Passenger comprehensive service method and system based on comprehensive transportation hub
By collecting and analyzing passenger behavior data in real time, combining convolutional neural networks and multimodal real-time resource scheduling models, the resource configuration of the comprehensive transportation hub is automatically adjusted, and the existing system's insufficient response speed and accuracy are solved, achieving more efficient resource utilization and better passenger experience.
Patent Information
- Application Number
- CN202411761932.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-03
- Publication Date
- 2025-03-28
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When facing large-scale passenger flow fluctuations and resource scheduling complexity, the existing integrated transportation hub service system lacks response speed and accuracy, unable to meet the growing demand, and lacks real-time perception and response mechanisms, resulting in unreasonable resource allocation and affecting passenger travel experience.
By collecting passenger behavior data in real time, preprocessing and standardizing, and using convolutional neural network models to analyze historical and current data, predict future fuzzy needs. Then, the passenger seat allocation and safety channel opening situation are automatically adjusted through the multimodal real-time resource scheduling model, and the resource configuration is monitored and optimized in real time.
Dynamic resource scheduling and intelligent adjustment of the service area of the comprehensive transportation hub has been achieved, operational efficiency and passenger service quality have been improved, waiting time and idle resources have been reduced, and intelligent management capabilities have been enhanced.
Smart Images

Figure CN119721571A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of integrated service technology, and in particular to a passenger integrated service method and system based on an integrated transportation hub. Background Art
[0002] With the accelerated development of global urbanization, integrated transportation hubs, as an important part of urban transportation systems, play a key role in alleviating urban traffic pressure and improving travel efficiency. The current transportation hub is not only a transfer node for different modes of transportation, but also a comprehensive place integrating multifunctional services such as commerce, leisure, and catering. In order to adapt to the rapidly changing passenger flow and the seamless connection between different means of transportation, the integrated transportation hub service system is gradually becoming intelligent, integrating a variety of technologies such as big data, the Internet of Things (IoT), artificial intelligence (AI), etc., aiming to provide passengers with a more convenient, efficient and personalized travel experience.
[0003] Existing service systems mostly use periodic resource scheduling models based on historical data, relying on static rules and manual scheduling. However, in the face of large-scale passenger flow fluctuations and the increasing complexity of resource scheduling, the response speed and accuracy of the existing system can no longer meet the growing needs of integrated transportation hubs.
[0004] Although the existing system has improved the resource utilization and service level of transportation hubs to a certain extent, it still has many shortcomings. First, the existing service system lacks a real-time perception and response mechanism for passenger behavior, and often relies on historical data for prediction. This static prediction method is prone to failure during peak hours or emergencies, and cannot flexibly adjust seat allocation and channel opening. Secondly, the existing system has limited capabilities in multi-service area resource scheduling and cannot achieve real-time, multi-modal resource optimization and adjustment, resulting in passenger congestion and long waiting times during peak hours, irrational resource allocation, and affecting the overall travel experience of passengers. Summary of the invention
[0005] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.
[0006] In view of the above existing problems, the present invention is proposed. Therefore, the present invention provides a passenger comprehensive service method based on a comprehensive transportation hub to solve the problems raised in the background technology.
[0007] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0008] In a first aspect, the present invention provides a comprehensive passenger service method based on a comprehensive transportation hub, comprising the following technical steps:
[0009] Collect passenger behavior data in real time, and pre-process and standardize the passenger behavior data, wherein the passenger behavior data includes passenger flow, seat utilization rate and service utilization;
[0010] The convolutional neural network model is used to analyze historical and current passenger behavior data to obtain the future fuzzy demand of the integrated transportation hub service area.
[0011] Automatically adjust passenger seat allocation and safety channel opening in integrated transportation hub service areas through multimodal real-time resource scheduling models;
[0012] Monitor the current passenger seat allocation and safety channel opening situation in the comprehensive transportation hub service area in real time, and optimize the passenger seat allocation and safety channel opening situation in the comprehensive transportation hub service area based on the passenger flow situation to achieve smooth passenger travel and full utilization of resources.
[0013] As a preferred technical solution of the comprehensive passenger service method based on the comprehensive transportation hub described in the present invention, the preprocessing and standardization of passenger behavior data includes: data cleaning, data format unification, missing data processing, and data standardization.
[0014] As a preferred technical solution of the comprehensive passenger service method based on the comprehensive transportation hub described in the present invention, the analysis of historical passenger behavior data and current passenger behavior data by the convolutional neural network model includes:
[0015] The preprocessed and standardized passenger behavior data forms a multidimensional dataset and serves as the input dataset of the convolutional neural network;
[0016] The convolution layer scans the input data set through the convolution kernel to extract high-dimensional features, and the pooling layer downsamples the high-dimensional features extracted by the convolution layer to obtain important features;
[0017] The fully connected layer performs a comprehensive analysis of the important features obtained, and the output layer generates the prediction results of the future fuzzy demand of the comprehensive transportation hub service area.
[0018] As a preferred technical solution of the comprehensive passenger service method based on the comprehensive transportation hub described in the present invention, the comprehensive transportation hub service area includes a waiting area, a security check area, a boarding / boarding area, a transfer area and an entrance and exit area.
[0019] As a preferred technical solution of the comprehensive passenger service method based on the comprehensive transportation hub described in the present invention, the automatic adjustment of the passenger seat allocation and the opening of the safety channel in different service areas by the multimodal real-time resource scheduling model includes:
[0020] Using historical passenger behavior data and future fuzzy demand forecast results, a scenario probability model of the integrated transportation hub service area is constructed to predict the precise demand of the integrated transportation hub service area in the future.
[0021] According to the precise requirements provided by the scenario probability model, the dynamic resource scheduling function is optimized to adjust the passenger seat allocation and safety channel opening in the integrated transportation hub service area in real time;
[0022] As a preferred technical solution of the comprehensive passenger service method based on the comprehensive transportation hub described in the present invention,
[0023] The Wasserstein distance is used to measure the deviation between the predicted probability distribution and the actual probability distribution to optimize scene management.
[0024] In a second aspect, the present invention provides a comprehensive passenger service system based on a comprehensive transportation hub, comprising:
[0025] A passenger behavior data collection and preprocessing module is configured to collect passenger behavior data in real time, and to preprocess and standardize the passenger behavior data;
[0026] The convolutional neural network analysis module is configured to analyze the historical passenger behavior data and the current passenger behavior data through the convolutional neural network model to obtain the future fuzzy demand of the integrated transportation hub service area.
[0027] Multimodal real-time resource scheduling, configured to automatically adjust the passenger seat allocation and safety channel opening in the integrated transportation hub service area through a multimodal real-time resource scheduling model;
[0028] The monitoring optimization module is configured to monitor in real time the passenger seat allocation and safety channel opening conditions in the current integrated transportation hub service area, and further optimize the passenger seat allocation and safety channel opening conditions in different service areas based on the passenger flow conditions.
[0029] In a third aspect, the present invention provides a computer device, comprising a memory and a processor, wherein the memory stores a computer program, wherein: the processor implements any step of the above method when executing the computer program.
[0030] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: the computer program, when executed by a processor, implements any step of the above method.
[0031] The beneficial effects of this application are reflected in improving the overall operational efficiency and passenger service quality of the integrated transportation hub. By constructing a multimodal real-time resource scheduling model, the system can make accurate predictions based on the real-time collected passenger behavior data and historical data, and realize intelligent adjustment of dynamic seat allocation and safe channel opening in different service areas. During peak hours, the system can quickly respond to the increase in passenger flow, reasonably increase seats and open more channels, reduce congestion, and reduce the average waiting time of passengers. During non-peak hours, the system effectively reduces idle resources, improves the utilization rate of seats and channels, and avoids waste of resources. At the same time, by predicting future passenger demand, the system can plan resource scheduling in advance, ensure the smooth operation of each service area, and optimize passenger flow within the transportation hub. This invention not only improves the efficiency of resource utilization, but also significantly improves the travel experience of passengers, reduces waiting time, and enhances the intelligent management capabilities and service level of the integrated transportation hub. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0033] Figure 1 This is an overall flow chart of a comprehensive passenger service method based on a comprehensive transportation hub according to an embodiment of the present invention;
[0034] Figure 2 This is a schematic diagram of a comprehensive passenger service system based on a comprehensive transportation hub according to an embodiment of the present invention; DETAILED DESCRIPTION
[0035] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.
[0036] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0037] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0038] The present invention is described in detail with reference to schematic diagrams. When describing the embodiments of the present invention, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0039] At the same time, in the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper, lower, inner and outer" are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first, second or third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0040] In the present invention, unless otherwise clearly specified and limited, the terms "install, connect, connect" should be understood in a broad sense, for example: it can be a fixed connection, a detachable connection or an integral connection; it can also be a mechanical connection, an electrical connection or a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0041] Example 1
[0042] Reference Figure 1 , which is the first embodiment of the present invention, and provides a comprehensive passenger service method based on a comprehensive transportation hub, including the following technical steps:
[0043] S100. Collect passenger behavior data in real time, and pre-process and standardize the passenger behavior data, wherein the passenger behavior data includes passenger flow, seat utilization rate and service utilization;
[0044] Furthermore, the preprocessing and standardization of passenger behavior data includes: data cleaning, data format unification, missing data processing and data standardization. By preprocessing and standardizing passenger behavior data, the present invention effectively improves data quality and ensures the accuracy and reliability of subsequent analysis.
[0045] It should be noted that passenger flow (P f) refers to the number of passengers passing through a designated integrated transportation hub service area within a specific period of time. Passenger flow is an important indicator for measuring the movement of passengers in a transportation hub. , where N p represents the total number of passengers passing through the specified area within the time period t; the seat utilization rate (S u ) represents the seat occupancy in a comprehensive transportation hub service area within a certain period of time. , where N s Indicates the number of occupied seats, N t Indicates the total number of seats. By monitoring the seat utilization rate, the allocation of seat resources can be optimized; service usage (U s ) refers to the use of various service facilities within the service area of a comprehensive transportation hub by passengers during a specific period of time. , where N u N is the number of people or times who actually use the service facilities in a specified time period. a Indicates the available capacity of the service facility during the time period (e.g. the number of services that can be provided).
[0046] S200. Analyze historical passenger behavior data and current passenger behavior data through a convolutional neural network model to obtain future fuzzy demand for the service area of the comprehensive transportation hub;
[0047] Furthermore, the preprocessed and standardized passenger behavior data forms a multidimensional data set, and as the input data set of the convolutional neural network, the multidimensional data set can integrate passenger flow, seat occupancy rate, and service usage. Through the recognition and utilization of the convolutional neural network, the high-dimensional features in the data of passenger flow, seat occupancy rate, and service usage can be captured. This high-dimensional feature includes not only the information of a single variable, but also the interactive effects between multiple variables, which can help relevant departments optimize scheduling and resource allocation.
[0048] Specifically, the expression of the multidimensional dataset is:
[0049] X={X i,t,f |i=1,2,...,N; t=1,2,...,T; f∈{P f ,S u ,U s}}
[0050] Among them, X i,t,f is the fth eigenvalue of the i-th sample at time step t; N is the total number of samples; T is the total number of time steps; f represents the feature dimension;
[0051] Furthermore, the convolution layer scans the input data set through the convolution kernel to extract the single variable features and complex, nonlinear interaction effect features in the multidimensional data set. The pooling layer downsamples the high-dimensional features extracted by the convolution layer to obtain important features.
[0052] Specifically, for the input data set X, the output of the convolutional layer can be expressed as:
[0053]
[0054] Among them, a i,t,k represents the output value of the convolution layer at the i-th sample, time step t, and the k-th convolution kernel; X i,t+r,f represents the input value of the i-th sample, time step t+r, and f-th feature; w k,f,r represents the weight parameter of the convolution kernel k on the feature f and the relative position r; b k represents the bias term of the convolution kernel k; F represents the total feature dimension; R represents the radius of the convolution kernel in the time dimension, and the convolution kernel size is 2R+1; is a nonlinear activation function;
[0055] It should be noted that the convolution kernel is used for a single feature dimension (such as P f ) performs local scanning, learns the local time variation pattern, and activates the function Strengthen the nonlinear characteristics of variables; convolution kernels are applied to all feature dimensions (P f ,S u ,U s ) When colleagues operate, the weight w k,f,r The local features of different variables are combined to capture the relationship between variables.
[0056] The output of the pooling layer can be expressed as:
[0057]
[0058] Among them, P i,t,,k represents the pooled value of the kth feature of the i-th sample at the time step t' after pooling; t' represents the time step index after pooling; w(t') represents the range of the pooling window, centered at the time step t', and the size is 2R+1;
[0059] It should be noted that the purification operation reduces the spatial size of the data by the maximum value in a specific window, thereby achieving feature dimensionality reduction and reduction of computational complexity in the convolutional neural network, while enhancing the model's robustness to spatial transformations.
[0060] Furthermore, the fully connected layer performs a comprehensive analysis of the important features obtained, and the output layer generates the prediction results of the future fuzzy demand of each service area.
[0061] Specifically, the mathematical expression of the fully connected layer is:
[0062]
[0063] in, is the flattened eigenvector; is the output tensor of the pooling layer, with a size of T′×K; P t,k is the value of the pooling layer output tensor at time step t and feature dimension k; T is the number of time steps of the pooling layer output; K is the feature dimension of the pooling layer output; y i is the i-th output value of the fully connected layer, indicating the future fuzzy demand forecast value of the i-th service area; τ() is the activation function; b i is the bias term, corresponding to the i-th output value; g j is the jth eigenvalue in the flattened eigenvector; D is the total dimension of the flattened eigenvector, D = T , ×D;α j is the adjustment coefficient of the jth feature; W ij is the connection weight between the i-th output node and the j-th input feature; β is the adjustment coefficient of the high-order nonlinear part; H is the number of features involved in the high-order nonlinear combination; V ik is the weight of the high-order nonlinear part; tanh(g k ) is the hyperbolic tangent function, for the characteristic g k Make a transformation;
[0064] It should be noted that the pooling layer retains the important local features extracted by the convolution layer through downsampling, reduces the data dimension, and inputs these key features into the fully connected layer for global analysis. The fully connected layer flattens the features output by the pooling layer, generates a comprehensive feature representation through the weight matrix and activation function, and finally generates the future fuzzy demand forecast for each service area in the output layer. This process provides strong support for the accurate prediction of future demand.
[0065] S300. Automatically adjust the passenger seat allocation and safety channel opening in the integrated transportation hub service area through a multimodal real-time resource scheduling model;
[0066] Furthermore, the integrated transportation hub service area includes a waiting area, a security check area, a boarding / boarding area, a transfer area, and an entrance and exit area;
[0067] Furthermore, by using historical passenger behavior data and future fuzzy demand forecast results, a scenario probability model of the integrated transportation hub service area is constructed to predict the precise demand of the integrated transportation hub service area in the future;
[0068] Specifically, the mathematical expression of the scene probability model is:
[0069]
[0070] Among them, α f ,α u ,α s is the weight parameter of each feature; M m (t) is the comprehensive scene moment, representing the service area S m Dynamic demand intensity; β m For scene S m Demand sensitivity parameter; θ m For scene S m The demand threshold; y(t) is the future fuzzy demand forecast value; T is the target forecast time range; M is the total number of service areas;
[0071] Furthermore, according to the precise requirements provided by the scenario probability model, the dynamic resource scheduling function is optimized to adjust the passenger seat allocation and safety channel opening in the service area of the integrated transportation hub in real time;
[0072] Specifically, the expression of the dynamic resource scheduling function is:
[0073]
[0074] Among them, A m,seat For service area S m The number of allocated seats; P(S m ) is the probability of the scene occurring; S u (t) is the real-time seat occupancy rate; A total,seat is the total number of available seats;
[0075] C m,channel For service area S m The number of open channels; D m is the flow density, that is, passenger flow / service area; C total,channel is the total number of available channels.
[0076] It should be noted that the present invention combines historical data, real-time dynamic information and future prediction results to optimize and adjust resource allocation, which can flexibly respond to complex and changing passenger demand scenarios and realize intelligent and efficient resource allocation. This method significantly improves the service efficiency of comprehensive transportation hubs, optimizes resource utilization, and improves passenger travel experience through a dynamic adjustment mechanism, which has high innovation and application value.
[0077] Furthermore, the Wasserstein distance is used to measure the deviation between the predicted probability distribution and the actual probability distribution to optimize the scene management;
[0078] Specifically, optimizing scene management includes the following steps:
[0079] Calculate the predicted probability P(S) and the actual probability P actual The Wasserstein distance W(P,P) between actual );
[0080]
[0081] Where inf is the minimum value of all possible joint distributions ζ, indicating the search for the best match between probability distributions; ζ is the joint distribution, describing the predicted probability distribution P(S) and the actual probability P acual The mapping relationship between distributions; Γ(P,P actual ) is the set of joint distributions, including all possible P(S) and P acual The joint distribution of; a, b are the predicted probability P(s) and the actual probability P acual The value in ;
[0082] If W(P,P actual )>∈W, the deviation between the predicted probability distribution and the actual probability distribution is large, and the scene management needs to be optimized;
[0083] According to the contribution of Wasserstein distance, find the scene with the largest deviation S m , and calculate its contribution to the Wasserstein distance Δ(S m );
[0084] Δ(S m )=|P(S m )-P actual (S m )|
[0085] Adjust the comprehensive scenario moment and model sensitivity parameters, correct the scenario probability distribution, and reallocate seat resources and the number of open channels based on the optimized scenario probability distribution;
[0086] The expressions of the adjusted scene moment and model sensitivity parameters are as follows:
[0087]
[0088] Among them, υ1 and υ2 are correction coefficients.
[0089] It should be noted that the system, combined with a multimodal real-time resource scheduling model, can dynamically adjust the passenger seat allocation and safety channel opening in the service area of the integrated transportation hub, and achieve accurate matching and efficient use of resources. This method uses historical passenger behavior data and future fuzzy demand forecast results to construct a scenario probability model and dynamically evaluate the demand changes in the service area. Specifically, during peak hours, the system reasonably increases the seat and channel resources in high-demand service areas through accurate prediction and real-time scheduling, significantly reducing passenger congestion and waiting time; during non-peak hours, the system optimizes resource allocation, reduces resource idleness, and improves the utilization efficiency of seats and channels. In addition, by measuring the deviation between the predicted and actual probability distributions using the Wasserstein distance, the system can further optimize scenario management, dynamically adjust model parameters, ensure the accuracy of predictions and the rationality of scheduling, thereby enhancing the intelligent management capabilities and passenger service experience of the integrated transportation hub, and significantly improving operational efficiency and resource utilization.
[0090] S400. Monitor the passenger seat allocation and safety channel opening conditions in the current integrated transportation hub service area in real time, and optimize the passenger seat allocation and safety channel opening conditions in different service areas based on the passenger flow conditions, so as to achieve smooth passenger travel and full utilization of resources.
[0091] Example 2
[0092] In addition, please refer to Figure 2 As shown, this embodiment also provides a comprehensive passenger service system based on a comprehensive transportation hub, including:
[0093] A passenger behavior data collection and preprocessing module is configured to collect passenger behavior data in real time, and to preprocess and standardize the passenger behavior data;
[0094] The convolutional neural network analysis module is configured to analyze the historical passenger behavior data and the current passenger behavior data through the convolutional neural network model to obtain the future fuzzy demand of the integrated transportation hub service area.
[0095] Multimodal real-time resource scheduling, configured to automatically adjust the passenger seat allocation and safety channel opening in the integrated transportation hub service area through a multimodal real-time resource scheduling model;
[0096] The monitoring optimization module is configured to monitor in real time the passenger seat allocation and safety channel opening conditions in the current integrated transportation hub service area, and further optimize the passenger seat allocation and safety channel opening conditions in different service areas based on the passenger flow conditions.
[0097] The computer device may be a terminal, and the computer device includes a processor, a memory, a communication interface, a display screen and an input device connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. The display screen of the computer device may be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device may be a touch layer covering the display screen, or a key, trackball or touchpad provided on the housing of the computer device, or an external keyboard, touchpad or mouse, etc.
[0098] This embodiment also provides a storage medium on which a computer program is stored. When the program is executed by a processor, the flue gas extraction monitoring preprocessing method proposed in the above embodiment is implemented.
[0099] The storage medium proposed in this embodiment and the data storage method proposed in the above embodiment belong to the same inventive concept. The technical details not fully described in this embodiment can be found in the above embodiment, and this embodiment has the same beneficial effects as the above embodiment.
[0100] Those skilled in the art will appreciate that the embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the application can adopt the form of complete hardware embodiments, complete software embodiments, or embodiments in combination with software and hardware. Moreover, the application can adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program codes. The scheme in the embodiments of the present application can be implemented in various computer languages, for example, object-oriented programming language Java and literal scripting language JavaScript, etc.
[0101] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0102] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0103] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0104] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.
[0105] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A comprehensive passenger service method based on a comprehensive transportation hub, characterized in that: The technical steps include: Collect passenger behavior data in real time, and pre-process and standardize the passenger behavior data. Collect passenger behavior data in real time, and pre-process and standardize the passenger behavior data; The convolutional neural network model is used to analyze historical and current passenger behavior data to obtain the future fuzzy demand of the integrated transportation hub service area. Automatically adjust passenger seat allocation and safety channel opening in integrated transportation hub service areas through multimodal real-time resource scheduling models; Monitor the current passenger seat allocation and safety channel opening situation in the comprehensive transportation hub service area in real time, and optimize the passenger seat allocation and safety channel opening situation in the comprehensive transportation hub service area based on the passenger flow situation to achieve smooth passenger travel and full utilization of resources.
2. The comprehensive passenger service method based on the comprehensive transportation hub according to claim 1 is characterized in that: The analysis of historical passenger behavior data and current passenger behavior data by a convolutional neural network model includes: The preprocessed and standardized passenger behavior data forms a multidimensional dataset and serves as the input dataset of the convolutional neural network; The convolution layer scans the input data set through the convolution kernel to extract high-dimensional features, and the pooling layer downsamples the high-dimensional features extracted by the convolution layer to obtain important features; The fully connected layer performs a comprehensive analysis of the important features obtained, and the output layer generates the prediction results of the future fuzzy demand of the comprehensive transportation hub service area.
3. The comprehensive passenger service method based on the comprehensive transportation hub according to claim 1 is characterized in that: The automatic adjustment of passenger seat allocation and safety channel opening in different service areas by a multimodal real-time resource scheduling model includes: Using historical passenger behavior data and future fuzzy demand forecast results, a scenario probability model of the integrated transportation hub service area is constructed to predict the precise demand of the integrated transportation hub service area in the future. Based on the precise requirements provided by the scenario probability model, the dynamic resource scheduling function is optimized to adjust the passenger seat allocation and safety channel opening in the service area of the integrated transportation hub in real time.
4. The comprehensive passenger service method based on the comprehensive transportation hub according to claim 3 is characterized in that: The Wasserstein distance is used to measure the deviation between the predicted probability distribution and the actual probability distribution to optimize scene management.
5. A passenger comprehensive service system based on a comprehensive transportation hub, based on the passenger comprehensive service method based on a comprehensive transportation hub according to any one of claims 1 to 4, characterized in that: include: A passenger behavior data collection and preprocessing module is configured to collect passenger behavior data in real time, and to preprocess and standardize the passenger behavior data; The convolutional neural network analysis module is configured to analyze the historical passenger behavior data and the current passenger behavior data through the convolutional neural network model to obtain the future fuzzy demand of the integrated transportation hub service area. A multimodal real-time resource scheduling module is configured to automatically adjust the passenger seat allocation and safety channel opening of the integrated transportation hub service area through a multimodal real-time resource scheduling model; The monitoring optimization module is configured to monitor in real time the passenger seat allocation and safety channel opening conditions in the current integrated transportation hub service area, and further optimize the passenger seat allocation and safety channel opening conditions in different service areas based on the passenger flow conditions.
6. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 4 are implemented.
7. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
Citation Information
Cited By
High-speed rail business travel service personnel scheduling method based on data analysis
CN120952284A
