Automatic compensation system for settlement and deflection of underpass structure of upper opening type bunched pipe roofing
By designing an automatic compensation system, the settlement risk of the structural base plate is monitored and evaluated in real time, the accelerated adjustment value is calculated, and the lifting speed is adjusted, and the overall structural deflection problem caused by the local settlement risk in the construction of the upper open-type bundle-closing pipe curtain is solved, and the safe and normal use of the structure is achieved.
Patent Information
- Application Number
- CN202510220580.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-27
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2045-02-27
AI Technical Summary
During the construction of the upper open-type bundle-closing pipe curtain underpass structure, due to soil disturbance and structural stress changes, the existing structural base plate is prone to local settlement risk, which may in turn cause the risk of deflection of the overall structure, seriously threatening the safety and normal use of the structure.
An automatic compensation system is designed, including potential identification module, risk warning module, emergency analysis module and emergency treatment module. The system monitors the settlement amount of the structural base plate in real time, identifies potential risk areas, conducts risk assessment and early warning, calculates expedited adjustment values, and adjusts the hoisting speed to compensate for structural settlement and deflection.
It realizes the accurate identification and evaluation of the potential settlement risks of structural base plates, timely sends out risk warning signals, improves the initiative and timely response to settlement risks, effectively corrects the deflection trend caused by local settlement risks, and ensures the safety and normal use of the structure.
Smart Images

Figure CN119737173A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground engineering construction, and in particular to an automatic compensation system for settlement and deflection of an underpass structure of an upper opening type bundled pipe curtain. Background Art
[0002] With the continuous advancement of urban underground space development, the upper open-type bundled pipe curtain construction method has been widely used in projects such as subway construction and underground passage construction. However, during the construction process, due to factors such as soil disturbance and structural stress changes, the existing structural floor is prone to local settlement risks, which may in turn cause the risk of deflection of the overall structure, seriously threatening the safety and normal use of the existing structure.
[0003] In the prior art, traditional monitoring and control methods are difficult to respond to such complex situations accurately and timely. Therefore, the present application monitors the settlement of each monitoring area on the bottom plate of the existing structure in real time, identifies the potential risk areas on the bottom plate of the existing structure that may experience significant settlement, and is used to evaluate the overall settlement risk status of the bottom plate of the existing structure, and promptly issues risk warning signals. Based on the risk warning signals, a linear trend analysis is performed on multiple potential risk areas to obtain linear analysis results, and a corresponding fitted warning line is constructed to obtain the remaining adjustment time. Based on the remaining adjustment time, the real-time monitoring values of multiple potential risk areas are combined to calculate the average value to obtain the required jacking distance, and the emergency adjustment value is calculated through a formula to obtain the emergency adjustment amount, and the original jacking speed is adjusted to solve the problem of the risk of deflection of the overall structure caused by the settlement risk in the local area of the bottom plate of the existing structure. Summary of the invention
[0004] The object of the present invention is to provide an automatic compensation system for the settlement and deflection of the underpass structure of the upper opening type bundled pipe curtain, so as to solve at least one of the above-mentioned problems of the prior art.
[0005] The automatic compensation system for the settlement and deflection of the structure under the upper open type bundled pipe curtain includes the following modules: Potential identification module: During the settlement monitoring period, multiple monitoring areas on the existing structure floor are monitored in real time to obtain potential analysis signals, and settlement prediction analysis is performed based on the potential analysis signals to obtain potential risk areas; Risk warning module: Based on the potential risk area, the potential settlement risk of the existing structure bottom plate is assessed to obtain potential assessment data, the potential assessment data is calculated and processed, and the assessment risk value is output and compared with the assessment risk threshold. If the assessment risk value is greater than the assessment risk threshold, a risk warning signal is generated; Emergency analysis module: Based on the risk warning signal, the settlement trend analysis is performed on multiple potential risk areas to obtain the Pearson coefficient. Based on the Pearson coefficient, a linear correlation analysis is performed to output the warning emergency value, which is compared with the warning emergency threshold to obtain the warning emergency signal; Emergency processing module: Based on the early warning emergency signal, obtain the urgent adjustment value and adjust the original jacking speed.
[0006] Beneficial effects of the present invention: 1. The present invention divides monitoring nodes at equal time intervals within the settlement monitoring cycle, uses the settlement measuring points in each monitoring area to obtain the settlement amount and draw a unit real-time monitoring curve, sets the settlement threshold and the warning value, intercepts the real-time monitoring sub-curve between the two, analyzes and determines the potential risk area, analyzes the quantity and potential risk degree of the potential risk area, and conducts a potential settlement risk assessment on the existing structure floor. It not only identifies the potential risk area on the existing structure floor where significant settlement may occur, and provides accurate location information for subsequent targeted treatment measures, but also further analyzes the potential risk area on the existing structure floor, and through quantitative risk assessment, comprehensively understands the overall settlement risk status of the existing structure floor, and issues a risk warning signal in a timely manner; 2. The present invention extracts the corresponding real-time monitoring sub-curves for multiple potential risk areas, calculates the fitting reference slope and equation of the line connecting the two end points of the real-time monitoring sub-curve, and uses the Pearson coefficient to perform linear analysis on the real-time monitoring sub-curve to obtain linear analysis results. Based on the linear analysis results, fitting warning lines are respectively constructed to obtain warning emergency values, thereby reflecting the remaining adjustment time according to the warning emergency values, improving the initiative and timeliness of coping with subsidence risks, and facilitating early planning and timely implementation of effective adjustment measures; 3. The present invention obtains the required jacking distance by averaging the real-time monitoring values of multiple potential risk areas, and then combines the early warning emergency value to calculate the emergency adjustment value through the formula to obtain the emergency adjustment amount, and adjusts the original jacking speed. It is helpful to promptly correct the deflection trend of the structure caused by local settlement risk, and solve the problem of deflection risk of the overall structure caused by settlement risk in local areas of the bottom plate of the existing structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0007] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0008] Figure 1It is a main structural diagram of the automatic compensation device for the settlement and deflection of the underpass structure of the upper opening type bundled pipe curtain of the present invention; Figure 2 It is the overall structure of the bundled pipe curtain and the distribution diagram of settlement measurement points; Figure 3 It is a flow chart of the automatic compensation method for the settlement and deflection of the structure under the upper opening type bundled pipe curtain of the present invention; Figure 4 It is a flow chart of the method for controlling the lifting speed of the present invention; Figure 5 It is a diagram of the automatic compensation system for the settlement and deflection of the underpass structure of the upper opening type bundled pipe curtain of the present invention; Figure 6 It is the internal diagram of the control center; The numbers in the main structure diagram are as follows: 1 is an intelligent self-locking jack, 2 is a force sensor, 3 is a pad, 4 is an existing structure bottom plate, 5 is interlayer soil, 6 is a grouting pipe, 7 is a stiffening rib, 8 is a steel support, 9 is a prestressed steel strand anchor, 10 is a prestressed steel strand, 11 is C50 concrete, 12 is a displacement meter, 13 is a wireless intelligent electronic level, 14 is a high-pressure oil pipe, 15 is a CNC oil pump, 16 is a control center, 17 is a bottom plate settlement measuring point, 18 is a reserved hole, 191 is a processor, 192 is a memory, and 193 is a computer program. DETAILED DESCRIPTION
[0009] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0010] Embodiment 1 Reference Figure 1-Figure 2 , the embodiment of the present invention provides an automatic compensation system for the settlement and deflection of the underpass structure of the upper opening type bundled pipe curtain, including an automatic compensation top pressure device, a data acquisition unit and a control center 16; Specifically, the automatic compensating top pressure device includes an intelligent self-locking jack 1, a high-pressure oil pipe 14, a numerically controlled oil pump 15 and a pad 3; More specifically, the intelligent self-locking jack 1 is installed in the working tube of the bundled tube curtain and is wirelessly connected to the control center 16. The intelligent self-locking jack 1 is arranged in a single row with a spacing of 0.5m along the axial direction of the tube curtain in each working tube; The numerical control oil pump 15 is connected to the intelligent self-locking jack 1 through the high-pressure oil pipe 14 to complete the hydraulic transmission, wherein the transmission hydraulic value is regulated by the control center 16; The pad 3 is installed between the force sensor 2 and the existing structure bottom plate 4 to transmit the pressure of the intelligent self-locking jack 1 to prevent excessive stress from causing damage to the existing structure bottom plate 4; Specifically, the data acquisition unit includes a displacement meter 12, a wireless intelligent electronic level 13 and a force sensor 2; More specifically, the displacement meters 12 are evenly distributed on the existing structural bottom plate 4 along the axial direction of the bundled tube curtain, and the displacement meters 12 are spaced 0.5 m apart and are all wirelessly connected to the control center 16 to transmit the settlement of each measuring point in real time; The wireless intelligent electronic level ruler 13 is installed at the center of the existing structure bottom plate 4. It should be leveled before installation and wirelessly connected to the control center 16 to monitor the deflection of the existing structure in real time; The force sensor 2 is installed between the piston and the pad 3 of the intelligent self-locking jack 1, and is wirelessly connected to the control center 16 to transmit the jack pressure value in real time; Specifically, the control center 16 is wirelessly connected to the displacement meter 12, the wireless intelligent electronic level 13, and the force sensor 2, and is connected to the CNC oil pump 15 through an electric control cable; After acquiring the data transmitted by the data acquisition unit, the control center 16 can synchronously display the jack pressure value, the settlement of each measuring point of the existing structure bottom plate 4 and its overall deflection. The operator can control the pressure value and piston displacement of each jack through the control center 16; A steel support 8 is arranged on the side of the stiffening rib 7, a prestressed steel strand 10 is arranged on the outer ring surface of the prestressed steel strand anchor 9, and a C50 concrete 11 is arranged on the outer ring surface of the prestressed steel strand 10.
[0011] Embodiment 2 Reference Figure 3 The embodiment of the present invention provides an automatic compensation method for the settlement and deflection of an underpass structure of an upper opening type bundled pipe curtain, comprising: S1: Complete the jacking construction of bundled pipe curtain; S2: Install the intelligent self-locking jack 1, the force sensor 2, and the pad 3 in the order along the working pipe of the bundled pipe curtain, and connect the intelligent self-locking jack 1 and the CNC oil pump 15 with a high-pressure oil pipe 14. Each automatic compensating top pressure device is arranged in a single row with an interval of 0.5m along the axial direction of the pipe curtain; S3: Install the displacement meter 12, arrange the displacement meter 12 in a single row at an interval of 0.5m along the axial direction of the pipe curtain at the existing structure bottom plate 4, and install a wireless intelligent electronic level ruler 13 at the center of the existing structure top plate; S4: Connect the high-pressure oil pump to the control center 16 through the electronic control cable, and adjust the automatic compensation jacking device to apply a pre-jacking force of 5 kN; S5: excavating the soil in the bundled pipe curtain and carrying out the main structure construction. During this process, the pressure and piston displacement of each intelligent self-locking jack 1 are adjusted in the control center 16 according to the data returned by the data acquisition unit to control the generation and development of the settlement and deflection of the upper structure; S6: After the construction is completed, the interlayer soil 5 is grout-reinforced and the gaps are filled through the grouting pipe 6; S7: After the grouting solidifies and reaches the designed strength, each intelligent self-locking jack 1 slowly releases pressure at the same time, and the automatic compensating top pressure device is recycled through the reserved hole 18, and then the displacement meter 12 and the wireless intelligent electronic level 13 installed at the existing structure bottom plate 4 are recycled.
[0012] Embodiment 3 Figure 4 A flow chart of an automatic compensation method for settlement and deflection of an underpass structure of an upper open-type bundled pipe curtain provided in the first embodiment of the present invention. The embodiment of the present invention can be applied to identify whether there are potential settlement risks in multiple monitoring areas on the bottom plate of an existing structure. The automatic compensation method for settlement and deflection of an underpass structure of an upper open-type bundled pipe curtain can be performed by an automatic compensation system for settlement and deflection of an underpass structure of an upper open-type bundled pipe curtain. The automatic compensation system for settlement and deflection of an underpass structure of an upper open-type bundled pipe curtain can be implemented by software and / or hardware. The automatic compensation system for settlement and deflection of an underpass structure of an upper open-type bundled pipe curtain can be configured in an automatic compensation device for settlement and deflection of an underpass structure of an upper open-type bundled pipe curtain. Optionally, the automatic compensation device for settlement and deflection of an underpass structure of an upper open-type bundled pipe curtain can be an electronic device, which can be a notebook, a desktop computer, a smart tablet, etc. The embodiment of the present invention does not limit this.
[0013] like Figure 4 As shown, the automatic compensation method for the settlement and deflection of the underpass structure of the upper opening type bundled pipe curtain provided by the embodiment of the present invention specifically includes the following steps: Step 1: During the settlement monitoring period, multiple monitoring areas on the existing structure bottom plate are monitored in real time to obtain settlement monitoring data, wherein the settlement monitoring data includes the settlement amount, and settlement prediction analysis is performed on the settlement monitoring data to obtain potential risk areas; It should be noted that a settlement measuring point is set up in each monitoring area, and the monitoring area is monitored in real time through the settlement measuring point; In some embodiments, the settlement monitoring period is divided into a number of monitoring nodes, and a monitoring area is arbitrarily selected to obtain the settlement amount of the settlement measuring point on the monitoring node in real time, and a two-dimensional coordinate system is established, where the X-axis is time and the Y-axis is settlement amount. The settlement amount obtained in real time is marked in the two-dimensional coordinate system in turn according to the time sequence of the monitoring node to obtain a unit real-time monitoring curve; It should be noted that the settlement monitoring period is divided in such a way that the settlement monitoring period is divided into equal time intervals; On the unit real-time monitoring curve, the sedimentation threshold is marked on the Y axis, and a straight line parallel to the X axis is drawn with it as the starting point as the sedimentation threshold line; On the unit real-time monitoring curve, mark the settlement warning value on the Y axis, and use it as the starting point to draw a straight line parallel to the X axis as the settlement warning line; It should be noted that the sedimentation threshold is set by professionals in this field based on experience and is an empirical value; The settlement warning value is set in the force sensor by professionals in this field based on experience. It is an empirical warning value, and the settlement warning value is less than the settlement threshold value. The real-time monitoring curves of some units located above the settlement warning line and below the settlement threshold line are intercepted as real-time monitoring sub-curves; Obtaining coordinate points on the real-time monitoring sub-curve, and performing real-time distance measurement between the coordinate points on the real-time monitoring sub-curve obtained in real time and the settlement threshold line to obtain real-time monitoring values; The real-time monitoring value is compared with the real-time monitoring threshold. The process is as follows: If the real-time monitoring value is greater than or equal to the real-time monitoring threshold, a potential analysis signal is generated; If the real-time monitoring value is less than the real-time monitoring threshold, the real-time monitoring distance measurement is continued; It should be noted that the real-time monitoring threshold is obtained by subtracting the settlement threshold from the settlement warning value; Based on the potential analysis signal, the length of the real-time monitoring sub-curve is extracted, and the ratio is calculated with the total length of the unit real-time monitoring curve to obtain the real-time analysis length; It can be understood that the meaning of the real-time analysis length is: the proportion of the length of the divided real-time monitoring sub-curve to the total length of the unit real-time monitoring curve is calculated to obtain the real-time analysis length. Specifically, it reflects the proportion of the time that the settlement amount in the monitoring area is between the warning value and the threshold value in the entire monitoring cycle time, which can be used to assist in evaluating the proportion of the time that the monitoring area is in a potential risk state during the entire monitoring cycle, and then provide a reference for judging whether the monitoring area is a potential risk area. Divide the real-time monitoring sub-curve according to the length of the equal sub-curve to obtain several analysis sub-curves; Connect the two endpoints of the analysis sub-curve and calculate using the slope calculation formula to obtain the slope of the analysis sub-curve; The slopes of all the analysis sub-curves are added and averaged to obtain the real-time analysis change value; It can be understood that the real-time analysis change value means that the slope of the divided analysis sub-curve is calculated by summing up the average value, which reflects the average rate of change of the settlement amount over time in the monitoring area during the period from the warning value to the threshold value. It can be used to evaluate the change trend characteristics of the monitoring area under this settlement state, and then provide a reference for the analysis and judgment of potential risk areas. The real-time analysis change value is added to the real-time analysis length to obtain a potential analysis value; It can be understood that the potential analysis value means: it reflects the settlement trend and severity of the monitoring area, the real-time analysis length reflects the proportion of time that the area is in a state that may cause a large settlement risk within a certain monitoring period, and the real-time analysis change value reflects the average change speed of settlement within this risk range; The potential analysis value is compared to the potential analysis threshold as follows: If the potential analysis value is greater than the potential analysis threshold, it means that the analyzed monitoring area has a high risk of significant subsidence in the future, and the analyzed monitoring area is marked as a potential risk area; If the potential analysis value is less than or equal to the potential analysis threshold, it means that the risk of significant subsidence in the analyzed monitoring area in the future is low, and the analyzed monitoring area is marked as a non-potential risk area; Step 2: Based on the potential risk area, the potential settlement risk of the existing structure bottom plate is assessed to obtain potential assessment data, wherein the potential assessment data includes the potential risk quantity and the potential risk degree. The potential assessment data is calculated and processed to output an assessment risk value, which is compared with the assessment risk threshold. If the assessment risk value is greater than the assessment risk threshold, a risk warning signal is generated; In some embodiments, the number of potential risk areas on the existing structure floor is obtained, and the ratio is calculated with the total number of monitoring areas on the existing structure floor to obtain the number of potential risks; It can be understood that the potential risk quantity means: obtaining the proportion of the potential risk area to the total number of monitoring areas on the existing structure bottom plate, specifically, reflecting the proportion of all potential risk areas on the existing structure bottom plate; Extract the real-time monitoring value corresponding to the potential risk area, and calculate the ratio with the real-time monitoring threshold to obtain the potential degree value; The potential degree values corresponding to all potential risk areas are summed and averaged to obtain the overall degree value; It can be understood that the overall degree value means: the potential degree values corresponding to all potential risk areas are summed up and averaged. Specifically, it reflects the average risk degree of all potential risk areas on the existing structure floor. The overall degree value is multiplied by the number of potential risks to obtain the assessed risk value; The assessed risk value is compared with the assessed risk threshold as follows: If the assessed risk value is greater than the assessed risk threshold, it means that the number of potential risk areas on the existing structure floor accounts for a large proportion and the potential risk level is high, and a risk warning signal is generated; If the assessment analysis value is less than or equal to the assessment risk threshold, it means that the number of potential risk areas on the existing structure floor is small and the potential risk level is low, and a continuous monitoring signal is generated; The specific implementation method of the embodiment of the present invention is as follows: the monitoring nodes are divided at equal time intervals within the settlement monitoring period, the settlement measurement points in each monitoring area are used to obtain the settlement amount and draw a unit real-time monitoring curve, and by setting the settlement threshold and the warning value, the real-time monitoring sub-curve between the two is intercepted for analysis to determine the potential risk area, and the potential risk area is analyzed based on the quantity and potential risk degree, and the potential settlement risk of the existing structure base plate is evaluated. Not only the potential risk area on the existing structure base plate where significant settlement may occur is identified, and accurate location information is provided for subsequent targeted treatment measures, but also the potential risk area on the existing structure base plate is further analyzed, and through quantitative risk assessment, the overall settlement risk status of the existing structure base plate is fully understood, and risk warning signals are issued in time.
[0014] Embodiment 4 Step 3: Based on the risk warning signal, conduct a settlement trend analysis on multiple potential risk areas to obtain the Pearson coefficient, perform a linear correlation analysis based on the Pearson coefficient, output the warning emergency value, and compare it with the warning emergency threshold. If the warning emergency value is less than the warning emergency threshold, generate a warning emergency signal; Exemplarily, a potential risk area is arbitrarily obtained, and a real-time monitoring sub-curve corresponding to the potential risk area is extracted; Get the two endpoints of the real-time monitoring sub-curve, connect the two endpoints to get the fitting reference straight line, and substitute the endpoint coordinates corresponding to the two endpoints into the slope calculation formula: , and obtain the fitting reference slope , where n represents the total number of potential risk areas, Represents the starting coordinates of the real-time monitoring sub-curve, Represents the end point coordinates of the real-time monitoring sub-curve, It is expressed as the Y-axis coordinate within the starting coordinate of the real-time monitoring sub-curve. It is expressed as real-time monitoring of the Y coordinate of the end point of the sub-curve. It is expressed as the X-axis coordinate within the starting coordinate of the real-time monitoring sub-curve. It is expressed as the X coordinate within the coordinates of the end point of the real-time monitoring sub-curve; Based on the fitted reference slope , monitor the coordinates of the two endpoints of the sub-curve in real time and obtain the fitting reference equation: ,in, The Y-axis coordinate calculated for the fitted reference equation, is a constant; Based on the fitting reference straight line, the real-time monitoring sub-curve is linearly analyzed by the Pearson coefficient. The process is as follows: S1, obtain the coordinates of other data points on the real-time monitoring sub-curve except the endpoints, set as ( , ), =1, 2, 3, ... m, where m is the number of data points excluding the endpoints; S2, calculate the mean of the X coordinates and calculate the mean of the Y coordinates ; S3, calculate the covariance of X and Y ; Calculate the standard deviation of X , calculate the standard deviation of Y ; S4, according to the Pearson coefficient formula , calculate the Pearson coefficient r; It can be understood that if r is close to 1, it means that the real-time monitoring sub-curve has a strong positive linear correlation with the fitting line, and it is a positive linear sub-curve; if r is close to -1, it means that the real-time monitoring sub-curve has a strong negative linear correlation with the fitting line, and it is a negative linear sub-curve; if r is close to 0, it means that the linear correlation between the real-time monitoring sub-curve and the fitting line is very weak, and it is a nonlinear sub-curve; Subtract the Pearson coefficient r from 0 to get the linear determination value, and compare it with the linear determination threshold. The process is as follows: If the linear determination value is greater than the linear determination threshold, the real-time monitoring sub-curve is a linear sub-curve; If the linear determination value is less than or equal to the linear determination threshold, the real-time monitoring sub-curve is a nonlinear sub-curve; It should be noted that the linear determination threshold is set by professionals in this field based on experience and is an empirical value; If the real-time monitoring sub-curve is a nonlinear sub-curve, the slopes of all the analysis sub-curves are compared, the maximum slope of the analysis sub-curve is extracted, and combined with the end point of the real-time monitoring sub-curve, a fitting warning line intersecting the settlement threshold line is made; If the real-time monitoring sub-curve is a linear sub-curve, a fitting warning line intersecting the sedimentation threshold line is made based on the real-time analysis change value and the end point of the real-time monitoring sub-curve; Obtain the X coordinate of the intersection point between the fitted warning line and the settlement threshold line, as well as the X coordinate of the end point of the real-time monitoring sub-curve, and perform subtraction to obtain the absolute value to obtain the emergency duration; The variance of the emergency durations corresponding to multiple potential risk areas is calculated to obtain the duration fluctuation value; The duration fluctuation value is compared with the duration fluctuation threshold, and the process is as follows: If the duration fluctuation value is greater than the duration fluctuation threshold, it means that the emergency duration fluctuations between multiple potential risk areas are large, and a large duration fluctuation signal is generated; If the duration fluctuation value is less than or equal to the duration fluctuation threshold, it means that the emergency duration fluctuations between multiple potential risk areas are small, and a small duration fluctuation signal is generated; It should be noted that the duration fluctuation threshold is set by professionals in this field based on experience and is an empirical value; Based on the large signal of time-length fluctuation, the Pearson coefficient corresponding to the potential risk area is obtained, and the sum is added to obtain the Pearson sum value; The emergency duration corresponding to the potential risk area is calculated by ratio with the Pearson sum value to obtain the weight coefficient; The emergency duration corresponding to the potential risk area is multiplied by the corresponding weight coefficient, and the sum is added to obtain the early warning emergency value; Based on the small signal of duration fluctuation, the corresponding emergency durations of multiple potential risk areas are summed and averaged to obtain the early warning emergency value; It can be understood that the meaning of the early warning emergency value is: an indicator that measures the average remaining time buffer degree of the overall distance to the settlement threshold by comprehensively considering the settlement trends of multiple potential risk areas. Specifically, if the early warning emergency value is larger, it means that there is still a relatively long time to reach the settlement threshold overall, and the situation is relatively less urgent. If the early warning emergency value is smaller, it means that the overall distance to the settlement threshold is closer, and emergency measures need to be initiated as soon as possible to deal with the possible greater settlement risk; Compare the warning emergency value with the warning emergency threshold. The process is as follows: If the warning emergency value is greater than or equal to the warning emergency threshold, it means that there is sufficient remaining adjustment time and a normal adjustment signal is generated; If the warning emergency value is less than the warning emergency threshold, it means that the remaining adjustment time is urgent, and a warning emergency signal is generated; The specific implementation plan of the embodiment of the present invention is: extract the corresponding real-time monitoring sub-curves for multiple potential risk areas, calculate the fitting reference slope and equation of the line connecting the two endpoints of the real-time monitoring sub-curve, and use the Pearson coefficient to perform linear analysis on the real-time monitoring sub-curve to obtain linear analysis results. Based on the linear analysis results, fitting warning lines are constructed respectively to obtain warning emergency values, so as to reflect the remaining adjustment time according to the warning emergency values, improve the initiative and timeliness of responding to subsidence risks, and help to plan in advance and implement effective adjustment measures in a timely manner.
[0015] Embodiment 5 Step 4: Based on the early warning emergency signal, obtain the urgent adjustment value, and adjust the original jacking speed according to the urgent adjustment value to solve the problem of the risk of deflection of the overall structure caused by the risk of settlement in the local area of the existing structure bottom plate; In some embodiments, the real-time monitoring values corresponding to the multiple potential risk areas are summed and averaged to obtain the required lifting distance; Substitute the required lifting distance and the warning emergency value into the formula, through the formula: , calculate the expedited adjustment value ,in, Expressed as the required lifting distance, It is expressed as the warning emergency value; Subtract the expedited adjustment value from the original lifting speed to obtain the expedited adjustment amount; The specific implementation method of the embodiment of the present invention is as follows: the required jacking distance is obtained by averaging the real-time monitoring values of multiple potential risk areas, and then combined with the early warning emergency value, the emergency adjustment value is calculated through a formula to obtain the emergency adjustment amount, and the original jacking speed is adjusted. This helps to promptly correct the deflection trend of the structure caused by local settlement risks, and solve the problem of deflection risks of the overall structure caused by settlement risks in local areas of the bottom plate of the existing structure.
[0016] Embodiment 6 Reference Figure 5 The embodiment of the present invention provides an automatic compensation system for the settlement and deflection of the structure under the upper opening type bundled pipe curtain, including: Potential identification module: During the settlement monitoring period, multiple monitoring areas on the existing structure floor are monitored in real time to obtain potential analysis signals, and settlement prediction analysis is performed based on the potential analysis signals to obtain potential risk areas; Risk warning module: Based on the potential risk area, the potential settlement risk of the existing structure bottom plate is assessed to obtain potential assessment data, the potential assessment data is calculated and processed, and the assessment risk value is output and compared with the assessment risk threshold. If the assessment risk value is greater than the assessment risk threshold, a risk warning signal is generated; Emergency analysis module: Based on the risk warning signal, the settlement trend analysis is performed on multiple potential risk areas to obtain the Pearson coefficient. Based on the Pearson coefficient, a linear correlation analysis is performed to output the warning emergency value, which is compared with the warning emergency threshold to obtain the warning emergency signal; Emergency processing module: Based on the early warning emergency signal, obtain the urgent adjustment value and adjust the original jacking speed.
[0017] Embodiment 7 Reference Figure 6 The embodiment of the present invention further provides a computer device, including: a memory 192 and a processor 191 and a computer program 193 stored in the memory 192. When the computer program 193 is executed on the processor 191, an automatic compensation method for settlement and deflection of an underpass structure of an upper open-type bundled pipe curtain as described in any one of the above methods is implemented.
[0018] The computer device may be a desktop computer, a notebook, a PDA, a cloud server or other computing device. The computer device may include, but is not limited to, a processor 191 and a memory 192. Those skilled in the art will appreciate that Figure 6 It is only an example of a computer device and does not constitute a limitation of the computer device. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, etc.
[0019] The processor 191 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0020] In some embodiments, the memory 192 may be an internal storage unit of the computer device, such as a hard disk or memory of the computer device. In other embodiments, the memory 192 may also be an external storage device of the computer device, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the computer device. Further, the memory 192 may also include both an internal storage unit of the computer device and an external storage device. The memory 192 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program. The memory 192 may also be used to temporarily store data that has been output or is to be output.
[0021] Embodiment 8 An embodiment of the present invention further provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, a method for automatically compensating for settlement and deflection of an underpass structure of an upper open-type bundled pipe curtain as described in any one of the above methods is implemented.
[0022] In this embodiment, if the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned various method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium can at least include: any entity or device that can carry the computer program code to the camera / terminal device, recording medium, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. For example, USB flash drive, mobile hard disk, disk or optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.
[0023] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0024] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0025] In the embodiments disclosed in the present application, it should be understood that the disclosed apparatus / terminal equipment and method can be implemented in other ways. For example, the apparatus / terminal equipment embodiments described above are merely illustrative. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. One point, the mutual coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection through some interface, device or unit, which may be electrical, mechanical or other forms.
[0026] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0027] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.
[0028] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. An automatic compensation method for the settlement and deflection of the structure under the upper opening type bundled pipe curtain, characterized in that: include: The intelligent self-locking jack, force sensor and pad are installed in sequence along the working pipe of the bundled pipe curtain, and the intelligent self-locking jack and the CNC oil pump are connected with a high-pressure oil pipe. Each automatic compensating top pressure device is arranged in a single row with an interval of 0.5m along the axial direction of the pipe curtain; Arrange the displacement meters in a single row at intervals of 0.5m along the axial direction of the pipe curtain at the bottom plate of the existing structure, and install a wireless intelligent electronic level ruler at the center of the top plate of the existing structure; Connect the high-pressure oil pump to the control center via an electronic control cable; Excavate the soil inside the bundled pipe curtain and carry out the main structure construction. During this process, the control center adjusts the pressure and piston displacement of each intelligent self-locking jack according to the data returned by the data acquisition unit to control the generation and development of the settlement and deflection of the superstructure; The interlayer soil is reinforced by grouting and the gaps are filled through the grouting pipe, and the automatic compensating top pressure device is recycled through the reserved holes.
2. Automatic compensation system for settlement and deflection of the structure under the upper open type bundled pipe curtain, characterized by: Includes the following modules: Potential identification module: During the settlement monitoring period, multiple monitoring areas on the existing structure floor are monitored in real time through settlement measurement points, and settlement prediction analysis is performed to obtain potential risk areas; Risk warning module: Based on the potential risk area, the potential settlement risk of the existing structure bottom plate is assessed and the assessment risk value is output. If the assessment risk value is greater than the assessment risk threshold, a risk warning signal is generated; Emergency analysis module: Based on the risk warning signal, the Pearson coefficient is used to analyze the settlement trend of multiple potential risk areas to obtain the emergency duration. Based on the emergency duration of multiple potential risk areas, the warning emergency value is obtained and compared with the warning emergency threshold to obtain the warning emergency signal; Emergency processing module: Based on the early warning emergency signal, obtain the urgent adjustment value and adjust the original jacking speed.
3. The automatic compensation system for settlement and deflection of the structure under the upper opening type bundled pipe curtain according to claim 2 is characterized in that: The process of real-time monitoring of settlement measuring points and settlement prediction analysis is as follows: The settlement monitoring period is divided into several monitoring nodes, a monitoring area is randomly selected, and a unit real-time monitoring curve is constructed according to the settlement amount of the settlement measuring point on the monitoring node obtained in real time; In the coordinate system where the unit real-time monitoring curve is located, a settlement threshold line and a settlement warning line are drawn respectively; The real-time monitoring curves of some units located above the settlement warning line and on the settlement threshold line are intercepted as real-time monitoring sub-curves; According to the coordinate points on the real-time monitoring sub-curve and the settlement threshold line, distance measurement is performed to obtain the real-time monitoring value; If the real-time monitoring value is greater than or equal to the real-time monitoring threshold, a potential analysis signal is generated.
4. The automatic compensation system for settlement and deflection of the structure under the upper opening type bundled pipe curtain according to claim 3 is characterized in that: The process of identifying potential risk areas is as follows: The length of the real-time monitoring sub-curve is extracted, and the ratio is calculated with the total length of the unit real-time monitoring curve to obtain the real-time analysis length; Divide the real-time monitoring sub-curve into several analysis sub-curves; Based on the connection of the endpoints of the analysis sub-curve, the analysis sub-line segment is obtained; The slopes of all the analysis sub-curves are added and averaged to obtain the real-time analysis change value; The real-time analysis change value is added to the real-time analysis length to obtain a potential analysis value; If the potential analysis value is greater than the potential analysis threshold, the analyzed monitoring area is marked as a potential risk area.
5. The automatic compensation system for settlement and deflection of the underpass structure of the upper opening type bundled pipe curtain according to claim 4 is characterized in that: The method of obtaining risk warning signals is as follows: Obtain the number of potential risk areas on the existing structure bottom plate, and calculate the ratio with the total number of monitoring areas on the existing structure bottom plate to obtain the number of potential risks; Extract the real-time monitoring value corresponding to the potential risk area, and calculate the ratio with the real-time monitoring threshold to obtain the potential degree value; The potential degree values corresponding to all potential risk areas are summed up and averaged to obtain the overall degree value; the overall degree value is multiplied by the number of potential risks to obtain the assessed risk value; If the assessed risk value is greater than the assessed risk threshold, a risk warning signal is generated.
6. The automatic compensation system for settlement and deflection of the structure under the upper opening type bundled pipe curtain according to claim 3 is characterized in that: The process of settlement trend analysis is as follows: Extract the real-time monitoring sub-curve corresponding to the potential risk area; Connect the two endpoints of the real-time monitoring sub-curve to obtain the fitting reference straight line and obtain the fitting reference slope , combined with the coordinates of the two endpoints of the real-time monitoring sub-curve, the fitting reference equation is obtained: ; Based on the fitted reference equation, the Pearson coefficient r was calculated; Subtract the Pearson coefficient r from 0 to get the linear determination value, and compare it with the linear determination threshold. The process is as follows: If the linear determination value is greater than the linear determination threshold, the real-time monitoring sub-curve is a linear sub-curve; If the linear determination value is less than or equal to the linear determination threshold, the real-time monitoring sub-curve is a nonlinear sub-curve.
7. The automatic compensation system for settlement and deflection of the underpass structure of the upper opening type bundled pipe curtain according to claim 6 is characterized in that: The method of obtaining emergency time is as follows: If it is a nonlinear sub-curve, the maximum slope of the analysis sub-curve is extracted and combined with the end point of the real-time monitoring sub-curve to make a fitting warning line that intersects with the sedimentation threshold line; If it is a linear sub-curve, a fitting warning line intersecting with the sedimentation threshold line is made based on the real-time analysis change value and the end point of the real-time monitoring sub-curve; Obtain the X coordinate of the intersection point between the fitted warning line and the settlement threshold line, as well as the X coordinate of the end point of the real-time monitoring sub-curve, and perform subtraction to obtain the absolute value to obtain the emergency duration.
8. The automatic compensation system for settlement and deflection of the structure under the upper opening type bundled pipe curtain according to claim 7 is characterized in that: Obtain the duration fluctuation value and analyze it. The process is as follows: The variance of the emergency durations corresponding to multiple potential risk areas is calculated to obtain the duration fluctuation value; If the duration fluctuation value is greater than the duration fluctuation threshold, a duration fluctuation large signal is generated; If the duration fluctuation value is less than or equal to the duration fluctuation threshold, a duration fluctuation small signal is generated.
9. The automatic compensation system for settlement and deflection of the structure under the upper opening type bundled pipe curtain according to claim 8 is characterized in that: The analysis of multiple potential risk areas is as follows: If the duration fluctuation value is greater than the duration fluctuation threshold, a duration fluctuation large signal is generated, the Pearson coefficient corresponding to the potential risk area is obtained, and the sum is added to obtain the Pearson sum value; The emergency duration corresponding to the potential risk area is calculated by ratio with the Pearson sum value to obtain the weight coefficient; The emergency duration corresponding to the potential risk area is multiplied by the corresponding weight coefficient, and the sum is averaged to obtain the warning emergency value; If the duration fluctuation value is less than or equal to the duration fluctuation threshold, a small duration fluctuation signal is generated, and the emergency durations corresponding to multiple potential risk areas are summed and averaged to obtain the warning emergency value.
10. The automatic compensation system for settlement and deflection of the structure under the upper opening type bundled pipe curtain according to claim 2 is characterized in that: Adjust the original lifting speed, the process is as follows: The real-time monitoring values corresponding to multiple potential risk areas are summed and averaged to obtain the required lifting distance; Substitute the required lifting distance and the warning emergency value into the formula, through the formula: , calculate the expedited adjustment value ,in, Expressed as the required lifting distance, It is expressed as the warning emergency value; Subtract the urgent adjustment value from the original lifting speed to obtain the urgent adjustment amount.
Citation Information
Patent Citations
Intelligent dynamic control method down-traversing existing metro station construction sedimentation at zero distance
CN111335916A
Device and method for foundation pit type static load test of existing building pile
CN115059126A
Intelligent load-holding sinking control system and method for pile group of buildings around deep foundation pit
CN115262610A
Settlement prevention method for advanced support construction of pipe shed
CN115450632A
Supporting and jacking device and construction method for tunnel closely attaching and underneath penetrating existing structure
CN116085006A
Cited By
Self-adaptive valve adjusting system and method based on hydraulic control
CN120386208A