Scaffold erecting method
Through the scaffolding erecting method in sections and reverse states, the problem of temporary removal and re-equipment of multi-layer deck guardrails is solved, and the rapid safety protection after the deck is turned over is achieved, reducing the risk of falling from high altitudes and lifting operation time.
Patent Information
- Application Number
- CN202510226325.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-27
- Publication Date
- 2025-04-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the overall construction of multi-layer decks and dock loading construction stages, the existing technology is difficult to effectively solve the problems of temporary removal and re-equipment of protective rails, resulting in high-altitude fall risks and increased lifting operation time.
The scaffolding erected method is adopted in sections and reverse states, and the vertical poles and cross bars of the protective railing scaffolding are formed to form a stable safety protection structure.
Ensure that the thin plate segmented deck is equipped with safety protection as soon as possible, reduce the risk of falling from high altitudes, and improve the overall strength and stability of the scaffolding through welding and bolt fixing, reducing the removal workload.
Smart Images

Figure CN119821623A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of scaffolding, in particular to a scaffolding erection method. Background Art
[0002] The multi-layer thin plate deck section edge protection railing is used to prevent the multi-layer deck edge from falling from high altitude. It is used in the two stages of section assembly construction and dock loading construction. There are the following problems in its use:
[0003] First, during the assembly construction phase, due to the excess marking and cutting operations on the edge of the thin deck, and considering that the guardrails are tightened with bolts using chucks and the thin deck edge, the edge guardrails need to be temporarily removed before the excess operations, resulting in the absence of safety guardrails when personnel work on the edge of the deck during the excess operations, creating a risk of falling from the edge of the multi-layer deck. After the excess operations are completed, the edge guardrails need to be restored in time to avoid the risk of falling from the edge of the multi-layer deck.
[0004] Second, during the dock-mounted construction phase, for the total section currently being hoisted and mounted, when it is docked with the total section that has been pre-loaded on the dock, it is necessary to remove the side protective railings of the two total sections while the total section is hoisted but not unhooked and the two total sections are close to docking. Considering safety factors, the side protective railings of the two total sections cannot be removed in advance, resulting in the scaffolding work being removed when the total section is hoisted and before it is hoisted into place, which increases the hoisting operation time.
[0005] Third, if Figure 1 As shown, the existing guardrail tooling usually uses a clamp that is commonly used for thick plate structure ships, which causes the clamp to fit poorly with the deck edge, resulting in poor stability of the guardrail and weak protective effect, and there is a risk of high-altitude falling from the multi-layer deck edge. Summary of the invention
[0006] In view of the deficiencies in the prior art, the present invention provides a scaffolding erection method, which solves the problems mentioned in the above background.
[0007] The present invention provides the following technical solution: a scaffolding erection method, comprising the following steps:
[0008] Step S1: Install the fixed scaffolding horse. In the reverse construction stage of the thin plate segmented deck, a distance position is reserved from the edge of the thin plate segmented deck, a straight line mark is made, and the fixed scaffolding horse installation position is divided, and the fixed scaffolding horse is installed;
[0009] Step S2: installing a docking scaffolding horse, installing a docking scaffolding horse at the lower end of the column of the guardrail scaffolding, and connecting the docking scaffolding horse to the fixed scaffolding horse;
[0010] Step S3: assembling the guardrail scaffolding, measuring the length of the thin plate segmented deck, and assembling the crossbars of the guardrail scaffolding onto the columns of the guardrail scaffolding;
[0011] Step S4: installing the footboard of the guardrail scaffolding;
[0012] Step S5: After the thin plate segmented deck is turned over, a scaffolding is finally formed.
[0013] Preferably, in step S1: the fixed scaffolding horse is welded to the thin plate segmented deck, the fixed position of the fixed scaffolding horse is on a pre-made straight line mark, and the fixed position of the fixed scaffolding horse is aligned with the position of the deck longitudinal bone on the thin plate segmented deck.
[0014] Preferably, in step S2: the docking scaffolding horse is welded to the bottom end of the column, and the docking scaffolding horse is installed to the surface of the fixed scaffolding horse using bolts.
[0015] Preferably, in step S4: a toeboard is installed on the thin plate segmented deck, and the toeboard is located on a side of the guardrail scaffolding away from the fixed scaffolding horse, and the toeboard is in close contact with the surface of the column.
[0016] Preferably, the footboard and the thin plate segmented deck are intermittently welded to reduce deformation of the thin plate during welding and removal, and reduce the workload of removing the footboard.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] 1. In the present invention, during the reverse construction stage of the thin plate segmented deck, fixed scaffolding horses and docking scaffolding horses are respectively installed, and the vertical poles and horizontal poles of the assembled guardrail scaffolding are assembled. The scaffolding is pre-erected in a reversed manner in sections, and the safety protection scaffolding can be used immediately after the sections are turned over, so as to avoid the situation where there is no guardrail scaffolding on the thin plate segmented deck, and reduce the risk of high-altitude fall when installing the guardrail scaffolding.
[0019] 2. The present invention welds the fixed scaffolding horse to the thin plate segmented deck, and uses bolts to fix the fixed scaffolding horse and the butt scaffolding horse to reduce the shaking of the edge protection railing. The fixed scaffolding horse is aligned with the longitudinal bone of the thin plate segmented deck for welding, which improves the overall strength and stability of the scaffolding horse and the scaffolding. Intermittent welding is adopted for the thin plate segmented deck and the butt scaffolding horse and the thin plate deck, which reduces the deformation of the thin plate during welding and removal and reduces the workload of scaffolding horse removal. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the existing structure;
[0021] Figure 2 It is a flow chart of the present invention;
[0022] Figure 3 This is a schematic diagram of the thin plate segmented deck structure of the present invention;
[0023] Figure 4 It is a schematic diagram of the side view structure of the thin plate segmented deck and scaffolding of the present invention;
[0024] Figure 5 It is a schematic diagram of the exploded structure of the thin plate segmented deck and scaffolding of the present invention;
[0025] Figure 6 This is a schematic diagram of the front view structure of the thin plate segmented deck and scaffolding of the present invention.
[0026] In the figure: 1. Thin plate segmented deck; 2. Fixed scaffolding horse; 3. Docking scaffolding horse; 4. Cross bar; 5. Column; 6. Footboard; 7. Clamp. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] See also Figure 2-6 A scaffold erection method, comprising: step S1: installing a fixed scaffolding horse 2, in the reverse construction stage of the thin plate segmented deck 1, a straight line mark is made at a reserved distance position from the edge of the thin plate segmented deck 1, and the installation position of the fixed scaffolding horse 2 is divided, and the fixed scaffolding horse 2 is installed;
[0029] Step S2: installing the docking scaffolding horse 3, the docking scaffolding horse 3 is installed at the lower end of the column 5 of the guardrail scaffolding, and the docking scaffolding horse 3 is connected to the fixed scaffolding horse 2;
[0030] Step S3: assembling the guardrail scaffolding, measuring the length of the thin plate segmented deck 1, and assembling the crossbar 4 of the guardrail scaffolding onto the column 5 of the guardrail scaffolding;
[0031] Step S4: installing the footboard 6 of the guardrail scaffolding;
[0032] Step S5: After the thin plate segmented deck 1 is turned over, a scaffolding is finally formed.
[0033] In step S1 : the fixed scaffolding horse 2 is welded to the thin plate segmented deck 1 , the fixed position of the fixed scaffolding horse 2 is on a pre-made straight line mark, and the fixed position of the fixed scaffolding horse 2 is aligned with the position of the deck longitudinal bone on the thin plate segmented deck 1 .
[0034] In step S2: the docking scaffolding horse 3 is welded to the bottom end of the column 5, and the docking scaffolding horse 3 is installed to the surface of the fixed scaffolding horse 2 using bolts.
[0035] In step S4 , the toeboard 6 is installed on the thin plate segmented deck 1 , and the toeboard 6 is located on the side of the guardrail scaffolding away from the fixed scaffolding horse 2 , and the toeboard 6 is in close contact with the surface of the column 5 .
[0036] The footboard 6 and the thin plate segmented deck 1 are intermittently welded to reduce the deformation of the thin plate during welding and removal, and reduce the workload of removing the footboard 6.
[0037] During the reverse construction phase of the thin plate segmented deck 1, the fixed scaffolding horse 2 and the docking scaffolding horse 3 are installed respectively, and the vertical poles and cross bars 4 of the assembled guardrail scaffolding are assembled. The scaffolding is pre-erected in reverse in sections to ensure that the safety protection scaffolding can be used as soon as possible after the section is turned over, to avoid the situation where there is no guardrail scaffolding on the thin plate segmented deck 1, to reduce the risk of high-altitude fall when installing the guardrail scaffolding, the fixed scaffolding horse 2 is welded to the thin plate segmented deck 1, and the fixed scaffolding horse 2 and the docking scaffolding horse 3 are fixed with bolts to reduce the shaking of the edge guardrail, and the fixed scaffolding horse 2 is aligned with the longitudinal bone of the thin plate segmented deck 1 for welding, which improves the overall strength and stability of the scaffolding horse and scaffolding; the thin plate segmented deck 1 and the docking scaffolding horse 3 are intermittently welded to the thin plate deck to reduce the deformation of thin plate welding and removal and reduce the workload of scaffolding horse removal.
[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A scaffolding erection method, characterized in that: The following steps are involved: Step S1: Install the fixed scaffolding horse (2). During the reverse construction phase of the thin plate segmented deck (1), a straight line mark is made at a distance from the edge of the thin plate segmented deck (1), and the installation position of the fixed scaffolding horse (2) is divided, and the fixed scaffolding horse (2) is installed; Step S2: installing a docking scaffolding horse (3), the docking scaffolding horse (3) is installed at the lower end of the column (5) of the guardrail scaffolding, and the docking scaffolding horse (3) is connected to the fixed scaffolding horse (2); Step S3: assembling the guardrail scaffolding, measuring the length of the thin plate segmented deck (1), and assembling the crossbar (4) of the guardrail scaffolding onto the upright column (5) of the guardrail scaffolding; Step S4: installing the footboard (6) of the guardrail scaffolding; Step S5: After the thin plate segmented deck (1) is turned over, a scaffolding is finally formed.
2. A scaffolding erection method according to claim 1, characterized in that: In the step S1: the fixed scaffolding horse (2) is welded to the thin plate segmented deck (1), the fixed position of the fixed scaffolding horse (2) is on a pre-made straight line mark, and the fixed position of the fixed scaffolding horse (2) is aligned with the position of the deck longitudinal bone on the thin plate segmented deck (1).
3. A scaffolding erection method according to claim 1, characterized in that: In the step S2: the docking scaffolding horse (3) is welded to the bottom end of the column (5), and the docking scaffolding horse (3) is installed to the surface of the fixed scaffolding horse (2) using bolts.
4. A scaffolding erection method according to claim 1, characterized in that: In the step S4: the footboard (6) is installed on the thin plate segmented deck (1), and the footboard (6) is located on the side of the guardrail scaffolding away from the fixed scaffolding horse (2), and the footboard (6) is in close contact with the surface of the column (5).
5. A scaffolding erection method according to claim 1, characterized in that: The footboard (6) and the thin plate segmented deck (1) are intermittently welded to reduce the deformation of the thin plate during welding and removal, and reduce the workload of removing the footboard (6).
Citation Information
Patent Citations
Fabricated scaffold and using method thereof
CN101844612A
Installation method of permanently retainable tool eye plate
CN111661272A
Hoisting method for large-span deck segment
CN112550624A
Combined handrail for edge opening of ship deck
CN119239832A
Guard bar for deck
CN203486096U