Engineering building remote monitoring system and device based on BIM and storage medium

Through the BIM-based remote monitoring system for engineering buildings, a three-dimensional virtual model is built and the building structure data is monitored in real time, which solves the integrity, safety and real-time problems of traditional monitoring methods, and improves the safety and quality management efficiency during the construction process.

CN119721565APending Publication Date: 2025-03-28SHENZHEN ZHONGAN PROJECT MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411751640.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-02
Publication Date
2025-03-28

AI Technical Summary

Technical Problem

Traditional building monitoring methods have poor integrity, poor safety and poor real-time performance, and cannot effectively monitor the safety and quality of building structures, resulting in safety hazards and inefficiency during construction.

Method used

A remote monitoring system for engineering construction based on BIM is adopted to build a three-dimensional virtual model of engineering construction through model construction modules. The information collection module detects structural data through sensors and transmits the data to the security assessment module for evaluation, generating alarm information to ensure construction safety.

Benefits of technology

Remote real-time intuitive monitoring of engineering buildings is realized, safety and quality management efficiency during construction is improved, and safety and quality problems are promptly discovered and dealt with.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119721565A_ABST
    Figure CN119721565A_ABST
Patent Text Reader

Abstract

The invention discloses an engineering building remote monitoring system based on BIM. The system comprises a model construction module, an information acquisition module, a safety evaluation module and an alarm unit. The model construction module is used for constructing an engineering building three-dimensional virtual model for an engineering building entity structure; the information acquisition module is used for detecting leakage humidity, crack width, supporting stress, temperature and underground water level of each designated position in an engineering building entity structure through a sensor and transmitting detection data to the model construction module and the safety evaluation module. By constructing the three-dimensional virtual model of the engineering building, remote real-time visual monitoring is facilitated for an engineering manager, real-time interaction of information is realized, meanwhile, whether the engineering building is safe or not can be evaluated, a management platform is coordinated, and a notification of safety and quality rectification is initiated in time; the safety and quality accident treatment efficiency is improved; and meanwhile, the safety in the construction process is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering construction monitoring, and in particular to a BIM-based engineering construction remote monitoring system, equipment and storage medium. Background Art

[0002] BIM (Building Information Modeling) technology is a digital tool used in engineering design, construction, and management. By integrating digital and information models of buildings, it is shared and transmitted throughout the entire life cycle of project planning, operation, and maintenance. It enables engineering and technical personnel to correctly understand and efficiently respond to various building information, provides a basis for collaborative work for design teams and all construction entities including construction and operation units, and plays an important role in improving production efficiency, saving costs, and shortening construction periods.

[0003] In traditional building monitoring, monitoring personnel basically use simple methods, such as visual inspection, rebound method, pulse echo method, and ray method. These methods monitor the structure periodically, but these methods have obvious defects, such as poor integrity, which only monitors part of the structure; poor safety, manual monitoring is required, and manual monitoring cannot be performed in dangerous places. Once the staff is in a dangerous place for monitoring, it is easy to be in danger of life; poor real-time performance, it takes time to integrate the data after monitoring, and then we can know the construction status or progress, and it cannot be monitored in real time, and the efficiency is extremely low. With the development of society and the advancement of science and technology, the safety of construction in the field of construction is still an urgent problem to be solved for the optimization and improvement of construction quality supervision. Summary of the invention

[0004] The present invention provides a BIM-based engineering building remote monitoring system, equipment and storage medium to solve the problems raised in the above background technology.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] A BIM-based engineering building remote monitoring system includes a model building module, an information collection module, a safety assessment module, and an alarm unit;

[0007] The model building module is used to build a three-dimensional virtual model of the engineering building for the engineering building entity structure;

[0008] The information acquisition module is used to detect leakage moisture, crack width, support stress, temperature, and groundwater level at various designated locations in the physical structure of the engineering building through sensors, and transmit the detection data to the model building module and the safety assessment module;

[0009] The safety assessment module is used to send the received leakage humidity, crack width, support stress, temperature, and groundwater level data to the safety assessment model for assessment, and output whether the engineering building is safe;

[0010] The alarm unit is used to generate alarm information and send it to construction personnel and construction management personnel for inspection and troubleshooting in a timely manner when the safety assessment module determines that it is unsafe.

[0011] As a further improvement of the present technical solution: the model building module is specifically as follows: using 3D laser scanning technology to obtain the physical engineering building model, and then establishing a point cloud model; the processed and spliced ​​point cloud data is imported into the BIM software, the key points of the engineering building structure are extracted, and then a 3D virtual model of the engineering building is established.

[0012] As a further improvement of the technical solution: when constructing the three-dimensional virtual model of the engineering building, the model construction module scales the components according to the sizes and materials used of different structures. After the construction is completed, the materials used for each component are matched with the usage time limit.

[0013] As a further improvement of the present technical solution: the information acquisition module transmits the detection data to the model construction module and displays the received leakage humidity, crack width, support stress, temperature, and groundwater level detection data at the corresponding position of the three-dimensional virtual model of the engineering building, so as to facilitate remote real-time intuitive monitoring.

[0014] As a further improvement of this technical solution: the construction method of the safety assessment model is:

[0015] Step S1: Collect a large number of engineering construction monitoring data samples;

[0016] Step S2: extracting sample features of engineering construction monitoring data and adding labels to construct a training data set, wherein the features include leakage humidity, crack width, support stress, temperature, and groundwater level;

[0017] Step S3: constructing a BP neural network model;

[0018] Step S4: Initialize and train the BP neural network model according to the training data set until the test error reaches a preset value or reaches a preset maximum number of training times, and obtain a trained safety assessment model;

[0019] Step S5: Input the leakage humidity, crack width, support stress, temperature, and groundwater level data detected in real time by the information acquisition module into the trained safety assessment model to determine whether the engineering building is safe.

[0020] As a further improvement of the technical solution: the safety assessment model takes the characteristic indicators of each group of sample data as input and takes the judgment result of whether the engineering building is safe as output, wherein the number of input layer nodes is 5 and the number of output layer nodes is 1.

[0021] As a further improvement of the present technical solution: in the step S4, the data set is divided into a test set and a training set during training, and after the training is completed, the validity of the model is verified in the test set.

[0022] An embodiment of the present invention also provides a terminal device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein when the processor executes the computer program, the BIM-based engineering building remote monitoring system described in any one of the above items is implemented.

[0023] An embodiment of the present invention also provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute any of the above-mentioned BIM-based engineering building remote monitoring systems.

[0024] Compared with the prior art, the present invention has the following beneficial effects:

[0025] The present invention constructs a three-dimensional virtual model of the engineering building, which facilitates project managers to remotely monitor in real time and realize real-time information interaction. It can also evaluate whether the engineering building is safe, coordinate the management platform, and promptly initiate safety and quality rectification notifications, thereby improving the efficiency of handling safety and quality accidents and greatly improving the safety of the construction process.

[0026] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. The specific implementation of the present invention is given in detail by the following embodiments and their accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0028] Figure 1 A schematic diagram of a BIM-based engineering building remote monitoring system proposed by the present invention;

[0029] Figure 2 Schematic diagram of the construction method of the security assessment model proposed in the present invention. DETAILED DESCRIPTION

[0030] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention. The present invention is described in more detail by way of example with reference to the accompanying drawings in the following paragraphs. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to facilitate and clearly assist in explaining the purpose of the embodiments of the present invention.

[0031] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0032] See also Figures 1-2 ,In an embodiment of the present invention, a BIM-based engineering building remote monitoring system includes a model building module, an information collection module, a safety assessment module, and an alarm unit;

[0033] The model building module is used to build a three-dimensional virtual model of the engineering building for the physical structure of the engineering building. The model building module specifically includes: using three-dimensional laser scanning technology to obtain the physical engineering building model, and then building a point cloud model; importing the processed and spliced ​​point cloud data into the BIM software, extracting the key points of the engineering building structure, and then building a three-dimensional virtual model of the engineering building; when building the three-dimensional virtual model of the engineering building, the model building module scales the components according to the size and materials used of different structures, and after the construction is completed, the materials used for each component are matched with the usage period;

[0034] The information acquisition module is used to detect the leakage humidity, crack width, support stress, temperature, and groundwater level at each designated position in the physical structure of the engineering building through sensors, and transmit the detection data to the model construction module and the safety assessment module; the information acquisition module transmits the detection data to the model construction module and displays the received leakage humidity, crack width, support stress, temperature, and groundwater level detection data at the corresponding position of the three-dimensional virtual model of the engineering building, so as to facilitate remote real-time intuitive monitoring.

[0035] The safety assessment module is used to send the received leakage moisture, crack width, support stress, temperature, and groundwater level data to the safety assessment model for assessment, and output whether the engineering building is safe;

[0036] The construction method of the safety assessment model is:

[0037] Step S1: Collect a large number of engineering construction monitoring data samples;

[0038] Step S2: extracting sample features of engineering construction monitoring data and adding labels to construct a training data set, wherein the features include leakage humidity, crack width, support stress, temperature, and groundwater level;

[0039] Step S3: constructing a BP neural network model;

[0040] Step S4: Initialize and train the BP neural network model according to the training data set until the test error reaches a preset value or reaches a preset maximum number of training times, and obtain a trained safety assessment model. During training, the data set is divided into a test set and a training set. After the training is completed, the validity of the model is verified in the test set;

[0041] Step S5: Input the leakage humidity, crack width, support stress, temperature, and groundwater level data detected in real time by the information acquisition module into the trained safety assessment model to determine whether the engineering building is safe.

[0042] Among them, the safety assessment model takes the characteristic indicators of each group of sample data as input and takes the judgment result of whether the engineering building is safe as output. The number of input layer nodes is 5 and the number of output layer nodes is 1.

[0043] The alarm unit is used to generate alarm information and send it to construction personnel and construction management personnel for inspection and troubleshooting in a timely manner when the safety assessment module determines that it is unsafe.

[0044] An embodiment of the present invention also provides a terminal device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein when the processor executes the computer program, the BIM-based engineering building remote monitoring system described in any one of the above items is implemented.

[0045] An embodiment of the present invention also provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute any of the above-mentioned BIM-based engineering building remote monitoring systems.

[0046] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any ordinary technician in the industry can smoothly implement the present invention as shown in the drawings and described above. However, any equivalent changes, modifications and evolutions made by technicians familiar with the profession without departing from the scope of the technical solution of the present invention using the technical content disclosed above are all equivalent embodiments of the present invention. At the same time, any equivalent changes, modifications and evolutions made to the above embodiments based on the essential technology of the present invention are still within the protection scope of the technical solution of the present invention.

Claims

1. A remote monitoring system for engineering buildings based on BIM, characterized in that: It includes model building module, information collection module, safety assessment module and alarm unit; The model building module is used to build a three-dimensional virtual model of the engineering building for the engineering building entity structure; The information acquisition module is used to detect leakage moisture, crack width, support stress, temperature, and groundwater level at various designated locations in the physical structure of the engineering building through sensors, and transmit the detection data to the model building module and the safety assessment module; The safety assessment module is used to send the received leakage humidity, crack width, support stress, temperature, and groundwater level data to the safety assessment model for assessment, and output whether the engineering building is safe; The alarm unit is used to generate alarm information and send it to construction personnel and construction management personnel for inspection and troubleshooting in a timely manner when the safety assessment module determines that it is unsafe.

2. The BIM-based engineering building remote monitoring system according to claim 1 is characterized in that: The model building module is specifically as follows: using 3D laser scanning technology to obtain the physical engineering building model, and then establishing a point cloud model; importing the processed and spliced ​​point cloud data into the BIM software, extracting the key points of the engineering building structure, and then establishing a 3D virtual model of the engineering building.

3. The BIM-based engineering building remote monitoring system according to claim 2 is characterized in that: The model building module scales the components of different structures according to their sizes and materials when building the three-dimensional virtual model of the engineering building. After the building is completed, the materials used for each component are matched with the usage time limit.

4. The BIM-based engineering building remote monitoring system according to claim 3 is characterized in that: The information acquisition module transmits the detection data to the model construction module and displays the received leakage humidity, crack width, support stress, temperature, and groundwater level detection data at the corresponding position of the three-dimensional virtual model of the engineering building, so as to facilitate remote real-time intuitive monitoring.

5. The BIM-based engineering building remote monitoring system according to claim 4 is characterized in that: The construction method of the safety assessment model is: Step S1: Collect a large number of engineering construction monitoring data samples; Step S2: extracting sample features of engineering construction monitoring data and adding labels to construct a training data set, wherein the features include leakage humidity, crack width, support stress, temperature, and groundwater level; Step S3: constructing a BP neural network model; Step S4: Initialize and train the BP neural network model according to the training data set until the test error reaches a preset value or reaches a preset maximum number of training times, and obtain a trained safety assessment model; Step S5: Input the leakage humidity, crack width, support stress, temperature, and groundwater level data detected in real time by the information acquisition module into the trained safety assessment model to determine whether the engineering building is safe.

6. The BIM-based engineering building remote monitoring system according to claim 5 is characterized in that: The safety assessment model takes the characteristic indicators of each group of sample data as input and takes the judgment result of whether the engineering building is safe as output, wherein the number of input layer nodes is 5 and the number of output layer nodes is 1.

7. The BIM-based engineering building remote monitoring system according to claim 6 is characterized in that: In step S4, during training, the data set is divided into a test set and a training set, and after the training is completed, the validity of the model is verified in the test set.

8. A terminal device, characterized in that: The invention comprises a processor, a memory and a computer program stored in the memory and configured to be executed by the processor, wherein when the processor executes the computer program, the BIM-based engineering building remote monitoring system as described in any one of claims 1 to 7 is implemented.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program, wherein when the computer program is executed, the device where the computer-readable storage medium is located is controlled to execute the BIM-based engineering building remote monitoring system as described in any one of claims 1 to 7.