Communication pipeline engineering design scheduling system, method, equipment, medium and product
By introducing a scheduling system in the communication pipeline engineering design, and using project management, operation point control and task planning modules, the problem of lack of online management and automated data flow in the design process is solved, and efficient and stable design results are achieved.
Patent Information
- Application Number
- CN202411830334.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-12
- Publication Date
- 2025-04-04
AI Technical Summary
In the prior art, the communication pipeline engineering design process lacks online management and automated data flow, resulting in limited improvement in work efficiency and results quality, and depends on the personal capabilities of designers, and the results quality is unstable.
It provides a communication pipeline engineering design and scheduling system, including project management module, operation point management module and task planning module, and controls the design process through standardized templates to realize automated data flow and online management.
It realizes standardized management of the communication pipeline engineering design process, improves the overall production efficiency of the design unit, ensures high-quality automated delivery of design results, and enriches the presentation of business data and project information.
Smart Images

Figure CN119761725A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of communication technology, and in particular to a communication pipeline engineering design and scheduling system, method, equipment, medium and product. Background Art
[0002] The complete communication pipeline engineering design process usually involves multiple links such as project cycle management, survey and design process, drawing and review of construction drawings, inspection and testing of communication pipelines, and evaluation of design effects.
[0003] At present, designers can use two production tools, intelligent surveying and automatic drawing, to assist in completing their work. However, since design units generally lack systems for online process control and automated data flow in these work links, the work mode of using production tools to simply assist designers has very limited impact on improving the overall work efficiency and quality of results of the unit, and there is a heavy reliance on the personal abilities of designers, resulting in unstable quality of results. Summary of the invention
[0004] The purpose of the embodiments of the present invention is to provide a communication pipeline engineering design scheduling system, method, equipment, medium and product, which can effectively support the standardized template to control each operation link of the communication pipeline engineering design and realize the management and control of the communication pipeline engineering design process.
[0005] To achieve the above objectives, an embodiment of the present invention provides a communication pipeline engineering design and scheduling system, including:
[0006] A project management module is used to create a project set and projects under the project set, and to decompose and manage sub-projects or temporary sub-projects according to the preset goals of the project;
[0007] An operation point management and control module is used to create an operation point under the subproject or the temporary subproject according to the basic information of the operation point, and manage the operation point;
[0008] The task planning module is used to generate work orders for work points and procedures according to the design tasks, and to distribute the work orders for work points and procedures.
[0009] As an improvement of the above solution, the project management module creates a project set and projects under the project set, and decomposes and manages sub-projects or temporary sub-projects according to preset goals of the project, including:
[0010] Enter project information and create a project set; the project information includes the project set number, name, production unit, undertaking province, responsible member, professional dimension and regional dimension;
[0011] Create a project under the project set, and configure project participants and production sections;
[0012] Decompose the subprojects or temporary subprojects according to the preset goals of the project, and clarify the subproject information of the subprojects or temporary subprojects; wherein the subproject information includes the name, planned completion time, estimated operation scale, estimated approval scale, and subproject leader;
[0013] After obtaining the official project establishment information, the temporary sub-project is migrated to the corresponding sub-project to achieve the association and change of the sub-project or the temporary sub-project.
[0014] As an improvement of the above solution, the project management module is also used for:
[0015] The job templates bound to the sub-projects under the project are managed through project batch configuration, and after configuration at the project level, all the job templates bound to the sub-projects are overwritten in batches;
[0016] After selecting the involved processes, subsequent dispatches will not be loaded. Selecting the configured process can load the bound job template and also has the unbinding function.
[0017] As an improvement of the above solution, the basic information of the operation point includes the name of the operation point, the sub-category of the operation point, the construction type, the scale and the region to which it belongs;
[0018] The management of the operation point includes importing, migrating, restoring, terminating or starting; the operation point control module manages the operation point, including:
[0019] After the operation point is created, the operation point is imported or migrated to other subprojects under the preset conditions; wherein the preset conditions are that the subproject leader and the subproject production year are the same;
[0020] Resume, terminate, or restart a completed job.
[0021] As an improvement of the above solution, the task planning module generates a work order for a work point process according to the design task, and distributes the work order for the work point process, including:
[0022] Synchronize the project management module to distribute design tasks;
[0023] After synchronization, the planned task operation point is automatically created, and the names and numbers of the related projects and tasks of the project management module are automatically saved;
[0024] Bind the work points in the planning task management to the sub-projects, and distribute the work orders for the work points.
[0025] As an improvement of the above solution, the system further includes a process work order management module;
[0026] The process work order management module is used to classify and manage processes and work orders; wherein the processes include non-core processes and core processes; the work orders include project work orders, work point work orders and management work orders.
[0027] As an improvement of the above solution, the system further includes a workload management module;
[0028] The workload management module is used to:
[0029] Edit and import the verification site in the workload supporting form and confirm the total workload hours;
[0030] Edit and upload design approval files in the workload supporting form, supporting single or batch deletion;
[0031] Edit and add work points in the workload supporting form and fill in the relevant attribute fields;
[0032] After the workload supporting form is reviewed and approved, an electronic signature and seal will be automatically added to the workload details list.
[0033] As an improvement of the above solution, the system further includes a quality audit module;
[0034] The quality audit module is used to:
[0035] Search and select the audit work order and audit personnel according to the conditions, and generate the audit task immediately after dispatching;
[0036] Search and select the audit work order and audit personnel according to the conditions, and generate audit tasks according to the time period after dispatching;
[0037] The random inspection task is assigned again under the conditions that inherit the previous random inspection task.
[0038] The embodiment of the present invention also provides a communication pipeline engineering design and scheduling method, including:
[0039] Create project sets and projects under the project sets, and decompose and manage sub-projects or temporary sub-projects according to the preset goals of the projects;
[0040] Creating an operation point under the subproject or the temporary subproject according to the basic information of the operation point, and managing the operation point;
[0041] Generate a work order for a work point process according to the design task, and distribute the work order for the work point process.
[0042] An embodiment of the present invention also provides a communication pipeline engineering design and scheduling device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, and when the processor executes the computer program, it implements the communication pipeline engineering design and scheduling method as described above.
[0043] An embodiment of the present invention also provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute the communication pipeline engineering design scheduling method as described above.
[0044] An embodiment of the present invention further provides a computer program product, which includes a computer program or computer instructions. When the computer program or the computer instructions are executed by a processor, the communication pipeline engineering design and scheduling method as described above is implemented.
[0045] Compared with the prior art, the communication pipeline engineering design and scheduling system, method, equipment, medium and product disclosed in the present invention enable the project team to control operation links such as intelligent survey and automatic drawing through the scheduling system supporting standardized templates, completely open up and standardize the processes and data of each link, automatically generate survey reports and design drawings, and make more refined process segmentation and centralized operations possible. The scheduling system can also be coordinated with more professional tools such as budget, text, table, delivery, etc., so as to continuously and significantly improve the overall production efficiency of the design unit, realize high-quality automated delivery of design results, and enrich the presentation of business data and project information. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 It is a structural schematic diagram of a communication pipeline engineering design and scheduling system provided by an embodiment of the present invention;
[0047] Figure 2 Schematic diagram of the project management module in an embodiment of the present invention;
[0048] Figure 3 Schematic diagram of the principle of the operation point control module in an embodiment of the present invention;
[0049] Figure 4 It is a structural schematic diagram of a preferred communication pipeline engineering design and scheduling system in an embodiment of the present invention;
[0050] Figure 5 It is a schematic diagram of the principle of process classification in an embodiment of the present invention;
[0051] Figure 6 It is a flow chart of a communication pipeline engineering design and scheduling method provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0052] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0053] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0054] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.
[0055] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0056] See also Figure 1 , is a structural diagram of a communication pipeline engineering design and scheduling system provided by an embodiment of the present invention. The embodiment of the present invention provides a communication pipeline engineering design and scheduling system 10, including a project management module 11, an operation point control module 12 and a task planning module 13, wherein,
[0057] The project management module 11 is used to create a project set and projects under the project set, and to decompose and manage sub-projects or temporary sub-projects according to the preset goals of the project;
[0058] The operation point management and control module 12 is used to create an operation point under the subproject or the temporary subproject according to the basic information of the operation point, and manage the operation point;
[0059] The task planning module 13 is used to generate a work order for a work point process according to the design task, and to distribute the work order for the work point process.
[0060] In an embodiment of the present invention, by developing a scheduling system for the design link of a communication pipeline engineering project, a pulsating "production line" combining parallel and serial operations is created around the key processes of production operations, thereby comprehensively promoting the digital upgrade of all factors in this operation field, including production tools and organizational models, operating processes and management and control carriers.
[0061] The communication pipeline engineering design scheduling system provided in the embodiment of the present invention is an important carrier for realizing the division of labor and collaboration in engineering design and process management. It focuses on solving the effective allocation of project management and work tasks, and performs real-time online monitoring of production links to realize online and refined management of the production process.
[0062] In an embodiment of the present invention, the communication pipeline engineering design and scheduling system 10 includes a project management module 11, a work point control module 12 and a task planning module 13. The project management module 11 is used to create a project set and projects under the project set, and sub-projects or temporary sub-projects are decomposed and managed according to the preset goals of the project. The work point control module 12 is used to create work points under the sub-projects or temporary sub-projects based on the basic information of the work points, and the work points are managed. The task planning module 13 generates work point process work orders according to the design tasks, and distributes the work point process work orders.
[0063] By adopting the technical means of the embodiments of the present invention, the project team can control the operation links such as intelligent survey and automatic drawing through the standardized template supported by the scheduling system, completely open up and standardize the processes and data of each link, automatically generate survey reports and design drawings, and make more refined process segmentation and centralized operations possible. The scheduling system can also be coordinated with more professional tools such as budget, text, table, delivery, etc., so as to continuously and significantly improve the overall production efficiency of the design unit, realize high-quality automated delivery of design results, and enrich the presentation of business data and project information.
[0064] As a preferred implementation, the embodiment of the present invention is further implemented on the basis of the above embodiment, the project management module 11 creates a project set and the projects under the project set, and decomposes and manages sub-projects or temporary sub-projects according to the preset goals of the project, which is specifically implemented through the following steps S11 to S14:
[0065] S11. Enter project information and create a project set; wherein the project information includes the project set number, name, production unit, undertaking province, responsible member, professional dimension and regional dimension;
[0066] S12. Create a project under the project set, and configure project participants and production sections;
[0067] S13. Decompose the subprojects or temporary subprojects according to the preset goals of the project, and clarify the subproject information of the subprojects or temporary subprojects; wherein the subproject information includes the name, planned completion time, estimated operation scale, estimated approval scale, and subproject leader;
[0068] S14. After obtaining the official project establishment information, the temporary sub-project is migrated to the corresponding sub-project to achieve the association and change of the sub-project or the temporary sub-project.
[0069] Preferably, the project management module 11 is further used to execute steps S15 to S16:
[0070] S15. Managing the job templates bound to the sub-projects under the project through project batch configuration, and after configuration at the project level, overwriting all the job templates bound to the sub-projects in batches;
[0071] S16. After selecting the process involved, subsequent dispatching will not be loaded. Selecting the configuration process can load the bound job template and also has the unbinding function.
[0072] See also Figure 2 , is a schematic diagram of the principle of the project management module in the embodiment of the present invention. In the embodiment of the present invention, the project management module 11 is the source of project information of the scheduling system, and usually adopts two-level management of project sets and projects. The project set can drill down to the affiliated projects. Currently, the main synchronized information is the project set number, project set name, production unit, undertaking province, project set leader A, project set leader B, professional dimension, regional dimension and other information; the project configures project participants (owned) and production sections (cooperative), among which owned personnel can add personnel under the current organizational structure as temporary personnel. Project set and project related information are synchronized with the project management system on a regular basis every day. The relevant project set leaders and project leaders can manage and control them in the project management menu, mainly including information such as supplementary project members and project establishment scale.
[0073] Specifically, the functions of the project management module 11 are as follows:
[0074] Subproject / temporary subproject creation: Decompose subprojects / temporary subprojects according to the specific goals of the project (bid section, Party A project establishment). When creating a subproject, it is necessary to specify the subproject name, planned completion time, estimated operation scale, estimated approval scale, subproject leader and other information. Batch creation / batch modification is supported, and the creation of temporary subproject pre-construction tasks is supported in advance.
[0075] Temporary sub-project association and change: After obtaining the official project establishment information, the temporary sub-project can be migrated to the target sub-project. The temporary sub-project and the sub-project have the same functions. For changes other than "planned scale" and "operation scale", the system directly starts the non-review process.
[0076] Customized process: The operation points and work orders under the sub-project / temporary sub-project are generated according to the specific task requirements received. The system automatically creates processes under the project according to various scenarios and the flexible control needs of each production unit. The early planning professional plan uses the stage delivery and results delivery process functions, and can freely query the execution status of customized processes.
[0077] Batch bind templates: All work points and work orders must be specified by the system to adapt to the work process and template when they are generated. Templates bound to sub-projects under the project are managed through project batch configuration. After the project level configuration, all bound templates of sub-projects under the project will be overwritten in batches. When the process is selected, subsequent dispatches will not be loaded. Selecting the configuration process can load the bound template, and it also has the unbinding function.
[0078] Automatic naming: The system automatically names the sub-projects according to the project type and professional sub-category according to the preset procedures, such as "XX Co., Ltd._XX Region 2024_5G Phase IV (700M)_Wireless_Construction Content Batch X".
[0079] As a preferred implementation, the embodiment of the present invention is further implemented on the basis of the above embodiment, wherein the basic information of the operation point includes the name of the operation point, the sub-category of the operation point, the construction type, the scale and the region to which it belongs;
[0080] Management of the operation point includes importing, migrating, restoring, terminating or starting;
[0081] The operation point control module 12 manages the operation point, which is specifically implemented through the following steps S21 to S22:
[0082] S21. After the operation point is created, the operation point is imported or migrated to another subproject under a preset condition; wherein the preset condition is that the subproject leader and the subproject production year are the same;
[0083] S22. Restore, terminate or restart the completed operation point.
[0084] See also Figure 3, is a schematic diagram of the principle of the operation point control module in the embodiment of the present invention, where the operation point is a specific work task or site in the survey and design work. When the operation point control module creates an operation point, it is necessary to clarify the basic information such as the operation point name, operation point subcategory, construction type, scale, and region, as well as the extended field information carried by the template after binding the template. Its main implementation methods are as follows:
[0085] New: The system creates an operation point after drilling down the operation point list in the subproject / temporary subproject.
[0086] Import and migration: After the system creates a batch of work points, it will migrate the work points to other subprojects under the condition that the subproject leader and the subproject production year are the same. After the migration, the information such as the project and subproject to which the migrated work point belongs will be updated with the target subproject / project related information.
[0087] Resume / Terminate / Restart: The system can restore a completed operation point to the ongoing state, terminate an operation point, or restart a terminated operation point to the ongoing state.
[0088] As a preferred implementation, the embodiment of the present invention is further implemented on the basis of the above embodiment, and the system 10 also includes a process work order management module 14, a workload management module 15, a quality audit module 16, a supporting control module 17 and a process adaptation module 18.
[0089] See also Figure 4 , is a structural diagram of a preferred communication pipeline engineering design and scheduling system in an embodiment of the present invention. The communication pipeline engineering design and scheduling system has the following functional characteristics: it is production process-oriented (extensible), takes work orders as the core carrier, can bind various types of operation templates, can drive various types of operation tools, is the process center of the production operation platform, and can realize the connection between operation processes and business data.
[0090] The main business processes of communication design include project improvement, target decomposition, operation task control, flexible scheduling and execution of survey / design process work orders, real-time viewing of project progress reports, and sedimentation and external sharing of survey / design results. The main functional steps of this solution (which can be adjusted and designed according to different business types) include project management, operation point control, work order management, workload management, quality review, statistical query, supporting control, process engine, etc., which are completed by various modules of the communication pipeline engineering design and scheduling system.
[0091] Preferably, the process work order management module 14 is used to classify and manage processes and work orders; wherein the processes include non-core processes and core processes; and the work orders include project work orders, work point work orders and management work orders.
[0092] In the embodiment of the present invention, the process work order management module records the progress and results of the survey and design work through the process work order, so as to facilitate the subsequent review, management and delivery.
[0093] See also Figure 5 , is a schematic diagram of the principle of process classification in an embodiment of the present invention, and the processes are divided into two categories, including: non-core processes and core processes.
[0094] The non-core process: The non-core auxiliary work links of communication engineering design usually include information collection, project coordination, auxiliary drawing, text sorting, table processing, file publishing, etc., and technical coordination services can be used. Among them, information collection corresponds to the on-site survey link, and auxiliary drawing corresponds to the drawing drawing link.
[0095] The core processes described above: The general management standards of the core work links are completed by in-house personnel, and the use of technical cooperation services is not allowed.
[0096] Work orders are divided into three categories, including project, work point, and management.
[0097] The project work orders are: dispatching project work orders based on projects or sub-projects, and managing the dispatched project work orders (dispatching, reassigning, terminating, etc.; the project work order page can dispatch multiple project work orders).
[0098] The work point work order: the work point work order is distributed based on the work point. The work point can distribute which process work orders can be configured at the corresponding sub-project. Common processes include information collection, auxiliary drawing, table processing, text sorting, etc.
[0099] The management work orders described above trigger the approval process according to the review needs of various types of affairs, including temporary sub-project change approval, template binding approval, workload approval and other management work orders.
[0100] Preferably, the workload management module 15 is used to: edit and import verification sites in the workload supporting form, and confirm the total working hours of the workload; edit and upload design approval files in the workload supporting form, and support single deletion or batch deletion; edit and add work points in the workload supporting form, and fill in relevant attribute fields; after the workload supporting form is reviewed and approved, automatically sign and seal electronically in the workload details table.
[0101] Specifically, in the embodiment of the present invention, the workload management module 15 is used to:
[0102] Import verification site: Edit and import verification site in the workload supporting form, and confirm that the total workload hours will be reduced by the verification site hours value.
[0103] Upload design approval: edit and upload design approval in the workload support form (select file type, design approval, meeting minutes, related design file page), and support single / batch deletion.
[0104] Select / add work points: edit and add work points in the workload support form (the attribute fields such as application classification, unit, quantity, etc. of the work points cannot be empty).
[0105] Review and seal: After the workload supporting form is reviewed and approved, the system will automatically seal the electronic signature in the pdf version of the workload details table.
[0106] Preferably, the quality audit module 16 is used to:
[0107] Search and select the audit work order and audit personnel according to the conditions, and generate the audit task immediately after dispatching;
[0108] Search and select the audit work order and audit personnel according to the conditions, and generate audit tasks according to the time period after dispatching;
[0109] The random inspection task is assigned again under the conditions that inherit the previous random inspection task.
[0110] Specifically, in the embodiment of the present invention, the quality review module 16 can assign the random review tasks to the reviewers by means of instant random review, scheduled random review and repeated random review.
[0111] Instant random review: The system searches according to conditions, selects random review work orders and random reviewers, and generates random review tasks immediately after dispatching, including configuring random review search conditions, selecting random review tasks as needed, configuring random review tasks, configuring random review rules, and other sub-steps;
[0112] Scheduled random review: The system searches according to conditions, selects random review work orders and random reviewers, and generates random review tasks regularly according to a certain time period after dispatching, including random review pool configuration, random review method selection, random review task configuration, random review rule configuration and other sub-steps;
[0113] Repeat random review: The system inherits the previous random review task conditions and distributes them again, including two sub-steps: selecting random review tasks and configuring random review rules.
[0114] As a preferred implementation, the embodiment of the present invention is further implemented on the basis of the above embodiment, the task planning module 13 generates a work point process work order according to the design task, and distributes the work point process work order, which is specifically implemented by the following steps S31 to S33:
[0115] S31, synchronizing the project management module to distribute design tasks;
[0116] S32, automatically creating a planned task operation point after synchronization, and automatically saving the names and numbers of the relevant projects and tasks of the project management module;
[0117] S33, binding the operation point in the planning task management to the sub-project, and dispatching the operation point process work order.
[0118] In an embodiment of the present invention, the task planning module 13 synchronizes the project management module (PMS) to dispatch design tasks. After the PMS is synchronized, the task planning module automatically creates the planned task operation point, and the task planning module automatically saves the name and number of the PMS related project and task. The task planning module binds the operation point in the planned task management to the sub-project, and dispatches the operation point process work order, which can truly connect the project management of each provincial company and the station-level production operation of the design institute in terms of process and data.
[0119] Compared with the prior art, the technical means of the embodiments of the present invention have the following beneficial effects:
[0120] Low learning cost and high operating efficiency: The embodiments of the present invention optimize the traditional operating process and mode, support flexible definition of processes, adjustment of task processes, and process-driven operations. Operators can focus more on the skills of a single process, thereby greatly reducing learning costs and improving operating efficiency.
[0121] Outstanding scale effect and stable quality of results: The system established by the embodiment of the present invention can provide a multi-dimensional service interface to the outside world, ensure the flexibility of system docking, improve the driving ability and demand of other operating tools, and make the centralized operation mode of engineering design possible. Design units can use this system to achieve collaborative operations of multiple processes, thereby greatly improving the operating efficiency and quality of results of a single process.
[0122] High production control capability and strong business scalability: The system established in the embodiment of the present invention can not only support the online flexible scheduling of station-level production operations, but also connect to the project-level management system to provide more diversified production control and business support capabilities such as progress monitoring, quality review, and workload evidence chain. The system can achieve business decoupling, can meet the business production needs of different professions and different scenarios, and has strong extended application characteristics.
[0123] The scheduling system of the embodiment of the present invention can connect various production project management systems, focus on the process-based, refined, and online management of the production process, and leverage management levers through production control capabilities such as progress monitoring, quality review, and cooperative evidence chain to provide diversified management methods and business support capabilities. Optimize traditional operating processes and modes, support flexible definition of procedures and adjustment of task processes, drive operations with processes, and meet multi-professional and multi-scenario business needs. Provide multi-dimensional service interfaces to the outside world to achieve business decoupling, ensure system docking flexibility, and enhance the driving capabilities and needs of other basic functional modules and operating tools.
[0124] See also Figure 6 , is a flow chart of a communication pipeline engineering design and scheduling method provided by an embodiment of the present invention. The embodiment of the present invention provides a communication pipeline engineering design and scheduling method, including steps S41 to S44:
[0125] S41, creating a project set and projects under the project set, and decomposing and managing sub-projects or temporary sub-projects according to preset goals of the project;
[0126] S42, creating a work point under the subproject or the temporary subproject according to the work point basic information, and managing the work point;
[0127] S43, generating a work order for a work point process according to the design task, and distributing the work order for the work point process.
[0128] It should be noted that all process steps of a communication pipeline engineering design and scheduling method provided in an embodiment of the present invention are executed by a communication pipeline engineering design and scheduling system of the above-mentioned embodiment, and the working principles and beneficial effects of the two correspond one to one, so they will not be repeated here.
[0129] An embodiment of the present invention also provides a communication pipeline engineering design and scheduling device, including a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, and when the processor executes the computer program, it implements the communication pipeline engineering design and scheduling method as described in the above embodiment.
[0130] It should be noted that a communication pipeline engineering design and scheduling device provided in an embodiment of the present invention is used to execute all process steps of a communication pipeline engineering design and scheduling method in the above embodiment. The working principles and beneficial effects of the two correspond one to one, and thus will not be described in detail.
[0131] An embodiment of the present invention also provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute the communication pipeline engineering design scheduling method as described in the above embodiment.
[0132] An embodiment of the present invention further provides a computer program product, characterized in that the computer program product includes a computer program or computer instructions, and when the computer program or the computer instructions are executed by a processor, the communication pipeline engineering design and scheduling method as described in the above embodiment is implemented.
[0133] A person skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. The storage medium can be a disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM), etc.
[0134] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.
Claims
1. A communication pipeline engineering design and scheduling system, characterized in that: include: A project management module is used to create a project set and projects under the project set, and to decompose and manage sub-projects or temporary sub-projects according to the preset goals of the project; An operation point management and control module is used to create an operation point under the subproject or the temporary subproject according to the basic information of the operation point, and manage the operation point; The task planning module is used to generate work orders for work points and procedures according to the design tasks, and to distribute the work orders for work points and procedures.
2. The communication pipeline engineering design and scheduling system according to claim 1, characterized in that: The project management module creates a project set and projects under the project set, and decomposes and manages sub-projects or temporary sub-projects according to the preset goals of the project, including: Enter project information and create a project set; the project information includes the project set number, name, production unit, undertaking province, responsible member, professional dimension and regional dimension; Create a project under the project set, and configure project participants and production sections; Decompose the subprojects or temporary subprojects according to the preset goals of the project, and clarify the subproject information of the subprojects or temporary subprojects; wherein the subproject information includes the name, planned completion time, estimated operation scale, estimated approval scale, and subproject leader; After obtaining the official project establishment information, the temporary sub-project is migrated to the corresponding sub-project to achieve the association and change of the sub-project or the temporary sub-project.
3. The communication pipeline engineering design and scheduling system according to claim 2, characterized in that: The project management module is also used to: The job templates bound to the sub-projects under the project are managed through project batch configuration, and after configuration at the project level, all the job templates bound to the sub-projects are overwritten in batches; After selecting the involved processes, subsequent dispatches will not be loaded. Selecting the configured process can load the bound job template and also has the unbinding function.
4. The communication pipeline engineering design and scheduling system according to claim 1, characterized in that: The basic information of the operation point includes the name of the operation point, the sub-category of the operation point, the construction type, the scale and the region to which it belongs; Management of the operation point includes importing, migrating, restoring, terminating or starting; The operation point control module manages the operation point, including: After the operation point is created, the operation point is imported or migrated to other subprojects under the preset conditions; wherein the preset conditions are that the subproject leader and the subproject production year are the same; Resume, terminate, or restart a completed job.
5. The communication pipeline engineering design and scheduling system according to claim 1, characterized in that: The task planning module generates a work order for a work point process according to the design task, and distributes the work order for the work point process, including: Synchronize the project management module to distribute design tasks; After synchronization, the planned task operation point is automatically created, and the names and numbers of the related projects and tasks of the project management module are automatically saved; Bind the work points in the planning task management to the sub-projects, and distribute the work orders for the work points.
6. The communication pipeline engineering design and scheduling system according to any one of claims 1 to 5, characterized in that: The system also includes a process work order management module; The process work order management module is used to classify and manage processes and work orders; wherein the processes include non-core processes and core processes; the work orders include project work orders, work point work orders and management work orders.
7. The communication pipeline engineering design and scheduling system according to any one of claims 1 to 5, characterized in that: The system also includes a workload management module; The workload management module is used to: Edit and import the verification site in the workload supporting form and confirm the total workload hours; Edit and upload design approval files in the workload supporting form, supporting single or batch deletion; Edit and add work points in the workload supporting form and fill in the relevant attribute fields; After the workload supporting form is reviewed and approved, an electronic signature and seal will be automatically added to the workload details list.
8. The communication pipeline engineering design and scheduling system according to any one of claims 1 to 5, characterized in that: The system also includes a quality audit module; The quality audit module is used to: Search and select the audit work order and audit personnel according to the conditions, and generate the audit task immediately after dispatching; Search and select the audit work order and audit personnel according to the conditions, and generate audit tasks according to the time period after dispatching; The random inspection task is assigned again under the conditions that inherit the previous random inspection task.
9. A communication pipeline engineering design and scheduling method, characterized in that: include: Create project sets and projects under the project sets, and decompose and manage sub-projects or temporary sub-projects according to the preset goals of the projects; Creating an operation point under the subproject or the temporary subproject according to the basic information of the operation point, and managing the operation point; Generate a work order for a work point process according to the design task, and distribute the work order for the work point process.
10. A communication pipeline engineering design and scheduling device, characterized in that: The method comprises a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein the communication pipeline engineering design and scheduling method as claimed in claim 9 is implemented when the processor executes the computer program.
11. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program, wherein when the computer program is executed, the device where the computer-readable storage medium is located is controlled to execute the communication pipeline engineering design and scheduling method as claimed in claim 9.
12. A computer program product, characterized in that The computer program product includes a computer program or a computer instruction, and when the computer program or the computer instruction is executed by a processor, the communication pipeline engineering design and scheduling method as claimed in claim 9 is implemented.
Citation Information
Patent Citations
Project cost consultation intelligent work order management method, system and equipment and storage medium
CN113887998A
Intelligent dispatching system based on process card control management
CN114358714A
Project review method and device, electronic equipment and storage medium
CN116011968A
Project management system and method, electronic equipment and medium
CN116796981A