Building drainage pipeline supporting device
By designing the adjustment and pushing mechanism of the building drainage pipeline support device, the problem of skewness during the docking of drainage pipelines is solved, and accurate docking and efficient installation of the pipelines are achieved.
Patent Information
- Application Number
- CN202510250629.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-04
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2045-03-04
AI Technical Summary
The existing building drainage pipes are difficult to move horizontally due to their large weight when docking, resulting in a skew at the docking point, affecting the installation accuracy.
A building drainage pipe support device is designed, including a fixing seat, an adjustment mechanism and a push mechanism. The adjustment mechanism adjusts the central axis of the second pipe through the driving motor of the first adjustment plate and the second adjustment plate so as to align it with the central axis of the first pipe. The pushing mechanism passes through the cylinder arm and the moving plate, drives the second pipe to move toward the first pipe and completes docking.
Accurate docking of drainage pipes is achieved, reducing installation difficulty and improving installation efficiency.
Smart Images

Figure CN119737512A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building drainage, and in particular to a building drainage pipe supporting device. Background Art
[0002] Drainage pipes refer to a system composed of pipes and their ancillary facilities that collect and discharge sewage, wastewater and rainwater, including trunk pipes, branch pipes and pipes leading to treatment plants. Regardless of whether they are built on the streets or anywhere else, as long as they are pipes that play a drainage role, they are collectively referred to as drainage pipes. When docking drainage pipes, because the pipes themselves are heavy, they are difficult to move during docking, resulting in uneven docking of the pipes. The problems in the prior art are: it is not convenient to dock drainage pipes. When docking drainage pipes, because the drainage pipes themselves are heavy, it is difficult to move the docking part laterally. There is often a deviation in the docking interface, resulting in the interface of the two drainage pipes cannot be accurately aligned, affecting the installation of the drainage pipes. In order to solve the above problems, the present invention proposes a building drainage pipe support device. Summary of the invention
[0003] To achieve the above-mentioned purpose, the present invention provides a building drainage pipe support device, including a fixing seat, on which is provided a fixing mechanism for fixing a first pipe, and an adjusting mechanism arranged on the fixing seat, the adjusting mechanism is used to adjust the second pipe to adjust the central axis of the second pipe and the central axis of the first pipe to the same straight line, and also includes a pushing mechanism arranged on the fixing seat, the pushing mechanism is used to drive the second pipe to move toward the first pipe and complete the docking after the central axis of the second pipe and the central axis of the first pipe are adjusted to the same straight line.
[0004] Optionally, the pushing mechanism includes a movable groove opened on the fixed seat, a movable plate is movably arranged in the movable groove, a first cylinder arm is fixedly connected to the side wall of the movable plate, the first cylinder arm is movably inserted into the fixed seat, one end of the first cylinder arm away from the movable plate is fixedly connected to the driving end of the first cylinder, and the first cylinder is fixedly arranged on the side plate of the fixed seat.
[0005] Optionally, the fixing mechanism includes a lower fixing plate assembly, the lower fixing plate assembly is fixedly set on the lower support seat, the lower support seat is fixedly set on the upper end surface of the fixing seat, the upper end of the lower support seat is fixedly connected to a first connecting assembly, the upper end of the first connecting assembly is fixedly connected to the lower end surface of the fixing block, the fixing block is fixedly set on the side wall of the upper fixing plate group, a first internal spiral tube is fixedly inserted on the fixing block, a first spiral rod is inserted into the internal thread of the first internal spiral tube, the lower end of the first spiral rod is rotatably set on the upper end surface of the lower support seat, and the upper end of the first spiral rod is fixedly connected to a screwing ring.
[0006] Optionally, the first connecting assembly includes a first connecting rod, a first connecting tube and a first connecting spring, the first connecting rod is movably inserted in the first connecting tube, the first connecting spring is wound and arranged outside the first connecting rod, the two ends of the first connecting spring are respectively fixedly connected to the side wall of the first connecting rod and the outer side wall of the first connecting tube, the first connecting rod is connected to the fixed block, and the first connecting tube is connected to the lower support seat.
[0007] Optionally, the adjustment mechanism includes a first adjustment plate and a second adjustment plate arranged relative to each other, and a movable slider is provided on the lower ends of the first adjustment plate and the second adjustment plate, and the two movable sliders are movably arranged in a movable slide groove, and the movable slide groove is opened on the movable plate, and the two movable sliders are fixedly inserted with a second inner spiral tube, and the two second inner spiral tubes are threadedly sleeved outside the second spiral rod, and the thread directions of the two second inner spiral tubes are opposite, one end of the second spiral rod is rotatably arranged on the side wall of the movable slide groove, and the other end of the second spiral rod is connected to the driving end of the driving motor, and the driving motor is fixedly arranged on the side wall of the movable plate, and two first electrode contacts are inlaid on the inner side wall of the first adjustment plate, and two second electrode contacts are inlaid on the inner side wall of the second adjustment plate.
[0008] Optionally, a control mechanism is further included, which is used to control the closing of the first cylinder. The control mechanism includes a first movable groove opened on the adjusting mechanism, in which a first control component is arranged, and a second movable groove opened on the fixing mechanism, in which a second control component is arranged. During operation, when the first pipeline contacts the second pipeline, the first control component and the first movable groove are also contacted synchronously, and the series circuit is connected to control the closing of the first cylinder.
[0009] Optionally, the first control component includes a third electrode contact piece, the third electrode contact piece is provided with an anti-stuck groove, the third electrode contact piece is fixedly set on the first supporting plate, the first supporting plate is movably set in the first movable groove, the first control component also includes a second connecting component, the second connecting component includes a second connecting rod, the second connecting rod is movably inserted in the second connecting tube, a second connecting spring is wound around the outside of the second connecting rod, the two ends of the second connecting spring are respectively fixedly connected to the side wall of the second connecting rod and the outer side wall of the second connecting tube, the second connecting rod is connected to the first supporting plate, and the second connecting tube is connected to the first movable groove.
[0010] Optionally, the second control component includes a fourth electrode contact piece movably arranged in the second movable groove, the fourth electrode contact piece is fixedly connected to the second supporting plate, the second supporting plate is movably arranged in the second movable groove, the second control component also includes a third connecting component, the third connecting component includes a third connecting rod, the third connecting rod is movably inserted in the third connecting tube, a third connecting spring is wound around the outside of the third connecting rod, the two ends of the third connecting spring are respectively fixedly connected to the side wall of the third connecting rod and the outer side wall of the third connecting tube, the third connecting rod is connected to the second supporting plate, and the third connecting tube is connected to the second movable groove.
[0011] Optionally, the lower fixed plate assembly has the same structure as the upper fixed plate assembly, and the lower fixed plate assembly is arranged below the upper fixed plate assembly, the upper fixed plate assembly includes a first fixed plate, the first fixed plate is movably arranged in an installation groove, the installation groove is opened on the second fixed plate, a movable hole is opened on the second fixed plate, a support rod is movably arranged in the movable hole, and the support rod is fixedly connected to the first fixed plate, wherein the support rod and the movable hole in the upper fixed plate assembly are arranged at the top of the upper fixed plate assembly, and the support rod and the movable hole in the lower fixed plate assembly are arranged on the side of the lower fixed plate assembly.
[0012] Optionally, it also includes a driving mechanism, which includes an arc plate slidably arranged on the upper end surface of the second fixed plate, the arc plate is connected to the upper end of the support rod, a second cylinder arm is fixedly connected to the side wall of the arc plate, the free end of the second cylinder arm is fixedly connected to the driving end of the second cylinder, the second cylinder is fixedly arranged on the upper end surface of the second fixed plate, a first horizontal plate is fixedly connected to the side wall of the arc plate, a fourth connecting assembly is fixedly connected to the lower end surface of the first horizontal plate, the lower end of the fourth connecting assembly is fixedly connected to the upper end surface of the second horizontal plate, the second horizontal plate is fixedly arranged on the support rod in the lower fixed plate assembly, the fourth connecting assembly includes a fourth connecting rod, a fourth connecting tube and a fourth connecting spring, the fourth connecting rod is movably inserted in the fourth connecting tube, the fourth connecting spring is wound outside the fourth connecting rod, and the two ends of the fourth connecting spring are respectively fixedly connected to the side wall of the fourth connecting rod and the outer side wall of the fourth connecting tube.
[0013] The beneficial effects of the present invention are as follows: The present invention improves the structure of an existing building drainage pipe support device. An adjustment mechanism is arranged in the improved building drainage pipe support device. The arrangement of the adjustment mechanism can adjust the position of the second pipe so that the central axes of the first pipe and the second pipe to be installed are on the same horizontal line, so that during installation, the docking interfaces of the first pipe and the second pipe will not be deflected and can be accurately docked, thereby reducing the difficulty of installation of the drainage pipe; at the same time, a pushing mechanism is also arranged in the present invention, which is used to drive the second pipe to move toward the first pipe and complete the docking after the central axes of the second pipe and the first pipe are adjusted to the same straight line. The arrangement of the pushing mechanism can not only improve the intelligence level of the equipment, but also improve the installation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the top view of the structure of an embodiment of the building drainage pipe support device of the present invention when it is not working; Figure 2 The present invention is a building drainage pipe support device Figure 1 A schematic diagram of the structure of the fixing mechanism of the first pipeline; Figure 3 The present invention is a building drainage pipe support device Figure 2 A schematic diagram of the enlarged structure in the middle; Figure 4 The present invention is a building drainage pipe support device Figure 1 A schematic diagram of the structure of the regulating mechanism of the second pipeline; Figure 5 The present invention is a building drainage pipe support device Figure 4 A schematic diagram of a first electrode contact sheet and a second electrode contact sheet being respectively arranged in the first adjustment plate and the second adjustment plate; Figure 6 It is a structural schematic diagram of a first embodiment of a building drainage pipe support device including a control mechanism according to the present invention; Figure 7 The present invention is a building drainage pipe support device Figure 6 A magnified schematic diagram of structure B in the middle; Figure 8 It is a structural schematic diagram of a second embodiment of the building drainage pipe support device including a control mechanism of the present invention; Fig. 9 It is a structural schematic diagram of an upper fixing plate assembly and a lower fixing plate assembly in a building drainage pipe supporting device of the present invention; Fig.10 The present invention is a building drainage pipe support device Fig. 9 Schematic diagram of the C structure.
[0015] Description of Reference Numerals Fixed seat 1, fixing mechanism 2, lower fixed plate assembly 21, lower support seat 22, first connecting assembly 23, first connecting rod 231, first connecting cylinder 232, first connecting spring 233, fixed block 24, upper fixed plate assembly 25, first fixed plate 251, second fixed plate 252, supporting rod 253, moving hole 254, first spiral rod 26, first inner spiral tube 27, screwing ring 28, adjusting mechanism 3, first adjusting plate 31, second adjusting plate 32, moving slider 33, moving slide groove 34, second inner spiral tube 35, second spiral rod 36, driving motor 37, first electrode contact sheet 38, second electrode contact sheet 39, pushing mechanism 4, moving plate 41, moving groove 42, first cylinder arm 43, first cylinder 44, control Control mechanism 5, first control component 51, third electrode contact piece 511, anti-stuck groove 512, first supporting plate 513, second connecting component 514, second connecting rod 5141, second connecting cylinder 5142, second connecting spring 5143, first movable groove 52, second control component 53, fourth electrode contact piece 531, second supporting plate 532, third connecting component 533, third connecting rod 5331, third connecting cylinder 5332, third connecting spring 5333, second movable groove 54, driving mechanism 6, arc plate 61, second cylinder arm 62, second cylinder 63, first horizontal plate 64, second horizontal plate 65, fourth connecting component 66, fourth connecting rod 661, fourth connecting cylinder 662, fourth connecting spring 663. DETAILED DESCRIPTION
[0016] In order to make the purpose, technical solutions and advantages of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention. Unless otherwise defined, the technical terms or scientific terms used herein should be understood by people with general skills in the field to which the present invention belongs. "Including" and similar words used in this article mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects.
[0017] In view of the problems existing in the prior art, an embodiment of the present invention provides a building drainage pipe support device, such as Figure 1As shown, the building drainage pipe support device includes a fixing seat 1, on which a fixing mechanism 2 for fixing a first pipe is provided, and an adjusting mechanism 3 provided on the fixing seat 1, and the fixing mechanism 2 is provided on the right side of the adjusting mechanism 3. The adjusting mechanism 3 is used to adjust the second pipe to adjust the central axis of the second pipe and the central axis of the first pipe to the same straight line, and also includes a pushing mechanism 4 provided on the fixing seat 1, and the pushing mechanism 4 is used to drive the second pipe to move toward the first pipe and complete the docking after the central axis of the second pipe and the central axis of the first pipe are adjusted to the same straight line.
[0018] In one embodiment, Figure 1 As shown, the pushing mechanism 4 includes a movable groove 42 opened on the fixed base 1, a movable plate 41 is movably arranged in the movable groove 42, a first cylinder arm 43 is fixedly connected to the side wall (which can be understood as the left side wall) of the movable plate 41, the first cylinder arm 43 is movably inserted into the fixed base 1, and one end of the first cylinder arm 43 away from the movable plate 41 (which can be understood as the left end) is fixedly connected to the driving end of the first cylinder 44, and the first cylinder 44 is fixedly arranged on the side plate (which can be understood as the left side plate) of the fixed base 1.
[0019] During operation, when the second pipeline is adjusted to be on the same horizontal line as the central axis of the first pipeline, the first cylinder 44 will start and push the moving plate 41 to move rightward through the first cylinder arm 43, thereby completing the docking of the second pipeline with the first pipeline.
[0020] In order to fix the first pipeline, in one embodiment, Figure 2 and Figure 3As shown, the fixing mechanism 2 includes a lower fixing plate assembly 21, and the lower fixing plate assembly 21 is fixedly arranged on a lower supporting seat 22, and the lower supporting seat 22 is fixedly arranged on the upper end surface of the fixing seat 1, and the upper end of the lower supporting seat 22 is fixedly connected with a first connecting assembly 23, and the upper end of the first connecting assembly 23 is fixedly connected to the lower end surface of a fixing block 24, and the fixing block 24 is fixedly arranged on the side wall of an upper fixing plate group 25. It is worth noting that the setting of the first connecting assembly 23 can enable the upper fixing plate group 25 to move upward or downward relative to the lower fixing plate assembly 21, and at the same time, it can also play a limiting role, so that the movement of the fixing plate group 25 is only carried out in the vertical direction. The number of the first connecting assemblies 23 can be set to one, two, three or more. The fixing block 24 is fixedly plugged with a first inner spiral tube 27, and the first inner spiral tube 27 is internally threaded with a first spiral rod 26. The lower end of the first spiral rod 26 is rotatably arranged on the upper end surface of the lower support seat 22, and the upper end of the first spiral rod 26 is fixedly connected with a screwing ring 28. During operation, the screwing ring 28 is screwed, and the rotation of the screwing ring 28 will drive the first spiral rod 26 to rotate. Since the first spiral rod 26 is threadedly plugged into the first inner spiral tube 27, the rotation of the first spiral rod 26 will drive the upper fixing plate group 25 to move upward or downward in the vertical direction through the first inner spiral tube 27 and the fixing block 24.
[0021] In one embodiment, Figure 3 As shown, the first connection assembly 23 includes a first connection rod 231, a first connection cylinder 232 and a first connection spring 233, the first connection rod 231 is movably inserted in the first connection cylinder 232, the first connection spring 233 is wound and arranged outside the first connection rod 231, the two ends of the first connection spring 233 are respectively fixedly connected to the side wall of the first connection rod 231 and the outer side wall of the first connection cylinder 232, the first connection rod 231 is connected to the fixing block 24, and the first connection cylinder 232 is connected to the lower support seat 22. The structure of the first connection assembly 23 is not limited to the first connection rod 231, the first connection cylinder 232 and the first connection spring 233.
[0022] In order to adjust the second pipeline so that the central axis of the second pipeline is on the same horizontal line as the central axis of the first pipeline, in one embodiment, Figure 4 and Figure 5As shown, the adjustment mechanism 3 includes a first adjustment plate 31 and a second adjustment plate 32 that are arranged opposite to each other, and a movable slider 33 is arranged on the lower end of the first adjustment plate 31 and the second adjustment plate 32, and the two movable sliders 33 are movably arranged in a movable slide groove 34, and the movable slide groove 34 is opened on the movable plate 41, and the two movable sliders 33 are fixedly inserted with a second inner spiral tube 35, and the two second inner spiral tubes 35 are threadedly sleeved outside the second spiral rod 36, and the thread directions of the two second inner spiral tubes 35 are opposite, one end of the second spiral rod 36 (which can be understood as the left end) is rotatably arranged on the side wall of the movable slide groove 34, and the other end of the second spiral rod 36 (which can be understood as the right end) is connected to the driving end of the driving motor 37, and the driving motor 37 is fixedly arranged on the side wall of the movable plate 41, and two first electrode contacts 38 are inlaid on the inner side wall of the first adjustment plate 31, and two second electrode contacts 39 are inlaid on the inner side wall of the second adjustment plate 32.
[0023] It should be noted that the structures of the first adjustment plate 31 and the second adjustment plate 32 are both arranged as arc structures, and an arc guide plate is arranged on the side where the first adjustment plate 31 and the second adjustment plate 32 are close to each other, so as to guide the second pipe to move upward to the middle of the first adjustment plate 31 and the second adjustment plate 32 when the first adjustment plate 31 and the second adjustment plate 32 are close to each other; when working, the second pipe is placed between the first adjustment plate 31 and the second adjustment plate 32, and then the driving motor 37 is started. The working of the driving motor 37 will drive the second spiral rod 36 to rotate, and drive the first adjustment plate 31 and the second adjustment plate 32 through the two second inner spiral tubes 35 and the moving slider 33. The second adjustment plates 32 move closer. As the first adjustment plate 31 and the second adjustment plate 32 approach each other, the second pipe is guided to move upward (which can be understood as moving toward the middle of the first adjustment plate 31 and the second adjustment plate 32) through the arc guide plate. As the first adjustment plate 31 and the second adjustment plate 32 move, the second pipe contacts the first electrode contact piece 38 or the second electrode contact piece 39. When the center axis of the second pipe is on the same horizontal center line as the center axis of the first pipe, the second pipe contacts the two first electrode contact pieces 38 and the two second electrode contact pieces 39 respectively, and the first adjustment plate 31 and the second adjustment plate 32 complete the clamping and fixing of the second pipe.
[0024] When the second pipe contacts the two first electrode contacts 38 and the two second electrode contacts 39 respectively (it can be understood that the first electrode contacts 38 and the second electrode contacts 39 are both sensors), the drive motor 37 is controlled to be turned off and the first cylinder 44 is started.
[0025] When the second pipe contacts the first pipe, in order to control the first cylinder 44 to stop working, in one embodiment, as Figure 6 and Figure 7As shown, the building drainage pipe supporting device also includes a control mechanism 5, and the control mechanism 5 is used to control the closing of the first cylinder 44. The control mechanism 5 includes a first movable groove 52 opened on the adjusting mechanism 3, and a first control component 51 is arranged in the first movable groove 52, and a second movable groove 54 opened on the fixing mechanism 2, and a second control component 53 is arranged in the second movable groove 54. During operation, when the first pipe contacts the second pipe, the first control component 51 and the first movable groove 52 are also synchronously contacted, and the series circuit is connected to control the closing of the first cylinder 44.
[0026] In one embodiment, Figure 7 As shown, the first control component 51 includes a third electrode contact piece 511, and an anti-stuck groove 512 is opened on the third electrode contact piece 511. The third electrode contact piece 511 is fixedly set on the first supporting plate 513, and the first supporting plate 513 is movably set in the first movable groove 52. The first control component 51 also includes a second connecting component 514, and the second connecting component 514 includes a second connecting rod 5141, and the second connecting rod 5141 is movably inserted in the second connecting tube 5142. A second connecting spring 5143 is wound around the outside of the second connecting rod 5141, and the two ends of the second connecting spring 5143 are respectively fixedly connected to the side wall of the second connecting rod 5141 and the outer side wall of the second connecting tube 5142. The second connecting rod 5141 is connected to the first supporting plate 513, and the second connecting tube 5142 is connected to the first movable groove 52.
[0027] In one embodiment, Figure 7 As shown, the second control component 53 includes a fourth electrode contact 531 movably arranged in the second movable groove 54, the fourth electrode contact 531 is fixedly connected to the second supporting plate 532, the second supporting plate 532 is movably arranged in the second movable groove 54, the second control component 53 also includes a third connecting component 533, the third connecting component 533 includes a third connecting rod 5331, the third connecting rod 5331 is movably inserted in the third connecting cylinder 5332, the third connecting rod 5331 is wrapped with a third connecting spring 5333, the two ends of the third connecting spring 5333 are respectively fixedly connected to the side wall of the third connecting rod 5331 and the outer side wall of the third connecting cylinder 5332, the third connecting rod 5331 is connected to the second supporting plate 532, and the third connecting cylinder 5332 is connected to the second movable groove 54.
[0028] During operation, when the second pipe does not contact the first pipe, the third electrode contact piece 511 does not contact the fourth electrode contact piece 531; when the second pipe contacts the first pipe, the third electrode contact piece 511 contacts the fourth electrode contact piece 531, the series circuit is connected, and the first cylinder 44 is controlled to stop working.
[0029] The structural design of the device of the present invention is reasonable. When the third electrode contact piece 511 and the fourth electrode contact piece 531 come into contact, an impact force will occur. The existence of the impact force will cause the third electrode contact piece 511 and the fourth electrode contact piece 531 to be damaged. In order to protect the third electrode contact piece 511 and the fourth electrode contact piece 531, the present invention sets a combination structure of the second connecting component 514 and the third connecting component 533. The setting of the combination structure can make the third electrode contact piece 511 and the fourth electrode contact piece 531 play a buffering role when they come into contact, thereby protecting the third electrode contact piece 511 and the fourth electrode contact piece 531. The setting of the second connecting component 514 and the third connecting component 533 can also make the third electrode contact piece 511 and the fourth electrode contact piece 531 have a larger relative movement distance in the horizontal direction. Since the control mechanism 5 is set on the wall of the fixing mechanism 2 and the adjusting mechanism 3, it will not affect the installation and docking of the second pipeline and the first pipeline.
[0030] In one embodiment, the third electrode contact sheet 511 and the fourth electrode contact sheet 531 are rectangular structures, such as Figure 7 As shown, in another embodiment, the third electrode contact sheet 511 and the fourth electrode contact sheet 531 are ring-shaped structures, such as Figure 8 As shown, Figure 8 The example works similar to Figure 7 The examples work in the same way and are not described here.
[0031] In order to further improve the intelligence of the equipment, reduce the difficulty of installation and improve the efficiency of installation, in one implementation, Fig. 9 and Fig.10As shown, the structure of the lower fixing plate assembly 21 is consistent with that of the upper fixing plate assembly 25, and the lower fixing plate assembly 21 is arranged below the upper fixing plate assembly 25, and the upper fixing plate assembly 25 includes a first fixing plate 251, the first fixing plate 251 is movably arranged in a mounting groove (not numbered), the mounting groove is provided on a second fixing plate 252, a moving hole 254 is provided on the second fixing plate 252, a support rod 253 is movably arranged in the moving hole 254, and the support rod 253 is fixedly connected to the first fixing plate 251, wherein the support rod 253 and the moving hole 254 in the upper fixing plate assembly 25 are arranged at the top of the upper fixing plate assembly 25, and the support rod 253 and the moving hole 254 in the lower fixing plate assembly 21 are arranged at the side of the lower fixing plate assembly 21. In the arrangement of this embodiment, the length of the upper fixing plate assembly 25 in the horizontal direction can be extended by the movement of the first fixing plate 251 relative to the second fixing plate 252, so that the second pipe and the first pipe after docking are fixed together. This example improves the structure of the upper fixing plate group 25 and the lower fixing plate assembly 21, and can complete the fixing of the second pipeline and the first pipeline without adding a fixing assembly, which can reduce the difficulty of equipment installation and reduce the investment cost of the equipment. It is worth noting that when the second pipeline is laid out, the right end of the second pipeline needs to be extended to the right side of the adjustment mechanism 3. This arrangement can avoid the right end of the adjustment mechanism 3 from fitting with the left end of the fixing mechanism 2, and reserve the fixing position of the second pipeline and the first pipeline, so that when the first fixing plate 251 moves to the left to the fixing position, it can cover the joint between the second pipeline and the first pipeline.
[0032] In order to facilitate the leftward movement of the first fixing plate 251 relative to the second fixing plate 252, in one embodiment, Fig. 9 and Fig.10As shown, the building drainage pipe support device also includes a driving mechanism 6, which includes an arc-shaped plate 61 slidably arranged on the upper end surface of the second fixed plate 252, the arc-shaped plate 61 is connected to the upper end of the support rod 253, a second cylinder arm 62 is fixedly connected to the side wall of the arc-shaped plate 61, the free end of the second cylinder arm 62 is fixedly connected to the driving end of the second cylinder 63, the second cylinder 63 is fixedly arranged on the upper end surface of the second fixed plate 252, a first horizontal plate 64 is fixedly connected to the side wall of the arc-shaped plate 61, and a fourth connecting rod 64 is fixedly connected to the lower end surface of the first horizontal plate 64. Assembly 66, the lower end of the fourth connecting assembly 66 is fixedly connected to the upper end surface of the second horizontal plate 65, the second horizontal plate 65 is fixedly set on the support rod 253 in the lower fixed plate assembly 21, the fourth connecting assembly 66 includes a fourth connecting rod 661, a fourth connecting tube 662 and a fourth connecting spring 663, the fourth connecting rod 661 is movably inserted in the fourth connecting tube 662, the fourth connecting spring 663 is wound and set outside the fourth connecting rod 661, and the two ends of the fourth connecting spring 663 are respectively fixedly connected to the side wall of the fourth connecting rod 661 and the outer side wall of the fourth connecting tube 662.
[0033] During operation, in step one, after the first pipe is fixed by the fixing mechanism 2 (in an example, the left end of the first pipe can also extend out of the fixing mechanism 2), the second pipe is placed between the first adjustment plate 31 and the second adjustment plate 32, and the driving motor 37 is started to adjust the position of the second pipe by the first adjustment plate 31 and the second adjustment plate 32; when the central axis of the second pipe is on the same horizontal line as the central axis of the first pipe, the first cylinder 44 is started, and the second pipe is moved to the right by the pushing mechanism 4, and the second pipe and the first pipe are connected; when the second pipe and the first pipe are connected, the third electrode contact piece 511 and the fourth electrode contact piece 531 are in contact, and the first cylinder 44 stops working. Step 2. When the second pipeline and the first pipeline are connected, adjust the first screw rod 26 to rotate in the opposite direction so that the upper fixed plate group 25 moves upward and separates from the first pipeline, so that the first pipeline loses its clamping effect; then start the second cylinder 63, and the second cylinder 63 will move the upper and lower first fixed plates 251 to the left relative to the second fixed plate 252 through the second cylinder arm 62, the arc plate 61, the support rod 253, the first horizontal plate 64, the fourth connecting assembly 66 and the second horizontal plate 65. When the first fixed plate 251 covers the connection point between the second pipeline and the first pipeline, close the second cylinder 63; adjust the first screw rod 26 to rotate in the forward direction so that the upper fixed plate group 25 moves downward and cooperates with the lower fixed plate assembly 21 to complete the fixation of the second pipeline and the first pipeline.
[0034] Although the embodiments of the present invention are described in detail above, it is obvious to those skilled in the art that various modifications and variations can be made to these embodiments. However, it should be understood that such modifications and variations are within the scope and spirit of the present invention. Moreover, the present invention described herein may have other embodiments and may be implemented or realized in a variety of ways.
Claims
1. A building drainage pipe support device, characterized in that: The invention comprises a fixing seat (1), the fixing seat (1) being provided with a fixing mechanism (2) for fixing a first pipeline, and an adjusting mechanism (3) arranged on the fixing seat (1), the adjusting mechanism (3) being used to adjust a second pipeline so as to adjust the central axis of the second pipeline and the central axis of the first pipeline to be on the same straight line, and a pushing mechanism (4) being arranged on the fixing seat (1), the pushing mechanism (4) being used to drive the second pipeline to move towards the first pipeline and complete docking after the central axis of the second pipeline and the central axis of the first pipeline are adjusted to be on the same straight line.
2. The building drainage pipe support device according to claim 1, characterized in that: The pushing mechanism (4) comprises a moving groove (42) formed on the fixed seat (1), a moving plate (41) being movably arranged in the moving groove (42), a first cylinder arm (43) being fixedly connected to a side wall of the moving plate (41), the first cylinder arm (43) being movably plugged into the fixed seat (1), an end of the first cylinder arm (43) away from the moving plate (41) being fixedly connected to a driving end of a first cylinder (44), and the first cylinder (44) being fixedly arranged on a side plate of the fixed seat (1).
3. The building drainage pipe support device according to claim 2, characterized in that: The fixing mechanism (2) comprises a lower fixing plate assembly (21), wherein the lower fixing plate assembly (21) is fixedly arranged on a lower support seat (22), wherein the lower support seat (22) is fixedly arranged on an upper end surface of a fixing seat (1), wherein an upper end of the lower support seat (22) is fixedly connected to a first connecting assembly (23), wherein an upper end of the first connecting assembly (23) is fixedly connected to a lower end surface of a fixing block (24), wherein the fixing block (24) is fixedly arranged on a side wall of an upper fixing plate assembly (25), wherein a first inner spiral tube (27) is fixedly inserted into the fixing block (24), wherein an inner thread of the first inner spiral tube (27) is inserted into a first spiral rod (26), wherein a lower end of the first spiral rod (26) is rotatably arranged on an upper end surface of the lower support seat (22), and a screwing ring (28) is fixedly connected to an upper end of the first spiral rod (26).
4. The building drainage pipe support device according to claim 3, characterized in that: The first connecting assembly (23) comprises a first connecting rod (231), a first connecting tube (232) and a first connecting spring (233); the first connecting rod (231) is movably inserted into the first connecting tube (232); the first connecting spring (233) is wound around the outside of the first connecting rod (231); two ends of the first connecting spring (233) are respectively fixedly connected to the side wall of the first connecting rod (231) and the outer side wall of the first connecting tube (232); the first connecting rod (231) is connected to the fixing block (24); and the first connecting tube (232) is connected to the lower support seat (22).
5. The building drainage pipe support device according to claim 3, characterized in that: The adjustment mechanism (3) comprises a first adjustment plate (31) and a second adjustment plate (32) which are arranged opposite to each other. A movable slider (33) is arranged at the lower end of each of the first adjustment plate (31) and the second adjustment plate (32). The two movable sliders (33) are movably arranged in a movable slide groove (34). The movable slide groove (34) is provided on the movable plate (41). A second inner spiral tube (35) is fixedly inserted on the two movable sliders (33). The two second inner spiral tubes (35) are threadedly sleeved on the second spiral rod (31). 6), the thread directions of the two second inner spiral tubes (35) are opposite, one end of the second spiral rod (36) is rotatably arranged on the side wall of the movable slide groove (34), the other end of the second spiral rod (36) is connected to the driving end of the driving motor (37), and the driving motor (37) is fixedly arranged on the side wall of the movable plate (41), the inner side wall of the first adjustment plate (31) is inlaid with two first electrode contact pieces (38), and the inner side wall of the second adjustment plate (32) is inlaid with two second electrode contact pieces (39).
6. The building drainage pipe support device according to claim 5, characterized in that: The invention also comprises a control mechanism (5), the control mechanism (5) being used for controlling the closing of the first cylinder (44), the control mechanism (5) comprising a first movable groove (52) provided on the regulating mechanism (3), a first control component (51) being arranged in the first movable groove (52), and a second movable groove (54) provided on the fixing mechanism (2), a second control component (53) being arranged in the second movable groove (54), and when the first pipe is in contact with the second pipe during operation, the first control component (51) and the first movable groove (52) are also in contact synchronously, and the series circuit is connected, so as to control the closing of the first cylinder (44).
7. The building drainage pipe support device according to claim 6, characterized in that: The first control component (51) comprises a third electrode contact piece (511), the third electrode contact piece (511) is provided with an anti-stuck groove (512), the third electrode contact piece (511) is fixedly arranged on a first supporting plate (513), the first supporting plate (513) is movably arranged in the first movable groove (52), the first control component (51) further comprises a second connecting component (514), the second connecting component (514) comprises a second connecting rod (5141), the second connecting rod (5141) is movably inserted in the second connecting tube (5142), a second connecting spring (5143) is wound around the outside of the second connecting rod (5141), two ends of the second connecting spring (5143) are respectively fixedly connected to the side wall of the second connecting rod (5141) and the outer side wall of the second connecting tube (5142), the second connecting rod (5141) is connected to the first supporting plate (513), and the second connecting tube (5142) is connected to the first movable groove (52).
8. The building drainage pipe support device according to claim 6, characterized in that: The second control component (53) comprises a fourth electrode contact piece (531) movably arranged in the second movable groove (54), the fourth electrode contact piece (531) is fixedly connected to the second supporting plate (532), the second supporting plate (532) is movably arranged in the second movable groove (54), the second control component (53) further comprises a third connecting component (533), the third connecting component (533) comprises a third connecting rod (5331), the third connecting rod (5331) is movably inserted in the third connecting cylinder (5332), a third connecting spring (5333) is wound around the outside of the third connecting rod (5331), two ends of the third connecting spring (5333) are respectively fixedly connected to the side wall of the third connecting rod (5331) and the outer side wall of the third connecting cylinder (5332), the third connecting rod (5331) is connected to the second supporting plate (532), and the third connecting cylinder (5332) is connected to the second movable groove (54).
9. The building drainage pipe support device according to claim 3, characterized in that: The structure of the lower fixing plate assembly (21) is consistent with that of the upper fixing plate assembly (25), and the lower fixing plate assembly (21) is arranged below the upper fixing plate assembly (25), and the upper fixing plate assembly (25) comprises a first fixing plate (251), the first fixing plate (251) is movably arranged in a mounting groove, the mounting groove is provided on a second fixing plate (252), a movable hole (254) is provided on the second fixing plate (252), a support rod (253) is movably arranged in the movable hole (254), and the support rod (253) is fixedly connected to the first fixing plate (251), wherein the support rod (253) and the movable hole (254) in the upper fixing plate assembly (25) are arranged at the top of the upper fixing plate assembly (25), and the support rod (253) and the movable hole (254) in the lower fixing plate assembly (21) are arranged on the side of the lower fixing plate assembly (21).
10. The building drainage pipe support device according to claim 9, characterized in that: The driving mechanism (6) further comprises a driving mechanism (6), wherein the driving mechanism (6) comprises a curved plate (61) slidably arranged on the upper end surface of the second fixed plate (252), the curved plate (61) being connected to the upper end of the support rod (253), a second cylinder arm (62) being fixedly connected to the side wall of the curved plate (61), a free end of the second cylinder arm (62) being fixedly connected to the driving end of the second cylinder (63), the second cylinder (63) being fixedly arranged on the upper end surface of the second fixed plate (252), a first horizontal plate (64) being fixedly connected to the side wall of the curved plate (61), a fourth connecting assembly (66) being fixedly connected to the lower end surface of the first horizontal plate (64), and the The lower end of the fourth connecting component (66) is fixedly connected to the upper end surface of the second horizontal plate (65), and the second horizontal plate (65) is fixedly arranged on the support rod (253) in the lower fixed plate assembly (21). The fourth connecting component (66) includes a fourth connecting rod (661), a fourth connecting tube (662) and a fourth connecting spring (663). The fourth connecting rod (661) is movably inserted in the fourth connecting tube (662), and the fourth connecting spring (663) is wound and arranged outside the fourth connecting rod (661). The two ends of the fourth connecting spring (663) are respectively fixedly connected to the side wall of the fourth connecting rod (661) and the outer side wall of the fourth connecting tube (662).
Citation Information
Patent Citations
Municipal fuel gas pipeline butt joint construction device
CN113681491A
Pipeline laying positioning device for water conservancy projects
CN212900089U
Pipe jacking machine for water conservancy project
CN213575904U
Building heating and ventilation pipeline connecting device
CN215908590U
Adjustable bracket for mounting high-efficiency filter
CN216158574U