Drainage pipe network test platform and application method thereof

By designing a drainage pipeline test platform including water storage area and multi-pipe testing area, simulating the operating status of pipelines of different pipe diameters and materials under multiple working conditions, the problem of inability to fully simulate the status of drainage pipelines and lack of effective repair technology in the prior art is solved, and the multi-business process verification of the drainage pipeline network and the mechanical testing of buried repaired pipelines is realized.

CN119802474APending Publication Date: 2025-04-11SHANGHAI URBAN ENVIRONMENT GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411846439.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-16
Publication Date
2025-04-11

AI Technical Summary

Technical Problem

The existing technology cannot fully simulate the status of the drainage pipeline network in different operating scenarios, especially under water operation or high water level conditions, and lacks effective repair technology and verification platforms.

Method used

A drainage pipeline network test platform is designed, including water storage areas and multi-pipe testing areas. The operating status of pipes of different pipe diameters and materials under various operating conditions is simulated by grooved buried pipes and water pump systems, and the circulation and return test is achieved through inspection of wells and gate valves.

Benefits of technology

The platform can simulate a variety of drainage pipeline scenarios, including different pipe diameters, materials and working conditions, conduct test and verification of the entire business process, solve the lack of repair processes and material selection in the existing technology, and realize mechanical testing and long-term monitoring of buried repaired pipelines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119802474A_ABST
    Figure CN119802474A_ABST
Patent Text Reader

Abstract

The invention provides a drainage pipe network test platform, which is used for carrying out a multi-pipe-diameter simulation test, is arranged on two sides of a ground operation area, and comprises a water storage area and a multi-pipe test area, the water storage area is communicated with the multi-pipe test area through a slotted buried pipe I, the multi-pipe test area flows back to the water storage area through a slotted buried pipe II, and a circulating backflow test is formed; wherein the water storage area comprises a first test pool and a second test pool which are connected with each other, and a first concrete pipe is placed in the first test pool and used for testing the situation that the concrete pipe is provided with water; the test pool II is connected with the slotted buried pipe I through the water pump I and is used for providing test water; the multi-pipe testing area comprises at least three pipeline testing positions which are respectively used for placing second concrete pipes, the two ends of each pipeline testing position are respectively communicated with an inspection well, and one end of each inspection well is communicated with the first slotted buried pipe through a pipeline and is used for introducing testing water; the other end of the inspection well is connected with a sump through a pipeline, and the sump is connected with a second slotted buried pipe through a second water pump and used for backflow to achieve the circulation test system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of drainage pipe network test platforms, and in particular to a drainage pipe network test platform and an application method thereof. Background Art

[0002] At present, the industry does not pay enough attention to systematic research on drainage pipe networks, lacks a systematic and scenario-based verification platform for "monitoring, inspection, evaluation, repair and maintenance", and the existing experimental platform cannot conduct experimental simulation of the operation status of the pipe network in all aspects. There are also several pain points in the industry that need to be solved urgently, such as the repair process under water operation or high water level conditions still needs technical breakthroughs. The existing pipeline non-excavation technology is basically applicable to dry warehouse conditions, and the repair technology under water operation conditions urgently needs breakthroughs; insufficient attention is paid to the diseases of inspection wells, and there are missing repair processes; the existing non-excavation repair technology has the dilemma of treating the symptoms but not the root cause, and pays more attention to the repair process and repair materials, and lacks systematic thinking on the whole process such as source design, material quality, construction quality, acceptance standards and pipeline force mechanism. Summary of the invention

[0003] The purpose of the present invention is to provide a drainage network test platform and its application method for a drainage network test base that can simulate various operating scenarios of existing drainage pipelines and is used for equipment integration research, process testing, and operation simulation of the pipeline "monitoring, inspection, evaluation, repair, and maintenance" process.

[0004] In order to achieve the above object, the present invention adopts the following technical solutions:

[0005] A drainage pipe network test platform, used for conducting multi-pipe diameter simulation tests, is arranged on both sides of a ground operation area, and includes a water storage area and a multi-pipe test area; the water storage area is connected to the multi-pipe test area through a slotted buried pipe 1, and the multi-pipe test area flows back to the water storage area through a slotted buried pipe 2, forming a circulation reflux test;

[0006] Among them, the water storage area includes a test pool 1 and a test pool 2 which are connected to each other. A concrete pipe 1 is placed in the test pool 1 to simulate the test of the concrete pipe 1 with water; the test pool 2 is connected to a slotted buried pipe 1 through a water pump 1 to provide test water; the multi-tube test area includes at least three pipeline test positions, which are respectively used to place concrete pipe 2, and both ends of each of the pipeline test positions are connected to an inspection well, one end of the inspection well is connected to the slotted buried pipe 1 through a pipeline for introducing test water; the other end of the inspection well is connected to a sump through a pipeline, and the sump is connected to the slotted buried pipe 2 through a water pump 2 for reflux to realize a circulation test system.

[0007] Preferably, a movable walkway board connected to the ground working area is provided on the multi-tube testing area to facilitate the staff to move around and inspect during the testing process and perform subsequent maintenance.

[0008] Preferably, both ends of the inspection well are connected to the slotted buried pipe 1 and the sump through gate valves for opening and closing, and the corresponding gate valves of the inspection wells at both ends of different pipeline test positions are opened and closed, thereby realizing the testing of the concrete pipe 2 placed at different pipeline test positions.

[0009] Preferably, the water pump 1 and the water pump 2 both use a flow rate of 1200m 3 / h water pump is used to ensure a fixed flow rate and fixed water depth in pipes with a diameter of DN1500 and below, which is convenient for simulating the current situation of drainage pipes on the construction site; at the same time, it is convenient for process test verification and dialectical process feasibility.

[0010] Preferably, the second concrete pipe is a concrete pipe with a diameter of DN1500, DN1200, or DN800; and the first concrete pipe is a concrete pipe with a diameter of DN3500.

[0011] Preferably, the gate valve is a DN800 gate valve.

[0012] Preferably, the first slotted buried pipe is a DN800 slotted buried pipe; and the second slotted buried pipe is a DN600 slotted buried pipe.

[0013] Preferably, a grille cover is provided on the inspection well to ensure that no debris falls into the inspection well during the period when no test is being carried out, thereby avoiding blockage of pipelines and gate valves.

[0014] The present invention also provides an application method of the platform according to the above platform, comprising the following steps:

[0015] Step S1: Test pool 1 and test pool 2 in the water storage area are loaded with test water, and at least two concrete pipes 1 with a diameter of DN3500 are placed in test pool 1 to simulate the test of the concrete pipe 1 with water;

[0016] Step S2: the test pool 2 is connected to the test pool 1 through a connecting pipe, and water is pumped from the test pool 2 to the slotted buried pipe 1 by a water pump 1;

[0017] Step S3: Open the gate valves corresponding to the inspection wells at both ends of the pipeline test position to be tested, and the water flows into the corresponding concrete pipe 2 at the pipeline test position;

[0018] Through opening and closing of the gate valves corresponding to the inspection wells at both ends of the pipeline test position, multi-pipe diameter simulation test can be realized;

[0019] Step S4: Open the gate valve on the pipe connecting the inspection well and the sump to drain the water flowing out of the second concrete pipe to the sump;

[0020] Step S5: The water from the sump is pumped out to the slotted buried pipe 2 by the water pump 2, and finally flows back to the test pool 1 in the water storage area, forming a circulation test system.

[0021] Preferably, when it is necessary to perform a mechanical test on the concrete pipe 2, the mechanical properties and repair effect of the concrete pipe 2 as a repair pipe buried in sand are verified by filling sand around the concrete pipe 2 and applying a load on the sand above the pipe.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] (1) The present invention can simulate multiple pipe diameters of DN200 to DN1500 (super-large pipe diameter test pool); multiple pipe materials: reinforced concrete, HDPE, cast iron pipe, etc.; multiple working conditions: whether the pipeline carries water, whether it is silted; surrounding soil cavities, different backfill densities, groundwater conditions, etc.; multiple diseases: simulation of various structural and functional diseases; multiple services: business scenarios cover drainage pipeline scenarios such as dredging, detection and evaluation, repair, monitoring, and maintenance of the entire business process, and conduct various equipment process tests and verifications.

[0024] (2) The present invention can apply pressure by backfilling the test pool to simulate the existing road surface load, and then carry out various mechanical tests on the buried repair pipe section.

[0025] (3) The present invention can simultaneously arrange linear sensors in the buried repair pipe section to monitor the buried repair pipeline for a long time and evaluate the repair effect.

[0026] In summary, the drainage network test platform and application method of the present invention can effectively solve the technical problems in the dredging, detection, evaluation, repair and operation and maintenance processes of the drainage network. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 A structural schematic diagram of a drainage network test platform provided by an embodiment of the present invention;

[0028] Figure 2 A schematic flow chart of an application method of a drainage network test platform provided in an embodiment of the present invention.

[0029] The serial numbers in the figure are as follows:

[0030] 1. Concrete pipe one; 2. Connecting pipe; 3. Drainage pipe; 4. Water storage area; 4-1. Test pool one; 4-2. Test pool two; 5. Water pump one; 6. Water supply pipe; 7. Slotted buried pipe one; 8. Gate valve; 9. Inspection well; 10. Concrete pipe two; 11. Movable walkway board; 12. Grille cover; 13. Sump; 14. Slotted buried pipe two; 15. Ground working area; 16. Water pump two; 17. Multi-tube test area. DETAILED DESCRIPTION

[0031] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0032] like Figure 1 As shown, a drainage network test platform provided in this embodiment

[0033] A drainage pipe network test platform is used for conducting multi-pipe diameter simulation tests, which is arranged on both sides of a ground operation area 15 and includes a water storage area 4 and a multi-pipe test area 17.

[0034] The water storage area 4 is connected to the multi-tube test area through the slotted buried pipe 1 7, and the multi-tube test area 17 flows back to the water storage area 4 through the slotted buried pipe 2 14, forming a circulating reflux test system.

[0035] The water storage area 4 includes a test pool 1 4-1 and a test pool 2 4-2 which are connected to each other through a connecting pipe 2. A concrete pipe 1 is placed in the test pool 1 4-1 to simulate the test of the concrete pipe 1 with water. The test pool 2 4-2 is connected to a slotted buried pipe 7 through a water pump 5 to provide water for the test.

[0036] The multi-tube test area 17 includes three pipeline test positions, which are used to place concrete pipes 10 (the three concrete pipes 10 for testing can be a combination of different diameters, or the same diameter). Both ends of each of the three pipeline test positions are connected to inspection wells 9, so that there are six inspection wells 9 for the three pipeline test positions.

[0037] One end of each inspection well 9 is connected to the slotted buried pipe 7 through a pipeline with a gate valve 8. The water supply of the slotted buried pipe 7 is controlled by the gate valve 8 to introduce test water from the slotted buried pipe 7.

[0038] The other end of each inspection well 9 is connected to the sump 13 through a pipeline with another gate valve 8, and the gate valve 8 can be used to control the drainage of the inspection well 9 into the sump 13. The sump 13 is then connected to the slotted buried pipe 14 through a water pump 16. The slotted buried pipe 14 is connected to the test pool 4-1 of the water storage area 4 for reflux to realize the circulation test system.

[0039] By using a pipe with a gate valve 8 at both ends of each inspection well 9 to open and close the slotted buried pipe 7 and the sump 13, during testing, according to the test requirements, the corresponding gate valves 8 of the inspection wells 9 at both ends of different pipeline test positions can be opened and closed, thereby achieving separate testing of the corresponding concrete pipes 10 at different pipeline test positions, which can be suitable for more application scenarios.

[0040] Furthermore, in this embodiment, a movable walkway board 11 connected to the ground operation area 15 is provided on the multi-tube test area 17, so as to facilitate the staff to move around and conduct inspection during the test and subsequent maintenance.

[0041] Further, in this embodiment, both the water pump 1 5 and the water pump 2 16 use a flow rate of 1200m 3 / h water pump is used to ensure a fixed flow rate and fixed water depth in pipes with a diameter of DN1500 and below, which is convenient for simulating the current situation of drainage pipes on the construction site; at the same time, it is convenient for process test verification and dialectical process feasibility.

[0042] Further, in this embodiment, the concrete pipe 10 is a concrete pipe with a diameter of DN1500, DN1200, or DN800; the concrete pipe 1 is a concrete pipe with a diameter of DN3500. The gate valve 8 is a DN800 gate valve. The slotted buried pipe 1 is a DN800 slotted buried pipe; and the slotted buried pipe 2 is a DN600 slotted buried pipe.

[0043] Furthermore, in the present embodiment, the inspection wells 9 are covered with grille covers 12 to ensure that no debris falls into the inspection wells when no test is being conducted, thereby avoiding blockage of pipes and gate valves. When it is necessary to conduct tests or to enter the inspection wells for underground operations, the grille covers 12 can be removed at any time to perform maintenance on the inspection wells.

[0044] like Figure 2 As shown, this embodiment also provides an application method based on the above platform, including the following steps:

[0045] Step S1: Test pool 1 4-1 and test pool 2 4-2 in the water storage area are loaded with test water, and two concrete pipes 1 with a diameter of DN3500 are placed in the test pool 1 4-1 to simulate the test of the concrete pipe 1 carrying water.

[0046] Step S2: the test pool 2 4 - 2 is connected to the test pool 1 4 - 1 through the connecting pipe 2 , and water is pumped from the test pool 2 4 - 2 to the slotted buried pipe 1 7 through the water pump 1 5 .

[0047] Step S3: Open the gate valves 8 corresponding to the inspection wells 9 at both ends of the pipeline test position to be tested, and the water flows into the corresponding concrete pipe 2 10 on the pipeline test position.

[0048] The multi-pipe diameter simulation test is realized by opening and closing the gate valves 8 corresponding to the inspection wells 9 at both ends of the pipeline test position.

[0049] Step S4: Open the gate valve 8 on the pipe connecting the inspection well 9 and the sump 13 to drain the water flowing out of the concrete pipe 2 10 to the sump 13.

[0050] Step S5: The water from the sump 13 is pumped to the slotted buried pipe 16 through the water pump 16, and finally flows back to the test pool 1 4-1 in the water storage area 4, forming a circulation test system.

[0051] In addition, by filling sand around the concrete pipe 10 and applying load on the sand above the pipe, the repair effect and mechanical properties of the repair process of the concrete pipe 10 are verified. By applying sand pressure to the concrete pipe 10, the existing road load is simulated, and then the mechanical test of the concrete pipe 10 as a repair pipe buried in sand is carried out.

[0052] Furthermore, in this embodiment, linear sensors can be synchronously arranged in the repair pipe section of the concrete pipe 10 buried by sand to monitor the buried repair pipe for a long time and evaluate the repair effect.

[0053] As shown in Table 1 below, the test data provided for this embodiment:

[0054] Table 1

[0055]

[0056] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0057] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0058] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A drainage network test platform, used for conducting multi-diameter pipe simulation tests, arranged on both sides of a ground operation area (15), characterized in that: It includes a water storage area (4) and a multi-tube test area (17); The water storage area (4) is connected to the multi-tube test area through the slotted buried pipe 1 (7), and the multi-tube test area (17) flows back to the water storage area (4) through the slotted buried pipe 2 (14), forming a circulation reflux test; The water storage area (4) comprises a test pool 1 (4-1) and a test pool 2 (4-2) which are connected to each other. A concrete pipe 1 (1) is placed in the test pool 1 (4-1) to simulate the test of the concrete pipe 1 (1) carrying water; The test pool 2 (4-2) is connected to the slotted buried pipe 1 (7) via a water pump 1 (5) to provide test water; The multi-tube test area (17) includes at least three pipeline test positions, each of which is used to place a concrete pipe (10). Both ends of each pipeline test position are connected to an inspection well (9). One end of the inspection well (9) is connected to a slotted buried pipe (7) through a pipeline for introducing test water. The other end of the inspection well (9) is connected to a sump (13) through a pipeline. The sump (13) is connected to a slotted buried pipe (14) through a water pump (16) for reflux to realize a circulation test system.

2. A drainage network test platform according to claim 1, characterized in that: The multi-tube test area (17) is provided with a movable walkway board (11) connected to the ground operation area (15), so as to facilitate the staff to move around and inspect during the test process and to perform subsequent maintenance.

3. A drainage network test platform according to claim 1, characterized in that: The two ends of the inspection well (9) are connected to the slotted buried pipe (7) and the sump (13) through gate valves (8) respectively, and the gate valves (8) corresponding to the inspection wells (9) at the two ends of different pipeline test positions are opened and closed, thereby realizing the testing of the concrete pipe (10) placed at different pipeline test positions.

4. A drainage network test platform according to claim 1, characterized in that: The water pump 1 (5) and the water pump 2 (16) both use a flow rate of 1200m 3 / h water pump is used to ensure a fixed flow rate and fixed water depth in pipes with a diameter of DN1500 and below, which is convenient for simulating the current situation of drainage pipes on the construction site; at the same time, it is convenient for process test verification and dialectical process feasibility.

5. A drainage network test platform according to claim 1, characterized in that: The concrete pipe 2 (10) is a concrete pipe with a diameter of DN1500, DN1200, or DN800; the concrete pipe 1 (1) is a concrete pipe with a diameter of DN3500.

6. A drainage network test platform according to claim 4, characterized in that: The gate valve (8) is a DN800 gate valve.

7. A drainage network test platform according to claim 1, characterized in that: The first slotted buried pipe (7) is a DN800 slotted buried pipe; the second slotted buried pipe (14) is a DN600 slotted buried pipe. According to the drainage network test platform described in claim 1, it is characterized in that the inspection wells (9) are provided with grille covers (12) to ensure that no debris falls into the inspection wells during the period when no test is carried out, thereby avoiding blockage of pipelines and gate valves.

8. An application method of the drainage network test platform according to any one of claims 1 to 8, characterized in that: The steps include: Step S1: Test pool 1 (4-1) and test pool 2 (4-2) in the water storage area are loaded with test water, and at least two concrete pipes 1 (1) with a diameter of DN3500 are placed in the test pool 1 (4-1) to simulate the test of the concrete pipe 1 (1) carrying water; Step S2: Test pool 2 (4-2) is connected to test pool 1 (4-1) via a connecting pipe (2), and water is pumped from test pool 2 (4-2) to slotted buried pipe 1 (7) via a water pump 1 (5); Step S3: Open the gate valves (8) corresponding to the inspection wells (9) at both ends of the pipeline test position to be tested, and the water flows into the corresponding concrete pipe 2 (10) at the pipeline test position; By opening and closing the gate valves (8) corresponding to the inspection wells (9) at both ends of the pipeline test position, a multi-pipeline simulation test is achieved; Step S4: Open the gate valve (8) on the pipe connecting the inspection well (9) and the sump (13) to drain the water flowing out of the second concrete pipe (10) to the sump (13); Step S5: The water from the sump (13) is pumped to the slotted buried pipe (16) through the water pump (16), and finally flows back to the test pool (4-1) in the water storage area (4), forming a circulation test system.

9. The application method of the drainage network test platform according to claim 8, characterized in that: When it is necessary to conduct a mechanical test on the concrete pipe 2 (10), the concrete pipe 2 (10) is filled with sand around it and a load is applied to the sand above the pipe, thereby verifying the mechanical properties and repair effect of the concrete pipe 2 (10) as a repair pipe buried in sand.