Auxiliary beam hanging device for T-beam prefabrication
By designing an auxiliary lifting beam device for prefabricating T beams, the precise positioning and stable installation of the ends of the T beams is achieved using components such as guide barrels, connecting rods and electric push rods, the problems of unstable installation and inconsistent dimensions of T beams in traditional construction are solved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202411938622.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-26
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2044-12-26
AI Technical Summary
In the prefabricated construction of T-beams, traditional construction technology requires multiple calibration and positioning, resulting in unsolid support of the formwork, causing concrete at the end of the T-beam to leak slurry, the structural dimensions do not meet the design requirements, and the installation stability of the hanging beam is low.
An auxiliary hanging beam device for prefabricated T-beams is designed, including a support frame and a connecting assembly. The connecting assembly consists of a guide cylinder, a first connecting rod, a second connecting rod, a positioning block, an electric push rod and a limiting pallet. Through the mutual cooperation of these components, precise positioning and stable installation of the end of the T-beam are achieved.
Through this device, it is possible to effectively avoid shaking and offset of the T-beam during installation and lifting, ensure the stability and accuracy of the T-beam, reduce the number of corrections and positioning during construction, and improve construction efficiency and safety.
Smart Images

Figure CN119735085A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hanging beam installation, and in particular to an auxiliary hanging beam device for prefabrication of T beams. Background Art
[0002] At present, the production of beams and slabs mainly relies on manual processing and production. The prefabrication of beams and slabs mainly includes the following processes: ① Installing and fixing the base; ② Binding and making the steel skeleton; ③ Setting up the outer formwork and fixing the end formwork; ④ Checking the inner formwork; ⑤ Pouring concrete; ⑥ Removing the formwork; ⑦ Tensing the steel strands (there is no such process for the prefabrication of non-prestressed beams and slabs); ⑧ Curing to the finished product; ⑨ Grouting and sealing the anchor. The various processes of beam and slab prefabrication are mainly based on manual work, which not only has low production efficiency, but also low product precision and high safety risks. In the process of T-beam prefabrication construction, the support of the end formwork is an important link. Ensuring that the prefabricated structural dimensions of the beam and slab and the slope of the end of the beam and slab meet the design requirements is a construction focus. In actual construction, the traditional construction process requires multiple corrections and positioning. If the formwork is not firmly supported, there will be problems such as T-beam end concrete leakage caused by formwork running and structural dimensions not meeting the design requirements. Therefore, an auxiliary beam hanging device is needed to help the installation of the hanging beam.
[0003] Among them, the patent with announcement number CN221116747U discloses a flexible prefabricated T-beam bottom hanging beam device, including a hanging beam mechanism, and also includes a support frame, a sliding frame, a reciprocating motor, a threaded rod, a slider, a threaded sleeve, a connecting plate and a laser marking light. The inner side of the top end of the support frame is connected to the outer side of the sliding frame, the right end of the sliding frame is connected to the inner end of the reciprocating motor, the output end of the reciprocating motor is connected to the right end of the threaded rod, the threaded rod is rotatably connected to the inner side of the sliding frame, the inner side of the sliding frame is also slidably connected to the outer side of the slider, a threaded sleeve is provided on the inner side of the slider, the inner wall of the threaded sleeve is threadedly connected to the outer wall of the threaded rod, the bottom end of the slider is connected to the bottom end of the hanging beam mechanism, the output end of the hanging beam mechanism is connected to the outer side of the connecting plate, the middle part of the bottom end of the connecting plate is connected to the top of the laser marking light, and a projection mechanism is provided on the outer side of the sliding frame.
[0004] When the structure is in use, the reciprocating motor is operated to rotate the threaded rod inside the slide frame. The threaded rod is screwed with the threaded sleeve to make the slider slide to the corresponding position inside the slide frame and drive the connecting piece to move, so that the laser marking light stops after acting at the end position, and then the prefabrication construction is completed. The laser marking projection can assist in measurement, so that the prefabrication position is more accurate and the reliability is improved. However, the structure is not easy to position the various ends of the suspension beam during installation, resulting in low stability during the installation of the suspension beam. Summary of the invention
[0005] The present invention provides an auxiliary beam hanging device for T-beam prefabrication, aiming to solve the problems raised in the above background technology.
[0006] The present invention is implemented in this way. The present invention provides the following technical solutions: an auxiliary beam hanging device for T-beam prefabrication, comprising a support frame, on which a connecting assembly is provided;
[0007] The connecting assembly comprises a guide cylinder arranged in the middle of the support frame, a plurality of first connecting rods with adjustable angles are hingedly connected to the outer side of the guide cylinder, and one end of each of the first connecting rods is hingedly connected to a second connecting rod with adjustable angles, a positioning block is arranged at the bottom of the plurality of second connecting rods, and a shaft pin seat hingedly connected to the corresponding second connecting rod is fixedly arranged on one side of each of the positioning blocks;
[0008] A first positioning plate is provided at the bottom of each of the positioning blocks, and a second positioning plate is provided at the top of each of the first positioning plates, a plurality of angle-adjustable reinforcing rods are hinged on the outer side of the first positioning plate, and a limited support plate is fixedly provided at the bottom of each of the reinforcing rods, a plurality of angle-adjustable first electric push rods are hinged on the outer side of the second positioning plate, and each of the first electric push rods is respectively located at the top of the corresponding reinforcing rod, a connecting frame is fixedly provided at one end of the first electric push rod, and the connecting frame cover is provided on the reinforcing rod and hinged to the reinforcing rod.
[0009] It can be seen that in the above technical solution, the output end of the first electric push rod extends to drive the connecting frame to drive the reinforcing rod to rotate along the axial point of the connection between the reinforcing rod and the first positioning plate, so that the reinforcing rod drives the limit support plate to deflect, and makes each limit support plate gather or spread, and the limit support plate and the reinforcing rod are distributed in a triangular shape, so that each limit support plate and the reinforcing rod can be located at the end of the T-beam and on both sides of the end, so that the limit support plate can be easily wrapped around the end of the T-beam to avoid shaking of the T-beam during installation and lifting, which causes the T-beam to be offset during installation.
[0010] Optionally, in a possible embodiment, a plurality of the second connecting rods are provided with a sliding groove on one side, and a slider is slidably connected in each of the sliding grooves, a spring is fixedly provided on the plurality of sliders, a limiting ring is provided on the top of the second connecting rod, a plurality of connecting sleeves are provided on the limiting ring, and one end of each of the springs extends to the corresponding connecting sleeve and is fixedly connected to the connecting sleeve, a plurality of cross bars are fixedly provided on the limiting ring, and one end of each of the cross bars is rotatably connected to a guide sleeve, and a plurality of the guide sleeves extend to the support frame and are slidably connected to the support frame.
[0011] It can be seen that in the above technical solution, the second connecting rod deflection slider slides in the slide groove, and the displacement of the slider by the traction force when the second connecting rod is deflected will drive the spring to be stressed. The second connecting rod is positioned through the elasticity of the spring itself, so that the second connecting rod can be subjected to a certain resistance when it is deflected, which is used to ensure the stability of the second connecting rod when it is deflected, and the limit ring slides on the support frame through the guide sleeve through the elasticity of the spring, which makes it easy for the second connecting rod to be fully deployed while ensuring that each second connecting rod is evenly stressed, making it easy to install the T-beam and also easy to demold the T-beam during the prefabrication construction of the T-beam, avoiding large wear between the end and the template and causing damage to the T-beam.
[0012] Optionally, in a possible embodiment, a second electric push rod is provided above the guide cylinder, the second electric push rod is installed on the support frame by bolts, and the output end of the second electric push rod extends to the top of the guide cylinder and is detachably connected to the guide cylinder by bolts, a plurality of lifting rods are provided on the outside of the second electric push rod, a column is provided at the bottom of the guide cylinder, the column is fixed on the support frame, the guide cylinder is sleeved on the outside of the column and is slidably connected to the column, the tops of multiple lifting rods all pass through the support frame and extend to the top of the support frame, the bottoms of multiple lifting rods all extend to the outside of the guide cylinder and are detachably connected to the guide cylinder by bolts, a locking plate is provided on the top of the lifting rod, multiple positioning blocks and second connecting rods are triangularly distributed along the axis point of the support frame, and each positioning block is rotatably connected to the corresponding second positioning plate.
[0013] It can be seen that in the above technical solution, after the second electric push rod is started, the output end of the second electric push rod drives the guide cylinder to slide on the column. When the guide cylinder is displaced, it will drive the first connecting rod to be displaced, so that the second connecting rod is rotated along the axis point of the connection between the second connecting rod and the support frame through the traction force when the first connecting rod is displaced, and then each positioning block can be unfolded, so that each positioning block is easy to cover the three ends of the T-beam respectively, and it is easy to position each end of the T-beam at the same time, thereby ensuring the stability of the T-beam during hoisting.
[0014] The present invention has the following advantages:
[0015] 1. The present invention drives the first connecting rod to move when the guide cylinder moves, so that the second connecting rod rotates along the axis point of the connection between the second connecting rod and the support frame through the traction force when the first connecting rod moves, and then each positioning block is unfolded, so that each positioning block is easily covered at the three ends of the T beam, and each end of the T beam is easily positioned at the same time, ensuring the stability of the T beam during hoisting;
[0016] 2. The present invention extends the drive connection frame through the output end of the first electric push rod to drive the reinforcing rod to rotate along the axis point of the connection between the reinforcing rod and the first positioning plate, so that the reinforcing rod drives the limit support plate to deflect, and makes each limit support plate gather or spread, and the limit support plate and the reinforcing rod are distributed in a triangular shape, so that each limit support plate and the reinforcing rod can be located at the end of the T beam and both sides of the end, so that the limit support plate can be easily wrapped around the end of the T beam, so as to avoid the T beam shaking during installation and lifting, which causes the T beam to deviate during installation;
[0017] 3. The second connecting rod deflection slider of the present invention slides in the slide groove. The displacement of the slider by the traction force when the second connecting rod is deflected will drive the spring to be stressed. The second connecting rod is positioned by the elasticity of the spring itself, so that the second connecting rod can be subjected to a certain resistance when deflected, so as to ensure the stability of the second connecting rod when deflected;
[0018] 4. The limit ring of the present invention slides on the support frame through the guide sleeve by the elasticity of the spring, which makes it easy to fully unfold the second connecting rod while ensuring that each second connecting rod is evenly stressed, and is easy to install the T-beam and demould the T-beam during the prefabrication construction of the T-beam, thereby avoiding large wear between the end and the template causing damage to the T-beam;
[0019] To summarize, through the corresponding coordinated use of various structures, each positioning block is respectively covered on the three ends of the T-beam, which is easy to position each end of the T-beam at the same time, ensuring the stability of the T-beam during hoisting. The limiting support plate and the reinforcing rod are distributed in a triangle, so that each limiting support plate and the reinforcing rod can be located at the end of the T-beam and both sides of the end, which makes it easy for the limiting support plate to be wrapped around the end of the T-beam to avoid shaking of the T-beam during installation and hoisting, which causes the T-beam to be offset during installation. The limiting ring slides on the support frame through the guide sleeve through the elasticity of the spring, which makes it easy for the second connecting rod to be fully deployed while ensuring that each second connecting rod is evenly stressed, making it easy to install the T-beam and also easy to demold the T-beam during the prefabrication construction process to avoid damage to the T-beam caused by large wear between the end and the template. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions in the present invention, the following briefly introduces the drawings required to be used in some embodiments of the present invention. Obviously, the drawings described below are only drawings of some embodiments of the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings. In addition, the drawings described below can be regarded as schematic diagrams, and are not limitations on the actual size of the product involved in the embodiments of the present invention, the actual process of the method, the actual timing of the signal, etc.
[0021] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0022] Figure 2 It is a side view of the overall structure of the present invention.
[0023] Figure 3 It is a schematic diagram of the first positioning plate, the second positioning plate, the first electric push rod, the connecting frame, the reinforcing rod and the limiting support plate of the present invention when they are installed together.
[0024] Figure 4 It is a three-dimensional diagram of the first electric push rod, the connecting frame, the reinforcing pull rod and the limiting support plate of the present invention.
[0025] Figure 5 It is a stereoscopic diagram of the positioning block, the second connecting rod, the limiting ring, the cross rod and the guide sleeve of the present invention.
[0026] Figure 6 It is a schematic diagram of the support frame, the guide cylinder, the first connecting rod and the second electric push rod of the present invention when they are installed together.
[0027] Figure 7 For the present invention Figure 5 Exploded diagram.
[0028] Figure 8 It is a stereoscopic diagram of the guide cylinder, the first connecting rod and the second electric push rod of the present invention.
[0029] Fig. 9 It is a three-dimensional diagram of the support frame, column, lifting rod and locking plate of the present invention.
[0030] In the figure: 1. support frame; 2. guide cylinder; 3. first connecting rod; 4. second connecting rod; 5. positioning block; 6. axle pin seat; 7. first positioning plate; 8. second positioning plate; 9. first electric push rod; 10. connecting frame; 11. reinforcing pull rod; 12. limiting support plate; 13. slide groove; 14. slider; 15. spring; 16. limiting ring; 17. connecting sleeve; 18. cross bar; 19. guide sleeve; 20. second electric push rod; 21. lifting rod; 22. column; 23. locking plate. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] As attached Figure 1 - Fig. 9The auxiliary hanging beam device for T-beam prefabrication shown in the figure, through the connection components set on the support frame 1, through the corresponding coordination of various structures, each positioning block 5 is respectively covered on the three ends of the T-beam, which is easy to position each end of the T-beam at the same time, ensuring the stability of the T-beam during lifting, the limiting support plate 12 and the reinforcing rod 11 are triangularly distributed, so that each limiting support plate 12 and the reinforcing rod 11 can be located at the end of the T-beam and both sides of the end, so that the limiting support plate 12 can be wrapped around the end of the T-beam to avoid shaking of the T-beam during installation and lifting, which causes the T-beam to deflect during installation, the limiting ring 16 slides on the support frame 1 through the guide sleeve 19 through the elasticity of the spring 15, which is easy to fully unfold the second connecting rod 4 while ensuring that each second connecting rod 4 is evenly stressed, easy to install the T-beam, and also easy to demold the T-beam during the prefabrication construction of the T-beam, avoiding large wear between the end and the template causing damage to the T-beam, and the specific structural arrangement of the component is as follows.
[0033] The connecting assembly includes a guide cylinder 2 arranged in the middle of the support frame 1, a plurality of first connecting rods 3 with adjustable angles are hingedly connected to the outer side of the guide cylinder 2, and one end of each first connecting rod 3 is hingedly connected to a second connecting rod 4 with adjustable angles, a positioning block 5 is arranged at the bottom of the plurality of second connecting rods 4, and a shaft pin seat 6 hingedly connected to the corresponding second connecting rod 4 is fixedly arranged on one side of each positioning block 5;
[0034] A first positioning plate 7 is provided at the bottom of each of the plurality of positioning blocks 5, and a second positioning plate 8 is provided at the top of each of the first positioning plates 7, a plurality of angle-adjustable reinforcing rods 11 are hinged on the outer side of the first positioning plate 7, and a limiting support plate 12 is fixedly provided at the bottom of each of the reinforcing rods 11, a plurality of angle-adjustable first electric push rods 9 are hinged on the outer side of the second positioning plate 8, and each of the first electric push rods 9 is respectively located at the top of the corresponding reinforcing rod 11, and a connecting frame 10 is fixedly provided at one end of the first electric push rod 9, and the connecting frame 10 is covered on the reinforcing rod 11 and hinged to the reinforcing rod 11.
[0035] A slide groove 13 is provided on one side of the plurality of second connecting rods 4, and a slider 14 is slidably connected in each slide groove 13, and a spring 15 is fixedly provided on the plurality of sliders 14. A limiting ring 16 is provided on the top of the second connecting rod 4, and a plurality of connecting sleeves 17 are provided on the limiting ring 16, and one end of each spring 15 extends to the corresponding connecting sleeve 17 and is fixedly connected to the connecting sleeve 17, a plurality of cross bars 18 are fixedly provided on the limiting ring 16, and one end of each cross bar 18 is rotatably connected to a guide sleeve 19, and a plurality of guide sleeves 19 extend to the support frame 1 and are slidably connected to the support frame 1.
[0036] A second electric push rod 20 is arranged above the guide cylinder 2, and the second electric push rod 20 is installed on the support frame 1 by bolts, and the output end of the second electric push rod 20 extends to the top of the guide cylinder 2 and is detachably connected to the guide cylinder 2 by bolts, and a plurality of lifting rods 21 are arranged on the outside of the second electric push rod 20, and a column 22 is arranged at the bottom of the guide cylinder 2, and the column 22 is fixed on the support frame 1, and the guide cylinder 2 is sleeved on the outside of the column 22 and is slidably connected to the column 22, and the tops of multiple lifting rods 21 all penetrate the support frame 1 and extend to the top of the support frame 1, and the bottoms of multiple lifting rods 21 all extend to the outside of the guide cylinder 2 and are detachably connected to the guide cylinder 2 by bolts, and a locking disk 23 is arranged on the top of the lifting rod 21, and multiple positioning blocks 5 and second connecting rods 4 are triangularly distributed along the axis point of the support frame 1, and each positioning block 5 is rotatably connected to the corresponding second positioning disk 8.
[0037] When using the above structure, the staff installs the device on the crane. When assisting the installation of the T-beam, the second electric push rod 20 is started, and the output end of the second electric push rod 20 drives the guide cylinder 2 to slide on the column 22. When the guide cylinder 2 is displaced, it will drive the first connecting rod 3 to be displaced, so that the second connecting rod 4 is rotated along the axis point of the connection between the second connecting rod 4 and the support frame 1 through the traction force when the first connecting rod 3 is displaced, and then each positioning block 5 is unfolded, so that each positioning block 5 is easy to cover the three ends of the T-beam respectively, and it is easy to position each end of the T-beam at the same time, ensuring the stability of the T-beam during hoisting.
[0038] And when the T-beam is being hoisted, it can be started by the first electric push rod 9. The output end of the first electric push rod 9 extends to drive the connecting frame 10 to drive the reinforcing rod 11 to rotate along the axial point of the connection between the reinforcing rod 11 and the first positioning plate 7, so that the reinforcing rod 11 drives the limiting support plate 12 to deflect, and makes each limiting support plate 12 gather or spread, and the limiting support plate 12 and the reinforcing rod 11 are distributed in a triangular shape, so that each limiting support plate 12 and the reinforcing rod 11 can be located at the end of the T-beam and on both sides of the end, so that the limiting support plate 12 can be easily wrapped around the end of the T-beam, thereby avoiding the shaking of the T-beam during installation and hoisting, which causes the T-beam to be offset during installation.
[0039] When the second connecting rod 4 is deflected, the second connecting rod 4 deflects the slider 14 to slide in the slide groove 13. The slider 14 is displaced by the traction force when the second connecting rod 4 is deflected, which drives the spring 15 to be stressed. The second connecting rod 4 is positioned through the elasticity of the spring 15 itself, so that the second connecting rod 4 can be subjected to a certain resistance when it is deflected, which is used to ensure the stability of the second connecting rod 4 when it is deflected. The limit ring 16 slides on the support frame 1 through the guide sleeve 19 through the elasticity of the spring 15, which makes it easy for the second connecting rod 4 to be fully deployed while ensuring that each second connecting rod 4 is evenly stressed, making it easy to install the T-beam and also easy to demould the T-beam during the prefabrication construction of the T-beam, avoiding large wear between the end and the template causing damage to the T-beam.
[0040] Different from the prior art, the present application discloses an auxiliary hanging beam device for T-beam prefabrication. Through the corresponding coordinated use of various structures, each positioning block 5 is respectively covered at the three ends of the T-beam, which is easy to simultaneously position each end of the T-beam to ensure the stability of the T-beam during lifting. The limiting support plate 12 and the reinforcing rod 11 are distributed in a triangle, so that each limiting support plate 12 and the reinforcing rod 11 can be located at the end of the T-beam and both sides of the end, so that the limiting support plate 12 can be wrapped around the end of the T-beam to avoid shaking of the T-beam during installation and lifting, which causes the T-beam to be offset during installation. The limiting ring 16 slides on the support frame 1 through the guide sleeve 19 through the elasticity of the spring 15, which is easy to fully unfold the second connecting rod 4 while ensuring that each second connecting rod 4 is evenly stressed, easy to install the T-beam, and also easy to demold the T-beam during the prefabrication construction of the T-beam to avoid large wear between the end and the template causing damage to the T-beam.
[0041] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An auxiliary beam hanging device for T-beam prefabrication, comprising a support frame (1), characterized in that: The support frame (1) is provided with a connecting component; The connection assembly comprises a guide cylinder (2) arranged in the middle of the support frame (1); a plurality of first connecting rods (3) with adjustable angles are hingedly connected to the outer side of the guide cylinder (2); and one end of each of the first connecting rods (3) is hingedly connected to a second connecting rod (4) with adjustable angles; a positioning block (5) is arranged at the bottom of each of the second connecting rods (4); and a shaft pin seat (6) hingedly connected to the corresponding second connecting rod (4) is fixedly arranged on one side of each of the positioning blocks (5); A first positioning plate (7) is provided at the bottom of each of the positioning blocks (5), and a second positioning plate (8) is provided at the top of each of the first positioning plates (7). A plurality of angle-adjustable reinforcing rods (11) are hingedly connected to the outer side of the first positioning plate (7), and a limiting support plate (12) is fixedly provided at the bottom of each of the reinforcing rods (11).
2. The auxiliary beam hanging device for T-beam prefabrication according to claim 1, characterized in that: A plurality of first electric push rods (9) with adjustable angles are hingedly connected to the outer side of the second positioning plate (8), and each of the first electric push rods (9) is located at the top of a corresponding reinforcing rod (11). A connecting frame (10) is fixedly provided at one end of the first electric push rod (9), and the connecting frame (10) is covered on the reinforcing rod (11) and hingedly connected to the reinforcing rod (11).
3. The auxiliary beam hanging device for T-beam prefabrication according to claim 1, characterized in that: A sliding groove (13) is provided on one side of each of the plurality of second connecting rods (4), and a sliding block (14) is slidably connected in each of the sliding grooves (13), and a spring (15) is fixedly arranged on each of the plurality of sliding blocks (14).
4. The auxiliary beam hanging device for T-beam prefabrication according to claim 3, characterized in that: A limiting ring (16) is provided at the top of the second connecting rod (4), a plurality of connecting sleeves (17) are provided on the limiting ring (16), and one end of each of the springs (15) extends to the corresponding connecting sleeve (17) and is fixedly connected to the connecting sleeve (17).
5. The auxiliary beam hanging device for T-beam prefabrication according to claim 4, characterized in that: A plurality of cross bars (18) are fixedly arranged on the limiting ring (16), and one end of each cross bar (18) is rotatably connected to a guide sleeve (19), and a plurality of guide sleeves (19) extend to the support frame (1) and are slidably connected to the support frame (1).
6. The auxiliary beam hanging device for T-beam prefabrication according to claim 1, characterized in that: A second electric push rod (20) is arranged above the guide cylinder (2), and the second electric push rod (20) is mounted on the support frame (1) by means of bolts, and an output end of the second electric push rod (20) extends to the top end of the guide cylinder (2) and is detachably connected to the guide cylinder (2) by means of bolts.
7. The auxiliary beam hanging device for T-beam prefabrication according to claim 6, characterized in that: A plurality of lifting rods (21) are arranged on the outer side of the second electric push rod (20), and a column (22) is arranged at the bottom of the guide cylinder (2), and the column (22) is fixed on the support frame (1).
8. The auxiliary beam hanging device for T-beam prefabrication according to claim 7, characterized in that: The guide cylinder (2) is sleeved on the outside of the column (22) and is slidably connected to the column (22), and the tops of the plurality of lifting rods (21) all penetrate the support frame (1) and extend to the top of the support frame (1).
9. The auxiliary beam hanging device for T-beam prefabrication according to claim 8, characterized in that: The bottoms of the plurality of lifting rods (21) extend to the outside of the guide cylinder (2) and are detachably connected to the guide cylinder (2) via bolts, and a locking plate (23) is provided at the top of the lifting rod (21).
10. The auxiliary beam hanging device for T-beam prefabrication according to claim 7, characterized in that: The plurality of positioning blocks (5) and the second connecting rods (4) are triangularly distributed along the axis point of the support frame (1), and each positioning block (5) is rotatably connected to a corresponding second positioning plate (8).
Citation Information
Patent Citations
Flexible prefabricated T-beam bottom hanging beam device
CN221116747U
Clamping device for lifting assembled shear web plates in wind turbine blade
CN103303787A
Curtain wall unit hoisting device
CN112047226A
Reinforcing steel bar hoisting clamp for building construction
CN115783971A
Lifting device for structural engineering
CN215626193U