Shield tunnel construction period segment floating quantity prediction method, system, equipment and medium
By combining the shield tunnel mechanical model and the Temusinko beam model, physical control equations are determined and integrated into the neural network model, the problem of difficulty in effectively predicting the floating amount of pipe sheets during the shield tunnel construction period in the prior art is solved, and the reliability of the prediction results is improved.
Patent Information
- Application Number
- CN202411711649.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-27
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2044-11-27
AI Technical Summary
The existing technology is difficult to effectively combine the physical mechanism of tunnel construction, and it is difficult to fully simulate complex soil-structure interactions, resulting in inaccurate prediction results of pipe sheet floating volume during shield tunnel construction.
A method for predicting the floating amount of pipe sheets during the construction period of shield tunnel is proposed. By obtaining the exploration data set and the measured data set, combining the shield tunnel mechanical model and the Temuxinke beam model, the physical control equation is determined, and it is integrated into the neural network model for training, and the pipe sheets is predicted to predict the floating amount of pipe sheets.
This method can effectively constrain the model prediction process, make the model more in line with the actual physical behavior of tunnel construction, improve the reliability of the prediction results of floating volume on the pipe sheet, and provide more scientific guidance for the construction process of shield tunnels.
Smart Images

Figure CN119720333A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of tunnel detection technology, and in particular to a method, system, equipment and medium for predicting the floating amount of a segment during the construction period of a shield tunnel. Background Art
[0002] During shield tunnel construction, segment floating is a common problem, which can cause a series of subsequent problems such as tunnel axis deviation, misalignment or opening between segments, and even water leakage, seriously affecting the long-term stability and service life of the tunnel. With the development of artificial intelligence technology, neural network-based prediction methods have gradually been applied to the field of shield tunnel construction, but these methods have failed to effectively combine the physical mechanism of tunnel construction and it is difficult to fully simulate the complex soil-structure interaction. Summary of the invention
[0003] The main purpose of this application is to propose a method, system, equipment and medium for predicting the floating amount of the pipe segments during the construction period of a shield tunnel, which can integrate the physical mechanism that conforms to tunnel construction into the neural network model to effectively constrain the prediction process, which is conducive to improving the reliability of the prediction results of the floating amount of the pipe segments.
[0004] To achieve the above-mentioned purpose, one aspect of the present application provides a method for predicting the floating amount of a segment during shield tunnel construction, the method comprising:
[0005] Acquire an exploration data set and a measured data set of a shield tunnel section, wherein the exploration data set includes geological parameter values, material parameter values, and shield construction parameter values of the shield tunnel section, and the measured data set includes positions and measured buoyancy of multiple measured segments in the shield tunnel section;
[0006] Inputting the exploration data set into a pre-built shield tunnel mechanical model for solving, and obtaining relevant mechanical parameter values of the shield tunnel section;
[0007] Determining a physical control equation for reflecting the deformation characteristics of the shield tunnel section according to the Timoshenko beam model and the relevant mechanical parameter values;
[0008] According to the measured data set and the physical control equation, a pre-built neural network model is trained to obtain a segment floating amount prediction model;
[0009] The positions of the multiple segments to be measured in the shield tunnel section are obtained and input into the segment floating amount prediction model for analysis to obtain the predicted floating amounts of the multiple segments to be measured.
[0010] Furthermore, the shield tunnel mechanical model includes an equivalent shear stiffness model and an equivalent bending stiffness model of the shield tunnel segment, an equivalent stiffness coefficient model of the foundation of the soil surrounding the shield tunnel segment, and a buoyancy model acting on the longitudinal direction of the shield tunnel segment.
[0011] Furthermore, the mathematical expression of the buoyancy model acting on the longitudinal direction of the shield tunnel segment is:
[0012] F T =F s (t)+F d (t)-G s ,
[0013]
[0014] F w =πR 2 γ w ,
[0015]
[0016] F d0 =2PRsinθ,
[0017] G s =πR 2 γ s ;
[0018] Among them, F T is the buoyancy force on the segment longitudinally, F s (t) is the static buoyancy of the segment at time t, F d (t) is the dynamic buoyancy of the segment at time t, G s is the self-weight stress of the segment, F s0 is the static buoyancy of the synchronous grouting slurry on the segment when it is not solidified, t s is the initial setting time of slurry, k s is the slurry solidification influence coefficient, F w is the groundwater pressure at the location of the segment, R is the outer radius of the segment, γ w is the density of groundwater, α g is the arc of the synchronous grouting slurry wrapped around the segment, γ g is the density of the synchronous grouting slurry, F d0 is the initial dynamic buoyancy of the segment, t d is the dissipation time of dynamic grouting pressure, k d is the grouting pressure dissipation influence coefficient, P is the synchronous grouting pressure on the segment, θ is the angle between the boundary of the grouting slurry bubble distribution area and the vertical direction, γ s The weight of the pipe segment.
[0019] Furthermore, the neural network model is constructed using a fully connected feedforward neural network as a basic architecture.
[0020] Furthermore, the pre-built neural network model is trained according to the measured data set and the physical control equation to obtain the segment floating amount prediction model, which includes:
[0021] Determine a final loss function according to the physical control equation and a preset loss function; wherein the preset loss function is used to measure the difference between the model prediction value and the true value;
[0022] The neural network model is trained according to the measured data set and the final loss function to obtain the segment floating amount prediction model.
[0023] Further, the determining of the final loss function according to the physical control equation and the preset loss function comprises:
[0024] The residual term of the physical control equation is added to the preset loss function in a weighted summation manner to form the final loss function.
[0025] Furthermore, the shield tunnel section includes a first shield tunnel section and a second shield tunnel section, the first shield tunnel section is in an unsolidified state of the synchronous grouting slurry, the second shield tunnel section is in a solidified state of the synchronous grouting slurry, and the measured density of the segments in the first shield tunnel section is greater than the measured density of the segments in the second shield tunnel section.
[0026] To achieve the above-mentioned purpose, another aspect of the present application provides a system for predicting the floating amount of a segment during shield tunnel construction, the system comprising:
[0027] An acquisition module is used to acquire an exploration data set and a measured data set of a shield tunnel section, wherein the exploration data set includes geological parameter values, material parameter values and shield construction parameter values of the shield tunnel section, and the measured data set includes positions and measured buoyancy of multiple measured segments in the shield tunnel section;
[0028] A solution module, used for inputting the exploration data set into a pre-built shield tunnel mechanical model for solution to obtain relevant mechanical parameter values of the shield tunnel section;
[0029] A determination module, for determining a physical control equation for reflecting the deformation characteristics of the shield tunnel section according to the Timoshenko beam model and the relevant mechanical parameter values;
[0030] A training module, used to train a pre-built neural network model according to the measured data set and the physical control equation to obtain a segment floating amount prediction model;
[0031] The prediction module is used to obtain the positions of multiple segments to be measured in the shield tunnel section and input the segments buoyancy prediction model for analysis to obtain the predicted buoyancy of the multiple segments to be measured.
[0032] To achieve the above objective, another aspect of the present application provides an electronic device, the electronic device comprising a memory and a processor, the memory storing a computer program, and the processor implementing the above method when executing the computer program.
[0033] To achieve the above objective, another aspect of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and the computer program implements the above method when executed by a processor.
[0034] The present application includes at least the following beneficial effects: by utilizing relevant exploration data of the shield tunnel section to conduct a combined analysis of the shield tunnel mechanical model and the Timoshenko beam model, a physical control equation that can reflect the deformation characteristics of the shield tunnel section is determined, and then the physical control equation is integrated into the neural network model for application. This can not only effectively constrain the model prediction process and make the model more consistent with the actual physical behavior of tunnel construction, but also improve the reliability of the prediction results of the buoyancy of the pipe segment, thereby providing more scientific guidance for the shield tunnel construction process. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 It is a flow chart of a method for predicting the floating amount of a segment during the construction period of a shield tunnel provided in an embodiment of the present application;
[0036] Figure 2 It is a structural schematic diagram of a system for predicting the floating amount of a segment during the construction period of a shield tunnel provided in an embodiment of the present application;
[0037] Figure 3 It is a schematic diagram of the hardware structure of the electronic device provided in the embodiment of the present application. DETAILED DESCRIPTION
[0038] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is further described in detail below in conjunction with the accompanying drawings and examples. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the embodiments of the present application. They are only examples of systems and methods consistent with some aspects of the embodiments of the present application as detailed in the attached claims.
[0039] It is understood that the terms "first", "second", etc. used in this application can be used to describe various concepts in this article, but unless otherwise specified, these concepts are not limited by these terms. These terms are only used to distinguish one concept from another concept. For example, without departing from the scope of the embodiment of the present application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the words "if" and "if" as used herein can be interpreted as "at the time of" or "when" or "in response to determination".
[0040] The terms "at least one", "multiple", "each", "any", etc. used in this application, at least one includes one, two or more, multiple includes two or more, each refers to each of the corresponding multiple, and any refers to any one of the multiple.
[0041] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein are only for the purpose of describing the embodiments of this application and are not intended to limit this application.
[0042] The shield method is widely used in the construction of urban subways and highway tunnels because it does not affect ground traffic and is less affected by environmental conditions. However, during the construction of shield tunnels, the floating of the segments is a common problem, which can cause a series of subsequent problems such as the deviation of the tunnel axis, the misalignment or opening of the segments, and even water leakage, which seriously affects the long-term stability and service life of the tunnel.
[0043] In the prior art, the calculation methods for the floating amount of the pipe segment mainly include analytical methods, numerical simulation methods and machine learning methods. The analytical method often shows the problem of insufficient calculation accuracy when dealing with heterogeneous foundations, complex boundary conditions or dynamically changing external environments during construction. The numerical simulation method has problems such as extremely large calculation amount and difficult convergence when simulating the shield tunnel construction process under heterogeneous foundations or complex boundary conditions. Although the neural network model constructed based on the machine learning method can effectively capture the complex relationship between data, it is a data-driven "black box" model. In the absence of a clear physical background, its prediction results are difficult to reflect the internal mechanism of the pipe segment floating. In other words, prediction methods based on neural networks have gradually been applied to the field of shield tunnel construction, but these methods have failed to effectively combine the physical mechanism of tunnel construction and it is difficult to fully simulate the complex soil-structure interaction.
[0044] In view of this, an embodiment of the present application provides a method, system, equipment and medium for predicting the floating amount of the segment during the construction period of a shield tunnel. The scheme combines and analyzes the shield tunnel mechanical model and the Timoshenko beam model by utilizing relevant exploration data of the shield tunnel section to determine a physical control equation that can reflect the deformation characteristics of the shield tunnel section. The physical control equation is then integrated into the neural network model for application. This can not only effectively constrain the model prediction process and make the model more consistent with the actual physical behavior of tunnel construction, but also improve the reliability of the segment floating amount prediction results, thereby providing more scientific guidance for the shield tunnel construction process.
[0045] The embodiment of the present application provides a method for predicting the floating amount of a segment during the construction period of a shield tunnel, which relates to the field of tunnel detection technology, and can be applied to a terminal, a server, or software running in a terminal or a server. In some embodiments, the terminal can be a smart phone, a tablet computer, a laptop computer, a desktop computer, a smart speaker, a smart watch, and a vehicle-mounted terminal, etc., but is not limited to this; the server side can be configured as an independent physical server, or a server cluster or distributed system composed of multiple physical servers, and can also be configured as a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, CDN, and big data and artificial intelligence platforms. The server can also be a node server in a blockchain network; the software can be an application that implements the above-mentioned method for predicting the floating amount of a segment during the construction period of a shield tunnel, etc., but is not limited to the above forms.
[0046] The present application can be used in many general or special computer system environments or configurations. For example: personal computers, server computers, handheld or portable devices, tablet devices, multiprocessor systems, microprocessor-based systems, set-top boxes, programmable consumer electronics, network PCs, minicomputers, mainframe computers, distributed computing environments including any of the above systems or devices, etc. The present application can be described in the general context of computer-executable instructions executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. The present application can also be practiced in distributed computing environments, in which tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules can be located in local and remote computer storage media including storage devices.
[0047] Figure 1 is an optional flow chart of a method for predicting the floating amount of a segment during shield tunnel construction provided in an embodiment of the present application. Figure 1The method may include but is not limited to steps S101 to S105:
[0048] Step S101, obtaining an exploration data set and a measured data set of a shield tunnel section;
[0049] Step S102, inputting the exploration data set into a pre-built shield tunnel mechanical model for solving, and obtaining relevant mechanical parameter values of the shield tunnel section;
[0050] Step S103, determining a physical control equation for reflecting the deformation characteristics of the shield tunnel section according to the Timoshenko beam model and the relevant mechanical parameter values;
[0051] Step S104: training the pre-built neural network model according to the measured data set and the physical control equation to obtain a segment floating amount prediction model;
[0052] Step S105, obtaining the positions of multiple segments to be measured in the shield tunnel section and inputting them into the segment buoyancy prediction model for analysis to obtain the predicted buoyancy of the multiple segments to be measured.
[0053] Steps S101 to S105 shown in the embodiment of the present application integrate physical mechanisms that conform to tunnel construction into the neural network model to effectively constrain the prediction process, which is conducive to improving the reliability of the prediction results of the floating amount of the pipe segment.
[0054] In step S101 of some embodiments, the exploration data set of the shield tunnel section mainly records all parameter values required to be applied when solving the shield tunnel mechanical model, specifically including the material parameter values, geological parameter values and shield construction parameter values used in the shield tunnel section. The material parameter values used are the key factors determining the overall stress state of the shield tunnel. The materials used include segments, bolts, etc. The geological parameter values have an important influence on the stability and buoyancy characteristics of the tunnel structure during the shield construction process. The shield construction parameter values have important reference value for the deformation behavior of the segments and the calculation of the buoyancy amount.
[0055] In step S101 of some embodiments, the measured data set of the shield tunnel section specifically includes the positions and measured buoyancy of multiple measured segments in the shield tunnel section. The measured buoyancy of the measured segments can be obtained by manual on-site measurement using a total station in conjunction with a ruler. The position of the measured segment is a one-dimensional position and can be represented by an X-coordinate value. The X-coordinate axis takes the position of the shield tail as the origin and is set along the longitudinal axis of the shield tunnel. Generally, a configuration point is arranged within the entire range of each segment. The position and measured buoyancy of each measured segment in the shield tunnel section can be understood as the position and measured buoyancy of the configuration point arranged on the measured segment.
[0056] The shield tunnel section mainly includes the first shield tunnel section in which the synchronous grouting slurry is in an unsolidified state (hereinafter described as the unsolidified slurry section) and the second shield tunnel section in which the synchronous grouting slurry is in a solidified state (hereinafter described as the solidified slurry section). The unsolidified slurry section is the tunnel section from the shield tail to the initial setting position of the grouting slurry, and the solidified slurry section is the tunnel section after the initial setting position of the grouting slurry. Considering that the buoyancy of the segments falling in the unsolidified slurry section changes dramatically, the corresponding displacement and deformation are relatively complex, while the deformation of the segments falling in the solidified slurry section is relatively stable, in order to improve the model training accuracy and prediction reliability, it is required that the measurement density of the segments in the unsolidified slurry section should be greater than the measurement density of the segments in the solidified slurry section. For example, it is required to measure the buoyancy of each ring of segments falling in the unsolidified slurry section, but to measure the buoyancy of all segments falling in the solidified slurry section once every five rings.
[0057] In step S102 of some embodiments, the shield tunnel mechanical model specifically includes an equivalent stiffness coefficient model of the foundation of the soil around the shield tunnel segment, an equivalent bending stiffness model of the shield tunnel segment, an equivalent shear stiffness model of the shield tunnel segment, and an upward buoyancy model acting on the longitudinal direction of the shield tunnel segment. The equivalent bending stiffness model of the shield tunnel segment and the equivalent shear stiffness model of the shield tunnel segment are important representations of the mechanical behavior of the shield tunnel. The above-mentioned models are explained as follows:
[0058] (1) The equivalent shear stiffness model of the shield tunnel segment can be expressed by the following mathematical expression:
[0059]
[0060] In the formula, (k f GA) eq is the equivalent shear stiffness of the segment, ξ is the equivalent shear stiffness correction factor, l s is the width of a single ring segment, l b is the length of the bolt, n is the number of longitudinal connecting bolts between segments, k fb is the Timoshenko shear coefficient of the bolt, G b is the shear stiffness of the bolt, A b is the cross-sectional area of the bolt, k fs is the Timoshenko shear coefficient of the segment ring, G s is the shear stiffness of the segment ring, A s is the cross-sectional area of the segment ring, and the parameter l s , l b , n, k fb , G b , A b , k fs , Gs and A s Belongs to the parameter values of the material used.
[0061] (2) The equivalent bending stiffness model of the shield tunnel segment can be expressed by the following mathematical expression:
[0062]
[0063] Where, (EI) eq is the equivalent bending stiffness of the segment, E s is the elastic modulus of the segment ring, I s is the moment of inertia of the segment ring, ζ is the equivalent coefficient of elastic bending stiffness within the tunnel annular joint, λ is the relative coefficient of the annular joint influence length, and the parameter E s and I s Belongs to the parameter values of the material used.
[0064] (3) When the shield tunnel segment falls into the slurry solidification section, the foundation equivalent stiffness coefficient model of the soil around the shield tunnel segment can be expressed by the following mathematical expression:
[0065]
[0066] When the shield tunnel segment falls on the unsolidified section of the slurry, the foundation equivalent stiffness coefficient model of the soil around the shield tunnel segment can be expressed by the following mathematical expression:
[0067]
[0068] Where k is the equivalent stiffness coefficient of the soil around the segment, E f is the elastic modulus of the soil around the segment, η h is the coefficient that takes into account the influence of the buried depth of the shield tunnel on the foundation stiffness, D is the outer diameter of the segment, μ is the Poisson's ratio of the soil around the segment, h is the buried depth of the tunnel, η f is the foundation equivalent stiffness reduction factor, and parameter E f , μ and h are geological parameter values, and parameter D is the parameter value of the material used.
[0069] It should be noted that synchronous grouting is a key process in shield construction. The grouting process has an important influence on the stiffness characteristics of the foundation. Specifically, the initial setting time, grouting pressure, and slurry distribution of the synchronous grouting slurry will affect the equivalent stiffness coefficient of the foundation. The longer the initial setting time of the synchronous grouting slurry, the lower the foundation stiffness, thereby increasing the risk of the tunnel segment floating. In addition, the depth of the tunnel is also an important factor affecting the foundation stiffness. The greater the depth of the tunnel, the stronger the constraint of the foundation on the tunnel, and the equivalent stiffness coefficient increases accordingly, thereby effectively suppressing the floating phenomenon of the tunnel.
[0070] (4) Regarding the buoyancy model acting on the longitudinal direction of the shield tunnel segment, the gravity effect of the shield machine, trolley and other equipment is ignored and can be expressed by the following mathematical expression:
[0071] F T =F s (t)+F d (t)-G s ,
[0072]
[0073] F w =πR 2 γ w ,
[0074]
[0075] F d0 =2PRsinθ,
[0076] G s =πR 2 γ s ;
[0077] In the formula, F T is the buoyancy force on the segment longitudinally, F s (t) is the static buoyancy of the segment at time t, which is determined by the groundwater pressure and the mechanical properties of the grouting in the initial setting process when the synchronous grouting slurry has not yet completely solidified. d (t) is the dynamic buoyancy of the segment at time t, which is determined by the grouting pressure, slurry distribution and tunnel construction status. s is the self-weight stress of the segment, F s0 is the static buoyancy of the synchronous grouting slurry on the segment when it is not solidified, t s is the initial setting time of slurry, k s is the slurry solidification influence coefficient, F w is the groundwater pressure at the location of the segment, R is the outer radius of the segment, and R = D / 2, γ w is the density of groundwater, α g is the arc of the synchronous grouting slurry wrapped around the segment, γ g is the density of the synchronous grouting slurry, F d0 is the initial dynamic buoyancy of the segment, t d is the dissipation time of dynamic grouting pressure, k d is the grouting pressure dissipation influence coefficient, P is the synchronous grouting pressure on the segment, θ is the angle between the boundary of the grouting slurry bubble distribution area and the vertical direction, γ sis the weight of the segment, and parameter t s , k s , α g , γ g ,t d , k d , P and θ are shield construction parameter values, and parameter γ w Belong to the geological parameter values, parameters R and γ s Belongs to the parameter values of the material used.
[0078] In the above step S102, after the exploration data set of the shield tunnel section is input into the shield tunnel mechanical model for solution, the outputted relevant mechanical parameter values of the shield tunnel section at least include the equivalent shear stiffness value of the segment, the equivalent bending stiffness value of the segment, the foundation equivalent stiffness coefficient value of the soil around the segment and the buoyancy force on the segment in the longitudinal direction.
[0079] In step S103 of some embodiments, in order to more accurately study the deformation characteristics of the floating section of the shield tunnel, it is preferred to use the Timoshenko beam model based on the Winkel foundation to construct the physical control equation. The Timoshenko beam model can simultaneously consider the shear deformation characteristics and the bending deformation characteristics. The specific expression of the physical control equation constructed in combination with the relevant mechanical parameter values of the shield tunnel section is as follows:
[0080]
[0081] In the formula, x is the position of the segment, w is the floating amount of the segment, is the pitch angle of the segment.
[0082] After determining the physical control equation, the boundary conditions required to solve the physical control equation should also be set. Since the shield tunnel section can be regarded as the Timoshenko beam on the Winkel foundation, the boundary conditions can be regarded as the boundary conditions at both ends of the beam. The end away from the shield tail of the shield machine can be regarded as the fixed end due to the complete solidification of the synchronous grouting slurry, while at the end connected to the shield tail of the shield machine, the buoyancy and pitch angle of the segment can be considered to be controlled by the posture of the shield machine. The posture of the shield machine includes the vertical deviation and pitch angle of the shield tail. The boundary condition can be expressed by the following mathematical expression:
[0083]
[0084] In the formula, w 1,x=0 is the buoyancy of the segment at one end connected to the shield tail of the shield machine. is the pitch angle of the segment at the end connected to the shield tail of the shield machine, w 2,x=∞ is the buoyancy of the segment at the end away from the shield tail of the shield machine, is the pitch angle of the segment at the end away from the shield tail of the shield machine, dv is the vertical deviation of the shield tail, P v is the pitch angle of the shield tail.
[0085] In step S104 of some embodiments, the neural network model adopted is constructed based on the existing fully connected feedforward neural network (FCNN) as the basic architecture. The fully connected feedforward neural network includes 6 hidden layers, each hidden layer is composed of 256 neurons, and the Tanh function is used as the activation function in the network, thereby enhancing the complexity and expression ability of the model, so that the model can better capture the nonlinear deformation characteristics of the shield tunnel segment after training.
[0086] In some embodiments, the above step S104 may include but is not limited to steps S201 to S202:
[0087] Step S201, determining a final loss function according to a preset loss function originally required by the neural network model and the physical control equation.
[0088] In this step, it is preferred to introduce the residual term of the physical control equation into the preset loss function in a weighted summation manner to form a final loss function, which can be expressed by the following mathematical expression:
[0089] LOSS total =α1LOSS PDE +α2LOSS data ;
[0090] Where, LOSS total is the final loss function, LOSS PDE is the residual term of the physical control equation, α1 is the term related to LOSS PDE The weight of LOSS data is the preset loss function, α2 is about LOSS data The weight of .
[0091] Among them, the preset loss function mainly measures the difference between the model prediction value and the true value, and can preferably adopt one of the mean square error loss function, the mean absolute error loss function, the cross entropy loss function, etc.; the residual term of the physical control equation mainly measures whether the model prediction value satisfies the physical control equation. Preferably, the first-order derivative to the fourth-order derivative of the model prediction value is calculated by the automatic differentiation method, and then these derivative results are substituted into the physical control equation. For the first equation contained in the physical control equation, the difference between the left and right values of the first equation is calculated and used as the first residual. For the second equation contained in the physical control equation, it is determined whether the left-side value of the second equation satisfies the boundary conditions required for solving the physical control equation. If it does, the second residual is set to zero. If it does not, the difference between the left-side value of the second equation and the corresponding threshold is calculated and used as the second residual. Finally, the sum of the first residual and the second residual is taken as the residual term value of the physical control equation. The final loss function determined by the residual term of the physical control equation and the preset loss function can ensure that the prediction results output by the model when it relies on the final loss function for training are consistent with the laws of physics and basically match the measured data.
[0092] Step S202: training the neural network model according to the final loss function and the measured data set of the shield tunnel section to obtain a segment floating amount prediction model.
[0093] In this step, the training method of the neural network model includes: inputting the measured data set of the shield tunnel section into the neural network model; training the neural network model by forward propagation, and using the final loss function to calculate the loss value of the neural network model; then according to the loss value of the neural network model, using the back propagation algorithm and combining the Adam optimizer to optimize the weights and biases of the neural network model; by iteratively executing the above model training and parameter optimization process until the neural network model reaches a convergence state, that is, the rate of change of the final loss function is less than the preset rate of change threshold, or the current number of iterations reaches the preset maximum number of iterations, the segment floating amount prediction model can be obtained.
[0094] By using the final loss function and the measured data set of the shield tunnel section to train the neural network model, it can be ensured that the final segment buoyancy prediction model can efficiently describe the stress and deformation behavior of the Timoshenko beam on the Winkel foundation while meeting the accuracy requirements, thereby achieving reliable and accurate prediction of the buoyancy of the shield tunnel segment.
[0095] The following is a further description of the solution provided in the embodiment of the present application in conjunction with a specific application example, which specifically includes the following:
[0096] Step 1: Obtain exploration data set and measured data set of shield tunnel section;
[0097] The exploration data set of this shield tunnel section specifically includes: the width of the single ring segment l s is 1.8m, the length of the bolt l b is 0.4m, the number of longitudinal connecting bolts between segments n is 19, and the shear stiffness of the bolts G b 7.94×10 4 MPa, shear stiffness of the segment ring G s 1.46×10 4 MPa, cross-sectional area of the bolt A b is 7.065×10 -4 m 2 , the cross-sectional area of the segment ring is A s 10.5504m 2 , Timoshenko shear coefficient k of the bolt fb is 0.9, and the Timoshenko shear coefficient k of the segment ring is fs is 0.5, the equivalent shear stiffness correction factor ξ is 0.45; the elastic modulus E s 3.5×10 4 MPa, moment of inertia of segment ring I s 93.3128m 4 The equivalent coefficient of elastic bending stiffness in the tunnel annular joint is ζ, which is 0.0213, and the relative coefficient of the annular joint influence length is λ, which is 1. The elastic modulus of the soil around the segment is E f is 33MPa, the outer diameter D of the segment is 8.8m, the Poisson's ratio μ of the soil around the segment is 0.3, the buried depth h of the tunnel is 20m, and the coefficient η considering the influence of the buried depth of the shield tunnel on the foundation stiffness is h is 1.2588, and the foundation equivalent stiffness reduction factor η f is 0.5; initial setting time of slurry t s is 6h, the slurry solidification influence coefficient k s is 2, the outer radius R of the segment is 4.4m, and the arc α of the synchronous grouting slurry wrapping the segment g is 2π, the density of the synchronous grouting slurry is γ g 20kN / m 3 , dissipation time of dynamic grouting pressure t d is 6h, the grouting pressure dissipation influence coefficient k d is 1, the synchronous grouting pressure P on the segment is 350 kPa, the angle θ between the boundary of the grouting slurry bubble distribution area and the vertical direction is π / 2, and the segment weight γ s 25kN / m 3 , the gravity of groundwater γ w 10kN / m3 In addition, it is preferred to set the vertical deviation d of the shield tail v and the pitch angle P of the shield tail v All are zero.
[0098] The measured data set of the shield tunnel section specifically includes the positions and measured buoyancy of multiple measured segments in the shield tunnel section. The length of the shield tunnel section is 99m, that is, the value range of the position of each segment in the shield tunnel section is (0m, 99m). The shield tunnel section is mainly composed of a slurry unsolidified section and a slurry solidified section. Through measurement, the length of the slurry unsolidified section is 14.4m and the length of the slurry solidified section is 84.6m. The position of each segment in the slurry unsolidified section is smaller than the position of each segment in the slurry solidified section. Since the length of the segment is 1.8m, the slurry unsolidified section contains 8 rings of segments, and the slurry solidified section contains 47 rings of segments. The 55 rings of segments in the shield tunnel section are numbered starting from the ring of segments closest to the shield tail.
[0099] Step 2: The pre-constructed shield tunnel mechanical model includes the foundation equivalent stiffness coefficient model of the soil around the shield tunnel segment, the equivalent bending stiffness model of the shield tunnel segment, the equivalent shear stiffness model of the shield tunnel segment, and the buoyancy model acting on the longitudinal direction of the shield tunnel segment. The exploration data set of the shield tunnel section is input into each of the above models for solution to obtain the relevant mechanical parameter values of the shield tunnel section, including the equivalent shear stiffness (k f GA) eq , Equivalent bending stiffness of the segment (EI) eq , the equivalent stiffness coefficient k of the soil around the segment and the buoyancy F acting on the segment in the longitudinal direction T .
[0100] Step three, the relevant mechanical parameter values of the shield tunnel section and the Timoshenko beam model are integrated and analyzed to determine the physical control equation, which mainly reflects the deformation characteristics of the shield tunnel section.
[0101] Step 4: Use the fully connected feedforward neural network as the basic architecture to build a neural network model, use the physical control equation and the measured data set of the shield tunnel section to train the neural network model, and obtain a segment floating amount prediction model.
[0102] Step five, obtaining the positions of multiple segments to be tested in the shield tunnel section and inputting them into the finally trained segment buoyancy prediction model for analysis to obtain the predicted buoyancy of the multiple segments to be tested.
[0103] A method for predicting the floating amount of a segment during the construction period of a shield tunnel proposed in an embodiment of the present application combines and analyzes the shield tunnel mechanical model and the Timoshenko beam model by utilizing relevant exploration data of the shield tunnel section to determine a physical control equation that can reflect the deformation characteristics of the shield tunnel section. The physical control equation is then integrated into the neural network model for application. This method can not only effectively constrain the model prediction process and make the model more consistent with the actual physical behavior of tunnel construction, but also improve the reliability of the prediction results of the floating amount of the segment, thereby providing more scientific guidance for the shield tunnel construction process.
[0104] See also Figure 2 The embodiment of the present application also provides a system for predicting the floating amount of a segment during the construction period of a shield tunnel, which can implement the above-mentioned method for predicting the floating amount of a segment during the construction period of a shield tunnel. The system includes:
[0105] An acquisition module 301 is used to acquire an exploration data set and a measured data set of a shield tunnel section;
[0106] The exploration data set of the shield tunnel section specifically includes the material parameter values, geological parameter values and shield construction parameter values used in the shield tunnel section, and the measured data set of the shield tunnel section specifically includes the positions and measured buoyancy of multiple measured segments in the shield tunnel section;
[0107] A solution module 302 is used to input the exploration data set of the shield tunnel section into a pre-built shield tunnel mechanical model for solution to obtain relevant mechanical parameter values of the shield tunnel section;
[0108] A determination module 303 is used to determine a physical control equation based on the relevant mechanical parameter values of the shield tunnel section and the Timoshenko beam model, which mainly reflects the deformation characteristics of the shield tunnel section;
[0109] A training module 304 is used to train a pre-built neural network model according to the physical control equation and the measured data set of the shield tunnel section to obtain a segment floating amount prediction model;
[0110] The prediction module 305 is used to obtain the positions of multiple segments to be tested in the shield tunnel section, and input them into the segment floating amount prediction model for analysis to obtain the predicted floating amounts of the multiple segments to be tested.
[0111] It can be understood that the contents of the above method embodiments are all applicable to the present system embodiments, the functions specifically implemented by the present system embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0112] The embodiment of the present application also provides an electronic device, the electronic device includes a memory and a processor, the memory stores a computer program, and the processor implements the above-mentioned method for predicting the floating amount of the pipe segment during the shield tunnel construction period when executing the computer program. The electronic device can be any intelligent terminal including a tablet computer, a car computer, etc.
[0113] It can be understood that the contents of the above method embodiments are all applicable to the present device embodiments, the functions specifically implemented by the present device embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0114] See also Figure 3 , Figure 3 The hardware structure of an electronic device according to another embodiment is shown. The electronic device includes:
[0115] The processor 401 may be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of the present application;
[0116] The memory 402 can be implemented in the form of a read-only memory (ROM), a static storage device, a dynamic storage device, or a random access memory (RAM). The memory 402 can store an operating system and other application programs. When the technical solution provided in the embodiment of the present application is implemented by software or firmware, the relevant program code is stored in the memory 402, and the processor 401 calls and executes the technical solution provided in the embodiment of the present application;
[0117] Input / output interface 403, used to implement information input and output;
[0118] Communication interface 404, used to realize communication interaction between the device and other devices, which can be realized by wired mode (such as USB, network cable, etc.) or wireless mode (such as mobile network, WIFI, Bluetooth, etc.);
[0119] Bus 405 , which transmits information between various components of the device (e.g., processor 401 , memory 402 , input / output interface 403 , and communication interface 404 );
[0120] The processor 401 , the memory 402 , the input / output interface 403 and the communication interface 404 are connected to each other in communication within the device via the bus 405 .
[0121] An embodiment of the present application also provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the above-mentioned method for predicting the floating amount of pipe segments during the construction period of a shield tunnel is implemented.
[0122] It can be understood that the contents of the above method embodiments are all applicable to the present storage medium embodiments, the functions specifically implemented by the present storage medium embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0123] The memory, as a non-transient computer-readable storage medium, can be used to store non-transient software programs and non-transient computer executable programs. In addition, the memory may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some embodiments, the memory may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0124] The embodiments described in the embodiments of the present application are intended to more clearly illustrate the technical solutions of the embodiments of the present application and do not constitute a limitation on the technical solutions provided in the embodiments of the present application. Those skilled in the art will appreciate that with the evolution of technology and the emergence of new application scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.
[0125] Those skilled in the art will appreciate that the technical solutions shown in the figures do not constitute a limitation on the embodiments of the present application, and may include more or fewer steps than shown in the figures, or a combination of certain steps, or different steps.
[0126] The system embodiments described above are merely illustrative, and the units described as separate components may or may not be physically separated, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the present embodiment.
[0127] Those skilled in the art will appreciate that all or some of the steps in the methods disclosed above, and the functional modules / units in the systems and devices may be implemented as software, firmware, hardware, or a suitable combination thereof.
[0128] The terms "first", "second", "third", "fourth", etc. (if any) in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0129] It should be understood that in the present application, "at least one (item)" means one or more, and "plurality" means two or more. "And / or" is used to describe the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" can mean: only A exists, only B exists, and A and B exist at the same time, where A and B can be singular or plural. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b or c can mean: a, b, c, "a and b", "a and c", "b and c", or "a and b and c", where a, b, c can be single or multiple.
[0130] In the several embodiments provided in the present application, it should be understood that the disclosed systems and methods can be implemented in other ways. For example, the system embodiments described above are only schematic. For example, the division of the above units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of systems or units, which can be electrical, mechanical or other forms.
[0131] The units described above as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0132] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0133] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including multiple instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods of various embodiments of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, referred to as ROM), random access memory (Random Access Memory, referred to as RAM), disk or optical disk and other media that can store programs.
[0134] The preferred embodiments of the present application are described above with reference to the accompanying drawings, but the scope of the rights of the present application is not limited thereto. Any modification, equivalent substitution and improvement made by a person skilled in the art without departing from the scope and essence of the present application should be within the scope of the rights of the present application.
Claims
1. A method for predicting the floating amount of a segment during shield tunnel construction, characterized in that: The method comprises: Acquire an exploration data set and a measured data set of a shield tunnel section, wherein the exploration data set includes geological parameter values, material parameter values, and shield construction parameter values of the shield tunnel section, and the measured data set includes positions and measured buoyancy of multiple measured segments in the shield tunnel section; Inputting the exploration data set into a pre-built shield tunnel mechanical model for solving, and obtaining relevant mechanical parameter values of the shield tunnel section; Determining a physical control equation for reflecting the deformation characteristics of the shield tunnel section according to the Timoshenko beam model and the relevant mechanical parameter values; According to the measured data set and the physical control equation, a pre-built neural network model is trained to obtain a segment floating amount prediction model; The positions of the multiple segments to be measured in the shield tunnel section are obtained and input into the segment floating amount prediction model for analysis to obtain the predicted floating amounts of the multiple segments to be measured.
2. The method for predicting the floating amount of a segment during shield tunnel construction according to claim 1, characterized in that: The shield tunnel mechanical model includes an equivalent shear stiffness model and an equivalent bending stiffness model of the shield tunnel segment, an equivalent stiffness coefficient model of the foundation of the soil around the shield tunnel segment, and a buoyancy model acting on the longitudinal direction of the shield tunnel segment.
3. The method for predicting the floating amount of a segment during shield tunnel construction according to claim 2, characterized in that: The mathematical expression of the buoyancy model acting on the longitudinal direction of the shield tunnel segment is: F T =F s (t)+F d (f)-G s , F w =πR 2 c w , F d0 =2PRsinθ, G s =πR 2 c s ; Among them, F T is the buoyancy force on the segment longitudinally, F s (t) is the static buoyancy of the segment at time t, F d (t) is the dynamic buoyancy of the segment at time t, G s is the self-weight stress of the segment, F s0 is the static buoyancy of the synchronous grouting slurry on the segment when it is not solidified, t s is the initial setting time of slurry, k s is the slurry solidification influence coefficient, F w is the groundwater pressure at the location of the segment, R is the outer radius of the segment, γ w is the density of groundwater, α g is the arc of the synchronous grouting slurry wrapped around the segment, γ g is the density of the synchronous grouting slurry, F d0 is the initial dynamic buoyancy of the segment, t d is the dissipation time of dynamic grouting pressure, k d is the grouting pressure dissipation influence coefficient, P is the synchronous grouting pressure on the segment, θ is the angle between the boundary of the grouting slurry bubble distribution area and the vertical direction, γ s The weight of the pipe segment.
4. The method for predicting the floating amount of a segment during shield tunnel construction according to claim 1, characterized in that: The neural network model is constructed using a fully connected feedforward neural network as the basic architecture.
5. The method for predicting the floating amount of a segment during shield tunnel construction according to claim 1, characterized in that: The pre-built neural network model is trained according to the measured data set and the physical control equation to obtain a segment floating amount prediction model, including: Determine a final loss function according to the physical control equation and a preset loss function; wherein the preset loss function is used to measure the difference between the model prediction value and the true value; The neural network model is trained according to the measured data set and the final loss function to obtain the segment floating amount prediction model.
6. The method for predicting the floating amount of a segment during shield tunnel construction according to claim 5, characterized in that: Determining the final loss function according to the physical control equation and the preset loss function includes: The residual term of the physical control equation is added to the preset loss function in a weighted summation manner to form the final loss function.
7. The method for predicting the floating amount of a segment during shield tunnel construction according to claim 1, characterized in that: The shield tunnel section includes a first shield tunnel section and a second shield tunnel section, the first shield tunnel section is in a state where the synchronous grouting slurry has not solidified, the second shield tunnel section is in a state where the synchronous grouting slurry has solidified, and the measured density of the segments in the first shield tunnel section is greater than the measured density of the segments in the second shield tunnel section.
8. A system for predicting the floating volume of segments during shield tunnel construction, characterized in that: The system comprises: An acquisition module is used to acquire an exploration data set and a measured data set of a shield tunnel section, wherein the exploration data set includes geological parameter values, material parameter values and shield construction parameter values of the shield tunnel section, and the measured data set includes positions and measured buoyancy of multiple measured segments in the shield tunnel section; A solution module, used for inputting the exploration data set into a pre-built shield tunnel mechanical model for solution to obtain relevant mechanical parameter values of the shield tunnel section; A determination module, for determining a physical control equation for reflecting the deformation characteristics of the shield tunnel section according to the Timoshenko beam model and the relevant mechanical parameter values; A training module, used to train a pre-built neural network model according to the measured data set and the physical control equation to obtain a segment floating amount prediction model; The prediction module is used to obtain the positions of multiple segments to be measured in the shield tunnel section and input the segments buoyancy prediction model for analysis to obtain the predicted buoyancy of the multiple segments to be measured.
9. An electronic device, characterized in that: The electronic device comprises a memory and a processor, the memory stores a computer program, and the processor implements the method according to any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Shield construction surface deformation dynamic prediction method based on MIC-LSTM
CN112364422A
Shield tunnel segment floating prediction method based on neural network
CN114254562A
Shield tunnel construction period floating analysis and calculation method considering slurry solidification characteristics
CN115344935A
Gas-liquid two-phase flow measurement method and system based on machine learning and physical constraint
CN115355959A
Shield tunnel floating process prediction method based on random forest
CN117473851A
Cited By
Equivalent flexural rigidity calculation method for synchronous grouting reinforcement shield tunnel
CN120180567A
An equivalent flexural stiffness calculation method for synchronous grouting reinforcement of shield tunnels
CN120180567B
Twist correction method and device for three-round pipe jacking machine
CN121048026A
Shield tunnel deformation real-time calculation method and system based on PINN
CN121723566A
Shield tunnel longitudinal deformation intelligent prediction method based on physical information neural network
CN121902854A