of each maintenance item.
[0074] The above-mentioned signal equipment mainly refers to the fixed signal on the railway that uses lights of different colors and numbers or arm positions of different colors and shapes to display command lines and shunting orders. According to different uses, the commonly used fixed signal mainly includes entry signal, exit signal, passing signal, advance signal and shunting signal.
[0075] When benchmarking the DJ current, you can take a section of the DJ current curve before the skylight ends, calculate the average value of the DJ current curve, and compare it with the DJ standard current curve. When the deviation between the two exceeds the preset initial value, it is judged as not meeting the standard. The above DJ current is the working current of the relay used by the signal. The above initial value is, for example, 5%, which can be set and adjusted by the staff as needed.
[0076] When conducting a benchmark analysis on the light position opening experiment, the signal opening status during the query period can be based on the start and end time of the skylight setting. If each light position of the signal light conducting the light position opening test is opened normally, it is judged to be up to standard; otherwise, it is judged to be not up to standard.
[0077] After benchmarking analysis of the test data of all the above-mentioned maintenance items, the benchmarking analysis report can be generated. The benchmarking analysis report can include whether each of the test items meets the standard; and analyze and record the reasons for each non-standard test item. By generating a benchmarking analysis report, it is convenient for management personnel to intuitively understand the specific situation of the maintenance work.
[0078] Furthermore, for each of the inspection items that do not meet the standards, an early warning reminder can be generated to facilitate operators to promptly discover and solve problems, further improve efficiency, and ensure the driving safety of the railway system.
[0079] In order to implement the above benchmarking analysis method, the second aspect of this embodiment provides a benchmarking analysis system for railway signal equipment maintenance operations, including an interactive interface, a detection module, a storage module and an analysis module.
[0080] Specifically, the interactive interface is used to pre-set the maintenance plan. The interactive interface can be used, for example, for any electronic device that can realize human-computer interaction, such as a mobile phone, a computer, a tablet computer, etc., for easy use by staff. Staff can input data such as the maintenance start time, the maintenance end time, the signal equipment to be repaired, the detection items of the signal equipment, and the standard values of the detection items through the interactive interface to set the maintenance plan.
[0081] The detection module may be, for example, centralized signal monitoring software, which is used to collect the detection data of the signal device, for example, to collect electrical characteristic data of the signal device in real time.
[0082] The storage module is connected to the interactive interface and the detection module, and is used to store the maintenance plan input by the staff through the interactive interface and the detection data collected by the detection module. The storage module can be, for example, a volatile memory or a non-volatile memory. The volatile memory is, for example, a random access memory or a dynamic random access memory. The non-volatile memory is, for example, a read-only memory, an electrically erasable programmable read-only memory, or a hard disk drive.
[0083] The analysis module is connected to the storage module, and can be used to establish the analysis model for each maintenance item of each signal device according to the maintenance plan, and perform benchmarking analysis on the detection data according to the analysis model, and generate the benchmarking analysis report and the early warning prompt.
[0084] Specifically, the analysis module can decompose the maintenance work by taking one maintenance item of one signal device as an analysis unit, decomposing the entire maintenance work into a plurality of analysis units, and sequentially storing all the analysis units into the analysis queue.
[0085] The analysis module may take out a plurality of the analysis units according to the analysis queue, and perform benchmark analysis on the detection data of the detection item corresponding to each of the analysis units in turn.
[0086] The analysis module can also compare and analyze the detection data stored in the storage module according to the maintenance plan stored in the storage module, based on parameters such as the standard value, and generate the benchmark analysis report and the early warning prompt according to the analysis results.
[0087] The present invention sets maintenance plans in advance, so that operators can set appropriate parameters according to actual conditions, ensuring that maintenance operations and benchmarking analysis are carried out in an orderly manner. By establishing an analysis model for each maintenance item of each signal device and performing benchmarking analysis on the detection data according to the analysis model, operation management and function expansion are facilitated, the analysis efficiency is higher, and the analysis results are more accurate and precise. By generating a benchmarking analysis report after the benchmarking analysis of each maintenance operation is completed, it is convenient for managers to intuitively understand the maintenance operation status. By generating early warning prompts, it is convenient for operators to discover and solve problems in a timely manner, ensuring the driving safety of the railway system. Compared with the existing technology, it has significant progress.
[0088] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0089] It should be noted that the devices and methods disclosed in the embodiments of this article can also be implemented in other ways. The device implementation described above is only schematic. For example, the flowcharts and block diagrams in the accompanying drawings show the possible architecture, functions and operations of the devices, methods and computer program products according to multiple embodiments of this article. In this regard, each box in the flowchart or block diagram can represent a part of a module, program or code, and the module, program segment or part of the code contains one or more executable instructions for implementing the specified logical function, and the module, program segment or part of the code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flowchart, and the combination of boxes in the block diagram and / or flowchart can be implemented by a dedicated hardware-based system for performing a specified function or action, or can be implemented by a combination of dedicated hardware and computer instructions.
[0090] In addition, the functional modules in the various embodiments of this document may be integrated together to form an independent part, or each module may exist independently, or two or more modules may be integrated to form an independent part.
[0091] Although the content of the present invention has been described in detail through the above preferred embodiments, it should be appreciated that the above description should not be considered as a limitation of the present invention. After reading the above content, it will be apparent to those skilled in the art that various modifications and substitutions of the present invention will occur. Therefore, the protection scope of the present invention should be limited by the appended claims.
Claims
1. A benchmarking analysis method for railway signal equipment maintenance work, characterized in that: include: Pre-set maintenance plan; According to the maintenance plan, establishing an analysis model for each maintenance item of each signal device; Acquiring detection data of the signal device; According to the analysis model, performing benchmark analysis on the detection data; Generate benchmark analysis reports and early warning prompts.
2. The benchmarking analysis method for railway signal equipment maintenance work according to claim 1 is characterized in that: The pre-set maintenance plan includes pre-setting the following contents: Maintenance start time, maintenance end time, the signal equipment to be maintained, the inspection items of the signal equipment, and the standard values of the inspection items.
3. The benchmarking analysis method for railway signal equipment maintenance work according to claim 1 is characterized in that: The establishing of the analysis model for each maintenance item of each signal device comprises: Taking one maintenance item of one signal device as an analysis unit, the maintenance operation is decomposed, and all the analysis units are sequentially stored in an analysis queue.
4. The benchmarking analysis method for railway signal equipment maintenance work according to claim 3 is characterized in that: The benchmarking analysis of the detection data according to the analysis model includes: According to the analysis queue, benchmark analysis is performed on the detection data of the detection item corresponding to each analysis unit in turn.
5. The benchmarking analysis method for railway signal equipment maintenance work according to claim 2 is characterized in that: The benchmarking analysis of the detection data includes: Based on the preset standard value, the test data of each test item is analyzed to determine whether the test item meets the standard.
6. The benchmarking analysis method for railway signal equipment maintenance work according to claim 5 is characterized in that: For each of the detection items that do not meet the standards, an early warning prompt is generated.
7. The benchmarking analysis method for railway signal equipment maintenance work according to claim 5 is characterized in that: The benchmarking analysis report includes the following contents: Whether each of the test items meets the standard; as well as The reason for each non-compliance of the test item.
8. The benchmarking analysis method for railway signal equipment maintenance work according to claim 1 is characterized in that: The signal device comprises: Turnout equipment, track equipment or signal equipment.
9. The benchmarking analysis method for railway signal equipment maintenance work according to claim 8, characterized in that: The maintenance items of the turnout equipment include: Turnout gap, turnout friction current, turnout friction power, turnout operation times, turnout break indication, turnout action power, turnout action time, turnout action current and turnout indication voltage.
10. The benchmarking analysis method for railway signal equipment maintenance work according to claim 8, characterized in that: The maintenance items of the track equipment include: Track voltage, track phase angle, track red light band times, branch residual pressure test and ZPW-2000 master-slave switching test.
11. The benchmarking analysis method for railway signal equipment maintenance work according to claim 8, characterized in that: The maintenance items of the signal equipment include: DJ current and / or light position open experiment.
12. A benchmarking analysis system for railway signal equipment maintenance operations, characterized in that: include: An interactive interface, wherein the interactive interface is used to pre-set a maintenance plan; A detection module, the detection module is used to collect detection data of the signal device; A storage module, the storage module is connected to the interactive interface and the detection module, and is used to store the maintenance plan and the detection data; and An analysis module is connected to the storage module, and is used to establish an analysis model for each maintenance item of each signal device according to the maintenance plan, and to perform a benchmark analysis on the detection data according to the analysis model, and to generate a benchmark analysis report and an early warning prompt.
13. The benchmarking analysis system for railway signal equipment maintenance work according to claim 12, characterized in that: The interactive interface is used to pre-set the following contents to form the maintenance plan: Maintenance start time, maintenance end time, the signal equipment to be maintained, the inspection items of the signal equipment, and the standard values of the inspection items.
14. The benchmarking analysis system for railway signal equipment maintenance work according to claim 13, characterized in that: The analysis module is used to analyze the test data of each of the test items based on the preset standard value, and determine whether the test item meets the standard, so as to complete the benchmark analysis of the test data.