Power supply guarantee management method and system, storage medium and electronic equipment
By obtaining and analyzing the operating status data of the power supply guarantee area, conducting risk analysis and formulating corresponding power supply guarantee plans, the existing system is difficult to prevent and respond to sudden risks in complex power supply environments, and achieving higher risk prevention and control capabilities, power supply stability and safety.
Patent Information
- Application Number
- CN202411863557.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-17
- Publication Date
- 2025-04-11
Smart Images

Figure CN119809333A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of power supply management, and in particular to a power supply management method, system, storage medium and electronic device. Background Art
[0002] Power supply management refers to the formulation and implementation of a series of security measures to ensure that the power supply can continuously, stably and safely meet the needs of users in a specific period or specific area; its purpose is to reduce the risk of power outages, improve power supply reliability, and ensure the normal operation of social production and life. In the existing technology, the current power supply task and its corresponding power supply level are first obtained; according to the current power supply task, the relevant responsibilities of each power supply party are determined. However, when dealing with a complex and changing power supply environment, the existing system is difficult to effectively prevent and respond to sudden risks, and there is room for further improvement in ensuring the stability and safety of power supply. Summary of the invention
[0003] The present disclosure aims to at least solve the technical problem in the prior art that the existing system is difficult to effectively prevent and respond to sudden risks when dealing with a complex and changeable power supply environment.
[0004] To this end, an object of the present disclosure is to propose a power supply management method, the power supply management method comprising:
[0005] Obtain the operating status data of the main network, distribution network and user equipment in the power supply guarantee area;
[0006] Based on the operating status data, obtaining risk analysis results;
[0007] Based on the risk analysis results, obtain power supply guarantee plans, technical requirements and emergency plans.
[0008] In some embodiments, obtaining risk analysis results based on the operating status data includes:
[0009] Analyze the operation status data to obtain preliminary analysis conclusions of the main network, distribution network and user equipment;
[0010] Based on the preliminary analysis conclusions, determine the risk points of the main network, distribution network and user equipment;
[0011] An assessment is performed based on the risk points to obtain risk analysis results.
[0012] In some embodiments, analyzing the operating status data to obtain preliminary analysis conclusions of the main network, the distribution network, and the user equipment includes:
[0013] Performing data processing on the operating status data based on a data analysis method;
[0014] Based on the processed data, comparing the operating status data with a preset threshold;
[0015] Based on the comparison results, a preliminary analysis conclusion is obtained.
[0016] In some embodiments, based on the preliminary analysis conclusion, determining the risk points of the main network, the distribution network, and the user equipment includes:
[0017] Analyze the preliminary analysis conclusions of the main network to determine the risk points of equipment failure, overload and short circuit in the main network;
[0018] Analyze the preliminary analysis conclusions of the distribution network to determine the risk points of equipment aging, line failure, and external force damage in the distribution network;
[0019] Analyze the preliminary analysis conclusions of the user equipment to determine the power safety hazards and equipment failure risk points of the user equipment.
[0020] In some embodiments, performing an assessment based on the risk points to obtain risk analysis results includes: performing an assessment based on the risk points to determine the size of the risk, the scope of impact, and the probability of occurrence.
[0021] In some embodiments, based on the risk analysis results, obtaining a power supply guarantee plan, technical requirements, and an emergency plan includes:
[0022] Based on the risk analysis results, predict the future operation status and risk development trend of the power grid;
[0023] Based on the operation status and risk development trend of the future power grid, predict the risk level;
[0024] Based on the risk level, obtain power supply guarantee plan, technical requirements and emergency plan.
[0025] In some embodiments, the operating status data includes at least voltage, current and temperature parameters.
[0026] Another object of the present disclosure is to provide a power supply guarantee system, comprising:
[0027] An acquisition module is used to obtain the operating status data of the main network, distribution network and user equipment in the power supply guarantee area;
[0028] A risk analysis module, used to obtain risk analysis results based on the operating status data;
[0029] The scheme determination module is used to obtain power supply guarantee schemes, technical requirements and emergency plans based on the risk analysis results.
[0030] Another object of the present disclosure is to provide a storage medium storing a computer program, characterized in that the steps of the above method are performed when the computer program is executed by a processor.
[0031] Another object of the present disclosure is to provide an electronic device, comprising at least a memory and a processor, wherein a computer program is stored in the memory, and wherein the processor implements the steps of the above method when executing the computer program in the memory.
[0032] The embodiments of the present disclosure provide a power supply management method, system, storage medium and electronic device, which have the following beneficial effects:
[0033] The power supply management method includes obtaining the operating status data of the main network, distribution network and user equipment in the power supply area; obtaining the risk analysis results based on the operating status data; and obtaining the power supply plan, technical requirements and emergency plan based on the risk analysis results. By analyzing the operating status data of the main network, distribution network and user equipment in the power supply area, the risk analysis results are obtained to improve the risk prevention and control capabilities; specifying the power supply plan based on the risk analysis results is conducive to specifying the inspection plan in a targeted manner according to the risk analysis results and the user's risk status, ensuring the safe and stable operation of the user-side equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the embodiments of the present disclosure or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0035] Figure 1 It is a schematic diagram of the steps of a power supply management method in an embodiment of the present disclosure;
[0036] Figure 2 It is a schematic diagram of the steps of a power supply management method in an embodiment of the present disclosure;
[0037] Figure 3 It is a schematic diagram of the steps of a power supply management method in an embodiment of the present disclosure;
[0038] Figure 4 It is a schematic diagram of the steps of a power supply management method in an embodiment of the present disclosure. DETAILED DESCRIPTION
[0039] Various aspects and features of the present disclosure are described herein with reference to the drawings.
[0040] It should be understood that various modifications may be made to the embodiments of the present application. Therefore, the above description should not be considered as limiting, but only as an example of an embodiment. Other modifications within the scope and spirit of the present disclosure will occur to those skilled in the art.
[0041] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the present disclosure and, together with the general description of the present disclosure given above and the detailed description of the embodiments given below, serve to explain the principles of the present disclosure.
[0042] These and other characteristics of the present disclosure will become apparent from the following description of a preferred form of embodiment given as a non-limiting example, with reference to the accompanying drawings.
[0043] It should also be understood that, although the present disclosure has been described with reference to some specific examples, those skilled in the art will be able to realize many other equivalent forms of the present disclosure that have the features described in the claims and are therefore within the scope of protection defined thereby.
[0044] The above and other aspects, features and advantages of the present disclosure will become more apparent from the following detailed description when taken in conjunction with the accompanying drawings.
[0045] Specific embodiments of the present disclosure are described hereinafter with reference to the accompanying drawings; however, it should be understood that the embodiments claimed are merely examples of the present disclosure, which may be implemented in a variety of ways. Well-known and / or repeated functions and structures are not described in detail to avoid obscuring the present disclosure with unnecessary or redundant details. Therefore, the specific structural and functional details claimed herein are not intended to be limiting, but merely serve as a basis and representative basis for the claims to teach those skilled in the art to use the present disclosure in a variety of ways with substantially any suitable detailed structure.
[0046] The first embodiment of the present disclosure provides a power supply management method. As shown in the figure, the power supply management method includes:
[0047] S1: Obtain the operating status data of the main network, distribution network and user equipment in the power supply guarantee area;
[0048] Specifically, the operating status data of the main network, distribution network and user equipment in the supply guarantee area are obtained through monitoring equipment, and the operating status data at least includes voltage, current and temperature parameters.
[0049] Through real-time monitoring and data analysis, we can realize real-time monitoring and abnormal warning of the power supply process, and improve the response speed. Continuous monitoring of the power supply line can timely discover and deal with external damage danger points to ensure line safety.
[0050] S2: Obtain risk analysis results based on operating status data;
[0051] Specifically, it includes:
[0052] S201: Analyze the operation status data to obtain preliminary analysis conclusions of the main network, distribution network and user equipment;
[0053] Specifically, it includes:
[0054] S2011: Processing the operation status data based on the data analysis method;
[0055] Exemplarily, the collected data is pre-processed by cleaning, denoising, standardization, etc. to improve the quality and reliability of the data. The operation status data of the main network is further analyzed, such as statistical analysis, trend analysis, pattern recognition, etc.
[0056] S2012: Based on the processed data, the operation status data is compared with a preset threshold value;
[0057] S2013: Based on the comparison results, obtain preliminary analysis conclusions.
[0058] Specifically, the real-time monitored operating status data is compared with the preset threshold to determine whether the data exceeds the normal range. When abnormal data is detected, it indicates that there is a hidden risk. For example, for device temperature, a reasonable temperature threshold can be set based on the device type, historical operating data, etc. When the device temperature exceeds this preset threshold, it can be considered that the device has a fire risk or other potential risks.
[0059] S202: Based on the preliminary analysis conclusions, determine the risk points of the main network, distribution network and user equipment;
[0060] Specifically, the preliminary analysis conclusions of the main network are analyzed to determine the risk points of equipment failure, overload, short circuit in the main network, and the impact of natural disasters on the main network;
[0061] Analyze the preliminary analysis conclusions of the distribution network to determine the risk points of equipment aging, line failures, external force damage in the distribution network, and the impact of user equipment failures on the distribution network;
[0062] Analyze the preliminary analysis conclusions of the user's equipment to determine the power safety hazards of the user's equipment, equipment failure risk points, and illegal power use and power theft.
[0063] S203: Perform assessment based on risk points and obtain risk analysis results.
[0064] Among them, it generally includes the following aspects to analyze each risk point, determine whether the power grid is currently stable and whether there are potential stability problems; determine whether the equipment is operating normally, whether there are faults or abnormal conditions; identify and confirm whether an abnormal event has occurred, as well as the type and severity of the abnormal event.
[0065] A combination of quantitative and qualitative methods is used to evaluate the identified risks and determine the risk analysis results, which include the size of the risk, the scope of impact and the probability of occurrence.
[0066] The magnitude of the risk includes the severity of the consequences of the failure, the possibility of the failure, and the frequency of the failure; the scope of impact reflects which equipment is affected by the failure; the probability of occurrence is usually evaluated based on historical operating status data, equipment conditions, environmental factors, etc., which can be reflected in the following ways: historical failure rate, equipment aging, environmental factors and human factors. The historical failure rate refers to the frequency of failures of equipment or systems in the past period of time. The degree of equipment aging means that the longer the equipment is used, the higher the degree of aging, and the greater the probability of failure. Environmental factors refer to the impact of climate, geological conditions, etc. on the stable operation of equipment or systems, thereby increasing the probability of failure. Human factors refer to operational errors, improper maintenance, etc., which may also increase the probability of failure.
[0067] Conduct risk analysis from the main network, distribution network to user equipment, especially identify hidden equipment and hidden risks, and improve risk prevention and control capabilities;
[0068] S3: Based on the risk analysis results, obtain power supply guarantee plans, technical requirements and emergency plans.
[0069] Specifically include:
[0070] S301: Based on the risk analysis results, predict the future operation status and risk development trend of the power grid;
[0071] Among them, the operating status and risk development trend of the power grid can be reflected by multiple indicators, including voltage stability, frequency stability, power balance, line load rate and equipment temperature. Voltage stability refers to whether the voltage fluctuation range is within the allowable range; frequency stability refers to whether the power grid frequency remains near the rated value; power balance refers to whether the power of power generation and power consumption in the power grid is balanced; line load rate refers to whether the power transmitted by the line is close to or exceeds its design capacity; equipment temperature refers to whether the equipment is overheated and whether it exceeds its maximum allowable operating temperature.
[0072] S302: Predict the risk level based on the future operation status and risk development trend of the power grid;
[0073] Specifically, by real-time monitoring and analysis of the current operating status data of power grid equipment or systems, combined with historical data, equipment conditions, environmental factors, etc., the possible failures of equipment or systems in the future are predicted. The purpose of fault prediction is to discover hidden dangers of equipment failure in advance so that measures can be taken to repair or replace them, thereby avoiding the occurrence of failures or reducing the impact of failures. Among them, time series analysis and data mining methods are used to predict the operating status and risk development trends of the future power grid; machine learning and artificial intelligence technologies are used to predict faults of power grid equipment.
[0074] Failure prediction refers to predicting the risk level and using tools such as risk matrix to grade the risks so that different response measures can be taken later.
[0075] S303: Based on the risk level, obtain power supply guarantee plans, technical requirements and emergency plans.
[0076] A power supply guarantee plan refers to a series of measures and plans formulated to ensure the stability and reliability of power supply. These plans usually include optimization of the grid structure, strengthening of equipment maintenance, establishment of emergency response mechanisms, etc. Technical requirements refer to the technical standards and specifications that need to be followed in the implementation of the power supply guarantee plan. These requirements usually involve aspects such as equipment performance parameters, operating conditions, and maintenance cycles. An emergency plan refers to plans and measures formulated to respond quickly and effectively when failures or accidents may occur during the power supply process. Emergency plans usually include emergency response procedures, division of responsibilities, and preparation of rescue materials.
[0077] When formulating strategies to ensure power supply, it is also necessary to clarify the corresponding technical requirements. For example, for equipment with overheating risks, it is necessary to strengthen heat dissipation measures or improve the temperature resistance level of the equipment.
[0078] Prepare corresponding emergency plans for possible failures or accidents. These plans should clearly define key elements such as emergency response process, division of responsibilities, and rescue measures to ensure that they can be responded to quickly and effectively when failures or accidents occur.
[0079] Based on the predicted fault conditions, formulate targeted power supply guarantee strategies, including strengthening equipment maintenance, optimizing grid structure, and improving equipment reliability.
[0080] For example, suppose that during the risk analysis process, it is found that a transformer in a substation has an overheating risk and may cause equipment failure. Based on this result, the following power supply guarantee strategy and technical requirements can be formulated:
[0081] Power supply guarantee strategy: Strengthen the monitoring and maintenance of transformers, and regularly perform dust cleaning and heat dissipation inspections on transformers.
[0082] Technical requirements: Improve the heat dissipation performance of the transformer, such as adding cooling fans, optimizing heat sinks, etc.
[0083] Emergency plan: formulate an emergency plan for transformer overheating failure, clarify the emergency response process, division of responsibilities and rescue measures, etc. When the transformer temperature exceeds the set threshold, immediately activate the emergency plan for disposal.
[0084] In the present disclosure, according to steps S1-S3, key customers are subject to enhanced inspections, key customer inspection plans are developed and implemented, and scheduled inspections and pre-tests of concealed equipment are enhanced;
[0085] This step includes predicting the failure of key user equipment in order to timely discover and deal with hidden dangers. Specifically, it includes clarifying the inspection objectives and scope, especially for important customers and hidden equipment, and formulating detailed inspection checklists and standards; reasonably determining the inspection cycle based on the type, importance and historical operation of the equipment to ensure that the equipment is inspected in a timely and effective manner; and determining the inspection content;
[0086] The key customer inspection program includes image capture inspection and real-time monitoring inspection of key parts.
[0087] Image capture inspections include regular and comprehensive inspections of user equipment; preventive tests on key equipment and hidden equipment; detailed records of problems and abnormalities found during the inspection, and data analysis to identify problems and take measures in a timely manner.
[0088] Real-time monitoring and inspection of key parts specifically involves installing monitoring equipment at key parts of user equipment to monitor the operating status of the equipment in real time; establishing a remote monitoring platform to transmit monitoring data to the monitoring center in real time to achieve remote monitoring and data analysis of the equipment's operating status; setting up an abnormal alarm function to promptly issue an alarm signal when an abnormality occurs in the equipment's operating status for rapid processing.
[0089] Through image inspection and real-time monitoring inspection of key parts, we can promptly discover the safety hazards in user equipment. For the safety hazards discovered, we will formulate detailed rectification plans, clarify the rectification measures, responsible persons and rectification deadlines; track the implementation of the rectification plans, urge relevant responsible persons to complete the rectification tasks on time, and ensure that the hazards are eliminated in a timely manner.
[0090] During the above process, the inspection content includes the appearance, wiring, insulation performance and operating parameters of the equipment.
[0091] By strengthening user-side equipment inspection and hidden danger management, targeted inspection plans are formulated to ensure the safe and stable operation of user-side equipment.
[0092] In the present disclosure, according to steps S1-S3, the power supply lines are continuously monitored to identify external damage danger points, and the monitoring data is processed and analyzed in real time through big data analysis technology to promptly detect abnormal situations and issue early warning signals; the environment around the power supply lines is regularly checked for hidden dangers; the hidden dangers found are assessed and graded, and corresponding prevention and control measures and emergency plans are formulated according to the risk level, such as a power supply plan that includes installing protective facilities and setting up warning signs.
[0093] S4: Generate a power supply management report based on operating status data, risk analysis results, power supply plan, technical requirements and emergency plans.
[0094] A second embodiment of the present disclosure provides a power supply guarantee system, comprising:
[0095] An acquisition module is used to obtain the operating status data of the main network, distribution network and user equipment in the power supply guarantee area;
[0096] A risk analysis module is used to obtain risk analysis results based on operating status data;
[0097] The solution determination module is used to obtain power supply solutions, technical requirements and emergency plans based on risk analysis results.
[0098] Furthermore, the risk analysis module includes:
[0099] A preliminary analysis unit is used to analyze the operation status data and obtain preliminary analysis conclusions of the main network, distribution network and user equipment;
[0100] The risk determination unit is used to determine the risk points of the main network, distribution network and user equipment based on the preliminary analysis conclusions;
[0101] The result analysis unit is used to evaluate based on risk points and obtain risk analysis results.
[0102] Furthermore, the preliminary analysis units include:
[0103] A data processing subunit, used for processing the operation status data based on a data analysis method;
[0104] A data comparison subunit, for comparing the operating status data with a preset threshold value based on the processed data;
[0105] The conclusion acquisition subunit is used to obtain preliminary analysis conclusions based on the comparison results.
[0106] Furthermore, the risk determination unit includes:
[0107] The main network risk determination subunit is used to analyze the preliminary analysis conclusions of the main network and determine the risk points of equipment failure, overload and short circuit in the main network;
[0108] The distribution network risk determination subunit is used to analyze the preliminary analysis conclusions of the distribution network and determine the risk points of equipment aging, line failures, and external force damage in the distribution network;
[0109] The user equipment risk determination subunit is used to analyze the preliminary analysis conclusions of the user equipment and determine the power safety hazards and equipment failure risk points of the user equipment.
[0110] Furthermore, the solution determination module includes:
[0111] The first prediction unit is used to predict the future operation status and risk development trend of the power grid based on the risk analysis results;
[0112] The second prediction unit is used to predict the risk level based on the future operation status of the power grid and the risk development trend;
[0113] The plan determination unit is used to obtain power supply guarantee plans, technical requirements and emergency plans based on risk levels.
[0114] In this embodiment, the operating status data of the main network, distribution network and user equipment in the power supply guarantee area are analyzed to obtain risk analysis results and improve risk prevention and control capabilities. Power supply guarantee plans are specified based on the risk analysis results, which is conducive to specifying inspection plans in a targeted manner based on the risk analysis results and the user's risk status, ensuring safe and stable operation of user-side equipment.
[0115] A third embodiment of the present disclosure provides a storage medium storing a computer program. When the computer program is executed by a processor, the steps of implementing the above method include:
[0116] S11: Obtaining the operating status data of the main network, distribution network and user equipment in the power supply guarantee area;
[0117] S12: Obtain risk analysis results based on the operating status data;
[0118] S13: Based on the risk analysis results, obtain power supply guarantee plans, technical requirements and emergency plans.
[0119] Of course, other steps of the control method can also be used to implement the above embodiment.
[0120] In this embodiment, the operating status data of the main network, distribution network and user equipment in the power supply guarantee area are analyzed to obtain risk analysis results and improve risk prevention and control capabilities. Power supply guarantee plans are specified based on the risk analysis results, which is conducive to specifying inspection plans in a targeted manner based on the risk analysis results and the user's risk status, ensuring safe and stable operation of user-side equipment.
[0121] A fourth embodiment of the present disclosure provides an electronic device, the electronic device including at least a memory and a processor, the memory storing a computer program, and the processor implementing the steps of the above method when executing the computer program in the memory, specifically including:
[0122] S21: Obtaining the operating status data of the main network, distribution network and user equipment in the power supply guarantee area;
[0123] S22: Obtain risk analysis results based on the operating status data;
[0124] S23: Based on the risk analysis results, obtain power supply guarantee plans, technical requirements and emergency plans.
[0125] Of course, other steps of the control method can also be used to implement the above embodiment.
[0126] In this embodiment, the operating status data of the main network, distribution network and user equipment in the power supply guarantee area are analyzed to obtain risk analysis results and improve risk prevention and control capabilities. Power supply guarantee plans are specified based on the risk analysis results, which is conducive to specifying inspection plans in a targeted manner based on the risk analysis results and the user's risk status, ensuring safe and stable operation of user-side equipment.
[0127] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0128] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0129] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0130] In the embodiments provided in the present application, it should be understood that the disclosed devices / terminal equipment and methods can be implemented in other ways. For example, the device / terminal equipment embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0131] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0132] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0133] If the integrated module is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned motor torque control method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.
[0134] In addition, the features of the embodiments shown in the drawings of the present application or the various embodiments mentioned in this specification are not necessarily understood as independent embodiments. Instead, each feature described in one example of an embodiment can be combined with one or more other desired features from other embodiments to produce other embodiments not described in words or with reference to the drawings.
[0135] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A method for power supply management, characterized in that: include: Obtain the operating status data of the main network, distribution network and user equipment in the power supply guarantee area; Based on the operating status data, obtaining risk analysis results; Based on the risk analysis results, obtain power supply guarantee plans, technical requirements and emergency plans.
2. The power supply management method according to claim 1, characterized in that: Based on the operating status data, a risk analysis result is obtained, including: Analyze the operation status data to obtain preliminary analysis conclusions of the main network, distribution network and user equipment; Based on the preliminary analysis conclusions, determine the risk points of the main network, distribution network and user equipment; An assessment is performed based on the risk points to obtain risk analysis results.
3. The power supply management method according to claim 2, characterized in that: Analyzing the operating status data to obtain preliminary analysis conclusions of the main network, distribution network and user equipment includes: Performing data processing on the operating status data based on a data analysis method; Based on the processed data, comparing the operating status data with a preset threshold; Based on the comparison results, a preliminary analysis conclusion is obtained.
4. The power supply management method according to claim 3, characterized in that: Based on the preliminary analysis conclusions, the risk points of the main network, distribution network and user equipment are determined to include: Analyze the preliminary analysis conclusions of the main network to determine the risk points of equipment failure, overload and short circuit in the main network; Analyze the preliminary analysis conclusions of the distribution network to determine the risk points of equipment aging, line failure, and external force damage in the distribution network; Analyze the preliminary analysis conclusions of the user equipment to determine the power safety hazards and equipment failure risk points of the user equipment.
5. The power supply management method according to claim 2, characterized in that: Performing an assessment based on the risk points to obtain risk analysis results includes: performing an assessment based on the risk points to determine the size of the risk, the scope of impact, and the probability of occurrence.
6. The power supply management method according to claim 1, characterized in that: Based on the risk analysis results, the power supply guarantee plan, technical requirements and emergency plans are obtained, including: Based on the risk analysis results, predict the future operation status and risk development trend of the power grid; Based on the operation status and risk development trend of the future power grid, predict the risk level; Based on the risk level, obtain power supply guarantee plans, technical requirements and emergency plans.
7. The power supply management method according to claim 1, characterized in that: The operating status data at least includes voltage, current and temperature parameters.
8. A power supply system, characterized in that: include: An acquisition module is used to obtain the operating status data of the main network, distribution network and user equipment in the power supply guarantee area; A risk analysis module, used to obtain risk analysis results based on the operating status data; The scheme determination module is used to obtain power supply guarantee schemes, technical requirements and emergency plans based on the risk analysis results.
9. A storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
10. An electronic device, comprising at least a memory and a processor, wherein a computer program is stored in the memory, wherein: The processor implements the steps of the method of any one of claims 1 to 7 when executing the computer program on the memory.
Citation Information
Patent Citations
Power security management and control method for whole process based on distribution and adjustment
CN106651643A
A risk analysis method for graded operation of a guaranteed power supply area based on main-distribution integration
CN109165837A
A method and a device for monitoring a power distribution network
CN109598452A
Power supply guarantee management system
CN110321509A
Intelligent analysis and control method and system for main distribution network scheduling power failure plan
CN112561248A