A surveying device for spatial planning

By designing a surveying equipment including a fixed shell and a telescopic shell, the problems of complex structure and low automation in the existing equipment are solved, and efficient and accurate multi-angle surveys are achieved.

CN119737535AInactive Publication Date: 2025-04-01SHANDONG JIANZHU UNIV DESIGN GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202510253264.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-05
Publication Date
2025-04-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing geographical survey and acquisition equipment has complex structure and low degree of automation. It is inconvenient for rapid start-up and storage during use. The freedom and accuracy during surveying are average, the detection efficiency is low, and it is impossible to automatically drive the instrument to conduct multiple and multi-angle surveys of the surrounding environment.

Method used

A surveying equipment including a fixed shell and a telescopic shell is designed. The telescopic shell is arranged on the top of the fixed shell. The sealing arc plate swings through the coordination of the threaded rod and the threaded sleeve, opening the survey chamber, and extending out of the surveying equipment to survey the surrounding surface. The equipment is also equipped with a drive motor and a rotating motor, which can automatically drive the instrument for multiple and multi-angle surveys.

Benefits of technology

It improves the safety and practicality of survey equipment, enhances the accuracy and efficiency of surveying, and can automatically conduct multiple and multi-angle surveys of the surrounding environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119737535A_ABST
    Figure CN119737535A_ABST
Patent Text Reader

Abstract

The present invention discloses a surveying device for space planning, which belongs to the field of space planning technology. A telescopic shell is movably arranged on the top of a fixed shell, a square track is arranged at the bottom of a support frame, a meshing ring facing downward is movably arranged in the middle of the support frame, a first moving platform is movably arranged on the top of the support frame, and a second moving platform is movably arranged on the top of the first moving platform; both sides of the second moving platform are connected with connecting frames facing downward, an upper meshing arm slidably arranged in the track is arranged on the top of the sliding sleeve, and a lower meshing arm is movably connected with the middle of the connecting frame; a rotating plate is arranged on the top of the equipment compartment, and multiple groups of surveying equipment are installed on the top of the rotating plate. The present invention can synchronously drive the sealing arc plate to swing through a threaded rod and a threaded sleeve. When the telescopic shell moves downward, the threaded rod drives the linkage gear to rotate clockwise, and at this time, the swinging gear drives the sealing arc plate to rotate counterclockwise and open the survey cavity. This design improves safety and practicality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of space planning, in particular to a surveying device used for space planning. Background Art

[0002] Spatial planning is a guide for spatial development, a spatial blueprint for sustainable development, and the basic basis for all kinds of development, protection and construction activities. Establish a spatial planning system and supervise its implementation, integrate spatial planning such as main functional area planning, land use planning, urban and rural planning into a unified national land space planning, realize "multiple plans in one", and strengthen the guiding and restraining role of spatial planning on various special plans. Geographic information survey and collection is a key point in national land space planning. Geographic information survey and collection refers to the process of systematically measuring, recording and collecting data on natural and artificial geographical elements such as surface features, topography, landforms, hydrology, vegetation, etc. using various technologies and equipment. These data can then be used to generate geographic information systems (GIS), maps, three-dimensional models and other geospatial products.

[0003] The patent application with publication number CN118794408A discloses a geographic information surveying and collecting equipment for land space planning; it includes a measuring seat and a measuring ball in the measuring seat; the surveying and collecting equipment is controlled and operated by a controller; the measuring seat is in the shape of an elongated strip; a cylindrical roller track is arranged inside the measuring seat along the length direction; a vacuum is arranged inside the roller track; the measuring ball is movably connected in the roller track; the inner wall diameter of the roller track is adapted to the outer diameter of the measuring ball; pressure sensors are arranged at both ends of the roller track; a driven groove is arranged on the lower inner wall of the roller track; two driven grooves are arranged near the corresponding pressure sensors; the invention arranges the measuring seat in the shape of an elongated strip so that the measuring ball can roll along the roller track, thereby greatly improving the rolling range of the measuring ball. Compared with the existing surveying and collecting equipment, the measurement accuracy of the land inclination is greatly improved, and it is easy to use.

[0004] However, the above-disclosed geographic survey and collection equipment has a complex structure and a general degree of automation. It is not convenient to start and store quickly when in use. In addition, the degree of freedom and accuracy during surveying are general, the detection efficiency is low, and the instrument cannot be automatically driven to conduct multiple and multi-angle surveys of the surrounding environment. Summary of the invention

[0005] The purpose of the present invention is to provide a surveying device for spatial planning in order to solve the problems of the existing geographic surveying and collecting equipment, such as complex structure, general degree of automation, inconvenience in quick startup and storage during use, general degree of freedom and accuracy during surveying, low detection efficiency, and inability to automatically drive the instrument to conduct multiple and multi-angle surveys of the surrounding environment.

[0006] To achieve the above-mentioned purpose, the technical solution of the present invention is: a surveying equipment for space planning, comprising a fixed shell and a telescopic shell, the telescopic shell being movably arranged on the top of the fixed shell; a support frame is installed on the bottom inner wall of the fixed shell, the bottom of the support frame is provided with a square track, the middle part of the support frame is also movably provided with a meshing circle facing downward, the diameter position of the meshing circle is fixedly provided with a connecting arm, a first moving platform is movably installed on the top of the support frame, a second moving platform is movably installed on the top of the first moving platform, and the moving direction of the first moving platform is perpendicular to the moving direction of the second moving platform; two sides of the second moving platform are fixedly connected with a pair of guide rails facing downward. A connecting frame is provided below, a sliding sleeve is slidably provided on the connecting arm, an upper engaging arm slidably provided in the track is provided on the top of the sliding sleeve, a lower engaging arm is provided at the bottom of the sliding sleeve, and the lower engaging arm is movably connected to the middle part of the connecting frame; an equipment bin is provided on the top of the second motion platform, a rotating plate is movably provided on the top of the equipment bin, and a plurality of surveying equipment are installed on the top of the rotating plate; a surveying cavity is provided in the middle part of the telescopic shell, a plurality of sealing arc plates are movably installed in the surveying cavity, and when the telescopic shell moves downward along the fixed shell, the sealing arc plate automatically swings and opens the surveying cavity, at which time the surveying equipment extends out of the surveying cavity and surveys the surrounding surface.

[0007] As a further solution of the present invention: a rotating cavity is opened in the middle of the support frame, a bearing is installed in the rotating cavity, a rotating shaft is arranged in the middle of the connecting arm, and the meshing ring is movably installed in the rotating cavity through the rotating shaft.

[0008] As a further solution of the present invention: a driving motor is also installed on the bottom inner wall of the fixed shell, and a driving wheel is installed on the output end of the driving motor. The driving wheel is connected to the outer wall of the meshing ring through a belt.

[0009] As a further solution of the present invention: a first trapezoidal rail is fixedly provided on the top of the support frame, and a first trapezoidal slide groove matching therewith is provided at the bottom of the first motion platform; a second trapezoidal rail is fixedly provided on the top of the first motion platform, and a second trapezoidal slide groove matching therewith is provided at the bottom of the second motion platform.

[0010] As a further solution of the present invention: a rotating column is fixedly arranged at the bottom of the rotating plate, the rotating column passes through the top of the equipment bin, a driven gear is installed at the bottom of the rotating column, a rotating motor is installed inside the equipment bin, and a special-shaped gear meshing with the driven gear is installed at the output end of the rotating motor.

[0011] As a further solution of the present invention: an annular hanging plate is fixedly provided on the top inner wall of the telescopic shell, and a double gear ring is movably installed between the annular hanging plate and the top inner wall of the telescopic shell, and the double gear ring includes an inner gear ring and an outer gear ring; multiple groups of swing gears meshing with the inner gear ring are also movably installed on the annular hanging plate, and the sealing arc plate is fixedly connected to the middle part of the swing gear; symmetrical ring rails are provided on the upper and lower sides of the double gear ring, and ring grooves matching with them are also opened on the annular hanging plate and the inner wall of the telescopic shell.

[0012] As a further solution of the present invention: three groups of support bins are arranged at the bottom of the fixed shell, cylinders are installed in the support bins, and conical support legs facing downwards are installed at the output ends of the cylinders. A sensor is also installed at the bottom of the fixed shell.

[0013] As a further solution of the present invention: a plurality of groups of convex plates are fixedly provided on the outer side of the annular hanging plate, a threaded rod is movably installed on the convex plate, and a linkage gear meshing with the outer gear ring is installed on the top of the threaded rod; a plurality of groups of fixed plates are fixedly provided on the inner wall of the fixed outer shell, and a threaded sleeve meshing with the threaded rod is provided in the middle of the fixed plate.

[0014] As a further solution of the present invention: a telescopic cavity is provided inside the outer wall of the fixed shell, a limiting boss is provided inside the telescopic cavity, and a limiting bottom plate cooperating with the limiting boss is fixedly provided on the bottom of the telescopic shell.

[0015] As a further solution of the present invention: a control panel is arranged on the outer wall of the fixed shell, and a symmetrical handle is also fixedly arranged on the outer wall of the telescopic shell.

[0016] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention can synchronously drive multiple sets of sealing arc plates to swing through the cooperation of the threaded rod and the threaded sleeve. When the telescopic shell moves downward along the telescopic cavity, the threaded rod drives the linkage gear to rotate clockwise under the drive of the threaded sleeve. Driven by the linkage gear, the double gear ring rotates counterclockwise, and at this time the swing gear drives the sealing arc plate to rotate counterclockwise and open the survey cavity. Multiple sets of survey equipment extend out of the survey cavity and survey the surrounding surface. This design improves the safety and practicality of the survey equipment used for space planning.

[0017] 2. During the surveying operation, when the driving motor drives the meshing circle to rotate, the upper meshing arm moves along the track and synchronously drives the connecting frame to move. When the sleeve moves along the track, the second motion platform will also make the same movement relative to the support frame, and its trajectory is also a square. When the rotating motor drives the special-shaped gear to rotate, the special-shaped gear will drive the driven gear and the rotating plate to rotate intermittently, thereby cooperating with the second motion platform at the bottom and performing multiple, cyclic detection of the terrain environment through multiple sets of survey equipment. This design improves the accuracy and survey effect of the survey equipment used for space planning. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The present invention will be further explained below in conjunction with the accompanying drawings and embodiments: Figure 1 It is a three-dimensional structural diagram of the present invention; Figure 2 is a cross-sectional view of the fixed housing in the present invention; Figure 3 It is the internal three-dimensional structure diagram of the present invention; Figure 4 It is a three-dimensional structural diagram of the first motion platform in the present invention; Figure 5 It is a three-dimensional structural diagram of the support frame in the present invention; Figure 6 It is a three-dimensional structural diagram of the meshing circle in the present invention; Figure 7 is a cross-sectional view of the telescopic housing of the present invention; Figure 8 yes Figure 7 A magnified view of the structure at center A; Fig. 9 It is a cross-sectional view of the present invention.

[0019] Description of reference numerals: 1. Fixed shell; 2. Telescopic shell; 3. Telescopic cavity; 4. Limiting boss; 5. Limiting bottom plate; 6. Support bin; 7. Cylinder; 8. Support leg; 9. Control panel; 10. Sensor; 11. Handle; 12. Support frame; 13. Track; 14. Rotating cavity; 15. Bearing; 16. Engaging ring; 17. Connecting arm; 18. Rotating shaft; 19. Driving motor; 20. Driving wheel; 21. Belt; 22. First moving platform; 23. First trapezoidal rail; 24. First trapezoidal slide; 25. Second moving platform; 26. Second trapezoidal rail; 27 , the second trapezoidal slide; 28, equipment compartment; 29, sliding sleeve; 30, upper meshing arm; 31, connecting frame; 32, lower meshing arm; 33, rotating plate; 34, surveying equipment; 35, rotating column; 36, driven gear; 37, rotating motor; 38, special-shaped gear; 39, surveying cavity; 40, annular hanging plate; 41, double gear ring; 42, inner gear ring; 43, outer gear ring; 44, ring rail; 45, ring groove; 46, swing gear; 47, sealing arc plate; 48, convex plate; 49, threaded rod; 50, linkage gear; 51, fixed plate; 52, threaded sleeve. DETAILED DESCRIPTION

[0020] The following will be combined with the attached Figures 1 to 9 The technical solution of the present invention is described clearly and completely. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] The present invention provides a surveying device for space planning by improvement, such as Figure 1-Figure 9As shown, it includes a fixed shell 1 and a telescopic shell 2, and the telescopic shell 2 is movably arranged on the top of the fixed shell 1; a support frame 12 is installed on the bottom inner wall of the fixed shell 1, and a square track 13 is arranged at the bottom of the support frame 12, and a meshing circle 16 facing downward is also movably installed in the middle of the support frame 12, and a connecting arm 17 is fixedly arranged at the diameter position of the meshing circle 16, and a first moving platform 22 is movably installed on the top of the support frame 12, and a second moving platform 25 is movably installed on the top of the first moving platform 22, and the moving direction of the first moving platform 22 is perpendicular to the moving direction of the second moving platform 25; the second moving platform 25 is fixedly connected to the connecting frames 31 facing downward on both sides, and the connecting arms 17 slide upward A sliding sleeve 29 is movably provided, and an upper engaging arm 30 slidably arranged in the track 13 is provided on the top of the sliding sleeve 29, and a lower engaging arm 32 is provided at the bottom of the sliding sleeve 29, and the lower engaging arm 32 is movably connected to the middle part of the connecting frame 31; an equipment warehouse 28 is provided on the top of the second motion platform 25, and a rotating plate 33 is movably provided on the top of the equipment warehouse 28, and multiple groups of surveying equipment 34 are installed on the top of the rotating plate 33; a surveying cavity 39 is opened in the middle of the telescopic shell 2, and multiple groups of sealing arc plates 47 are movably installed in the surveying cavity 39. When the telescopic shell 2 moves downward along the fixed shell 1, the sealing arc plate 47 automatically swings and opens the surveying cavity 39. At this time, the surveying equipment 34 extends out of the surveying cavity 39 and surveys the surrounding surface.

[0022] In this embodiment: the surveying equipment for space planning is mainly divided into two parts: a fixed housing 1 and a telescopic housing 2. When the equipment is in use, the equipment is first placed on the ground, and then the multiple groups of cylinders 7 are started through the control panel 9 and the length of the supporting legs 8 are adjusted to keep the equipment in a horizontal state. Then the telescopic housing 2 is manually slid downward along the fixed housing 1 through the handle 11. When the telescopic housing 2 moves downward along the telescopic cavity 3, the threaded rod 49 drives the linkage gear 50 to rotate clockwise under the drive of the threaded sleeve 52. Driven by the linkage gear 50, the double gear ring 41 rotates counterclockwise, and at this time, the swing gear 46 drives the sealing arc plate 47 to rotate counterclockwise and open the survey cavity 39. Then the drive motor 19 and the rotating motor 37 are started. When the drive motor 19 drives the meshing ring 16 to rotate, the upper meshing arm 30 synchronously drives the connecting frame 31 to move when it moves along the track 13. When the sliding sleeve 29 moves along the track 13, the second moving platform 25 will also make the same movement relative to the support frame 12, and the equipment compartment 28 will make a square reciprocating motion relative to the support frame 12. When the rotating motor 37 drives the special-shaped gear 38 to rotate, the special-shaped gear 38 will drive the driven gear 36 and the rotating plate 33 to rotate intermittently, so as to perform multiple and cyclic surveys of the surrounding terrain through the survey equipment 34. After the survey operation is completed, the telescopic housing 2 is manually moved upward along the telescopic cavity 3 through the handle 11, and the threaded rod 49 drives the linkage gear 50 to rotate counterclockwise under the drive of the threaded sleeve 52. Driven by the linkage gear 50, the double gear ring 41 rotates clockwise, and the swing gear 46 drives the sealing arc plate 47 to rotate clockwise and close the survey cavity 39.

[0023] See attached Figure 3 and attached Figure 5 A rotating chamber 14 is provided in the middle of the support frame 12 , a bearing 15 is installed in the rotating chamber 14 , a rotating shaft 18 is provided in the middle of the connecting arm 17 , and the meshing ring 16 is movably installed in the rotating chamber 14 through the rotating shaft 18 .

[0024] In this embodiment, in order to ensure that the meshing ring 16 is rotatably arranged in the rotating chamber 14, a bearing 15 structure is designed.

[0025] See attached Figure 2 -Attached Figure 3 A driving motor 19 is also installed on the bottom inner wall of the fixed housing 1 , and a driving wheel 20 is installed on the output end of the driving motor 19 . The driving wheel 20 is connected to the outer wall of the meshing ring 16 through a belt 21 .

[0026] In this embodiment, a drive motor 19 is provided to drive the meshing ring 16 to rotate.

[0027] See attached Figure 3 -Attached Figure 6A first trapezoidal rail 23 is fixedly provided on the top of the support frame 12, and a first trapezoidal slide groove 24 matching therewith is provided at the bottom of the first motion platform 22; a second trapezoidal rail 26 is fixedly provided on the top of the first motion platform 22, and a second trapezoidal slide groove 27 matching therewith is provided at the bottom of the second motion platform 25.

[0028] In this embodiment: when the drive motor 19 drives the meshing ring 16 to rotate, the upper meshing arm 30 drives the connecting frame 31 to move synchronously when moving along the track 13. When the sliding sleeve 29 moves along the track 13, the second motion platform 25 will also make the same movement relative to the support frame 12, and its trajectory is also a square. Assume that the adjacent sides of the track 13 are A and B, and A is perpendicular to the direction of the first trapezoidal rail 23. When the sliding sleeve 29 moves along the A side of the track 13, the connecting frame 31 drives the second motion platform 25 to slide along the second trapezoidal rail 26, and the first motion platform 22 remains stationary. When the sliding sleeve 29 moves along the B side of the track 13, the first motion platform 22 slides along the first trapezoidal slide 24, and the second motion platform 25 remains stationary relative to the first motion platform 22.

[0029] See attached Figure 2 A rotating column 35 is fixedly provided at the bottom of the rotating plate 33, and the rotating column 35 passes through the top of the equipment bin 28. A driven gear 36 is installed at the bottom of the rotating column 35. A rotating motor 37 is installed inside the equipment bin 28, and a special-shaped gear 38 meshing with the driven gear 36 is installed at the output end of the rotating motor 37.

[0030] In this embodiment, a rotating column 35 is designed to ensure that the rotating plate 33 drives the multiple surveying equipment 34 to rotate relative to the equipment compartment 28. During the surveying operation, in order to drive the rotating plate 33 to rotate intermittently, so as to measure the surrounding environment multiple times at 360 degrees, a driven gear 36 and a special-shaped gear 38 that cooperate with each other are designed.

[0031] See attached Figure 7 -Attached Figure 8 An annular hanging plate 40 is fixedly arranged on the top inner wall of the telescopic shell 2, and a double gear ring 41 is movably installed between the annular hanging plate 40 and the top inner wall of the telescopic shell 2, and the double gear ring 41 includes an inner gear ring 42 and an outer gear ring 43; a plurality of sets of swing gears 46 meshing with the inner gear ring 42 are also movably installed on the annular hanging plate 40, and a sealing arc plate 47 is fixedly connected to the middle part of the swing gear 46; symmetrical ring rails 44 are arranged on the upper and lower sides of the double gear ring 41, and annular grooves 45 cooperating with them are also opened on the annular hanging plate 40 and the inner wall of the telescopic shell 2.

[0032] In this embodiment, in order to ensure that the double gear ring 41 can rotate freely relative to the annular hanging plate 40 and further improve its stability during rotation, a ring rail 44 and annular groove 45 structure that cooperate with each other are designed.

[0033] See attached Figure 1 and attached Fig. 9 Three groups of support bins 6 are arranged at the bottom of the fixed shell 1, and a cylinder 7 is installed in the support bin 6. A conical support leg 8 facing downward is installed at the output end of the cylinder 7. A sensor 10 is also installed at the bottom of the fixed shell 1.

[0034] In this embodiment, when the site is uneven during operation, the length of the support legs 8 can be adjusted by multiple independent cylinders 7, so that the device always remains horizontal and the survey accuracy is further improved. In order to monitor the horizontal state of the device in real time, a sensor 10 is designed.

[0035] See attached Figure 7 -Attached Fig. 9 A plurality of groups of convex plates 48 are fixedly provided on the outer side of the annular hanging plate 40, a threaded rod 49 is movably installed on the convex plate 48, and a linkage gear 50 meshing with the outer gear ring 43 is installed on the top of the threaded rod 49; a plurality of groups of fixed plates 51 are fixedly provided on the inner wall of the fixed shell 1, and a threaded sleeve 52 meshing with the threaded rod 49 is provided in the middle of the fixed plate 51.

[0036] In this embodiment: when the telescopic housing 2 moves downward along the telescopic cavity 3, driven by the threaded sleeve 52, the threaded rod 49 drives the linkage gear 50 to rotate clockwise. Driven by the linkage gear 50, the double gear ring 41 rotates counterclockwise, and the swing gear 46 drives the sealing arc plate 47 to rotate counterclockwise and open the survey cavity 39. When the telescopic housing 2 moves upward along the telescopic cavity 3, driven by the threaded sleeve 52, the threaded rod 49 drives the linkage gear 50 to rotate counterclockwise. Driven by the linkage gear 50, the double gear ring 41 rotates clockwise, and the swing gear 46 drives the sealing arc plate 47 to rotate clockwise and close the survey cavity 39.

[0037] See attached Figure 2 and attached Figure 7 A telescopic cavity 3 is provided inside the outer wall of the fixed shell 1, a limiting boss 4 is provided inside the telescopic cavity 3, and a limiting bottom plate 5 cooperating with the limiting boss 4 is fixedly provided at the bottom of the telescopic shell 2.

[0038] In this embodiment, in order to ensure that the telescopic housing 2 slides along the fixed housing 1, so as to store the surveying equipment 34, a telescopic cavity 3 is designed. When the telescopic housing 2 moves along the fixed housing 1, in order to limit its position, a mutually cooperating limiting boss 4 and limiting bottom plate 5 are designed.

[0039] See attached Figure 1 and attached Fig. 9 A control panel 9 is arranged on the outer wall of the fixed shell 1 , and a symmetrical handle 11 is also fixedly arranged on the outer wall of the telescopic shell 2 .

[0040] In this embodiment, a control panel 9 is provided to control the operation of the device. A symmetrical handle 11 is provided to facilitate pulling the telescopic housing 2 upward or downward during operation.

[0041] The working principle of the present invention is as follows: when the device is used, the device is first placed on the ground, and then the multiple groups of cylinders 7 are started through the control panel 9 and the length of the supporting legs 8 is adjusted to keep the device in a horizontal state. Then the telescopic housing 2 is manually slid downward along the fixed housing 1 through the handle 11. When the telescopic housing 2 moves downward along the telescopic cavity 3, the threaded rod 49 drives the linkage gear 50 to rotate clockwise under the drive of the threaded sleeve 52. Driven by the linkage gear 50, the double gear ring 41 rotates counterclockwise, and at this time the swing gear 46 drives the sealing arc plate 47 to rotate counterclockwise and open the survey cavity 39. Then the drive motor 19 and the rotating motor 37 are started. When the drive motor 19 drives the meshing ring 16 to rotate, the upper meshing arm 30 drives the connecting frame 31 to move synchronously when it moves along the track 13. When the sliding sleeve 29 moves along the track 13, the second motion platform 25 also makes the same movement relative to the support frame 12, and at this time the equipment compartment 28 makes a square reciprocating motion relative to the support frame 12. When the rotating motor 37 drives the special-shaped gear 38 to rotate, the special-shaped gear 38 drives the driven gear 36 and the rotating plate 33 to rotate intermittently, thereby performing multiple, cyclic surveys of the surrounding terrain through the surveying equipment 34. After the surveying operation is completed, the telescopic housing 2 is manually moved upward along the telescopic cavity 3 through the handle 11, and the threaded rod 49 drives the linkage gear 50 to rotate counterclockwise under the drive of the threaded sleeve 52. Driven by the linkage gear 50, the double gear ring 41 rotates clockwise, and at this time the swing gear 46 drives the sealing arc plate 47 to rotate clockwise and close the survey cavity 39.

[0042] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and inventive features disclosed herein.

Claims

1. A surveying device for space planning, comprising a fixed housing (1) and a telescopic housing (2), characterized in that: The telescopic shell (2) is movably mounted on the top of the fixed shell (1); a support frame (12) is mounted on the inner wall of the bottom of the fixed shell (1); a square track (13) is mounted on the bottom of the support frame (12); a meshing ring (16) facing downward is movably mounted in the middle of the support frame (12); a connecting arm (17) is fixedly mounted at the diameter position of the meshing ring (16); a first moving platform (22) is movably mounted on the top of the support frame (12); a second moving platform (25) is movably mounted on the top of the first moving platform (22); and a moving direction of the first moving platform (22) is perpendicular to a moving direction of the second moving platform (25); The second motion platform (25) is fixedly connected to a connecting frame (31) facing downward on both sides, a sliding sleeve (29) is slidably arranged on the connecting arm (17), an upper meshing arm (30) slidably arranged in the track (13) is arranged at the top of the sliding sleeve (29), a lower meshing arm (32) is arranged at the bottom of the sliding sleeve (29), and the lower meshing arm (32) is movably connected to the middle part of the connecting frame (31); An equipment bin (28) is arranged on the top of the second moving platform (25), a rotating plate (33) is movably arranged on the top of the equipment bin (28), and a plurality of groups of surveying equipment (34) are installed on the top of the rotating plate (33); a surveying cavity (39) is opened in the middle of the telescopic housing (2), and a plurality of groups of sealing arc plates (47) are movably installed in the surveying cavity (39); when the telescopic housing (2) moves downward along the fixed housing (1), the sealing arc plates (47) automatically swing and open the surveying cavity (39), and at this time, the surveying equipment (34) extends out of the surveying cavity (39) and surveys the surrounding ground surface.

2. A surveying device for space planning according to claim 1, characterized in that: A rotating cavity (14) is provided in the middle of the support frame (12), a bearing (15) is installed in the rotating cavity (14), a rotating shaft (18) is provided in the middle of the connecting arm (17), and the meshing ring (16) is movably installed in the rotating cavity (14) via the rotating shaft (18).

3. The surveying device for space planning according to claim 1, characterized in that: A driving motor (19) is also mounted on the inner wall of the bottom of the fixed housing (1), and a driving wheel (20) is mounted on the output end of the driving motor (19), and the driving wheel (20) is connected to the outer wall of the meshing ring (16) via a belt (21).

4. The surveying device for space planning according to claim 1, characterized in that: A first trapezoidal rail (23) is fixedly provided on the top of the support frame (12), and a first trapezoidal slide groove (24) matching therewith is provided on the bottom of the first motion platform (22); a second trapezoidal rail (26) is fixedly provided on the top of the first motion platform (22), and a second trapezoidal slide groove (27) matching therewith is provided on the bottom of the second motion platform (25).

5. A surveying device for space planning according to any one of claims 1 to 4, characterized in that: A rotating column (35) is fixedly provided at the bottom of the rotating plate (33), the rotating column (35) passes through the top of the equipment bin (28), a driven gear (36) is installed at the bottom of the rotating column (35), a rotating motor (37) is installed inside the equipment bin (28), and a special-shaped gear (38) meshing with the driven gear (36) is installed at the output end of the rotating motor (37).

6. A surveying device for space planning according to any one of claims 1 to 4, characterized in that: An annular hanging plate (40) is fixedly arranged on the top inner wall of the telescopic shell (2), and a double gear ring (41) is movably installed between the annular hanging plate (40) and the top inner wall of the telescopic shell (2), and the double gear ring (41) includes an inner gear ring (42) and an outer gear ring (43); a plurality of groups of swing gears (46) meshing with the inner gear ring (42) are also movably installed on the annular hanging plate (40), and the sealing arc plate (47) is fixedly connected to the middle of the swing gear (46); symmetrical ring rails (44) are arranged on the upper and lower sides of the double gear ring (41), and ring grooves (45) cooperating with the double gear ring (46) are also opened on the inner walls of the annular hanging plate (40) and the telescopic shell (2).

7. A surveying device for space planning according to any one of claims 1 to 4, characterized in that: Three groups of support bins (6) are arranged at the bottom of the fixed housing (1), a cylinder (7) is installed in the support bin (6), a tapered support leg (8) facing downwards is installed at the output end of the cylinder (7), and a sensor (10) is also installed at the bottom of the fixed housing (1).

8. The surveying device for space planning according to claim 6, characterized in that: A plurality of groups of convex plates (48) are fixedly arranged on the outer side of the annular hanging plate (40), a threaded rod (49) is movably mounted on the convex plate (48), and a linkage gear (50) meshing with the outer gear ring (43) is mounted on the top of the threaded rod (49); a plurality of groups of fixed plates (51) are fixedly arranged on the inner wall of the fixed housing (1), and a threaded sleeve (52) meshing with the threaded rod (49) is arranged in the middle of the fixed plate (51).

9. A surveying device for space planning according to any one of claims 1 to 4, characterized in that: A telescopic cavity (3) is provided inside the outer wall of the fixed housing (1), a limiting boss (4) is provided inside the telescopic cavity (3), and a limiting bottom plate (5) cooperating with the limiting boss (4) is fixedly provided at the bottom of the telescopic housing (2).

10. A surveying device for space planning according to any one of claims 1 to 4, characterized in that: A control panel (9) is provided on the outer wall of the fixed housing (1), and a symmetrical handle (11) is also fixedly provided on the outer wall of the telescopic housing (2).

Citation Information

Patent Citations

  • Geographic information surveying and collecting equipment for territorial space planning

    CN118794408A