Tunnel dynamic convergence monitoring device and method based on U-Net neural network

By using U-Net neural network in the tunnel convergence monitoring equipment to determine the scanning height difference of the target dynamic scanner, the problem of difficulty in finding a suitable direction for data acquisition in the prior art is solved, and accurate tunnel convergence monitoring and security guarantee are achieved.

CN119778037AActive Publication Date: 2025-04-08CCCC SECOND HIGHWAY ENG CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202510036642.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-09
Publication Date
2025-04-08
Estimated Expiration
2045-01-09

AI Technical Summary

Technical Problem

The prior art is difficult to find a suitable orientation for data acquisition in tunnel convergence monitoring, resulting in the measurement data not having good reference value and the convergence of the tunnel cannot be accurately judged.

Method used

The tunnel dynamic convergence monitoring device based on U-Net neural network is adopted, and the U-Net neural network is used to determine the scanning height difference of the target dynamic scanner through the lifting platform controller, adjust its height, so that it can find a suitable orientation to collect the two-dimensional target distribution image, and generate a three-dimensional tunnel target distribution image to analyze the angle changes and displacement changes of the targets in the tunnel.

Benefits of technology

The target dynamic scanner has achieved a suitable location in the tunnel for data acquisition. The target in the generated image is located at the middle position, which can accurately judge the convergence of the tunnel and improves the accuracy and safety of monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119778037A_ABST
    Figure CN119778037A_ABST
Patent Text Reader

Abstract

The invention discloses tunnel dynamic convergence monitoring equipment and method based on a U-Net neural network, and relates to the technical field of tunnel engineering disaster prediction.The tunnel dynamic convergence monitoring equipment comprises a target spot dynamic scanner, a column type lifting platform, a data processing system, a lifting platform controller, a maintenance trolley and a plurality of target spots arranged in a tunnel; the target spot dynamic scanner is located on the column type lifting platform, the column type lifting platform and the lifting platform controller are both fixedly connected to the maintenance trolley, and the lifting platform controller is in communication connection with the column type lifting platform; and the data processing system is in communication connection with the target spot dynamic scanner. According to the lifting platform controller, the scanning height difference value of the target spot dynamic scanner is determined through the U-Net neural network, and the height of the target spot dynamic scanner is adjusted based on the scanning height difference value, so that the target spot dynamic scanner can find a proper direction to collect a two-dimensional target spot distribution image.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tunnel engineering disaster prediction, and in particular to a tunnel dynamic convergence monitoring device and method based on a U-Net neural network. Background Art

[0002] During the construction and operation and maintenance of a tunnel, by measuring the changes in the clearance dimensions around the tunnel, that is, measuring the convergence displacement around the tunnel, the stability of the tunnel surrounding rock or structure can be judged intuitively and clearly. Therefore, convergence displacement is a routine monitoring item in tunnel monitoring.

[0003] At present, when monitoring the convergence of a tunnel, workers are required to carry detection instruments to conduct detection in front of the newly excavated heading face. At this time, there are many safety hazards in the geology of this part of the tunnel, such as the falling of stones due to the instability of the surrounding rock after excavation, a large amount of dust in the tunnel during excavation, water gushing in the tunnel, etc., which seriously endanger the lives of workers.

[0004] For example, the Chinese utility model patent with application number 201920728095.7 provides a new type of tunnel convergence instrument, which connects the tunnel convergence instrument by opening a hole in the tunnel cross section, and uses the value of the initial tension measurement as the basis for the tension value in each subsequent measurement. On the premise that the tension value measured each time is consistent with the initial tension value, the length value is read, and the length value in different subsequent time periods is subtracted from the initial length to obtain the convergence value in the tunnel in different time periods; although this method can monitor the convergence of the tunnel, it is not easy to find a suitable position for data collection, resulting in the measured data not having a good reference value and being unable to make an accurate judgment on the convergence of the tunnel. Summary of the invention

[0005] In view of the technical problem described in the above background technology, it is difficult to find a suitable position for data collection when performing tunnel convergence monitoring in the prior art. To address this technical problem, the present invention proposes a tunnel dynamic convergence monitoring device and method based on a U-Net neural network.

[0006] The present invention discloses a tunnel dynamic convergence monitoring device based on a U-Net neural network. The lifting platform controller determines the scanning height difference of the target dynamic scanner through the U-Net neural network, and adjusts the height of the target dynamic scanner based on the scanning height difference, so that the target dynamic scanner can find a suitable position to collect a two-dimensional target distribution image. At the same time, the target point in the two-dimensional target distribution image generated by the target dynamic scanner can be located in the middle position, and the convergence of the tunnel can be accurately judged when analyzing the angle change and displacement change of the same target point.

[0007] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0008] The present invention discloses a tunnel dynamic convergence monitoring device based on a U-Net neural network, comprising a target point dynamic scanner, a column-type lifting platform, a data processing system, a lifting platform controller, a maintenance trolley, and a plurality of target points arranged in the tunnel, wherein the target point dynamic scanner is located on the column-type lifting platform, the column-type lifting platform and the lifting platform controller are both fixedly connected to the maintenance trolley, the lifting platform controller is communicatively connected to the column-type lifting platform; the data processing system is communicatively connected to the target point dynamic scanner;

[0009] The lifting platform controller is used to determine the scanning height difference of the target dynamic scanner using a U-Net neural network, and control the lifting distance of the column lifting platform according to the scanning height difference to adjust the height of the target dynamic scanner; the U-Net neural network is formed by training based on a large amount of two-dimensional target distribution image sample data and standard image sample data;

[0010] The target point dynamic scanner is used to scan multiple target points on the same cross section of the tunnel along the extension direction of the tunnel using the target point dynamic scanner with adjusted height, generate multiple two-dimensional target point distribution images, and send the multiple two-dimensional target point distribution images to the data processing system;

[0011] The data processing system is used to receive multiple two-dimensional target point distribution images, and generate a three-dimensional tunnel target point distribution image based on the multiple two-dimensional target point distribution images, analyze the angle change and displacement change of the same target point along the extension direction of the tunnel in the three-dimensional tunnel target point distribution image to obtain a tunnel change convergence animation, and perform tunnel dynamic convergence monitoring based on the tunnel change convergence animation.

[0012] It is further defined that the target point is arranged on the support close to the tunnel face.

[0013] It is further defined that the tunnel dynamic convergence monitoring equipment also includes an equipment carrying box, which is arranged on the maintenance trolley, and the target dynamic scanner, column lifting platform and lifting platform controller are all arranged in the equipment carrying box.

[0014] It is further defined that the data processing system includes a data transmission module, a data storage module and a data analysis and processing module, the data transmission module is communicatively connected to the target dynamic scanner, the data analysis and processing module and the data storage module are both connected to the data transmission module, and the data analysis and processing module is connected to the data storage module;

[0015] The data transmission module is used to receive a plurality of two-dimensional target point distribution images, and send the plurality of two-dimensional target point distribution images to the data analysis and processing module and the data storage module;

[0016] The data analysis and processing module is used to generate a three-dimensional tunnel target point distribution image based on multiple two-dimensional target point distribution images, analyze the angle change and displacement change of the same target point along the extension direction of the tunnel in the three-dimensional tunnel target point distribution image to obtain a tunnel change convergence animation, and send the tunnel change convergence animation to the data storage module;

[0017] The data storage module is used to store a plurality of two-dimensional target distribution images and tunnel change convergence animations.

[0018] It is further defined that the data processing system further includes a data display module, the data display module being connected to the data analysis and processing module;

[0019] The data analysis and processing module is also used to send the tunnel change convergence animation to the data display module;

[0020] The data display module is used to display the tunnel change convergence animation, so as to perform tunnel dynamic convergence monitoring according to the tunnel change convergence animation.

[0021] The present invention provides a tunnel dynamic convergence monitoring method based on a U-Net neural network, which is applied to the above-mentioned tunnel dynamic convergence monitoring device based on a U-Net neural network, and comprises the following steps:

[0022] S1. Multiple targets are arranged in sequence on the support near the tunnel face;

[0023] S2. The maintenance trolley drives the target dynamic scanner to move in the extension direction of the tunnel;

[0024] During the movement, the lifting platform controller uses a U-Net neural network to determine the scanning height difference of the target dynamic scanner, and controls the lifting distance of the column lifting platform according to the scanning height difference to adjust the height of the target dynamic scanner; the U-Net neural network is formed based on a large amount of two-dimensional target distribution image sample data and standard image sample data training;

[0025] Scanning multiple targets on the same cross section of the tunnel using a target dynamic scanner with adjusted height, generating multiple two-dimensional target distribution images, and sending the multiple two-dimensional target distribution images to a data processing system;

[0026] S3. The data processing system receives a plurality of two-dimensional target distribution images, and generates a three-dimensional tunnel target distribution image based on the plurality of two-dimensional target distribution images, analyzes the angle change and displacement change of the same target along the extension direction of the tunnel in the three-dimensional tunnel target distribution image to obtain a tunnel change convergence animation, and performs tunnel dynamic convergence monitoring according to the tunnel change convergence animation.

[0027] It is further defined that in step S2, during the movement process, the lifting platform controller determines the scanning height difference of the target dynamic scanner through the U-Net neural network based on the target position information, specifically including:

[0028] Determine the label data image of the target dynamic scanner according to the height adjustment range of the column lifting platform;

[0029] Input the label data image into the U-Net neural network as the standard image;

[0030] During the movement, the target dynamic scanner collects the two-dimensional target distribution image in real time, and inputs the two-dimensional target distribution image into the U-Net neural network. The U-Net neural network compares the label data image and the two-dimensional target distribution image to determine the loss value of the two-dimensional target distribution image, and determines the scanning height difference of the target dynamic scanner according to the loss value of the two-dimensional target distribution image.

[0031] It is further defined that the label data image includes the actual monitoring range of the target dynamic scanner and the actual monitored range of the target, and the actual monitored range of the target is within the actual monitoring range of the target dynamic scanner;

[0032] The distance difference between the outer periphery corresponding to the actual monitoring range of the target point dynamic scanner and the outer periphery corresponding to the actual monitored range of the target point is at least X, where X is twice the tunnel convergence value.

[0033] Further defining, the training process of the U-Net neural network is:

[0034] Obtaining two-dimensional target distribution image sample data and standard image sample data;

[0035] The position information and shape information of the two-dimensional target distribution image sample data are extracted through the convolution layer, and the nonlinearity of the two-dimensional target distribution image sample data is increased to form a nonlinear feature map;

[0036] The maximum pooling layer compresses the position information and shape information in the nonlinear feature map to form a high-dimensional feature map;

[0037] The deconvolution layer fuses and splices the feature maps of the same layer in the high-dimensional feature map, and performs deconvolution processing at the same time to restore the image information of the two-dimensional target distribution image sample data and generate the sample image to be compared;

[0038] Compare the sample image to be compared with the standard image sample data to generate height difference sample data;

[0039] Among them, the U-Net neural network includes a convolutional layer, a maximum pooling layer, a deconvolution layer and a splicing layer connected in sequence.

[0040] It is further defined that the step of comparing the sample image to be compared with the standard image sample data to generate the height difference sample data specifically includes:

[0041] The mean square error function is used as the loss function, and the sample image to be compared is compared with the standard image sample data using the loss function to determine the loss value of the sample image to be compared, and the height difference sample data is determined according to the loss of the compared sample image.

[0042] Compared with the prior art, the present invention has the following beneficial effects:

[0043] 1. The present invention is a tunnel dynamic convergence monitoring device based on U-Net neural network, wherein the lifting platform controller thereon determines the scanning height difference of the target dynamic scanner through the U-Net neural network, and adjusts the height of the target dynamic scanner based on the scanning height difference, so that the target dynamic scanner can find a suitable orientation to collect a two-dimensional target distribution image. At the same time, the target point in the two-dimensional target distribution image generated by the target dynamic scanner can be located in the middle position, so that the convergence of the tunnel can be accurately judged when analyzing the angle change and displacement change of the same target point.

[0044] 2. In the present invention, the tunnel change convergence animation can be obtained based on the angle change and displacement change of the same target point. By observing the tunnel change convergence animation, the convergence of the tunnel can be intuitively seen, the deformation of the tunnel can be monitored, and the location where the disaster may occur can be predicted, effectively ensuring the safety of tunnel construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Figure 1 This is a schematic diagram of the use status of the tunnel dynamic convergence monitoring device of the present invention;

[0046] Figure 2 It is a schematic diagram of the tunnel dynamic convergence monitoring device of the present invention;

[0047] Figure 3 It is a side view of a tunnel dynamic convergence monitoring device based on a U-Net neural network of the present invention;

[0048] Figure 4 It is an overall structural diagram of the tunnel dynamic convergence monitoring device based on the U-Net neural network of the present invention;

[0049] Figure 5 It is a schematic diagram of the U-Net neural network structure;

[0050] Figure 6 Schematic diagram of data label;

[0051] In the figure: 1-equipment carrying box; 2-target dynamic scanner; 3-column lifting platform; 4-data processing system; 5-lifting platform controller; 6-maintenance trolley; 7-data processing system connecting line; 8-column lifting bracket connecting line. DETAILED DESCRIPTION

[0052] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0053] Example 1

[0054] refer to Figure 1 and Figure 3 , this embodiment provides a tunnel dynamic convergence monitoring device based on U-Net neural network, including a target point dynamic scanner 2, a column lifting platform 3, a data processing system 4, a lifting platform controller 5, a maintenance trolley 6 and a plurality of targets arranged in the tunnel, the target point dynamic scanner 2 is located on the column lifting platform 3, the column lifting platform 3 and the lifting platform controller 5 are both fixedly connected to the maintenance trolley 6, the lifting platform controller 5 is communicatively connected to the column lifting platform 3; the data processing system 4 is communicatively connected to the target point dynamic scanner 2;

[0055] The lifting platform controller 5 is used to determine the scanning height difference of the target point dynamic scanner 2 by using the U-Net neural network, and control the lifting distance of the column lifting platform 3 according to the scanning height difference, so as to adjust the height of the target point dynamic scanner 2, thereby realizing the height adjustment of the target point dynamic scanner 2 and improving the reliability and accuracy of monitoring; the U-Net neural network is formed based on a large amount of two-dimensional target point distribution image sample data and standard image sample data training;

[0056] The target point dynamic scanner 2 is used to scan multiple target points on the same cross section of the tunnel along the extension direction of the tunnel using the target point dynamic scanner 2 with adjusted height, generate multiple two-dimensional target point distribution images, and send the multiple two-dimensional target point distribution images to the data processing system 4;

[0057] The data processing system 4 is used to receive multiple two-dimensional target distribution images, and generate a three-dimensional tunnel target distribution image based on the multiple two-dimensional target distribution images, analyze the angle change and displacement change of the same target along the extension direction of the tunnel in the three-dimensional tunnel target distribution image to obtain a tunnel change convergence animation, and perform tunnel dynamic convergence monitoring based on the tunnel change convergence animation.

[0058] In this embodiment, multiple targets are arranged on the support close to the tunnel face.

[0059] In the present invention, the tunnel dynamic convergence monitoring device also includes an equipment carrying box 1, which is arranged on the maintenance trolley 6, and the target dynamic scanner 2, the column lifting platform 3 and the lifting platform controller 5 are all arranged in the equipment carrying box 1. In a non-working state, the target dynamic scanner 2, the column lifting platform 3 and the lifting platform controller 5 can be placed in the equipment carrying box 1, which is convenient for transportation and storage, avoids the influence of the external environment, ensures its service life, and ensures reliable use. For details, see Figure 2 The column lifting platform 3 includes a placement table and a driving transmission assembly for driving the placement table to perform lifting movements. The fixed end of the driving transmission assembly is fixedly connected to the maintenance trolley 6. The power output end on the maintenance trolley 6 is connected to the placement table. The target dynamic scanner 2 is placed on the upper end surface of the placement table.

[0060] In this embodiment, the driving transmission component can be any device that can be driven to perform linear motion, such as a cylinder, a hydraulic cylinder, a servo motor, etc.

[0061] See also Figure 4 In this embodiment, the data processing system 4 includes a data transmission module, a data storage module and a data analysis and processing module. The data transmission module is communicatively connected to the target dynamic scanner 2, the data analysis and processing module and the data storage module are both connected to the data transmission module, and the data analysis and processing module is connected to the data storage module;

[0062] The data transmission module is used to receive a plurality of two-dimensional target point distribution images, and send the plurality of two-dimensional target point distribution images to the data analysis and processing module and the data storage module;

[0063] The data analysis and processing module is used to generate a three-dimensional tunnel target point distribution image based on multiple two-dimensional target point distribution images, analyze the angle change and displacement change of the same target point along the extension direction of the tunnel in the three-dimensional tunnel target point distribution image to obtain a tunnel change convergence animation, and send the tunnel change convergence animation to the data storage module;

[0064] The data storage module is used to store multiple two-dimensional target distribution images and tunnel change convergence animations. The data storage module can not only store the data that needs to be transmitted, but also provide the saved historical data to the data analysis and processing module to meet actual use needs.

[0065] Preferably, in the present invention, the data processing system 4 also includes a data display module, which is connected to the data analysis and processing module; the data display module is used to intuitively display the tunnel change convergence animation, so as to facilitate personnel to intuitively observe the tunnel convergence situation.

[0066] The data analysis and processing module is also used to send the tunnel change convergence animation to the data display module;

[0067] The data display module is used to display the tunnel change convergence animation, so as to perform tunnel dynamic convergence monitoring according to the tunnel change convergence animation.

[0068] In this embodiment, the tunnel dynamic convergence monitoring equipment based on the U-Net neural network also includes a data processing system connecting line 7 and a column lifting bracket connecting line 8. The data processing system 4 is connected to the target dynamic scanner 2 in the equipment carrying box 1 through the data processing system connecting line 7, and the target dynamic scanner 2 in the equipment carrying box 1 is connected to the lifting platform controller 5 through the column lifting bracket connecting line 8.

[0069] In this embodiment, the lifting platform controller 5 determines the scanning height difference of the target dynamic scanner 2 through the U-Net neural network based on the target position information. Specifically, the lifting platform controller 5 determines the scanning height difference of the target dynamic scanner 2 through the U-Net neural network based on the target position information. The label data image includes the actual monitoring range of the target dynamic scanner 2 and the actual range of the target being monitored, and the actual range of the target being monitored is within the actual monitoring range of the target dynamic scanner 2;

[0070] The distance difference between the outer periphery corresponding to the actual monitoring range of the target dynamic scanner 2 and the outer periphery corresponding to the actual monitored range of the target is at least X, where X is twice the tunnel convergence value.

[0071] The lifting platform controller 5 in this embodiment determines the scanning height difference of the target point dynamic scanner through the U-Net neural network, and adjusts the height of the target point dynamic scanner based on the scanning height difference, so that the target point dynamic scanner can find a suitable position to collect the two-dimensional target point distribution image. At the same time, it can also make the target point in the two-dimensional target point distribution image generated by the target point dynamic scanner 2 located in the middle position, so as to make an accurate judgment on the convergence of the tunnel when analyzing the angle change and displacement change of the same target point.

[0072] Example 2

[0073] Based on the tunnel dynamic convergence monitoring device based on U-Net neural network provided in Example 1, this embodiment provides a tunnel dynamic convergence monitoring method based on U-Net neural network, which corresponds to the tunnel dynamic convergence monitoring device based on U-Net neural network in Example 1, and the method includes the following steps:

[0074] S1. Multiple targets are arranged in sequence on the support near the tunnel face;

[0075] S2, the maintenance trolley 6 drives the target dynamic scanner 2 to move in the extension direction of the tunnel;

[0076] During the movement, the lifting platform controller 5 uses the U-Net neural network to determine the scanning height difference of the target dynamic scanner 2, and controls the lifting distance of the column lifting platform 3 according to the scanning height difference to adjust the height of the target dynamic scanner 2; the U-Net neural network is formed based on a large amount of two-dimensional target distribution image sample data and standard image sample data training;

[0077] Scanning multiple targets on the same cross section of the tunnel using the target point dynamic scanner 2 with adjusted height, generating multiple two-dimensional target point distribution images, and sending the multiple two-dimensional target point distribution images to the data processing system 4;

[0078] S3, the data processing system 4 receives a plurality of two-dimensional target distribution images, and generates a three-dimensional tunnel target distribution image based on the plurality of two-dimensional target distribution images, analyzes the angle change and displacement change of the same target along the extension direction of the tunnel in the three-dimensional tunnel target distribution image to obtain a tunnel change convergence animation, and performs tunnel dynamic convergence monitoring according to the tunnel change convergence animation.

[0079] In this embodiment, in step S2, during the movement, the lifting platform controller 5 determines the scanning height difference of the target dynamic scanner 2 based on the target position information through the U-Net neural network, specifically including:

[0080] Determine the label data image of the target point dynamic scanner 2 according to the height adjustment range of the column lifting platform 3;

[0081] Input the label data image into the U-Net neural network as the standard image;

[0082] During the movement, the target dynamic scanner 2 collects the two-dimensional target distribution image in real time, and inputs the two-dimensional target distribution image into the U-Net neural network. The U-Net neural network compares the label data image and the two-dimensional target distribution image to determine the loss value of the two-dimensional target distribution image, and determines the scanning height difference of the target dynamic scanner 2 according to the loss value of the two-dimensional target distribution image.

[0083] See also Figure 6 , the label data image includes the actual monitoring range of the target dynamic scanner 2 and the actual range of the target being monitored, and the actual range of the target being monitored is within the actual monitoring range of the target dynamic scanner 2; Figure 6 In the figure, the outer rectangle represents the actual monitoring range of the target dynamic scanner 2, the black part represents the actual monitored range of the target, and the vertical distances between the four sides corresponding to the outer rectangle and the black rectangle are all x, where x is twice the tunnel convergence value to ensure that each target can be monitored throughout the entire process.

[0084] The distance difference between the outer periphery corresponding to the actual monitoring range of the target dynamic scanner 2 and the outer periphery corresponding to the actual monitored range of the target is at least X, where X is twice the tunnel convergence value.

[0085] In this embodiment, the training process of the U-Net neural network is:

[0086] Obtaining two-dimensional target distribution image sample data and standard image sample data;

[0087] The position information and shape information of the two-dimensional target distribution image sample data are extracted through the convolution layer, and the nonlinearity of the two-dimensional target distribution image sample data is increased to form a nonlinear feature map;

[0088] The maximum pooling layer compresses the position information and shape information in the nonlinear feature map to form a high-dimensional feature map;

[0089] The deconvolution layer fuses and splices the feature maps of the same layer in the high-dimensional feature map, and performs deconvolution processing at the same time to restore the image information of the two-dimensional target distribution image sample data and generate the sample image to be compared;

[0090] The sample image to be compared is compared with the standard image sample data to generate height difference sample data.

[0091] See also Figure 5, wherein the U-Net neural network includes a convolution layer, a maximum pooling layer, a deconvolution layer and a splicing layer connected in sequence. Specifically, the monitored two-dimensional target distribution image sample data is first used as input data, and the position and shape features are extracted through the convolution operation in the downsampling process, and then the nonlinearity is increased through the ReLU activation function. Then, a 2×2 maximum pooling layer is applied to compress the image size to complete a downsampling work. Five downsamplings are performed to extract more abstract position and shape features, and the output is a higher-dimensional feature map. Then, the image size is enlarged through the upsampling deconvolution, and then the downsampled feature maps of the same layer are fused and spliced ​​to the upsampling through the jump connection, and the convolution operation is performed to restore the resolution, and the upsampling is performed five times to restore the image information. Then, the mean square error function is used as the loss function, and the sample image to be compared is compared with the standard image sample data, and the loss value is calculated, and then the height difference sample data is generated. The difference is transmitted to the internal drive (drive transmission component) of the target dynamic scanner 2 and the column lifting platform 3, thereby realizing the automatic adjustment of the height of the target dynamic scanner 2 and the column lifting platform 3. Similarly, the process of monitoring the convergence of the target point is to change the feature extraction to extract the displacement, deformation, and relative distance measurement between the initial position and the position when the target point changes, select the target feature data at the maximum allowable convergence value of the tunnel as the label data, and then perform the same operation as above to determine the dynamic convergence information of the monitoring target point.

[0092] In this embodiment, comparing the sample image to be compared with the standard image sample data to generate the height difference sample data specifically includes:

[0093] The mean square error function is used as the loss function, and the sample image to be compared is compared with the standard image sample data using the loss function to determine the loss value of the sample image to be compared, and the height difference sample data is determined according to the loss of the compared sample image.

[0094] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some or all of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the present invention.

Claims

1. A tunnel dynamic convergence monitoring device based on U-Net neural network, characterized in that: The invention comprises a target point dynamic scanner (2), a column-type lifting platform (3), a data processing system (4), a lifting platform controller (5), a maintenance trolley (6), and a plurality of target points arranged in a tunnel, wherein the target point dynamic scanner (2) is located on the column-type lifting platform (3), the column-type lifting platform (3) and the lifting platform controller (5) are both fixedly connected to the maintenance trolley (6), and the lifting platform controller (5) is communicatively connected to the column-type lifting platform (3); and the data processing system (4) is communicatively connected to the target point dynamic scanner (2); The lifting platform controller (5) is used to determine the scanning height difference of the target point dynamic scanner (2) using a U-Net neural network, and to control the lifting distance of the column lifting platform (3) according to the scanning height difference, so as to adjust the height of the target point dynamic scanner (2); the U-Net neural network is formed by training based on a large amount of two-dimensional target point distribution image sample data and standard image sample data; The target point dynamic scanner (2) is used to scan multiple target points on the same cross section of the tunnel along the extension direction of the tunnel using the target point dynamic scanner (2) with the height adjusted, generate multiple two-dimensional target point distribution images, and send the multiple two-dimensional target point distribution images to the data processing system (4); The data processing system (4) is used to receive a plurality of two-dimensional target point distribution images, and generate a three-dimensional tunnel target point distribution image based on the plurality of two-dimensional target point distribution images, analyze the angle change and displacement change of the same target point along the extension direction of the tunnel in the three-dimensional tunnel target point distribution image to obtain a tunnel change convergence animation, and perform tunnel dynamic convergence monitoring based on the tunnel change convergence animation.

2. The tunnel dynamic convergence monitoring device based on U-Net neural network according to claim 1 is characterized in that: The target point is arranged on the support close to the tunnel face.

3. The tunnel dynamic convergence monitoring device based on U-Net neural network according to claim 1 is characterized in that: The tunnel dynamic convergence monitoring device also includes an equipment carrying box (1), the equipment carrying box (1) is arranged on a maintenance trolley (6), and the target point dynamic scanner (2), the column lifting platform (3) and the lifting platform controller (5) are all arranged in the equipment carrying box (1).

4. The tunnel dynamic convergence monitoring device based on U-Net neural network according to claim 1 is characterized in that: The data processing system (4) comprises a data transmission module, a data storage module and a data analysis and processing module, wherein the data transmission module is connected to the target dynamic scanner (2) for communication, the data analysis and processing module and the data storage module are both connected to the data transmission module, and the data analysis and processing module is connected to the data storage module; The data transmission module is used to receive a plurality of two-dimensional target point distribution images, and send the plurality of two-dimensional target point distribution images to the data analysis and processing module and the data storage module; The data analysis and processing module is used to generate a three-dimensional tunnel target point distribution image based on multiple two-dimensional target point distribution images, analyze the angle change and displacement change of the same target point along the extension direction of the tunnel in the three-dimensional tunnel target point distribution image to obtain a tunnel change convergence animation, and send the tunnel change convergence animation to the data storage module; The data storage module is used to store a plurality of two-dimensional target distribution images and tunnel change convergence animations.

5. The tunnel dynamic convergence monitoring device based on U-Net neural network according to claim 4 is characterized in that: The data processing system (4) further comprises a data display module, wherein the data display module is connected to the data analysis and processing module; The data analysis and processing module is also used to send the tunnel change convergence animation to the data display module; The data display module is used to display the tunnel change convergence animation, so as to perform tunnel dynamic convergence monitoring according to the tunnel change convergence animation.

6. A tunnel dynamic convergence monitoring method based on U-Net neural network, applied to the tunnel dynamic convergence monitoring device based on U-Net neural network according to claim 1, characterized in that: The following steps are involved: S1. Multiple targets are arranged in sequence on the support near the tunnel face; S2, the maintenance trolley (6) drives the target point dynamic scanner (2) to move in the extension direction of the tunnel; During the movement, the lifting platform controller (5) uses a U-Net neural network to determine the scanning height difference of the target point dynamic scanner (2), and controls the lifting distance of the column lifting platform (3) according to the scanning height difference, so as to adjust the height of the target point dynamic scanner (2); the U-Net neural network is formed by training based on a large amount of two-dimensional target point distribution image sample data and standard image sample data; Scanning multiple target points on the same cross section of the tunnel using a target point dynamic scanner (2) with an adjusted height, generating multiple two-dimensional target point distribution images, and sending the multiple two-dimensional target point distribution images to a data processing system (4); S3, a data processing system (4) receives a plurality of two-dimensional target point distribution images, generates a three-dimensional tunnel target point distribution image based on the plurality of two-dimensional target point distribution images, analyzes the angle change and displacement change of the same target point along the extension direction of the tunnel in the three-dimensional tunnel target point distribution image to obtain a tunnel change convergence animation, and performs tunnel dynamic convergence monitoring based on the tunnel change convergence animation.

7. The tunnel dynamic convergence monitoring method based on U-Net neural network according to claim 6 is characterized in that: In the step S2, during the movement, the lifting platform controller (5) determines the scanning height difference of the target dynamic scanner (2) through the U-Net neural network based on the target position information, specifically including: Determining a label data image of a target point dynamic scanner (2) according to a height adjustment range of a column-type lifting platform (3); Input the label data image into the U-Net neural network as the standard image; During the movement, the target dynamic scanner (2) collects a two-dimensional target distribution image in real time, and inputs the two-dimensional target distribution image into a U-Net neural network. The U-Net neural network compares the label data image and the two-dimensional target distribution image to determine the loss value of the two-dimensional target distribution image, and determines the scanning height difference of the target dynamic scanner (2) based on the loss value of the two-dimensional target distribution image.

8. The tunnel dynamic convergence monitoring method based on U-Net neural network according to claim 7 is characterized in that: The label data image includes the actual monitoring range of the target point dynamic scanner (2) and the actual monitored range of the target point, and the actual monitored range of the target point is located within the actual monitoring range of the target point dynamic scanner (2); The distance difference between the outer periphery corresponding to the actual monitoring range of the target point dynamic scanner (2) and the outer periphery corresponding to the actual monitored range of the target point is at least X, where X is twice the tunnel convergence value.

9. The tunnel dynamic convergence monitoring method based on U-Net neural network according to claim 6 is characterized in that: The training process of the U-Net neural network is: Obtaining two-dimensional target distribution image sample data and standard image sample data; The position information and shape information of the two-dimensional target distribution image sample data are extracted through the convolution layer, and the nonlinearity of the two-dimensional target distribution image sample data is increased to form a nonlinear feature map; The maximum pooling layer compresses the position information and shape information in the nonlinear feature map to form a high-dimensional feature map; The deconvolution layer fuses and splices the feature maps of the same layer in the high-dimensional feature map, and performs deconvolution processing at the same time to restore the image information of the two-dimensional target distribution image sample data and generate the sample image to be compared; Compare the sample image to be compared with the standard image sample data to generate height difference sample data; Among them, the U-Net neural network includes a convolutional layer, a maximum pooling layer, a deconvolution layer and a splicing layer connected in sequence.

10. The tunnel dynamic convergence monitoring method based on U-Net neural network according to claim 9 is characterized in that: The step of comparing the sample image to be compared with the standard image sample data to generate height difference sample data specifically includes: The mean square error function is used as the loss function, and the sample image to be compared is compared with the standard image sample data using the loss function to determine the loss value of the sample image to be compared, and the height difference sample data is determined according to the loss of the compared sample image.

Citation Information

Patent Citations

  • Intelligent tunnel full-section convergence monitoring device and using method

    CN110823180A

  • Tunnel lining disease change feature intelligent inversion method and system and storage medium

    CN115630492A

  • Surrounding rock stability prediction method and system based on neural network, and storage medium

    CN115929406A

  • Tunnel surrounding rock structure deformation measuring method based on machine vision and structured light

    CN117091525A

  • Digital twin-driven tunnel surrounding rock joint network intelligent generation method

    CN117688640A