A railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform
By introducing a graphical reporting and intelligent management system based on the LKJ basic data platform in the railway construction management system, the problems of inconsistent information entry and cumbersome review process in the existing system are solved, efficient entry, intelligent correction and refined management of construction plans are achieved, and the efficiency and safety of construction management are improved.
Patent Information
- Application Number
- CN202411809319.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-10
- Publication Date
- 2025-04-01
AI Technical Summary
The existing railway construction management system mainly relies on manual text entry, and there are problems such as inconsistent information format, poor scalability, cumbersome review process and error-prone, making it difficult to meet the needs of railway information construction for efficient data integration and visual expression.
Develop a graphical reporting and intelligent management system for railway construction plans based on the LKJ basic data platform, and realize rapid entry, intelligent correction, conflict detection, approval process automation and safety card control of construction plans through a graphical interface, and support graphical reporting of operation locations related to multiple stations and refined management of operation plans.
Through graphical reporting and intelligent management systems, the refinement level and operating efficiency of construction management are improved, the safety and compliance of construction plans are ensured, and manual errors and audit workload are reduced.
Smart Images

Figure CN119740746A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of railway traffic management and information technology, and in particular to a railway construction plan graphical reporting and intelligent management system based on an LKJ basic data platform. Background Art
[0002] With the gradual development of railway informatization, the continuous integration and utilization of data and the visualization of data have become the key contents of railway informatization. The current mainstream operating line construction management system reports the scope of construction operations mainly through manual text entry. The key information is not formatted, the scalability is weak, the expansion function effect is not ideal, and the inherited information is relatively limited, which makes the plan submitters fill in the content at will, and the plan approval personnel have heavy inspection and approval work. The traditional railway construction management system mainly relies on manual text entry, and there are problems such as inconsistent information format, poor scalability, cumbersome and error-prone review process. With the in-depth development of railway informatization, the demand for efficient integration and visualization of data is becoming increasingly urgent. Therefore, it is particularly important to develop a system that can graphically report construction plans and has the functions of automatic correction, conflict detection, safety card control and operation plan management. Summary of the invention
[0003] The purpose of the present invention is to provide a railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform, which realizes the rapid entry, intelligent correction, conflict detection, approval process automation and safety control of the construction plan through a graphical interface, and at the same time realizes the graphical reporting of the work site associated with multiple stations, the standardization of the description terms of the work site, the display of the work scope conflict effect on the station map of the work plan, the safety control of the graphical reporting link, and the association of the skylight work unit with the station map equipment, thereby greatly improving the refinement level of construction management and the work efficiency.
[0004] The present invention is achieved through the following technical solutions:
[0005] A railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform, including:
[0006] Graphical reporting module, used to select the construction impact range through the station schematic diagram of the LKJ basic data management platform, and supports graphical reporting of work locations associated with multiple stations;
[0007] Standardized job description module, which is used to standardize the description terms of job locations to ensure the accuracy and consistency of information;
[0008] Intelligent conflict detection and display module, which is used to display the conflict effect of the working scope on the site map after the construction plan is entered, and automatically perform conflict detection;
[0009] Safety card control and early warning module, used for safety card control in the graphical reporting link to ensure the safety and compliance of the construction plan;
[0010] The operation plan management and approval module is used to associate the skylight operation unit with the station map equipment to achieve refined management of the operation plan.
[0011] As a further improvement of the technical solution of the present invention, the graphical reporting module also includes a detailed editing and preview function of the work location, supporting the user to fine-tune the work location according to actual needs.
[0012] As a further improvement of the technical solution of the present invention, the standardized work description module has a built-in standardized work site description term library, and the user can select or input standardized description terms from the library when reporting the construction plan.
[0013] As a further improvement of the technical solution of the present invention, the intelligent conflict detection and display module automatically detects time conflicts, resource conflicts and safety distance conflicts after the construction plan is entered; the conflict detection results are displayed in a graphical manner on the site map, including the conflict location, type and impact range, to facilitate users to quickly identify and resolve conflicts.
[0014] As a further improvement of the technical solution of the present invention, the safety card control and early warning module performs real-time monitoring in the graphical reporting link, including construction progress, on-site personnel and equipment status; once potential safety risks or construction progress deviations are found, the system will immediately trigger the early warning mechanism, give early warning information and adjustment suggestions, and ensure the safety and compliance of the construction plan.
[0015] As a further improvement of the technical solution of the present invention, the work plan management and approval module associates the skylight work unit with the station map equipment to achieve refined management of the work plan; users can view the construction plan details through the graphical interface, including the work location, time and impact range; the system supports multi-level approval process, and the approval personnel can quickly understand the construction plan status through the graphical interface and give approval opinions; at the same time, the system has an automatic approval function to quickly approve construction plans that meet the preset conditions.
[0016] As a further improvement of the technical solution of the present invention, the graphical reporting module allows users to intuitively select stations and line sections affected by construction through a graphical interface, and supports reporting of work sites across stations; users can accurately mark the construction scope on the schematic diagram through click, drag and zoom operations, thereby realizing graphical entry of construction plans.
[0017] As a further improvement of the technical solution of the present invention, the standardized job description module also has an automatic verification function, prompting the user for description terms that do not meet the standards and requiring the user to correct them.
[0018] As a further improvement of the technical solution of the present invention, the automatic adjustment principle of the disassembly sequence of the train automatic flow distribution and relief system is: the arriving vehicles used by the departing vehicles with earlier starting points are disassembled first.
[0019] As a further improvement of the technical solution of the present invention, the graphical reporting module further includes:
[0020] Dynamic marking and preview function: users can view the marking effect of the construction scope in real time, and support fine-tuning of the marking to ensure the accuracy of the construction scope;
[0021] Multi-layer management: The system supports multi-layer management. Users can add, delete or modify layers as needed to better display the construction plan.
[0022] As a further improvement of the technical solution of the present invention, the standardized operation description module further includes:
[0023] Customizable description term library: Users can customize or modify the terms in the description term library according to actual needs to meet the needs of different construction scenarios;
[0024] Intelligent recommendation function: The system intelligently recommends relevant standardized descriptive terms based on the keywords entered by the user to improve input efficiency.
[0025] As a further improvement of the technical solution of the present invention, the intelligent conflict detection and display module further includes:
[0026] Conflict type breakdown: The system can identify and display multiple types of conflicts, including time conflicts, resource conflicts, safety distance conflicts, etc.
[0027] Conflict resolution suggestions: The system gives specific conflict resolution suggestions based on the conflict type and scope of impact to help users resolve conflicts quickly.
[0028] As a further improvement of the technical solution of the present invention, the safety card control and early warning module further includes:
[0029] Real-time monitoring and data analysis: The system monitors construction progress, on-site personnel and equipment status in real time, and performs data analysis to identify potential safety risks.
[0030] Multi-level early warning mechanism: The system sets up a multi-level early warning mechanism according to the risk level to ensure the timeliness and accuracy of early warning information.
[0031] As a further improvement of the technical solution of the present invention, the operation plan management and approval module also includes:
[0032] Graphical approval interface: Approving personnel can quickly understand the construction plan through the graphical interface, including the work location, time, impact scope, etc., to improve approval efficiency.
[0033] Automatic approval and manual review: The system automatically approves construction plans that meet preset conditions, and also supports manual review to ensure the accuracy of the approval results.
[0034] Beneficial effects of the present invention:
[0035] Graphical reporting method of work locations associated with multiple stations: The present invention realizes reporting of work locations associated with multiple stations through a graphical interface, thereby improving the accuracy and efficiency of construction plan reporting.
[0036] Standardization of job site description terms: The present invention has a built-in standardized job site description term library to ensure that the description terms in the construction plan are accurate and consistent, avoiding information misunderstandings and conflicts.
[0037] The work plan displays the work scope conflict display effect on the site map: After the construction plan is entered, the present invention can automatically detect conflicts and display the conflict effects in a graphical manner on the site map, so that users can quickly understand the conflict situation and make adjustments.
[0038] Safety control in the graphic reporting link: The present invention performs real-time monitoring and safety control in the graphic reporting link to ensure the safety and compliance of the construction plan.
[0039] The skylight operation unit is associated with the station map equipment: the present invention associates the skylight operation unit with the station map equipment, realizes the refined management of the operation plan, and improves the refined level of construction management and operation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 This is a structural diagram of a railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform according to an embodiment of the present invention;
[0041] Figure 2 It is a schematic diagram of the graphical construction of an embodiment of the present invention;
[0042] Figure 3 It is a standardized schematic diagram of description terms for the work location in an embodiment of the present invention;
[0043] Figure 4 This is a schematic diagram of a conflict pre-setting of a job plan according to an embodiment of the present invention;
[0044] Figure 5This is a schematic diagram of implementing secure card control in a graphical reporting process according to an embodiment of the present invention;
[0045] Figure 6 This is one of the functional schematic diagrams of the embodiment of the present invention for realizing rapid query of station map and line map status at each production post;
[0046] Figure 7 This is the second functional schematic diagram of the embodiment of the present invention for realizing rapid query of station map and line map status at each production post;
[0047] Figure 8 This is the third functional schematic diagram of an embodiment of the present invention for realizing rapid query of station map and line map status at each production post. DETAILED DESCRIPTION
[0048] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. The exemplary embodiments and descriptions of the present invention are used to explain the present invention, but are not intended to limit the present invention.
[0049] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, upper end, lower end, top, bottom...) are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0050] In the present invention, unless otherwise clearly defined and limited, the term "connection" should be understood in a broad sense, for example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0051] In addition, in the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features; in addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0052] like Figure 1 and Figure 2As shown, a railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform includes:
[0053] Graphical reporting module, used to select the construction impact range through the station schematic diagram of the LKJ basic data management platform, and supports graphical reporting of work locations associated with multiple stations;
[0054] Standardized job description module, which is used to standardize the description terms of job locations to ensure the accuracy and consistency of information;
[0055] Intelligent conflict detection and display module, which is used to display the conflict effect of the working scope on the site map after the construction plan is entered, and automatically perform conflict detection;
[0056] Safety card control and early warning module, used for safety card control in the graphical reporting link to ensure the safety and compliance of the construction plan;
[0057] The operation plan management and approval module is used to associate the skylight operation unit with the station map equipment to achieve refined management of the operation plan.
[0058] It should be noted that:
[0059] Graphical reporting method of work locations associated with multiple stations: The present invention realizes reporting of work locations associated with multiple stations through a graphical interface, thereby improving the accuracy and efficiency of construction plan reporting.
[0060] Standardization of job site description terms: The present invention has a built-in standardized job site description term library to ensure that the description terms in the construction plan are accurate and consistent, avoiding information misunderstandings and conflicts.
[0061] The work plan displays the work scope conflict display effect on the site map: After the construction plan is entered, the present invention can automatically detect conflicts and display the conflict effects in a graphical manner on the site map, so that users can quickly understand the conflict situation and make adjustments.
[0062] Safety control in the graphic reporting link: The present invention performs real-time monitoring and safety control in the graphic reporting link to ensure the safety and compliance of the construction plan.
[0063] The skylight operation unit is associated with the station map equipment: the present invention associates the skylight operation unit with the station map equipment, realizes the refined management of the operation plan, and improves the refined level of construction management and operation efficiency.
[0064] Through the above scheme, the present invention has the following advantages:
[0065] Reference Figure 2, improve the intuitiveness and accuracy of plan submission. Through the graphical reporting method, the construction site can be selected more intuitively and accurately, reducing the possibility of wrong selection, providing an accurate scope of operation impact, and providing plan approval personnel with a graphical means of reviewing the scope of operation.
[0066] Reference Figure 3 , standardize the description of the work site. Generate standardized terms for the construction site without changing the content of the existing plan submission. By selecting the construction site on the site map, the system automatically generates standardized terms
[0067] Reference Figure 4 , work plan conflicts are pre-arranged. During the construction site plan reporting stage, the system analyzes the construction site, construction project and road vehicle operation plan, and reminds the construction unit of other conflicting plans. The construction unit can communicate and coordinate in advance, thereby improving the efficiency of plan reporting.
[0068] Reference Figure 5 , to achieve safe card control in the graphical reporting link. The first is the card control of line insulation. Through the integrity of the line insulation equipment related to the line insulation, the integrity of the line insulation equipment at the work site in the engineering reporting link is determined, so as to avoid the situation where the engineering fails to report the related locations due to line insulation; the second is the card control of the construction site with power outage. By setting the power supply affecting equipment range, the construction blockade range exceeding the power outage range can be effectively controlled in the reporting link.
[0069] Reference Figures 6 to 8 , providing each production post with the function of quickly querying the station map and line map.
[0070] This provides basic data support for CTC's safety control in the next step. Within the scope of construction work, relevant access routes cannot be opened, thus fundamentally carrying out safety control.
[0071] Specifically, in this embodiment, the graphical reporting module also includes detailed editing and previewing functions of the work location, supporting the user to fine-tune the work location according to actual needs.
[0072] Specifically, in the present embodiment, the standardized work description module has a built-in standardized work site description term library, and the user can select or input standardized description terms from the library when reporting the construction plan.
[0073] Specifically, in the present embodiment, the intelligent conflict detection and display module automatically detects time conflicts, resource conflicts and safety distance conflicts after the construction plan is entered; the conflict detection results are displayed graphically on the site map, including the conflict location, type and impact range, to facilitate users to quickly identify and resolve conflicts.
[0074] Specifically, in this embodiment, the safety card control and early warning module performs real-time monitoring in the graphical reporting link, including construction progress, on-site personnel and equipment status; once potential safety risks or construction progress deviations are found, the system will immediately trigger the early warning mechanism, give early warning information and adjustment suggestions, and ensure the safety and compliance of the construction plan.
[0075] Specifically, in this embodiment, the work plan management and approval module associates the skylight work unit with the station map equipment to achieve refined management of the work plan; users can view the construction plan details through the graphical interface, including the work location, time and impact range; the system supports multi-level approval process, and the approvers can quickly understand the construction plan status through the graphical interface and give approval opinions; at the same time, the system has an automatic approval function to quickly approve construction plans that meet the preset conditions.
[0076] Specifically, in this embodiment, the graphical reporting module allows the user to intuitively select stations and line sections affected by the construction through a graphical interface, and supports reporting of work sites across stations; the user can accurately mark the construction scope on the schematic diagram through click, drag and zoom operations, thereby realizing graphical entry of the construction plan.
[0077] Specifically, in this embodiment, the standardized job description module also has an automatic verification function, prompting the user for description terms that do not meet the standards and requiring the user to correct them.
[0078] Specifically, in the present embodiment, the principle of automatic adjustment of the disassembly order of the automatic train flow distribution and relief system is as follows: the arriving vehicles used by the departing vehicles with earlier starting points are disassembled first.
[0079] Specifically, in this embodiment, the graphical reporting module further includes:
[0080] Dynamic marking and preview function: users can view the marking effect of the construction scope in real time, and support fine-tuning of the marking to ensure the accuracy of the construction scope;
[0081] Multi-layer management: The system supports multi-layer management. Users can add, delete or modify layers as needed to better display the construction plan.
[0082] Specifically, in this embodiment, the standardized operation description module further includes:
[0083] Customizable description term library: Users can customize or modify the terms in the description term library according to actual needs to meet the needs of different construction scenarios;
[0084] Intelligent recommendation function: The system intelligently recommends relevant standardized descriptive terms based on the keywords entered by the user to improve input efficiency.
[0085] Specifically, in this embodiment, the intelligent conflict detection and display module further includes:
[0086] Conflict type breakdown: The system can identify and display multiple types of conflicts, including time conflicts, resource conflicts, safety distance conflicts, etc.
[0087] Conflict resolution suggestions: The system gives specific conflict resolution suggestions based on the conflict type and scope of impact to help users resolve conflicts quickly.
[0088] Specifically, in this embodiment, the security card control and early warning module also includes:
[0089] Real-time monitoring and data analysis: The system monitors construction progress, on-site personnel and equipment status in real time, and performs data analysis to identify potential safety risks.
[0090] Multi-level early warning mechanism: The system sets up a multi-level early warning mechanism according to the risk level to ensure the timeliness and accuracy of early warning information.
[0091] Specifically, in this embodiment, the operation plan management and approval module also includes:
[0092] Graphical approval interface: Approving personnel can quickly understand the construction plan through the graphical interface, including the work location, time, impact scope, etc., to improve approval efficiency.
[0093] Automatic approval and manual review: The system automatically approves construction plans that meet preset conditions, and also supports manual review to ensure the accuracy of the approval results.
[0094] The intelligent management system of the present invention is a railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform. Its working principle mainly revolves around core modules such as graphical reporting, standardized operation description, intelligent conflict detection and display, safety card control and early warning, and operation plan management and approval. The following is a detailed description of how the system works:
[0095] 1. Graphical reporting module
[0096] Data foundation: The system first uses the station schematic diagrams of the LKJ basic data management platform as the basis for graphical reporting. These schematic diagrams contain key information such as the detailed layout of railway stations, line directions, and signal equipment.
[0097] Graphical interface operation: Users can intuitively select stations and line sections affected by construction through the system's graphical interface. By clicking, dragging, zooming, and other operations, users can accurately mark the construction scope on the schematic diagram.
[0098] Cross-station work support: The system supports cross-station work site reporting, allowing users to easily handle complex construction plans involving multiple stations.
[0099] 2. Standardized Job Description Module
[0100] Standardized term library: The system has a built-in standardized term library for describing the work site. These terms have been carefully designed and screened to ensure the accuracy and consistency of the description.
[0101] User selection or input: When submitting a construction plan, users can select or input standardized descriptive terms from the library. The system also has an automatic verification function, prompting users for non-standard descriptive terms and requiring them to make corrections.
[0102] Intelligent recommendation: The system intelligently recommends relevant standardized descriptive terms based on the keywords entered by the user, thereby improving input efficiency.
[0103] 3. Intelligent conflict detection and display module
[0104] Conflict detection: After the construction plan is entered, the system immediately detects time conflicts, resource conflicts and safety distance conflicts. These detections are based on LKJ basic data and the rules and restrictions of railway construction.
[0105] Graphical display: The conflict detection results are displayed graphically on the site map. Users can clearly see the conflict location, type and impact range, so as to quickly identify and resolve the conflict.
[0106] Conflict resolution suggestions: The system gives specific conflict resolution suggestions based on the conflict type and impact scope to help users quickly adjust construction plans.
[0107] 4. Security card control and early warning module
[0108] Real-time monitoring: The system monitors key information such as construction progress, on-site personnel and equipment status in real time. This information is collected and transmitted to the system in real time through sensors, video surveillance and other equipment.
[0109] Data analysis and early warning: The system conducts in-depth analysis of real-time monitoring data to identify potential safety risks. Once safety risks or construction progress deviations are found, the system will immediately trigger an early warning mechanism.
[0110] Multi-level warning mechanism: The system sets up a multi-level warning mechanism according to the risk level. Different levels of warning information will adopt different notification methods (such as SMS, email, system message, etc.) to ensure the timeliness and accuracy of the warning information.
[0111] 5. Operation plan management and approval module
[0112] Refined management: The system links the skylight operation unit with the station map equipment to achieve refined management of the operation plan. Users can view the details of the construction plan through the graphical interface, including the operation location, time, and impact range.
[0113] Graphical Approval Interface: Approval personnel can quickly understand the construction plan through the graphical interface, thereby improving approval efficiency. The graphical interface displays detailed information on the construction plan and potential risk points, helping approval personnel make more informed decisions.
[0114] Automatic approval and manual review: The system automatically approves construction plans that meet the preset conditions. At the same time, the system also supports manual review to ensure the accuracy of the approval results. During the manual review process, the reviewer can review and adjust the automatic approval results.
[0115] In summary, the intelligent management system of the present invention realizes the graphical reporting and intelligent management of railway construction plans through core modules such as graphical reporting, standardized operation description, intelligent conflict detection and display, safety card control and early warning, and operation plan management and approval. These modules work together to improve the reporting efficiency and management level of railway construction plans, and ensure the safety and compliance of railway construction. The present invention has the following beneficial effects:
[0116] 1. The graphical reporting function of the construction plan integrates the information resource advantages among various systems, realizes information sharing between the construction system and various systems, and provides other systems with a more accurate construction impact range.
[0117] 2. The graphical reporting function of the construction plan selects the construction impact range through the station schematic diagram provided by the LKJ basic data management platform, thereby realizing the system automatic correction, conflict check and safety control of the entire process of construction plan entry, review and approval, greatly improving the level of construction organization refinement and operation efficiency, and laying a solid foundation for the goal of automatic review of construction plans.
[0118] 3. The graphical reporting function of the construction plan reduces the workload of human intervention and review of the construction plan, and effectively promotes the transformation of construction plan review and approval from "manual judgment type" to "assisted decision-making type", ultimately realizing intelligent construction management and improving construction operations and management efficiency.
[0119] The technical solutions provided by the embodiments of the present invention are introduced in detail above. Specific examples are used herein to illustrate the principles and implementation methods of the embodiments of the present invention. The description of the above embodiments is only applicable to help understand the principles of the embodiments of the present invention. At the same time, for those skilled in the art, according to the embodiments of the present invention, there will be changes in the specific implementation methods and application scopes. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform, characterized in that: include: Graphical reporting module, used to select the construction impact range through the station schematic diagram of the LKJ basic data management platform, and supports graphical reporting of work locations associated with multiple stations; Standardized job description module, which is used to standardize the description terms of job locations to ensure the accuracy and consistency of information; Intelligent conflict detection and display module, which is used to display the conflict effect of the working scope on the site map after the construction plan is entered, and automatically perform conflict detection; Safety card control and early warning module, used for safety card control in the graphical reporting link to ensure the safety and compliance of the construction plan; The operation plan management and approval module is used to associate the skylight operation unit with the station map equipment to achieve refined management of the operation plan.
2. According to claim 1, a railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform is characterized by: The graphical reporting module also includes detailed editing and preview functions of the work site, supporting users to fine-tune the work site according to actual needs.
3. According to claim 1, a railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform is characterized in that: The standardized work description module has a built-in standardized work site description term library. When reporting a construction plan, the user can select or input standardized description terms from the library.
4. According to claim 1, a railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform is characterized in that: After the construction plan is entered, the intelligent conflict detection and display module automatically detects time conflicts, resource conflicts and safety distance conflicts; the conflict detection results are displayed in a graphical manner on the site map, including the conflict location, type and impact range, so that users can quickly identify and resolve conflicts.
5. According to claim 1, a railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform is characterized by: The safety card control and early warning module performs real-time monitoring in the graphical reporting link, including construction progress, on-site personnel and equipment status; once potential safety risks or construction progress deviations are found, the system will immediately trigger the early warning mechanism, provide early warning information and adjustment suggestions, and ensure the safety and compliance of the construction plan.
6. The railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform according to claim 1 is characterized by: The work plan management and approval module links the skylight work unit with the station map equipment to achieve refined management of the work plan; users can view the construction plan details through the graphical interface, including the work location, time and scope of impact; the system supports multi-level approval processes, and the approvers can quickly understand the construction plan status through the graphical interface and give approval opinions; at the same time, the system has an automatic approval function to quickly approve construction plans that meet the preset conditions.
7. The railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform according to claim 1 is characterized by: The graphical reporting module allows users to intuitively select stations and line sections affected by construction through a graphical interface, and supports reporting of work sites across stations; users can accurately mark the construction scope on the schematic diagram through click, drag and zoom operations, thereby realizing graphical entry of construction plans.
8. The railway construction plan graphical reporting and intelligent management system based on the LKJ basic data platform according to claim 1 is characterized by: The standardized job description module also has an automatic verification function, which prompts the user for description terms that do not meet the standards and requires the user to correct them.