By designing reusable aluminum formwork pull tabs and matching dismantling devices, the efficient dismantling and recycling of aluminum formwork pull tabs has been achieved, solving the problems of low efficiency and environmental protection of traditional aluminum formwork dismantling tools, and improving construction efficiency and resource utilization.
Patent Information
- Application Number
- CN202411807908.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-10
- Publication Date
- 2025-11-14
- Estimated Expiration
- 2044-12-10
AI Technical Summary
Traditional aluminum mold puller removal tools are inefficient, cannot be effectively recycled, and pose quality risks and environmental problems.
Design a reusable aluminum mold pull tab and a matching removal device. The pull tab end and middle are easily connected through a locking structure. Combined with a removal rod and a collection box, the pull tab end can be easily disassembled and collected.
It improves the efficiency of aluminum formwork removal, reduces material waste, reduces environmental pollution during construction, saves construction time, and promotes resource recycling.
Smart Images

Figure CN119711749B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of aluminum formwork installation and dismantling construction technology, and in particular to a reusable aluminum formwork pull tab and a matching dismantling device and its usage method. Background Technology
[0002] Traditional tools for removing pull-tab aluminum formwork involve using two tools together: a long-handled pull-tab remover for removing the upper, higher pull-tabs on the wall, and a hammer for removing the lower, middle pull-tabs. For this type of pull-tab aluminum formwork, a standard flat-headed hammer is first used to knock away the lower, middle pull-tabs, while a flat-end steel pipe is used to clean the upper pull-tabs. This method is inefficient and requires repeated tool changes. Furthermore, when using a flat-headed hammer, the lateral movement of the hammer causes the pull-tabs to shift, making them harder to remove. This also causes concrete to be squeezed and detached from the pull-tab area, creating a quality and aesthetic risk. Additionally, the pull-tab fragments that fall to the ground are not collected and are treated as construction waste, which is detrimental to environmental protection and resource recycling.
[0003] Therefore, there is an urgent need to study an aluminum formwork removal method that can effectively improve the construction efficiency of aluminum formwork removal, effectively ensure the overall quality of the structure, and have a positive effect on environmental protection and resource recycling. Summary of the Invention
[0004] To address the problem of low efficiency and inability to recycle existing aluminum mold pull tabs, this application provides a reusable aluminum mold pull tab, a matching removal device, and a method for using it.
[0005] Firstly, this application provides a reusable aluminum mold pull sheet and a matching removal device, which adopts the following technical solution:
[0006] A reusable aluminum mold pull sheet and matching removal device.
[0007] Aluminum die sheeting includes:
[0008] The pull tab has a middle section and two pull tab ends at its two ends. A locking structure is provided between the pull tab ends and the pull tab middle section to lock / unlock them after they are rotated to a set angle. The pull tab ends have pin holes.
[0009] The dismantling device includes:
[0010] The rod is removed because both ends are open and the inside is hollow.
[0011] Collection box for collecting the removed ends of the pull tabs;
[0012] A flexible hose for connecting the removal rod and the collection box;
[0013] A fixing pin is fixedly connected to the cavity of the removal rod;
[0014] A movable pin, having a gap between itself and the fixed pin for the end of the pull tab to extend into, and adapted to be inserted into the pin hole; and
[0015] A control mechanism is provided for driving the movable pin toward the fixed pin and locking the pin hole on the end of the pull tab that extends into the cavity of the removal rod.
[0016] Furthermore, the locking structure includes:
[0017] A connecting buckle includes a connecting part and a buckle part, wherein the connecting part is fixedly connected to the end of the pull tab, and the width of the buckle part is greater than the width of the connecting part;
[0018] Two snap-fit cylinders are provided and respectively fixed to both ends of the middle part of the pull tab. The inner diameter of the snap-fit cylinder is not less than the width of the snap-fit part.
[0019] A limiting cylinder is fixedly connected to the hollow part of the end of the buckle cylinder away from the middle of the pull tab. A transverse groove is provided through the limiting cylinder for the buckle part to be inserted into the hollow part of the buckle cylinder. The axial length of the limiting cylinder along the buckle cylinder is not less than the length of the connecting part.
[0020] When the end of the pull tab is rotated to be flush with the middle of the pull tab, the buckle part does not correspond to the horizontal groove.
[0021] Furthermore, the control mechanism includes:
[0022] The movable rod is located inside the cavity of the removal rod and one end is fixedly connected to the movable pin.
[0023] The control lever is fixedly connected to the movable lever, and the connection between the control lever and the movable lever is hinged inside the dismantling lever, with the hinge axis of the two being orthogonal to the axis of the movable pin.
[0024] A button is located at one end of the removal rod near the hose and connected to the control rod. When the button is pressed, the control rod is driven to rotate within the removal rod so that the movable pin approaches the fixed pin.
[0025] Furthermore, it also includes a short rod for connecting the button and the control lever, the short rod being fitted with a return spring, one end of the return spring being pressed against the button and the other end being pressed against the release lever.
[0026] Furthermore, a fork block is fixedly connected to one end of the movable rod near the control rod, and the width of the fork block is not less than the thickness of the end of the pull tab;
[0027] When the end of the pull tab that enters the cavity of the removal rod is embedded in the fork of the fork block, the movable pin is aligned with the pin hole.
[0028] Furthermore, a baffle is fixedly connected in the cavity of the removal rod, and a positioning groove is provided through the middle of the baffle for the end of the pull piece to pass through. The positioning groove corresponds to the fork of the fork block, and the width of the positioning groove is greater than the thickness of the end of the pull piece.
[0029] Furthermore, both the fixed pin and the movable pin are located on the side of the baffle away from the hose, and the fixed pin is fixed to the baffle.
[0030] Furthermore, a sealing plate is fixed to the end of the removal rod away from the hose, and a positioning hole is provided through the sealing plate. When the end of the pull tab that enters the cavity of the removal rod is embedded in the fork of the fork block and fits against the lower side wall of the positioning hole, the movable pin is aligned with the pin hole.
[0031] Furthermore, the removal rod has a curved grip at one end near the hose, and the button is located at the grip.
[0032] Secondly, this application provides a method for removing a reusable aluminum mold pull tab, based on the aforementioned reusable aluminum mold pull tab and its matching removal device, comprising the following steps:
[0033] S1. Aluminum formwork removal: After the main structure wall and column concrete is poured and reaches the set strength, the aluminum formwork is removed so that the ends of the tie plates are exposed outside the wall and column.
[0034] S2. Pull tab removal: Hold the removal rod so that the end of the pull tab is inserted into the cavity of the removal rod. After the movable pin is aligned with the pin hole on the end of the pull tab, the control mechanism controls the movable pin to pass through the pin hole and abut against the fixed pin. Rotate the removal rod to unlock the end of the pull tab and the pull tab by means of the locking structure. Then pull the end of the pull tab out from the middle of the pull tab.
[0035] S3. Pull tab collection: Raise the head end of the removal rod and release the movable pin, so that the removed pull tab end slides along the cavity of the removal rod and the hose into the collection box;
[0036] S4. Pull-out cleaning: After the collection box is full, transfer the end of the pull-out piece for the next use.
[0037] In summary, this application includes at least one of the following beneficial technical effects:
[0038] 1. By setting the aluminum formwork pull tab as a middle part and two ends, and using the cooperation of the snap-fit cylinder and the connecting snap-fit to achieve a simple snap-fit connection between the ends and the middle part of the pull tab, a convenient and detachable connection between the ends and the middle part of the pull tab can be achieved. After the aluminum formwork pull tab is used, the ends of the pull tab can be recycled and reused, which can effectively improve the efficiency of aluminum formwork pull tab removal construction, and reduce the material loss rate by reusing the ends of the pull tab.
[0039] 2. By setting the removal device as a removal rod plus a collection box, when removing the end of the pull tab, the construction personnel only need to align the head of the removal rod with the end of the pull tab, so that the end of the pull tab is embedded in the cavity of the removal rod and the movable pin in the removal rod is aligned with the pin hole on the end of the pull tab. Then, press the button to make the control rod swing the movable rod to drive the movable pin through the pin hole and abut against the fixed pin. At this time, the end of the pull tab is confined in the cavity of the removal rod. Simply rotate the removal rod to make the end of the pull tab rotate on the middle of the pull tab, align the buckle with the horizontal groove on the limiting cylinder, and then pull the removal rod to make the connecting buckle disengage from the buckle cylinder. This completes the removal of the end of the pull tab on the middle of the pull tab, making the removal process of the pull tab end simple and efficient.
[0040] 3. The reset spring drives the button to swing the control lever in the opposite direction, causing the movable pin to disengage from the pin hole. At this time, the pull tab end is released from its restraint. Simply lift and shake the head of the removal rod, and the removed pull tab end can enter the hose through the cavity in the removal rod and finally be transported to the collection box for collection. This integrates the disassembly, transmission, and collection of aluminum mold pull tabs into a single construction process, which can effectively reduce environmental pollution during construction, avoid secondary cleaning, and reduce labor costs. Moreover, completing the construction process in one go can effectively improve the construction progress and greatly save the construction period. Attached Figure Description
[0041] To more clearly illustrate the technical solutions in this invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0042] Figure 1 This is a schematic diagram of the overall structure of the aluminum mold sheet according to an embodiment of this application;
[0043] Figure 2 This is a schematic diagram of the aluminum mold pull tab after installation according to an embodiment of this application;
[0044] Figure 3 This is a schematic cross-sectional view of the pull tab end and the middle part of the pull tab after splicing according to an embodiment of this application;
[0045] Figure 4 This is a schematic diagram of the overall structure of the demolition device according to an embodiment of this application;
[0046] Figure 5 This is a perspective structural diagram of the removal rod according to an embodiment of this application;
[0047] Figure 6 yes Figure 5 An enlarged schematic diagram of part A in the middle.
[0048] Figure label:
[0049] 1. Middle part of the pull tab; 11. Clip tube; 12. Limiting tube; 121. Horizontal groove;
[0050] 2. Pull tab end; 21. Pin hole; 22. Connecting buckle; 221. Connecting part; 222. Buckle part;
[0051] 3. Remove the rod; 31. Holder;
[0052] 41. Collection box; 42. Hose;
[0053] 51. Fixed pin; 52. Movable pin;
[0054] 61. Movable lever; 62. Control lever; 63. Button; 64. Crossbar;
[0055] 7. Fork block;
[0056] 8. Baffle; 81. Positioning groove;
[0057] 9. Sealing plate; 91. Positioning hole. Detailed Implementation
[0058] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without creative effort are within the scope of protection of this invention.
[0059] Reference Figure 1 , Figure 2 and Figure 3 This application discloses a reusable aluminum mold pull sheet and a matching removal device.
[0060] Its aluminum die sheet includes:
[0061] The pull tab has a middle part 1 and two pull tab ends 2 at its two ends. A locking structure is provided between the pull tab ends 2 and the pull tab middle part 1 to lock / unlock after the two are rotated to a set angle. The pull tab ends 2 have a pin hole 21.
[0062] Specifically, the locking structure includes:
[0063] The connecting buckle 22 includes a connecting part 221 and a buckle part 222. The connecting part 221 is fixed to the end of the pull tab 2. The width of the buckle part 222 is greater than the width of the connecting part 221. The buckle part 222 is perpendicular to the connecting buckle 22, so that the end of the pull tab 2 can be locked / unlocked after rotating 90° relative to the middle part 1 of the pull tab.
[0064] Two buckle cylinders 11 are provided and are respectively fixed to both ends of the middle part 1 of the pull tab. The inner diameter of the buckle cylinder 11 is not less than the width of the buckle part 222.
[0065] The limiting cylinder 12 is fixedly connected to the hollow part of the buckle cylinder 11 away from the middle part 1 of the pull tab. The limiting cylinder 12 has a transverse groove 121 through which the buckle part 222 is inserted and enters the hollow part of the buckle cylinder 11. The axial length of the limiting cylinder 12 along the buckle cylinder 11 is not less than the length of the connecting part 221, and the inner diameter of the limiting cylinder 12 is not less than the width of the connecting part 221 and not greater than the width of the buckle part 222.
[0066] Furthermore, when the end 2 of the pull tab rotates to be flush with the middle part 1 of the pull tab, the latching part 222 does not correspond to the horizontal groove 121.
[0067] Reference Figure 4 , Figure 5 and Figure 6 Its dismantling device includes:
[0068] Remove rod 3, which has through ends and an internal cavity;
[0069] Collection box 41 is used to collect the removed pull tab ends 2. Specifically, it is equipped with a removable inner liner. When the inner liner is full of pull tab ends 2, the inner liner can be removed and transferred.
[0070] Hose 42, used to connect the removal rod 3 and the collection box 41;
[0071] The fixing pin 51 is fixed in the cavity of the removal rod 3;
[0072] The movable pin 52 has a gap between it and the fixed pin 51 for the end 2 of the pull tab to extend into, and is adapted to be inserted into the pin hole 21; and
[0073] A control mechanism is used to drive the movable pin 52 toward the fixed pin 51 and lock the pin hole 21 on the pull tab end 2 that extends into the cavity of the removal rod 3.
[0074] Therefore, by setting the aluminum formwork pull tab as a pull tab middle part 1 and two pull tab ends 2, and realizing the simple snap-fit connection between the pull tab ends 2 and the pull tab middle part 1 through the cooperation of the snap-fit cylinder 11 and the connecting snap 22, the pull tab ends 2 and the pull tab middle part 1 can be conveniently and detachably connected. After the aluminum formwork pull tab is used, the pull tab ends 2 can be recycled and reused, which can effectively improve the efficiency of aluminum formwork pull tab removal construction, and reduce the material loss rate by reusing the pull tab ends 2.
[0075] By setting the removal device as a removal rod 3 plus a collection box 41, when removing the pull tab end 2, the construction personnel only need to align the head of the removal rod 3 with the pull tab end 2, so that the pull tab end 2 is embedded in the cavity of the removal rod 3 and the movable pin 52 in the removal rod 3 is aligned with the pin hole 21 on the pull tab end 2. Then, the control mechanism drives the movable pin 52 through the pin hole 21 and abuts against the fixed pin 51. At this time, the pull tab end 2 is confined in the cavity of the removal rod 3. Simply rotate the removal rod 3 to drive the pull tab end 2 to rotate on the middle part 1 of the pull tab, so that the buckle part 222 is aligned with the transverse groove 121 on the limiting cylinder 12. Then pull the removal rod 3 to make the connecting buckle 22 disengage from the buckle cylinder 11, and the removal of the pull tab end 2 on the middle part 1 of the pull tab can be completed. This makes the removal process of the pull tab end 2 simple and efficient.
[0076] Then, the control mechanism drives the movable pin 52 to disengage from the pin hole 21. At this time, the pull tab end 2 is released from restriction. Only the head of the removal rod 3 needs to be lifted. The removed pull tab end 2 can enter the hose 42 through the cavity in the removal rod 3 and finally be transported to the collection box 41 for collection. The process of disassembling, transporting and collecting aluminum mold pull tabs is integrated into the construction process, which effectively reduces environmental pollution during construction, avoids secondary cleaning and reduces labor costs. Moreover, the construction progress can be effectively improved by completing the construction process in one go, and the construction period can be greatly saved.
[0077] Specifically, to facilitate the operation of construction personnel, refer to Figure 4 , Figure 5 and Figure 6 The control mechanism includes:
[0078] The movable rod 61 is located inside the cavity of the removal rod 3 and one end is fixedly connected to the movable pin 52.
[0079] The control lever 62 is fixedly connected to the movable lever 61. The connection part 221 between the control lever 62 and the movable lever 61 is hinged to the removal lever 3, and the hinge axis of the two is orthogonal to the axis of the movable pin 52.
[0080] Button 63 is located at one end of the removal rod 3 near the hose 42 and is connected to the control rod 62. When button 63 is pressed, the control rod 62 is driven to rotate inside the removal rod 3 so that the movable pin 52 approaches the fixed pin 51.
[0081] A short lever is used to connect the button 63 and the control lever 62. A return spring (not shown in the figure) is provided on the outer sleeve of the short lever. One end of the return spring is pressed against the button 63 and the other end is pressed against the release lever 3.
[0082] Furthermore, a fork block 7 is fixedly connected to one end of the movable rod 61 near the control rod 62. The width of the fork of the fork block 7 is not less than the thickness of the pull tab end 2. When the pull tab end 2, which enters the cavity of the removal rod 3, is embedded in the fork of the fork block 7, the movable pin 52 is aligned with the pin hole 21.
[0083] Furthermore, a baffle 8 is fixedly connected to the cavity of the removal rod 3. A positioning groove 81 is provided through the middle of the baffle 8 for the end of the pull tab 2 to pass through. The positioning groove 81 corresponds to the fork of the fork block 7, and the width of the positioning groove 81 is greater than the thickness of the end of the pull tab 2. The fixed pin 51 and the movable pin 52 are both located on the side of the baffle 8 away from the hose 42, and the fixed pin 51 is fixed to the baffle 8.
[0084] A sealing plate 9 is fixed to one end of the removal rod 3 away from the hose 42. A positioning hole 91 is opened through the sealing plate 9. When the end of the pull tab 2 that enters the cavity of the removal rod 3 is embedded in the fork of the fork block 7 and fits against the lower side wall of the positioning hole 91, the movable pin 52 is completely aligned with the pin hole 21.
[0085] Therefore, when the construction worker holds the removal rod 3 and places its head end on the pull tab end 2, the pull tab end 2 first passes through the positioning hole 91 on the sealing plate 9, which can limit the position of the pull tab end 2 in the vertical direction to a certain extent; then the pull tab end 2 passes through the positioning groove 81 on the baffle 8, which can limit the amount of swaying of the pull tab end 2 in the horizontal plane to a certain extent; and when the head end of the pull tab end 2 is pressed against the fork of the fork block 7 on the movable rod 61, the pull tab end 2 can be limited in the depth direction in the horizontal plane. At this time, after being limited or positioned in three directions, the pin hole 21 on the pull tab end 2 can be accurately aligned with the movable pin 52, ensuring that the construction worker can lock the pull tab end 2 when pressing it against the pull tab end 2 with the removal rod 3, without the need for complicated positioning and calibration operations, which greatly improves the operating efficiency.
[0086] To continue operation, simply press button 63. The reset spring is compressed, and button 63 pushes the control rod 62 to swing in the removal rod 3 via the short rod. This causes the movable pin 52 on the movable rod 61 to move towards the fixed pin 51 and pass through the pin hole 21 on the pull tab end 2. At this time, the pull tab end 2 is stably locked, and the removal rod 3 can be rotated to remove the pull tab end 2. After removal, release button 63. Under the deformation force of the reset spring, button 63 pulls the control rod 62 to swing in the opposite direction via the short rod, causing the movable pin 52 to move away from the fixed pin 51. The operator then shakes the head end of the removal rod 3 laterally and raises the head end, causing the pull tab end 2 to come out of the fork of the fork block 7 and slide completely into the cavity of the removal rod 3 in the gap on the side of the fork block 7 away from the movable rod 61, thus completing the collection of the removed pull tab end 2.
[0087] Additionally, refer to Figure 4 and Figure 5 The removal rod 3 has a curved grip 31 at one end near the hose 42, and a button 63 is located at the grip 31. The curved grip 31 allows construction workers to remove the end 2 of the pull tab at a higher position on the wall column while standing on the ground, making it more practical.
[0088] This application also discloses a method for removing reusable aluminum mold pull tabs. Based on the above-mentioned reusable aluminum mold pull tab and matching removal device, the following technical solution is adopted:
[0089] A method for removing reusable aluminum mold pull tabs includes the following steps:
[0090] S1. Aluminum formwork removal: After the main structure wall and column concrete is poured and reaches the set strength, the aluminum formwork is removed so that the end 2 of the tie plate is exposed outside the wall and column.
[0091] S2. Pull tab removal: Hold the removal rod 3 so that the pull tab end 2 is inserted into the cavity of the removal rod 3. After the movable pin 52 is aligned with the pin hole 21 on the pull tab end 2, the movable pin 52 is controlled by the control mechanism to pass through the pin hole 21 and abut against the fixed pin 51. Rotate the removal rod 3 to unlock the pull tab end 2 and the pull tab end 2 by means of the locking structure. Then pull the pull tab end 2 out from the middle part 1 of the pull tab.
[0092] S3. Pull the tab to collect, lift the head of the removal rod 3 and release the movable pin 52, so that the removed tab end 2 slides along the cavity of the removal rod 3 and the hose 42 into the collection box 41;
[0093] S4. Pull-out cleaning: After the collection box 41 is full, transfer the pull-out end 2 for next use.
[0094] The implementation principle of a reusable aluminum mold sheet in this application embodiment is as follows:
[0095] By setting the aluminum formwork pull tab as a pull tab middle part 1 and two pull tab ends 2, and realizing the simple snap-fit connection between the pull tab ends 2 and the pull tab middle part 1 through the cooperation of the snap-fit cylinder 11 and the connecting snap 22, the pull tab ends 2 and the pull tab middle part 1 can be conveniently and detachably connected. After the aluminum formwork pull tab is used, the pull tab ends 2 can be recycled and reused, which can effectively improve the efficiency of aluminum formwork pull tab removal construction, and reduce the material loss rate by reusing the pull tab ends 2.
[0096] By setting the removal device as a removal rod 3 plus a collection box 41, when removing the pull tab end 2, the construction personnel only need to align the head of the removal rod 3 with the pull tab end 2, so that the pull tab end 2 is embedded in the cavity of the removal rod 3 and the movable pin 52 in the removal rod 3 is aligned with the pin hole 21 on the pull tab end 2. Then, press the button 63 to make the control rod 62 drive the movable rod 61 to swing so that the movable pin 52 passes through the pin hole 21 and abuts against the fixed pin 51. At this time, the pull tab end 2 is confined in the cavity of the removal rod 3. Simply rotate the removal rod 3 to drive the pull tab end 2 to rotate on the middle part 1 of the pull tab, and then align the buckle part 222 with the transverse groove 121 on the limiting cylinder 12. Then pull the removal rod 3 to make the connecting buckle 22 disengage from the buckle cylinder 11, and the removal of the pull tab end 2 on the middle part 1 of the pull tab can be completed. This makes the removal process of the pull tab end 2 simple and efficient.
[0097] Then, the reset spring drives the button 63 to swing the control rod 62 in the opposite direction, causing the movable pin 52 to disengage from the pin hole 21. At this time, the pull tab end 2 is released from its restraint. Simply lift and shake the head of the removal rod 3, and the removed pull tab end 2 can enter the hose 42 through the cavity in the removal rod 3 and finally be transported to the collection box 41 for collection. In this way, the disassembly, transmission and collection process of aluminum mold pull tabs is integrated into the construction process, which can effectively reduce environmental pollution during construction, avoid secondary cleaning and reduce labor costs. Moreover, by completing the construction process in one go, the construction progress can be effectively improved and the construction period can be greatly saved.
[0098] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A matching removal device for reusable aluminum mold pull tabs, characterized in that, Aluminum die sheeting includes: The pull tab has a middle section and two pull tab ends at its two ends. A locking structure is provided between the pull tab ends and the pull tab middle section to lock / unlock them after they are rotated to a set angle. The pull tab ends have pin holes. The dismantling device includes: The rod is removed because both ends are open and the inside is hollow. Collection box for collecting the removed ends of the pull tabs; A flexible hose for connecting the removal rod and the collection box; A fixing pin is fixedly connected to the cavity of the removal rod; A movable pin, having a gap between itself and the fixed pin for the end of the pull tab to extend into, and adapted to be inserted into the pin hole; and A control mechanism is used to drive the movable pin toward the fixed pin and lock the pin hole on the end of the pull tab that extends into the cavity of the removal rod; The control mechanism includes: The movable rod is located inside the cavity of the removal rod and one end is fixedly connected to the movable pin; The control lever is fixedly connected to the movable lever, and the connection between the control lever and the movable lever is hinged inside the dismantling lever, with the hinge axis of the two being orthogonal to the axis of the movable pin. A button is located at one end of the removal rod near the hose and connected to the control rod. When the button is pressed, the control rod is driven to rotate within the removal rod so that the movable pin approaches the fixed pin. A fork block is fixed to one end of the movable rod near the control rod, and the width of the fork block is not less than the thickness of the end of the pull plate; When the end of the pull tab that enters the cavity of the removal rod is embedded in the fork of the fork block, the movable pin is aligned with the pin hole; The end of the removal rod away from the hose is fixed with a sealing plate, and a positioning hole is opened through the sealing plate. When the end of the pull piece that enters the cavity of the removal rod is embedded in the fork of the fork block and fits against the lower side wall of the positioning hole, the movable pin is aligned with the pin hole.
2. The matching removal device for the reusable aluminum mold pull sheet according to claim 1, characterized in that, The locking structure includes: A connecting buckle includes a connecting part and a buckle part, wherein the connecting part is fixedly connected to the end of the pull tab, and the width of the buckle part is greater than the width of the connecting part; Two buckle cylinders are provided and respectively fixed to both ends of the middle part of the pull tab, and the inner diameter of the buckle cylinder is not less than the width of the buckle part; A limiting cylinder is fixedly connected to the hollow part of the end of the buckle cylinder away from the middle of the pull tab. A transverse groove is provided through the limiting cylinder for the buckle part to be inserted into the hollow part of the buckle cylinder. The axial length of the limiting cylinder along the buckle cylinder is not less than the length of the connecting part. When the end of the pull tab is rotated to be flush with the middle of the pull tab, the buckle part does not correspond to the horizontal groove.
3. The matching removal device for the reusable aluminum mold pull sheet according to claim 1, characterized in that, It also includes a short rod for connecting the button and the control lever, the short rod being fitted with a return spring, one end of the return spring being pressed against the button and the other end being pressed against the release lever.
4. The matching removal device for the reusable aluminum mold pull sheet according to claim 1, characterized in that, A baffle is fixedly connected in the cavity of the removal rod. A positioning groove is opened through the middle of the baffle for the end of the pull piece to pass through. The positioning groove corresponds to the fork of the fork block, and the width of the positioning groove is greater than the thickness of the end of the pull piece.
5. The matching removal device for the reusable aluminum mold pull sheet according to claim 4, characterized in that, Both the fixed pin and the movable pin are located on the side of the baffle away from the hose, and the fixed pin is fixed to the baffle.
6. The matching removal device for the reusable aluminum mold pull sheet according to claim 1, characterized in that, The removal rod has a curved grip at one end near the hose, and the button is located at the grip.
7. A method for removing reusable aluminum formwork pull tabs, based on a matching removal device for reusable aluminum formwork pull tabs as described in any one of claims 1-6, characterized in that, Includes the following steps: S1. Aluminum formwork removal: After the main structure wall and column concrete is poured and reaches the set strength, the aluminum formwork is removed so that the ends of the tie plates are exposed outside the wall and column. S2. Pull tab removal: Hold the removal rod so that the end of the pull tab is inserted into the cavity of the removal rod. After the movable pin is aligned with the pin hole on the end of the pull tab, the control mechanism controls the movable pin to pass through the pin hole and abut against the fixed pin. Rotate the removal rod to unlock the end of the pull tab and the pull tab by means of the locking structure. Then pull the end of the pull tab out from the middle of the pull tab. S3. Pull tab collection: Raise the head end of the removal rod and release the movable pin, so that the removed pull tab end slides along the cavity of the removal rod and the hose into the collection box; S4. Pull-out cleaning: After the collection box is full, transfer the end of the pull-out piece for the next use.
Citation Information
Patent Citations
Aluminum alloy template quick-detaching system construction process
CN111576878A
Pulling-on piece head and pulling-on piece set thereof
CN117127801A