PCB production management method and system based on multi-area management
Through the PCB production management method based on multi-region management, the production task allocation is dynamically adjusted and product transport efficiency is optimized, and the production task mismatch caused by order changes is solved, and an efficient production process and accurate delivery cycle is achieved.
Patent Information
- Application Number
- CN202510292295.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-12
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2045-03-12
AI Technical Summary
During the PCB production process, the change in order quantity causes the production task to mismatch the production capacity of different production process areas in the production line, resulting in the production results not meeting expectations.
The PCB production management method based on multi-region management is adopted. By obtaining production line information and production monitoring information, the production efficiency of each production process area and the online product production progress value of each production line are calculated, the production task allocation is dynamically adjusted, and the product transport efficiency is optimized to ensure that the production task allocation meets the expected requirements.
It effectively solves the problem of mismatch in production tasks caused by order changes, improves the consistency and coordination of the production process, and ensures the realization of production goals and the satisfaction of the delivery cycle.
Smart Images

Figure CN119809288A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of PCB production, and in particular to a PCB production management method and system based on multi-region management. Background Art
[0002] PCB is an electronic component that provides electrical connection and mechanical support for electronic components. With the miniaturization and high performance of electronic equipment, the production process of PCB is becoming more and more complicated, and the requirements for production management are also increasing. Traditional extensive management is difficult to meet the needs of high-precision and high-reliability PCB production. Therefore, multi-area management methods have emerged. By subdividing the production process areas, it can more accurately control each link in the production process. This management method aims to improve production efficiency, ensure product quality, optimize resource allocation, and better deal with complex situations in the production process.
[0003] At present, in the production process of PCB, the order quantity often changes. When the order quantity changes, in order to achieve the expected production target, it is usually necessary to allocate the production tasks according to the production capacity of the production line. However, this allocation method has the problem that the production tasks do not match the production capacity of different production process areas in the production line, which leads to the problem that the final production results do not meet the production expectations. Summary of the invention
[0004] The main purpose of the present invention is to provide a PCB production management method and system based on multi-zone management, aiming to solve the technical problems in the prior art.
[0005] The present invention proposes a PCB production management method based on multi-region management, comprising: Acquire multiple production line information and multiple production monitoring information of PCB production, wherein the production line information includes multiple production process areas; Acquire product in-and-out information of each production line according to the production monitoring information, wherein the product in-and-out information includes in-and-out time information and in-and-out quantity information; Calculate the first production efficiency of each production process area and the online product production progress value of each production line according to the in-and-out time information and the in-and-out quantity information; Calculating the second production efficiency of each production line according to the in-and-out time information, the in-and-out quantity information and the online product production progress value; Obtaining order change information for PCB production, and obtaining a first allocated quantity for each production line according to the order change information and the second production efficiency; Obtaining the product transfer efficiency between each two successive production process areas according to the in-and-out time information and the in-and-out quantity information, and calculating the second allocation quantity according to the first production efficiency, the product transfer efficiency and the first allocation quantity; Obtaining an estimated delivery period according to the second allocated quantity and the first production efficiency; Determine whether the estimated delivery period is greater than the expected value; If the expected delivery period is not greater than the expected value, it is determined that the second allocated quantity meets the expected production requirements; If the expected delivery cycle is greater than the expected value, the product transportation efficiency is adjusted until the expected delivery cycle is no greater than the expected value, so that the second allocated quantity meets the expected production requirements.
[0006] Preferably, the step of calculating the first production efficiency of each production process area and the online product production progress value of each production line according to the in-and-out time information and the in-and-out quantity information includes: Obtain the completed quantity of products in each production process area according to the in-and-out quantity information; Obtaining the single-area product processing time of each production process area according to the storage-in and storage-out time information; Obtaining a first production efficiency of each production process area according to the number of completed products in each single area and the corresponding processing time of the products in the single area; Obtain the weight coefficient corresponding to each production process area; The online product production progress value of each production line is calculated according to the completed quantity of each single-area product and the weight coefficient, wherein the calculation formula is: ; Among them, Z i represents the production progress value of the online product of the i-th production line, y ij represents the number of products completed in the jth production process area of the i-th production line, w ij represents the weight coefficient corresponding to the jth production process area in the i-th production line, n i Represents the number of production process areas in the i-th production line.
[0007] Preferably, the step of calculating the second production efficiency of each production line according to the in-and-out time information, the in-and-out quantity information and the online product production progress value comprises: Obtain the total quantity of products input and the total quantity of products completed for each production line according to the in-and-out quantity information; Obtain the number of online products for each production line based on the total number of product inputs and the total number of product completions; Obtaining the single-line product processing time of each production line according to the storage and out-of-warehouse time information; The second production efficiency of each production line is calculated according to the total number of products completed, the number of online products, the production progress value of online products and the processing time of single-line products of each production line, wherein the calculation formula is: ; Among them, E i represents the second production efficiency of the i-th production line, M i represents the total number of products completed on the i-th production line, N i represents the number of online products on the i-th production line, Z i represents the production progress value of the online product of the i-th production line, T i Represents the single-line product processing time of the i-th production line.
[0008] Preferably, the step of acquiring the first allocated quantity of each production line according to the order change information and the second production efficiency comprises: Acquire production defect information of PCB production according to the production monitoring information, and acquire the number of production defect according to the production defect information; Obtain the total inventory of products based on the total completed quantity of the products of each production line, and obtain the completed quantity of products based on the total inventory of products and the quantity of production defects; Obtaining the order change quantity according to the order change information, and obtaining the product to-be-processed quantity according to the order change quantity and the product completed quantity; The first allocation quantity of each production line is obtained according to the quantity of products to be processed and each second production efficiency.
[0009] Preferably, the step of calculating the second allocated quantity according to the first production efficiency, the product transfer efficiency and the first allocated quantity comprises: The blending production efficiency of each production process area is calculated according to the first production efficiency and the product transfer efficiency, wherein the calculation formula is: ; Among them, S ij represents the coordinated production efficiency of the jth production process area in the i-th production line, e hf represents the product transfer efficiency of the fth production process area in the hth production line to the jth production process area in the ith production line, r ij represents the first production efficiency of the jth production process area in the i-th production line; The second allocation quantity is calculated according to the blending production efficiency and the first allocation quantity, wherein the calculation formula is: ; Among them, X vij represents the second allocation quantity of the product transferred from the vth production line to the jth production process area in the ith production line, P i represents the first allocation quantity of the i-th production line, S ij It represents the harmonic production efficiency of the jth production process area in the i-th production line, and n represents the number of production process areas.
[0010] Preferably, the step of obtaining the estimated delivery period according to the second allocated quantity and the first production efficiency comprises: Obtaining the production demand time of each production process area according to the second allocated quantity and the corresponding first production efficiency of each production process area; Obtaining the required transfer time of each production process area according to the second allocated quantity and the corresponding product transfer efficiency of each production process area; The production demand time and the corresponding transfer demand time of each production process area are sorted by size, the larger value is used as the single-area completion demand time, and the single-line completion demand time is obtained according to the multiple single-area completion demand times in each production line; The required completion times of the multiple single lines are sorted by size, and the larger value is used as the estimated delivery cycle.
[0011] The present application also provides a PCB production management system based on multi-region management, including: A first acquisition module is used to acquire multiple production line information and multiple production monitoring information of PCB production, wherein the production line information includes multiple production process areas; A second acquisition module is used to acquire product input-output information and product in-and-out information of each production line according to the production monitoring information, wherein the product in-and-out information includes in-and-out time information and in-and-out quantity information; A first calculation module, used for calculating the first production efficiency of each production process area and the online product production progress value of each production line according to the product input-output information and the storage time information; A second calculation module, used to calculate the second production efficiency of each production line according to the product input-output information, storage time information and online product production progress value; A third acquisition module is used to acquire order change information of PCB production, and acquire a first allocation quantity of each production line according to the order change information and the second production efficiency; A third calculation module is used to obtain the product transfer efficiency between every two successive production process areas according to the in-and-out time information and the in-and-out quantity information, and calculate the second allocation quantity according to the first production efficiency, the product transfer efficiency and the first allocation quantity; a fourth acquisition module, configured to acquire an estimated delivery period according to the second allocated quantity and the first production efficiency; A judgment module, used to judge whether the estimated delivery period is greater than an expected value; If the expected delivery period is not greater than the expected value, it is determined that the second allocated quantity meets the expected production requirements; If the expected delivery cycle is greater than the expected value, the product transportation efficiency is adjusted until the expected delivery cycle is no greater than the expected value, so that the second allocated quantity meets the expected production requirements.
[0012] Preferably, the second calculation module comprises: A first acquisition unit is used to acquire the total quantity of product inputs and the total quantity of product completions of each production line according to the product input-output information; A second acquisition unit is used to acquire the number of online products of each production line according to the total number of product inputs and the total number of product completions; A third acquisition unit is used to acquire the single-line product processing time of each production line according to the storage and out-of-warehouse time information; A calculation unit is used to calculate the second production efficiency of each production line according to the total number of products completed, the number of online products, the production progress value of online products and the processing time of single-line products of each production line, wherein the calculation formula is: ; Among them, E i represents the second production efficiency of the i-th production line, M i represents the total number of products completed on the i-th production line, N i represents the number of online products on the i-th production line, Z i represents the production progress value of the online product of the i-th production line, T i Represents the single-line product processing time of the i-th production line.
[0013] The present invention also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above-mentioned PCB production management method based on multi-zone management when executing the computer program.
[0014] The present invention also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned PCB production management method based on multi-region management are implemented.
[0015] The beneficial effects of the present invention are as follows: the present invention accurately reflects the flow of products on the production line through the in-and-out time information and the in-and-out quantity information, and uses the in-and-out time information and the in-and-out quantity information to calculate the first production efficiency of each production process area and the online product production progress value of each production line, and then uses the in-and-out time information, the in-and-out quantity information and the online product production progress value to calculate the second production efficiency of each production line, and the second production efficiency provides a more accurate indicator for the overall production efficiency evaluation of the production line, and then obtains the first allocated quantity of each production line according to the order change information and the second production efficiency, so as to facilitate timely adjustment of the task allocation of the production line according to the changes in order demand, avoiding production chaos or waste of resources due to order changes, and then analyzing the transfer efficiency of products between different production process areas, and combining with different The production efficiency of the same production process area and the initial allocation quantity of products for each production line are used to further optimize the allocation of production tasks, avoid affecting the overall production progress due to transfer efficiency issues, and improve the continuity and coordination of the production process. Then, the estimated delivery cycle is obtained based on the second allocation quantity and the first production efficiency. By comparing the estimated delivery cycle with the expected value, it can be determined whether the current production task allocation meets the expected requirements. If the estimated delivery cycle is greater than the expected value, it is determined that the current production task allocation does not meet the expected requirements. Then, by adjusting the key factor of product transfer efficiency, the production task allocation is re-optimized to ensure that the expected production requirements are ultimately met. Through this dynamic adjustment mechanism, production management can be continuously optimized according to actual conditions. Through iterative adjustments, production plans that meet expectations can be gradually found, which effectively solves the problem of delivery delays and ensures the realization of production goals. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 The figure is a schematic diagram of a method flow of an embodiment of the present application.
[0017] Figure 2 Schematic diagram of the system structure of an embodiment of the present application.
[0018] Figure 3 A schematic diagram of the internal structure of a computer device according to an embodiment of the present application.
[0019] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0020] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0021] like Figure 1-Figure 3 As shown, the present application provides a PCB production management method based on multi-region management, including: S1. Acquire multiple production line information and multiple production monitoring information of PCB production, wherein the production line information includes multiple production process areas; S2. Acquire product in-and-out information of each production line according to the production monitoring information, wherein the product in-and-out information includes in-and-out time information and in-and-out quantity information; S3. Calculate the first production efficiency of each production process area and the online product production progress value of each production line according to the in-and-out time information and the in-and-out quantity information; S4, calculating the second production efficiency of each production line according to the in-and-out time information, the in-and-out quantity information and the online product production progress value; S5. Obtain order change information for PCB production, and obtain a first allocation quantity for each production line according to the order change information and the second production efficiency; S6. Obtain the product transfer efficiency between every two successive production process areas according to the in-and-out time information and the in-and-out quantity information, and calculate the second allocated quantity according to the first production efficiency, the product transfer efficiency and the first allocated quantity; S7. Obtaining an estimated delivery period according to the second allocated quantity and the first production efficiency; S8. Determine whether the estimated delivery period is greater than the expected value; If the expected delivery period is not greater than the expected value, it is determined that the second allocated quantity meets the expected production requirements; If the expected delivery cycle is greater than the expected value, the product transportation efficiency is adjusted until the expected delivery cycle is no greater than the expected value, so that the second allocated quantity meets the expected production requirements.
[0022] As described in the above steps S1-S8, PCB is an electronic component that provides electrical connection and mechanical support for electronic components. With the development of miniaturization and high performance of electronic equipment, the production process of PCB is becoming more and more complicated, and the requirements for production management are also increasing. Traditional extensive management is difficult to meet the needs of high-precision and high-reliability PCB production. Therefore, a multi-region management method came into being. It can more accurately control each link in the production process by subdividing the production process area. This management method aims to improve production efficiency, ensure product quality, optimize resource allocation, and better deal with complex situations in the production process. At present, in the production process of PCB, the order quantity often changes. When the order quantity changes, in order to achieve the expected production target, it is usually necessary to allocate production tasks according to the production capacity of the production line. However, this allocation method has the problem that the production tasks do not match the production capacity of different production process areas in the production line, resulting in the problem that the final production results do not meet the production expectations. The present invention obtains multiple production line information and multiple production monitoring information of PCB production, wherein the production line information refers to the key production process areas that constitute the complete PCB production process, mainly including the graphic process area, the lamination process area, the surface process area and the molding process area; the production monitoring information refers to the detailed record of the product processing conditions in each production line and each production process area during the PCB production process; then, according to the production monitoring information, the in-and-out time information and the in-and-out quantity information are obtained, wherein the in-and-out time information refers to the specific time when the product enters and exits each production line and each production process area; the in-and-out quantity information refers to the specific quantity of the product entering and exiting each production line and each production process area; the in-and-out time information and the in-and-out quantity information can accurately reflect the flow of products on the production line; then, the in-and-out time information and the in-and-out quantity information are used to calculate the first production efficiency of each production process area and the online product of each production line Production progress value, where the first production efficiency refers to the individual production efficiency of each production process area on each production line, and the online product production progress value refers to the production progress of the product in the production state in a single production process area. The online product production progress value can intuitively present the current progress of the product on the production line, and then use the in-and-out time information, in-and-out quantity information and online product production progress value to calculate the second production efficiency of each production line, where the second production efficiency refers to the overall production efficiency of each production line. The calculation of the second production efficiency comprehensively considers the production efficiency of each production process area on each production line and the current production progress of each production process area, thereby providing a more accurate indicator for the overall production efficiency evaluation of the production line. Then, the first allocation quantity of each production line is obtained according to the order change information and the second production efficiency, where the order change information refers to the relevant information that the order content has changed due to various factors after the customer places an order.The first allocated quantity refers to the specific production quantity allocated to each production line according to the order change information, so as to facilitate the timely adjustment of the task allocation of the production line according to the changes in order demand, and avoid production chaos or waste of resources due to order changes. Then, the second allocated quantity is calculated according to the first production efficiency, product transfer efficiency and the first allocated quantity. Among them, the product transfer efficiency refers to the efficiency of a production process area of a production line in transferring products to the subsequent production process areas of the same or another production line. The second allocated quantity refers to the specific quantity of a production process area of a production line in transferring products to the subsequent production process areas of the same or another production line. By analyzing the transfer efficiency of products between different production process areas, combined with the production efficiency of different production process areas and the initial allocation quantity of products for each production line, the production task allocation is further optimized so that production The task allocation is more scientific and reasonable, avoiding the impact of transfer efficiency issues on the overall production progress, improving the consistency and coordination of the production process, and then obtaining the expected delivery cycle based on the second allocation quantity and the first production efficiency. The expected delivery cycle refers to the time required for all production lines to jointly realize the specified product processing quantity in the order change information. Finally, the expected delivery cycle is compared with the expected value to determine whether the current production task allocation meets the expected requirements. If the expected delivery cycle is greater than the expected value, it is determined that the current production task allocation does not meet the expected requirements. By adjusting the key factor of product transfer efficiency, the production task allocation is re-optimized to ensure that the expected production requirements are finally met. Through this dynamic adjustment mechanism, production management can be continuously optimized according to actual conditions. Through iterative adjustments, a production plan that meets expectations can be gradually found, effectively solving the problem of delivery delays and ensuring the realization of production goals. ,
[0023] In one embodiment, the step of calculating the first production efficiency of each production process area and the online product production progress value of each production line according to the in-and-out time information and the in-and-out quantity information includes: S31, obtaining the number of completed products in each production process area according to the in-and-out quantity information; S32, obtaining the single-area product processing time of each production process area according to the storage and warehousing time information; S33, obtaining a first production efficiency of each production process area according to the number of completed products in each single area and the corresponding processing time of the single area products; S34, obtaining a weight coefficient corresponding to each production process area; S35. Calculate the online product production progress value of each production line according to the completed quantity of each single-area product and the weight coefficient, wherein the calculation formula is: ; Among them, Z irepresents the production progress value of the online product of the i-th production line, y ij represents the number of products completed in the jth production process area of the i-th production line, w ij represents the weight coefficient corresponding to the jth production process area in the i-th production line, n i Represents the number of production process areas in the i-th production line.
[0024] As described in the above steps S31-S35, in the present invention, by obtaining the number of completed single-area products and the processing time of single-area products in each production process area, wherein the number of completed single-area products refers to the number of products processed in a single production process area in a single production line, and the processing time of single-area products refers to the processing time of products in a single production process area in a single production line. The single production process area can be individually evaluated by the number of completed single-area products and the processing time of single-area products. Then, the first production efficiency of the corresponding production process area can be obtained by dividing the number of completed single-area products by the corresponding single-area product processing time. The first production efficiency is a quantitative evaluation of the production capacity of each production process area. At the same time, taking into account the different importance of different production process areas in the entire production line, by obtaining the weight coefficient corresponding to each production process area, the contribution of each production process area to the overall production progress of the production line can be more accurately reflected. Finally, the number of completed products in each production process area and its corresponding weight coefficient are comprehensively considered to calculate the online product production progress value of the entire production line. The online product production progress value can be used for the accurate calculation of the second production efficiency of each subsequent production line.
[0025] In one embodiment, the step S4 of calculating the second production efficiency of each production line according to the in-and-out time information, the in-and-out quantity information and the online product production progress value includes: S41, obtaining the total quantity of product input and the total quantity of product completed for each production line according to the in-and-out quantity information; S42, obtaining the number of online products of each production line according to the total number of product inputs and the total number of product completions; S43, obtaining the single-line product processing time of each production line according to the storage and out-of-warehouse time information; S44, calculating the second production efficiency of each production line according to the total number of products completed, the number of online products, the production progress value of online products and the processing time of single-line products of each production line, wherein the calculation formula is: ; Among them, E i represents the second production efficiency of the i-th production line, M i represents the total number of products completed on the i-th production line, N irepresents the number of online products on the i-th production line, Z i represents the production progress value of the online product of the i-th production line, T i Represents the single-line product processing time of the i-th production line.
[0026] As described in the above steps S41-S44, the present invention obtains the number of online products of each production line according to the difference between the total number of product inputs and the total number of product completions, wherein the total number of product inputs refers to the number of products input into a single production line, the total number of product completions refers to the number of products processed by the corresponding production line, and the number of online products refers to the number of products that have been put into the production line but have not yet been processed. Then, the second production efficiency of each production line is calculated according to the total number of product completions of each production line, the number of online products, the online product production progress value and the single-line product processing time according to a specific formula, wherein the single-line product processing time refers to the time that a single production line has processed the product, the total number of product completions in the specific formula reflects the completed production results, and the online product number and the production progress value take into account the status of the products on the current production line. Through this comprehensive calculation method, the actual production capacity of the production line can be more comprehensively and accurately reflected.
[0027] In one embodiment, the step S5 of acquiring the first allocation quantity of each production line according to the order change information and the second production efficiency includes: S51, obtaining production defect information of PCB production according to the production monitoring information, and obtaining the number of production defect information according to the production defect information; S52, obtaining the total inventory of products according to the total completed quantity of the products of each production line, and obtaining the completed quantity of products according to the total inventory of products and the quantity of production defects; S53, obtaining the order change quantity according to the order change information, and obtaining the product to-be-processed quantity according to the order change quantity and the product completed quantity; S54. Obtain a first allocated quantity for each production line according to the number of products to be processed and each second production efficiency.
[0028] As described in the above steps 51-S54, in the present invention, the number of production defects is obtained according to the production defect information, wherein the production defect information refers to the situation of products with quality problems in the production process, and the number of production defects refers to the number of products with quality problems in the production process. The number of completed products is obtained according to the difference between the total inventory of products and the number of production defects, wherein the total inventory of products refers to the sum of the number of products that have been processed by all production lines, and the number of completed products refers to the sum of the number of qualified products that have been processed by all production lines after removing the defective products. Then, the number of products to be processed is obtained according to the difference between the order change quantity and the completed number of products, wherein the number of products to be processed refers to the number of products that still need to be processed. Finally, the first allocation quantity of each production line is obtained according to the number of products to be processed and the second production efficiency, wherein the calculation formula of the first allocation quantity of a single production line is: first allocation quantity=number of products to be processed*(second production efficiency of a single production line / sum of second production efficiencies of all production lines). This allocation method can make full use of the production capacity of each production line, which is conducive to improving the overall production efficiency.
[0029] In one embodiment, the step S6 of calculating the second allocation quantity according to the first production efficiency, the product transfer efficiency and the first allocation quantity comprises: S61. Calculate the blending production efficiency of each production process area according to the first production efficiency and the product transfer efficiency, wherein the calculation formula is: ; Among them, S ij represents the coordinated production efficiency of the jth production process area in the i-th production line, e hf represents the product transfer efficiency of the fth production process area in the hth production line to the jth production process area in the ith production line, r ij represents the first production efficiency of the jth production process area in the i-th production line; S62, calculating a second allocation quantity according to the blending production efficiency and the first allocation quantity, wherein the calculation formula is: ; Among them, X vij represents the second allocation quantity of the product transferred from the vth production line to the jth production process area in the ith production line, P i represents the first allocation quantity of the i-th production line, S ij It represents the harmonic production efficiency of the jth production process area in the i-th production line, and n represents the number of production process areas.
[0030] As described in the above steps S61-S62, the present invention combines the first production efficiency and the product transfer efficiency to calculate the blending production efficiency through a specific formula, wherein the blending production efficiency refers to an indicator that comprehensively considers the production capacity of the production process area itself and the product transfer efficiency between different production process areas. The first production efficiency represents the production capacity of the production process area itself, and the product transfer efficiency represents the smoothness of product transfer between production process areas. Then, the second allocation quantity is calculated based on the blending production efficiency and the first allocation quantity. Allocation based on the blending production efficiency can make full use of the comprehensive advantages of each production process area. The purpose is to ensure that each production process area can undertake a reasonable amount of production tasks according to its actual capacity, so that the distribution of production tasks between areas is more reasonable, which helps to reduce waiting time and resource waste in the production process, thereby improving the production efficiency of the entire production line.
[0031] In one embodiment, the step S7 of obtaining the estimated delivery period according to the second allocated quantity and the first production efficiency includes: S71, obtaining the production demand time of each production process area according to the second allocated quantity and the corresponding first production efficiency of each production process area; S72, obtaining the required transfer time of each production process area according to the second allocated quantity and the corresponding product transfer efficiency of each production process area; S73, sorting the production demand time and the corresponding transfer demand time of each production process area according to size, taking the larger value as the single-area completion demand time, and obtaining the single-line completion demand time according to the multiple single-area completion demand times in each production line; S74, sorting the plurality of single-line completion demand times by size, and taking the larger value as the estimated delivery cycle.
[0032] As described in the above steps S71-S74, the present invention obtains the production demand time of each production process area by dividing the second allocated quantity of each production process area by the corresponding first production efficiency, and obtains the transfer demand time of each production process area by dividing the second allocated quantity of each production process area by the corresponding product transfer efficiency. For each production process area, since the completion of the product depends not only on production but also on transfer, the larger value of the production demand time and the transfer demand time is taken as the single-area completion demand time, wherein the single-area completion demand time refers to the time required for a single production process area to complete the processing of a specified number of products. On this basis, the single-area completion demand times of multiple production process areas in a production line are further integrated to obtain the single-line completion demand time, wherein the single-line completion demand time refers to the time required for a single production line to complete the processing of a specified number of products. Finally, the single-line completion demand times of different production lines are compared, and the maximum value is selected as the estimated delivery cycle, which is an overall estimate of the delivery time of the entire PCB production. The estimated delivery cycle provides a reliable delivery cycle forecast for the enterprise.
[0033] The present application also provides a PCB production management system based on multi-region management, including: A first acquisition module is used to acquire multiple production line information and multiple production monitoring information of PCB production, wherein the production line information includes multiple production process areas; A second acquisition module is used to acquire product in-and-out information of each production line according to the production monitoring information, wherein the product in-and-out information includes in-and-out time information and in-and-out quantity information; A first calculation module, used for calculating the first production efficiency of each production process area and the online product production progress value of each production line according to the in-and-out time information and the in-and-out quantity information; A second calculation module, used for calculating the second production efficiency of each production line according to the in-and-out time information, the in-and-out quantity information and the online product production progress value; A third acquisition module is used to acquire order change information of PCB production, and acquire a first allocation quantity of each production line according to the order change information and the second production efficiency; A third calculation module is used to obtain the product transfer efficiency between every two successive production process areas according to the in-and-out time information and the in-and-out quantity information, and calculate the second allocation quantity according to the first production efficiency, the product transfer efficiency and the first allocation quantity; a fourth acquisition module, configured to acquire an estimated delivery period according to the second allocated quantity and the first production efficiency; A judgment module, used to judge whether the estimated delivery period is greater than an expected value; If the expected delivery period is not greater than the expected value, it is determined that the second allocated quantity meets the expected production requirements; If the expected delivery cycle is greater than the expected value, the product transportation efficiency is adjusted until the expected delivery cycle is no greater than the expected value, so that the second allocated quantity meets the expected production requirements.
[0034] In one embodiment, the second calculation module includes: A first acquisition unit is used to acquire the total quantity of product input and the total quantity of product completion of each production line according to the in-and-out quantity information; A second acquisition unit is used to acquire the number of online products of each production line according to the total number of product inputs and the total number of product completions; A third acquisition unit is used to acquire the single-line product processing time of each production line according to the storage and out-of-warehouse time information; A calculation unit is used to calculate the second production efficiency of each production line according to the total number of products completed, the number of online products, the production progress value of online products and the processing time of single-line products of each production line, wherein the calculation formula is: ; Among them, E i represents the second production efficiency of the i-th production line, M i represents the total number of products completed on the i-th production line, N i represents the number of online products on the i-th production line, Z i represents the production progress value of the online product of the i-th production line, T i Represents the single-line product processing time of the i-th production line.
[0035] The present invention also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned PCB production management method based on multi-region management are implemented.
[0036] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media provided in this application and used in the embodiments may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (SSRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.
[0037] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, device, article or method including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, device, article or method. In the absence of further restrictions, an element defined by the sentence "includes a ..." does not exclude the presence of other identical elements in the process, device, article or method including the element.
[0038] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A PCB production management method based on multi-region management, characterized in that: include: Acquire multiple production line information and multiple production monitoring information of PCB production, wherein the production line information includes multiple production process areas; Acquire product in-and-out information of each production line according to the production monitoring information, wherein the product in-and-out information includes in-and-out time information and in-and-out quantity information; Calculate the first production efficiency of each production process area and the online product production progress value of each production line according to the in-and-out time information and the in-and-out quantity information; Calculating the second production efficiency of each production line according to the in-and-out time information, the in-and-out quantity information and the online product production progress value; Obtaining order change information for PCB production, and obtaining a first allocated quantity for each production line according to the order change information and the second production efficiency; Obtaining the product transfer efficiency between each two successive production process areas according to the in-and-out time information and the in-and-out quantity information, and calculating the second allocation quantity according to the first production efficiency, the product transfer efficiency and the first allocation quantity; Obtaining an estimated delivery period according to the second allocated quantity and the first production efficiency; Determine whether the estimated delivery period is greater than the expected value; If the expected delivery period is not greater than the expected value, it is determined that the second allocated quantity meets the expected production requirements; If the expected delivery cycle is greater than the expected value, the product transportation efficiency is adjusted until the expected delivery cycle is no greater than the expected value, so that the second allocated quantity meets the expected production requirements.
2. A PCB production management method based on multi-region management according to claim 1, characterized in that: The step of calculating the first production efficiency of each production process area and the online product production progress value of each production line according to the in-and-out time information and the in-and-out quantity information includes: Obtain the completed quantity of products in each production process area according to the in-and-out quantity information; Obtaining the single-area product processing time of each production process area according to the storage-in and storage-out time information; Obtaining a first production efficiency of each production process area according to the number of completed products in each single area and the corresponding processing time of the products in the single area; Obtain the weight coefficient corresponding to each production process area; The online product production progress value of each production line is calculated according to the completed quantity of each single-area product and the weight coefficient, wherein the calculation formula is: ; Among them, Z i represents the production progress value of the online product of the i-th production line, y ij represents the number of products completed in the jth production process area of the i-th production line, w ij represents the weight coefficient corresponding to the jth production process area in the i-th production line, n i Represents the number of production process areas in the i-th production line.
3. A PCB production management method based on multi-region management according to claim 1, characterized in that: The step of calculating the second production efficiency of each production line according to the in-and-out time information, the in-and-out quantity information and the online product production progress value comprises: Obtain the total quantity of products input and the total quantity of products completed for each production line according to the in-and-out quantity information; Obtain the number of online products for each production line based on the total number of product inputs and the total number of product completions; Obtaining the single-line product processing time of each production line according to the storage and out-of-warehouse time information; The second production efficiency of each production line is calculated according to the total number of products completed, the number of online products, the production progress value of online products and the processing time of single-line products of each production line, wherein the calculation formula is: ; Among them, E i represents the second production efficiency of the i-th production line, M i represents the total number of products completed on the i-th production line, N i represents the number of online products on the i-th production line, Z i represents the production progress value of the online product of the i-th production line, T i Represents the single-line product processing time of the i-th production line.
4. A PCB production management method based on multi-region management according to claim 3, characterized in that: The step of acquiring the first allocation quantity of each production line according to the order change information and the second production efficiency comprises: Acquire production defect information of PCB production according to the production monitoring information, and acquire the number of production defect according to the production defect information; Obtain the total inventory of products based on the total completed quantity of the products of each production line, and obtain the completed quantity of products based on the total inventory of products and the quantity of production defects; Obtaining the order change quantity according to the order change information, and obtaining the product to-be-processed quantity according to the order change quantity and the product completed quantity; The first allocation quantity of each production line is obtained according to the quantity of products to be processed and each second production efficiency.
5. The PCB production management method based on multi-region management according to claim 1, characterized in that: The step of calculating the second allocated quantity according to the first production efficiency, the product transfer efficiency and the first allocated quantity comprises: The blending production efficiency of each production process area is calculated according to the first production efficiency and the product transfer efficiency, wherein the calculation formula is: ; Among them, S ij represents the coordinated production efficiency of the jth production process area in the i-th production line, e hf represents the product transfer efficiency of the fth production process area in the hth production line to the jth production process area in the ith production line, r ij represents the first production efficiency of the jth production process area in the i-th production line; The second allocation quantity is calculated according to the blending production efficiency and the first allocation quantity, wherein the calculation formula is: ; Among them, X vij represents the second allocation quantity of the product transferred from the vth production line to the jth production process area in the ith production line, P i represents the first allocation quantity of the i-th production line, S ij It represents the harmonic production efficiency of the jth production process area in the i-th production line, and n represents the number of production process areas.
6. A PCB production management method based on multi-region management according to claim 1, characterized in that: The step of obtaining the estimated delivery period according to the second allocated quantity and the first production efficiency comprises: Obtaining the production demand time of each production process area according to the second allocated quantity and the corresponding first production efficiency of each production process area; Obtaining the required transfer time of each production process area according to the second allocated quantity and the corresponding product transfer efficiency of each production process area; The production demand time and the corresponding transfer demand time of each production process area are sorted by size, the larger value is used as the single-area completion demand time, and the single-line completion demand time is obtained according to the multiple single-area completion demand times in each production line; The required completion times of the multiple single lines are sorted by size, and the larger value is used as the estimated delivery cycle.
7. A PCB production management system based on multi-region management, characterized in that: include: A first acquisition module is used to acquire multiple production line information and multiple production monitoring information of PCB production, wherein the production line information includes multiple production process areas; A second acquisition module is used to acquire product in-and-out information of each production line according to the production monitoring information, wherein the product in-and-out information includes in-and-out time information and in-and-out quantity information; A first calculation module, used for calculating the first production efficiency of each production process area and the online product production progress value of each production line according to the in-and-out time information and the in-and-out quantity information; A second calculation module, used to calculate the second production efficiency of each production line according to the in-and-out time information, the in-and-out quantity information and the online product production progress value; A third acquisition module is used to acquire order change information of PCB production, and acquire a first allocation quantity of each production line according to the order change information and the second production efficiency; A third calculation module is used to obtain the product transfer efficiency between every two successive production process areas according to the in-and-out time information and the in-and-out quantity information, and calculate the second allocation quantity according to the first production efficiency, the product transfer efficiency and the first allocation quantity; a fourth acquisition module, configured to acquire an estimated delivery period according to the second allocated quantity and the first production efficiency; A judgment module, used to judge whether the estimated delivery period is greater than an expected value; If the expected delivery period is not greater than the expected value, it is determined that the second allocated quantity meets the expected production requirements; If the expected delivery cycle is greater than the expected value, the product transportation efficiency is adjusted until the expected delivery cycle is no greater than the expected value, so that the second allocated quantity meets the expected production requirements.
8. A PCB production management system based on multi-region management according to claim 7, characterized in that: The second calculation module includes: A first acquisition unit is used to acquire the total quantity of product input and the total quantity of product completion of each production line according to the in-and-out quantity information; A second acquisition unit is used to acquire the number of online products of each production line according to the total number of product inputs and the total number of product completions; A third acquisition unit is used to acquire the single-line product processing time of each production line according to the storage and out-of-warehouse time information; A calculation unit is used to calculate the second production efficiency of each production line according to the total number of products completed, the number of online products, the production progress value of online products and the processing time of single-line products of each production line, wherein the calculation formula is: ; Among them, E i represents the second production efficiency of the i-th production line, M i represents the total number of products completed on the i-th production line, N i represents the number of online products on the i-th production line, Z i represents the production progress value of the online product of the i-th production line, T i Represents the single-line product processing time of the i-th production line.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
Citation Information
Patent Citations
Production management method and system for industrial capacity distribution
CN114169766A
Internet of Things equipment production process supervision system based on big data
CN115793584A
Comprehensive management system for cable production
CN116151508A
Mold production monitoring method and system
CN118229450A
Production line balance analysis method for assisting process route design
CN119294779A