Auxiliary device for precise installation of suspension rod and installation method of suspension rod

By designing auxiliary devices for precise installation of the boom, the efficient installation and precise adjustment of the boom is achieved by using the crane connection nodes and adjustment components, the problems of difficult and poor accuracy of the boom installation in traditional methods are solved, and construction efficiency and safety are improved.

CN119754173APending Publication Date: 2025-04-04ZHEJIANG ZHONGNAN CONSTR GRP STEEL STRUCTURE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510051032.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-13
Publication Date
2025-04-04

AI Technical Summary

Technical Problem

The installation of the boom is difficult, the traditional method has low construction efficiency and poor installation accuracy, especially in high-altitude working environments.

Method used

An auxiliary device for precise installation of the hanging rod is designed, including a crane connection node, a boom adjustment assembly one and a boom adjustment assembly two, and efficient installation and precise adjustment of the boom is achieved through the hoisting part and the rotating part.

Benefits of technology

Improves the installation accuracy and construction safety of the boom, enhances the reliability and efficiency of operation, is suitable for booms of different diameters, and increases friction at the connection to prevent loosening.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119754173A_ABST
    Figure CN119754173A_ABST
Patent Text Reader

Abstract

The present invention discloses an auxiliary device for accurate installation of a boom and a method for installing the boom. The device includes a crane connection node, a boom adjustment component 1 and a boom adjustment component 2. The boom adjustment component 1 is arranged on an auxiliary platform, and the boom adjustment component 2 is arranged on a climbing platform of a climbing vehicle. The boom adjustment component 1 and the boom adjustment component 2 both include a lifting part and an adjustment part, and the adjustment part includes a supporting part and a rotating part. The present invention realizes efficient installation of the boom by means of the boom adjustment component in cooperation with a crane, a climbing vehicle, and a hand chain hoist, and the boom adjustment component itself can be adjusted in all directions in accordance with the boom installation angle requirements, thereby ensuring the installation accuracy of the boom. The boom connection node can facilitate the stable installation between the boom and the crane, improve the operational safety and reliability, and the auxiliary platform is equipped with a ladder, which can facilitate the climbing construction of construction personnel, increase practicality, and be more convenient for actual construction operations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of suspension rod installation, and in particular relates to an auxiliary device for accurate installation of a suspension rod and a method for installing the suspension rod. Background Art

[0002] As an important load-bearing member inside an arch bridge, the main function of the hanger is to transfer the load borne by the bridge deck to the arch rib. In a steel arch rib arch bridge, the hanger effectively transfers the weight of the bridge deck and other loads to the arch rib through its tension, and the arch rib then disperses the load to the pier or foundation. The top of the hanger needs to be precisely docked with the top of the steel arch rib to ensure the overall stability and safety of the structure. However, due to the high top of the steel arch rib, the environmental complexity of high-altitude operations, the accuracy requirements, and safety risks, the installation of the hanger is difficult. Traditionally, the hanger is only pulled into place by a crane and coordinated with a hand winch, which has low construction efficiency and poor installation accuracy. Summary of the invention

[0003] The purpose of the present invention is to provide a technical solution of an auxiliary device for precise installation of a boom and a method for installing the boom in view of the shortcomings of the prior art. The device is cleverly designed, and efficient installation of the boom is achieved by cooperating with a boom adjustment assembly, a crane, a aerial platform, and a hand winch. The boom adjustment assembly itself can be adjusted in all directions according to the boom installation angle requirements, thereby ensuring the installation accuracy of the boom. The boom connection node can facilitate the stable installation between the boom and the crane, and improve operational safety and reliability. The auxiliary platform is equipped with a ladder, which can facilitate climbing construction by construction personnel, increase practicality, and be more convenient for actual construction operations.

[0004] In order to solve the technical problem, the present invention adopts the following technical solution:

[0005] An auxiliary device for precise installation of a boom, comprising a crane connection node, a boom adjustment component 1 and a boom adjustment component 2. The crane connection node is arranged on the boom to achieve connection between the boom and the crane. The boom adjustment component 1 is arranged on an auxiliary platform. The boom adjustment component 1 is connected to the boom. The boom adjustment component 2 is arranged on a climbing platform of a aerial platform vehicle. The boom adjustment component 2 is connected to the boom. Both the boom adjustment component 1 and the boom adjustment component 2 comprise a lifting part and an adjusting part. The adjusting part comprises a supporting part and a rotating part. The bottom of the supporting part is connected to the lifting part, the top of the supporting part is connected to the rotating part, and the rotating part is connected to the boom.

[0006] Furthermore, the hanger connection node includes half sleeve one and half sleeve two, and extension plate one is provided on both sides of half sleeve one and both sides of half sleeve two, and the two extension plates one on the corresponding connection sides of half sleeve one and half sleeve two are connected and fixed by bolt assembly one, so that a clamp groove one is formed between half sleeve one and half sleeve two, and the hanger connection node is fixed to the hanger by clamping the clamp groove one, and lifting ears are provided on half sleeve one and half sleeve two.

[0007] Furthermore, the lifting part includes a vertical lifting cylinder and a transverse lifting cylinder. The vertical lifting cylinder is fixed to the support part, and the transverse lifting cylinder is distributed circumferentially along the outer side of the vertical lifting cylinder. The piston rod of the transverse lifting cylinder is tightly limited on the side of the vertical lifting cylinder.

[0008] Furthermore, the supporting part includes a supporting rod and a limiting block, the supporting rod is fixedly arranged on the limiting block, a slot is arranged at the bottom of the limiting block, the piston rod of the vertical lifting cylinder is limitedly inserted into the slot, a tightening bolt is arranged through the side thread of the slot, and the tightening bolt is tightened and limited on the side of the piston rod of the vertical lifting cylinder.

[0009] Furthermore, an internal threaded hole is provided on the top surface of the support rod, the rotating part includes a rotating component and a connecting component, a mounting column is provided on the rotating component, the mounting column is threadedly screwed into the internal threaded hole, a mounting seat is provided on the rotating component, and the connecting component is hingedly connected to the mounting seat.

[0010] Furthermore, the connecting member includes a rotating arm and a connecting sleeve, the rotating arm is movably connected to the mounting seat through a rotating shaft, and limit nuts are arranged at both ends of the rotating shaft. The connecting sleeve includes a connecting half sleeve one and a connecting half sleeve two, and both sides of the connecting half sleeve one and both sides of the connecting half sleeve two are provided with an extension plate two. The two extension plates two on the corresponding connecting sides of the connecting half sleeve one and the connecting half sleeve two are connected and fixed by a bolt assembly two, so that a clamp groove two is formed between the connecting half sleeve one and the connecting half sleeve two, and the connecting member is fixed to the suspension rod by a clamp in the clamp groove two.

[0011] Furthermore, a connecting column is provided on the connecting half sleeve 1, and an internal threaded hole 2 is provided on the connecting column. An extension column is provided on the rotating arm, and the extension column is threadedly rotated in the internal threaded hole 2.

[0012] Furthermore, the auxiliary platform includes two symmetrically arranged support frames, the tops of the two adjacent support frames are bolted with an operation panel, the sides of the two adjacent support frames are bolted with stiffening ribs, the support frames include two vertical support columns and one transverse support column, the transverse support column is transversely arranged between the two vertical support columns, the operation panel is bolted between the two transverse support columns, and the stiffening ribs are bolted between the two vertical support columns of the two adjacent support frames.

[0013] Furthermore, a ladder is arranged on the vertical support column, a limit frame is arranged on the top of the ladder, and the horizontal support column limit card is connected in the corresponding limit frame.

[0014] The method for installing a boom using the above-mentioned auxiliary device for accurate installation of a boom comprises the following steps:

[0015] Step 1: A fork-ear anchor is connected to the upper end of the boom. Two sets of crane connection nodes are installed at the upper end of the boom near the fork-ear anchor according to the lifting requirements. Half sleeve 1 and half sleeve 2 of the crane connection node are attached and clamped on the side wall of the boom. Half sleeve 1 and half sleeve 2 are then connected and fixed by bolt assembly 1 to achieve the connection and fixation between the crane connection node and the boom, and ensure that the two sets of crane connection nodes are set at intervals.

[0016] Step 2: Take a support part and a rotating part and assemble them to form the adjusting part of the boom adjustment assembly 2, screw the mounting column thread of the rotating part into the internal threaded hole 1 of the support part, and then adjust the angle of the connecting sleeve according to the installation requirements of the boom, the mounting column rotates along the internal threaded hole 1, the connecting column rotates along the extension column through the internal threaded hole 2, loosen the limit nut to rotate the rotating arm along the rotating shaft, until the angle of the connecting sleeve is adjusted to meet the installation position of the boom, tighten the limit nuts at both ends of the rotating shaft, attach and clamp the connecting half sleeve 1 and the connecting half sleeve 2 to the side wall of the boom, and then connect and fix the connecting half sleeve 1 and the connecting half sleeve 2 through the bolt assembly 2 to achieve the connection and fixation between the adjusting part and the boom, and the adjusting part is connected to the boom between the two sets of boom connection nodes;

[0017] Step 3: Connect the crane hook to the lifting ears on the two sets of crane connection nodes through the lifting rope, and then the crane lifts the boom upward through the two sets of hanger connection nodes. After the boom is lifted to the appropriate position, stop lifting and wait until the boom stops shaking;

[0018] Step 4: Install a lifting part on the climbing platform of the climbing vehicle, place the vertical lifting cylinder support on the climbing platform, and the transverse lifting cylinder is distributed on the side of the vertical lifting cylinder. The transverse lifting cylinder is fixed to the climbing platform through the mounting seat and screws. The piston rod of the transverse lifting cylinder is tightened and limited on the side of the vertical lifting cylinder. The vertical lifting cylinder is tightened and fixed, and the climbing vehicle is moved so that the piston rod of the vertical lifting cylinder on the climbing platform is limited and inserted into the slot of the adjustment part connected to the suspension rod, and the tightening bolt is adjusted to tighten and fix the piston rod of the vertical lifting cylinder to the support part;

[0019] Step 5: A hand chain hoist is connected to the hook of the crane. Pull the hand chain hoist and cooperate with the jacking part to further accurately adjust the position of the boom, so as to achieve accurate connection between the fork-ear anchor at the upper end of the boom and the ear plate contained in the arch rib;

[0020] Step 6: After the upper end of the boom is hoisted and connected, remove the bolt assembly 1 to dismantle the two sets of crane connection nodes, remove the bolt assembly 2, dismantle the boom adjustment assembly 2, and then use a forklift to move the lower end of the boom to a suitable position;

[0021] Step 7: Set up an auxiliary platform near the lower end of the boom, place a jacking part on the auxiliary platform, then take a support part and install it on the jacking part, the piston rod of the vertical jacking cylinder of the jacking part is limitedly inserted into the slot of the support part, and the tightening bolt is adjusted to tightly fix the piston rod of the vertical jacking cylinder and the support part, and then install a rotating part on the top of the support part, and the mounting column of the rotating part is screwed into the internal threaded hole 1 on the top of the support part. After the jacking part, the support part and the rotating part are assembled, a boom adjustment assembly 1 is formed, and then the angle of the connecting sleeve in the boom adjustment assembly 1 is adjusted according to the installation requirements of the boom, and then the connecting sleeve is connected to the boom to realize the connection between the boom adjustment assembly 1 and the boom;

[0022] Step 8: Under the action of the forklift and the jacking part, the position of the boom is further accurately adjusted to achieve accurate installation between the lower end of the boom and the anchor plate, remove the bolt assembly 1 of the boom adjustment assembly 1, and dismantle the boom adjustment assembly 1.

[0023] The present invention has the following beneficial effects due to the adoption of the technical solution:

[0024] During the installation process of the boom of the present invention, efficient installation of the boom is achieved through the designed boom adjustment component 1 and boom adjustment component 2 in cooperation with a crane, a forklift, and a hand winch, and the jacking parts contained in the boom adjustment component 1 and boom adjustment component 2 can accurately adjust the overall lateral position and longitudinal height, the vertical jacking cylinder lifts to adjust the longitudinal height of the boom adjustment component, and the lateral jacking cylinder pushes the vertical jacking cylinder to achieve fine-tuning of the lateral position of the vertical jacking cylinder, thereby ensuring the accuracy of the boom installation, and at the same time, the connecting sleeve in the boom adjustment component 1 and boom adjustment component 2 can achieve multi-directional spatial rotation, the mounting column of the rotating part can rotate 360° along the internal threaded hole 1, the connecting sleeve can rotate 360° along the extension column through the internal threaded hole 2, and the rotating arm can also swing and adjust along the rotating axis, thereby achieving all-round angle adjustment of the connecting sleeve, thereby ensuring that the spatial angle of the boom can be flexibly adjusted, and further achieving precise installation of the boom. The present invention adopts a boom connection node in the boom hoisting to replace the traditional manual rope binding method for connecting with the boom. The boom connection node adopts a connection method of half sleeve one, half sleeve two and bolt assembly one to ensure the firmness and reliability of the connection, and is easy to install and disassemble. The boom connection node can be applied to booms of different diameters, thereby increasing the application range of the boom connection node. During actual installation, soft fillers can be installed on the inner wall of the half sleeve to increase the friction between the connection sleeve and the boom. A lifting ear is also welded on the half sleeve to facilitate the connection with the crane, so that the connection sleeve and the boom are tightly connected under the gravity of the boom and the traction of the crane, thereby further improving the stability and reliability of the connection. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The present invention will be further described below in conjunction with the accompanying drawings:

[0026] Figure 1 It is a schematic diagram of the connection structure between the suspension rod connection node, the suspension rod adjustment component 1, the suspension rod adjustment component 2 and the suspension rod in the present invention;

[0027] Figure 2 It is a structural schematic diagram of the suspension rod connection node in the present invention;

[0028] Figure 3 It is a structural schematic diagram of the suspension rod adjustment component 1 or the suspension rod adjustment component 2 in the present invention;

[0029] Figure 4 It is a structural schematic diagram of the rotating part in the present invention;

[0030] Figure 5 It is a structural schematic diagram of the support part in the present invention;

[0031] Figure 6 It is a structural schematic diagram of the connecting member in the present invention;

[0032] Figure 7 It is a structural schematic diagram of the auxiliary platform in the present invention;

[0033] Figure 8 It is a schematic diagram of the installation structure of the ladder and the vertical support column in the present invention;

[0034] Fig. 9 It is a structural schematic diagram of the operation panel in the present invention;

[0035] Fig.10 The figure is a schematic diagram of the installation structure of two sets of suspension rod connection nodes on the suspension rod in the present invention.

[0036] In the figure: 1- suspension rod; 2- crane connection node; 3- suspension rod adjustment component 1; 4- auxiliary platform; 5- suspension rod adjustment component 2; 6- half sleeve 1; 7- half sleeve 2; 8- extension plate 1; 9- bolt assembly 1; 10- lifting ear; 11- lifting part; 12- supporting part; 13- rotating part; 14- vertical lifting cylinder; 15- horizontal lifting cylinder; 16- supporting rod; 17- limiting block; 18- tightening bolt; 19- internal threaded hole 1; 20- climbing platform; 21- clamp groove 1; 22- mounting column; 23- Rotating member; 24-connecting member; 25-mounting seat; 26-connecting half set one; 27-connecting half set two; 28-extension plate two; 29-bolt assembly two; 30-connecting column; 31-internal threaded hole two; 32-rotating arm; 33-clamp groove two; 34-extension column; 35-support frame; 36-operating panel; 37-stiffening rib plate; 38-vertical support column; 39-lateral support column; 40-ladder; 41-limiting frame; 42-limiting plate; 43-fork ear anchor; 44-anchoring device; 45-fixed seat. DETAILED DESCRIPTION

[0037] like Figures 1 to 10As shown, an auxiliary device for precise installation of a boom of the present invention comprises a crane connection node 2, a boom adjustment component 1 3 and a boom adjustment component 2 5, the crane connection node 2 is arranged on the boom 1 to realize the connection between the boom 1 and the crane, the boom adjustment component 1 3 is arranged on the auxiliary platform 4, the boom adjustment component 1 3 is connected to the boom 1, the boom adjustment component 2 5 is arranged on the climbing platform 20 of the aerial platform vehicle, the boom adjustment component 2 5 is connected to the boom 1, the boom adjustment component 1 3 and the boom adjustment component 2 5 both comprise a lifting part 11 and an adjusting part, the adjusting part comprises a supporting part 12 and a rotating part 13, the bottom of the supporting part 12 is connected to the lifting part 11, the top of the supporting part 12 is connected to the rotating part 13, and the rotating part 13 is connected to the boom 1. The design of the crane connection node 2 can facilitate the connection between the hanger and the boom 1, ensure the stability and firmness of the connection, and improve the overall construction safety. The design of the boom adjustment assembly can be fully adjusted according to the actual installation angle of the boom 1, thereby improving the installation accuracy of the boom 1. The auxiliary platform 4 can facilitate the climbing operations of the construction workers and increase the practicality of the device.

[0038] The boom connection node includes a half sleeve 1 6 and a half sleeve 2 7. Both sides of the half sleeve 1 6 and both sides of the half sleeve 2 7 are provided with extension plates 18. The two extension plates 18 on the corresponding connection sides of the half sleeve 1 6 and the half sleeve 2 7 are connected and fixed by a bolt assembly 19, so that a clamp groove 21 is formed between the half sleeve 1 6 and the half sleeve 2 7. The boom connection node 2 is clamped and fixed to the boom 1 by the clamp groove 21. The half sleeve 1 6 and the half sleeve 2 7 are provided with lifting ears 10. The half sleeve 1 6 and the half sleeve 2 7 are connected with bolts, which can facilitate the assembly and fixation between the boom connection node 2 and the boom 1, ensure the firmness and reliability of the connection, and the bolt connection is also convenient in practice. Disassembly and assembly, the extension plate 18 and the half sleeve 16 and the half sleeve 27 adopt an integrally formed structure to ensure the structural strength of the half sleeve, and also facilitate the presetting of the holes on the half sleeve, so that the holes are set on the extension plate 18, and the flat punching is more conducive to ensuring the punching accuracy, which is conducive to actual assembly. The two ends of the bolt pass through the holes on the corresponding two extension plates 8 and are tightened with the nuts, effectively ensuring the structural strength after assembly, and adjusting the length of the bolt between the corresponding two extension plates 8 can adjust the size of the clamp groove 121 after assembly, expand the application range of the suspension rod connection node 2, so that the suspension rod connection node 2 can be used for assembly connection between suspension rods 1 of different diameters. In actual use, flexible fillers can also be set on the inner side walls of the half sleeve 16 and the half sleeve 27, so as to increase the friction between the half sleeve and the suspension rod 1, prevent the suspension rod 1 from sliding or loosening during the lifting process, and avoid direct friction between the half sleeve and the suspension rod 1, reducing the wear on the surface of the suspension rod 1. The half sleeve is provided with a lifting lug 10, which can facilitate the connection with the crane. Under the gravity of the boom 1 and the traction of the crane, the boom connection node 2 is firmly connected to the boom 1, further improving the connection stability and reliability.

[0039] The lifting part 11 includes a vertical lifting cylinder 14 and a transverse lifting cylinder 15. The vertical lifting cylinder 14 is fixed to the support part 12. The transverse lifting cylinder 15 is distributed along the outer circumference of the vertical lifting cylinder 14. The piston rod of the transverse lifting cylinder 15 is tightened and limited on the side of the vertical lifting cylinder 14. A fixing seat 45 is welded on the outer shell of the transverse lifting cylinder 15. The fixing seat 45 is provided with a mounting hole. The fixing seat 45 is screwed to the auxiliary platform 4 or the climbing platform 20 of the climbing vehicle through the mounting hole to ensure the placement firmness and reliability of the transverse lifting cylinder 15. The screw fixing is also convenient for actual disassembly and assembly, improving the structural stability and reliability of the vertical lifting cylinder 14 after tightening and limiting, avoiding the displacement or shaking of the vertical lifting cylinder 14 during the lifting process, improving the accuracy and reliability of the lifting process, and making the lifting operation more stable and reliable. The position of the vertical lifting cylinder 14 on the auxiliary platform 4 or the climbing platform 20 of the climbing vehicle can be fine-tuned. After the position of the vertical lifting cylinder 14 is adjusted, it is tightened and fixed by the lateral lifting cylinders 15 on the four sides to ensure the structural stability of the vertical lifting cylinder 14 after being adjusted into place.

[0040] The support part 12 includes a support rod 16 and a limit block 17. The support rod 16 is fixedly set on the limit block 17. A slot is set at the bottom of the limit block 17. The piston rod of the vertical lifting cylinder 14 is limited and inserted in the slot. A tightening bolt 18 is threaded through the side of the slot. Corresponding threaded through holes are set on the side of the slot. The tightening bolt 18 threadedly penetrates the corresponding threaded through holes to realize the adjustable installation of the tightening bolt 18 on the limit block 17. The tightening bolt 18 is tightened and limited on the side of the piston rod of the vertical lifting cylinder 14. The limit block 17 can facilitate the connection between the support part 12 and the vertical lifting cylinder 14, and the slot realizes the initial insertion and limiting of the piston rod of the vertical lifting cylinder 14 in the limit block 17, and then the tightening bolts 18 on the four sides of the slot can limit and fix the piston rod of the vertical lifting cylinder 14 to the limit block 17, effectively preventing the piston rod from falling off or deflecting during the lifting process, so that the vertical lifting cylinder 14 can achieve a stable lifting operation of the support part 12, thereby improving construction safety. The overall structural design is ingenious and reasonable, and the installation and disassembly are convenient and simple. When disassembly is required, the tightening bolt 18 is rotated toward the outside of the limit block 17 so that the tightening bolt 18 releases the piston rod of the vertical lifting cylinder 14.

[0041] An internal threaded hole 19 is provided on the top surface of the support rod 16, and the rotating part 13 includes a rotating component 23 and a connecting component 24. A mounting column 22 is provided on the rotating component 23, and the mounting column 22 is threadedly screwed into the internal threaded hole 19. A mounting seat 25 is provided on the rotating component 23, and the connecting component 24 is hingedly connected to the mounting seat 25. The outer wall of the mounting column 22 is provided with a thread, which cooperates with the internal threaded hole 19 to realize the threaded connection between the rotating part 13 and the supporting part 12, effectively ensuring the firmness and reliability of the connection, and the connection is not easy to loosen or fall off. At the same time, the threaded connection is also convenient for actual installation and disassembly, and the threaded connection can also adjust the installation angle of the rotating part 13 on the supporting part 12. The mounting column 22 is rotated along the internal threaded hole 19 to realize 360° adjustment of the angle of the rotating part 13, so that the connecting component 24 meets the requirements of the hanger 1 with different installation angles, thereby increasing the overall flexibility.

[0042] The connecting member 24 includes a rotating arm 32 and a connecting sleeve. The rotating arm 32 is movably connected to the mounting seat 25 through a rotating shaft. Limiting nuts are arranged at both ends of the rotating shaft. The connecting sleeve includes a connecting half sleeve 1 26 and a connecting half sleeve 2 27. Both sides of the connecting half sleeve 1 26 and both sides of the connecting half sleeve 2 27 are provided with extension plates 28. The two extension plates 28 on the corresponding connecting sides of the connecting half sleeve 1 26 and the connecting half sleeve 2 27 are connected and fixed by bolt assemblies 29, so that a clamp groove 23 is formed between the connecting half sleeve 1 26 and the connecting half sleeve 2 27. The connecting member 24 is clamped and fixed to the suspension rod 1 through the clamp groove 23. The rotating arm 32 is rotatably connected to the mounting seat 25 through a rotating shaft, and limiting nuts are arranged at both ends of the rotating shaft. The rotating arm 32 can swing within a certain range with the rotating shaft as the center, so that the angle of the connecting member 24 can be further adjusted, so that the connecting member 24 can adapt to the installation requirements of the suspension rod 1 at different angles and directions, thereby improving the convenience and adaptability of installation. The connecting sleeve adopts a connecting half sleeve 1 26 and a connecting half sleeve 27 with bolts to ensure the structural stability of the connecting sleeve after assembly. This design can ensure the firmness and reliability of the connection between the connecting sleeve and the hanger 1, and the design of the two connecting half sleeves also facilitates the assembly between the connecting component 24 and the hanger 1. The extension plate 28 and the connecting half sleeve adopt an integrated structural design, which can ensure structural strength and is conducive to the preset holes on the connecting half sleeve, so that the holes are set on the extension plate 28. Flat punching is more conducive to precise control of the holes, which is conducive to assembly and splicing between components. Both ends of the bolt pass through the holes on the corresponding two extension plates 28 and are tightened with nuts, effectively ensuring the structural strength after assembly, and adjusting the length of the bolt between the corresponding two extension plates 28 can adjust the size of the clamp groove 2 33 after assembly, thereby expanding the application range of the connecting component 24, so that the connecting component 24 can be used for assembly and connection between hangers 1 of different diameters. A flexible filler can be provided on the inner wall of the connecting half sleeve to increase the friction between the connecting sleeve and the suspension rod 1, prevent the suspension rod 1 from sliding or loosening during lifting and installation, and avoid direct friction between the connecting sleeve and the suspension rod 1, thereby reducing the surface loss of the suspension rod 1.

[0043] A connecting column 30 is provided on the connecting half sleeve 1 26, and an internal threaded hole 2 31 is provided on the connecting column 30. An extension column 34 is provided on the rotating arm 32, and the extension column 34 is threadedly rotated in the internal threaded hole 2 31. The extension column 34 and the rotating arm 32 are an integrally formed structure, which is convenient for actual processing and forming, and can ensure structural strength. The outer wall of the extension column 34 is provided with a thread, which cooperates with the internal threaded hole 2 31 to realize the threaded connection between the rotating arm 32 and the connecting plate sleeve, effectively ensuring the tightness and stability of the connection, ensuring the strength and firmness of the connection, and the threaded connection is also convenient for actual installation and disassembly, and is convenient for actual operation. The threaded connection can also rotate the connecting sleeve 360° with the extension column 34 as the center, so that the connecting sleeve can meet the requirements of the hanger 1 with different installation angles and directions, and increase flexibility.

[0044] The auxiliary platform 4 includes two symmetrically arranged support frames 35, the tops of the two adjacent support frames 35 are bolted with an operation panel 36, the sides of the two adjacent support frames 35 are bolted with a stiffening rib 37, the support frames 35 include two vertical support columns 38 and one transverse support column 39, the transverse support column 39 is transversely arranged between the two vertical support columns 38, the operation panel 36 is bolted between the two transverse support columns 39, and the stiffening rib 37 is bolted between the two vertical support columns 38 of the two adjacent support frames 35. The various components of the support frame 35 are fixedly connected by bolts, and the stiffening ribs 37, the operation panel 36 and the two support frames 35 are also fixedly connected by bolts, which is convenient for the disassembly and assembly of the auxiliary platform 4 and increases the reuse rate of the auxiliary platform 4. The support frame 35 includes two vertical support columns 38 and a transverse support column 39. The transverse support column 39 connects the tops of the two vertical support columns 38. Two limit plates 42 are symmetrically welded on the tops of the vertical support columns 38. A placement groove is formed between the two limit plates 42 and the vertical support columns 38, which is convenient for the transverse support columns 39 to be clamped and limited at the tops of the vertical support columns 38, facilitates assembly positioning, simplifies the installation process and improves efficiency. The transverse support column 39 and the limit plate 42 are then connected and fixed by bolts to effectively ensure the overall structural strength after assembly. The stiffening ribs 37 connect the corresponding side parts of the two support frames 35 to further enhance the bearing capacity of the auxiliary platform 4, making the auxiliary platform 4 structure more stable and reliable. The operation panel 36 is connected to the top of the two support frames 35. The operation panel 36 is provided with multiple pieces. The multiple operation panels 36 are assembled and spliced ​​to form an operation placement surface of a certain area, so as to facilitate subsequent construction operations.

[0045] A ladder 40 is provided on the vertical support column 38, a limit frame 41 is provided on the top of the ladder 40, and the transverse support column 39 is limitedly connected in the corresponding limit frame 41. The design of the ladder 40 can facilitate the construction workers to climb and increase practicality. The ladder 40 is fixed to the vertical support column 38 by welding to ensure the connection strength. At the same time, a limit frame 41 is also provided on the top of the ladder 40, and the limit frame 41 can provide auxiliary support for the transverse support column 39, making the overall structure more solid and reliable, and improving the safety and stability of the structure.

[0046] An auxiliary device for precise installation of a boom and a method for installing the boom, comprising the following steps:

[0047] Step 1: A fork-ear anchor 43 is connected to the upper end of the boom 1. Two groups of crane connection nodes 2 are installed at the upper end of the boom 1 near the fork-ear anchor 43 according to the lifting requirements. The half sleeve 1 6 and the half sleeve 2 7 of the crane connection node 2 are attached and clamped on the side wall of the boom 1, and then the half sleeve 1 6 and the half sleeve 2 7 are connected and fixed by the bolt assembly 1 9 to realize the connection and fixation between the crane connection node 2 and the boom 1, and ensure that the two groups of crane connection nodes 2 are set at an interval; the two groups of crane connection nodes 2 are spaced a certain distance apart to leave space for the subsequent connection of the boom adjustment assembly 2 5 and the boom 1, so that the boom adjustment assembly 2 5 is connected between the two groups of crane connection nodes 2, which is beneficial to the lifting and installation operation of the boom and improves the stability and reliability during the lifting and installation process. The crane connection node 2 adopts a two-half sleeve design, which can facilitate the assembly and disassembly between the crane connection node 2 and the boom 1, and the design makes the crane connection node 2 applicable to booms 1 of different diameters, expanding the scope of application;

[0048] Step 2: Take a support part 12 and a rotating part 13 and assemble them to form the adjustment part of the boom adjustment assembly 25, screw the mounting column 22 of the rotating part 13 into the internal threaded hole 19 of the support part 12, and then adjust the angle of the connecting sleeve according to the installation requirements of the boom 1, the mounting column 22 rotates along the internal threaded hole 19, the connecting column 30 rotates along the extension column 34 through the internal threaded hole 2 31, loosen the limit nut to rotate the rotating arm 32 along the rotating shaft until the angle of the connecting sleeve is adjusted to meet the installation position of the boom 1, tighten the limit nuts at both ends of the rotating shaft, attach and clamp the connecting half sleeve 1 26 and the connecting half sleeve 2 27 to the side wall of the boom 1, and then use the bolt assembly 2 2 9. Connect and fix the connecting half sleeve 1 26 and the connecting half sleeve 2 27 to realize the connection and fixation between the adjustment part and the boom 1, and the adjustment part is connected to the boom 1 between the two groups of boom connection nodes 2; during the angle adjustment process of the connecting sleeve, the installation column 22 can rotate 360° along the internal threaded hole 19, the connecting column 30 can rotate 360° along the extension column 34 through the internal threaded hole 2 31, and the limit nut is loosened to allow the rotating arm 32 to rotate a certain angle along the rotating axis, so that the full-range angle adjustment of the connecting sleeve can be realized, so that the boom adjustment component 2 5 can be suitable for the installation angle requirements of different booms 1, and the installation accuracy of the boom 1 is improved;

[0049] Step 3: Connect the crane hook to the lifting ears 10 on the two sets of crane connection nodes 2 through the lifting rope, and then the crane lifts the boom 1 upwards through the two sets of hanger connection nodes. After the boom 1 is lifted to a suitable position, stop lifting and wait until the boom 1 does not shake; the lifting ears can facilitate the connection between the crane and the boom 1, the connection is convenient, and the connection is firm. The crane lifts the boom 1 to a suitable height to facilitate the subsequent further precise adjustment of the position of the boom 1;

[0050] Step 4: Install a lifting part 11 on the climbing platform 20 of the climbing vehicle, the vertical lifting cylinder 14 is supported and placed on the climbing platform 20, the horizontal lifting cylinder 15 is distributed on the side of the vertical lifting cylinder 14, and the horizontal lifting cylinder 15 is fixed to the climbing platform 20 through the mounting seat 25 with screws, the piston rod of the horizontal lifting cylinder 15 is tightened and limited on the side of the vertical lifting cylinder 14, the vertical lifting cylinder 14 is tightened and fixed, and the climbing vehicle is moved so that the piston rod of the vertical lifting cylinder 14 on the climbing platform 20 is limited and inserted into the slot of the adjustment part connected to the suspension rod 1, and the tightening bolt 18 is adjusted to tighten and fix the piston rod of the vertical lifting cylinder 14 to the supporting part 12; after the adjustment part and the lifting part 11 are assembled, a suspension rod adjustment assembly 2 5 is formed on the climbing platform 20, so that the suspension rod position can be further adjusted by the lifting part 11;

[0051] Step 5: A hand chain hoist is connected to the hook of the crane. Pull the hand chain hoist and cooperate with the jacking part to further accurately adjust the position of the boom 1, so as to achieve accurate connection between the fork ear anchor 43 at the upper end of the boom 1 and the ear plate contained in the arch rib; the boom 1 can be further fine-tuned by the hand chain hoist, and the vertical jacking operation of the vertical jacking cylinder 14 can be cooperated to further accurately adjust the position of the boom 1, so as to facilitate the accurate alignment and connection between the boom 1 and the ear plate, thereby improving the installation efficiency;

[0052] Step 6: After the upper end of the boom 1 is hoisted and connected, remove the bolt assembly 1 9 to dismantle the two sets of crane connection nodes 2, remove the bolt assembly 2 29, dismantle the boom adjustment assembly 2 5, and then use a forklift to move the lower end of the boom 1 to a suitable position; the crane connection node 2 adopts a two-half sleeve design, and the connecting sleeve adopts a two-connection half sleeve design, which can facilitate the disassembly and assembly between the crane connection node 2, the boom adjustment assembly 2 5 and the boom 1, simplify the disassembly and assembly steps, and improve efficiency;

[0053] Step 7: Set up an auxiliary platform 4 near the lower end of the boom 1, place a lifting part 11 on the auxiliary platform 4, then take a supporting part 12 and install it on the lifting part 11, the piston rod of the vertical lifting cylinder 14 of the lifting part 11 is limitedly inserted into the slot of the supporting part 12, and the tightening bolt 18 is adjusted to tightly fix the piston rod of the vertical lifting cylinder 14 to the supporting part 12, and then install a rotating part 13 on the top of the supporting part 12, and the mounting column 22 of the rotating part 13 is screwed into the internal threaded hole 19 at the top of the supporting part 12. The lifting part 11, the supporting part 12 and the rotating part 13 are assembled to form a boom adjustment component 3, and then adjust the angle of the connecting sleeve in the boom adjustment component 3 according to the installation requirements of the boom 1, and then connect the connecting sleeve to the boom 1 to realize the connection between the boom adjustment component 3 and the boom 1; boom adjustment component The structures of the boom adjustment assembly 13 and the boom adjustment assembly 25 are completely consistent, except that one is installed on the climbing platform 20 and the other is installed on the auxiliary platform 4, and the installation time points of the two in the construction steps of the boom 1 are inconsistent. The boom adjustment assembly 25 is to facilitate the installation between the upper end of the boom 1 and the ear plate, and the boom adjustment assembly 13 cooperates with the auxiliary platform 4 to facilitate the installation between the lower end of the boom 1 and the anchor plate. The angle adjustment of the connecting sleeve in the boom adjustment assembly 13 is the same as the angle adjustment of the connecting sleeve in the boom adjustment assembly 25. The installation column 22 can be rotated 360° along the internal threaded hole 19, the connecting column 30 can be rotated 360° along the extension column 34 through the internal threaded hole 231, and the limit nut is loosened to allow the rotating arm 32 to rotate a certain angle along the rotating axis, thereby realizing the full range of angle adjustment of the connecting sleeve;

[0054] Step 8: Under the action of the forklift and the lifting part 11 in the boom adjustment assembly 3, the position of the boom 1 is further accurately adjusted to achieve accurate installation between the lower end of the boom 1 and the anchor plate, remove the bolt assembly 9 of the boom adjustment assembly 3, and dismantle the boom adjustment assembly 3.

[0055] During the installation process of the boom 1, the present invention realizes efficient installation of the boom 1 by means of the designed boom adjustment assembly 1 3 and boom adjustment assembly 2 5 in cooperation with a crane, a forklift, and a hand chain hoist, and the jacking part 11 contained in the boom adjustment assembly 1 3 and boom adjustment assembly 2 5 can accurately adjust the overall lateral position and longitudinal height, the vertical jacking cylinder 14 is lifted to adjust the longitudinal height of the boom adjustment assembly, and the lateral jacking cylinder 15 pushes the vertical jacking cylinder 14 to achieve fine adjustment of the lateral position of the vertical jacking cylinder 14, thereby To ensure the accuracy of the installation of the boom 1, the connecting sleeves in the boom adjustment component 13 and the boom adjustment component 25 can realize multi-directional spatial rotation. The mounting column 22 of the rotating part 13 can rotate 360° along the internal threaded hole 19, and the connecting sleeve can rotate 360° along the extension column 34 through the internal threaded hole 2 31. The rotating arm 32 can also be swung and adjusted along the rotating axis, thereby realizing all-round angle adjustment of the connecting sleeve, thereby ensuring that the spatial angle of the boom 1 can be flexibly adjusted, and further realizing the accurate installation of the boom 1. The present invention adopts a boom connection node 2 to replace the traditional manual rope binding method for connecting with the boom 1 during the installation of the boom 1. The boom connection node 2 adopts a connection method of half sleeve 1 6, half sleeve 2 7 and bolt assembly 1 9 to ensure the firmness and reliability of the connection, and is easy to install and disassemble. The boom connection node 2 can be applied to booms 1 of different diameters, thereby increasing the applicable scope of the boom connection node 2. During actual installation, soft fillers can be installed on the inner wall of the half sleeve to increase the friction between the connection sleeve and the boom 1. A lifting ear 10 is also welded on the half sleeve to facilitate the connection with the crane, so that the connection sleeve is firmly connected to the boom 1 under the gravity of the boom 1 and the traction of the crane, thereby further improving the stability and reliability of the connection.

[0056] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to achieve basically the same technical effects are all included in the protection scope of the present invention.

Claims

1. An auxiliary device for precise installation of a boom, characterized in that include: A crane connection node is provided on the boom to realize the connection between the boom and the crane; A boom adjustment component 1, wherein the boom adjustment component 1 is disposed on the auxiliary platform and connected to the boom; A second boom adjustment component, the second boom adjustment component is arranged on the climbing platform of the climbing vehicle, and the second boom adjustment component is connected to the boom; The boom adjustment assembly 1 and the boom adjustment assembly 2 both include a lifting part and an adjusting part, the adjusting part includes a supporting part and a rotating part, the bottom of the supporting part is connected to the lifting part, the top of the supporting part is connected to the rotating part, and the rotating part is connected to the boom.

2. The auxiliary device for precise installation of a suspension rod according to claim 1, characterized in that: The suspension rod connection node includes half sleeve one and half sleeve two, and extension plate one is provided on both sides of half sleeve one and both sides of half sleeve two. The two extension plates one on the corresponding connection sides of half sleeve one and half sleeve two are connected and fixed by bolt assembly one, so that a clamp groove one is formed between half sleeve one and half sleeve two, and the suspension rod connection node is fixed to the suspension rod by the clamp groove one, and lifting ears are provided on half sleeve one and half sleeve two.

3. The auxiliary device for precise installation of a suspension rod according to claim 1, characterized in that: The lifting part includes a vertical lifting cylinder and a transverse lifting cylinder. The vertical lifting cylinder is fixed to the support part, and the transverse lifting cylinder is distributed circumferentially along the outer side of the vertical lifting cylinder. The piston rod of the transverse lifting cylinder is tightly limited on the side of the vertical lifting cylinder.

4. The auxiliary device for precise installation of a suspension rod according to claim 3, characterized in that: The support part includes a support rod and a limit block, the support rod is fixedly arranged on the limit block, a slot is arranged at the bottom of the limit block, the piston rod of the vertical lifting cylinder is limitedly inserted into the slot, a tightening bolt is arranged through the side thread of the slot, and the tightening bolt is tightened and limited on the side of the piston rod of the vertical lifting cylinder.

5. The auxiliary device for accurate installation of a suspension rod according to claim 4, characterized in that: The top surface of the support rod is provided with an internal threaded hole 1, the rotating part includes a rotating component and a connecting component, the rotating component is provided with a mounting column, the mounting column is threadedly screwed into the internal threaded hole 1, the rotating component is provided with a mounting seat, and the connecting component is hingedly connected to the mounting seat.

6. The auxiliary device for accurate installation of a suspension rod according to claim 5, characterized in that: The connecting member includes a rotating arm and a connecting sleeve, the rotating arm is movably connected to the mounting seat via a rotating shaft, and limit nuts are arranged at both ends of the rotating shaft. The connecting sleeve includes a connecting half sleeve one and a connecting half sleeve two, and both sides of the connecting half sleeve one and both sides of the connecting half sleeve two are provided with an extending plate two. The two extending plates two on the corresponding connecting sides of the connecting half sleeve one and the connecting half sleeve two are connected and fixed by a bolt assembly two, so that a clamp groove two is formed between the connecting half sleeve one and the connecting half sleeve two, and the connecting member is clamped and fixed to the suspension rod by the clamp groove two.

7. The auxiliary device for precise installation of a suspension rod according to claim 6, characterized in that: The first connecting half sleeve is provided with a connecting column, the second internal threaded hole is provided on the connecting column, the rotating arm is provided with an extension column, and the extension column is threadedly rotated in the second internal threaded hole.

8. The auxiliary device for precise installation of a suspension rod according to claim 1, characterized in that: The auxiliary platform includes two symmetrically arranged support frames, the tops of two adjacent support frames are bolted with an operation panel, the sides of two adjacent support frames are bolted with stiffening ribs, the support frame includes two vertical support columns and one transverse support column, the transverse support column is transversely arranged between the two vertical support columns, the operation panel is bolted between the two transverse support columns, and the stiffening ribs are bolted between the two vertical support columns of two adjacent support frames.

9. The auxiliary device for accurate installation of a suspension rod according to claim 8, characterized in that: A ladder is arranged on the vertical support column, a limit frame is arranged on the top of the ladder, and the horizontal support column is limit-engaged in the corresponding limit frame.

10. A method for installing a boom based on the auxiliary device for accurate installation of a boom according to claim 1, characterized in that: The steps include: Step 1: A fork-ear anchor is connected to the upper end of the boom. Two sets of crane connection nodes are installed at the upper end of the boom near the fork-ear anchor according to the lifting requirements. Half sleeve 1 and half sleeve 2 of the crane connection node are attached and clamped on the side wall of the boom. Half sleeve 1 and half sleeve 2 are then connected and fixed by bolt assembly 1 to achieve the connection and fixation between the crane connection node and the boom, and ensure that the two sets of crane connection nodes are set at intervals. Step 2: Take a support part and a rotating part and assemble them to form the adjusting part of the boom adjustment assembly 2, screw the mounting column thread of the rotating part into the internal threaded hole 1 of the support part, and then adjust the angle of the connecting sleeve according to the installation requirements of the boom, the mounting column rotates along the internal threaded hole 1, the connecting column rotates along the extension column through the internal threaded hole 2, loosen the limit nut to rotate the rotating arm along the rotating shaft, until the angle of the connecting sleeve is adjusted to meet the installation position of the boom, tighten the limit nuts at both ends of the rotating shaft, attach and clamp the connecting half sleeve 1 and the connecting half sleeve 2 to the side wall of the boom, and then connect and fix the connecting half sleeve 1 and the connecting half sleeve 2 through the bolt assembly 2 to achieve the connection and fixation between the adjusting part and the boom, and the adjusting part is connected to the boom between the two sets of boom connection nodes; Step 3: Connect the crane hook to the lifting ears on the two sets of crane connection nodes through the lifting rope, and then the crane lifts the boom upward through the two sets of hanger connection nodes. After the boom is lifted to the appropriate position, stop lifting and wait until the boom stops shaking; Step 4: Install a lifting part on the climbing platform of the climbing vehicle, place the vertical lifting cylinder support on the climbing platform, and the transverse lifting cylinder is distributed on the side of the vertical lifting cylinder. The transverse lifting cylinder is fixed to the climbing platform through the mounting seat and screws. The piston rod of the transverse lifting cylinder is tightened and limited on the side of the vertical lifting cylinder. The vertical lifting cylinder is tightened and fixed, and the climbing vehicle is moved so that the piston rod of the vertical lifting cylinder on the climbing platform is limited and inserted into the slot of the adjustment part connected to the suspension rod, and the tightening bolt is adjusted to tighten and fix the piston rod of the vertical lifting cylinder to the support part; Step 5: A hand chain hoist is connected to the hook of the crane. Pull the hand chain hoist and cooperate with the jacking part to further accurately adjust the position of the boom, so as to achieve accurate connection between the fork-ear anchor at the upper end of the boom and the ear plate contained in the arch rib; Step 6: After the upper end of the boom is hoisted and connected, remove the bolt assembly 1 to dismantle the two sets of crane connection nodes, remove the bolt assembly 2, dismantle the boom adjustment assembly 2, and then use a forklift to move the lower end of the boom to a suitable position; Step 7: Set up an auxiliary platform near the lower end of the boom, place a jacking part on the auxiliary platform, then take a support part and install it on the jacking part, the piston rod of the vertical jacking cylinder of the jacking part is limitedly inserted into the slot of the support part, and the tightening bolt is adjusted to tightly fix the piston rod of the vertical jacking cylinder and the support part, and then install a rotating part on the top of the support part, and the mounting column of the rotating part is screwed into the internal threaded hole 1 on the top of the support part. After the jacking part, the support part and the rotating part are assembled, a boom adjustment assembly 1 is formed, and then the angle of the connecting sleeve in the boom adjustment assembly 1 is adjusted according to the installation requirements of the boom, and then the connecting sleeve is connected to the boom to realize the connection between the boom adjustment assembly 1 and the boom; Step 8: Under the action of the forklift and the jacking part, the position of the boom is further accurately adjusted to achieve accurate installation between the lower end of the boom and the anchor plate, remove the bolt assembly 1 of the boom adjustment assembly 1, and dismantle the boom adjustment assembly 1.